JUIN 2014 - Site officiel MINEPAT
Transcription
JUIN 2014 - Site officiel MINEPAT
REPUBLIQUE DU CAMEROUN Paix-Travail-Patrie - ------MINISTERE DE L’ECONOMIE, DE LA PLANIFICATION ET DE L’AMENAGEMENT DU TERRITOIRE -------SECRETARIAT GENERAL --------DELEGATION REGIONALE DU SUD OUEST REPUBLIC OF CAMEROON Peace-Work-Fatherland -------MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENT --------PERMANENT SECRETARIAT -------SOUTH WEST REGIONAL DELEGATION JUIN 2014 --- SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table of contents Table of contents ....................................................................................................... i List of table .................................................................................................................... iii INTRODUCTION ................................................................................................................ 1 I. GEOGRAPHICAL AND SOCIO ECONOMIC CHARACTERISTIC OF THE REGION .................................................................................................................................... 2 I.1 GEOGRAPHICAL CHARACTERIISTICS................................................................ 2 I.1.1LOCATION ........................................................................................................................ 2 I.1.2 RELIEF .............................................................................................................................. 2 I.1.3 CLIMATE ......................................................................................................................... 3 I.1.4 SURFACE AREA .............................................................................................................. 3 I.1.5 HYDROLOGY .................................................................................................................. 3 I.1.6 VEGETATION .................................................................................................................. 4 I.1.7 PEDOLOGY ...................................................................................................................... 5 I.2 SOCIO ECONOMIC CHARACTERISTICS .............................................................. 5 I.2.1 DEMOGRAPHIC CHARACTERISTICS ......................................................................... 5 I.2.2 SOCIAL CHARACTERISTICS: overview of the evolution of the MDGs ...................... 7 II. ECONOMIC POTENTIALS ...................................................................................... 9 II.1 MINING RESSOURCES ............................................................................................. 9 II.2 FISHERY ....................................................................................................................... 9 II.3 TOURISM .................................................................................................................... 10 III. SOCIO ECONOMIC ACHIEVEMENTS IN THE REGION IN 2013 ................. 11 III.1 HEALTH .................................................................................................................... 11 III.1.1 ANALYZING OF THE CURRENT SITUATION ...................................................... 11 III.1.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 ................................................. 14 III.1.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 .......................................................................................................................................... 15 III.1.4 PROPOSED SOLUTIONS ........................................................................................... 15 III.2 SOCIAL ...................................................................................................................... 15 III.2.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY ............................................................................................................................... 15 III.2.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 ................................................. 20 III.2.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 .......................................................................................................................................... 22 III.2.4 PROPOSED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES IDENTIFIED ... 23 III.3 EDUCATION, VOCATIONAL, TRAINING AND RESEARCH ........................ 23 III.3.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY ............................................................................................................................... 23 II.3.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 .................................................. 31 III.3.3 DIFFICULTIES ENCOUNTERED IN THE IMPLEMENTATION OF ACTIVITIES IN 2013 ..................................................................................................................................... 32 III.3.4 PROPOSED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES IDENTIFIED ... 32 III.4 INFRASTRUCTURES .............................................................................................. 32 III.4.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY ............................................................................................................................... 32 III.4.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 ................................................. 40 III.4.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 .......................................................................................................................................... 43 i MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.4.4 PROPOSED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES IDENTIFIED ... 44 III.5 GENERAL ADMINISTRATION AND FINANCE ............................................... 45 III.5.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY ............................................................................................................................... 45 III.5.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 ................................................. 46 III.5.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 .......................................................................................................................................... 47 III.5.4 PROPOSED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES IDENTIFIED ... 48 III.6 PRODUCTION AND COMMERCE (MINADER, MINEPIA, MINFOF, MINEPDED) ....................................................................................................................... 49 III.6.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY ............................................................................................................................... 49 III.6.2 SPECIFIC ACHIEVEMENT S RECORDED IN 2013 ................................................ 58 III.6.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 .......................................................................................................................................... 61 III.6.4 PROPOSED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES IDENTIFIED ... 62 III.7 PRODUCTION AND COMMERCE (MINIMIDT, MINTOUL, MINCOMMERCE, MINPMEESA) ................................................................................. 63 III.7.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY ............................................................................................................................... 63 III.7.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 ................................................. 69 III.7.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 .......................................................................................................................................... 71 III.7.4 PROPOSED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES IDENTIFIED ... 72 III.8 COMMUNICATION, CULTURE, YOUTH AND SPORTS ................................ 72 III.8.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY ............................................................................................................................... 72 III.8.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 ................................................. 75 III.8.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 .......................................................................................................................................... 75 III.8.4 PROPOSED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES IDENTIFIED ... 76 III.9 SOVEREIGNTY ........................................................................................................ 76 III.9.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY ............................................................................................................................... 76 III.9.2 SPECIFIC ACHIEVEMENTS RECORDED ............................................................... 77 III.9.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES ... 78 III.9.4 PROPOSED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES IDENTIFIED ... 78 IV. LOCAL DEVELOPMENT ACHIEVEMENTS IN 2013 ....................................... 79 1. KONYE COUNCIL ................................................................................................... 79 2. KUMBA I COUNCIL ............................................................................................... 81 3. EYUMODJOCK COUNCIL ..................................................................................... 83 4. TIKO COUNCIL........................................................................................................ 85 5. IDENAU COUNCIL .................................................................................................. 87 6. LIMBE II COUNCIL................................................................................................. 89 7. LIMBE III COUNCIL ............................................................................................... 91 8. LIMBE I COUNCIL .................................................................................................. 93 9. BUEA COUNCIL ....................................................................................................... 95 10. MUYUKA COUNCIL............................................................................................ 97 V. OUTLOOK ................................................................................................................. 99 CONCLUSION ...................................................................................................................... 100 ii MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 List of table Table 1:Distribution of the population in age of work according to some indicators ............................. 6 Table 2: CENSUS OF ARTISANAL FISHERMEN .............................................................................. 9 Table 3: Distribution of Natural Touristic Attractions, South West Region ......................................... 10 Table 4: Distribution of public health facilities within the region .................................................. 11 Table 5: Distribution of private health facilities within the region ....................................................... 11 Table 6: classification of public health personnel ................................................................................. 12 Table 7: classification of private health personnel ................................................................................ 12 Table 8: Distribution of health equipment............................................................................................. 13 Table 9: Immunization campaigns conducted in the Region during the year 2013 .............................. 13 Table 10: vaccination coverage rate in 2012 and 2013 ......................................................................... 13 Table 11: Mains causes of death in 2012 .............................................................................................. 14 Table 12: Distribution of social structures existing in the Region in 2012 and 2013............................ 15 Table 13: Distribution of children women and vulnerable persons monitored in social structures in 2012 and 2013 ....................................................................................................................................... 16 Table 14: Number of public/private women's empowerment structures (operational and non operational) available in the region in 2012 and 2013 .......................................................................... 16 Table 15: Breakdown of MINPROFF staff in the South West.............................................................. 16 Table 16: number of workers affiliated/unionized with a social security corporation (CNPS) and the number of companies with collective agreements in the region in 2012 and 2013 ............................... 17 Table 17: Trade union and labour security in the region ............................................................... 18 Table 18: Number of professional training schools existing in the Region .......................................... 18 Table 19: Number of students per type of schools as at the 1st December in the Region ..................... 18 Table 20: Statistics of personnel at MINEFOP in the South West Region in 2011 .............................. 19 Table 21: Composition of the population of working age at 31st December ......................................... 19 Table 22: Overall unemployment rate and sex according to the ILO 31st December ........................... 19 Table 23: Unemployment rates by age according to the ILO at 31st December .................................... 20 Table 24: Unemployment rate according to the ILO by level of education in the region ..................... 20 Table 25: Number of jobs by industry (activity sectors) in the region 31st December .......................... 20 Table 26: MINPROFF budget for 2012 and 2013................................................................................. 21 Table 27: MINTSS budget for 2012 and 2013 ...................................................................................... 21 Table 28: MINEFOP budget for 2012 and 2013 ................................................................................... 22 Table 29: Distribution of Anglophone schools facilities in the South West Region ............................. 23 Table 30: Distribution of equipment in the Anglophone sub-system .................................................... 24 Table 31: Enrolment of pupils from 2011/2012 to 2012/2013 .............................................................. 24 Table 32: distribution of teachers from 2011/2012 to 2012/2013 ......................................................... 25 Table 33: Results of GCE A Level ........................................................................................................ 26 Table 34: Results of GCE A Level Technical ....................................................................................... 26 Table 35: Results of GCE O Level ........................................................................................................ 26 Table 36: Results of Probatoire, Baccalaureat ...................................................................................... 27 Table 37: Statistics of Teaching Staff by Rank and Faculty for 2010/2011 academic year .................. 28 Table 38: Statistics of Staff Promoted to various grades....................................................................... 28 Table 39: Situation of the professional training in the SW region ........................................................ 28 Table 40: Distribution of researchers per specialties in 2012 and 2013 ................................................ 30 Table 41: Situation of research center per specialties ........................................................................... 30 Table 42: Budget of RD MINEDUB for 2012 and 2013 ...................................................................... 31 Table 43: Budget of CRRI Buea for 2012 and 2013 ............................................................................. 31 Table 44: Distribution of the National network according to their category and the linear .................. 33 Table 45: Tarred road in the South-West Region .................................................................................. 33 Table 46: Distribution of the earth roads by division and by category (in km) ..................................... 34 Table 47: major civil engineering structures realized in 2012 and 2013............................................... 34 Table 48: potable water scheme in the Region ...................................................................................... 35 Table 49: Number of posts and telecommunications infrastructures available in the region ................ 37 iii MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 50: Number of telecommunication subscribers in 2012 and 2013 .............................................. 38 Table 51: Distribution of lands developed per surface area in 2012 and 2013 ..................................... 39 Table 52: list of railway stations in 2012 and 2013............................................................................... 39 Table 53: Number of vehicles, motorbikes and semi trailers registered in 2012 and 2013................... 39 Table 54: Distribution of driving licenses issued per category in 2012 and 2013 ................................ 40 Table 55: Public Works Budget in 2012 and 2013................................................................................ 40 Table 56: Administrative units .............................................................................................................. 46 Table 57: Distribution of main products per production area ............................................................... 49 Table 58: Level of production of the main cash crops (in Kg).............................................................. 49 Table 59: Level of production of food crop in 2013 (in kg).................................................................. 50 Table 60: Distribution of cooperatives in the region in 2012 and 2013 ................................................ 50 Table 61: Number of farm tractor and other equipments used in the Region ....................................... 50 Table 62: Number of agricultural enterprises existing in the region ..................................................... 51 Table 63: Major products and major production area ........................................................................... 51 Table 64: situation of equipment existing in the region ........................................................................ 52 Table 65: Quantities and prices of inputs used ...................................................................................... 52 Table 66: Fishing methods and quantities ............................................................................................. 53 Table 67: Number of equipment used for animal husbandry ................................................................ 53 Table 68: Number of small fishermen in the region.............................................................................. 53 Table 69: Number of Medium fishermen producers in the region ........................................................ 54 Table 70: Number of Big fishermen producers in the region ................................................................ 54 Table 71: Quantities and prices of main inputs for production of fish .................................................. 54 Table 72: Distribution of staff at the MINFOF SW .............................................................................. 56 Table 73: Distribution of national parks and reserves in the SW .......................................................... 56 Table 74: Protected area in South West ................................................................................................ 57 Table 75 exploitable forest potential in the South West region ............................................................ 57 Table 76: level of production per non timber forest product ................................................................. 57 Table 77: Environmental impact Assessments conducted in 2012 and 2013 ........................................ 58 Table 78: The budget of the Regional Delegation of MINADER ......................................................... 58 Table 79: Budget of MINEPIA for 2012 and 2013 ............................................................................... 59 Table 80: Number of enterprises of industrial sector in the South West Region .................................. 63 Table 81: Existing and exploited mines in the South West region ........................................................ 63 Table 82: Number of exploitation licenses attributed during the years 2012 and 2013 ........................ 63 Table 83: Major industries in the three border divisions of the SW Region ......................................... 65 Table 84: Distribution of Tourist Attractions in the Border Areas–South West Region....................... 65 Table 85: Hotel map of the South west region ...................................................................................... 66 Table 86: Number of SME/SMI by line of business existing in the Region in 2012 and 2013 ............ 67 Table 87: Social economy structures in the region in 2012 and 2013 ................................................... 67 Table 88: average prices of great consumption products in 2012 and 2013 ......................................... 68 Table 89: number of test and periodic markets organized in the year 2012 and 2013 .......................... 69 Table 90: Some Potential Frontier Markets of the Region .................................................................... 69 Table 91: budget of MINPMEESA in 2012 and 2013 .......................................................................... 70 Table 92: number of media available in South West Region in 2012 and 2013 ................................... 72 Table 93: number of specialist of communication according to gender in 2012 and 2013 in the region ............................................................................................................................................................... 73 Table 94: List of libraries in the region ................................................................................................. 73 Table 95: List of book editing house in the region ................................................................................ 73 Table 96: Sport equipment in the region ............................................................................................... 74 Table 97: Number of sport monitors in 2012 and 2013 in the region ................................................... 74 Table 98: Number of license granted per type of sport ......................................................................... 74 Table 99: Distribution of number of workers in the MINJUSTICE in South-West region in 2011 ..... 76 Table 100: Rolling stocks at prison ....................................................................................................... 77 Table 101: Distribution of number of prisoner by prison in South-West region (2010/2011) .............. 77 iv MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 INTRODUCTION his report aims to (i) provide a panoramic view of the level of development of the region in general, and (ii) present the main achievements in 201 3, and the problems identified and solutions proposed elements in particular. As such, the report of the South West Region shall include the physical, demographic, and administrative area. It also presents the status and prospects in various development sectors in the light of the budget nomenclature. It also highlights the state of the existing sites in these areas, the various interventions of economic actors that are: the state, the RLA (regional and local authorities), civil society (NGOs, Development Associations ...). This document is divided into four main parts: The socio-economic characteristics of the region, including in particular the specific physical, demographic, administrative, and political in the region; The achievements in socio-economic recorded in 2013; The local development efforts in the region and; Prospects. T The four main parts are presented in chapters or sections as appropriate. It is clear that this report is the harmonization of the contribution of different economic sectors in the context not only to report and assess the future level of development of the region, but also to facilitate their exploitation for the development of a comprehensive summary for inclusion in the Report on Economic Development in Cameroon (RADEC) for a given year. It should be noted that this report is prepared from data collected from differen t regional offices of ministries; it does not contain enough information not only on the inventory of private economic structures as well as regional and local authorities, but also on specific achievements in the private sector and civil society organizat ions registered in 2013. 1 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 I. GEOGRAPHICAL AND SOCIO CHARACTERISTIC OF THE REGION ECONOMIC I.1 GEOGRAPHICAL CHARACTERIISTICS I.1.1LOCATION The South-West Region lies between latitudes 4°N and 6°N of the Equator and longitudes 8°E and 10°E of the Prime Meridian. It is bounded on the west by the Republic of Nigeria, on the north by the North-West Region, on the east by the East Region and the West by the West and Littoral Regions, and on the south by the Atlantic Ocean. Its close location to Nigeria, the Atlantic Ocean and the Littoral Region is of strategic economic importance because the agricultural and natural resources are within the reach of the Douala-based agro-industries and other foreign markets. I.1.2 RELIEF The South-West Region has a varied landscape consisting of the coastal lowlands, the Mamfe Depression, the rocky coast, and the Cameroon, Kupe, Muanenguba and Rumpi Mountains. This landscape has a lot of implications on the economic development of the region. The coastal lowland is a vast sedimentary zone stretching from the mouth of River Akwa Yafe in the extreme west to the mouth of River Lokoundje with an average altitude of 90m interrupted to the east by the Cameroon Mountain. Close to the Atlantic Ocean the coastal lowlands have mangrove swamps, several creeks, sandbars and sand-spits. These sedimentary deposits make navigation difficult and the construction of good harbours an expensive venture. The Mamfe depression, which lies further to the north, forms a distinct zone located some 150km from the coast. It is almost encircled by a range of mountains except to the west where its lowlands stretch into Nigeria and receives numerous streams that flow down from the surrounding mountains. The rocky coast lies between Bimbia and Idenau and results from the extension of the volcanic rocks of Mount Cameroon that spread right down into the sea. Past volcanic activities have also resulted in the presence of stacks protruding above the sea and some metres off the coast of Limbe. The rocky coast is characterized by the presence of bays, capes, cliffs and rocky islands making the area a potential zone for tourism and natural harbour development. The Cameroon, Kupe, Muanenguba and Rumpi mountains constitute prominent volcanic peaks of the region. The Cameroon Mountain which is a heap of piled up lava reaching a height of about 4095 metres, is very immense with a length of 50km and width of about 35km giving it an area of some 1750km 2 . The mountain is composed of different volcanic materials that in many places accumulate to form 2 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 small cones numbering about 75 in all. On some of the slopes of the mountain one comes across fumaroles that emit different gases and geysers that send out water in jets. Thus, the mountain is a huge tourist attraction. The Kupe Mountain with its culminating point reaching 2064m overlooks the town of Loum and Tombel. It is built up mainly of crystalline materials and then layers of volcanic flows with slopes that are almost vertical. These materials are frequently being dug and used for road maintenance and for building construction. I.1.3 CLIMATE The South-West Region experiences the equatorial climate, particularly the Cameroonian Type. It is generally very hot and humid with two seasons – a short dry season of about four months and one wet season of about eight months during which the rains are abundant throughout with occasional thunderstorms that are destructive to vegetation and property. The maritime Cameroon type is experienced along the sea-facing slopes of Mount Cameroon that receive the monsoon winds at right angle. This area is well known as the second wettest place in the world with Debunscha r ecording an annual rainfall of about 10.000mm. On the whole, rainfall in this Region averages more than 4000mm per annum. Further inland to the north of Mount Cameroon rainfall is usually between 2000mm and 4000mm per annum. The temperatures are generally high throughout the year varying from 20 0 C to 28 0 C. However, altitude exercises much influence in lowering the temperatures of certain areas especially on the Cameroon, Kupe and Muanenguba Mountains. Generally, the high temperatures, high rainfall, high relative humidity and volcanic soils, favour luxuriant vegetation growth and the breeding of a wide variety of insects. To the peasant farmers such conditions are rather enervating and make agriculture an irksome and sapping task. I.1.4 SURFACE AREA The South-West is one of the ten Regions that make up the Republic of Cameroon. With an area of about 24.910 km2 it represents 5.2% of the surface area of the country. Mount Cameroon occupies about 1.750 km2. To the southeast and west of Mount Cameroon there are substantial areas that are covered by mangrove swamps. Inland, particularly in Meme, there are large expanses of land covered by forests containing a wide variety of plant and animal species. I.1.5 HYDROLOGY The water resources of the South West Region are of immense importance to the economic development of the region. The rivers provide navigable ways and waterfalls that are potential sites for hydroelectric power development. The creeks, the on-shore and in-shore waters 3 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 provide good fishing grounds. While the deep natural bays provide potential sea-port sites, the coastal stacks, arches, beaches and crater lakes are potential tourist attractions. The inland, inshore, onshore and offshore waters provide good fishing grounds. Along the coastal zone, the many creeks, swamps, estuaries and bays make fishing a lucrative venture to the coastal communities. Three major rivers drain the Region, namely: the Manyu, the Ndian, the Mungo and their tributaries and distributaries. The Manyu River is about 600km long and takes its rise from the Rumpi Hills and flows west through the Mamfe depression into Nigeria. This river is navigable and provides an important means of transport from Mamfe to Nigeria. The Ndian River and its tributaries, which drain the extreme South Western part of the Region, take their rise from the Rumpi Hills and flow south into the Atlantic Ocean. At the upper course of the Ndian River navigation is hampered because of rapids and waterfalls. Along its lower course, before entering the sea, the ri ver breaks up into small distributaries because of the alluvial deposits brought down from the hills, forming a large estuary known as Rio-de-Rey. The Mungo River, which takes its rise from the Rumpi Hills and the Kupe-Muanenguba Mountains, has a length of about 150km and is interrupted by waterfalls and rapids. The most important waterfall is the Mungo Falls at Yoke that had once been harnessed and could be reharnessed for the generation of hydroelectricity. Below the Mungo Falls, on the sedimentary land, the river becomes navigable for about 100km before entering the mangrove swamps. Here the river course is a potential source for sand quarrying. The Mungo River for its greater length in the south forms the boundary between the Littoral and South West Region. Besides the rivers, the Region is also endowed with a number of lakes of varying shapes and sizes. These are mostly crater lakes that resulted from the accumulation of water in the craters of extinct volcanoes found at the top of volcanic hills. The main ones are Lake Barombi in Kumba and the two beautiful Muanenguba Lakes in the Bakossi land. Along the coastal zone there abound a number of creeks, swamps, estuaries and bays whose importance to the coastal communities cannot be over-emphasized. The South West Region practices principally crop cultivation and to a very small extent pastoral agriculture. However, the Region possesses pastoral and aquatic resources that could be exploited to improve upon the economy. I.1.6 VEGETATION The huge forest resources of the South-West Region form an economic asset that, if exploited in a sustainable manner, can boast development enormously. The Region falls under the dense equatorial forest region with two distinguished vegetation types - the mangrove and rain forests. The mangrove forest occupies the two swampy regions of the coast – the region around Rio-de-Rey and the Mungo River basin. The mangrove swamps around Rio 4 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 de-Rey extend from Akwa Yafe River in the west to the foot of Mount Cameroon just east of Bamusso and inland as far as Isangele stretching down to the coast. The other swamp region starts from Bimbia through Tiko to Modeka and down to the whole of the Douala basin. The trees here have developed very long roots that plunge from the stem down into the swamps. This region is highly infested with mosquitoes and other insects. The highly indented nature of the coast makes navigation difficult. The evergreen forest that lies inland just after the mangrove forest has been subjected to human attacks for farms, lumbering and settlement. Where these exploitations have taken place, a type of secondary forest does appear. The primary forest in its unhampered form can still be found around the Korup area. Here the forest is immense, luxuriant, and has a continuous canopy of leaves. This evergreen forest contains trees of economic importance such as the iroko, mahogany, obeche, ebony, padouk, tiama, framire, sapelli, makore and bilinga. It is worth noting too that this forest is the home of many animals such as chimpanzees, elephants, monkeys and many rodents. I.1.7 PEDOLOGY The South-West Region is entirely composed of material belonging to the vast African shield covered by sediments and lava flows. The massive volcanic mountains formed by successions of volcanic flows of basalts and rhyolites, include the Kupe, Muanenguba, Rumpi, and Cameroon Mountains. The coastal lowlands of the Ndian and Mungo Basins are sedimentary formations of post cretaceous and recent alluvial deposits. The upper Mungo basin margins are composed of cretaceous formations of sandstone, silt and limestone. These are really huge deposits of limestone that could be quarried for cement production. The region lying between the Mamfe depression and the coastal alluvial deposits including the Akwaya region to the north are made up of the basement complex composed of mica-schists, gneiss, migmatites and granites. The mineral wealth of the Region for now mainly reposes on the petroleum deposits along the coastal region and pockets of limestone deposits in the Mamfe depression and the northern Mungo sedimentary basin. The huge deposits of alluvial soils along the river courses could have been useful for agriculture if not hampered by the swamps. Since the South West Region is basically a volcanic zone, the whole region is covered by black and brown soils that result from basaltic rocks. These soils are extremely fertile and they account for the small- and large-scale agricultural plantations found in the Region. I.2 SOCIO ECONOMIC CHARACTERISTICS I.2.1 DEMOGRAPHIC CHARACTERISTICS According to the results of the third General Census of Population and Housing (RGPH 3), in 2005, the South West Region had 1,316,079 inhabitants. This population which represents a demographic weight of 7 .5% is spread over a total area of 25,410 km 2 with a density of 51.8 inhabitants per km 2 . The rate of urbanization in the region is 42.5%. Regarding the structure of the population by gender, there is an imbalance in male / female for men, the sex ratio is 102.71. The main cause is certainly the existence of 5 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 male migration from the regions of North-West and West and particularly towards large plantations and agro-industry in the South-west. This may be associated with female emigration departing from this region to Douala. In relation to age, it should be noted that the half of the population is aged above 19 years old which is a little more than the national level (the national median age is 17.7 years old). The population in age of work (15-59 years) in the region is 732,310 which represents 8.2% of this same population at the national level. The details about this population are presented in the table below: Table 1:Distribution of the population in age of work according to some indicators Indicators Urban area Rural area Region Active population (15-59 years) Male 169830 198685 368515 Female 165782 198013 363795 Total 335612 396698 732310 Masculinity rate 102.4 100.3 101.3 Demographic weight 60.1 52.4 55.6 15 years and above population according to their activity situation (%) Male Active who have a job 54.5 69.2 62.7 Unemployed but who have had a job before 2.6 1.4 1.9 Unemployed but looking for their first job 6.7 4 5.2 Student which no economic activity 27.5 15.2 20.7 stock holder with no economic activity 0.8 1.1 1 Female Active who have a job 36.5 51.2 44.7 Unemployed but who have had a job before 2.2 1.2 1.7 Unemployed but looking for their first job 6.7 3.6 5 Student which no economic activity 17.9 18.2 18.1 stock holder with no economic activity 28.6 15.4 21.3 Total Active who have a job 45.7 60.4 53.8 Unemployed but who have had a job before 2.4 1.3 1.8 Unemployed but looking for their first job 6.7 3.8 5.1 Student which no economic activity 8.8 9 8.9 stock holder with no economic activity 28 15.3 21 Source: BUCREP, Etat et Structure de la population, indicateurs démographiques The culture of the people living in the South West Region is as varied as the number of ethnic groupings in the region. The population of the South West Region is a conglomerate of more than 70 ethnic groups comprising both the native population 6 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 and a significant proportion of immigrants from other Regions of the country and from foreign countries, particularly Nigeria. The native population comprises of the following ethno-linguistic groups: Akwaya, Bafaw, Bakossi, Mbonge, Balue, Balundu, Bangwa, Banyangi, Ejagam, Mbo, Bima, Mundani, Oroko, Bakundu, Bakweri, Balong, Ngolo, Balock. For non-native ethnicities in the region of South-West, the concentration is higher in the Divisions of Fako and Meme, certainly because of the attractiveness of agro industrial and oil on the one hand and trade of other. They include ethnic groups from regions of the North West, West, Central and South. It is worthy to note here that each of these ethnic groups strives to preserve their ancestral traditions and to express themselves in different ways culturally, especially through traditional dances such as: the Malay or Elephant Dance of the Bakweri people in Fako; the Mesekele and the Ahong of the Bakossi; the Nyamkpe of the Bafaw people in Meme; the Monenkim and the Obasindjom of the Banyangi people in Manyu; the Ekpe of the Balundu people in Ndian. I.2.2 SOCIAL CHARACTERISTICS: overview of the evolution of the MDGs Considerable efforts have been made in the direction of achieving the Millennium Development Goals in the South West Region. Indeed, of the six goals, efforts for their realization improved significantly and the results are quite positive for at least three of them. A quick tour of the situation in the region of these objectives is presented below: Goal 1: Eradicate extreme poverty and hunger According to the Regional report on MDG progress for the South West in 2010, the incidence of poverty has declined by at least 6 percentage points between 2001 and 2007 from 27.5 to 33.8. This reduction is more pronounced in rural areas (down 9.8 points) than urban areas (down 3.6 points). In addition, access to employment which is one of the important points to eliminate extreme poverty has improved significantly over the same period. Indeed, the employment rate in creased from 58.2% in 2001 to 83.8% in 2007, an increase of more than 20 points. Goal 2: Achieve universal primary education for all The enrollment rate for primary school children has grown by more than 20 percentage points between 2001 and 2007 from 72% to 93.7%. In addition, there was a marked improvement in the literacy rate among 15 to 24 year olds in the region. In fact, this improvement is very significant for it is above the national level. Indeed, it has advanced by 2.5 points in the region to onl y 0.8 points at national level. Goal 3: Promote gender equality and empower women Regarding the elimination of gender disparities in primary and secondary schools, girls / boys parity index has evolved at both the elementary and secondary levels. In primary school, where this trend is much more pronounced, it went from 0.96 to 1.01 between 2001 and 2007. However, the empowerment of women through their participation in economic activity is not positive for their participation in the labor 7 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 market has deteriorated over the same period. Indeed, in 2001 37.1% of women employed in the nonagricultural sector, this proportion dropped to 18.6% in 2009. Goal 4: Reduce under 5 years child mortality According to reports MICS 4 and EDS 3, the child mortality decreased between 2004 and 2011. Indeed, in 2004 the rate of child mortality was 144 per tho usand, and he dropped down to 127 per thousand in 2011. It should also be noted that the Expanded Programme on Immunization (EPI) focuses on the protection of children from 0 to 5 years against certain diseases has reduced between 2004 and 2006 the morbidi ty of children. Goal 5: Improve maternal health Efforts to improve maternal health through the implementation of the reproductive health program have helped to reduce the risk of complications related to pregnancy. Indeed, according to reports MICS 4 and 3, the proportion of births attended by skilled health personnel has increased between 2006 and 2011 from 69.6% to 91.3%. Goal 6: Combat HIV / AIDS, malaria and other major diseases In 2011, the prevalence rate of HIV / AIDS among men and women aged 15 to 49 years was 5.7% in the South West (according to MICS 4). It should nonetheless be noted that the rate of HIV infection among pregnant women has increased considerably between 2008 and 2009 from 8.6% to 13.4% according to the National Programme for the Fight Against AIDS. For malaria, there is a slight increase in prevalence among patients seen in the health centers of the region. According to the National Programme for the Fight against Malaria, this rate increased from 35.5% in 2008 to 36.5% in 2009. Regarding tuberculosis, the incidence of the disease has improved slightly in the region (82.8% to 78.7% between 2008 and 2009), although it is still higher than the national average, which was 75.4% in 2009. 8 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 II. ECONOMIC POTENTIALS II.1 MINING RESSOURCES The Southwest region is relatively poor in minerals. In the sedimentary basin of Mamfe Gulf, indices of lead, zinc sapphire, lignite and salt were discovered, as well as some hot springs. In the region of Tombel it indicates the presence of mineral springs and deposits pozzolanic. These detected minerals have not yet been working. Yet geothermal and mineral springs and thermo mineral deserve a detailed inventory. The use of building materials such as sand, gravel or limestone faces the inadequacy and poor state of the roads. The Southwest region has many rivers with their waterfalls that could contribute to the development of dams, but till today, none of them are exploited. In addition to the rivers, the South West provides through its offshore oilfields and gas in areas of Rio del Rey and Limbe, the coverage needs of the country's oil and domestic gas. II.2 FISHERY The South West Region has a great potential in terms of fishery industry. About 40,000 tons of fish and 10,000 tons of crayfish/lobsters are caught in the Ndian Maritime Zone by artisanal fishermen every year. Fish caught in Ndian waters is evaluated at about 10 billion francs yearly. But it is worth to notice that about 80 90% of this catch is taken to Nigeria without being subject to control by the Cameroonian authorities (MINEPIA). Just between 10-20% of the catch is left in Cameroon. At the other hand, more than 95% of the fishermen are foreigners mainly Nigerians and a few Beninois and this explain why most of the fish caught goes to Nigeria. Factors contributing to this unfortunate situation include: inadequate cold chain facilities, poor access of fishing settlement to Cameroonian markets (due to poor road network), easier access to Nigeria and hi gher cost of the fish in Nigeria. The following table presents the result of a census of fishermen carried out by the Regional Delegation of Fishery and Livestock in the Region. Table 2: CENSUS OF ARTISANAL FISHERMEN Division Ndian Fako Fishing station No. of fishing camps Number of fishermen per country Idabato Bamusso Kombo Itindi Ekondo Titi Isangele Kombo Abedimo Mundemba Idenau 14 49 14 19 20 16 7 1 Cameroonian 1 91 20 80 73 2 60 20 Nigerians 1752 920 1443 821 340 410 11 141 Ghanaians 0 2 0 0 0 0 0 612 Beninois 0 3 0 0 0 0 0 290 Enyengue 3 21 132 151 76 Debunscha Mudeka Tiko Limbe 2 5 8 - 58 0 15 77 32 51 152 774 2 0 0 85 0 0 0 249 others 20 5 Togolese - 9 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Total 158 518 6979 Percentage 6.03 81.26 Source: Regional Delegation MINEPIA, Buea, 2012 462 5.38 615 7.16 15 0.17 II.3 TOURISM The South West Region is greatly endowed with multifarious natural attractions which if judiciously harnessed would make the tourism industry a lucrative one. It is rather unfortunate that most attractive sites have not been developed. However, efforts are on the way to develop a number of sites. The following natural touristic attractions can be identified: Table 3: Distribution of Natural Touristic Attractions, South West Region DIVISION TOURIST ATTRACTIONS - The Limbe Zoo with monkeys, gorillas, chimpanzees, snakes, etc. - The Limbe Botanic Gardens. - The Limbe Sea Port. - Mount Cameroon in Buea and Etindi Mountain View. - Bays such as Ambas Bay and Man O’War Bay. FAKO - Beaches Isokolo, Bobende, Seme, Mile Six and Etisha. - Bomana Waterfall, Twin Lake Bakingili and Lake Dibuncha. - Lava Flow Terminal. - German Light House, German Prison (Mondoli Island), Bota Island. - Slave Trade Market (Bimbia) and Alfred Saker Tomb Limbe. KUPE- The Twin Lakes of Mwanenguba. MUANENGUBA - The Bayang-Mbo Santuary - The Turbine on the Begeh River. - The Waterfalls. LEBIALEM - Nie (Mbindia Village). - The Mountains. - Manyu Bridge at Mile 18 on the Mamfe-Bamenda Road. - The Hippos in the Manyu River seen in mid-January to March. - The Tali Marbles found along the streams in Upper Bayang. MANYU - Mfum Bridge-Ekok (Highest Suspension Bridge in West Africa). - The Hanging Bridge built by the Germans at G.R.A., Mamfe. - Satum Bridge linking Mamfe Town to Akwaya Sub-Division. - The Volcanic Lakes – Lake Barombi and Lake Soden. MEME - River Meme. - The Supe Fly over on the Mamfe-Kumba Road. - Ekondo Titi Beach. NDIAN - The Korup Park. - The Rumpi Mountains. Source: Regional Delegation of Tourism, Buea. 10 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III. SOCIO ECONOMIC ACHIEVEMENTS IN THE REGION IN 2013 III.1 HEALTH III.1.1 ANALYZING OF THE CURRENT SITUATION Health coverage in the South West Region can be assessed in terms of the various centres accessible to the population. According to the information gathered from the Regional Delegation of Health, health areas covered by one or more health centres represent about 91% of the whole Region. Health districts are delimited into health areas. Health area is a geographical zone in a health district with a health centre that cares for the population living in it. More than half of all homes in the South West Region are situated at less than 3-km to the nearest health centre be it public or private. However, rural areas somehow suffer a bit more than urban areas in terms of accessibility to health units. A broad picture of health centres and personnel in the South West Region can be seen in the tables below: Table 4: Distribution of public health facilities within the region Type of public 31 december 2012 Creation in the course facilities year 2013 Central hospital 0 0 Regional hospital 2 0 District hospital 12 0 Sub divisional health centre Integrated helath centre 17 0 167 0 Dispensary 0 0 Others 0 0 198 0 Total number Table 5: Distribution of private health facilities within the region Type of private facilities 31 december 2012 Creation in the course Denominal hospital year02013 7 Clinic 11 0 Integrated health centre 69 0 Private health centre 0 0 Others 0 0 Total number 87 0 In the South West Region, 69.5% health facilities are public while 30.5% are private. Among all these health facilities 82.8% are Integrated Health centers. 11 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Human Ressource In general, the health personnel is very insufficient in quality and in number. For the whole population, the Region has at all 1249 medical and sanitarian personnel. These personnel are distributed at 1029 in public and 390 in private sector. The situation of the health personnel in the Region is summarize in the table below: Table 6: classification of public health personnel Available as at 31 Posting in the Category of Dec 2012 course year health personnel Male Female Male Female 10 03 Medical specialists 13 68 32 General practitioners 100 02 02 Pharmacists 04 06 08 Medical and helath 14 engineers 10 12 Medical and health 22 technician 110 211 Senior nurses 321 89 460 Nurses 549 0 06 Pharmacy technicians 06 others Available as at 31 Dec 2013 Male Female Nurses represent 53.4% of public health personnel while senior nurses are 31.2%. This statistics show that the great part of health personnel in the Region is nurses. Table 7: classification of private health personnel Available as at 31 Posting in the Category of Dec 2012 course year health personnel Male Female Male Medical specialists 02 01 General practitioners 03 Available as at 31 Dec 2013 Male Female Pharmacists Medical and helath engineers Medical and health technician 02 / 02 / / 12 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 14 Senior nurses 24 38 13 Nurses 29 42 Pharmacy technicians others Table 8: Distribution of health equipment 2012 2013 Privat Publi Privat Public e c e 115 15 Health equipment Number of pharmacies available Number of pharmacies incorporated in hospitals Number of medical laboratories 3 3 Number of surgery units 14 14 Number of helath schools Number of hemodialysis centres 04 03 01 06 Number of X-ray machines 04 03 01 06 Vaccination Table 9: Immunization campaigns conducted in the Region during the year 2013 Campaign Period of the year SASNIM1 (Vit A+Mebendazole) th 26-30 April 2013 Number of vaccines given VitA 19867 VitA 173197 Meb 173652 VitA VitA Meb 25 th -27 th October OPV 24023 192230 192070 239178 Table 10: vaccination coverage rate in 2012 and 2013 2012 2013 Types of vaccines Boy/girl Boy/girl SASNIM 2 (Vit A Mebendazole +OPV) Coverage rate BCG 76.9% 76.5% Penta 3 79.6% 86.9% Opv 3 80% 86.5% MeasLes 77.2% 85.8% Yellow fever 77.1% 85.4% 13 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 11: Mains causes of death in 2012 N° Causes principales 1 2 3 4 Paludism HIV/AIDS Anemia Pneumonia, bronchitis brochopneumonia, 5 Other méningitis and meningoencephalitis 6 Epilepsy 7 Skin cancer 8 Abdominal infection 9 Other surgical infections 10 Hygh Blood Pressure Nbre de cas Nber of cases 05 years Nber of cases 5-15 years Nber of cases 15-45 years Nber of maternal deathss Total Nber of death 12335 1890 175 47 1 31 9 1 0 22 47 9 0 0 1 87 58 53 422 3 0 6 0 16 52 5 2 2 0 11 170 2 216 0 354 7 8 4 0 1 0 0 0 0 0 3 0 0 2 4 0 0 0 11 10 8 7 7 Source : RD Public Health SW III.1.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 With a total budget of 120 559 100 FCFA, of which 33.8% was a running budget and 66.2% was investment budget (which was consumed only at 30%), the Regional Delegation of Public Health had realized many actions. In 2013, some projects were carried out and follow up in the health domain in the South West region, but they are all ongoing. There are: The construction of the district hospital of Tombel The construction of the district hospital of Tiko The construction of the Integrate Health center of Benmong Bukkewe Kumba The construction of the IHC of Nkack The construction of the LAM of the district hospital of Akwaya The construction of the LAM of the Integrate Health Center of Bermin The extension of the Sub divisional health center of kumba The acquisition of an incinerator at the Regional Hospital of Limbe The rehabilitation of the Ndom IHC The construction of a drilling at the Bekora IHC The construction of the Administrative bloc of Muea IHC The construction of a fence at the district hospital of Kumba The acquisition of a technical tray at the district hospital of Mamfe During the year 2013, the Regional Delegation of Public Health received some gifts from international organizations. GIZ gave motorcycles and the delegation received phones of teleconference equipment from the World Health Organization. 14 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.1.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 The main difficulties faced in 2013 are: Human resource shortage Difficult access to some health facilities Data collection from some districts is very difficult due to no electricity internet and poor roads III.1.4 PROPOSED SOLUTIONS The Public Health Regional Delegation proposes that the central budgeting and planning should reflect regional recommendations and specifications. III.2 SOCIAL III.2.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY SOCIAL AFFAIRS In the South West, there are 05 centers, one reeducation center, one rehabilitation center, one structure for early childhood (center for children in need of Ekondo Titi) and two disabled training structures. Alongside these public structures, there are structures that are private orphanages, nurseries, associations and NGOs involved in the protection of vulnerable people. The table below presents the situation of these centers. Table 12: Distribution of social structures existing in the Region in 2012 and 2013 Year 2012 Year 2013 Social Structures Public Private Public Private Rehabilitation and Re-education 02 09 02 09 Centres Disabled training Structures 02 02 24 Orphanage Day nursery Other specify Total Number 24 1 26 1 26 5 59 05 59 Infrastructure point of view, with the exception of some social services housed in public buildings, most services are housed in old buildings for rent that state cannot rehabilitated. Outside the social centers of Menji, Komba Abedimo and Manyu, other housing buildings are still in disrepair existing public buildings urgently need to be rehabilitated Despite the state of the centers, they received many children, women and disabled person as one can see in the following table. 15 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 13: Distribution of children women and vulnerable persons monitored in social structures in 2012 and 2013 Social structures Year 2012 Year 2013 Children women Disabled Children women Disabled Rehabilitation and Re-education 52 82 134 60 94 154 Centres Disabled training 02 02 02 02 02 02 structures Orphanage 247 249 Day nursery 126 126 In human resources, the Regional Delegation of Social Affairs has a diverse staff, consisting of nine IAPS, seven IAS, fifteen APAS, eight AAS and four AAAS. With the recruitment of 25,000 graduates, the staff situation has improved slightly. Some social centers are not functional due to lack of staff. There are several Sub-Divisions (Limbe II, Limbe III, Kumba III, Tiko, Idabato, Dikome Balue) without social center. Lack of support staff (cooks, watchmen), particularly in specialized centers WOMEN EMPOWERMENT AND FAMILY Regarding institutions advancement of women and the family, there are now at the Region: 10 Women’s Empowerment Centre (WEFC); 08 adult literacy centers created out of the WEFC; 3 private charities such as St Theresa Girl's Vocational School (Kumba), Baptist Home Women Economic Center (Mutengene), and the Social Mission Full Gospel Center (Muyuka); Throughout the region, there are more than 3000 women training groups as presented in the next table. Table 14: Number of public/private women's empowerment structures (operational and non operational) available in the region in 2012 and 2013 Year 2012 Year 2013 Public Private Public Private Number of groups 3015 1001 2940 110 Personnel Table 15: Breakdown of MINPROFF staff in the South West Number of women Number of men DELEGATIONS Fako + Regional 18 05 Kupe Muanenguba 07 02 Lebialem 03 02 Manyu 02 00 Meme 04 00 Ndian 04 01 Total 23 09 05 02 04 05 16 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Total 1 38 10 MINPROFF staff in WEFC in the S.W.R Buea 08 00 Bangem 04 00 Isangele 01 00 Kendem 00 01 Kumba 07 02 Kumbo Abedimo 00 01 Kumba 07 02 Limbe 09 00 Mamfe 06 01 Menji 01 00 Mundemba 03 01 Total 2 39 06 Grand total 77 16 48 08 04 01 01 09 01 09 09 07 01 04 45 93 Source : DR/MINPROFF/SW Infrastructures In 2011 the WEFC of Menji and Limbe have been constructed and 02 residential homes had completed in Isangele and Kombo Abedimo. LABOUR AND SOCIAL SECURITY On infrastructure, the region has more than 600 companies and institutions. For some Divisional Delegations Buildings are isolated in the nature without fence (Manyu, Ndian, Meme and Kupe Muanenguba); In terms of human resources, the Regional and Divisional Delegations of Labour and Social Security South West have 05 Labour Administrators, 03 Labour controllers, 05 contract officers, 04 state agents, 05 Temporary Workers and 10 newly recruited Contract Staff. Concerning the social security, the following tables present the situation of workers affiliated to a social security system and the syndical organization in the region. Table 16: number of workers affiliated/unionized with a social security corporation (CNPS) and the number of companies with collective agreements in the region in 2012 and 2013 Number of workers affiliated to a social security system (CNPS) Number of workers unionized Number of enterprises having collectives agreements Year 2012 Year 2013 1965 2283 20056 20441 43 50 17 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 17: Trade union and labour security in the region Year 2012 Number of staff representatives 292 Number of mutual health assistance and 43 social security association Number of strikes recorded 02 Number of lay-offs recorded 188 Number of industrial accidents (deadly and 19 non deadly) Number of occupational diseases 0 Year 2013 292 52 04 366 22 (02 fatal) 0 EMPLOYMENT AND VOCATIONAL TRAINING The South West Region has 01 Intensive Vocational Training Centre serving Sou th West and North West Regions. They are 59 professional training schools from which 61% are private and for the majority located in Fako and Meme Divisions. Table 18: Number of professional training schools existing in the Region Number of schools as at 31st Schools December Year 2012 Year 2013 Public Private Public Private 23 33 23 36 Number of schools 40 100 40 110 Number of classrooms/workshops Table 19: Number of students per type of schools as at the 1st December in the Region Number of trainee as at 31st Equipement Year 2012 December Year 2013 Men Women Men Women Public Schools Number of trainee 433 192 525 249 Number of teachers 72 51 87 60 Number of graduated of professional training 157 68 218 81 HUMAN RESSOURCES South West Region has 124 teaching staff, 17 Administrative staff and 09 support staff. 166 trainees are currently learning skills for self employment in private accredited centres. PIAASI uses a staff of 15 people. 18 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 20: Statistics of personnel at MINEFOP in the South West Region in 2011 DIVISION REG. DELEGATIO N I.V.T.C BUEA FAKO KUPE MUANENG. LEBIALEM MANYU MEME NDIAN TOTAL ADMINISTRAT IVE STAFF ADMINISTRATI VE STAFF IN SAR/SM PERMANENT SUPPORT STAFF OF THE DELEGATION PERMANENT TEACHING STAFF TOTAL 07 - 05 - 12 02 - - 04 06 10 03 01 53 58 01 06 - 20 27 01 02 01 01 16 02 06 17 01 02 00 09 11 15 20 124 02 13 20 27 166 Source: RD MINEFOP SW SOCIAL SITUATION, TRAINING AND EMPLOYMENT As might be expected, over time the number of people of working age has increased for both men and women. This is presented in the table below: Table 21: Composition of the population of working age at 31st December Number at the 31 st December Working age population Year 2011 Year 2010 Male 337.418 336.768 Female 328.348 327.898 TOTAL 665.766 664.666 Source: RD MINEFOP SW From 2010 to 2011, the unemployment rate increased by one point each in men than in women, thereby increasing the rate from 21% to 23% as shown in the table below: Table 22: Overall unemployment rate and sex according to the ILO 31st December Year 2011 Year 2010 Male 12.00% 11.00% Female 11.00% 10.00% TOTAL 23.00% 21.00% Source: RD MINEFOP SW When considering that rate according to age, it notes that it is important enough for youth aged 26 to 40 years. This is indeed the age of completion of formal and / or professional education. 19 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 23: Unemployment rates by age according to the ILO at 31st December Unemployment Rates Age Year 2011 Year 2010 20 - 25 11.10% 11.10% 26 - 30 42.80% 40.80% 31 - 40 34.20% 36.20% 41 - 50 08.90% 08.70% 51 + 03.20% 03.20% Source: RD MINEFOP SW While the unemployment rate fell slightly among those with at least a GCE A Level degree between 2010 and 2011, we note that it is rather increased in those who do not have degrees or so at the BEPC. Table 24: Unemployment rate according to the ILO by level of education in the region Unemployment rate Degree Year2011 Year 2010 no degree 38.00% 37.00% BAC-BTS 15.00% 16.00% BEPC-CAP 31.00% 29.00% LICENCE – MAITRISE 14.00% 16.00% INGENIEUR 0.008% 0.008% DEA- DOCTORAT 0.012% 0.012% Source: RD MINEFOP SW Table 25: Number of jobs by industry (activity sectors) in the region 31st December Number of jobs Industry Year2011 Year 2010 Primary sector 328 178 327 378 Secondary 88 840 88 340 sector Tertiary sector 104 830 1030 Source: RD MINEFOP SW III.2.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 SOCIAL AFFAIRS MINAS services in the south west led many activities with a total running budget of 10 310 000 FCFA since they did not receive any investment fund. WOMEN EMPOWERMENT AND FAMILY In 2013, the total budget allocated to the Delegation of MINPROFF was increased of 5.5% in comparison with their 2012 budget as presented in the next table. 20 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 26: MINPROFF budget for 2012 and 2013 Running budget Investment budget TOTAL Year 2012 Year 2013 91,561,250 91,750,200 4,850,000 91,561,250 96,600,200 The main specific achievements in the field of advancement of women and family in the year 2013 are as follows : Training on income generating activities, computers, Hotel Management, Sewing, etc.; Marriage counseling; Production of 1 000 copier of the South West Women’s Magazine; Creation of Gender Focal Point in some public institutions. Conduction of Mass marriage. Handing of girls to rural women. Capacity building workshop/Seminars. Radio educative talks LABOUR AND SOCIAL SECURITY With a total budget of 11 millions, the Regional Delegation of MINTSS carried out many activities. Table 27: MINTSS budget for 2012 and 2013 Year 2012 Year 2013 Running budget 9 980 000 9 980 000 Investment budget 6 538 279 1 500 000 Total 16 518 279 11 480 000 In term of physical realizations, the following ones were done. Achieved actions: Constructed a fence round the RDLSS Buea; Received a TOYOTA Pickup car for the RDLSS. On-going actions Census on mutuals; Creation of hygiene and safety committees in enterprises; Sensitization campaigns on workers protection; Training of staff representatives; Reinforcement of social dialogue in enterprises. 21 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 EMPLOYMENT AND VOCATIONAL TRAINING The budget of MINEFOP for 2013 has recorded a high increase in comparison with the 2012 budget as one can easily see in the next table. Table 28: MINEFOP budget for 2012 and 2013 Running budget Investment budget Total Year 2012 Year 2013 5 512 000 8 300 000 48 900 000 5 512 500 57 200 000 The main physical realizations with this budget were: The purchase of two complete set of computers; The renovation of Regional Delegation Building; The construction of the Regional Delegation which still at the first phase; The purchase of didactic material for I.V.T.C Buea. III.2.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 WOMEN EMPOWERMENT AND FAMILY In 2013, the following difficulties were registered: Lack of infrastructure, no has for sensitization meeting, no befitting structures for the Regional, Divisional and Sub Divisional Delegations; Lack of office equipment, no computers, no photocopies, no fence; Insufficient funds to carry out the numerous activities especially celebration s of International days; LABOUR AND SOCIAL SECURITY The difficulties encountered in the implementation of activitie s in the ministry of labour and social security are: Insufficient number of trained and qualified staff that greatly reduces effective actions on field; Absence of official documents prescribed by law by some employers of labour EMPLOYMENT AND VOCATIONAL TRAINING The difficulties encountered are: Late launching of the budget to the implementation of the new budget system : budget Programme Insufficient allocation of running budget of the Regional Delegation 22 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.2.4 PROPOSED IDENTIFIED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES WOMEN EMPOWERMENT AND FAMILY The following propositions can be considered to solve the difficulties mentioned above: Befitting structures for the Delegations should be constructed Equipment should be provided to facilitate work Logistics should be provided to enable the Delegations to carry out the activities EMPLOYMENT AND VOCATIONAL TRAINING To face the difficulties encountered, the following propositions are made: Increase the running budget and fast execution of the investment credit. III.3 EDUCATION, VOCATIONAL, TRAINING AND RESEARCH III.3.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY BASIC EDUCATION The distribution of schools facilities in the Region during the two last school years is presented in the next table. Table 29: Distribution of Anglophone schools facilities in the South West Region Number as at 31st December Schools Year 2011/2012 Year 2012/2013 Government school facilities Nursery schools 250 299 Primary schools 800 827 Literacy center 0 0 Special schools for people with disabilities 1 1 (deaf-and-dumb, visually Privatel schools Nursery schools Primary schools Literacy center Specialised schools (deaf dumb, blind,…) schools Community Nursery schools Primary schools 280 341 0 0 0 306 413 0 0 0 0 0 0 0 23 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 There are no community schools through the Region but it exists one specialized school for blind. Concerning the francophone schools, there are 14 nursery schools with 09 classrooms and 20 primary schools with 89 classrooms. Table 30: Distribution of equipment in the Anglophone sub-system Number as at the 31st December Equipment Year 2011/2012 Year 2012/2013 public private public private Nursery schools Number of classrooms 1325 1411 Number of library Number of canteen Number of infirmary Number of school multi media Numbercenter of playing area Number of latrines 62 60 Number of water point 78 72 Primary schools Number of classrooms 7021 7185 Number of library Number of canteen Number of infirmary Number of school multi media center Number of playing area Number of latrines Number of water point With an increase rate of 26.9% for public and 4.8% in private schools, the pupils in nursery schools have noticed a great enrolment from 2012 to 2013 in the Anglophone sub-system. Unfortunately, there is no statistics for francophone sub -system. Table 31: Enrolment of pupils from 2011/2012 to 2012/2013 Number of student as at 31st December Year 2011/2012 Year 2012/2013 Boys Girls Boys Girls Anglophone sub-system Public nursery schools 4960 6112 6852 7203 Private nursery schools 9460 9963 10090 10268 Public primary schools 90125 84702 90755 89705 Private primary schools 32415 33600 36315 36678 Specialised schools (deaf dumb, blind,…) Francophone sub-system Public nursery schools Private nursery schools Public primary schools Private nurseryy schools Specialised schools (deaf dumb, blind,…) 24 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Community schools Nursery schools Primary schools If men represent less than 1% of teachers in nursery schools, they are about 35% of teachers in primary schools. Private primary schools have registered the greatest increase in the number of teacher from 2011/2012 to 2012/2013 with a rate of 10.8% while this rate is just 2.7% in public primary schools. The following table is presenting the details of this distribution. Table 32: distribution of teachers from 2011/2012 to 2012/2013 Number of teachers as at 31st December Teachers Year 2011/2012 Year 2012/2013 Men Women Men Women Anglophone sub-system Public nursery schools 2 755 2 779 Private nursery schools 7 911 7 948 Public primary schools 1362 2315 1370 2407 Private Primary schools 870 1915 907 2178 Specialised schools (deaf dumb, blind,…) Francophone sub-system Public nursery schools Private nursery schools Public primary schools Private nurseryy schools Specialised schools (deaf dumb, blind,…) SECONDARY EDUCATION There are two sections in the South West region secondary school: the General secondary school and the technical secondary school. In 2011, the number of secondary schools in SW region was 294 of which 218 public secondary schools and 76 in private sector. The secondary school had on enrolment 118486 students in SW region of whom 59090 girls. Among the secondary school in South-West region (294 schools), there are 129 general secondary schools (Grammar school, ESG/GHS, GBHS, GSS & GBSS) and 65 technical secondary schools (GTHS & GTC). General secondary education The 179 South-West general secondary schools are distributed in public and private sector as follows: 170 public schools and 59 private schools. These schools had on enrolment 98003 students among whom 52280 girls and 45723 boys. These students have been educated by 3888 teachers of whom 1584 women. The total number of classrooms is 1282 among which 1133 are in permanent material and 149 in temporary material. 25 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Technical secondary education The 65 South-West technical secondary schools are distributed in public and private sector as follows: 48 public schools and 17 private schools. These schools had on enrolment 20483 students among whom 6810 girls and 13673 boys. These students have been educated by 1629 teachers of whom 415 women. The total number of classrooms is 382 among which 340 are in permanent material and 42 in temporary material. The results statistics for official’s examinations in the region is presented in the following tables. Table 33: Results of GCE A Level 2012 AL 2013 AL Division Registered Sat Pass % Pass Registered Sat Pass % Pass Fako 6,960 6,679 3,687 55.20 7,218 6,870 3,705 53.93 Kupe Maunenguba 621 607 269 44.32 541 534 250 46.82 Lebialem 485 480 255 53.13 425 423 250 59.10 Manyu 1,045 1,019 473 46.42 946 910 399 43.85 Meme 4,258 4,174 2,013 48.23 4,019 3,907 1,924 49.24 Ndian 306 297 174 58.59 298 290 140 48.28 Source: General Certificate of Education Board, Buea Table 34: Results of GCE A Level Technical 2012 ALT 2013 ALT Division Registered Sat Pass % Pass Registered Sat Pass % Pass Fako 1,298 1,263 576 45.61 1,376 1,346 854 63.45 Lebialem 5 5 1 20.00 7 7 6 85.71 Manyu 12 12 8 66.67 18 18 16 88.89 Meme 59 56 10 17.86 73 69 30 43.48 Ndian 5 5 0 0.00 1 1 0 0.00 Source: General Certificate of Education Board, Buea Table 35: Results of GCE O Level 2012 OL Division Fako Kupe Muanenguba Lebialem Manyu Meme Ndian Registere d 13,979 2,020 1,559 3,204 9,660 1,336 2013 OL Sat Pass % Pass Registered 11,714 1,889 1,436 2,870 8,678 1,261 5,003 632 718 863 2,745 441 42.71 33.46 50.00 30.07 31.63 34.97 15,228 1,896 1,392 3,203 10,777 1,471 Sat Pass 12,382 1,760 1,257 2,866 9,612 1,348 5,719 647 606 1,054 3,624 505 Source: General Certificate of Education Board, Buea 26 MINEPAT, SOUTH WEST % Pass 46.19 36.76 48.21 36.78 37.70 37.46 SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 36: Results of Probatoire, Baccalaureat Probatoire Technique Division Fako Kupe Muaneguba Meme Ndian Total SouthWest Region Brevet de Technicien Registered 2012 569 2011 412 2012 378 2011 156 2012 248 2011 110 2012 183 Sat 555 564 412 377 156 244 109 179 Passed 162 205 115 86 60 101 24 32 % Pass Registered 29% - 36% 16 28% - 23% 19 38% - 41% 22% - 18% 0 Sat - 16 - 19 - 0 - 0 Passed - 0 - 6 - 0 - 0 0 0% Registered 47 57 3 0 - 6 - 4 Sat 47 57 3 0 - 6 - 4 Passed 14 37 2 0 - 0 - 2 30% 24 65% 44 67% 7 12 4 0% 2 5 50% 5 Sat 24 44 7 12 4 2 5 4 Passed 5 5 1 1 1 1 1 0 % Pass Registered 21% 365 11% 406 14% 290 8% 317 25% 118 50% 139 20% 218 0% 151 Sat 365 400 290 312 118 139 217 148 Passed 146 185 47 139 41 72 92 48 % Pass 40% 46% 16% 45% 35% 52% 42% 32% Registered - 7 12 - 0 - 0 Sat - 7 12 - 0 - 0 Passed - 0 10 - 0 - 0 % Pass Registered 991 0% 1,099 712 83% 738 278 395 333 343 Sat 991 1,088 712 732 278 391 331 335 Passed 327 432 165 242 102 174 117 82 % Pass 33% 40% 23% 33% 37% 45% 35% 24% % Pass Registered Manyu Baccalaureat Technique 2011 555 % Pass Lebialem Probatoire de BT Source: General Certificate of Education Board, Buea HIGHER EDUCATION There are 12 higher schools in the South-West region of which 06 IPES and one university (university of BUEA). In the University of BUEA there are 07 faculties and 02 higher training schools. The number of students of this university institute was 15731 in 2011 among whom 8186 girls and 7545 boys. These students have trained by 315 lecturers of this university. 27 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 UNIVERSITY OF BUEA Staffing Situation and Human Resource Development In the University of BUEA there are 07 faculties and 02 higher training schools. The number of students of this university institute was 15731 in 2011 among whom 8186 girls and 7545 boys. The University had about 314 permanent academic staff as shown in the table below and many part-time staff to teach in the over 117 degree programmes. The staffing situation and space therefore remain insufficient especially in the new establishments. Table 37: Statistics of Teaching Staff by Rank and Faculty for 2010/2011 academic year No. 1. 2. 3. 4. 5. 6. 7. 8. 9. Faculty Prof FAVM FA ASTI COT FED FET FHS FS FSMS Total Ass. Prof Lect. 1 3 1 2 1 1 12 5 26 2 25 6 1 3 9 48 30 124 2 2 1 6 2 13 Asst. Lect. 29 6 1 12 1 9 34 40 132 Inst. GTRA 2 1 7 2 11 7 7 Sex M 3 41 11 2 14 2 18 83 61 235 Total F 20 2 5 3 31 17 78 03 61 13 02 19 02 21 114 79 314 Source: University of Buea The quality of teaching staff greatly improved during this period following promotions and acquisition of new degrees. Twenty five (25) members of academic staff were promoted to various ranks as table below shows. Table 38: Statistics of Staff Promoted to various grades Category No. Promoted Assistant Lecturer to Lecturer 18 Lecturer to Associate Professor 06 Associate Professor to Professor 01 Total 25 Source: University of Buea PROFESSIONAL TRAINING The situation of the professional training centres in the South-West region is presented in the table below. Table 39: Situation of the professional training in the SW region DIVISION NDIAN N° SUB DIVISION 1 MUNDEMBA 2 BAMOUSSO 3 Etablissements Specialities OBSERVATIONS SAR/SM MUNDEMBA MEN/MAC/ EMC/EE SAR/SM BAMOUSSO SAR/SM EKOMBO LIONGO MEN/MAC/ EMC Classrooms are in wood MEN/MAC/ EMC Just the Director is working 28 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 DIVISION FAKO MEME N° SUB DIVISION 4 ISANGUELE 5 BAKASSI 6 EKONDO TITI 7 MUYUKA 8 MUYUKA 9 IDENAU 10 KUMBA3 11 KONYE 12 13 UPPER BAYANG MANYU 14 KUPE MANENGOU MBA 15 16 GUTI TOTAL SUD-OUEST Source : MINEFOP Etablissements Specialities SAR/SM ISANGUELE SAR/SM AKWA BAKASSI SAR/SM EKONDO TITI SAR/SM MUYUKA SAR/SM EKONA SAR/SM IDENAU SAR/SM MAMBANDA SAR/SM KONYE SAR/SM NDEKWEI SAR/SM UPPER BANYANG SAR/SM TINTO SAR/SM MANYEMEN OBSERVATIONS MEN/MAC/ EMC MEN/MAC/ EMC MEN/MAC/ EMC/EE MEN/MAC/ EMC/EE MEN/MAC/ EMC/EE MEN/MAC/ EMC MEN/MAC/ EMC/EE MEN/MAC/ EMC/EE MEN/MAC/ EMC MEN/MAC/ EMC MEN/MAC/ EMC MEN/MAC/ EMC MEN/MAC/ SAR/SM GUTI EMC 16 SCIENTIFIC RESEARCH AND INNOVATION In the South-West region, the Ministry of Scientific Research and Innovation is represented by 04 structures, notably: IRAD, “Plants and Medical Research Institute” “Geological Research Institute” and ING. 1. IRAD: this institute is present in EKONA, Batoke and Barombi-Kang. IRAD has produced the nursery of maize, plantain and varieties of yams. In EKONA division there is one biotech laboratory which can help to test fertility of ground and quality of agricultural products. Moreover, one program has been carried up about hevea production which helps to detect the parasites that can be harmful for the growing of this plant. The Barombi-Kang centre was created in 1952, to carry out the research about robusta coffee. Nowadays, this centre helps to develop the others varieties of cacao, maize, rice which PPTE funds. The Batoke centre was created to carry up the research about the varieties of fish which contain a lot of proteins such as Tilapia. 2. The institute of medicinal research and study of medicinal plants is specialized in diagnostics and laboratory test. 3. The institute of geologic and surface mine research is specialize in seismology and geology. 29 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 There is no private laboratory in the region. The number of public laboratories has not change from 2012 to 2013 and it stand at 14. The situation of researchers present in the Region is presented in the next table. Table 40: Distribution of researchers per specialties in 2012 and 2013 Number of researchers as at 31st Year 2012 December Year 2013 Men Women Men Women Specialities Agronomy 4 4 5 4 Animal production 2 2 2 2 Aquatic Biology 1 0 1 0 Biotechnology 2 0 2 0 Entomology 3 0 3 0 Epidemiology 1 0 1 0 Fisheries & Hydrobiology 2 0 2 0 Geochemistry 1 0 1 0 Phyto-pathology 1 1 1 1 Postharvest technology 1 0 1 0 Seed Technology 1 0 1 0 Socio-economy 0 2 0 2 Soil Science 1 1 3 1 Volcanology 3 2 5 2 24 12 28 12 Total The total number of research center is 05 and presented as follow. Table 41: Situation of research center per specialties Number of center as at 31st December Year 2012 Year 2013 Specialities Agriculture 02 02 Marine/Aquaculture 01 01 Geophysics/Volcanology 01 01 Medicinal plants/ Tropical disease 01 01 30 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 II.3.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 BASIC EDUCATION As far as the basic education is concerned, many physical achievements were registered in South-West region during the year 2013. Their budget for the two last years are presented in the below table: Table 42: Budget of RD MINEDUB for 2012 and 2013 Year 2012 Year 2013 117 559 600 125 259 900 Running budget Investment budget 806 183 000 783 891 000 923 739 600 909 150 900 Total For these two years, they have consumed at 100% the running budget while the investment budget was consumed at 95% in 2012 and at 72.4% in 2013. With the investment budget, they realized the following: Construction of 40 classrooms in some 20 primary schools; Construction of 02 nursery schools; Rehabilitation of 07 public primary schools; Construction of 04 latrines blocks; Construction of 02 teachers residences; Supply of 1440 benches in some 24 primary schools; Supply of furniture to 04 nursery schools; Supply of tables and chairs to50 schools; Supply of office equipment to the RDBE; Supply of a boat to the DDBE Ndian.; Beside these achievements, there are others which still ongoing, notably: Construction of 20 classrooms in some 10 primary schools; Construction of 01 nursery block; Construction of One Divisional Delegation; Construction of one sub divisional Delegation; Construction of 01 teacher’s residence. The councils with the support of PNDP have built 20 classrooms in 10 schools and blocks of latrine in 08 schools throughout the region. SCIENTIFIC RESEARCH AND INNOVATION With an investment budget of 24 millions, the main activity realized by CRRI was the furnishing of offices as physical achievement. Table 43: Budget of CRRI Buea for 2012 and 2013 Year 2012 Year 2013 Running budget 15.650.000 15.650.000 Investment budget 43.000.000 24.025.000 Total 58.650.000 39.675.000 31 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.3.3 DIFFICULTIES ACTIVITIES IN 2013 ENCOUNTERED IN THE IMPLEMENTATION OF BASIC EDUCATION The main difficulties encountered in basic education activities in South -West region are: The very enclave nature of the region makes coordination and supervision very difficult Acute shortage of teachers mostly in the rural areas Acute shortage of classrooms Too many requests for transfers from rural to urban areas SCIENTIFIC RESEARCH AND INNOVATION The main difficulties encountered in basic education activities in South-West region are: Lack of funds to locate independent researchers and innovators With only one service administrative vehicle, it is difficult to carry out the duties of the service No fuel allocated for the entire year III.3.4 PROPOSED IDENTIFIED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES SCIENTIFIC RESEARCH AND INNOVATION The following proposers are necessary for the progressing of activities in the South West region. Allocation of funds to identify and visit independent researchers and innovators Provide at least one other service vehicle and 04 bikes Provide fuel for the service III.4 INFRASTRUCTURES III.4.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY PUBLIC WORKS The mains infrastructure concerns the different kind of transport. The various transport infrastructures which are present in the Region will be presented notably Road infrastructures, Railway infrastructures and port infrastructure. 32 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Road infrastructures The roads are classified according to the following classification: Urban roads Highways National roads Regional roads Divisional roads Rural roads The table bellow shows the distribution of the national network road according to the different categories of roads. Table 44: Distribution of the National network according to their category and the linear Linear of road Category of road as at 31 Dec 2012 Earth Paved/asphalted Priority network Non priority network 984 km classified 268 km 1252 km 1436 km (Rural) as at 31 Dec 2013 826.2 km 327.7 km 1549.8 km 2703.7 km Road network in the South-West Region The South-West Region network has a total length of 2 688 km. which represent only 5.3% of the national road network (50.321 km) and making the South -West Region the least in terms of total length of road network of the country as whole. The regional network is composed of 268 km of tarred roads (which represents 10% of the total of the region and less than 4% of the total of national tarred roads), 984 km earth roads and 1436 km of rural roads. The 90% of the regional network are earth roads which the state are very bad during the rainy season and then made the accessibility to many zones difficult. The tarred network is composed of following stretches of road which are part of the N3 and N8 national roads. Table 45: Tarred road in the South-West Region N° National Stretch Length km N3 Mungo Bridge – Limbe with Tiko Branch 44 km 2 km N3 Limbé - Idenau 45 km N8 Mutengéné – Buea 17 km N8 N8 Mile 17 Muyuka – Kumba Supe – Nfaitok with Nguti Branch Total 69 km 50 km 2 km 268 km Source : Regional Delegation of Public Works, South-West. 33 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 As concern earth roads, they are distributed per division and by category as it is presented in the table below. According to this table, if we take into consideration the total length of the earth road and independently with their state, Manyu Division appears as the most equipped with 571 km which is the quarter of the total network. Followed by Meme and Ndian Divisions which have respectively 290 km and 350 km, Lebialem Division comes at least with 290km, which represent more than 12% of the network considered. Table 46: Distribution of the earth roads by division and by category (in km) Division Category of road National Regional Division Rural Total Fako 0 13 66 235 314 Kupe - Manengouba 0 0 0 336 336 Lebialem 22 65 0 203 290 Manyu 181 0 75 315 571 Meme 150 0 165 177 492 Ndian 70 0 110 170 350 South West Region 423 78 416 1436 2353 Source: Regional Delegation of Public Works, South -West. The major civil engineering structures realized in 2012 and 2013 are presented below. Table 47: major civil engineering structures realized in 2012 and 2013 Period as at 31 Dec 2012 Major civil engineering structures (‘Ouvrages d’art’) Dalots road Mungo-Mutengene as at 31 Dec 2013 Bridge Malingo junction-Bulu nativeTole Protection of Embankment Bakingili The South West region has only two weighting station which are the MISELELE weighting station (on the Douala-Tiko road) and the BALANGUI EDIKI (Kumba pk43+100) weighting station Railway infrastructures The South West Region has been provided with a railway, the stretch Mbanga Kumba (called “bretelle est-ouest”) which is 29 km long and put into service in April 1969. The Régie des Chemins de Fer du Cameroun (Régiferman) which was in charge of the exploitation of this stretch since the creation has been privatised and rebaptised CAMRAIL by their new owners composed with the French group SAGA and the South African COMAZAR. CAMRAIL is supposed to start activity there effectively since the 1 st April 1999. 34 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Port Infrastructures Limbe-Tiko port facilities Apart from the Douala-Bonabéri port, the Cameroun maritime coast harbor two other constructed port facilities on the Atlantic Ocean. These are the Port of Kribi, Limbe Bota and Tiko ports facilities. We will just present the Tiko -Limbe port which is in the South-West region. Limbé-Bota and Tiko ports were constructed by Germans in 1911. These ports were handed to CDC at the end of the Second World War. They are managed since 1973 by ONPC according to the convention signed between the CDC and the Cameroon government. Since the construction of bridge on Moungo River and the cons truction of the railway Mbanga-Kumba, the port traffic constituted essentially by CDC’s products have decreased. The proximity of Douala and the difficulties of packing along side are the main raisons of the stagnation and the traffic decline . The Exportation which concern Palm product and Cocoa are more than importation. Importations are nil since 1980. Personnel resources As concern personnel resources, the South-West regional Delegation counts 88 personnel distributed as follow 07 Senior Civil Engineers 01 Treasure controller 16 Civil Engineers 01 Contractual of Administration 13 Senior Civil Technicians 01 Adjoint d’administration 07 Civil Technicians 32 State agents 04 Civil Technician Agents WATER AND ENERGY Accessibility to Potable Water The South West region has 09 centers of water distribution covering 27 localities, either 33.3% of all the localities in the region according to the report on the state of the population in 2010 produced by BUCREP. Always according to this same report, the rate of access of the households to a source of safe drinking water is 63.2% in the Region. The potable water schemes in the region are presented below. Table 48: potable water scheme in the Region Period Potable water supply infrastructure As at 31 Dec 2012 As at 31 Dec 2013 Njungo water supply scheme, Isangele and Bakuto Ombe water supply scheme Local hydraulic infras. Equipped borehole at EATMS Equipped borehole at Fiango and Kossalo Bore-holes/wells 35 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Electricity power Supply Thermal energy is the main source of electricity production in the region. Aside of this source, there is solar panel which have been newly installed in Fako and Meme Division. In 2013, 04 villages benefitted from rural electrification, they are: Big Ngandjo, Nninong, Bwiteva and Mondoni. Station services in the South-West Region In 2012, they were 38 petroleum product sale stations while in 2013 this number has grow up to 41 sale stations. Personnel resources The staffing situation of the Regional delegation of MINEE South West has a total of 31 personnel distributed as follows: 17 at the Regional Delegation 04 in meme Division 02 in Fako Division 02 in Ndian Division 02 in Lebialem Division 02 in Kupe Muanenguba 02 in Manyu Division 36 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 The personnel are effectively present and actively working. Many office Heads have not been appointed in all Divisional Delegations. POSTS AND TELECOMMUNICATIONS The Telecommunication operators’ (privates and publics) in the South -West offer different services to their subscribers or costumers notably: telegraphic, fix and mobiles telephonic, transmission of data and private radio electricity (Telecommunications services). The posts and telecommunications provide also mail and money transfer services and saving money service. The Posts and Telecommunication Through its different structures which are CAMTEL, CAMPOST and ENSPT, annex Buea employs 256 agents. Posts Establishments They are composed of : 17 Posts offices which are all functional distributed as follow 5 in Fako, 2 in Meme, 4 in Manyu, 3 in Kupe-Manengouba, 3 in Ndian and 1 in Lebialem ; 07 Mails lines which are composed of 2 inter regional and 5 divisional. These lines are done by CAMPOST and Some Privates structures on the base of a convention. 3 EMS Agencies (Buéa, Kumba, Limbé) functionnal. 4822 Postal Boxes. The National Advanced School of Posts and Telecommunication, Annex Buea which is incharged of the training of agents, private sector employees, controllers, senior technicians, technicians and exploitation agents for the state. The situation of post and telecommunication infrastructures available in the region is presented below. Table 49: Number of posts and telecommunications infrastructures available in the region Number of infrastructures Type of infrastructure Postes Telecommunication Community tele-centres as at 31 Dec 2012 17 6 12 as at 31 Dec 2013 17 6 12 37 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Telecommunications Establishments They are composed of: 5 Telecommunications centers (5 commutation centers, 5 local network centers, 5 transmission centers, 5 actel) in Buea Town (700 lines), Kumba (300 lines), Limbe (700 lines), Mamfe 400 lines) and Tiko (300 lines); 5 equipped telex lines (GENTEX) in Buea, Kumba, Limbe, Mamfe, Tiko ; 10 radiotelegraphic stations MORSES (Buea, Muyuka, Mundemba, Nguti, Mamfe, Akwaya, Fontem, Ekondo-Titi, Tali, Kumba) ; 7 stations relais (antennes situées le long des axes routiers pour la connexion des villes) dans les localités suivantes : Buéa (Signal-Hill, Soppo-Hill,), Ekona, Diongo, Kurumé, Asuhill, Tinto, Kumba-Hill ; 01 transmission sector in Buea ; 01 transmission sub-sector in Mamfe; 01 Commutation sector Buea ; 01 local network in Buea; 10 CET/CPET in the lovaties of Buea, Muyuka, Nguti, Mamfe, Akwaya, Ekondo-Titi, Limbe, Tiko, Kumba, Tali. 9 Telecenters (Bambili, Idénau, Kombone mission, Nyassoso ; Nguiti ; Bakebe ; Menji ; Akwaya) only those of Menji and Nyassoso are operational. They are 03 parcels companies in the region. As internet services providers, the region has three main actors which are CAMTEL, MTN and ORANGE. The situation of the telephone network in the region is not saturated. The number of telecommunication subscribers is shown in the following table. Table 50: Number of telecommunication subscribers in 2012 and 2013 Number of telecommunication subscribers Type of Subscription as at 31 Dec 2012 as at 31 Dec 2013 Land line 4880 4921 internet 454 497 STATE PROPERTY, CADASTRAL, LAND TENURE AND SURVEY In 2013, the Delegations of Land Tenure have established 1575 land titles. That same year, they were 445 administrative vehicles and 2067 administrative buildings in the region. The number of lands developed per surface area in 2012 and 2013 are presented as follow. 38 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 51: Distribution of lands developed per surface area in 2012 and 2013 Number of lands developped Surface area of land 30,500,807 m 2 23,400,000 m 2 15,700,000 m 2 25,600,000 m 2 18,900,000 m 2 as at 31 Dec 2012 890 980 650 1200 1090 as at 31 Dec 2013 1200 1100 780 1300 1005 TRANSPORT In 2012 as in 2013, they are 29km of rail linear in the Region. The railway stations are presented below. Table 52: list of railway stations in 2012 and 2013 Period as at 31 Dec 2012 NDOH I; NDOH II Railway stations MBALANGUI; EDIKI MABONJI BAROMBI as at 31 Dec 2013 NDOH I; NDOH II MBALANGUI EDIKI, MABONJI BAROMBI TIKO airport is the only airport present in the Region. They are 03 ports existing in the region which are: Tiko, Idenau and Bota. The region registered 13 traveling agencies and 07 driving schools. In 2013, we recorded 131 accidents throughout the Region. It exist two toll gates, one in Tiko and one in Essongo. 482 of taxi driving licenses were delivered by transport delegations. As far as matriculations are concern, they were a great number of vehicles registered in 2013 as one can see in the next table. Table 53: Number of vehicles, motorbikes and semi trailers registered in 2012 and 2013 Number of matriculations as at 31 Dec 2012 Vehicules Moto-bike Semi-trailers 164 186 07 as at 31 Dec 2012 2631 1720 46 In 2013, about 8 000 driving licenses were issued in the Region. The situation is the following. 39 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 54: Distribution of driving licenses issued per category in 2012 and 2013 Number of driving licenses Category of license as at 31 Dec 2012 A B C D E FB G TOTAL 196 3581 290 1526 632 01 120 6376 as at 31 Dec 2012 234 5163 382 1518 474 02 90 7863 III.4.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 PUBLIC WORKS With a great increase in its investment budget in 2013(consumed at 71.85%) in comparison with 2012 (consumed at 98%), the Delegations of Public Works have achieved many activities. Table 55: Public Works Budget in 2012 and 2013 Year 2012 Year 2013 Running budget 72 900 000 109 000 000 Investment budget 296 200 000 1 095 395 500 Total 369 100 000 1 204 395 500 The completed physical actions induced by the total budget in 2013 are: Road Mondoni-Inter N3; Road Molingo junction-Bulu Native –Tole-Bulu blind; Rehabilitation of bridge Ekondo Titi Lobe Town-Mbonge (Pk1+500); Rehabilitation of bridge bridge Ekondo Titi Lobe Town-Mbonge (Pk1+300); Treatment of critical points on the road Loum-Tombel; Treatment of critical points on the road Melong-Bangem; Elevement Eboulement Route RN8 (Montee Plantecam); The ongoing actions are: Rehabilitation of Road Ekombe Bonji Bakumba Dikume Balue; Rehabilitation of Road Mbelenka, Folemo, Fotsop, Mmokbie-Awut-Det; Rehabilitation of road Santchou-West Region Njungo 40 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 WATER AND ENERGY For the year 2013 the running budget of the Regional Delegation stands at 41,460,000 Fcfa it has increase compare to the 34,060,000 Fcfa allocated in 2012. The Investment budget of 2013 (534,000,000 Fcfa) has increased also compare to 2012 which the amount allocated was 302,500,000 Fcfa. The both budget have been executed at the rate of 100%. The realizations occurred: Completed actions On-going actions Rehabilitation of CIAP potable water scheme at Construction of Mabeta water supply Mutengene Scheme Rural electrification of Mondoni (phase2) Rural electrification, Akwa and Issobo Rural Electrification, Bwiteva Equipped borehole,Mudeka Equipped borehole, Mongo Island Equipped borehole, Ekwe Balue Realisation of a potable water supply scheme, Ngosso Construction of Ecossan two latrines with four compartments Construction of equipped borehole at Lysoka Equipped borehole, Loe Balondo Equipped borehole at Kossala Equipped borehole at Fiango Private sector realizations: Structures Completed actions Rehabilitation of the Bakingili water supply scheme Supply scheme, Rehabilitation of bonadikombo water supply scheme On-going actions Construction of equipped borehole at LYSOKA construction of a borehole Borehole with a manual pump at GPS New Lay-out- Tiko, Fako Division; COUNCILS/ Rehabilitation of Ebam village water supply, PNDP/FEICO Manyu Division M Mini potable network of Banga Babong water supply scheme Construction of Babong Water supply scheme Rehabilitation of Ekok village water supply Construction of Bonji Water supply scheme Extension of water supply systems GNS Dikume Balue 41 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Rehabilitaion of Bangem water supply Scheme K/M Rehabilitation and extension of Konye giant water supply to Kokaka, Dikoni, Konye, Ndoi, and Ndolo Bolo Rehabilitation and sand filter of Azi and extension of Azi water supply scheme Step down electricity supply from Fotabe to Defang , Manyu Division Step down electricity supply Kendem to Bokwa, Manyu Division Rural electrification from alou market to Meneh through Kongomeh Other funds Rehabilitation of water supply at the for financing University of Buea, Fako Division micro-projects POSTS AND TELECOMMUNICATIONS The total budget of Regional Delegation of MINPOSTEL in 2013 was 30 900 000 FCFA constituted in 16 200 000FCFA as running budget and 14 700 000 FCFA as investment. The main achievements were : Refection de la peinture dans le bâtiment habritant les services de la Délégation Reg des P & T du Sud Ouest; Achat mobilier de bureau (Chaises de réception, armoires, rideaux, tables de bureau, TV); Achat des ordinateurs LAND TENURE AND SURVEY Within the reference period, the Regional Delegation and the six divisional delegations didn’t registered realization due to lack of fund. TRANSPORT With its 10 000 000FCFA of investment fund, the Regional Delegation has realized the supply of office equipment. Table 56: Budget of Transport in 2012 and 2013 Year 2012 Year 2013 5,832,000 7,467,800 Running budget 30,000,000 10,000,000 Investment budget 35,832,000 17,467,800 Total 42 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.4.3 DIFFICULTIES ENCOUNTERED THE IMPLEMENTATION OF ACTIVITIES IN 2013 PUBLIC WORKS The main difficulties encountered by the Regional Delegation of public works during the year 2013 are: Absence of vehicle for the regular follow up of projects ; Insufficiency of qualified technical personnel ; Insufficiency of running budget ; Generalized salary inadequacy; TRANSPORT The delegation suffered the late arrival of credit N° Z864065 Charge N° 47 46340010 2276 amounting to (4 563 544 F) on the 30th of December 2013 at about 1 too late for any engagement to made this credit was returned to Yaounde in the ministry for further action. NB It was for the acquisition of office equipment. WATER AND ENERGY: The main difficulties encountered are followed: Lack of adequate safety materials for personnel during inspection; Lack of recent legislative texts in the Petroleum and Water Sectors; Absence of field vehicles to render work effective; Insufficient running credits with respect to required work to be done and number of personnel; POSTS AND TELECOMMUNICATIONS The difficulties encountered is essentially: Insufficient of funds; LAND TENURE AND SURVEY The difficulties encountered are: Lack or insufficient personnels Lack of means of follow up of projects; 43 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.4.4 PROPOSED IDENTIFIED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES PUBLIC WORKS The following proposed solutions should take into consideration; Supply of vehicles to all the delegations; Recruitment and deployment of technical personnel; Increase of running budget; Restoration of the salary level at the minimum level of 1992; TRANSPORTS They propose the early re-allocation of subsequent credits to avoid falling in the same soup at the end of the financial year which definitely devoid the service from its annual allocation on equipment. WATER AND ENERGY The following proposed solutions are necessary to solve the difficulties presented above : Technical equipping of services and Delegations which do not have materials like GPS, altimeter, etc.; Increase of running credits for effective service and allocation of enough funding for feasibility studies for electrification and water projects; Provision of vehicles (pick up 4X4 double Cabin) per Divisional Delegation to facilitate work; Supply of safety materials for personnel during inspections; Regular training sessions to specify responsibilities with respect to other Ministerial departments in Petroleum products, Gas and Water sectors. POSTS ET TELECOMMUNICATIONS The main proposition is to increase the budget. STATE PROPERTY AND LAND TENURE The main proposition is to provide means of follow up of projects in the Region 44 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.5 GENERAL ADMINISTRATION AND FINANCE III.5.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY FINANCE As far as equipment and infrastructure are concerned, one can note that the Divisional Tax Centers of Ekondo Titi and Tiko are located in the buildings rend by the General Direction of Taxation. The Region has 04 vehicles between which just one is in used and 7 motor-bikes between which 06 are breakdown. There are also 28 computers with just 17 functionning. The economic environment has greatly suffered from the effects induced by the growing financial and economic vulnerability therefore, all things having led the slowdown in growth and thus stagnating revenues including tax. In addition, the Southwest lack of "big calibres" records not only modest in quantity but also in quality and especially not subject to stability in terms of tax yield. The counterparties of large firms (SONARA, CDC, PAMOL ...) come from elsewhere and operate in our district as "importing" so tax. They were 292 tax collection centers in 2013 while they were 232 in 2012. In 2013, the total number of staff whose salaries are paid in the region has drop from 4,742 in 2012 to 4,107. At the other hand, the number of pensioners has increase from 2,971 in 2012 to 3,074 in 2013. Concerning the tax regime, they were 98 in 2013 an d 48 in 2012 for the actual regime. For the simplified regime, they were 349 in 2013 for 178 in 2012. ECONOMY, PLANNING AND REGIONAL DEVELOPMENT In terms of material resources, the construction of the South West Regional Delegation has been completed. It should be noted that all Regional offices are housed in the premises belonging to MINEPAT. In terms of equipment, the Regional Delegate has a car brand Toyota Prado and one Hilux Pick-up. A total of six vehicles for the entire Regional Delegation; also two boats are secured by the army on behalf of MINEPAT in Limbe. A boat is available to MINEPAT Ndian for missions in the Bakassi area. These boats were provided by the DATZF. The execution rate of PIB in the region per division is presented in the foll owing table. Table 57: Execution rate of PIB in 2012 and 2013 per Division Division At the 31/12/2012 As at the 31/12/2013 Region 88.87 23.80 Fako 96.50 58.45 Kupe Muanenguba 82.14 33.00 Lebialem 87.00 54.62 Manyu 98.56 89.04 Meme 92.48 79.89 Ndian 97.50 62.00 45 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 TERRITORIAL ADMINISTRATION AND DECENTRALISATION The headquarter of the South West Region is Buea. According to BUCREP, the population of the South West Region is estimated in 2011 at 1 421 456 habitants amongst which they are 719 394 male and 702 062 female. The region has 06 Divisions and 31 Sub-divisions presented in the table below: Table 58: Administrative units DIVISIONS FAKO HEADQUARTER BUEA, LIMBE I, LIMBE II, LIMBE III, WEST COAST, MUYUKA, TIKO LIMBE KOUPE MUANENGOUBA LEBIALEM SUB-DIVISION BANGEM BANGEM, TOMBEL, NGUTI MENJI ALOU, WABANE, FONTEM MANYU MAMFE MEME KUMBA AKWAYA, MAMFE, UPPER BANYANG, EYUMODJOCK KONYE, MBONGE, KUMBA I, KUMBA II, KUMBA III NDIAN MUNDEMBA BAMUSSO, EKONDO – TITI, DIKOME BALUE, IDABATO, TOKO ISANGELE, KOMBO ABEDIMO, KOMBO ITINDI, MUNDEMBA, Source : Governor service South West PUBLIC SERVICE AND ADMIINISTRATIVE REFORM The delegation has 26 personnel that is Civil servants and 16 state agents. Among the civil servants, they are 03 men and 07 women while among state agent they are 6 men and 10 women. III.5.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 FINANCE In 2013, the Regional Control of Finance had a running budget of 20,033,150 which was consumed at 100%. They had no investment credits. ECONOMY, PLANNING AND REGIONAL DEVELOPMENT In 2013, the Regional delegation of MINEPAT has notice a decrease in both its running and investment budget as shown in the following table. Table 59: MINEPAT budget for 2012 and 2013 Year 2012 Year 2013 19,292,800 16,150,000 Running budget 127,000,000 58,000,000 Investment budget Total 146,292,800 74,150,000 Implementation of the Action Plan 2013 at the South West Regional Delegation is satisfactory. 46 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 With regard to the management and monitoring of the implementation of the GESP, in a participatory evaluation of the implementation of GESP, technical services and the divisional delegates of MINEPAT presented the GESP with respect to the Regions projects to the authorities and population. Two conferences had been held to sensitize the population on the GESP. Investment promotion is effective. A database on projects and public investmen t programs is available in all Divisional offices. After forming the databank of public investment projects, the regional delegation MINEPAT South West has also followed the said public investment projects and other stakeholders. These projects include: RUMPI, SOWEDA; PNDP; GCE BOARD and University of Buea, etc.. The logbook project was also posted and distributed in the regional and divisional delegations. Concerning the follow-up of the Rural Sector Development Strategy, information were collected from services concerned assembled and transmit ted to hierarchy. Concerning the activities of the National Community Driven Development Programme (PNDP), the follow up of the elaboration of CDPs for the 26 councils for 2013 was carried out in a participatory follow up meeting. The training of Mayors, Steering committee members and LSOs was carried out in a training workshop . Other specific achievements in 2013 were: Rural electrification of Nninong village in Kupe Muanenguba Division; Construction of fence and a water tank support at the Regional Delegation; Equipment of offices; PUBLIC SERVICE AND ADMINISTRATIVE REFORM In 2013, the Regional delegation of public service has notice an increase in both their running and investment budget as presented in the next table. Table 60: MINFOPRA budget for 2012 and 2013 Year 2012 Year 2013 23,180,000 27,680,000 Running budget 4,000,000 4,900,000 Investment budget Total 27,180,000 32,580,000 Specific achievements in 2013 are presented below: Purchase of office materials; Purchase of two computers; Purchase of two splits; III.5.3 DIFFICULTIES ACTIVITIES IN 2013 ENCOUNTERED THE IMPLEMENTATION OF FINANCE The main difficulties were: There was disconcordance in amounts between finance control and Treasury The inability of municipal controllers and D.O’s to forward budgetary information 47 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Late award of contracts Instability of the software application Insufficient of computers Insufficiency of running credits Lack of trained personnel ECONOMY, PLANNING AND REGIONAL DEVELOPMENT The two cars at the Regional Delegation are in Bad state; The allocation for fuel is insufficient considering the enclavement of the region; Bad state of road for the achievement of field work; Need of training of personnel have been never taken into account; Need of a driver; PUBLIC SERVICE AND ADMINISTRATIVE REFORM Difficulties are : Enclave nature of the Region and the fact that it is inaccessible to communication facilities. this prevents those in the enclave areas to get information about the Public Service Insufficient budget to carry out the activities of the Delegation in the Region. For Instance mission allowance within the country. III.5.4 PROPOSED IDENTIFIED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES FINANCE We need a permanent computer technician Contracts should be awarded early enough We need updated computers Credit for the running of the service should be increased More trained personnel are needed A more performing software application is required ECONOMY, PLANNING AND REGIONAL DEVELOPMENT To face the difficulties mentioned above, the following propositions are made: Provide cars for the delegation; Increase the running credit; Give means to carry out activities; Taking into account the need of training of the staff; PUBLIC SERVICE AND ADMINISTRATIVE REFORM The following proposals are needed: The Region should be developed in terms of transport and communication network 48 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Services of the Public Service should be extended to the Divisions through the Creation of Divisional Delegations III.6 PRODUCTION MINEPDED) AND COMMERCE (MINADER, MINEPIA, MINFOF, III.6.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY AGRICULTURE AND RURAL DEVELOPMENT The South West Region has a surface area of about 24,923 km 2 with 951 316 Ha under cultivation. The region has a population of about one million, four hundred and twenty one thousand, and four hundred fifty six (1,421,456) inhabitants of which over 70% are living in the rural areas and involved in agricultural activities. The South West Region is one of the production basin. The main products are presented in the following table. Table 61: Distribution of main products per production area Main products Production areas cocoa Meme, Fako, Manyu, Tombel Robuster coffee Limbe, Bangem, Manyu, Meme Cassava The whole Region Plantains Tombel, Bangem, Fako, Fontem, Ekondo titi Orages Manyu, Fako, Meme, Ndian Yam Buea, Muyuka, Ekondo titi, Eyumodjock Cocoyam Tombel, Bangem, Fako, Alou Irish Potatoes Nkongle, Bangem Tomatoes Buea, Nkongle, Bangem Egusi Manyu, Muyuka, Ekondo Titi The situation of the main cash crop is as follow Table 62: Level of production of the main cash crops (in Kg) Level of production Surfaces As at 31 Dec As at 31 Dec As at 31 As at 31 Main products 2012 2013 Dec 2012 Dec 2013 Cocoa 145,039,300 193,959,000 108554 ha Rubuster coffee 6,446,800 6,163,220 11194 ha Oil Palm 95,148,400 182,992,500 66274 ha Plantains 1,311,710,000 17825 ha Cassava 1,014,158,600 79309 ha Cocoyam 49,419,105 33237 ha Oranges 261,000 672 ha Irish Potatoes 10,480,000 1750 ha 49 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Beside the cash crop, the population of the South West Region also produces the food crops. The level of production of this last one is presented in the following table. Table 63: Level of production of food crop in 2013 (in kg) Main products As at 31 Dec 2013 Cassava Plantains Egusi Irish Potatoes Tomatoes Oranges Banana Maize Yam Pepper Cabbage 10,14,158,600 1,311,710,000 6,014,500 10,480,000 2,488,000 261,000 108,273,000 69,423,500 450,411,000 1,580,700 7,519,000 The table below shows the various professional organizations/Cooperatives existing in the region in 2012 and 2013 Table 64: Distribution of cooperatives in the region in 2012 and 2013 Number of Professional organizations /CIGs/COOPERATIVES Titles As at 31 Dec 2012 As at 31 Dec 2013 Professional organizations CIGs 1636 2460 COOPERATIVES 489 867 Union of CIGs 220 220 Union of cooperatives 8 8 Producer in the region don’t have enough heavy equipment for their production. Nevertheless, they are some of them which are well equipped. Table 65: Number of farm tractor and other equipments used in the Region Number of equipments used for agriculture Types of Equipments As at 31 Dec 2012 Tractors Manuel Oil Press As at 31 Dec 2013 10 50 They are agricultural enterprises in the region as presented in the next table. 50 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 66: Number of agricultural enterprises existing in the region Number of agricultural enterprises existing Main products Oil Palm Rubber Banana Tea As at 31 Dec 2012 As at 31 Dec 2013 2 2 2 1 2 2 2 1 During the year 2013, 4km if rural road were rehabilitated to enable farmers to carry their product from farm to market. LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIES BREEDING Breeding is relatively small presence in the South West. Medium densities, the region could accommodate a larger pastoral activity. The statistics provided by the Office of MINEPIA can nevertheless get an idea of livestock products. Before going through the statistics of breeding, we will first look at the mains production areas. Major Production areas Major products and major production areas in South West are presented below Table 67: Major products and major production area Quantities produced Type of breeding short cycle Long cycle Other products of breeding Poultry porcine Non-conventional Quails Snails Cane Rats Rabits Giant Rats bovine ovine Caprine milk honney eggs Main zone/locality of production As at 31 Dec 2012 As at 31 Dec 2013 Ndian Kupe-Muanenguba 615,031 31,021 Fako-1,662,159 Fako-32,175 Fako Fako Fako Fako Kupe-Muanenguba Manyu Meme Meme 18,123 485,000 518 920 39 7,094 15,561 34,836 2,889 154,928 307 Meme-970 6 7,423 54,640 35,500 Kupe-Muanenguba Fako 30,200L 64,873 13,609L 388,052 By reading the table below, one can notice that each Division in the South West Region is specialize in almost one type of breeding. 51 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 The table below gives the situation of equipment existing in the region Table 68: situation of equipment existing in the region Number of equipments used for breeding Types of Equipments Feed Mills Hatcheries (incubators) Honey pressing machines As at 31 Dec 2012 As at 31 Dec 2013 15 7 25 7 There are almost twenty thousands of breeders in the Region and the majority of them are doing poultry. Now we look at the situation of the main inputs used for breeding in the region. Table 69: Quantities and prices of inputs used Evolution inputs prices on the local market quantity used Main inputs Unit As at 31 Dec 2012 As at 31 Dec 013 As at 31 Dec 2012 As at 31 Dec 2013 Complete feed 50kg 4,501.1 4,745.05 18,000 17,000 875.7 29,000 30,000 Concentrate 25kg 1,012.5 Fish meal 10kg 174.6 28.25 2,000 2,000 Maize 50kg 2715.6 5,833.7 26,000 25,000 Soya beans 50kg 158.64 340.8 30,000 27,500 Remoulage 50kg 394.27 847 7,000 6,500 4.98 10.7 3,500 3,500 Sea shell 25kg Wheat brand 25kg 74.47 160 3,800 3,500 Palm kennel 25kg 0.6 1.3 3,500 3,500 FISHERY PRODUCTION Here the focus is essentially on fish production systems, those involved in terms of fishermen and the markets, all in a bid to highlight the importance of fish production in the frontier zone and the South West economy generally. The fish production systems include marine fisheries, inland fisheries and aquaculture. Marine fishing is being carried out in Fako and Ndian Divisions and is divided into three sectors: artisanal, artisanal semi-industrial and industrial, while the inland sector is mainly artisanal. The next table presents the different fishing methods and the quantities caught. 52 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 70: Fishing methods and quantities Quantities produced Mains products Fish Other sea products Aquaculture Artisanal fishing Industrial fishing Continental fishing shrimp Main zone/locality of production Fako and Meme Fako and Ndian Fako and Ndian Meme and K/M Fako and Ndian As at 31 Dec 2012 4.8 tons 440.811 tons 574 tons 969.437 tons 304 tons As at 31 Dec 2013 0.446 tons 3, 026.4 tons 1,977.7 tons 34.7 tons 2,792.1 tons Despite the high demand of fish (especially fresh fish) by the population of Mundemba, Isangele and Ekondo-Titi, nearly all the fish caught in Ndian Maritime zone is taken to Nigeria by the dominant Nigerian fishing population. The main equipments used for the production of fish are presented in the following table Table 71: Number of equipment used for animal husbandry Number of equipments used for animal husbandry Types of Equipements As at 31 Dec 2012 As at 31 Dec 2013 used for breeding Dessecting sets 02 02 Electronic scale 02 02 Hormones 10 flacons 10 flacons Artemia larva 10 10 Hatching trays 10 10 Happas 10 10 CENSUS OF ARTISANAL FISHERMEN Small producers Table 72: Number of small fishermen in the region As at 31 dec 2012 Men Women Aquaculture Artisanal fishing Industrial fishing Continental fishing 78 2992 418 393 / / / / 78 2992 418 393 56 3031 352 582 / / / / 56 3031 352 582 shrimp 241 / 241 289 / 289 Main products Fish Other sea products As at 31 dec 2013 Total Men Women Total Women are not really involved in the cashing of fish even if they are present in the distribution channel and the smoking of cash product. 53 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 73: Number of Medium fishermen producers in the region As at 31 dec 2012 As at 31 dec 2013 Total Main products Men Women Men Women Total 118 84 Aquaculture 118 / 84 / Artisanal fishing 4488 / 4488 4547 / 4547 Fish Industrial fishing 628 / 628 526 / 526 Continental 589 873 589 / 873 / fishing Other sea 360 412 shrimp 360 / 412 / products Table 74: Number of Big fishermen producers in the region As at 31 dec 2012 Total Men Women As at 31 dec 2013 Total Men Women Aquaculture Artisanal fishing Industrial fishing Continental fishing 236 8977 1256 1179 236 8977 1256 1179 169 9094 1056 1747 169 9094 1056 1747 shrimp 724 724 868 868 Main products fish Other sea products Artisanal fishing is the principal method of fishing practiced in the region, the fishermen practising this method represented 70.4% of all the fishermen. It is follow by continental (13.5%) and industrial fishing (8.2%). The main inputs used for the production of fish are presented below. Table 75: Quantities and prices of main inputs for production of fish Quantities used Main inputs Unit Dissect set Electronic scale Prices of inputs on the local market As at 31 Dec 2012 As at 31 Dec 2013 As at 31 Dec 2012 As at 31 Dec 2013 1 1 30,000Frs 30,000Frs 1 1 200,000Frs 200,000Frs Hormones Bottles 2 2 50,000Frs 50,000Frs Artemia larva Bottles 2 2 50,000Frs 50,000Frs Hatching trays Trays 4 4 40,000Frs 40,000Frs 3 3 90,000Frs 90,000Frs Happas The framework of traditional activities Although the region and the population are strongly rural, modernization efforts of the conditions of production and industrialization are clearly visible. The results are far from negligible. It is in this context that the actions fit for the supervision of the agricultural, 54 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 pastoral, and fish producers. In both sectors, management structures include government departments, companies and development projects. Supervision departments (MINADER MINEPIA) are through their respective regional offices and their decentralized structures (delegations department, district centers and livestock veterinarians). As development companies, we counted a number in the region. While some of these structures within the public sector, initiatives from natives and foreigners are not lacking. Others like PNVRA (National Agricultural Extension and Agricultural Research) funded by the World Bank have almost national coverage of Cameroonian territory and aim to provide the extension to all farmers. The South West region is covered by four 19 sectors and 146 agricultural extension areas. Among the support structures that hold the most attention include the SOWEDA, IRAD and PSCC in agriculture. In pastoral and fish, the action of SODEPA (Development Society of Animal Production) established in 1974 under the Plan Meat(Founded in 1974, the plan targeted the emergence of a modern cattle, ranching, to increase the production of meat in Cameroon.) is virtually nonexistent here. It was set up ranches State and provide support to the management of private ranches whose creation should be encouraged. It is the same action of the Special Mission Tsetse Eradication (MSEG) also created under the Plan Meat. In the area of livestock, Project Development Livestock (ESDP) is a special place, but again its effects are not sufficiently experienced in the region. Designed as backup to previous projects Meat Plan I and II that occurred between 1974 and 1988 and found unsatisfactory, the ESDP which is part of the Structural Adjustment Programme has opted for an increase in production from an improvement of traditional breeding of all animals. We also have AFOP and ACEFA (Programme for Competitiveness of Family Agropastoral Farms) supporting actions of MINEPIA. FOREST AND WILDLIFE Infrastructure resources and equipment Regional Delegation of Forestry and Wildlife in the South West Region is spread over the 06 Divisions that rely Region through its regional delegations, Limbe Botanic Garden, the Zoological Gardens Limbe, national parks (Mt Cameroon, Korup Bakossi and Takamanda), the wildlife Sanctuary mbayang-Mbo, the technical and operational units, checkpoints forrestiers. To carry out their activities, each unit mentioned above has the necessary facilities such as offices, vehicles, motorcycles, computers and field equipment; they are presented below. It should be noted that the infrastructure resources and equipment belonging to the state listed below cover all Divisional Delegations, conservation institutions and the Regional Delegation of Forestry and Wildlife South West 43 buildings 45 computers 05 firearms 19 vehicles 06 photocopiers 01 fan 02 tractors 34 printers 01 TV 42 motorcycles 31 hammers forest 14 executive chair 55 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Tables 38 55 chairs 02 refrigerators 15 tents and sleeping bags 14 GPS 02 projectors 14 compasses 01 Microscope 45 plastic chairs 05 cabinets 14 brush cutter 07 saws saw Staff The staff of the Ministry of Forestry and Wildlife affected in the South West is estimated at 236 people in 2011 among which are the officials in the various grades of the public service, contract administration and maintenance staff. The breakdown is as follows: Table 76: Distribution of staff at the MINFOF SW Institutions Quantity RDFOF 32 DDFOF FAKO 24 DDFOF MANYU 15 DDFOF LEBIALEM 7 DDFOF KOUPE 12 DDFOF NDIAN 15 DDFOF MEME 20 Banyang Mbo Sanctuary 6 Takamanda National Park 9 Korup National Park 20 Mount Cameroon National 7 Park Limbe Botanical Garden 34 Limbe Zoological Garden 29 Bakossi National Park 6 TOTAL 236 Source: RDMINFOF SW The South-west is covered at 65% evergreen forest, mountain forests and sub alpine meadows. Permanent forests constitute 29.7% or 739.195 ha of forest area in the region while the non-permanent forest is 59.097 ha. Forests also proposed under permanent forests constitute 15% or 372.574 ha. The table below shows the various entities forest (47.14%) existing in the region according to their type, their number and size. Table 77: Distribution of national parks and reserves in the SW Type No Superficie National Parks (existing) 4 280,763 National Parks (planned) 1 233,973 Wildlife Sanctuary 2 71,027 56 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Reserve protection Generation reserves UFA (existing) UFA (proposed) Forests (proposed) Sale cuts Community Forests Source : RD MINFOF SW 6 6 5 5 2 5 18 39,897 107,978 239,530 92,007 46,594 11,785 47,312 Protected areas in the region are presented in the following table: Table 78: Protected area in South West Label Mt Cammeroon National Park Korup National Park Protected areas Takamanda National Park Bakossi National Park Bayang-mbo Sanctuary Surface areas 58,178 ha 126,000 ha 67, 599 ha 66, 200 ha Exploitable forest potential of the region is presented in the following table. Table 79 exploitable forest potential in the South West region Heqding Exploitable forest potential Exoploitable surface areas Size of the total surface reforested Unit Number of logging permits granted Number of hunting permits granted Volume of logs cut production As at 31st Dec 2012 As at 31st Dec 2013 14,450 ha 14,450 ha 20,000 ha 20,000 ha 2 Van de coupe 6 Forestry Management units 02 domestic permits 01 Van de coupe 7 Forestry Management Units 18 Domestic permit 00 00 64325852 The situation of non timber forest product is presented in the next table. Table 80: level of production per non timber forest product production Main products Gnetum africanam Plunus africana Unit As at 31st Dec 2012 442 tons 52 160 tons As at 31st Dec 2013 2000 tons 5 440 tons 57 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 ENVIRONMENT AND NATURE CONSERVATION The delegation of the Ministry of Environment and Protection of Nature is not well supplied with qualified personnel and does not have enough vehicles for field activities. It has a demonstration plot for reforestation (municipal land) 2 ha at Kumba 0.3 ha at the Bilingual High School Buea and 0.5 ha at the University of Buea. In 2013, it has conducted some environmental assesment which are presented in the next table. Table 81: Environmental impact Assessments conducted in 2012 and 2013 Environmental impact studies conducted As at 31st Dec 2012 As at 31st Dec 2013 EIA os Supermont EIA of Glencore EIA of G power Cement EIA of stone quary Tiko EIA of Mt Cameroon touristicproject EIA CDC EIA DANA Petroleum Company EIA PERANCO Company EIA of Gas International EIA of COSTA III.6.2 SPECIFIC ACHIEVEMENT S RECORDED IN 2013 AGRICULTURE AND RURAL DEVELOPMENT Table 82: The budget of the Regional Delegation of MINADER Year 2013 Running budget 19 614 000 Investment budget 17 710 000 Regional agropastoral show 26 000 000 Total 63 324 000 01 02 03 04 05 06 07 08 09 The investment budget was consumed at 60%. The mains achievements in 2013 in this ministry in the south west region are: Achieved actions On-going action 70.36 tons of maize seeds produced 0.5 ha of cocoa plot created 100,000 cassava cuttingsb produced 0.5 ha of cassava plot created 200,000 sweet Potatoe vine produced 3 groups selected for irrigation support 180,000 coffee cuttings produced Follow up the sustainability of 10 Complete construction of building of village banks 1807 cocoa Pods produced Regional Delegation 14,828 farmers trained 30,000 Plantain suckers Regional agropastoral show organised Supervise the construction of 4 culverts Follow up of farmers Identification and appraisal of village water catchment areas 1.141.250 Fcfa FIMAC loand recovered 58 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 10 Setting of 19 and 20 young farmers at PAIJA site of IKILIWINDI ETOKE Activities carried out by other sources of financing are: 105,000 plantain suckers distributed by plantain Project 6 tons of fertilizer distributed to farmer 23,356,067 CFAF granted to farmer groups by ACEFA 22,250 sachets of insecticide distributed to farmers 7 atomisers, 9 sprayers and 34 production kits distributed to farmer groups 56 cooperative restructured in compliance of OHADA uniform Act. Training of 3376 cocoa farmers in Farmer Field Schools Training of 2776 farmers in farmers Business Schools LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIES Their budget for the two last years are presented below Table 83: Budget of MINEPIA for 2012 and 2013 Year 2012 Year 2013 Running budget 80,560,700 175,489,300 Investment budget 81,000,000 405,500,000 Total 161,560,000 580,989,300 The mains achievements are: Construction of a fish market ant Bekumu, Bamusso Sub Division; Construction of Modern fish smoking Oven at Bekumu, Bamusso Sub Division; Completion of the Divisional Delegation of MINEPIA Ndian at Mundemba; Renovation of the Ombe piggery Station, Tiko sub Division-Fako ; Renovation of the residence of the Regional Delegate of MINEPIA Buea South West; Construction of a honey collection Centre in Tombel ; Extension of electricity to the Veterinary Centre -Nyasoso ; The ongoing actions are: Construction of a pilot Aquaculture centre at Kumba Construction of lodging for the resettlement of fishermen in Bakassi 59 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 ACEFA project has sponsored 25 CIG which are listed below S/ N 1 2 3 4 5 6 Name Location Type Cosmopolitan (Union of CIGs) HAFANAM PROJECT Rocky Valley Multipurpose CIG Dibamba Farmer CIG Unity and Progress CIG Makana Crop and Livestock CIG Feed Mill Automatic Feeders Bee Hives Pig Pens Pig Pens Pig Pens 7 8 9 10 11 12 13 14 Pig Pens Goat Pens Pig Pens Fish Pond Poultry House Poultry House Poultry House Poultry House 12 10 15 6 01 01 01 01 15 16 17 18 Batoke Livestock Farmers CIG Malingo CIG Bojoke Association of CIGs Join Action Multipurpose CIG Modest Farmers CIG Harmonized Farmers CIG Young Poultry Farmers CIG Mutual Pioneers Farmers Association Community Snails Mixed CIG Bolifamba livestock Farmers CIG Bekoli CIG Self Help Farmers CIG Buea Ewongo Buea Bonadikombo Unity Quarter, Limbe Mabeta New Layout, Limbe Batoke -Limbe Bonakanda-Buea Bojongo-Buea Yoke-Muyuka Bwitingi -Buea Muea Makanga -Muyuka Mutengene Num ber 01 40 60 05 05 05 Mutengene Mile 16 -Buea Ndio-Konye Small Ekombe 19 20 21 22 23 24 Ben Down Women CIG Water Loo Farmers CIG Humble Men Social CIG Agri Women CIG DEVAPA CIG Social Farmers CIG Pig Pens Poultry House Propagator Pig Pens and Fish Pond Pig Pens Poultry House Pig Pens Poultry House Poultry House Pig Pens 12 01 01 05/0 1 15 01 08 01 01 10 25 Etiendem Farming CIG Pig pens 10 Kumba Fiango-Kumba Boa Bakundu Kumba Fiango-Kumba 3 Corners –Ekombe, Kumba Kombone, Kumba FORESTRY AND WILDLIFE The actions performed by MINFOF in Southwest Region are: HIV Planning workshop Conservation development agreement Steering committee PSMNR-SW II Training workshop of conservators Lessons learnt workshop on IITA cassava project Two planning workshop to defined strategies and operational guardlines Follow up meetings between MINFOF, KFW, GIZ and program consultants Bilateral German-Cameroon corporation negotiations Visit of the Minister of forestry and wildlife to south West 60 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 ENVIRONMENT AND NATURE PROTECTION With a running budget of 11,500,000 FCFA and an investment budget of 8,000,000FCFA, MINEPDED has achieved the following: Environmental inspection; Support of school Through environmental clubs d Environment Through environmental clubs Environment Environmental control Execution of mangrove project in collaboration with FAO and MINEPDED III.6.3 DIFFICULTIES ACTIVITIES IN 2013 ENCOUNTERED THE IMPLEMENTATION OF AGRICULTURE AND RURAL DEVELOPMENT Difficulties encountered are: Insufficient credits: credits allocated were inadequate and many Agric Posts had no credits at all. Fund not allocated for most activities Inadequate allocation of funds Availability of funds Centralization of many intervention in Yaounde Activities centralized in Yaounde are run without involving the Regional Delegation/Field Staff LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIES The following difficulties were noticed: Poor road network resulting to high cost of transportation was a major handicap in the realization of projects Inadequate studies by competent engineers through effective field visits Inadequate collaboration between the major stakeholders in the award and execution process of public investment projects due to selfish/personal interest The long duration of the award process of investment projects Lack of seriousness by some contractors FOREST AND WILDLIFE The mains difficulties are: Not enough fund to regularly hold the antipoaching quarterly meetings Lack of fund to carry out capacity building on ecoguards in the National parks and sanctuary 61 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 ENVIRONMENT AND NATURE PROTECTION Difficulties of MINEPDED are: No budget allocated to carry out activity III.6.4 PROPOSED IDENTIFIED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES AGRICULTURE AND RURAL DEVELOPMENT Propositions below are requisite to ameliorate the services in the Region: Allocation of funds should tie with volume of activities Majority of activities should be centralize in the Region Timely provision of funds to respect agric calendar Hierarchy should create an impress account at the level of the Region to avoid these delays at the level of finance control. LIVESTOCK, FISHERIES AND ANIMAL INDUSTRIES The following proposals are necessary for the proper functioning of the activities in the area: The tarring of all major and farm to market roads will ease the execution of project in the Region Sufficient checks and balances should be instituted in the award and execution process of public investment projects More involvement of most competent representatives of beneficiary services/ministries in the choice /selection of competent contractors FORESTRY AND WILDLIFE To cope with these difficulties the following solutions are possible: Enough fund should be regularly disbursed to carry out the quarterly antipoaching meetings and to carryout capacity building on the ecoguards ENVIRONMENT AND NATURE PROTECTION To cope with these problems, it is necessary to: Budget should be allocated to the various Chiefs of services to carry out their functions 62 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.7 PRODUCTION AND MINCOMMERCE, MINPMEESA) COMMERCE (MINIMIDT, MINTOUL, III.7.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY MINES, INDUSTRY AND TECHNOLOGICAL DEVELOPMENT Mining and Industry MINING The south west region has about sixteen industrial enterprises which intervene in several domains. Their number and description are presented in the following table. Table 84: Number of enterprises of industrial sector in the South West Region Branch of Number of Local raw materials activities enterprises transformed Oil refinery 01 Crude oil Oil Mill 06 Palm nut Rubber factory 04 Rubber Water Bottling Natural water 05 plant The types of mines existing in the region and those exploited are presented below. Table 85: Existing and exploited mines in the South West region Types of mines Liquid Solid Liquid Mines (Gisements) Petrol Sand Stone Pouzzolane Mineral water Types of working/Exploitation (traditional, industrial) Industrial Artisanal/Industrial Artisanal/Industrial Artisanal/Industrial Industrial Table 86: Number of exploitation licenses attributed during the years 2012 and 2013 Number of exploitation licence attributed Branch of As at 31 Dec 2012 As at 31 Dec 2013 activities Sand quarry 28 10 Stone quarry 05 02 Petroleum Exploitation Pouzzolane quarry 04 01 Water bottling plant 63 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 The agro-industrial units The main agro-industrial units in the region are the CDC, PAMOL and DELMONTE. They produce tea, bananas, palm oil, rubber and pepper to the local and foreign markets. Rubber production is processed in 7 plants belonging to CDC for achieving annual rate of nearly 25,000 tons. 55% of the rubber products are in the form of smoked sheets (RSS) and 45% in the form of granules. Much of this production is exported. Four of the seven mills produce only the rubber sheet (Meanja, Missellele, and Mbonge Malende), one (Pendamboko) just of the granule and two (Tiko and Mukonje) both leaves and of the granulate. The production of palm oil is processed in two mills under the CDC for ac hieving annual rate of nearly 26,000 tons of palm oil and 5,000 tons of palm kernels. These products are sold in local markets and export. Both mills are installed Mondoni and Idenau. As for PAMOL, it has also two plants in Mundemba and Lobe. Only the one of Lobe is currently operating producing just over 10,000 tons of palm oil. The production of green tea leaves is treated plant planting. The three plants of CDC produce a total 3900 tons of excellent produced annually, mainly for local markets and Central Africa, with some minor sales markets of Nigeria, Europe and North America. Bananas do not undergo any transformation. Nevertheless ten packing stations are distributed as follows: 3 to Ekona, 3 and 4 in Tiko Mondoni. Throughout the CDC alone represents a significant industrial potential. Other processing units A number of other processing units exist in the region. Among them include the Metropolitan Plastic and Brasseries du Cameroon in the industrial area of Ombe which already has a significant number of companies. The first produces plastics such as pouches, bags, tubes. The second is just a distribution center Brasseries du Cameroon after the closure of the Coca-Cola plant during operations "dead cities". The staff is now down to puncture minimum. Other units away from the industrial area are also of some importance. This is the case of plant Ediki near Kumba that turns wood into matchsticks or the source country that produces and bottled mineral water to Supermont Muyuka and Semme that also bottled mineral water at Limbe. Industries Most of the industries in the Region are food processing, a few manufacturing and extractive industries. About 85% of these industries are to be found in Fako Division alone. Apart from the National Oil Refinery and the Industrial Shipyard Unit in Cape Limboh, most of the industries to be found in Meme (one only), Ndian (one only) and Kupe Muanenguba (one only) are mainly Agro-forestry transformation units. Modern agriculture in the Region involves the cultivation of oil palm, rubber, banana and tea carried out in large plantations manly by the CDC and other industrial concerns like PAMOL, DELMONTE and the Cameroon Tea Estate. 64 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 87: Major industries in the three border divisions of the SW Region Division Industry Cameroon Development Corporation SONARA DELMONTE Banana METROPOLITAN PLASTICS SBM Banana FAKO TIKO SOAP SUPERMONT TELLCO PRESWOOD ETS AGROCHIMIE National Printing Press MANYU NCHANG OIL MILL NDIAN PAMOL Source: MINDIC, Limbe Main Activity Plantations & Industry Petrol Refining Banana production Plastics and Cartoons Banana Production Soap Production Mineral Water Production Woodworks Drug Sales/Manufacture Printing/ Sales of Books Palm Oil Production Palm Oil Production Location Bota-Limbe Limbe Tiko Ombe Tiko Tiko Muyuka Ombe Muyuka Buea Mamfe Lobe TOURISM Tourism is a particular activities sector in the South -West region, because there are some touristic potential which are not exploited sufficiently. There are more picturesque area in that region such as mount Cameroon and the sea area. The mount Cameroon becomes famous since the beginning of the ascension which is nowadays an international competition. The sediment of lava coming from the last eruptions of mount Cameroon has made the mount more attractive. Thus one can admire the greenery dotted with jagged black rocks that this casting of 1922 at one mile of Idenau. Similarly, Ekona deposits of 1959 and more recent ones in 2000 in the village Bokwango offer a fascinating landscape. Other attractions are also in the region including the famous Korup Nationa l Park, the oldest rainforest in Africa. This forest reserve has rare species and many animals. Despite its remoteness and poor road infrastructures, Korup is regularly visited by many tourists and scientists. Other attractions include the Limbe Botanic Ga rden, the only zoo in the region at Limbe, Mile six Beach at Limbola with its black sand, volcanic lakes at Barombi Mbo and Barombi Kotto near Kumba the twin lakes of Manengoumba at Bangem, falling of iyouwe high of more than 120 m, of Lebialem at Fontem, of Ekon in the Korup Park at Ekombe. Some historical sites complete this panorama. These include the fountain of Bismark Buea built in 1904 in memory of the first Chancellor of the German Empire, the statue of Alfred Saker erected in 1885 to commemorate the centenary of the founding of Victoria (now Limbe). Table 88: Distribution of Tourist Attractions in the Border Areas–South West Region DIVISION FAKO MANYU - TOURIST ATTRACTIONS The Limbe Zoo with monkeys, gorillas, chimpanzees, snakes, etc. The Limbe Botanic Gardens. The Limbe Sea Port. Mount Cameroon in Buea and Etindi Mountain View. Bays such as Ambas Bay and Man O’War Bay. Beaches: Isokolo, Bobende, Seme, Mile Six and Etisha. Bomana Waterfall, Twin Lake Bakingili a nd Lake Dibuncha. Lava Flow Terminal German Light House, German Prison (Mondoli Island), Bota Island. Slave Trade Market (Bimbia) and Alfred Saker Tomb Limbe. Manyu Bridge at Mile 18 on the Mamfe -Bamenda Road. Lake 65 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 NDIAN - Ejagham The Hippos in the Manyu River seen in mid-January to March. The Tali Marbles found along the streams in Upper Bayang. Mfum Bridge-Ekok (Highest Suspension Bridge in West Africa). The Hanging Bridge built by the Germans at G.R.A., Mamfe. Satum Bridge linking Mamfe Town to Akwaya Sub-Division. Ekondo Titi Beach. The Korup Park. The Rumpi Mountains. Source: Regional Delegation of Tourism, Buea. To develop this potential, the local and national initiatives have created and developed an infrastructure for home quite extensive. Many hotels and allow tourists to find accommodation on site, although much remains to be done in this area. Beside of these touristic attrations, they are two museums in the region which are: Lifafa museum and the museum of the Regional Delegation of Arts and Culture both in Buea. They are two tourism agencies and two leisure sites in the Region. Fako has the great number in hotel infrastructure, probably because of the richness and variety of its tourist attractions, proximity to Douala, but also good access. Compared to other regions where tourism is developed, the Southwest oc cupies an honorable place. The development of large-scale tourism goes by, however, the improvement of accommodation capacity, improving the attractiveness of certain sites and infrastructure development of road communication in particular. Hotel map of the region and is shown below Table 89: Hotel map of the South west region Number of hostelry structures Average capacities of bedrooms/beds Category Three stars Two stars One star Total As at 31st Dec 2012 3 7 21 31 As at 31st Dec 2013 03 08 22 33 As at 31st Dec 2012 306 366 402 1047 As at 31st Dec 2013 306 372 460 1148 SMALL AND MEDIUM SIZED ENTERPRISES, SOCIAL ECONOMY AND HANDICRAFTS Infrastructure The Regional Delegation and the Divisional Delegations do not have permanent buildings to accommodate their personnel since the creation of the Ministry. Meanwhile they are being accommodated by other Ministries. Equipment The Equipments which were put in place from the inception of the Ministry are old and insufficient particularly with the appointment of new personnel in the Regional Delegation. 66 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 90: Number of SME/SMI by line of business existing in the Region in 2012 and 2013 Number of SME/SMI by sector ou branch of activities Branches of activities As at 31 Dec 2012 As at 31 Dec 2013 Primary 22 04 Secondary 1345 147 Tertiary 1294 480 It exists in the region only one handicraft centre based at Limbe. The craftsmen registered at the level of delegations of MINPMEESA in 2013 are 1578 which are 911 men and 667 women. The number of social economy structures existing in the region is presented in the following table. Table 91: Social economy structures in the region in 2012 and 2013 As at 31 Dec Type of structures As at 31 Dec 2013 2012 CIGs 3833 3833 07 07 E.I.G 374 374 Associations 02 02 Mutual Associations 11 11 NGO 18 18 Trade Unions 03 03 Credits Unions 01 01 Mutual Funds 120 120 Cooperatives Savings and Loan 92 92 Cooperatives (MFI) 01 01 UG 02 02 Cooperative Union 02 02 C.I.G Union 01 01 F.U.G 01 01 Confederation COMMERCE The South West Region experiences inter-border exchanges between the huge Nigerian market in the west and Equatorial Guinea in the south. The open sea, the creeks and the forested borders are very porous. The very poor roads render movement and custom controls almost impossible. Internally, the Region is lacking in market infrastructures; within the six 67 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 divisions and several large towns, only two markets are well built and organised, i.e. Kumba Main Market, and Tiko Market. The rest of the markets are constructed with temporal materials mostly wood. Every year fire disasters consume goods worth millions of Francs. In the Region, 60-70% of economic activities are in the informal sector that is well infiltrated by non-Cameroonians especially in sectors like auto-mechanic repairs of all sorts, hairdressing, shoe mending, tailoring and embroidery. Cameroonian commodities such as food products, forest products, beers and minerals, scrap metals and plastics, exported to Nigeria still pass through informal channels. A partial survey of the major markets in the South West Region reveals that between 75-85% of the market space is occupied by foreign nationals, particularly Nigerians. Major commercial activities involving plastics, textiles, cosmetics, essential drugs, and fancy goods are predominantly from Nigeria. The alcoholic drinks sector receives supplies, to a very reasonable extent, from Malabo, while fake whiskies come mainly from Nigeria. It is important to note that the cash flows that result from this inter-border trade adversely affects Cameroon’s balance of payment due to the following: 1. The inconvertibility of the Naira, a currency limited only to the Nigerian economy. 2. The widespread and easy convertibility of the Francs CFA, within two regional zones sandwiching the huge and attractive Nigerian market. 3. Most of these alien businesses do not operate functional bank accounts in the South West through which genuine exchange could be effected. Consequently, clandestine transfer of physical cash (CFA) out of the country without any form of exchange control is detrimental to the economy. These facts call for a proper study that would verify the facts and actually assess the impact of this trans-border trade on the economy of the South West Region. Table 92: average prices of great consumption products in 2012 and 2013 Trends in consumer good prices on the local markets Mains products Unit As at 31 Dec 2012 As at 31 Dec 2013 Rice 5% thaï 50 Kg 18 250 18 000 Fish (Moroco) 1 Kg 1 250 1 200 Cow meat 1 Kg 2 600 2 700 Salt 18 Kg 2 500 2 400 Flour (SGMC) 50 Kg 19 875 18 000 Sugar (cube) 1 Kg 750 743 From 2012 to 2013, in general the price of first necessity products has decreased. Apart from the price of cow meat, a great number of products have noticed a decrease in their prices. 68 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 93: number of test and periodic markets organized in the year 2012 and 2013 Number of Number of witness periodic Number of Number of organized organized existing Cold existing Period markets markets stores bakeries 10 Modern As of 31 bakeries 01 MIRAP 137 27 Dec 2012 34 Handicraft Bakeries 09 Modern As of 31 Dec bakeries 01 MIRAP 138 30 2013 34 Handicraft Bakeries The frontier markets The South West Region has as her national trading partners the Littoral, West and North West Regions and to a lesser extent other Regions of the country. On the International scene her foreign markets include Nigeria, Equatorial Guinea, Gabon as well as Angola. The Region has a good number of frontier markets that need to be developed. The table below outlines the major ones. Table 94: Some Potential Frontier Markets of the Region DIVISION MARKET POST Fako Limbe, Idenau, Sanje, Modeka, Tiko Meme Mbonge Manyu Ekok, Ottou, Mamfe Town, Eyumojock, Akwaya Ndian Ekondo Titi, Masore, Ndian Town, Dibonda, Bamusso, Isangele Source: Region Delegation, MINCOMMERCE, Limbe. III.7.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 MINES, INDUSTRY AND TECHNOLOGICAL DEVELOPMENT With a running budget of 23,450,000 FCFA (which has increase in comparison with the 21,200,000 FCFA in 2012); the regional delegation of MINIMIDT has carried out the following activities: Inspection of classified Establishments Control of mining activities Inspection of pressure vessels Control of explosives TOURISM Apart from the equipment of the divisional delegation of TOURISM of Manyu, many activities were carried out by MINTOUR in South-West during the year 2013; notably Collection of hotel statistics; 69 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Control of tourism establishments; Information seminar on competitive value chains project; the case of ecotourism on mount Fako; Actions carried out by private sector and local communities Construction of New Hotels Opening of hotels by private promoters SMALL AND MEDIUM SIZED ENTERPRISES, SOCIAL ECONOMY AND HANDICRAFTS The budget of the regional delegation of MINPMEESA is presented in the following table. Table 95: budget of MINPMEESA in 2012 and 2013 Year 2012 Year 2013 11 800 000 11 250 000 Running budget 30 000 000 25 900 000 Investment Budget 41 800 000 37 150 000 Total Physical actions realized in the small and medium Sized Enterprises sector for the year 2013 were as follows: Acquisition of equipment for CFCE Limbe Acquisition of office equipment for CFCE Limbe Acquisition of office furniture for CFCE Limbe Acquisition of computers for the Regional Delegation. Activities realized in the domain of social econom y by other actors Structures Actions achieved BUEA council Financed the following organizations -NDIFAW area mixed farming 2.600.000FCFA -KEN ECOLOGIE animal husbandary livestock farming 2.600.000FCFA -NAKANDES CIG farming 2.600.000FCFA COUNCILS -ECOMAN CIG sanitation and horticulture 2.600.000FCFA KUMBA I Council -NEWCAM CIG processing and conversation of agricultural products and equipment 3.000.000FCFA MBONGE Council - GO TO F CIG 2.600.000FCFA 70 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 COMMERCE With a little increase in their running budget (from 91,940,000FCFA in 2012 to 92,300,000FCFA in 2013), the regional delegation of COMMERCE has not received investment credit for physical realizations. III.7.3 DIFFICULTIES ACTIVITIES IN 2013 ENCOUNTERED THE IMPLEMENTATION OF MINES, INDUSTRY AND TECHNOLOGICAL DEVELOPMENT Difficulties in 2013 are as follows: Lack of means of transportation Difficulties in the collection of the execution budget from the treasury Insufficient running credit Lack of office materials Lack of cooperation from some operators of classified establishments and some administrations TOURISM Difficulties in 2013 are as follows: Late arrival of credit card for PIB; Late programming. SMALL AND MEDIUM SIZED ENTERPRISES, SOCIAL ECONOMY AND HANDICRAFT Difficulties in 2013 are as follows: Late supply of the office furnitures in the PIB 2013 by lifestyle Ltd COMMERCE Difficulties in 2013 are as follows: Narrowness of the building thus leading to bad working conditions poor state of the road network, which limit the supply of goods Lack of computerized offices equipments Insufficiency of credit card Difficulty to engage credit card in some divisions Lack of funds to finance promotional sales 71 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.7.4 PROPOSED IDENTIFIED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES MINES, INDUSTRY AND TECHNOLOGICAL DEVELOPMENT The following proposals are expected: Make provision for basic office materials Implicate the Regional Delegation during the preparation of the budget in order to identify the various needs The procedure at the level of the treasury should be facilitated TOURISM The following proposals are expected: Early distribution of credit cards Early programming of projects. SMALL AND MEDIUM SIZED ENTERPRISES, SOCIAL ECONOMY AND HANDICRAFT Contract should be awarded early enough COMMERCE The following proposals are made Allocation of vehicle to all Divisional delegations Allocation of funds to finance promotional sales Allocation of computerize office equipment III.8 COMMUNICATION, CULTURE, YOUTH AND SPORTS III.8.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY COMMUNICATION The table below shows number of media present in the Region: Table 96: number of media available in South West Region in 2012 and 2013 Number of medias Type of media Television At the 31/12/2012 5 In 2013 5 Radio 12 16 Newspapers 28 28 72 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 97: number of specialist of communication according to gender in 2012 and 2013 in the region At the 31/12/2012 Type of Specialist Men At 31/12/2013 Women Men Women Journalist 70 75 150 150 Animator 40 40 45 46 From 20 to 22, the number of cable distributors in the region has increase from 2012 to 2013. CULTURE The South West Region has 05 libraries all located in the FAKO and MEME divisions. They are presented in the next table. Table 98: List of libraries in the region Period library (public/private) At the 31/12/2012 Ex-ALLIANCE CEFAM SYNOD OFFICE LIMBE CITY COUNCIL KOUMBA CITY COUNCIL At the 31/12/2013 Ex-ALLIANCE CEFAM SYNOD OFFICE LIMBE CITY COUNCIL KOUMBA CITY COUNCIL Table 99: List of book editing house in the region Period Book editing house At the 31/12/2012 ANUCAM COSMOS PRESBOOK CAMBRIGE THE CURE At the 31/12/2013 ANUCAM COSMOS PRESBOOK CAMBRIGE THE CURE SOCAM and SCAAP are the two representations of copyrights corporations present in the region. They are 01 music recording studio and 03 cinema production studios in the region. In the region, they are 06 night clubs and 01 amphi theatre. They are also 06 museums in the region among which 05 privates and 01 public. A modest estimation of the number of cultural groups in the South West Region can be put at 500. As stated earlier, these groups have been reorganized into cultural associations in all the six Divisions and 14 Sub-divisions. 73 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Cultural associations are mainly involved with choral and dance groups. Moreover, animation also involves musical artists, most of whom are amateurs with little training, rehearsals, production or promotion facilities. Generally, the South West Region is in dire need of animation structur es. The few structures as of now, that can accommodate cultural activities are: Ex Alliance Franco-Camerounaise, Buea with a capacity of 200 seats Amphitheatres of UB and halls of some educational establishments Youth and Animation centre, Buea Halls of some Economic Operators e.g. Banquet Hall One open amphi theatre was built for the occasion of the celebration of the 50 th anniversary of the reunification, but it is not yet in use. SPORTS AND PHYSICAL EDUCATION As for the youth, sport and entertainment, most of the sports facilities owned by private organizations (mostly schools). The overall picture of sports equipment and other is as follows: Table 100: Sport equipment in the region Number of infrastructure Type of media At the 31/12/2012 In 2013 Football stadium 03 01 handball stadium 03 Tennis stadium 03 The number of sport monitors is presented in the following table. Table 101: Number of sport monitors in 2012 and 2013 in the region At the 31/12/2012 Type of Specialist Men 82 Women 30 Recruited in 2013 Men 90 Women 35 Table 102: Number of license granted per type of sport Number of license Type of sport At the 31/12/2012 At the 31/12/2013 football 360 400 basketball 25 30 They are about 23 sport teams registered in the region among which 20 football teams; 01 basketball team; 01 volleyball team and 01 handball team. 74 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.8.2 SPECIFIC ACHIEVEMENTS RECORDED IN 2013 COMMUNICATION During 2013, the main achievement was routine supervision. CULTURE In 2013, regional delegation of art and culture had a running budget of 9,000,000FCFA. That same year a CIG has created an arts gallery (CACUFO) in Kumba. SPORTS AND PHYSICAL EDUCATION The main achievement under sport was the construction of the international stadium in NGEME – Limbe. III.8.3 DIFFICULTIES ACTIVITIES IN 2013 ENCOUNTERED THE IMPLEMENTATION OF COMMUNICATION The following difficulties were recorded: Lack of sufficient funds for office equipments and their maintenance Lack of logistics like service vehicle to ease mobility of staff on assignment Lack of staff cleaners, drivers etc CULTURE Difficulties are: No service vehicle so movement is slow and consequently slows down productivity No equipment (Computers, fax machine, Photocopier, sound system, TV set, furniture) No funding for the celebration of some world days (Theatre day, Heritage day, mother tongue day etc) SPORTS AND PHYSICAL EDUCATION Difficulties are: The running budget for the Region was very small (inadequate) Missions could not be executed because there was no fund for it Equipment in the office are lacking No investment budget 75 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 III.8.4 PROPOSED IDENTIFIED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES COMMUNICATION The budgetary allocations for the Regional delegation of communication should be increase, taking into account the fact that staff are always sent on official assignments A service vehicle should be put in place to enable the Regional delegate and staff to carry out assigned tasks with ease CULTURE The office needs a service vehicle driver and compound cleaner Offices should be furnished with the necessary equipment Funds should be dispatched for commemorative celebrations of national and international days linked to this sector SPORTS AND PHYSICAL EDUCATION To cope with the difficulties mentioned above, it would be necessary to: Running budget should be increased Make provision for investment budget III.9 SOVEREIGNTY III.9.1 INVENTORY OF EXISTING IN THE VARIOUS DOMAINS COVERED BY THE MINISTRY MINJUSTICE In the South West region, they are one appeal court, 6 High courts, 10 court of first instance and 47 customary courts. Table 103: Distribution of number of workers in the MINJUSTICE in South-West region in 2011 Institutions Personnels Regional Delegation 19 Buea Central Prison 65 Kumba main Prison 52 Mamfe main Prison 29 Upper farm secondary prison 19 Bavenga secondary prison 14 Total 179 Source: RD of Penitentiary administration SW As regards rolling stock, the available of the regional delegation of the prison in the South West is presented in the following table: 76 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Table 104: Rolling stocks at prison Institutions Material RDAP SW 1 pick-up 4x4 Ford registered CA 7477-C 1 cellular truck registered CA 6077-C Buea Central Prison One supply truck registered CA 6003-C Kumba main prison 1 cellular truck registered CA 6081-C Source: RD of Penitentiary administration SW It should be noted that these vehicles are a gift of the European Union in the framework of PACDET. With regard to equipment, it consists essentially of safety equipment (weapons, ammunition, handcuffs, padlock, gas), office equipment (computers, printers, photocopiers) mostly offered by the European Union. However, typically, the Buea Central Prison has: A Mill A building constructed with support from the European Union to raise chickens A biogas supply system of the non-functional kitchen, a gift of the European Union A built drilling under PACDET II Sprayers A rickshaw. The distribution of prisoners is presented in the table below. Table 105: Distribution of number of prisoner by prison in South-West region (2010/2011) N° PRISONS ACCUSED CONDEMNED TOTAL CAPACITY 1 BUEA 361 135 496 300 2 KUMBA 250 236 486 500 3 MAMFE 77 59 136 130 4 BAVENGA 0 18 18 80 5 BUEA0 20 20 100 UPPER-F TOTAL 688 468 1156 1110 Source : MINJUSTICE III.9.2 SPECIFIC ACHIEVEMENTS RECORDED Some physical achievements are registered in South-West regional delegation of the ministry of penitentiary administration during the year 2011. The main realizations are: Rehabilitation of the regional delegation of ministry of penitentiary administration; Equipment of the regional delegation of ministry of penitentiary administration; Rehabilitation of the administrative bloc of the central prison of Buea; Construction of borehole in Bavenga secondary prison; 77 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Construction of enclosure of Kumba prison; Rehabilitation of water network canalization of Kumba prison. III.9.3 DIFFICULTIES ACTIVITIES ENCOUNTERED THE IMPLEMENTATION OF There are different difficulties which are encountered in implementation of activities, notably: The lack of managerial staff Insufficient Credit Services budget to the regional services of MINJUSTICE Decay and aging infrastructure Overcrowding Delays in the procurement procedures of public procurement Absence of cars and trucks to prison Secondary Upper Farm No cookware prisoners (large pots, ...) to the Upper Prison Farm Insufficient funds held maintenance exacerbated by recent cuts that complicate the situation in the prison of Upper Farm The lack of specialized personnel (farmers, ranchers, plumbers, masons, computer) to the Upper prison farm; The lack of automatic gun for officer safety during night patrols in prison Upper Farm; Lack of a specific budget for the production of Buea Central Prison Acute shortage of qualified personnel at the Buea Central Prison. A need of a perimeter wall round the cells at Bavenga Prison; The absence of pipe-bone water at Bavenga Prison; The total dilapidation of the warders barracks at Bavenga Barracks The absence of an administrative block; infirmary and a kitchen; The dilapidation of the two existing cells which makes the Bavenga prison III.9.4 PROPOSED IDENTIFIED SOLUTIONS TO THE PROBLEMS/DIFFICULTIES The following proposers are necessary for the progressing of activities in the South West region. Ongoing training of managerial staff by specialization in the different schools of training in agriculture, livestock and other areas where economic activity could boost production in prisons. Rehabilitation of secondary prison of Upper Farm; Reinforce the security of Upper Farm secondary prison; Purchase of equipment in PSUF; Staffing prison farm in Upper rolling stock 78 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 IV. LOCAL DEVELOPMENT ACHIEVEMENTS IN 2013 The local development achieve in the region in 2013 will be present in this section per Division. 1. KONYE COUNCIL BUDGET OF THE YEAR 2013 450,000,000 PERCENTAGE OF EXECUTION 87% LOCATION PERCENTAGE TOTAL COUNCIL DESCRIPTION OF PROJECTS OF OF AMOUNT PARTICIPATION PROJECTS EXECUTION Construction of a grand stand GS KONYE 16,000,000 16,000,000 100% Construction of semi-permanent GS Baduma 2,000,000 2,000,000 100% A DESCRIPTION AND grand stand LOCATION OF THE Supply of 60 benches GS Ndoi 1,800,000 100% DIFFERENT Supply of teachers’table GS Ndoi 250,000 SOCIO-ECONOMIC GS MATOH, ACHIEVEMENTS Construction of four VIP latrines, Konnye, RECORDED IN 19,992,000 19,992,000 100% ADB project Meme, Ewone KONYE COUNCIL IN Health Centre 2013 Assistance to Matoh electricity Matoh 3,000,000 3,000,000 <80% project Extension and rehabilitation of Kokaka, 47,000,000 KONYE Giant water supply Dokim, NgoloPROJECTS IN Bolo PARTNERSHIP WITH PNDP Construction of an equipped block of Gs Matondo 20,000,000 100% 20,000,000 two classrooms and a toilet Construction of a bridge to complete PROJECTS IN PARTNERSHIP WITH the surfacing of Wone-Ibenni road Koba Village 35,000,000 35,000,000 100% project awarded in 2009 FEICOM 79 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL SPECIFIC DIFFICULTIES ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION PROPOSED SOLUTIONS PRIORITIES OF THE COUNCIL -The Deplorable nature of the Kumba-Mamfe road was largely responsible for the slow rate of execution of projects in 2013. -The transition from council tenders board to Divisional Tender Board had many hitches -Tender Board of councils were frizzed thus slowing down the process of decentralization -Many ministries are still to send a credit card to Konye council even though some of their competences have been ceded to councils -Many PIB projects are top-bottom -Tender boards of should go operational -PIB projects should be bottom-top -All ministries involved in the ongoing decentralization process should send credit cards to councils -Extension of electricity from ikiliwindi to kokobuma -Extension of electricity from wone to Ibemi - Extension of electricity from Kombone Bafaw to Ifanga II - Extension of electricity from Ikiliwindi to Mbonge Meteke -Rehabilitation of farm to market roads 1 Ikiliwindi to mbonge Mateke 2 kombone Bafaw to Ifanga II 3 Wone to Ibemi -Building of markets: Konye, Ikiliwindi, Wone, Mbakwa Supe, Matoh , Diongo, Matoh Butu, Matondo II -Equipment of Health Centres and hospitals: 1 Konye District Hospital 2 Mbakwa Supe Integrated Health Centre 3 Ikiliwindi Integrated Health Centre 4 Matoh Integrated Health Centre 5 Ibemi Integrated Health Centre -Building and equipment of Classrooms: G.S Dikolo, G.S kombone Bafaw, G.S Mesange, G.S Diongo, G.S Mbakwa, G.S Nywangale, G.S Ediki Mbonge, G.S Kokaka, G.S Illeh Lobange -Provision of pipe borne water; Dikomi, Lobange, Kumbe, Matoh, Diongo, Edike Bekoli 80 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 2. KUMBA I COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE DESCRIPTION OF PROJECTS A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC Construction of a block of two ACHIEVEMENTS RECORDED IN KUMBA I COUNCIL TOTAL COUNCIL OF PROJECTS AMOUNT PARTICIPATION 18,000,000 18,000,000 100% 18,000,000 18,000,000 100% 18,000,000 18,000,000 100% 18,000,000 18,000,000 100% 18,000,000 18,000,000 100% GS Diffa classrooms Construction of a block of two classrooms PERCENTAGE LOCATION GS Nkangmudikum OF EXECUTION GS Construction of a block of two classrooms Nkangmudikum II IN 2013 PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM Construction of a block of two classrooms Construction of a block of two classrooms GS Kake II GS Kake I 81 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 DIFFICULTIES ENCOUNTERED The suppressing of municipal Tenders board for the divisional Tenders board and Regional Tenders board moved down the rate of execution of projects. DURING THE YEAR 2013 IN GENERAL SPECIFIC DIFFICULTIES Ministerial Department that had accepted decentralization did not send their credit cards to the competent councils ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION PROPOSED -Competences devolving to local councils should be let to go 100% operational SOLUTIONS -PIB projects should reflect the realities of the local population all ministries involved in decentralization should sent their credit cards to the competent councils -Extension of electricity to Djaffa Village -Equipment of the Kake II Integrated Health Centre PRIORITIES OF THE COUNCIL -Supply of drugs of basic necessity to the Kake II Health Centre -Rehabilitation of farm to market roads -Building of Municipal market at Kake II and a food market at Down Hill Mbonge Road -Building and equipment of classrooms at : GS Diffa, GS Kake, GNS Nkangmudikum, GBPS GP I Station, GBPS GP II Station 82 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 3. EYUMODJOCK COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE TOTAL COUNCIL PROJECTS AMOUNT PARTICIPATION Construction of 2 classrooms GS Otu 16,000,000 Nill 100% Supply of benches GS Otu 1,800,000 Nill 100% Teacher table and chair GS Otu 250,000 Nill 100% DESCRIPTION OF PROJECTS A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC ACHIEVEMENTS RECORDED IN EYUMODJOCK COUNCIL IN 2013 PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM PERCENTAGE LOCATION OF OF EXECUTION Construction of 2 classrooms GS Akak 16,000,000 100% Supply of benches GS Akak 1,800,000 100% Teacher table and chair GS Akak 250,000 100% Renovation of CEAC Ajayu 100% Ajah Integrated Health Centre Inokun 50,000,000 Nill 100% Construction of Ebam Water Supply Construction of Babong Water Supply Scheme Rehabilitation of Ekok water Ebam 14,000,000 5% 100% Babong 15,000,000 5% 100% Ekok 23,000,000 5% 100% Construction of two classrooms GSS Ekok 18,000,000 100% Construction of two classrooms GSS Ayukaba 18,000,000 100% Construction of two classrooms GSS Afab 18,000,000 100% 83 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 Construction of two classrooms GTC Ogomoko 18,000,000 100% Construction of two classrooms GS Bakwelle 16,000,000 80% Construction of two classrooms GS Talangaye 16,000,000 75% Construction of two classrooms GS Tenuko 16,000,000 70% 14 Private VIP Latrines DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL SPECIFIC DIFFICULTIES ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION PROPOSED SOLUTIONS PRIORITIES OF THE COUNCIL Ekok, Ossing,Kembong, Eyumojock 4 Public VIP latrines Babong, Bakago, Ngbegati, Nsanaragati -Non involvement of stakeholders concern 7,000,000 5% 100% -The process is still slow -Lack of sufficient transfer of funds to the local government authority (council) -Training of staff and stakeholders -Transfer of enough funds from the various ministries concern to the local government authority -Rehabilitation of farm to market roads -Rural electrification extension to other villages -Provision of Potable water to needy communities 84 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 4. TIKO COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE DESCRIPTION OF PROJECTS A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC ACHIEVEMENTS RECORDED IN EYUMODJOCK COUNCIL IN 2013 Construction of culvert leading to GTC Tiko Rehabilitation of road from Moquo to Mondoni Construction of culvert linking long street and Holforth Construction of integrated health center Construction of integrated health center Construction of 02 GS classrooms Construction of Bore Hole LOCATION OF TOTAL COUNCIL PROJECTS AMOUNT PARTICIPATION PERCENTAGE OF EXECUTION Tiko 3,467,000 100% 100% Mondoni 4,998,000 100% 100% Tiko 4,998,000 100% 100% Misselele 50,000,000 Nil/PIB 100% Moquo 50,000,000 Nil/PIB 100% New Bonako 16,000,000 Nil/PIB 100% Mungo island 8,000,000 Nil/PIB 100% GS Mudeka 2,200,000 Nil/PIB 100% Purchase of benches GS New Bonakoh 1,800,000 Nil/PIB 100% Purchase of teachers desk GS New Bonakoh 250,000 Nil/PIB 100% Construction of bore hole GBHS Mudeka 8,000,000 Nil/PIB 100% Rehabilitation of GS CIAP Mutengene 1,600,000 Nil/PIB 100% Rehabilitation of schools 85 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 No project implemented in 2013 PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL Construction of VIP latrine Moquo 4,979,403 10% 100% Construction of VIP latrine Holforth 4,987,035 10% 100% Construction of VIP latrine Mungo 10% 100% Construction of VIP latrine New Bonako 4,979,403 4,979,403 10% 100% -Difficulties in acquisition of land - Late publishing of tender - Late award of contract - Difficulty to follow up projects awarded at the Regional level - Non communication of contract documents to MINMAP - Non involvement of the council in the award phase - Delay in the decentralization process with regards to transfer of competences SPECIFIC DIFFICULTIES - Conflicts between state holders in the management of projects ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION -Speed up of transfer of competences PROPOSED -Full operation of council internal tenders board SOLUTIONS - clarification of state holders role in the process -Maintenance of earth roads in Tiko; Mungo and Mutengene villages PRIORITIES OF THE -Extension of pipe borne water in Missellele; Mudeka; Mondooni and Tiko COUNCIL 86 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 5. IDENAU COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE TOTAL COUNCIL PROJECTS AMOUNT PARTICIPATION Block 20 Idenau 16,908,300 100% 100% Supply of 60 benches GS Njonji 1,800,000 Nil/PIB 100% Construction of two classrooms GS Njonji 16,000,000 Nil/PIB 100% Idenau 1,085,000 Nil/PIB 100% GS Njonji 250,000 Nil/PIB 100% GS Njonji 20,150,000 10% 100% GS Sange 19,600,001 10% 100% GS Sange 1,955,000 10% 100% Bakingili 29,650,000 10% 100% DESCRIPTION OF PROJECTS A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC ACHIEVEMENTS RECORDED IN EYUMODJOCK COUNCIL IN 2013 PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM PERCENTAGE LOCATION OF Rehabilitation of road network Renovation of GS Group III Purchase of two teachers desk Construction and equipment of 02 classrooms / VIP toilets Construction and equipment of 02 classrooms / VIP toilets Purchase of 60 benches Rehabilitation of Bakingili water scheme OF EXECUTION No projects with FEICOM 87 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL SPECIFIC DIFFICULTIES ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION PROPOSED SOLUTIONS PRIORITIES OF THE COUNCIL -roads inaccessibility to get to the project sites - there exist late publication to tender; and also late award of contracts by MINMAP - inadequate follow up of the village management committee - Delay in the decentralization process - Some stakeholders were not able to implement the management of some of their priority projects -Acceleration of the transfer of competences to the local authorities -Need of multipurpose hall -Concreting of the Idenau wharf - Guest house / council restaurant 88 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 6. LIMBE II COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE DESCRIPTION OF PROJECTS A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC ACHIEVEMENTS RECORDED IN EYUMODJOCK COUNCIL IN 2013 Rehabilitation of road DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL TOTAL COUNCIL PROJECTS AMOUNT PARTICIPATION PERCENTAGE OF EXECUTION Botaland 3,555,222 100% 100% Wovia 1,682,289 100% 100% Rehabilitation of road Mokunda 5,479,660 Nil/PIB 100% Rehabilitation of road Botaland 5,479,660 Nil/PIB 100% Rehabilitation of road Isokolo 4,932,800 Nil/PIB 100% GS Batoke 4,932,800 Nil/PIB 100% 100% 100% Rehabilitation of beach Rehabilitation of two classrooms PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM LOCATION OF Convention yet to be signed with PNDP Council chambers Mokundange Limbe II 165,000,000 - Lack of finances for execution of action plan of the council 89 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 - Our classrooms have been awarded at the MINMAP level without any information to our councils. Our SPECIFIC DIFFICULTIES council services therefore have little knowledge of what is happening at the site ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION -Councils should be allowed to award their projects via their various tender boards. PROPOSED - Tender boards of councils should be organized irrespective of thei r last administrative account SOLUTIONS PRIORITIES OF THE COUNCIL - Water supply to Ngeme; Wovia; Limbola, Botaland layout - Road rehabilitation of Mokunda, Botaland, Bobende - Extension of electricity to Lowe, Batoke Layout and Biando village 90 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 7. LIMBE III COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE DESCRIPTION OF PROJECTS Road maintenance A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC ACHIEVEMENTS RECORDED IN EYUMODJOCK COUNCIL IN 2013 Construction of 02 classrooms LOCATION OF TOTAL COUNCIL PROJECTS AMOUNT PARTICIPATION PERCENTAGE OF EXECUTION Bonabile 1,701,000 100% 100% GS Ijaw Mabeta 16,000,000 100% 100% Rehabilitation of block of classrooms Supply of 60 benches GS Mabeta 3,600,000 Nil/PIB 100% GS Ijaw Mabeta 1,800,000 Nil/PIB 100% Supply of teachers desks GS Ijaw Mabeta 250,000 Nil/PIB 100% Mabeta 22,000,000 Nil/PIB 60% Chop Farm 160,000,000 10% 30% Construction of art fish drying Ovens and solar dryers with Addax PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM Construction of Limbe III council chambers 91 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL SPECIFIC DIFFICULTIES ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION PROPOSED SOLUTIONS Difficult terrain; earth roads made accessibility very difficult. Construction in the creeks was very challenging due to absence of fresh water and fluctuating tides. The late publication of tender and late award caused payment delays and some cards returned to Yaounde unpaid. - Confusion between stakeholders with regards to the management and implementation of projects (PIB and Priority Investment) - Delay in the decentralization process with regards to transfer of competences - Award of contracts at the central level which jeopardizes the implementation and control at the grassroots level, resulting in law impact - Involvement of local actors (Mayor; technical services, MINEPAT) in the implementation of projects managed at the central level - Speed up the transfer of competences to local authorities - Allocate funds for feasibility studies PRIORITIES OF THE COUNCIL 92 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 8. LIMBE I COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC ACHIEVEMENTS DESCRIPTION OF PROJECTS LOCATION OF PROJECTS TOTAL AMOUNT COUNCIL PARTICIPATION PERCENTAGE OF EXECUTION Construction of a culvert at Mawoh Mawoh 4,800,000 100% 100% Mile 4, Limbe I 224,000,000 2% Maintenance 100% RECORDED IN LIMBE I COUNCIL IN 2013 PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL Reception definitive AEP mile 4 60% PEAPA/MSU Limbe 10,000,000 -Lack of platform of understanding between the Limbe City Council and Sub-Divisional Councils so as to accentuate development. -The exclusion of council’s competent Technical services in Public works and infrastructure -The understanding of the programmed budgeting (CA/PA) Very few clarification were made 93 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 SPECIFIC DIFFICULTIES ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION PROPOSED SOLUTIONS PRIORITIES OF THE COUNCIL -The suffocation of sub-divisional councils by the Limbe city Council. Inventory of property not done; clear limites in duties absent. Non involvement of sub-divisional councils in development projects(as required in section 122 of the law on decentralization). -Arbitration is very poor, compromising the population’s welfare for selfish reasons -A complete inventory be done and property shared between the Limbe City Council and the sub-divisional councils -A platform of understanding be arrived at , allowing Mayors to work freely and as regulated by law on decentralization -Council Technical staff/Engineers be more included in projects, so that they can better en sure the interest of the council -An arbitration forum on councils, MINATD, MINEPAT and MINTP be organized for a clearer view of common development orientation and good governance. -Service delivery at condition -Be able to open and run a market -Build and open roads, bridges to disenclave Towo, Mawoh, Livanda, Burumbu villages -Build solid classrooms and Integrated Health Centres etc. -Contribute in every possible way in nation building 94 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 9. BUEA COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE LOCATION OF PROJECTS TOTAL AMOUNT COUNCIL PARTICIPATION PERCENTAGE OF EXECUTION Construction of a block of 02 classrooms GNS Muea 25,000,000 Nil/PIB 100% Construction of a block of 02 classrooms EPB Muea 16,000,000 Nil/PIB 100% EPB Muea 2,000,000 Nil/PIB 100% EPB Muea 250,000 Nil/PIB 100% EPB Muea GS Buiyuku 1,800,000 20,000,000 Nil/PIB 10% 100% 100% 18,204,204 10% 100% 1,349,997 Nil 100% DESCRIPTION OF PROJECTS A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC ACHIEVEMENTS RECORDED IN BUEA COUNCIL IN 2013 PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM Equipment of classrooms Purchase of teacher’s desk Purchase of benches Construction of a block of 02 classrooms stand top Construction of a block of 02 classrooms and a set of toilet and stand top grading of road Construction of VIP toilets (03) Mt Carmel Wonya MoKumba Mile 16 95 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL -Late publication of tender -Late award of contract -Poor communication between MINMAP and councils -Delay in the decentralization process with regards to transfer competences SPECIFIC -Conflict between stakeholders in the management of projects DIFFICULTIES ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION -Speed up transfer of competences -Full operation of council internal tender board PROPOSED -Clarification of stakeholder’s in the management of projects SOLUTIONS PRIORITIES OF THE COUNCIL 96 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 10. MUYUKA COUNCIL BUDGET OF THE YEAR 2013 PERCENTAGE LOCATION OF PROJECTS TOTAL AMOUNT COUNCIL PARTICIPATION Construction of mortuary first phase MUYUKA 30,000,000 100% PERCENTAGE OF EXECUTION 100% Construction of banquet hall first phase Construction of classrooms MUYUKA GS OWE 74,000,000 16,000,000 100% NIL/PIB 100% 100% EKONA GS OWE EKONA LELU OWE 250,000 1,800,000 NIL/PIB NIL/PIB 100% 100% 21,983,884 10% 100% 6,497,294 10% 100% 20,021,649 10% 100% DESCRIPTION OF PROJECTS A DESCRIPTION AND LOCATION OF THE DIFFERENT SOCIO-ECONOMIC ACHIEVEMENTS RECORDED IN MUYUKA COUNCIL IN 2013 PROJECTS IN PARTNERSHIP WITH PNDP PROJECTS IN PARTNERSHIP WITH FEICOM DIFFICULTIES ENCOUNTERED DURING THE YEAR 2013 IN GENERAL Connexion of Light CEAC Purchase of Teacher’s Desk Rehabilitation of GS Construction of box culvert across Mowele river Rehabilitation of health centre Purchase of medical equipment BAVENGA IKATA BAVENGA ITAKA Nil -Late publishing of projects and tenders -Late award of contracts -Non communication of Projects contract documents -Non involvement of the council 97 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 SPECIFIC DIFFICULTIES ENCOUNTERED IN THE CURRENT PROCESS OF DECENTRALIZATION PROPOSED SOLUTIONS -Slow transfer of competences -Confusion between the stakeholders of the decentralization process -Acceleration of transfer of competences full operation of internal tender board clarification of stakeholders roles -Road maintenance, water supply and electricity PRIORITIES OF THE COUNCIL 98 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 V. OUTLOOK his report was written following a prescribed canvas at headquarters MINEPAT to harmonize the presentation but also allow comparisons and to make a good analysis of economic reports from the different regional offices. It also allows for a better understanding of economic developments taking place in the region and facilitate the evaluation of the implementation of the GESP regionally but also progress towards the development of our country. However, since the beginning of this experience, some difficulties in its development are identified including the fact that the regional offices of the various ministries are not yet fully understand the appropriate disclosures, non-transmission and sometimes delayed sending information at the regional delegation of MINEPAT are also ahead. This justifies the absence of data of some administrations and some information gaps observed in some parts of the report which we hope to correct them in future editions. Moreover, it should also be recalled that in terms of prospects, with the recent developments in the progress of the implementation of the decentralization process underway, particularly in the light not only of the transfer of certain powers to the Regional and Local Authorities (CTD), but also more and more resources, one of the major issues and challenges lies in the mastery of the annual level of implementation of economic policies in these basic units of economic development of the nation. Also, although some municipalities have transmitted the information they requested on the annual budget, the percentage of execution of the budget, description and location of the socio-economic achievements in their communities, the difficulties they encountered and proposed solutions, there is still a certain laxity and opacity of most of them. This results in the absence of this information for some municipalities, in fact all those of the divisions of Lebialem, and Kupe Muanengouba but also their incompleteness. To correct these shortcomings in future editions, it would be necessary and important to put emphasis on educating stakeholders (public and private) on the importance of their collaboration in the development of this document how important for our region . It should also allocate resources to allow descent to the ground with these actors for the collection of information. The means for the collection of this information should be sent early enough to allow enough time for this collection, data processing and report writing. T 99 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 CONCLUSION O verall, the performance achieved by the various sectors of economic and social life of the South West Region in the year 2013 certainly helped contribute to the revival of growth and indirectly to reduce poverty in this part of the country. The information available permit to note that for agriculture, production increased contributing to a good coverage of food to people of the region. This is understandable insofar as actions to encourage this production were conducted during the year. In this respect, we can mention the support provided to producers for the purchase of farm input, the financing of agricultural micro projects, distribution of improved inputs and financial assistance to producers of corn. However, efforts should be made to boost production. It should for instance increase the action of certain agricultural programs in case those sub-sector plantain and cocoa / coffee. With regard to fisheries, it should be noted that this sector is still heavily dominated by Nigerian fishermen even at national level. It should also be noted that much of fishery products, particularly in Ndian Division is sent to Nigeria to the detriment of local markets. The quantities of fish catch have severely drop down from 2012 to 2013. All the same, we noted this year that the breeding and marketing of non conventional animal have noticed a drop especially for quails, snails, cane rats and giant rats. A number of socio-economic infrastructures were built: classrooms, latrines rooms in schools, health centers, housing and social-call, boreholes constructed or rehabilitated roads and rural roads open and / or maintained; localities covered in telephone networks. In addition, measures have been taken with regard to the protection and promotion of children's rights and the protection of persons with disabilities. However, these recorded performances remain insufficient to effectively boost economic growth not only in the region but also the whole country to raise significantly the particular level of living at the base. In the region, the problem of access to drinking water is still a growing problem. As water, electricity is a serious problem in the region. Although efforts have been made to rural electrification and provide access to safe drinking water to the population through the Public Investment Budget, much remains to be done especially that are important not only for welfare of the population, but also to increase industrial production. In the areas of health, social development and education in general, there is mainly: Lack of teachers and health personnel especially in rural areas; in this region, we have a ratio of less than one master in elementary school; a lack of infrastructure and facilities (classrooms, CSI ...) illiteracy rate remains high, especially among women; an unemployment rate still very high especially among the young population; 100 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 a lack of structures (public and private) coaching early childhood and juvenile social misfits; Lack of visibility of the policy of vocational training and the labor and social security in the region particularly in terms of concrete achievements; In the Infrastructure segment, we observe: a lack of socio-community facilities (lack of habitats, including social); a timid opening of the Region; Rural and urban roads inadequately maintained; Lack of Urban Planning Master Plans for the majority of cities in the Region; The non-perception of the importance of land title by the people especially in Lebialem Division; An anarchic occupation of urban spaces. In terms of communication, culture, sports and recreation, much of the region remains particularly landlocked especially in divisions and sub-divisions. Communication infrastructure (community radios, telecentres, telecommunications) are still insufficient. In fact; they still some localities in the region which did not receives CRTV or Cameroon radio and TV signal. It is the same of those relating to culture such as museums, structures promoting culture and sports facilities are virtually absent in the various divisions and subdivisions of the region. In the sub-sector industries and services, we note the rising prices of staple foods in local markets due to the shortage of these products, a deficiency in the protection of local industry threatened by the importation of products smuggling and supervision of SME / SMI and as well as the financing of the sector. In addition, we note the lack of professionalism in tourism. The sub-sector rural development suffers mainly from its usual ailments, namely growth still quite low agropastoral production and low diversification of that production. In addition, there is a quasi absence of agricultural mechanization, which has resulted in the stagnation (increased shy) production, despite various policy proposals and ongoing. In terms of general and financial administration, it is primarily a lack of synergy of interventions including coordination between different government sectors in the region, however custodians transversal missions throughout. In addition, there is a glaring deficiency in the quantity and quality of staff in regional offices and especially divisional offices of the various ministries. Regarding the sovereignty (justice), it should be noted that since 2003, no additional structure in terms not only of the courthouse or jail was built, while the population has continued to grow. In addition, some prisons are in disrepair. With regard to municipalities in the region, the lack of information not only about their operations, but also their various achievements, mainly because of a lack of communication apparently voluntary by officials, does not have a readability / visibility of local development effort, yet one of the outcomes of the decentralization process. 101 MINEPAT, SOUTH WEST SOUTH WEST REGIONAL ECONOMIC REPORT 2013 In terms of suggestions for improvement, immediate action should be undertaken in the South West, not only to make it more readable / visible the various efforts and achievements made (public, private, civil society organizations, partners development), but also and especially to significantly develop the locality. The Regional Delegate 102 MINEPAT, SOUTH WEST