5` CorusrRucTlotrt CottsULTlNG LngonnroRY, IwrnnN,trIoNAL
Transcription
5` CorusrRucTlotrt CottsULTlNG LngonnroRY, IwrnnN,trIoNAL
- r5'- CorusrRucTlotrt LngonnroRY,IwrnnN,trIoNAL CottsULTlNG - TESTREPORT: I 0{/1.S. 2-97 ANSUAAMA/NWWDA SERIES990ALUMINUMAWNINGWINDOW Reponr#CCLI{7-{,|{ November2O,2OO7 for: Prepared INC. RA]UIINDUSTRIES, 13119MulaCourt Stafford,Texas 77477 1601LunaRoad Canollton,Texas 75006 $IIE,r3. A Quality Control Company Office:(972)242-0566 FAX: (972) 245€io{.7 G g November14,2007 TABLEOFCONTENTS APPENDIX A: APPENDIX INC. RAMINDUSTRIES, SERIES990AWNINGWINDOWDRAWINGS $-utlllD,ltG. A Quality ControlComPanY G g November14,2007 Page1 of4 1. PROJECTDATA Proiect: Test AAMAPerformance RamIndustries Series990AwningWindow Dateof Testins: May11,2006 TestedFor: Inc RamIndustries, 1 3 1 1 9M u l aC o u r t Stafford,TX 77477 Mr.JimWendt WitnessedBv: (Allor Partial Viewing) Tel: (281)495-9056 Fax:(281)495-6778 International Laboratory, Consulting WesleyA. Wilson Construction International BrandonNewman ConstructionConsultingLaboratory, 2. SCOPE (GGLI)was requested to reportthe lnternational Laboratory, Consulting Construction Tests AwningWindow. Inc.Series990Aluminum testingresultsof RamIndustries, 101 1.S.2-97 test were performedin accordancewith ANSI/AMMA/NWWDA specification. 3. SUMMARY The Ram Industries,Inc. Series990 AluminumAwning Window was tested and achieveda DesignC-60classification. 4. TESTSPECIMEN Type: Product SeriesModel: Specification: FrameSize: Vent Size: Gonfiguration: Window, Awning Aluminum ProductDrawings,ApPendixA. AwningWindow Inc.Series990Aluminum RamIndustries, (a8x 36) AP-C60 1.S.2-97 101 ANSI/AMMA/NWWDA 4'-0"x 3'-0" x2''1013/to" 3'-1013/ro" X ON CONSULTINGLABORATORY,INtnruunoruu. CONSTRUCTf G g November14,2007 Page2of4 Referto Mock-Updrawingsin AppendixA, this reportis not completeunlessthis below. G'*HXS" drawingis stampedand initialedby GGLIas illustrated iU LJ L'rmn^ronY' 'rranil noxrl 1601 Luna Road Carrollton'Texas 75006 3::::[Hj1ifl3L\t-ro'5) faceof thefiffHt:mil; Weather€trippino:Bulbvinyl#14 attheinterior full perimeter. Bulb vinyl part #RC3129locatedat the exteriorface of the frame members,full perimeter.Vinylbulb locatedat interiorface of exteriorleg of frame jambs. WeepArranqement:None. Hardware: One (1) Rotgtype vent operatorlocatedmidspanof framesill interior at ventstilesattachedwiththree face attachedwith six (6) "/a"screws. Frictionhinge t/8" t/8" (3) x screwsto vent per hinge. Cam 8 (3) # I x screwsto frameand three # lockswith keeperat midspanof ventstiles.Locksattgchedto ventwithtwo (2) # 8 x t/e"screwsand keepersaitachedwiththree(3) # S x t/8"screws. Reinforcement:None. 2 pcsdoublestrengthannealed glass7/0"overallthickness, Glass: Sealedinsulating withTz"air spacer. Glazinq: Exteriorglazedwith aluminumsnapin glazingbead and/o" diameterbulb vinyl at the exteriorof the glass. Siliconeback beddingcompoundappliedto the interiorof glass,full perimeter. Sealant: Framecornersandventsealedwithsiliconesealant. lnstatlationFeatures: Framenailfin was sealedagainst#2,2" x 8" yellowpinetest fastenedwith#8 x 1 /2" hex headscrews2" fromeachcorner buckand mechanically andon 11Y4"centers. Other Features: Frame,vent,and snap-onnail fin membersare pouredand detGrmalt broken.Snap-innailfinadaptorattachedto main- framemembers br'tdged 12" on witn-*Ox 1 Yo"self tappingscrews1" from each end and approximately center.Framecornersare miteredand attachedwith two (2) #8 x 1 /r" hex head screwsand two (2) aluminumcornerkeys. Vent cornersare miteredand attached key. corner andone(1)aluminum withtwo(2)#8x 1 1/""hexheadscrews LABORATORY,IursRNAuou'lt CONSULTING CONSTRUCTION G g November14,2Q07 Page3 of 4 RESULTS 5. PERFORMANCE Paraqraph Title of Test No 2.1.2 Air Infiltration @ 1.57psf Test Method Measured Allowed ASTM E 283-04 .04 cfmtft2 0.30cfm/ft2 1011.5.2-97 for air (Thetestedspecimenexceedsthe performance levelsin ANSI/AMMA/NWWDA airvalueswerereportedat the requestof the manufacturer.) infiltration, 2.1.3 4.3 2.1.4.1 2.1.4.2 WaterResistance ASTME 547& 331-00 No Leakage @ 2.86psf No Leakage WaterResistance ASTME547 & 331-00 No Leakage @ 11.25psf No Leakage UniformLoad Deflections 60 psf Positive 60 psf Negative UniformLoad Structural 90 psfPositive 90 psfNegative -Permanent Set 2.1.8 ASTME 330-02 105' 235" ASTME 330-02 NoDamage NoDamage 0.125" ForcedEntryResistanceASTMF 588-97 NoEntry Grade10 2.2.4.5.2 SashTorsionTest Reported Reported 1.25" NoDamage NoDamage 0.192" NoEntry 1.58" Detailedextrusionand assemblydrawingsindicatingmeasuredwall thicknessand are on file and were comparedto the test samplesubmitted. cornerconstruction Theserecordswill be retainedat GCLIfor a periodof four years. LTING LABORATORY,Ivrcnu,nrcutt GONSU CONSTRUCTION E g November 14,2007 Page4 of 4 6. CONCLUSION The test specimen,Ram Industries,Inc. Series900 AluminumAwningWindow, of the ANSI/AMMA/NWWDA requirements meetsthe Commercial60 performance were obtainedby using the results The above 101 1.S.2-97test specification. This withthe abovespecification. test methodsand indicatecompliance designated granted product, may be by which only of this reportdoes not constitutecertification the programadministrator. submitted, Respectfully AL c LaeoRAroRY,INTERNATIoN GoHsrnucnon Cot suLTIN SrEveNs CONSULTINGLABORATORY,INTERNAmoNAL CONSTRUCTION