5` CorusrRucTlotrt CottsULTlNG LngonnroRY, IwrnnN,trIoNAL

Transcription

5` CorusrRucTlotrt CottsULTlNG LngonnroRY, IwrnnN,trIoNAL
-
r5'-
CorusrRucTlotrt
LngonnroRY,IwrnnN,trIoNAL
CottsULTlNG
-
TESTREPORT:
I 0{/1.S.
2-97
ANSUAAMA/NWWDA
SERIES990ALUMINUMAWNINGWINDOW
Reponr#CCLI{7-{,|{
November2O,2OO7
for:
Prepared
INC.
RA]UIINDUSTRIES,
13119MulaCourt
Stafford,Texas 77477
1601LunaRoad
Canollton,Texas 75006
$IIE,r3.
A Quality Control Company
Office:(972)242-0566
FAX: (972) 245€io{.7
G
g
November14,2007
TABLEOFCONTENTS
APPENDIX
A:
APPENDIX
INC.
RAMINDUSTRIES,
SERIES990AWNINGWINDOWDRAWINGS
$-utlllD,ltG.
A Quality ControlComPanY
G
g
November14,2007
Page1 of4
1. PROJECTDATA
Proiect:
Test
AAMAPerformance
RamIndustries
Series990AwningWindow
Dateof Testins:
May11,2006
TestedFor:
Inc
RamIndustries,
1 3 1 1 9M u l aC o u r t
Stafford,TX 77477
Mr.JimWendt
WitnessedBv:
(Allor Partial
Viewing)
Tel: (281)495-9056
Fax:(281)495-6778
International
Laboratory,
Consulting
WesleyA. Wilson Construction
International
BrandonNewman ConstructionConsultingLaboratory,
2. SCOPE
(GGLI)was requested
to reportthe
lnternational
Laboratory,
Consulting
Construction
Tests
AwningWindow.
Inc.Series990Aluminum
testingresultsof RamIndustries,
101
1.S.2-97
test
were performedin accordancewith ANSI/AMMA/NWWDA
specification.
3. SUMMARY
The Ram Industries,Inc. Series990 AluminumAwning Window was tested and
achieveda DesignC-60classification.
4. TESTSPECIMEN
Type:
Product
SeriesModel:
Specification:
FrameSize:
Vent Size:
Gonfiguration:
Window,
Awning
Aluminum
ProductDrawings,ApPendixA.
AwningWindow
Inc.Series990Aluminum
RamIndustries,
(a8x 36)
AP-C60
1.S.2-97
101
ANSI/AMMA/NWWDA
4'-0"x 3'-0"
x2''1013/to"
3'-1013/ro"
X
ON CONSULTINGLABORATORY,INtnruunoruu.
CONSTRUCTf
G
g
November14,2007
Page2of4
Referto Mock-Updrawingsin AppendixA, this reportis not completeunlessthis
below. G'*HXS"
drawingis stampedand initialedby GGLIas illustrated
iU
LJ
L'rmn^ronY'
'rranil noxrl
1601 Luna Road
Carrollton'Texas 75006
3::::[Hj1ifl3L\t-ro'5)
faceof thefiffHt:mil;
Weather€trippino:Bulbvinyl#14 attheinterior
full perimeter. Bulb vinyl part #RC3129locatedat the exteriorface of the frame
members,full perimeter.Vinylbulb locatedat interiorface of exteriorleg of frame
jambs.
WeepArranqement:None.
Hardware: One (1) Rotgtype vent operatorlocatedmidspanof framesill interior
at ventstilesattachedwiththree
face attachedwith six (6) "/a"screws. Frictionhinge
t/8"
t/8"
(3)
x
screwsto vent per hinge. Cam
8
(3) # I x
screwsto frameand three #
lockswith keeperat midspanof ventstiles.Locksattgchedto ventwithtwo (2) # 8 x
t/e"screwsand keepersaitachedwiththree(3) # S x t/8"screws.
Reinforcement:None.
2 pcsdoublestrengthannealed
glass7/0"overallthickness,
Glass: Sealedinsulating
withTz"air spacer.
Glazinq: Exteriorglazedwith aluminumsnapin glazingbead and/o" diameterbulb
vinyl at the exteriorof the glass. Siliconeback beddingcompoundappliedto the
interiorof glass,full perimeter.
Sealant: Framecornersandventsealedwithsiliconesealant.
lnstatlationFeatures: Framenailfin was sealedagainst#2,2" x 8" yellowpinetest
fastenedwith#8 x 1 /2" hex headscrews2" fromeachcorner
buckand mechanically
andon 11Y4"centers.
Other Features: Frame,vent,and snap-onnail fin membersare pouredand detGrmalt broken.Snap-innailfinadaptorattachedto main- framemembers
br'tdged
12" on
witn-*Ox 1 Yo"self tappingscrews1" from each end and approximately
center.Framecornersare miteredand attachedwith two (2) #8 x 1 /r" hex head
screwsand two (2) aluminumcornerkeys. Vent cornersare miteredand attached
key.
corner
andone(1)aluminum
withtwo(2)#8x 1 1/""hexheadscrews
LABORATORY,IursRNAuou'lt
CONSULTING
CONSTRUCTION
G
g
November14,2Q07
Page3 of 4
RESULTS
5. PERFORMANCE
Paraqraph
Title of Test
No
2.1.2
Air Infiltration
@ 1.57psf
Test Method
Measured
Allowed
ASTM E 283-04
.04 cfmtft2
0.30cfm/ft2
1011.5.2-97
for air
(Thetestedspecimenexceedsthe performance
levelsin ANSI/AMMA/NWWDA
airvalueswerereportedat the requestof the manufacturer.)
infiltration,
2.1.3
4.3
2.1.4.1
2.1.4.2
WaterResistance ASTME 547& 331-00
No Leakage
@ 2.86psf
No Leakage
WaterResistance ASTME547 & 331-00
No Leakage
@ 11.25psf
No Leakage
UniformLoad
Deflections
60 psf Positive
60 psf Negative
UniformLoad
Structural
90 psfPositive
90 psfNegative
-Permanent
Set
2.1.8
ASTME 330-02
105'
235"
ASTME 330-02
NoDamage
NoDamage
0.125"
ForcedEntryResistanceASTMF 588-97
NoEntry
Grade10
2.2.4.5.2 SashTorsionTest
Reported
Reported
1.25"
NoDamage
NoDamage
0.192"
NoEntry
1.58"
Detailedextrusionand assemblydrawingsindicatingmeasuredwall thicknessand
are on file and were comparedto the test samplesubmitted.
cornerconstruction
Theserecordswill be retainedat GCLIfor a periodof four years.
LTING LABORATORY,Ivrcnu,nrcutt
GONSU
CONSTRUCTION
E
g
November
14,2007
Page4 of 4
6. CONCLUSION
The test specimen,Ram Industries,Inc. Series900 AluminumAwningWindow,
of the ANSI/AMMA/NWWDA
requirements
meetsthe Commercial60 performance
were
obtainedby using the
results
The
above
101 1.S.2-97test specification.
This
withthe abovespecification.
test methodsand indicatecompliance
designated
granted
product,
may
be
by
which
only
of
this
reportdoes not constitutecertification
the programadministrator.
submitted,
Respectfully
AL
c LaeoRAroRY,INTERNATIoN
GoHsrnucnon Cot suLTIN
SrEveNs
CONSULTINGLABORATORY,INTERNAmoNAL
CONSTRUCTION

Similar documents