here - Builders Licence: BLD172104
Transcription
here - Builders Licence: BLD172104
Ground Control Solutions Director Address Phone Email Web Builders Licence Supervisors licence Phill Barry 549 Yatala Vale Road, Fairview Park, SA 5126 0418 828 483 [email protected] www.rwsolutions.net.au BLD172104 BLD 177723 Company Brief RW Solutions started operating in May 2001 trading as Retaining Wall Solutions Pty Ltd. Specialising in all types of retaining walls & erosion control systems. Realising that there was a need for ground control solutions in South Australia we started developing system & specialised equipment to fit the work, we also developed a very good repour with Transport SA engineers & Tony Meyer from ROCKTEST consulting. We are a small yet highly specialised company that over the past 14 years we have been involved with many different & difficult site conditions. Many new products & systems have pioneered into South Australia by RW Solutions Are aim is to solve problem for our clients, in the greater majority of projects unforseen issues will appear, because we have a good understanding of the engineering, constructability, geological and environmental components of each project. We are able to work together with the client and engineers to give an economical solution for the project. By combining many components of our work we can take most project from start to completion without the need to use contractor’s i.e. • Rock scaling using either Spider EWP or industrial rope access o Light scaling: Pry bars, Crow bars o Medium scaling: Air bags, hydraulic jacks o Heavy Scaling: Drilling & expanding grouts • Rock drilling o 28mm to 51mm top hole hammer o 85mm to 100mm down hole hammers o 100mm klaw drill • Injection grouting & rock bolting • Rock fall drapes o Maccaferri Double twist & HEA panels o Geobrugg Tecco 45/2, 80/2, 65/3 & Spider • Catch fences o Maccaferri OM500kJ o Geobrugg Tecco T35, GBE100 • Dry shot-crete concrete Keynote Projects • 2001 Maccaferri double twist drape o o o Location Client Scope of work § • 2002 :Green Hill Road, Green Hill, South Australia :RPC Roads & Transport SA :Rock scaling, Rope access, installing 1,800m2 mesh Google Earth 54 H 288252.45 m E 6129980.80 m S Greatest area of Maccaferri double twist drape in the southern hemisphere “2002” o o o Location Client Scope of work § :Gorge Road, Castambul, South Australia :Transport SA & Works Infrastructure :Rock scaling, Rope access, installing 12,000m2 mesh Google Earth: 54 H 293840.65 m E 6139875.74 m S • 2003 Maccaferri double twist drape o Location :Bogong High Plains Road, Clover Dam, Victoria o Client :RPC roads & Vic Roads “Joe Black” o Scope of work :Rock scaling, Rope access, installing 2.500m2 mesh § Google Earth: 55 H 519437.39 m E 5929197.17 m S Install first Soil Panel system in Australia o Location :Main Road, Belair, South Australia o Client :SA Water o Scope of work :Rock scaling, Rope access, Rock drilling ,installing 65m2 Soil Panel • 2006 • 2007 Install first Macaferri 500kJ barrier in Australia o Location :Boral Quarry, Burnside, South Australia o Client :Boral construction materials o Scope of work :Rock scaling, Rope access, Rock drilling ,installing 60m2 500kj Barrier • 2009 Install first Geobrugg Deltax G80/2 drapery in Australia o Location :Gorge Road, Athelstone, South Australia o Client :DPTI “Transport SA” o Scope of work :Rock scaling, Rope access, installing 2,500m2 mesh o Project Value :$125,000.00 +gst § Google Earth: 54 H 291133.24 m E 6139667.57 m S • 2010 Install Macaferri OM500kJ barrier o Location :Gorge Road, Castambul, South Australia o Client :DPTI “Transport SA” o Scope of work :Rock scaling, Rope access, installing 50m long fence & 650m2 drape mesh o Project Value :$81,000.00 +gst § • 2011 Install first Geobrugg 100kJ barrier in South Australia o Location :Adelaide Crafers freeway, Urrbrae, South Australia o Client :DPTI “Transport SA” o Scope of work :Rock Drilling, Rope access, installing 60m rock fall fence o Project value :$81,000.00 +gst § • 2011 Google Earth: 54 H 295672.93 m E 6139999.93 m S Google Earth : 54 H 285429.90 m E 6127706.51 m S Install first Geobrugg Deltax G45/2 drapery in Australia o o o o • 2011 Location Client Scope of work Project value Installing first Geobrugg Deltax G80/2 hybrid barrier in the southern hemisphere o Location :Adelaide Crafers freeway, Urrbrae, South Australia o Client :DPTI “Transport SA” o Scope of work :Rock scaling, Rope access, installing 12,000m2 mesh o Project value : $195,000.00 +gst § • 2012 :Marino boardwalk, Marino, South Australia :Seacon Australia Pty Ltd :Rock scaling, Rope access, installing 650m2 mesh : $35,000 +gst Google earth 54 H 285422.32 m E 6127923.41 m S Install first Geobrugg Tecco mesh / rock bolt system in South Australia o Location :Gorge Road, Castambul, South Australia o Client :DPTI “Transport SA” o Scope of work :Rock Drilling, Rope access, installing 200m2 pinned Tecco mesh o Project Value :$42,500.00 +gst § Google Earth 54 H 294536.04 m E 6139213.99 m S • 2013 Install first Geobrugg Tecco mesh & gabion structure system in Australia o Location :Adelaide Crafers freeway, Mt Osmond, South Australia o Client :DPTI “Transport SA” o Scope of work :Soil Nailing, installing 100m2 tecco mesh & gabions o Project value : $72,000 +gst Install first Geobrugg hybrid attenuator system o Location :Kanmantoo, South Australia o Client :Hillgrove resources o Scope of work :Rock scaling, Rope access, installing 10,000m2 deltax mesh o Project value : $130,000.00 +gst +All Materials Supplied by the client • 2013 • 2014 Installed the first ballast stone retaining structure o Location :Randal Street, Castambul, South Australia o Client :DPTI & Mid Murray Council o Scope of work :Rope access, Soil Nailing, installing Tecco mesh & ballast cage o Project value : $135,000.00 +gst • 2014 Drain refurbishment & rock bolting o Location :Blue Lake , Mount Gambier, South Australia o Client :GEM & SA Water o Scope of work :Rope access, Rock bolting & shot-creting o Project value : $151,000.00 +gst Equipment • Trucks Ø Ø Ø Ø Ø • Rock Drilling Ø 4 hand held pneumatic rock drills 1 @ SIG PLB 29 air leg 2 @ BBD 94W air leg 1 @ CP0069 Sinker drill Ø 1 hydraulic drill Ø 1 pneumatic drifter Ø 2 hydraulic augers Ø Marini DACHS drill rig o EP95 Rotation head o MA100 top hole hammer o QXL 35 Down hole hammer o 100mm continuous flute auger A variety of custom built aluminium drill rigs Ø large selection of rods & tips to suit • Machinery Ø Ø Ø Ø Ø • Vertical access Ø Purpose built dedicated shipping container full of roped access equipment. Hino 8 ton flatbed with a 3 ton unic crane Mazda duel cab 4 ton tipper Isuzu Dual cab 4x4 / crane service truck Isuzu 8 ton 3 way tipper 10 ton custom built plant trailer 400cfm compressor Lova dry shotcrete machine 5 ton excavator miniature bobcat Monitor 3700 spider lift “Elevated work platform” Commercial Clients • Public Authorities Ø Ø Ø Ø Ø Ø Ø Department of Transport Energy and Infrastructure (DTEI): Road and Marine Trans Adelaide Rail Department of Environment and Heritage SA Water Vic Roads Australian Rail Track Corporation (ARTC) Country Water NSW • Local Councils Ø Ø Ø Ø City of Playford City of Norwood Payneham & St Peters City of Mitcham City of Marion • Civil and Mining Contractors Ø Ø Ø Ø Ø Ø Ø Ø Ø Rocktest Consulting Rock Australia Transfield services ABI Group Bardavcol Built Environs Works infrastructure McMahon Joint venture Seacon • Mining Companies Ø Ø Ø Ø Sibelco Australia Boral Resources Hansen Hillgrove Resources Recent Relevant Ground Control Projects Date 1999 2001 2002 2003 Location South Eastern freeway, Devils Elbow South Eastern freeway, Toll Gate Southern Expressway Stage 2, Flaxmill Bridge Greenhill Road, Green Hills Gorge Road, Black Hill Conservation Park Mt Bogone Victoria Dartmouth Dam Victoria Client McMahon Joint venture McMahon Joint venture Built Environs Project Install 6m high x 250m long Rockwood classic retaining wall Install 6m high Permacrib retaining wall Works Infrastructure/DTEI Install 6.5m high x 400m long Permacrib retaining wall on both sides of road Install 500m2 Maccaferri draped mesh Works Infrastructure/DTEI Install 8500m2 Maccaferri draped mesh Works Infrastructure/ Vic Roads Works Infrastructure/ Vic Roads Install 500m2 Maccaferri draped mesh Scale 2t rock from 30m high cliff using roped access 2006 Belair Rail/Water/Road SA Water Install Soil Panel system 2007 Mount Tamborine, Queensland Kuranda Railway, Qld Blue Lake, Mt. Gambier Greenhill Quarry Gorge Road, Castambul White rock quarry Green hill Road, Greenhill Rock Engineering Australia Rock drilling 800 holes on a 50m high slope for a pinned Geobrugg Tecco system Install 1000kJ Geobrugg rock fall barrier Rock scaling along the outlet pipes of the blue lake Install Maccaferri 500kJx 40m long rock fall barrier Install Maccaferri 500kJ x 60m long rock fall barrier Install 500m2 Maccaferri draped mesh Install Maccaferri HEA mesh and 500m2 Maccaferri draped mesh Myponga Dam SA Water Rock scaling. Install Maccaferri HEA mesh and Geobrugg Tecco mesh system Gorge Road, Athelstone Gorge Road, Castambul Lilydale mine, Victoria DTEI DTEI Sibelco Australia Install 2500m2 Geobrugg Deltax G80/2 rock fall mesh Install 1800m2 Maccaferri draped mesh Install surface extensometers from crest to toe using roped access Broken Hill NSW Country Water Shotcrete stone retaining wall Blackwood Rail cutting Miramonti, South Eastern freeway Eden Hills rail cutting Marino Rocks Miramonti, South Eastern freeway Stage 1 Morialta Falls, Morialta Petworth Rail Sleeps Hill Tunnel South Eastern freeway, Glen Osmond Trans Adelaide DTEI Rocktest Consulting Rocktest Consulting Transfield Services DPTI Rock Bolting Install 53m Geobrugg 100kj barrier and 600m2 Maccaferri draped mesh Rock scaling Install 650m2 Geobrugg Deltax rock fall netting G45/2 Install Geobrugg hybrid barrier with 1200m2 Deltax draped mesh Inspection of rock climbing anchors using roped access Inspection of rock slopes in rail corridors Install 300m2 Maccaferri draped mesh Install 50m2 Geobrugg Tecco pinned mesh Gorge Road, Castambul DPTI Install 30m2 Geobrugg Tecco pinned mesh Miramonti, South eastern freeway Stage 2 Gumeracha Weir DPTI Cape Jervis Ferry terminal DPTI Hillgrove Mine, Kanmantoo Hillgrove Resources Install Geobrugg hybrid barrier with 1300m2 Deltax draped mesh Install 30m2 Geobrugg Tecco pinned mesh netting Shot-crete 20 m2 Install 6 rock bolt anchors Install 25 ton concrete fender block Install 1200m2 Geobrugg Deltax pinned mesh netting. Install first Geobrugg hybrid attenuator system 2008 2009 2010 2011 2012 2013 Rock Engineering Australia SA Water Boral Resources DTEI Hanson DTEI Trans Adelaide Seacon and City of Marion DTEI DPTI 2014 Gorge Road, Paracombe DPTI Install 20m2 Geobrugg Tecco pinned mesh Gorge Road, Paracombe DPTI Rock scaling Gorge Road, Castambul DPTI Install 30m2 Geobrugg Tecco pinned mesh Gorge Road, Castambul DPTI Rock scaling Morgan Pump station SA Water Retaining wall repair & shot-crete Aldgate DPTI First ballast cage structure Randal street Mannum Mid Murray council First Tecco & Ballast cage Mt Gambier SA Water Rock drilling and Shot-crete drainage liner