here - Builders Licence: BLD172104

Transcription

here - Builders Licence: BLD172104
Ground Control Solutions
Director
Address
Phone
Email
Web
Builders Licence
Supervisors licence
Phill Barry
549 Yatala Vale Road, Fairview Park, SA 5126
0418 828 483
[email protected]
www.rwsolutions.net.au
BLD172104
BLD 177723
Company Brief
RW Solutions started operating in May 2001 trading as Retaining Wall Solutions Pty Ltd.
Specialising in all types of retaining walls & erosion control systems. Realising that there was a need for
ground control solutions in South Australia we started developing system & specialised equipment to fit the
work, we also developed a very good repour with Transport SA engineers & Tony Meyer from ROCKTEST
consulting.
We are a small yet highly specialised company that over the past 14 years we have been involved
with many different & difficult site conditions. Many new products & systems have pioneered into South
Australia by RW Solutions
Are aim is to solve problem for our clients, in the greater majority of projects unforseen issues will
appear, because we have a good understanding of the engineering, constructability, geological and
environmental components of each project. We are able to work together with the client and engineers to
give an economical solution for the project.
By combining many components of our work we can take most project from start to completion
without the need to use contractor’s i.e.
• Rock scaling using either Spider EWP or industrial rope access
o Light scaling:
Pry bars, Crow bars
o Medium scaling:
Air bags, hydraulic jacks
o Heavy Scaling:
Drilling & expanding grouts
• Rock drilling
o 28mm to 51mm top hole hammer
o 85mm to 100mm down hole hammers
o 100mm klaw drill
• Injection grouting & rock bolting
• Rock fall drapes
o Maccaferri
Double twist & HEA panels
o Geobrugg
Tecco 45/2, 80/2, 65/3 & Spider
• Catch fences
o Maccaferri
OM500kJ
o Geobrugg
Tecco T35, GBE100
• Dry shot-crete concrete
Keynote Projects
•
2001
Maccaferri double twist drape
o
o
o
Location
Client
Scope of work
§
•
2002
:Green Hill Road, Green Hill, South Australia
:RPC Roads & Transport SA
:Rock scaling, Rope access, installing 1,800m2 mesh
Google Earth
54 H 288252.45 m E 6129980.80 m S
Greatest area of Maccaferri double twist drape in the southern hemisphere “2002”
o
o
o
Location
Client
Scope of work
§
:Gorge Road, Castambul, South Australia
:Transport SA & Works Infrastructure
:Rock scaling, Rope access, installing 12,000m2 mesh
Google Earth: 54 H 293840.65 m E 6139875.74 m S
•
2003
Maccaferri double twist drape
o Location
:Bogong High Plains Road, Clover Dam, Victoria
o Client
:RPC roads & Vic Roads “Joe Black”
o Scope of work :Rock scaling, Rope access, installing 2.500m2 mesh
§
Google Earth: 55 H 519437.39 m E 5929197.17 m S
Install first Soil Panel system in Australia
o Location
:Main Road, Belair, South Australia
o Client
:SA Water
o Scope of work :Rock scaling, Rope access, Rock drilling ,installing 65m2 Soil Panel
•
2006
•
2007
Install first Macaferri 500kJ barrier in Australia
o Location
:Boral Quarry, Burnside, South Australia
o Client
:Boral construction materials
o Scope of work :Rock scaling, Rope access, Rock drilling ,installing 60m2 500kj Barrier
•
2009
Install first Geobrugg Deltax G80/2 drapery in Australia
o Location
:Gorge Road, Athelstone, South Australia
o Client
:DPTI “Transport SA”
o Scope of work :Rock scaling, Rope access, installing 2,500m2 mesh
o Project Value
:$125,000.00 +gst
§ Google Earth: 54 H 291133.24 m E 6139667.57 m S
•
2010
Install Macaferri OM500kJ barrier
o Location
:Gorge Road, Castambul, South Australia
o Client
:DPTI “Transport SA”
o Scope of work :Rock scaling, Rope access, installing 50m long fence & 650m2 drape mesh
o Project Value
:$81,000.00 +gst
§
•
2011
Install first Geobrugg 100kJ barrier in South Australia
o Location
:Adelaide Crafers freeway, Urrbrae, South Australia
o Client
:DPTI “Transport SA”
o Scope of work :Rock Drilling, Rope access, installing 60m rock fall fence
o Project value
:$81,000.00 +gst
§
•
2011
Google Earth: 54 H 295672.93 m E 6139999.93 m S
Google Earth : 54 H 285429.90 m E 6127706.51 m S
Install first Geobrugg Deltax G45/2 drapery in Australia
o
o
o
o
•
2011
Location
Client
Scope of work
Project value
Installing first Geobrugg Deltax G80/2 hybrid barrier in the southern hemisphere
o Location
:Adelaide Crafers freeway, Urrbrae, South Australia
o Client
:DPTI “Transport SA”
o Scope of work :Rock scaling, Rope access, installing 12,000m2 mesh
o Project value
: $195,000.00 +gst
§
•
2012
:Marino boardwalk, Marino, South Australia
:Seacon Australia Pty Ltd
:Rock scaling, Rope access, installing 650m2 mesh
: $35,000 +gst
Google earth
54 H 285422.32 m E 6127923.41 m S
Install first Geobrugg Tecco mesh / rock bolt system in South Australia
o Location
:Gorge Road, Castambul, South Australia
o Client
:DPTI “Transport SA”
o Scope of work :Rock Drilling, Rope access, installing 200m2 pinned Tecco mesh
o Project Value
:$42,500.00 +gst
§
Google Earth
54 H 294536.04 m E 6139213.99 m S
•
2013
Install first Geobrugg Tecco mesh & gabion structure system in Australia
o Location
:Adelaide Crafers freeway, Mt Osmond, South Australia
o Client
:DPTI “Transport SA”
o Scope of work :Soil Nailing, installing 100m2 tecco mesh & gabions
o Project value
: $72,000 +gst
Install first Geobrugg hybrid attenuator system
o Location
:Kanmantoo, South Australia
o Client
:Hillgrove resources
o Scope of work :Rock scaling, Rope access, installing 10,000m2 deltax mesh
o Project value
: $130,000.00 +gst +All Materials Supplied by the client
•
2013
•
2014
Installed the first ballast stone retaining structure
o Location
:Randal Street, Castambul, South Australia
o Client
:DPTI & Mid Murray Council
o Scope of work :Rope access, Soil Nailing, installing Tecco mesh & ballast cage
o Project value
: $135,000.00 +gst
•
2014
Drain refurbishment & rock bolting
o Location
:Blue Lake , Mount Gambier, South Australia
o Client
:GEM & SA Water
o Scope of work :Rope access, Rock bolting & shot-creting
o Project value
: $151,000.00 +gst
Equipment
•
Trucks
Ø
Ø
Ø
Ø
Ø
•
Rock Drilling
Ø 4 hand held pneumatic rock drills
1 @ SIG PLB 29 air leg
2 @ BBD 94W air leg
1 @ CP0069 Sinker drill
Ø 1 hydraulic drill
Ø 1 pneumatic drifter
Ø 2 hydraulic augers
Ø Marini DACHS drill rig
o EP95 Rotation head
o MA100 top hole hammer
o QXL 35 Down hole hammer
o 100mm continuous flute auger
A variety of custom built aluminium drill rigs
Ø large selection of rods & tips to suit
•
Machinery
Ø
Ø
Ø
Ø
Ø
•
Vertical access
Ø Purpose built dedicated shipping container full of roped access equipment.
Hino 8 ton flatbed with a 3 ton unic crane
Mazda duel cab 4 ton tipper
Isuzu Dual cab 4x4 / crane service truck
Isuzu 8 ton 3 way tipper
10 ton custom built plant trailer
400cfm compressor
Lova dry shotcrete machine
5 ton excavator
miniature bobcat
Monitor 3700 spider lift “Elevated work platform”
Commercial Clients
•
Public Authorities
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Department of Transport Energy and Infrastructure (DTEI): Road and Marine
Trans Adelaide Rail
Department of Environment and Heritage
SA Water
Vic Roads
Australian Rail Track Corporation (ARTC)
Country Water NSW
•
Local Councils
Ø
Ø
Ø
Ø
City of Playford
City of Norwood Payneham & St Peters
City of Mitcham
City of Marion
•
Civil and Mining
Contractors
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Rocktest Consulting
Rock Australia
Transfield services
ABI Group
Bardavcol
Built Environs
Works infrastructure
McMahon Joint venture
Seacon
•
Mining Companies
Ø
Ø
Ø
Ø
Sibelco Australia
Boral Resources
Hansen
Hillgrove Resources
Recent Relevant Ground Control Projects
Date
1999
2001
2002
2003
Location
South Eastern freeway,
Devils Elbow
South Eastern freeway,
Toll Gate
Southern Expressway
Stage 2, Flaxmill Bridge
Greenhill Road, Green
Hills
Gorge Road, Black Hill
Conservation Park
Mt Bogone Victoria
Dartmouth Dam Victoria
Client
McMahon Joint venture
McMahon Joint venture
Built Environs
Project
Install 6m high x 250m long Rockwood classic
retaining wall
Install 6m high Permacrib retaining wall
Works Infrastructure/DTEI
Install 6.5m high x 400m long Permacrib retaining
wall on both sides of road
Install 500m2 Maccaferri draped mesh
Works Infrastructure/DTEI
Install 8500m2 Maccaferri draped mesh
Works Infrastructure/ Vic
Roads
Works Infrastructure/ Vic
Roads
Install 500m2 Maccaferri draped mesh
Scale 2t rock from 30m high cliff using roped access
2006
Belair
Rail/Water/Road
SA Water
Install Soil Panel system
2007
Mount Tamborine,
Queensland
Kuranda Railway, Qld
Blue Lake, Mt. Gambier
Greenhill Quarry
Gorge Road, Castambul
White rock quarry
Green hill Road, Greenhill
Rock Engineering Australia
Rock drilling 800 holes on a 50m high slope for a
pinned Geobrugg Tecco system
Install 1000kJ Geobrugg rock fall barrier
Rock scaling along the outlet pipes of the blue lake
Install Maccaferri 500kJx 40m long rock fall barrier
Install Maccaferri 500kJ x 60m long rock fall barrier
Install 500m2 Maccaferri draped mesh
Install Maccaferri HEA mesh and 500m2 Maccaferri
draped mesh
Myponga Dam
SA Water
Rock scaling. Install Maccaferri HEA mesh
and Geobrugg Tecco mesh system
Gorge Road, Athelstone
Gorge Road, Castambul
Lilydale mine, Victoria
DTEI
DTEI
Sibelco Australia
Install 2500m2 Geobrugg Deltax G80/2 rock fall mesh
Install 1800m2 Maccaferri draped mesh
Install surface extensometers from crest to toe using
roped access
Broken Hill NSW
Country Water
Shotcrete stone retaining wall
Blackwood Rail cutting
Miramonti, South Eastern
freeway
Eden Hills rail cutting
Marino Rocks
Miramonti, South Eastern
freeway Stage 1
Morialta Falls, Morialta
Petworth Rail
Sleeps Hill Tunnel
South Eastern freeway,
Glen Osmond
Trans Adelaide
DTEI
Rocktest Consulting
Rocktest Consulting
Transfield Services
DPTI
Rock Bolting
Install 53m Geobrugg 100kj barrier and 600m2
Maccaferri draped mesh
Rock scaling
Install 650m2 Geobrugg Deltax rock fall netting G45/2
Install Geobrugg hybrid barrier with 1200m2 Deltax
draped mesh
Inspection of rock climbing anchors using roped access
Inspection of rock slopes in rail corridors
Install 300m2 Maccaferri draped mesh
Install 50m2 Geobrugg Tecco pinned mesh
Gorge Road,
Castambul
DPTI
Install 30m2 Geobrugg Tecco pinned mesh
Miramonti, South eastern
freeway Stage 2
Gumeracha Weir
DPTI
Cape Jervis Ferry terminal
DPTI
Hillgrove Mine,
Kanmantoo
Hillgrove Resources
Install Geobrugg hybrid barrier with 1300m2 Deltax
draped mesh
Install 30m2 Geobrugg Tecco pinned mesh netting
Shot-crete 20 m2
Install 6 rock bolt anchors
Install 25 ton concrete fender block
Install 1200m2 Geobrugg Deltax pinned mesh
netting.
Install first Geobrugg hybrid attenuator system
2008
2009
2010
2011
2012
2013
Rock Engineering Australia
SA Water
Boral Resources
DTEI
Hanson
DTEI
Trans Adelaide
Seacon and City of Marion
DTEI
DPTI
2014
Gorge Road, Paracombe
DPTI
Install 20m2 Geobrugg Tecco pinned mesh
Gorge Road, Paracombe
DPTI
Rock scaling
Gorge Road, Castambul
DPTI
Install 30m2 Geobrugg Tecco pinned mesh
Gorge Road, Castambul
DPTI
Rock scaling
Morgan Pump station
SA Water
Retaining wall repair & shot-crete
Aldgate
DPTI
First ballast cage structure
Randal street Mannum
Mid Murray council
First Tecco & Ballast cage
Mt Gambier
SA Water
Rock drilling and Shot-crete drainage liner

Similar documents