proiek penswastaan jambatan kedua pulau pinang second penang
Transcription
proiek penswastaan jambatan kedua pulau pinang second penang
SYARIKAT KONSESI: LEMBAGA LEBUHRAYA MALAYSIA -L IAMBATAN KEDUA SDN BHD PROIEK PENSWASTAAN JAMBATAN KEDUA PULAU PINANG SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38: BATU KAWAN EXPRESSWAY WEEKLY REPORT NO. 38/2011 1719111 @ h - 231911.1 UM CONSTRUCTION SDN BHD SUTTE OHl, MENARA IIM LAND, LEBUH TUNKU KUDIN 3, 11700 GELUGO& PENANG 1, Prepared byt Checkedby: Name: Mohd Khairull Nizam bin Abdul Rani Name TanLingJin Date:23l9lll Date:2319111 LIST OF CONTENT: 1 SUBMISSION FOR PLANNING PERMISSION 2 WEEKLY PROGRESS REPORTS / ONE MONTH LOOKING AHEAD 3 DESIGN CHANGES. NiI 4 METHOD STATEMENT SUBMISSION AND APPROVAL 5 HSE MONITORING AND REPORTS 6 COMPLAINTS 7 SUMMARY OF TRIAL MIXES I SUMMARY OF INSPECTION AND TEST RESULTS 9 MATERIAL SUBMISSION AND APPROVAL 10 SUMMARY OF NCR 11 CONSTRUCTION/SHOP DRAWINGS SUBMISSION AND APPROVAL 12 CONSTRUCTION DRAWNGS AND CONTRACT DRAWNGS DIFFERENCES OR INADEQUACIES 13 SUBMISSION OF AS.BUILT DRAWNGS 15 SITE PHOTOGRAPHS REQUEST FOR INFORMATION L 16 l I CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 ; BATU KAWAN EXPRESSWAY CLIENT: JAMBATAN KEDUA SDN BHD CONTRACTOR : lJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD 1 SUBMISSION FOR PLANNING PERMISSION ITEM DESCRIPTION OF PLANNING PERMISS!ON NO. 1 Master Work Program APPROVING AUTHORITY SUBMITTED DATE APPROVED DATE JKSB 261612010 191812010 3 4 5 Project Quality Plan (PQP) Proposed Consultant for Bridge Over Canal Project Safety & Health Plan (PSP): Draft Environmental Management Plan (EMP) JKSB Work Programme Rev. 00 dated 301712010 IJMC submitted PQP Rev. 11712010 2 REMARKS 1 on 2412111 IJMC submitted PQP Rev. 2 on 18/3/11 1813111 131512011 PQP Rev. 2 was approved via JKSB letter ref no: JKSB(SyP3B/QC/IJM/1 1 -00080 dated 1 3/5/201 1 241812010 JKSB letter ref. no.: JKSB/P3B/DN/IJMl10-15 JKSB 71712010 JKSB 71712010 IJMC resubmited the draft PSP Rev. 181812010 DOE letter dated 291912010 responded to the EMP submission.Resubmission of EMP by JKSB letter ref. no.: JKSB(S/P3B/QC/|JM/100001 2 dated on 2511012010. IJMC resubmitted letter ref. no. : IJMC(PG/BKEW/P3B/10166(JKSB) dated on 111112010. JKSB 8t12t2010 1 CONTRACT: SEGOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 ; BATU KAWAN EXPRESSWAY CLIENT: JAMBATAN KEDUA SDN BHD CONTRACTOR : lJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD 1 SUBMISSION FOR PLANNING PERMISSION ITEM DESCRIPTION OF PLANNING PERMISSION NO. 6 7 I Suratkuasa untuk membeli dan menyim pan barang-barang kawalan berjadual Pendaftaran Tapak Kerja Operasi Bangunan/ Kerjabina Keiuruteraan Notification of information on contractors/ construction works (CIDB); Perakuan Pembayaran Levi APPROVING AUTHORITY SUBMITTED DATE APPROVED DATE Kementerian Perdagangan Dalam Negeri, Koperasi dan Kepenggunaan (KPDNKK) 15t7t2010 271712010 Surat kuasa no.: SPT 58/2010/SI(S/BBKL Jabatan Keselamatan dan Kesihatan Pekerjaan (JKKP) 1716t2010 29t6t2010 JKKP site registration no: PP/10/03/3016 Lembaga Pembangunan lndustri Pembinaan Malaysia (CIDB) 23t612010 N/A REMARKS I CSB/CD/1 0-0328(CD04)L date: 23161 201 0. coNTRAcri sEcoND PENA{G BRTDGE LAilo ExpREsswAy pAcKAcE 38 ; BATU KAWAN ExpREsswAy CLIENT : JAIIBATAN KEDUA SDII BHD CONTRACTOT : IJM CONSIRUCTTON SON BHD CONSULTANI : KKJP2 SOt{ BHD 2 WEEKLT PROGRESS T,EPORTS OTE MONTH LOOKINC AHEAD ' lo ACTIVITY ID rcTNITY DURATION '{AME EARLY START EARLY FIIiIISH LATE START LATE FINISH TOTAL QUANTITY CUMULATIVE TOTAL (includlng this % achieved weekl I ts = --i Scheduled 1 PHYSICAL PROGRESS 2 FINANCIAL PROGRESS Not6: 1) Revised uDrk program datsd 3orl20,t0. 2) Please refer to App€ndix Dilference ..... (delayed/ahead) PLANNED FOR THE PRECEDING WEEK PLANNED ACHIEVED GAI.ITT CHART'CPM CONTRACT: SECOND PENANG BRIOOE LAND EXPRESSWAY PACKAGE 38 ; BATU KAWAN EXPRESSWAY CLIENT I JAMBATAN KEDUA SDN BHD CONTRACTOR: UM CONSTRUCTION SDN BHD cOl{SULTANT : KKJP2 SDN BHO 2 WEEKLY PROORESS REPORTS ONE MOI{TH LOOKING AHEAO ' Summary of Project uverafl Revlsed dated 31st 201 1 Scheduled Actual Difference I 2 23rd Seotember 2011 Physical Progress Financial Progress (claim as of 20th Aug 25.4o/o 27.2% Completion Completion Delays (- days) Delays G days) Ahead (+ d2Ysl Ahead (+ (2Ys1 1,80/o 1 24.0o/o 20.60/o uecIlonat -12 -3.40/o 2011\ Aroa3 ol dslay: 1. Ground Improwment, land bridgs, Sunoai Tengah Bridg6, Clo/erleaf lnbrchange - Bridge, Stone Column, Eafthfilling, Precast T-beams Cau8es ot d€layl '1, Geo+ynthetlc mEterlal to b€ testad in PSB Singapore b3forc procurement. 2. Delay ln approval of method strt6msnt - no approval of msthod shbmEnt obhined to date, 3. Delay ln is8uanco of construction drawing. 4, Delay ln material epproval for sand malerial and soil. 5. D€lay ln obtaining acccss to 6ito, 6, D€lay ln slts posses6lon at land bridgo. 7, D€lay ln 6lte posse3sion from CH 19150 - 20800 8, Delay ln handlng over of Cloverleaf lntorchangs 9. Delay in Pile Bendlng Test 10,OuBtandin9 raply on corrospondencss and Request for lnformation 1 1, PDC oil palm and oarthflll encroached lnto ROW. 1 2, JKSB supervislon t6am absence on Saturdsy (till before Octobso 13, S.O's in6truction to slc il down the PVD lnstallation Work 14, To conduct an additlonal buckling t6st on F\/D material 1 5, To obtaln approval for PVD mat€rial in batches. 16, S'tone column - to lncrease test load of plat6 b€aring tests to 3 times the original tsst load 17. Confirmation of Ston€ Column D€sign lssues '18. Discropancy in location of Land Bridge which was only resolved on 131/12'10. 19. Pending confirmation on 350mm dia spun pil€ to replace 300mm square pile 20. lnclement wBathor (20 days) for Novemb€r 2010. 21. Outstanding survey information ofthe GPS Control Stations PT08 and PT09 22. Outstanding response on the changes of design for T-beam details coNTRACT: SECOND PENANG BR.IDGE LAI{D EXPRESSWAY PACKAGE 38 ; BATU KAWAN EXPRESSWAY CONTRACTOR: IJM CONSTRUCTION SON BHD CONSULTANT: KKJP2 SDN BHD 2 WEEKLY PNOGRESS REFORTS'ONE MONTH LOOKINGAHEAD 23. Slo,v response on the proposed MLT Load and Cycle for 350mm dia. spun pilo 24,Pending relocation of underground utilities by others 2S.Ponding finalizationofthepilinglayoutdrawingsforSungai TsngahBridge 26,OuBtanding details on the T-beam recess 27.A roquisite to conduct Mass Loss lgnition & to obtain MLT < 2,5% 28. JKSB/Consultant instructed the of work due to 29,Additional earthfilling & stone column 30,Rsduction I to the existing road. 3l,lntroductory of curv6 at the POC road in order to pile Tengah Bridge 32 Changes design of Land 33.Changes of pile cap at Land Bridge 34.lnstruction hold the construction ofthe pile cap at Land Bridge pending issuance ofthe construction drawings bythe designer 35.The 2nd Revised Work Program 1Sth July 201 I - 31st Aug 201 1 (Sth 24-Sep-11 l7:4( WtsS NAME Start Finish BL Pmiect Start 30-Sep-13 17-Jun-10 l7.Jun-l0 A 2&Jun-10 A Woil 17-Jun-10 Fl;,!fj""t | *'*'l;l OA 1 lsuc ; I Toll Plaza Earlhwork & Grd Tmrtnent PB2X Toll Booth Eafttuork & Ord Troatnent PBZX 20-Jul-10 16-Nov-1 1 0lo 08-Feb12 z&Jun-10 22-Jan-13 55.68% 1 0% 1'l-Nov.1l '17-Jun-i0 I 0lo 08-Dec-l I 3l'Mar-11 0&Dec-r'l 01" 0Y" 0lo eh I 07-Sep-l 2 48.320/o SGJul-10 13-Jul-12 86,95% 86.96% 3 0S-Apr-1 2 98.9% 98.9% 33 13-JuF12 71.7% 71.7% 3 0% 0o/o 0 30-Jul-10 A 20-Apt-12 30-Ju '18-Jan-1 1 A 'l 1-Ju 1 l-12 F 1 0 9-Jan-1 1 307 28{uFl2 o&JuF10 16-Jul-12 80.es% 77.89yo -12 96.78% 97.39% 87 54.29% 12 18-Aug -'l 0 A 17-Jan-12 06-Jul-10 28-Jan-12 17-May- l IA 28-Jul12 18-May-1'l 16-Ju l-12 20-Jun-12 1 02-Apr-12 02-Dec-1 0 31-Mar-12 1.02/" 1.02% 445 24-Aug-10 A 07-Jul12 30-Jul-10 23-Ju n- 1 2 71.45/" 73.60/" -125 17-May-12 2 l -Sep-12 17-May-12 07-Sep-1 2 0% 0% 244 Treatnent E!ilhwork & Grd TEatncnt Ch 17078 - 17180 E 03-Dec-10 A East Ch 17078. Ch 17180 (StorD Column Aroa) olherWottr 01-Oct-10 A I 8-Jan-l 1 T- 19-Jun-12 rI 60.32% 36.180/o Ch 17180. 17rt00 Dralnage Sygtem . 17400 M&E ch 17180. 17400 30.180/" I A 'I 1 1 5-Nov- I 2 27-Aug-10A 24-Dec-12 1 S-Nov- 1 2 29-Nov-12 25-Oct-12 08-Nov- 1 2 00k 0o/" 122 -Jan-1 3 08-Nov-1 2 20-Dec-12 lYo 0o/o 140 07-Aug-1 0 29'Oct-12 40. 11% 45. 110/o 86 05-Feb-13 29-@t-12 21 -Jan-1 3 07o 0% 119 2 08-Mar-13 06-Nov-1 2 21-Feb-13 0% 0% 86 0'l-Mar-12 02-Mar-13 01-Mar-1 2 26-Feb-13 0o/o 0% 109 29-Nov-1 2 1 1 -Ja n-13 07-Aug-l 0 25-Oct-l 2 40,76/" 40.76% 1-May-12 06-Dec- 1 2 0!" 13.25% o&Mar-13 Ch r-r H 17'00. 01-Sep-10A 17'100. 17900 Dnlnage Syrtem 1 ch Ch 17't(,0 - 3-Nov-1 2 21 -Nov-1 Pav6ment & -67 27-Aug-1 0 A 1 & Rd Rrmllure I 2A.04Yo 21 t t 567 06-Ju[10 1 1-JuFl2 15-Jul-'11 612 PLUS Toll Booth Land Brldge. I 2 215 0o/o PLUS Tol! Plaza Earthwork & Grd I Land Brldgc Congtructlon I 1A 31-Doc-10 30lJuFl0 A 18'Aug-10 A '$95 0lo 01-Dec-1 I 30-Jul-10 A -1 87.3?/. 55.68% 2SJan-{ l$Oct 10A I %l rotarFroat .P/" tr2-Jan-t3 2ZJul-,10 A 'l7.Jun-10 A Actuar 1 3-Nov-1 2 122 105 @ Oracle Program 1Sth July ttt t - 31 st Aug 201 1 24-Sep-11 Start ch . 18400 Ch 17900. 18400 Dralnago Systom ch 17900. M&E '8400 Malnllne Ch 17900 - 18400 Ch 17900. 18400 Pavoment & Rd Rrmlture Finish 30-Jul-10 A 30-Oct-,l2 24-Jul-,10 22-@t-12 10-Dec- 1 05-Nov-12 14-Nov-12 12 % 19-Nov-1 2 82.970/o 78,5% 2-Nov- 1 2 29-Dec- 1 2 0% 0o/" 144 26-Nov-'12 04-Dec-1 2 0o/o 0To r03 0o/o lYo 0 t3-Mar-13 0o/o 0o/o 103 27-Feb-12 0o/o 0/o 377 410 1O-Nov-12 20-Feb.13 01-Dec-12 103 12-,]En-12 t PB2X Toll Plaza Dralnage 30-Jan-'12 PB2X Toll Plaza M&E I l] l] 0o/o 19-Jan-12 24-lpr-12 1 t 20-Jan-12 12 PB2X Tol! Plaza M&E-i & Grd TEatflont Ch 18400 - 18840 Dralnage Systom 1 1 6-Apr-1 2 0o/o 0o/o 08-Apr-1 28-Feb-13 44.990/o 38.59% 32 4.6Yo A 08-Feb-13 08-Fob-13 ch 18400.1SS40M&E Ch 16/()0. 18840 Pavement & Rd tumlrure lnbrchlngo. 09-Apr-1 bankmenl West Clorortcal lnbrchange - Brldge Clowrleal Inbrchenge. Plle Embankment East Clorarleat lnl Eartlruork & Grd Tr€atnent Clowrlcal lnt Olh6r Work! 0 12-Jan-12 A Ch 18'm0. 18840 I ll 06-Mar- 1 8-Apr- i 3 28-Feb-1 3 06-May-1 3 0% 0o/o 3-Nov-1 2 29-Mar-.|3 29-Oct-1 2 1 S-Apr-1 3 0To 0To 58 oo 08-Feb-1 3 '1S-May-13 28-Feb-1 3 03-Ju n-l 3 0% 0o/o 46 20-Nov-l 2 246 1 1 10-Nov-l0A 01 -Dec-12 1 O-Jan-1 30-Dec-'10 A 28-Sep-12 1 6-Jan- l l 26-Jan-11 A 1s-Oct-'12 26-Jan-1 '13-Sep-10 A 25-Ja n- 1 3 04-Sep-l 2 1 3-Apr-1 3 1 1.030/o 9.09% 13-Sep-12 14.540/o 9.290/o 130 29-Sep-12 0.58% 17.53% 287 31-JuF'l 0 1O-Jan-l3 45.240/0 35.95% 103 18-Aug-12 02-Apr-1 3 0% 0/o 88 04-Apr-1 3 32.05% 25.68V" -20 17-Dec-12 15.89% 13.58% 226 1 A Clowrlcal lnt I I I t I ll Il & Grd TEatnont Beam Cartlng at ClovorloarVold Area Ctonrleat lnt Dralnags SyBbm Clororleal lnt M&E Clowrleat lnl Plvoment & Rd Fumlture -ch l9tl()0 - 20000 Earlhwork Grd Trcatnent Ch 19400. 20000 Dralnage Systom ch 19400. 20000 M&E Ch 19/m0. 20000 Pavemont & Rd Rrrnlture tch ch - 20300 Earlhwork 20000 - 20300 M&E atrent 13-Sep-10 A 03-Apr-13 31 -JuF 09-Mar11 A 25-Dec-12 25-Feb-1 21-Nov-12 30-Ju 22-Sep.1 1S-Ju l- 13 1 l- 13 1 0 1 4-Nov-1 2 05-Sep-l 28-Mar-13 1 07-Feb-11 A 1S-Mar.13 1 06-Mar-13 04-May-13 12-Mar-13 6-Aug-i 3 1 1 30-Mar-13 29-Ju 01 l- 13 -Aug-1 3 '1S-Aug-13 0o/o 0o/o 26 5.57Yo 0o/o 60 0o/o 0h -l 0.2870 1-Feb-1 't 1-Mar-13 2.41./o 0.430/o 01-Mar- 13 23-Apr- 1 3 Oo/o Oo/" -2 20-Ju n- 1 3 12-Mar-13 08-Ju l-13 0o/o 0o/o 14 23-Mar-13 05-Ju n- 1 3 04-Mar-13 24-May-1 3 0o/o 0o/" -6 24-Aug-10 A 12-Oct-12 02-Aug-1 0 26-Sep-1 2 19-Mar- 12 1s-Oct-'12 26-M*-12 2ol 31-Oct- ,l2 1 -26 'l8.ll% 83.7Vo 75.1'lo/o 54 0o/o 0o/o 170 4 @ Oracle 1 2nd Revised Work Program 'lSth July 20i 1 - 3i st Aug zOt 1 (Sth 24-Sep-11 Start ch I & Rd Rtmlture Ch 20000. 20300 Dnlnage Sylrom lch t t .20805 & Grd Troatrnent 31-Oct-12 26-Apr-.l3 16-Oct-12 1 0o/o 0% 30 12-&1-12 30-Nov-12 27-Sep-12 '14-Nov-12 lYo 0% 140 05-Dec- 1 2 t5 24.Aug-10 A 19-Dec-12 03-Aug-l 47'.040/o 39.25% 27-Mar-13 06-Dec-l 2 13-Mar-13 ch 20300.2080s M&E 0o/o lYo 36 20-Dec- 12 08-Mar-13 06-Dec- 1 2 22-Feb-13 01" lc/o 116 1o-Jan-'13 1 26-Dec-12 07-May- 3 00k 00h -5 201100 - 20805 Pavcmcnt & Rd Fumlurc ch 20805. & Grd TEatnent Ch 20805. 20950 Dralnags System 4-Ju n-1 3 1 0-Nov-12 07-Aug-1 0 04-Dec-1 2 21 ,690h -Sep-12 1 1-Dec-12 17-Aug-12 04-Jan-1 3 0% 28-Aug-12 1 0-Sep-1 2 16-Nov-12 Ch 20805.20950 Pavement & Rd Rrmltrra 1 6-Nov-1 2 21 18-Jan-12 Il Il t -Dec-12 11 -Dec-1 2 PLUS Toll Plaza M&E 1s-Feb-12 11-Jan-12 Sg Jelawl Brldge Qer Sg Jelawl - Brtdge . ptle Embankment East Wost 180 169 07o 0o/o 0% 0/o O8-Feb-12 t4-Feb-12 157 0o/o 6-Jan- 1 3 A . &cr 4,930/ Wo 18-Jan-12 21-Fe612 l1-Jan-12 Brldge 1 10-Dec-12 1 PLUB Toll Pleza M&E.1 174 463 393 0o/o 0o/" 0% 0o/o 0 01" 0o/o 463 12.A3qo 7A 30-Aug -1 0 A 31-Oct-.l2 02-Aug-10 03-Oct-12 2.15o/o 28.530/" 135 13-Mar-13 17.930/0 19.98% 76 5,320/ 76 1s-Oct-10 A 23-Mar-13 Brldge Orer Sg Jelawl 06-Sep-10 A 09-Jan- 1 3 24-Dec-1 0 1 g-Aug- 1 0 28-Dec-12 Proposed PDC HoadunderBOSJ 4.79% O*Jan-12 05-Nov-1 2 07-Jan-12 08-Nov- 1 2 BOSJotherWorks 0% 00/" 125 01"Aug-11 A 30-May-13 28-Feb-12 07-Sep-'13 0o/o 0.36% 76 46.86% 51 '05/o 208 0o/o 0o/o 224 lch t ll 1 07-Aug.10 ch 20805.20950 M&E PLUS Tol! Plaza Dralnage 0 30-Aug-10 A 01 Onrr I I I t 8-May-1 3 20-Dec-12 3eArg.l0 A t % Ch 20300. 20805 Dralnage Sysrem Ch lf I Finlsh 30-Ocl-12 0 - 21525 Earthwork & 17-Oct-12 13.Sep-10 A 20-Sep-12 1 S-Aug-1 0 07-Sep-1 2 02-Julr12 20-Oct-l 2 1 S-Jun-1 2 08-Oct-12 ch21460-21525M&E 10-Ju 1.12 26-Sep-12 21-Jun-12 1 3-Sep- 1 2 Ch 21tt60.21525 Prvcment & Rd Rrmltwc 0!" 01" 218 27-Sop-12 30-Oct-12 14-Sep-l 2 17-@t-12 lYo 0/" 218 48.93% 54.930h 126 Ch 21460 -21525 Dralnagesystem Ch 21525.21 & Grd TGatncnt Ch 21525 - 21900 Dralnage Systom 13-Sep-10 A 29-Oct-12 02-Aug-10 1s-Oct-12 30-Oct-12 05-Jan-1 3 1s-Oct- 12 21-Oec-12 ch21525.21900M&E Oo/o 0o/o 153 30-Oct-12 23-Nov-1 2 1s-Oct-12 02-Nov-12 0lo 0o/o 134 04-Dec-12 23-Jan-1 3 19-Nov-12 08-Ja n- 1 3 0/o lYo Ch 21525.2't900 Pavcmont & Rd Rrmlturc A 21900 - 22029 & Grd Tre attent 28-Sep-10 A 144 131 3l-Dec.12 14-Aug-10 t4-Dec-i2 14.38% 60.09% 122 3of4 @ Oracle 17:4t. 2nd Revised Work Program 1Sth July 2011 - 31st Aug 2011 (5th 24-Sep-11 17:4( o/o Sy!tom 06-Oct-12 13 0o/o 0o/" s-Oct- 1 2 20-Dec-1 2 '13-Mar-13 0o/" 0o/" 12e 0% lYo 131 30-Oct-1 2 07-Ja n- 1 3 1 Ch 21900 - 22029 Pavement & Rd Rrmlture 07-Jan- 1 3 26-Mar- 21 A t e 31-Ja ch 21900.22029M&E 13 -Dec-1 2 'l3.Apr-tl3 9,6tlo/o West 04-Oct-'10 A 05-Dec-12 26-Oct- 10 2 1,7"/" 23.35/o . Brldge Bddgc Oru Caml. Pllc Embankmcnt Eart 24.Aug-10 A 21-Jan-13 03-Aug-l 0 05-Ja n-'13 15.87% 't0.280/0 36 04-Ocl-10 A 06- Feb- 1 3 07-Jan-1 1 22-Jan-13 1.25y" 1.250/o 190 Brldge Orer Canal . other Workc 07-Feb- 1 3 13-Apr-.l3 23-Jan-13 29-Mar-'13 0o/" 01o Brldge Ovar Caml 21-Jan t t 43-UlfiO Dnlnrgo Syltom ch ch 22143. 22400 M&E -22400 & Furnlture l -Jan-1 Ch 22'00 - 22600 Dralnage System 09-Oct-1 0 A 03-Apr-13 21 01 -Dec-1 2 15-Mar-13 21-Dec-1 2 04-Apr13 01.Dec-1 2 1 g-Feb-1 3 21-Oec-12 'I 20-Fob-13 1 7-Apr- 1 3 12-Mar-13 1 22400.22600 M&E Ch 22'tO0 - 22600 Pavcment & Fumllure [email protected] A 11-Jun-13 22-Sep-l 1 24-May-13 1 22-Jan-13 26-Jan-13 03-May. l 3 20-Ju n-1 3 1 30-Sep-13 30-Apr-l 05-Mar-13 Etpnaclon lolnt 0.33% 113 Oo/o 105 1-Mar-13 0% 0o/" 10'l 13 0% 0% 109 0.3% 28-May-13 1 11-May-13 0.21% 0% 42 08-Jan-13 14-Jan-13 0% 0o/o 101 8-Apr-1 3 07-Ju n-'13 0o/o 0o/" 56 I tl-Scp-12 01-Aug-'12 28-Sep-1 3 0% 01o -l 07" t0 28-Feb-13 2l-Scp-r3 0lo iolc 5 07o 0% -1 07o 0o/o 48 0% eh 1 20-Feb-1 3 05-Sep-1 3 26-Feb- l 3 04-Sep-1 3 14-Mar-13 30-Ju l-13 09-Mar-1 3 02-Aug-1 3 Page 4 of 4 6'l r09 Oo/o 0,83% 29-Aug-13 ttc 243 0.8o 1 t 139 56 Resource: @ Oracle Corporatior CONTRACT: SECOND PENANG BRIDGE I-ANO EXPRESSWAY PACKAGE 38; BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SON BHD CONTRACTOR: tJM CONSTRUCTION SDN BHD CONSULTANT : KKJP2 SDN BHD 4 NO. METHOD STATEMENT SUBMISSION AND APPROVAL DESCRIPTION REFERENCE 1. BKE/QAMg/E/O1 2 BKEIQA^.IS/E/02 Earthworks - Site dearing and Sand Blanket Earthworks & Ground Treatment Geotextile & Geogrid lnstallation Soil Investigation oF IilAil REV O REV 1 REV 2 REV 3 APPROVAL 26161201,0 t918/2070 13/912010 Nil 8141201,1, 26/612070 271812010 14110/2070 Nil 8/4/2017 81412071 5171201.0 20/91201,0 2211212070 Nil 1917/2070 2U812010 11/7ol2o7o 1,6/1,1,/2070 814/2077 BKEiOAA4$iXlos PVD Installation Work Cone Penetration Test (CPT) 21./81201,0 11.11.0/201.0 Nil 8/4/201r 6 BKE/OAA4$/GI/01 Geotechnical lnstrumentation 26/8/20L0 21.112/2070 Nil Nil Nil 8/4/2011 7 BKE/QA/\4SlE/06 Ground Treaknent by Vibro fleplacement (Vibro Stone) Dry Bottom Feed Method 27t8/20r0 2211012010 Nil Nil 111512011 8 BKE/QAMS/E/06,A 10/11/201,0 Nil '11/s/2011 9 BKE/QAM5,/E/068 Nil Nil 11/5t2017 10 BKE/QA/il{9/PWO1 Piling work and Load Test BKE/QAA{9/EFI01 Embantment filling 3 BKE/QA[\iS/SI/01 4 BKE/QAA4-g/E/04 5 11 Method Statement for Plate Load Test (Single Column) 26110/201,0 91171201,0 Method Statement for Group (4) Column 2211.1.12070 Plate Load Test. Bridge: Method of statement for Spun Piles (600mm Dia.) IJMC(PG)EKEW/P3BII Instrumentation, Automatic Pile Test 1-0730KSB) Monitoring Load Transfer Analysis and 4/71/201.0 Et STATUS 819/20't0 25/2/2011 23/70t201.0 Nil Nil Nil Nil 22/612011 2719/2010 u2l20r1 81312071. Nil Nil 2216/201.1. 271612071, Sg. Tengah t2 Reporting Works for Static Load Test. / CONTRACT: SECOND PENANG BRIDGE I-AND EXPRESSWAY PACKAGE 38; BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM GONSTRUCTIoN SDN BHD CONSULTANT : KKJP2 SDN BHD 4 NO. METHOD STATEMENT SUBMISSION AND APPROVAL DESCRIPTION REFERENGE 13 BKE/QAM$/X/07 l4 BKE/QA&I9IEF/01 15 BKE/QAA{$/Pw/O4 Method Statement for The Construction of Earth Drain Method Statement for Embankment Filling at Stone Column area sl REV ,ttsN I REV 3 Nil Nil Nil 27161201.1 7214/201,1, Nil Nil 27/6/201,'.1, 7/412011 Nil Nil Nil 22/6/2077 2s1812010 23/1.2/201,0 8/2/2411 22/7/2011 1.8161201,1, t9l4l201r REV 1 STATUS APPROVAL REV 2 O Test Setup and lnstrumentation Monitoring Layout for Static Lateral Load Tests on Instrumented Spun Piles. 76 BIG/QAA4$/SVY/o1 Survey Works .KKIP2 commented on Rev. 00 via email on 1.5/312077..IIMC reply on KKIP2 email comments on 2113/2011 via email. oIJMC letter ref . no: IJMC(I'G) EKEW /P3BI 77-31 20KSB) 't7 BKE/QAA4S/BTVO1 Temporary Steel Sheet Pile Cofferdam for Bridge Pile Cap Works. dated6/5l2077.I|MC replied on the KKJP2 commerrts Rev.0. .ARUP (SE) commented and IJMC responded on23/612017. olCE's Closed out 7/2t201,1 27/212017 Nil Nil 7sl9l20't1, . KKIP2 (NIk Jai) Closed out on 241612071,..Arup (SE) closed out. oPending KKJP2 (IISB) closed out. oCommerrt KKIP2 23/512077. (Arup) not yet received by I|MC. oIIMC letter ref. no: IJMC(IIG)/BKEWP3B/11-563ffi8) dated 5/812077.IJMC response to MPa's check comments. IIMC received closed out from |KSB on2019l201l. CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38; BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SON BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT : KKJP2 SDN BHD 4 NO. 18 METHOD STATEMENT SUBMISSION AND APPROVAL REFERENCE BKE/QAA4S/BR/02 DESCRIPTION Construction and Completion of R.C Bridge Structure Works ot stAll sl REV O 313/2011, REV 1 20/7/2011 REV 2 Nil MEN I REV 3 Nil APPROVAL STATUS 1618/2071 oIJMC letter ref. no: IIMC(PG)/BKEryP3B/113110KSB) dared6li/2017.IfMC replied on the ICE check comments Rev. 0. oIIMC letter ref. no: IIMC(PG)/BKEWiP3B/1 1406(KSB) dated 19 BKE/QAA\{$/BFYO3 Constrqction and Completion of R.C Bridge Stmcture Works at Bridge Over 11./41201,1, Nil Nil Nil Nil PDC Road 1,01612011,. IIMC response to Consultant (Mpa) check comments. oIIMC letter ref. no: IJMC(PG)iBKEWP3B/1 1434(]KSB) dated 22/6|2O1|.IJMC response to Arup (SE) check comrnents. . Arup (SE) closedofi2S/6/2017. rMpa closed out 1015/2011. rICE comments not yet received by IJMC. 20 BKE/QAM5/BEAM/002 Method statement for Construction of Precast Post-Tensioned T-Beams 1,6/5/201,1, 271712011 Nil 16/8/2017 CONTRACT: SECONO PENANG BRIDGE LAND EXPRESSWAY PAGKAGE 38 ; BATU KAWAN EXpRESSWAy CUENT: JAMBATAN KEDUASDN BHD CONTRACTOR: IJM CONSTRUCTIoN SDN BHD CONSULTANT I KKJP2 sDN BHD 4 NO. METHOD STATEMENT SUBMISSION AND APPROVAL REFERENCE DESCRIPTION sl REV O REV 1 REV 2 REV 3 APPROVAL STATUS oIJMC letter ref. no: IJMC(PG)/BKEWIP3BII344(KSB) dated 18/512011..IIMC letter ref. no: UMC(PG)/BIGW/P3B/1 1405flKS8) dated 9/6l201l.IJMC response to Consultant (MPa) dreck comments. o[MC letter ref. no: UMC(PG)/BKEWPSB/1 1428(II(SB) dated 2ll6l2011.IJMC response to Arup (SE) check comments. oICE issued close out and received 27 BKE/QA/\4Sl"Wos Method Statement for Piling Works and Load Test for Bridge Over PDC Road t7/5t2077 08t03111 Nil Nil $Dn0r1 by\MCby 13/7/2011. rArup (SE) to issue close ovrby finn017. eIIMC letter ref. no: IIMC(PG)/BKEWP3B/1 D|QO\7.IJMC 1 -502([KsB) dated response to Arup (SE) check comments. .Pending ICE closed out. oMPa has issued closed out. oIJMC leHer rcf. no: UMC(PG)/BKEWP3B/11-s510r$B) dated 3/8l20ll.IJMC response to ARUP (SE) check comments. IJMC received approved close out by JKSB on 20Pl2011. CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 ; BATU KAWAN ExPREsswAY CUENT: JAMBATAN KEDUASDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT I KKJP2 SDN BHD '0 NO. METHOO STATEMENT SUBMISSION AND APPROVAL REFERENCE DESCRIPTION sr, REVO r REV 1 REV 2 REV3 APPROVAL STATUS rIIMC letter ref. no: !JMC(PG)EKEry?38/11347(KSB) dated 1815/2077 (Response to JI(SB letter ref. no: JKSB/?3B/DN/IJM1-73 dated 9/512011). oIIMC letter ref, no: 22 BKE/QAA,I$ATVM Method Statement for Installation of High IIMC(PG)/3KEWIP1B/I Damping Rubber Bearing (Seismic 1-347(IKSB) IIMC(PG)/BKEWP3B/1 M/6n077 Nil Nil Nil Nil 78161201.7. 1425(I(SB) dated Detailed method Btatement subnission. .UMC to rcsubrtrit method Bearing) statement based on meeting at JKSB HQ on U6n07l..KKIP2 (Nik lai) close out on 22/612011. olCE, Arup (SE), KKJP2 (Arup) comtnent not yet received by IJMC. Method Statement for Dynamic Load 23 24 uMC(PG)/BKEWlP3Blr Test on Driven Pile using Foundtest Drop 1-3560KSB) BKE/QA^\45I"8/01 NiI 27finon Nil Nil 7618/2011 241512017 26nnon Nil Nil 76/8/2077 System. Method Statement for Constnrction and Completion of RC Piled Embankment Slab 25 BKE/QAA,ISlGV02 Method Statement for Well Points 7718/2071 Nil Nil Nil Nil 26 JKSB/"GI002926082011 Method Statement for Approval Manufacturing of Nehemiah Wall Panels 7/912011 Nil Nil Nil Nil Method Statement for PDA Test on 27 BKEIQAMS,IPWNT Raked Piles at Pier 1 of PDC Bridge Over PDC Road t0/9/2071 Nil Nil Nil Nil rUMC letter ref. no: I|MC(PG)/BKEWP3B/11602(IKSB) dated 22ftn011. oIIMC letter ref. no: IJMC(PG)EKEW/P3B/17639(KSB) dated 70 /e /2011. o[MC letter ref. no: I]MC(PG)/BKEW?3B/116400KSB) dated 12/9 12071. CONTRACT: SECOND PENANG BRIDGE LAttlD EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT: JAIIIBATAN KEDUASDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD 5 HSE MONITORING AND REPORTS ITEM NO. REFERENGE NUMBER TYPE OF REPORT SUBMITTED TO DATE SUBMITTED COMMENTS (if any by the authority or REMARKS JKSB) - JKSB letter ref. no: JKSB(SyP3B/OC/rJM /10-00012 dated 25110/10. DOE requests for addendum on the EMP. 1 Environmental Management Plan (EMP) DOE 181812010 DOE letter dated IJMC resubmitted 291912010 responded EMP to JKSB on to the EMP 1111110. Letter ref no: submissions rJMC(PGyBKEW/P3 B/10-166 (JKSB) - EMP approved by JKSB via letter ref no: iKSB(SyP2B/OP/AL U10-00060 dated 8t12110. CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD 5 HSE MONITORING AND REPORTS lTEM NO. REFERENCE NUMBER TYPE OF REPORT SUBMITTED TO DATE SUBMITTED COMMENTS (if any by the authority or REMARKS JKSB) - JKSB letter ref. no: JKSB(SyP3B/QC/rJM /10-00012 dated 25t10t10. DOE requests for addendum on the EMP. 1 Environmental Management Plan (EMP) DOE 181812A10 DOE letter dated IJMC resubmitted 291912010 responded EMP to JKSB on to the EMP 1111110. Letter ref no: submissions rJMC(PGyBKEW/P3 B/10-166 (JKSB) - EMP approved by JKSB via letter ref no: JKSB(SyP2B/OP/AL U10-00060 dated 8t12t10. CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD 6 COMPLAINTS ITEM DATE NO. RECEIVED DESCRIPTION OF COMPLAINTS TYPE OF MEDIA COMPLA!NTS CATEGORY - Tidak menyediakan "Washing Bay''bagi mencuci tayar{ayar loriyang 1 2 15-11-10 17-01-11 keluar masuk ke tapak projek Environment - Tidak membasahkan pada laluan jentera-jentera pembinaan termasuk jalan awam yang digunakan - Ketidakpatuhan Pengurusan Alam Sekitar Environment DATE TAKEN REMARKS ACTION Letter ref no: rJMC(PGyBKEW/P3B/1 24-11-10 0-313(JKSB) dated 29th December 20'10 MHA CONTRACT: SECOND PENANG BRIDGE I-AND EXPRESTTWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT: JAMBATAN KEDUASDN BHD CoNTRACTOR : IJM CONSTRUGTION SDN BHD CONSULTANT: KKJP2 SDN BHD SUMMARY OF TRIAL MIXES 7 ITEM I TYPE OF TRIAL MIX Concrete DESCRIPTION osubmisairn of Concr.L Mb( DGsbn via letter rsf. no: UMC(PGyB]<EWP3U1Gi25(JKSB) dtrd9/102010. NUMBERS TRIAL MIX DONE NUTIBERS DID NOT MEET SPECIFICATIONS G20f.U m AQiNlg(15nf',), 0 G25M on 3/122010 05 noE), GAINJm 9/12n010 (15 rbs), G4085 oloOF DATE FAILED SUBil]lTTED 0% z3lirzfi1A 5tun11 DATE APPROVED 662011 E 30/52011 APROVING AUTHORITY JKSB REMARKS rBopced fft Dc[n lor @,Hol,a G15N, G20N, 925N. Oi[N, G:XP, GaoN, @t(P. Ca(}f .td C50HP. JKSB rcrponao h[cr deled 25/102010. LtlE trpondcd via lotlar m 1E11/2O1O. Cd|orrL ldC mil h6 ilatld $ U2nO1O.nd m 1Ul2/2010 (3O 0og cube), G30PJ q1 18l12l2O1OQ7 rw, oubo), G4!l,lJ on fit@O1l(zl t@, aubo), O@S5 on 2O12/2010 (3Onc aubo), G.(,Os HP $zElfino1oe4 fficub€), G38l'lJ oomplolad ilzennofi. oSubmisbr of TIbl Coocr.a.lr$(R0|llF yi. tofis .sf. m: Utrc(PO)8(EWPtB/t'l- urcecyEtGi/F38/t I dsbd 5/{20t1. rJIGB epgml -222(J|GB) lelter rd. m: .,(SB(S)/P38OC[$,1 l0()7O dd.d 6/5/201l. r LftE lder r€f. no: UtlC(PGyBl(EWFBa/l 1324(JIGB) dsLd 1115/2011, 6not t& on 13/12011 €1nc cube), (XXiPJ or tdGr 1eAf2O11 (21n* aDe), G40PJ m 19/12011 (21 na aub.), G35llG m 21l1n011C21trop, cube), G50SE on 26ll/2011 C30 nG dbo) t d. m: IIrc(PGIBI(EWrFBE/I l. 336(,^KSB) dcr.d iArS/2Ot 1. Submh.bn cood€L aupfier UPC PClP.td Trct C\r. .Jl(ta applml 1660r rd. m: {(SE(SyHIA,QC4Ii/11UIEE dd.d atis/:lol1. CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38: BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD SUMMARY OF TNSPECTTON AND ROUTTNE TEST RESULTS 117t9t2011 - 23t9t20111 8 1 i. ii. NO OF NO OF TEST NO OF PASSED Cube Compressive Strength (24 hours) 18 18 Test result received from Aruo Lab on 19/9/2011_ 1 ) G50/20HP T-Beam Span 295/810 (Date of testing: 2718111 , RFI ref. no: Testingtr90) 2) G5OI20HP T-Beam Span 295/89 (Date of testing: 7l9l2fi 1, RFI ref. no: Testinq/821) Test result received froln jrup l-ab on 211912011 1) G50/20HP T-Beam Span 295/88 (Date of testing: 1419111, RFI ref. no: Testins/853) 2) G50/20HP T-Beam Span 295/87 (Date of testing: 1719111, RFI ref. no: Testing/860) 3) G50/20HP T-Beam Span 295/86 (Date of testing: 1819111, RFI ref. no:Testing/866) 4) G50/20HP T-Beam Span 295/85 (Date of testing: 2019111, RFI ref. no:Testins/868) Cube Compressive Strensth (7 davs) 35 35 Test result received from Arup Lab on 19/9/2011 1) G50/20HP T-Beam Span 295/812 (Date of testing: 5/9/11, RFI ref. no: Testing/811) 4 GSAD9HP T-Beam Span 295/811 (Date of testing: 5/9/11, RFI ref. no: Testinq/812) 3) G50/20HP T-Beam Span 295/810 (Date of testing: 5/9/11, RFI ref. no: Testing/813) 4) G15120 Lean concrete Pl11 (Date of testing: 519111, RFI ref. no: Testing/814) Test result received from Arup Lab en 211912011 1) G50/20HP T-Beam Span 295/89 (Date of testing: 1319111, RFI ref. no: Testing/854) DESCR!PTION ITEM FAILURES REMARKS Concrete GONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PAGKAGE 38: BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT : KKJP2 SDN BHD SUMMARY OF INSPECTTON AND ROUTTNE TEST RESULTS 117t9t2011 -23tst20111 8 DESCRIPTION ITEM II II I NO OF TEST NO OF PASSED NO OF REMARKS FA!LURES 2) G5Ol20 Pile plug P5 & P11 Sg Tengah Bridge (Date of testing: 1719111, RFlref. no: Testing/855) 3) G50/20HP T-Beam Span 295/88 (Date of testing: 2019111, RFI ref. no: Testins/869) iii. Cube Compressive Strength (28 days) 81 81 Test result received from Arup Lab on 19lgl2011 1) G50/20HP T-Beam Span 2941811 (Date of testing: 2618111, RFI ref. no: Testino/762) 2) G50/20HP T-Beam Span 294188 (Date of testing: 519111, RFI ref no: Testins/800) 3) G50/20HP T-Beam Span 294189 (Date of testing: 519111, RF! ref. no: Testing/8O1) 4) G50/20HP T-Beam Span 294187 (Date of testing: 519111, RFI ref no: Testins/805) 5) G50/20HP T-Beam Span 294186 (Date of testing: 519111, RFI ref no:Testins/807) 6) G50/20HP T-Beam Span 294185 (Date of testing: 519111, RFlref no:Testing/809) 7) G15l2O Lean conc Land bridge P2 (Date of testing: 5/9/11, RFI ref. no: Testins/816) 8) G15/20 Lean conc Sg Tengah P5 (Date of testing: 5/9/1 1, RFI ref. no: Testins/817) Test result received from Arup Lab on 211912011 1) G50/20HP T-Beam Span 294183 (Date of testing: 1019111, RFI ref. no: Testins/832) G50/20HP T-Beam Span 294/81 (Date of testing: 1719111, RF! ref. no: CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT : KKJP2 SDN BHD I SUMMARY OF TNSPECTTON AND ROUTINE TEST RESULTS 117t9t2011 -23t9120111 DESCRIPTION ITEM iv. RCPT v. ISAT 2 NO OF TEST NO OF PASSED NO OF FAILURES REMARKS 3) G50/20HP T-Beam Span 294lBl (Date of testing: 1719111, RFI ref. no: Testino/845) 4) G15l2O Lean conc Land bridge P2 (Date of testing: 1519111, RFI ref. no: Testins/857) 5) G50/20HP T-Beam Span 295/812 (Date of testing: 2019111, RFI ref. no: Testing/870) Test result received from Arup Lab on 211912011 1) G50/20HP T-Beam Span 294184 (Date of testing: 1219111, RFI ref. no: Testing/831) 2) G50/20HP T-Beam Span 294183 (Date of testing: 1319111, RFI ref. no: Testino/833) 3) G50/20HP T-Beam Span 294182 (Date of testing: 1319111, RFI ref. no: Testino/843) 4) G50/20HP T-Beam Span 294181 (Date of testing: 1719111, RFI ref. no: Testino/846) 5) G50/20HP T-Beam Span 295/812 (Date of testing: 21l9l11, RFI ref. no: Testino/871) 5) G50/20HP T-Beam Span 295/811 (Date of testing: 2119111, RFI ref. no: Testins/880) 18 18 16 16 G50/20HP T-Beam Span 294lB 4, 2941B,3, 2941B,2, 294181 12 12 Test result received from Arup Lab on 1gl9l2011 1) 2nd layer (250mm thk) sand blanket at Ch20450 - Ch20550 (Date of testinq: 2518111, RFI ref. no: Testins78S) 2) 1st layer (750mm thk) sand blanket at Ch18550 - Ch18580 (Date of testinq: 619111, RFI ref. no: Testins/820) MATERIALS a. Sand - Sieve Analysis Test CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD SUMMARY OF TNSPECTTON AND ROUTINE TEST RESULTS l17tgt2011 -2319120111 8 DESCRIPTION ITEM NO OF TEST NO OF PASSED NO OF FAILURES REMARKS 3) 1st layer (750mm thk) sand blanket at Ch19240 - Ch19350 (Date of testinq: 1019111, RFI ref. no: Testing/837) Test result received from Arup Lab on 211912011 1)2nd layer (250mm thk) sand blanket at Ch18640 - Ch18750 (Date of testins: 1019111, RFI ref. no: Testing/836) 2)2nd layer (250mm thk) sand blanket at Ch18100 - Ch18340 (Date of testing: 1719111, RFI ref. no: Testing/867) b. FDT 2''d Layer Sand 5 Test result received from Arup Lab on 2119/2011 5 1) Ch18300 - Ch18400 (Date of testing: 1719111, RFI ref. no: Testing/865) c. Granular Material i. Sieve Analysis Test b fqslresult received from Aruo Lab on 19/9/2011 6 1) Aggregate stone column. Sample taken at stockpile cloverleaf near Ch18900 (Date of testing: 8lgl11, RFI ref. no:Testing/824) Test result received from lnrpaab on 211912011 1) Aggregate stone column. Sample taken at stockpile cloverleaf near Ch18900 (Date of testing: 18&19/9/1 1 , RFI ref. no: Testing/862) d. FDT Soil/Earth Filling 105 95 10 Test result receiyed from Aruo Lab on19l9l2O11 1) Ch20300 - Ch20400 Zndlayer (Date of testing: 319111, RFI ref. no: Testing/795) 2) Ch20000 - Ch20100 4th layer (Date of testing: 319111, RFI ref. no: Testing/796) CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38: BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT : KKJP2 SDN BHD I SUMMARY OF TNSPECTTON AND ROUTTNE TEST RESULTS l17tgt2011 -2319120111 ITEM II I I DESCRIPTION NO OF TEST NO OF PASSED NO OF FAILURES REMARKS 3) Ch17950 - Ch18100 7th layer (Date of testing: 419111, RFI ref. no: Testino/Z97) 4) Ch17730 - Ch17800 3rd layer (Date of testing: 419111, RFI ref. no: Testing/799) 5) Ch17000 - Ch18050 8th layer (Date of testing: 819111, RFI ref. no: Testing/825) 6) Ch17950 - Ch18050 7th layer retest (Date of testing: 719111, RFI ref. no: Testing/826) 7) Ch20050 - Ch20200 4th laYer (Date of testing: 819111, RFI ref no:Testins/828) Test result received from Arup Lab on 211912011 1) Ch20300 - Ch20400 3rd layer (Date of testing: 1019111, RFI ref. no: Testing/829) 2) C\2O4O0 - Ch20460 1st layer (Date of testing: 1919111 , RFI ref no: Testins/839) 3) Ch20060 - Ch20100 5th layer (Date of testing: 1819111 , RFI ref. no: Testing/848) 4) Ch20000 - Ch20100 5th layer (Date of testing: 1419111 , RFI ref. no: Testing/849) 5) Ch20060 - C\202AO 5th layer (Date of testing: 1519111 , RFI ref. no: Testins/852) 6) Ch20300 - Ch20400 4th layer retest (Date of testing: 2119111, RFI ref. no: Testing/874) 7) Ch17950 - Ch18050 7th layer retest (Date of testing: 2019111, RFI ref. no: Testing/875) 8) Ch17730 - Ch17800 3rd layer retest (Date of testing: 2019111, RFI ref. no: Testing/876) CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD SUMMARY OF TNSPECTTON AND ROUTINE TEST RESULTS 117t9t2011 -23t9t20111 8 DESCRIPTION ITEM e. f I I g. h. 3 Reinforcement bar material geotextile i. Woven ii. Non-woven geotextile PVD Geogrid PILE TESTING a. Maintained Load Test NO OF TEST NO OF PASSED NO OF FAILURES REMARKS CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38: BATU KAWAN EXPRESSWAY CLIENT: JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHO CONSULTANT: KKJP2 SDN BHD I MATERIAL SUBMISSION AND APPROVAL ITEM NO. ,l 2 DESCRIPTION OF MATERIAL Sand for Sand Filling (ref. no: CSS/P3B/053) MANUFACTURER' SUPPLIER ECK Construction Sdn Bhd 75mm UPVC Pipe & 32mm Gl Pipe (End Bearing Ball Syarikat Ujitanah Sdn Bhd Valve) for Well Point (ref. DATE DATE SUBM!TTED APPROVED 't6t6t2011 Nit APPROVED BY JKSB e IJMC letter ref. no: IJMC(PGyBKEWP3B/1141g(JKSB) dated 16/6/2011. Sand source: Kg. Sg. Limau, Lunas, Kulim. 9t8t2011 Nir JKSB o IJMC letter ref. no: IJMC(PGIBKEWP3B/11577(JKSB) dated 9/8/2011. rJKSB letter ref. no: JKSB(S/P3B/QC/IJM/1 1 -001 62 dated 261812011. Well points material must be in accordance with the specification and construction drawings. 17t9t2011 Nit JKSB o IJMC letter ref. no: IJMC(PG/BKEWP3B/11647(JKSB) dated 17 1912011. 191912011 Nit JKSB o IJMC letter ref. no: IJMC(PGyBKEWP3B/11653(JKSB) dated 19/9/201 1. no: CSS/P3B/057) 3 Aggregate for stone column (ref. no: css/P3B/058) 4 Cemex, Batu Kawan/ MRP Sdn Bhd Nehemiah Walls (Casting Nehemiah Reinforced Soil components: Jabez Key Hole & Jabez K-Plate) (ref. Sdn Bhd no: CSS/P3U059) REMARKS CONTRACT: SECOND PEilANG BRIDGE I.AND EXPRESSWAY PACXAGE 38: BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN XEDUA SDN 8HD CONTRACTOR I IJM CONSTRUCNON sDN BHD CONSULTANT: KKJP2 8ON BHD IO SUMMARYOF NCR PACKAGE 38 ITEM DESCRIPTION NO. NCR'P3B'IJMOI4 1 Pile found b bc dcviatad (v6rtical) mor. than 1:75. NCR/P3B/IJM'016 2 Verticallity of inetelled pile found to bo d€viatod (wrtical) >1 :75 LOCATION DATE ISSUE Pilc embankment frle at PE/S16 and Sg. Tengah pile at Pier 7/L6 @El2011 Sg. Tengah Brkjge. Pilee at P+S7, P1't-N14, Pl 1-N5 11Bnol1 DATE COMMENTS FURTHER ACTION REOUESTED R6for b NCR reply attechmont docurncnts. 1nlN|1 Calculation to bo endorscd by PE. Opcn Rofer to NCR raply attachmont documonts. 1nm11 Calculatkxr to bc endorted by PE. Open DATE CORRECTION ACTION REPLY 8TATU8 OF ItcR 1g9nofi & 3 requircd blcnncc 73t61?o11 & 139/2011 efior: \Anm|1 nnm11, davhd f,ihs.nd e8/20rl thc dceign Open crlcukrtionr (duly endor*) by a PE h.\rc.ubmitbd vh our lotlar rcfercncc no, |JMC(PGyBKEWF3B/11- daud n n m1 1 & 1 1 - 510d.d21nm11 NCR'P3B'IJMIOTT Bouldor6 and mud has b€on cH 18ZX) 1U7ml1 14nm11 romoved immediately on Open 1gntnfi. NCR'P3B'IJM'03'T 5 Embankmcnt earthfilling (5h hycr) using unsuitable mabdal which contein roots, organic material and big bould€r. cH 181m fimn11 Bl7tN|1 To rcmo,€ th€ fud aarlh Monitor clo!.ly on arcry pilc whilc driving. p.r RFI/lsqJKsB) rdetion, the oontraobr has c.riod out reen lydt o, thc of 75mm. Earth frlling 5h hyer wihout remoring tho mud rnd bb boulder on hyer m 4 Monibr dos.ly on artry dlc whiL drMng. 1) Thc anely:b rceulte condud.d th.t tho as built piL poilion capadv Bridgc Pler 4 & 5 i! .dcqu$ b takc th! doolen lo.dlng a8 tis 501 (JKSB) 4 REMARKS 2319i2011 Specification Clauce 10.2.6 5, DATE cLosEo 2,3t6/?011, tlF contacbr! b modfi thc e.rb rtucture deeign (if any) for pile dcvidd more than the limit ln ilcR P3Bn iir030 As builtrccod.hort $etlh. til€..t Pl.r Picr 4 and Pier 4 and Plcr5 tnd dad6d outof thc l-ard Bridgo PREVENTN'E ACTION Opan 2) Thc dcvletm ofthe pilra i. duc b th6 soft marinc day gramd movcmcnt during pla drMng procear, All the actffng ant polnt shall bc oheckcd daily in ordor b anoid rofff.nc. b ths setting out pco duc to nrorurncnt of ground. 'I,JMC l€tter r6f. no: IJMC(PGYBKEWP 3B/1 I -531 (JKSB) deled 27fit2111 Submission of roport oh th€ analysis check. . COT.ITRACT: SECONO PENANG BRIDGE IAND EXPRES8WAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT: JAMBATAN KEDUA 8DN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP,I gDN BHD 10 SUMMARYOF NCR PACKAGE38 ITEM DESCRIPNON NO. LOCATION DATE DATE ISgUE REPLY CORRECTION ACTION DATE COMMENTS FURTHER ACTION REOUESTED sTATU8 Of PREVEIiITIYE DATE NCR ACTlON CLOSED 1. Wc harro entiapabd '1. 6 NCR'P:}BJUMO6I Wc for.rnd tM thc oofi.rd.m ct Plcr 2 Sh€ot pilee movld b thc lnncr tEc of ttre cofhrdam during lroe\flton. Thit b darporouo end vcry Land Bridgc ?8t7t2011 9N2o1',l We havc etopped /p.X oo hold infodnctkm of th..ddidonal 3. The pile cap lorcl rcwrc. t{cR PtBrumog7 Surfrcc of crtrworlcwa not propcdy grade, don't hwc arfitdcnt gr.dbnt wrbr rnd p?tr,rnt ponding b ni!. may occur atd trto haw incrurc/raised ths pcn&aton of the Opon sfut b lh€d cH 20050 - cH NSml1 20300 pilc cep lcvcl O avoid &cp ocardion a3 pcr Plcr 292 dcolgn levcl of pilc cep whEh is ebon grannd lorcl. oQ.dlt tlc To dbcfiarge ojtttc$r&r ponding. To r.tte mo6or gradorb lorcl and b compec't profiy. Open NCR'P3B'IJiUIOI I lmutfiobnt.ggr.ges filing during installdion of $ono column #774 (drpth 19.4m) \tol. eggngatas r€quircd = 17,52713. Aotel aggrogate uccd during inltel$on = '19 buck€6 x 0.887 = 16.85m3 Cloverlef lnterchange Ramp 3 8Btn11 6t9DO11 Remind operator on w66kly basis for how many buckets of stone per column. 7El2o11 Clo€od r{cR P3B'frMrr05 RSG 25 ws turnd damaged and tittad Rcpcnebru urirU VC vibrabr b 7.&n deptr frorn grwnd u.rface. Conrtrwt !&t1€ column uling 1 Duckot per mr&o from 7m b 21re,r2o11 5m. Remainingfrom 4.9rn b 0m wlll bo compao'tcd wift 1I2 buckot pcr meto. < requhcd abovc. I ahoct pilc from odrginal 18m b 24m. 2. To rcqucot the dcoigncrto mire the 200mmb e\oidfurhcr opatetkm wfibtr m.y giv..dor Yvorking pLtform & u/Drks. 7 thattt1c mowtnent ths oxca\retion of pilo cep rt RHS and additioml s&utr haw bccn infoduced at lounrtbr. 2, Tho crack linc on thc adJrccnt ground vra3 not soen efbr cH 18000 ?fl8r2011 To r6c'tify datnaood RSG, Clo€ad 2$tn11 REMARKS CONTRACT: SECOND PENANG BRIDGE IAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT i KKJP2 SDN BHD CONSTRUCTION/SHOP DRAWNGS SUBM ISSION AND APPROVAL 11 ITEM NO. DRAWING TITLE DRAWINGS REFERENCE NUMBER DATE SUBMITTED DATE APPROVED APPROVED REMARKS BY ..UMC Lettor datod 111212010, toplted m the ICE comrnsnts on Dosign Caldlation for Bridge Over Canal. ..UMC Lett€r datod 2U4I2O1O,rcplid on tho ICE comiionts on De€ign Calculation (Rsv. 4) and drawings for Bridge 0\16r Canal. ..|JMC Lottor r6t no: rJMC(PGyBKEWP3EyI 1 -360 dat6d 261412010, repliod on ths ICE comments on Design Calculglion (Rov. 4) and dawings br Bridge orrer Canal. .IJMC l€*tsr rsf. no: IJI\iIC(PGyBKEWP3B/1 1399(JKSB) dato( 9/ry201 1 . |JMC respon$ to ICE's check comments. .IJMC lotter rof. no: IJMC(PGYBKEWP3B/1 I.459(JKSB) dated 6171201'l . IJMC response to tCE check commsnts (GEO-P3B-ZKR41 daled 261612011).t IJMC lettor rof. no: JMC(PGyBKEWP3B/1 1 -529(J KSB) datd 27 17 1201 1. IJMC rssponss to ICE ch6ck @mmnts (BRIDGE-P3&ZKR08). .IJMC lattor rd. no: JMC(PGyBKEWP3BTI 1 {00(J KSB) dated 2olty201 1. IJMC rospons€ to ICE ch6ck commanB (BRIDGE-P3&ZKR08x9/8/201 1). BRIDGE OVER CANAL 1.0 r r 1.1 T/P2}UPK3B/II M/CAN/ST/OO1 Bridge Ovq Canal Ceneral Alrangement 1.2 wiP2vPK3BlU M/CAN/ST/m1 BRIDGE OVER CANAL GENERAL NOTES -111112070 1.3 WP2VPK3B/I] M/CAN/S"TIM2 BRIDGE OVER CANAL GENERAL ARRANCEMENT 7177/2070 JKSB 7.4 WPryPrcB/I]M/CAN/ST/M3 BRIDGE OVER CANAL PILING LAYOUT 7t77t2070 JKSB 1.5 wP2XiPK3B/IJMiCAN/ST/004 BRIDGE OVER CANAL ABUTMENT DETAII,S 7t17t810 JKSB 1-6 ryP2VPK3B/IJMiCAN/ST/0o5 BRIDCE OVER CANAL PIER DETAITS 7117t2070 JKSB 1.7 WP2VPK3B/l jN!',CANt5T/006 BRIDCE OVER CANAL DETAILS OF ?4,25m PRECAST BEAM (SHEET 1 OF 2) 7t771m10 lKsB 74/8120]O JKSB JKsB CONTRACT: SECOND PENANG BRIDGE IAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: UM GONSTRUCTION SDN BHD CONSULTANT : KKJP2 SDN BHD CONSTRUCTION/SHOP DRAWINGS SUBM ISSTON AND APPROVAL 11 !TEM NO. DATE SUBMITTED DRAWNG TITLE DRAW]NGS REFERENCE NUMBER DATE APPROVED APPROVED BY 1.8 WPXIPK3B/IJ M/CAN/S-VM7 BRIDCE OVER CANAL DETAITS OF 24.25M PRECAST BEAM (SHEET 2 OF 2) 1,t11t2010 JKsB 1.9 WP2X/PK3BIJ M/CANiST/M8 BRIDCE OVER CANAL DECK SLAB DETAILS lt7112010 ]KSB 1.10 wP2XlPK3BlJ M/CAN/ST/oOe BRIDCE OVER CANAL DIAPHRAGM DETAILS uwm70 JKSB 1.11 ryP2XlPK3B/uM/CAN/ST/o10 BRIDCE OVER CANAL PARAPET DETAITS 7fi7t2010 JKSB 1.72 WP2VPK3B/UM/CAN/ST/o11 BRIDCE OVER CANAL MISCELLANEOUS DETAIIS u77t2070 JKSB 1.13 T/P2VPK3B/IJ M/CAN/ST/OOI Bridge Ovs Canal Ceneral Arrangment 74!812010 JKSB 1.14 WP2X/PK3B/J M/CAN/STim1 BRIDCE OVER CANAL GENERAL NOTES 6/4/2017 16t8/2017 JKSB 1.15 WiPIVPK3B/lJ IVVCAN/ST/O2 BRIDCE OVER CANAL GENERAL ARRANGEMEI{T 61412011 rc18/2s77 ]KSB 1.16 wP2)7PK3B/J M/CAN/ST/oo3 BRIDGE OVER CANAL PILING LAYOUT 614t2071 781512077 JKSB REMARKS oIJMC letter ref. no: tJMC(PGyBKEWP3B/1 1 -1148(J KSB) dad.€d 25lWO1 1. IJMC rsspomo to ICE ch€ck cmmonts. .JKSB letter rsf. no: JKSB(SYP3EYDN/tJtU1 1 €2 dat€d 181512011. .IJMC lGflor rsf. no.l rJMC(PGyBKEWP3B/t 1 -525(J KSB) drted 26171201'l . Ofiicial submission of mnstruclioil drawino. wi?zv"K3B/l jM/CAN/sT/m4 WP2VPK3B/UM/CAN/STi M5 ERIDGE OVER CANAL ABUTMENT DETAITS 6t4/2071 16t8t2077 JKSB 1.18 ERIDGE OVER CANAL PIER DETAITS 6/412071 1618t2071 JKSB 1.19 WP2VPK3B/IJ L{/CAN/ST/oo6 BRIDGE OVER CANAL DETAITS OF 24.25m PRECAST BEAM (SHEET 61412011 76t8/2071 JKSB t.t7 1 OF 2) CONTRACT: SECOND PENANG BRIDGE IAND EXPRESSWAY PACKAGE sB : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: UM GoNSTRUGTION SDN BHD CONSULTANT : KKJP2 SDN BHD CONSTRUCTION/SHOP DRAWNGS SUBM ISSION AND APPROVAL 't1 ITEM NO. DATE SUBMITTED DATE APPROVED APPROVED BY 614/2071 161812011 JKSB 61412011 7618/2077 JKSB 61412011, 16t4t2017 JKSB 6tq2u7 76t8/2077 JKSB 61q2077 76t8t2071 JKSB 6t412077 $tal2011 JKSB VERTICAL DRAINAGE SYSTEM 6fiOt?o70 DRAWNG TITLE DRAWNGS REFERENCE NUMBER 1.20 WP2VPK3B/IJ M/CAN/ST/M7 BRIDGE OVER CANAL DETAITS OF 24.25m PRECAST BBAM (SHBET 1.27 WP}?PK3B/IJ M/CAN/sT/M8 BRIDGE OVER CANAL DECK SLAB DETAITS 7.22 wP2mrcB/rjM/CAN/ST/m9 BRIDCE OVER CANAL DIAPHRAGM DETAITS 7.23 WP2X,PK3B/IIM/CANiST/O1O BRIDGE OVER 7.24 wiP2)7PK3B/ll MicAN/sr/o1 t.l5 wP2VPK3B/uM/CAN/ST/012 CANAL MISCELLANEOUS DETAI1S BRIDGE, OVER CANAL MISCELLANEOUS DETAIIS KVEKM/I JM/2PBI38/PVD/M1 PVD LAYOUT PLAN CH 77775. CH KA/EKM^JM/2PB/3B/PVD/002 PVDLAYOUT 2.3 KA-/EKM/tJ M/2PBlgBi PVD/003 2.4 KA/EKM/ 2.5 r!!/EKM/UM/2PB/38/PVD/005 1 LO 2.7 U M/2PB/38/PVD/OO4 CANAL PARAPET DETAII,S BRIDGE OVER 2 OF 2) REMARKS JKSB Rev. A JKSB R€v. A JKSB Rev. A JKSB ReY. A 6t70tm,o ]KSB Rev. PVD LAYOUT PLAN CH 182M. CH 18450 6t70/xto ]KSB Rev. A A 4* qfilm70 17450 - CH 1z/00 PVD LAYOUT PLC,N CH 17700 - CH 17950 6tNm70 6tfilmLo PVD LAYOUT PLAN CH 17950 - CH 182M cH 17 2.6 KA/EKM/I JM/2PB/38/PVD/OO6 PVD LAYOUT PLAN CH 18450 - CH 18700 6/70t2070 ]KSB Rev. A 2.7 KA /EKMI ttM/2PB I 38 I P V D I N7 PVD LAYOUT PLAN CH 18700. CH 187/5 6t70/2070 JKSB Rev. A 2.8 KA./EKlv/IJtit2PBl38/PVD/00 I PVD LAYOUT PLANCH 17175 - CH 17450 7911'y2070 JKSB Rry. B 79111t2070 ]KSB R€Y. B 7917u2070 JKSB Rev. B 79/7112070 ,KSB Rev. B 79117120tO JKSB Rev. B 1911,7t2010 JKSB Rev. B 79t11,t20rO JKSB Rev. B 79177t20L0 JKSB Rev. B 79t7112070 JKsB Rev. B 19t7112070 JKSB Rev. B 79t11t2010 ]KSB Rev. B 79t7Um70 JKSB ReY. B 19t11t2070 JKSB Rev. B 19t7112070 JKSB Rev. B 20t7t2011 ]KsB Rev. E 20tu?s77 JKSB Rev. E 20t712077 JKSB Rev. E mlv2077 JKSB Rev. E 2UU2017 JKSB Rev. E 8 (Peel No. l) PVD SETTn{G OUT FLAN CH 17175 - CH 17450 (Prel No. l) 2.9 KA,/EIO/I[}!u2PBI3B/PVD/00 2.10 Kt\tEKl,/y7IW ?PB 2.11 KNEKMIIIM/ ?PB I3B IPYD / N?A 2.72 K'EK[,['IJM/2PB13B,PYD/M3 PVDLAYOUTPLANCH 17,00 - CH 2.73 KAJEKM/IJI\.,t/2PBl3Bl?vD/0034 PvD SETTING OLIT PLAN CH 2.14 IK1,/EI(MfiIMJlPBBB/P\DI@. PID LAYOUTPLANCH 2.1s KA"/EK\,!/I JM2PB/3B IPYD / $4A PVD SETTING OUT PLAN cH 1 7950 - CH t 8200 2.16 K.l/EKf\.4/l Jl\.{/2PBBBlPvDim5 PVD LAYOUT PI-AN CH I 8200 - CH I E450 2.17 KA/EKN,!/I JM2PBBB/PVD/005a PVD SETTING OUT PLAN CH 18200 - CH 18450 2.74 XA./EK\,4/I JM2PB6B/PVD/OO6 PVD LAYOUT PLAN CH 2.19 KA/EK\,,'/I JN,T/2PB/3B/P1D/OO6A PvD SETTING OUI PLAN CH 2.20 KA./EKI,f/I JI\,I/2PBBB/P1'Di007 PVD 2.27 KA./EKlvi4 JMDPBI3B lPVD I 007 2.22 KA/EK\,'/IJM/2PB/38/PVD/OO I 2.23 KA/EKMIJI"I2PBI38/PVD/00 I 2.24 KA./EI0\rIJlvr2PBl3B,PVD/m2 )rq KA"/EKt\r'1Jl't2PBl3B 2.26 KAJEKI//I JM2PBBBPYD/M3 PvD LAYOUTPI^ANCH 2.27 KA/EKN.I/I J1\.il2PB/38/P\D/003a PvD SETTINGoUIPI-ANCH l7/m - CH 17950(Pel No.3) 20/um1l JKSB Rev. E 2.28 KA./EK\,f/I Pl'D LAYOLJT PLAN CH I 7950 - CH I 8200 (Pecl No. 4) 20t7t2017 ]KSB Rev. E 2.29 KA,/EK\,,I/I JL'2PB/3B/P}D/OO4 PVD LAYOUT PLAN CH I 7950 - CH I 8200 (PdEl No. 4) 3tun71 JKSB Rev. F / I 18 tP\D t 002 PVDLAYOUr PLA).IcH 6 1700 (P&ot No. 2) PVD SETIING OIIT PI-AN CH 17450 - CH 17100 17950 17700 - 17950 - I 8450 - cH cH tE20o (Pel 8 No. 2) (Peol No. 3) 17950 (Pel (Pel No. 3) No.4) (Pet No. 4) (P@l No. 5) (PelNo. 5) CH I 8700 (Peel No. O 18450 - CH LAYOUI PLAN CH I 87m - CH I 8775 18ru Gel No. 6) (Peel No. 7) PVD SETTING OUT PLAN CH I E700 - CH 1 8775 (Pel PvD LAYOUT PIAN cH 17180 - CH 17450 (Pecl No IPYD I &2a JI\r2ml38/PlD/004 17450 - CH PVD SETIING Ot T PLAN CH 17180 - CH 17450 No. A l) (Pel No. l) PvD LAYOUT PLAN cH 17450 - CH 1700 (Pe€l No. 2) PvD SETIING OUT PLAN cH 17450 - cH lru (PryEl No. 2) 1700 - CH 17950 (P&cl No. 3) CONTRACT: SECOND PENANG BRIDGE IAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: UM GONSTRUCTION SDN BHD GONSULTANT : KKJP2 SoN BHD CONSTRUCTION/SHOP DRAWNGS SUBM ISSION AND APPROVAL 11 ITEM NO. DATE SUBMITTED DRAWNG TITLE DRAWINGS REFERENCE NUMBER (Pel DATE APPROVED APPROVED BY REMARKS 20t1t2017 JKSB Rev. E 20t7/2071 JKSB Rev. E 3t3t2077 JKSB Rev. F 20t1t?o17 JKSB Rev. E 20t712011 JKSB Rev. E x1712071 JKSB Rev. E 20t7t2071 JKSB Rev. E PVD SETTING OIJT FLAN CH 18700 - CH 1e850 (ParEl No. 7) 20t712077 JKSB Rev. E KA./EKlvtiI J}"V2PBI3B/PlD/008 PVD LAYOT T PLANCI{ l9d00 - CH 19650 (Peol No. 8) 20/um71 JKSB Rev. E 2.39 IAVEKMiIIIilzPBABlPVD/0088 PVD SETrING OUT PLANCH 19400 - CH 19650 (P{El No. 8) mlumll JKSB Rev. E 2.44 (!EKI\{/'IJM?PBBB/P\D/009 20fitm71 JKSB Rev. E 2.47 IO\,EKlvtrIIM?PB/3B/PVD/009a PVD LAYOUT PLANCH 19650 - CH l9m0 (Pm€l No. 9) PVD SETTING OllT PLAN CH l%50 - CH 19900 (Po€l No 9) 20t1t2071 JKSB Rev. 2.42 IA/ETSVIIJM?PB/3BPVD/O I O PVD LAYOUT PLAN CH l990O - CH 20150 20tumt7 JKSB Rev. E 2.43 IQ{EIovr{n\,r?PB/3BPVD/0 I 0a PVD SETnNG OUT PLAN CH 19900 - cH 20150 (Pelcl No. l0) 20t1t2017 JKSB Rev. E 2.44 IAEKT\rIINi/2PBI3B,PVD/0 I I PvD LAYOUT PLAN CH 20150 - cH 20400 (Pert No. I l) 20t1t2011 JKSB Rev. E 2.45 I({?KI\44,M/2PBI3BPVD/01 mtum1l JKSB Rev. E 2.46 KA,/EKI\..1/I JM2PB/3B/P\D/0 201112017 ]KSB Rev. E 2.47 Krqr'EKlvL/"I Jlvl/2PBl3B mt7t2071 JKSB Rev. E 2.4A KVEKI\,{,/I JM?PB/3B,PVD/0 mtu2077 JKSB Rev. E 2.49 K,VEKI,{/'IJM/zi'Bl3B/PVD/o1 3a 201712017 JKSB Rev. E 2.50 K]A,EKI,fi JN,'/2PB/38/P}D/O 20t7t2071 JKSB Rev. E 2.51 IQ!r,EKI,t/'lI\,!2PBI3B/PVD/0 I 4a PVD SETTING O1,r PLAN cH 21525 - cH 20Atm77 JKSB Rev. E IQq',EKlvt/IlM,2PBl38/PvD/0 I 5 PVD LAYOUT PLAN CH 21700 - CH 21900 20t1t2017 JKSB Rev. E 2.53 KA./EKI,TUM2PBI38/PVD/OI 58 PvD SETIING OlrT PLAN CH 21700 - CH 2l9m (P8El No. 20l1lmtl JKSB Rev. E 2.54 K'EIO''IJ}V'PBI3BPVD/OI PVD LAYOUT PI-A,N CH2238O - CH22591.682 20t7t201,1 ]KSB Rev. E 2.55 KA"/EKld Jt\r2PBl3B lP W I ol 6a PVD SETTING OIJT PLAN CH 22380 - CH 22597.682 (Puel No. 20t7t2071 JKSB Rev. E 2.% K'EKM1'M2PBi3B|?VD/O I 7 PvD LAYoUT PLAN CLOVERLEAF - WEST (Pacl No. I 9) mtltmTl lKsB Rev. E 2.57 KA/EKlvt/lIM2PB/3B PYD I 0 17 a PvD SETTING OIJI PLAN CLOIERLEAI mtu2071 JKSB Rev. E 2.8 KA/EKMI]M2PB/3B/?1D/01 8 PvD LAYOUI PLAN CLOIERLEAF 20t7t2071 JKSB ReY. E 2.59 KAIEK\NNIM]?PB I3BIPVDI01 8A PID SETTING OIII PLAN CLOVERLEAF - mtu2077 JKsB Rev. E 2.60 KA/EKIAIJ}VV2PB13B,P1D/M4 PVD LAYOUT PLAN CH I 7950 - CH (Pa€l No. 4) 246/N71 2318/2o7l JKSB IKSB(S)/P3B/oP lwl1-00153 dated 21t4t2017. R€v. F .JKSE letter ref. no: 2.67 KA.EK\r'/III\IJ 2PBBB lPW I @7 PVD CH I 8850 (Pecl No. 7) 2216tm17 231812071 JKSB JI(sB(S)/P3B/oP/lIM/11-m1$ dated 2.30 Kt/tsICvLrI^,{/2PB/3B/P!D/004a PVD SETTING OUT PLAN CH I 7950 - CH I 8200 2.31 K4/€Klvr{lMrzPBi 3BPVD/005 PVD LAYOUT PLAN 2.32 KA,EKlrln f/zPBl3BlP!',Dlms PVD LAYOUT PLAN CH I 8200 - CH I 8450 2.33 Kr{€KI\4,TJI\III?PB/3BPVD/005a PVD SETTING OtlT FI-AN CH I 8200 - CH 1 8450 KrA/EKtWiI JI\,I//2I'Bl3BlP\,rDl006 P'vD 2.35 IG,EKlv{,,.tM/2PBI38/PVD/006a PlD SEmING 2. KA/EKI,{/IJMzPBBB/PID/OO7 PlfD LAYOIII PLANCH 18700 - CH 18850 (Peel No 7) 2.37 Ii{,EKIV(,TJM4PB/38 /pvD / N7 a 2.* lP\D / 0 I e cH LAYOUI PLAN CH I 8200 - CH I 8450 No. 4) (Peel No. 5) 8450 I (Pel No. 5) (Pel No. 5) (Peel No. 6) - CH I 8700 OUT FLAN CH 1E450 - CH 18700 (Putl No. 6) (Peel No. l0) PvD SETTING OUI PLAN CH 20150 - Ct{ 2O400 (Prcl No. I l) I 2 PvD LAYOUT PLAN CH 2M00 - cH 20650 @uol No. 12) 1 2a PVD SETTINC OUT FLAN CH 20,100 - CH 20650 I 3 PvD L,AYOUT PLAN cH 20650 - CH 20810 (Perl No 13) I 4 6 PvD SETTING OIJTPLAN cH PVD LAYOT T PLAI{ CH 21 20650 - 525 - cH cH 21 - (Peil No. 21 700 EAST & 15) No. 14 & l, 14 (Pel (Pecl No. - l2) No. (Pmcl No. 13) 20810 700 (Pel 16 16 & l5) & l7) (P@lNo. 18) l8) WEST @mel No. I 9) esel EAST No. 20) @wl No. 20) Rev. LAYOIIT PLAN CH 1 8700 - 1 8200 I F OJKSB )4Nn11 tett$ ref. no: CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU K.AWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: UM GoNSTRUCTIoN SDN BHD CONSULTANT : KKJP2 SDN BHD CONSTRUCTION/SHOP DRAWNGS SUBMISSION AND APPROVAL 11 ITEM NO. DRAWNG TITLE ORAWINGS REFERENCE NUMBER DATE SUBMITTED APPROVED APPROVED BY 2318/2017 JKsB IKSB(S)/P3B/DN/IJM/l 1-82 dated tgt5t2077. DATE REMARKS Rev. K'EKM/'I JI,'2PBI38/PID/O I O PVD LAYOUT PLAN CH 19900 - cH 20t50 (P@l No. l0) 2216t2011 F .rKSB letter ref. no: 2.63 KA"/EKI/t{r}vr2PBABlP}aDloG4 PVD LAYOUT PLAN CH I 7950 - CH I 8200 (Peel No. 4) 25/812071 JKSB Rev.C 2.& KAJEXI4{JI/2PBAB/PVD/OO5 PVD LAYOUT PLAN CH I 8200 - CH I 8450 (Pmol No. 5) 25t8lmtl JKSB Rev.C 2.65 I({,€,KIv{,{M/?PB/38/PVD/m6 PvD LAYOUI PLAN CH I M50 - CH I 8700 (Pm€l No. 6) 25t8t2or7 ,KSB Rev.G 2.6 K'NEKI\4/1II\A 2.67 CI{ I 8850 (Pel No. 7) 25lAm17 JKSB Rev.G IG/EKld,ltNd4PB/3Bi?1D/008 PVD LAYOUT PLAN CH 19400 - CH 19650 @el No. 8) 25t8tn11 JKSB Rev.G 2.68 KIVEK\TATMI?PB I3BlPYD / N9 PI,A.N CH I 9650 - CH I 9900 (Pmel No. 9) 2518/2011 ]KSB Rev.G 2.69 I0!EKI,14JN{,/'2PBI3B/P\D/0 I 0 PlD LAYOUT PlD LAYOUT (Pucl No. l0) 2518t2077 JKSB Rev.G 2.m KAIEK]WIJM2PBAB,PVD/OI I PVD LAYOUT 2st8t2017 JKSB Rev.G 25t8t2017 JKSB Rev.G 2518/2s71 JKSB Rev.G 25181m71, ]KsB Rev.C 251812071 JKSB Rev.G 25t812011 JKSB Rev.C 25181m17 JKSB Rev.G 2st8t2077 JKSB Rev.G ?PB I 3B lP\lD I $7 PVD LAYOIJT PI^AN cH I 8700 - PI-A,N CH 19900 - CH 20150 KA/EISVYIJMZPBAB/PVD/01 2 2.72 I(AEK]WIn,V?PB/3B/PVD/0I 3 PlLN CH 20150 - CH 2M00 (Peel No. I l) PvD LAYOUI PLAN cH 20400 - cH 20650 (Peol No. 12) PVDLAYOU'T PLANCH 20650 - CH 20810 (Pocl No. 13) 2.73 KA/EKII{4II\4,4P8l3B,?\D/0 I 4 PVDLAYOUTPIAN 2.74 KTEKN4/IJI\,il2PBI3B,P!D/0 I 5 2.75 K'EK\I/IJI,'2PBI38/P1D/O I 6 PVD LAYOUT PI-A,N CH223BO - CH22597 682 2.76 KA,/EKIWIJ}VS2PB/38/PVD/0 I 7 2.n KA,/EIO'/IJM?PBBB/PVD/OI PID LAYOUT PLAN CLOVERLEAF - WEST (Peel No. I 9) PVD LAYOLIT PLAN CLOVERLEAF - EAST (Peel No. 20) 8 C1121525 PlD LAYOUT PI^ANCH - CH2l7oo(Puel No. l4 & 15) 21700 - CH 21900 (Pmel No. 16 & 17) (PselNo. l8) STONE COLUMN 3.0 3.1 10/8126qCUCUmO1 9.2 10/812SqCUU0002 JKSB STONE COLUMNS LAYOUT PLAN TONE COLUMNS LAYOUT PLAN RAMP 3. CH 178.0 TOCTI 288.0, RAMP 7. CH 345,0 74l1Ol2O7O JKSB 74t70t2070 JKSB JKSB TO437.0 3.3 10/81,SC/U0001 STONE COLUMNS LAYOUT PLAN CH CH 17125.00 14l70lm10 3.4 10/812/SqU@02 STONE COLUMNS LAYOUT PLAN CH 17125,00 - CH 17180.00 lA7olmto ,KSB 3.5 r081zsc/clluooo1 STONE COLUMN LAYOUT CH26O,O) 2t1712070 JKSB 3.6 l0/81?Jsgcl/L/ooo1.1 sToNE COLUMNLAYOUTPLIII (RAMP 3 CrI259.0. CH 328.0, RAMP 7 CH345.O -CH2tu.O) a77l20lo JKSB 3.7 l0/8l1Jsc/cl4./0003 SIONE COLUMN LAYOUT PLAN (MAINLINE CH 18850,0 . CH I893.I,0, RAMP u1712010 JKSB 3.8 l0/81zsc/cl,t/0003. I STONE COL1JMN LAYOUT PLAN u7712010 JKSB 3.9 l0lSt?]sclcLlJoro4, STONE COLTJMN LAYOUT PLAN (MAINLINE CH 18934.0 - CH I9O3O.O, RAMP 3 CH 70.0. CH 165,0) 2177t20LO JKsB 3.10 rclStasctcL/Llffic4.l STONE C\OLTJMN 2J11t2010 JKSB 3.11 10/812/SC[,OD/0001 LIST OF DRAWINCS |t3/2077 JKSB Rev 0 3.12 l0/8tzsc/cucl/0001 STOM COLUMNS LAYOUT PILE 7l3lD77 JKSB Rd0 3.13 IOtItzlSCIC,-fi,!0(101 STONE CIOLUMNS LA,YOUT 3.1{ lc|/Elrscvcl/lJ0ool.l SETTINC OUT COODINATES FOR RAtvlP 3 : CH 269.0 3.15 ruSt2nC]cl.Mvex STONE 3,16 3.77 PI-\N (RAMP 17075,00 - 3 CH 269,0 . CH 328,0, RAMP 7 CH345.O (MAINLINE CH I885O,O - LAYOUI PLAN (MAINLINE CH ' CH 512.0 . CH '18.0) CH 18934,0, RAMP ? CH 345.0 IE934,O - . - CH JI8,O) CH 19030,0, RAMP 3 CH 70,0. CH 165,0) To 328.0 & RAMP 7 : CH 345.0 tO 280.0) 7|312071 JKSB R4l To & RAMP 7 : CH 345.0 TO 280.0 7t312071 JKSB R*l CoLI,MNS I^F\YOUI PI-AN (RAMP 3 : CI{ l65.0TO 269.0 & RAMP 7 : CH4lE.0 TO 345.0) "u312071 JKSB Rfl'2 to/a0tscta-t)ufrL1 SE?TING OUI COODINATBS FORRAN'IP 3 : CH 165.0IO 269.0 &RAlvlP 7 I CH 418.0 TO 345.0 "11312017 JKsB Rdl to/at2JSC/O-lL1ffi3 STONE JKSB Rw3 PLAII (RAMP 3 : cll coLUMNs LAYOIIT PLAN (I.TAINLTNE : CH 269.0 18850.0 To 328.0 18934.0 & RAMP 7: cH J12.0 TO 418.0) 71312011 CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: UM CoNSTRUCTIoN SDN BHD CONSULTANT : KKJP2 SDN BHD CONSTRUCTIONISHOP DRAWINGS SUBM ISSION AND APPROVAL 11 ITEM NO. DATE DRAWNG TITLE DRAWINGS REFERENCE NUMBER SUBMITTED 3.18 l0/8l2sc/clll/0003.1 sEfm{cotncooDINATEsFoRtrAINLlNE:cH18850.0To18934.0&RArP7 3.19 l0lSttsctctuccoq sIoNE CoLUMNS LAYOUT PLAN OIAINLINE 3.20 to/812tsctcLtL/W.l SETTINO OI.JT COODINATES 3.21 t0t8t2tSACI.MW' STONE COLIJMNS 3.22 T|B|ASACUL|0f{5.1 SETTTNG OUT COODNATES FoR MAINLINE 3.23 totEtasctcLtLlCo6 mNE 3.24 l0/8t2/SC/CLA_/0006. I LAyol]T SLmS hyour CH 18934,0'ID : FoR MAINLINE PL.EN : Pr.AN (MAINLNE : : Io 8849.0 I JKSB Rw2 JKSB Rwl u3tN77 JKSB Rwl 713t2077 JKSB Rev 0 7t3t2077 JKSB Rw0 11e.65) 7t3t2017 JKSB Rs0 4 : CH 375.347'tO 487.665 7t3t2071 JKSB Rw0 7t3t2017 JKSB Rd0 7t3t2071 JKSB Rd0 7t3t2071, JKSB Ra0 71312071 ]KSB Rd0 27tstx77 JKSB Rev I 27t51m77 JKSB Rev 27t5t2017 JKSB RflI TO 165,0) 7O,O 19030.0 RAMP 4 : I 55.488 TO 2 13.05, CH 18849.0 To 19030.0 RAMP 4 | 1r5.,m 10 216.067 CH 18931.0 Tb 190t0.0 & RAM? sEmINc ouT cooDINATES rOR MAINLINE : CH 18934.0'tO r ; ctl r?J.!{? & &A]l.lP 19030.0 REMARKS 713t2011 3 : CH CH 18934.0 To 19030.0 & RAMP 3 : CH ?0.0 TO 165.0 (MAINLINE : CH APPROVED BY 7t3t2077 cH5l2.0To418.0 & RAMP I9O3O.O DATE APPROVED sroNE coLrJMNs LAyO(n PLAN (RAMP 3.26 i.ottt2tsda-n lw1 'tuSt2lsctct-tLtw1.l 3.27 l0/81ZSC/CLI!/0008 sToNE COLTJMNS L-AYilJT PI-AN (RAMP .l : CH 220.0 TO 296.54 & Rrt ltP 3.28 l0/8 lZSCycL/l_/0008. I SETTING Ot T COODNATES FOR RAMP 4 : CH 220.0 TO 296.964 3.29 tO/BtVSC/CLtu/m1 STONE COLIJMNS 3.30 rotSt2Jsacl-nlcm7.l sETTB'rc O1JI COODTNATES FOR RAM? 1 - CH 296.964 10 3.31 t0/El2/sc/cullmo8 SIoNE cOLt MNS 3.32 l0/8tzscycl/L/0008. 27t5t2017 JKSB RdI 3.33 l0/Slzscycl,{-/0001 SIONE COLI]MNS I.AYOUT PI,AN (RAMP 3 : CH 269.0 TO 32t,0 & RAMP ? : CH 345,0 TO 280,0) 916t2071 JKSB Rd2 3.U l0/EIZSC/CLltr/ooo1.1 SETING OUT CooDNATES FoR RAMP 3 : CH 269.0 TO 328.0 a RAMP 7 : Ct{ 345.0 To 280.0 9/6t2077 ,KSB Rw2 3.35 ruSt2tsctcLtuc0g2 STONE COLUMNS LAYOUT PI-AN (RAlvP 3 : CH 165.0 TO 269.0 418 0 TO 345.0) 9t612017 JKSB Rd3 3. t0/812/socuu00o2.l SETTING OUI COODINATES FOR RAI\'IP 3 TO 34J.0 9t6t2077 ]KSB Rd3 3.37 tuSt2tsc/cuuun3 STONE COLUMNS LAYOUT 9t6t2077 It(sB Rfl4 3,38 r0/8lzscvcuu0003.l SETTINC OIJT COODINATES FOR !,'AINL[NE 9t612077 JKSB Re3 3.39 lc/Sl2JscycL/1./0004 SToNE COLUMNS LAYOUT PLAN (MAINLINE 9t612077 JKSB P.d2 3.40 tu$asc/cl SETTING OUT CTCODNATES FoR MAINLINE 9t6t2077 JKSB Rev 2 3.L7 ^JNM.I totStascrcuumo5 SIONE COLUMNS LAYOUT PLAN (MAINLINE : CH 9t6tN71 JKSB Rdl 3.42 rclStasctcl-Nffis.1 SETTING OUT CooDINATES FoR MAINLINE T0 218.067 9/612011 JKSB Rdl 3.43 rclEtasclcLMcc{5 mNE CoLmS hYouT 487.65) 9t612071 JKSB 3.44 l0/81zsc/cl[/0006. I smNc om CmDNAIIS 487.665 91612011 JKSB Rdl 3.45 rctStasc/cLtL/M7 SToNE CoLUMNS LAYOUT PLAN (RAMP 4 - CH 296.96'lT0 375.14? & RAMP 8: CH 199 037T0 297 564) 9t6tN17 JKSB Rw2 3.46 l 0/8 I 9t6/2017 JKSB Rs2 3.47 l0/8lzsc/cl/L/0008 slONE COLUMNS LAYOUT PLAN (RAMP 9t6t2077 JKSB Rw2 3.48 l0/8lzsc/cuLl0008. I SETTINO OU'T COODTNATES FOR RAMP 4 | CH 220.0 TO 2%.964 9t6t207"t JKSB Rfl2 3.49 l0/8lzsc/clll/0001 STONE 23t7t2011 JKSB Rw2 3.50 t0/8lzsc/cllt SETIING OUT COODINATES FOR R.AIUP 3 : Ctl269 23/7/2011, JKSB Rs2 3.51 10/81)lSCtCL/LI0002 sToNE CoLUMNS f o 3as.0) 23t712077 JKSB Rcv 3 3.52 t0lSlasclcL/I./w).1 SETIING oUT 8.0 TO 345.0 xt7tNl1 JKSB 3.53 rctstasc/cLMw3 SToNE 23t7t2017 JKSB Ra4 3.54 l0/81?/sc/cull0003.1 sETnNG dJT 23t7t2077 JKSB Rw4 3.25 sETm{cdJT cooDINATES FoR l zsc/clA,/0007. I 0001.1 SET! tNC 4 - R.AMP 4 - cH cH 3?5.!,fi & 296.964 TO 296.96,{ To LAYCXJT PLAN (RAMP 1 : cH t 199.037 & i 297.564) To 197.56.{ CH 297.564 TO 3t0.0) & RAMP 8 : CH 29?.564 fO 380.0 & RAMP & RAMP 3?5.3.1? 220.0 TO 296.964 cH & rAMP 8 | cH 199.03710 375.347 ,l - CH 296.964 TO 375.34? LAYOII PLAN (RAMP zuA.ti4P E : 8 : CH I 99.037 TO 297.564) 19.037TO i97.J64 8 | CH R.AMP E : CH 297.564 To 3i0.0) Ot T COODIMTES FOR RAMP 4 : CH 220 0 TO 2!X.96{ & RAMP 8 : CH 297.564 fO 380.0 : Cg PLAN (MAINLINE :cH PLAN 18850.0 TO 18934.0 : cH & RAMP 7: cH : I & RAMP 1t914.0 TO 1903)0 41 8,0 512.0 TO 418.0) 3 : cH 70.0 TO 165.0) cH 18934.0 To l9o3o.0 & RAMP 3 : CH 70.0 To lA49.0To 19030.0 RAMP 4: l55.1t8TO CH 18a49.0 To 19030.0 R]{MP 1 18934.0 4 - CH 296 Tb 010 96{'tD 19030.0 375 347 3 : CH cooDINAIES FoR RAl,lP 3 | CH 1 0 & RAMP & RAMP & RAMP 4 : 0 213.067) I 155.48E I I Ctl 165 375.317 T0 cH 375.347'Io 8 | CH I5D.037 TO 197.54 8 : CH 297.564 TO 380.0) & RAMP 8 | CH 297.564 To 380.0 To 328.0 & RAMP 7 : CH 345.0 To 280.0) 010 65 0 & nAMP 19010.0 4 : CH 220.0 TO 296.964 CoLIA{NS U,YOUT PLA).I (RAMP 3 | cE 269 & R-AI\{P 7 : CH 345.0 TO 280.0 328.0 To 269 0 & RAMP ? : cIl 165.0 TO 269.0 coLuMNs LAYOUI PLAN (MAINLINE : CH 18850.0TO cooDIN & RAI\{P 7 : CH 165.0 TO 269.0 FoR MAINLINE : CH 18934 LAYOU PLAN (RAMP : CX{ CH lA50 0 1]3 1E934.0 A RAMP 7: CH 512.0 TO 418.0 : (MINLINE : CH SEfm{C Otn COODINATES FOR RAMP & Rr\Ivtr' 7 & RAI!,IP 7 : CH 18934.0 TEs FOR MAINLINE : CH 18850.0 TO 1E934.0 41 & RAMP ? : cH a RAMP 7: CH 8 0 41 512.0 TD 418.0) 512.0 TO 418 0 I Rav I CONTRACT: SEGoND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT : KKJP2 SDN BHD CONSTRUCTION/SHOP DRAWINGS SUBMISSION AND APPROVAL 11 ITEM NO. DRAWINGS REFERENCE NUMBER DATE DRAWING TITLE SUBMITTED 3.55 tolSt?/saCl-^JW SToNE CoLUMNS LA,YOIIT PI,AN (MAINLINE 3.56 rctitasclcx-tL/xr0/,.t SEI.TING OI,T COODINATES 3.57 t0/8tasc/Cl.tLMns SToNE CoLLTMNS LAYOUT PLAN (MA.TNLINE: CH lEE49.0To 19030.0 RAMP 3.58 lU8t2tSClCItLKfrs.t SETTTNG OUT COODINATES 3.59 10/8l7SC/CL4/0006 STONE 3.60 10/81?sc/cl&/00)6. I SSIfiNG OUI COODINATES FOR MAINLINE : CH 3.61 IUEIASCICL/L/o(W sToNE COLUMNE LAYOUT PIAN (RAMP 4 - CH 296.964T0 375.347 & RAMP 3.62 l0t8t2tsacL/L/tN7.t sErm{G our cooDINATps FoR RAMP 3.63 10/8t?scicli1,/m08 STONE COLUMNS LAYOUT PLAN 3.64 l0/El?/scicl[/0008. I SETTING OUT C@DINATES FOR RAMP 4 : CH 220 CoLmS HYOIJI : FOR MAINLINE FOR MAINLINE PLA){ (MAJNLINE cH : : 18934 0To 19030.0 CH 18934.0 TO CH 18849.0 TO 19O3O.O CH 18934.0 To 1s30.0 & : 1E934 O 1! 19030.0 EAMP 4 : CH 220.0 TO 296.964 O JrcB Rtr2 JKSB R42 4: 155.188T0 21i.06, 23t7t2077 ]1(s8 Rsl RAMP 4 : 155,488 TO 218,067 23t7t2071 JKSB Rfll 23/7tN17 JI(sB Rcv I 4 : CH 375.347 TO 487,665 23t7t2077 JrcB Rdl CH 19.017 TO 297.J64) 23t7t2077 J1(S8 R*2 23t7t2077 JKSB Rev 2 23t7t2077 J1(s8 Rcv 2 23t7t201,7 JKSB Rw2 NP I & tu\MP & RAMP REMARKS 23t712071 3 : cH : E : To 70.0 & RAMP 3 : CH 165.0) TO 165.0 7O,O CH 375.347 rc & RAMP 8 : CH 199.037T0 4 - CH 296 964 TO 375.347 APPROVED BY 23t7tNl| & RAMP .I9O3O.O DATE APPROVED G7.665) 197.564 8 : CH 297 564 TO 3,t0.0) TO 296.964 & PdMP 8 : CH 297.564 tO 380.0 PROJECT SIGNTBOARI) 4.0 4.7 IJI\I/A7,PS 0 I PROJECT SIGNBOARD SHOP DRAWING ?/7u2010 ]KSB 4.2 l t/M)P502 PROJECT SIGNBOARD SHOP DRAWING ?/lu2070 JKSB 4.3 ltw-M/Ps03 PROJECT SIGNBOARD SHOP DRAWING ?/lu2010 JKSB SPIJNPILE 5.0 Im 5.1 ICP/25088-10/002 O 250 (25B8STD) 78/7U2070 JKSB 5.2 ICP/300B8-10/002 o 300 m (30B8STD) 18/12/2010 JKSB 5.3 ICPB50B8-10/003-l o 350 m (3sB8sP) 20t1z20ro J1(s8 PruCST PGT. TENSIONED T- BE$S TOR 5.0 I:m BHDCE ATCH !6M T. BEAM - SPAN 29! ( CAST LENGTH 3a000rm) - (rYPE l) 6.7 CFICEP/CEITTTPE 1ISP293/RC/IB/001 DETAILS OF POST - Th{SIONSD 6t4t2077 JKSB Rev A (SUPERSEDED) 6.2 cBcEP/CEHlrypE l/s293/RC/IrV002 DETNLS OF REINrORCEMENT T - BEAtr{ - SPAN 293 (CAST LENGTH 3400orm) - (TYPE I ) 61412017 JKSB Rw A (SUPERSEDED) 6.3 CE"/CEP/CEH/TYPE DEIAILS oF DIAPHRAOM BEAM STARTTR BARS (CAST LENGTH ?,1000d8) l) 614t2017 JKSB Rev 6.4 cfri cEP / ffil/ryw 2|SP294,RC/IB/001 DETNLS oF POST - TENSIONED T - BEAM - SPAN 29a ( CAST LENGTI{ 34000rm) - (TYPE 2) 614i2011 JKSB Rd A (SUPERSEDED) 6.5 CS./ GP / CgEffyPE 2/ SP294/RC/TBr/002 DETAILS OF PAINTORCEMENT T - BEAM - SPAN 294 (CAST LENGTH 3400otm) - (TYPE 2) 6t4t2071 JKSB Rd A (SUPERSEDED) 6.6 cnJ cEP / clH/rYPE A 5P294/RC/TB/003 DTTAILS OF DIAPIIRAOM BEAM STARTER BARS (CAST LENGTH ].000rm) - SPAN 29{ - (rYPE 2) 6t4t2017 JKSB R* A (SUPERSEDED) 6.7 CEICEP/CE1'TI?E I /SP295,EC/TEVOOI DETNLS oF PoST - TENSIONBD T - BEAM - SPAN 295 (CAST LENGTI{ 3amorm) - (TYPE I ) 6t4t2011 JKSB Rd A 6.8 CEI I I SP295/RC/TEV002 DETNLS oF REINFoRCEMENT T - BEAM - SPA}I 295 (CAST LENGIH 3a000dm) - (TYPE 1) 6t1!2017 JKSB Rd A GiUPBRSEDED) 6.9 CE/CEPICEI'TYPE I/S295/RC/TB/OO3 DSTAILS oF DTAPHRAQM BEAM STARTER BARS (CAST LENGTH 34000tm ) - SPAN 295 " CrfPE *P / frHtTY?E I/S?293IRC/TBiOO3 6.10 cEJ GP /CE 6.11 6,/GP/CE IlPC66n tW 6.72 'SP293/RC/TB/002 cEl cnP / ffillJP c66nYw I A,/SP293/RC/TB/003 llPC66ryPE 6.74 6,tqP /c.g.grrc6r,nwB 6,/ fiP / qWP C6f,/I}?E 6.15 cE/ cEP 6.13 I ffiflryC66 I TYPE I A,/Sp293,p1lTB,/001 I - SPAN 293 - GYPE I) DETAILS OF POST . TE NSIONED T.BEAM - SPAN 293 (CAST LENGTH 34OOOm) - (TYPE I A) A (ST PERSEDED) (S'I.JPERSEDED) 6ta20r1 JKSB Rd A 3715t2077 J1(s8 R* B (SIIPERSEDED) (SLJPPRSEDED) DBTAILS Or REINFoRCEMENT T-BEAM - SPAI'I 293 (CAST LENGTH 34000m) - (TYPE lA) 3U5tn11, JIGB R* B (SL"ERSEDED) DETAILS oF DIAPHRAGM BEAM STARTER BARS (CAST LENGTH 34000tnm) SPAN 293 - GyPE lA) 3U5/m71, JKSB Rd B (SUPERSEDED) 70t6t2017 JKSB Rev C l rsp293,/pT/TB/001 DET.AILS OF POST - TE NSIONED T-BBAM - SPAN 293 (CAST LENOTH 3400onm) - (TYPE 1 ,SP293/RC/TB/002 DETNLS oF REINFORCEMENT T-BEAM - SPAN 293 (CAST LENGTH 3400orm) - (TYPE I A) 70t612017 ]KSB Rcv C 1 A,/SP293,&.C/TB/003 DEIAILS OF DIAPHRACM BEAM STARTER BARS (CAST LENGTH 14000m) SPAII lA) 10t612s71 JKSB RflC 293 - CrYPE I A) CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: UM CONSTRUCTION SDN BHD CONSULTANT : KKJP2 SDN BHD CONSTRUCTION/SHOP DRAWNGS SUBM lSSlON AND APPROVAL 't1 ITEM NO. DRAWINGS REFERENCE NUMBER DATE SUBMITTED DRAWING TITLE (ft"E lA) DATE APPROVEO APPROVED BY REMARKS N SP293EI nBt@l DETAtr-s oF POST - TE NsloNED T-BEAM - SPAII 293 (cAsT LENomI 3a000rm) - 76t7tNL7 JKSB Rev D N SY293 tRClT?l/ &2 DETAtr-S OF PAN\TFONCEMENT T.BEAM - SPAN 293 (CAST LENGTH 34OOOIM) " (TYPE IA) 76/7t2077 JKSB R.v D A/SP293/RC,'TB/m3 DEIAILS oF DIAPHRAGM BEAM STARIER BARS (CAST LENGTH }ooorre) SPAN IA) 76t7t2017 JKSB RdD DBTAILS OF ?OST " TSI{SIONED T - BEAM - SPAN 294 ( CAST LENGTH 34000rm) - (TYPE 2) 211712011 JKSB RwB CFICEP/CEIYTYPE 2/SP294 /RC/TB/@2 DETAILS OF RIil{FORCEMENT T - BEAM - SPAN 294 (CAST I.ENGT}i 34OOOIM) . (TYPE 2) 2V7tmll JKSB RwB 6.21 CE]CEP/ CfrINYPE DETAILS OF DI,APHRACM BEAM STARTER BARS (CAST LENGTH 34OOOtrM) . SPAN 294. GY}E 2) 2U7tmt1 JKSB 6.22 cBt 9t8t2071 JKSB 623 cE/ cw lcwypc6llYPE I Bl sF29 5 9t8t2071 JKSB R€v 6.24 CBI CW / CE$|EC66{rYPB 1 9t8/2077 JKSB RwB 6.16 cF/c'Ep/cEI{/PC66|rrPE 6.17 CE / CW / &HIPC66.{YPB I 6.18 cBt cEP / Cf,;lrrcfi 6.79 CEICEP/CEWTYPE ZSP294/YI NW@I 6.20 nwB ?/ c* / cwy$6fi I I SP294/RC/IBIOO3 \PE I Er/SP295imlTB/001 lyl lTBl @2 W SP29 5 {n nB/ @3 DETAILS OF POST - TSNSIONED T - BEAM - SPAII 293 (CAST LENGTH 34000rm) - (TIPE DETAILS oF DLAPHRAGM BEAM STARTER BARS (CAST I.EN TH 34OoOm ) . sPAI.i (t{!d 295 " G{PE IB) Rev B RwB B BrtdS.) 79t4/mtl JKSB Rev 2 OO 79141mll JKSB Rd2 sloNE COLUMNI^A.YOUT PI,AN CH t7076.00 - CH I?l25.00 23t7t2071 ]KSB Rd3 CII 17125.00 - CH 1?180 m 23/712071 JKSB Rd3 1914t2077 JKSB Rq2 t9t4t2077 JKgB Rry2 u,t5tnt7 JKSB Rd3 11t512071 JKSB Rry3 7.7 to/81213C/L/(nl sToNE CDLIIMN LAYOUT PLAN CH l?076.m - CH 1?125.m 7.2 to8l2Jsr:/u(fr2 STONE CDLIJMNI.A.YOUT PLAN 8.1 I 8.2 t0lEt2/{,lt1fi2 O/At2Jsr:lj(nl lB) DETAtr s oF REINFORCEMENT T - BEAM - SPAN 295 (CAST LENoIH 34000m) - (TYPE I B) STONE COLUf,fly WORXS - CE 17O7G CE 171fl) 7.O 293 . C|YPE STONE COLIIMN I-a\YOUT PLAN CII I?I25,OO - CH 1?I8O sToNE COLUMN WORXS - CE 2r$0 - CE 22m6 8.0 8.1 loalzsc/u06 sToNE COL(MN ITYOUT PLAN CH 21890.00 - CII 22006.00 8.2 l0/81?sc/u008.1 SBTTING OUT COODNATES FOR CH 21890.00 - 8.3 l0/812/sc -/@ STONB COLIJMNLAYOUT 8.4 I 8.5 l0/tl zsc/L/od sToNE COLUMN I-A.yOUr PI^AN CH 21890.00 - CH 22m6.00 23t1DO| JKSB Ra4 8.6 10El ?sc/1.,/00E.1 srTlNG EnDOtl JKSB Rw4 8.7 A3/loalzsc/u008 sroNE coLLr\dNI-AYour PLAN CH 21890.00 - CH 22m6.00 23t1Dotl JKSB Rd0 8,8 ABloal2/sc/u006.1 AS BIJILT DEPTII FOR 23nl20tl JKSB Rd0 8.9 AB AS BIJILT JKSB Rd0 8.10 AB/l061 rsclr008.3 AS BUILT DEPTIT FOR CI{ Bnmtt JKSB Rd0 8.11 AA/10A1 26CIIJ008.4 AS BIJILT DEPTH FOR CH 21890,@ . CII 22006,00 23/1l?otl lKsB R*0 8.12 totSt2ls€la,A)ott sToNB COLUMNS I-A,YOUT PLAN CH 21484.00 - CH 21525.00 9/a/2011 JKSB Rd0 JKSB R.v A .Ref6 to JKSB httq ef. no.: JKSB(SyP3EvOPnJlrl 140109 d.lrd 2:Vd20l 0/81 2vsc/L/008.1 0AI2/SC/L/008.2 9.0 9.7 BEAM 21E90.00 - CII 22006.00 PLAN CH 2I89O,OO. CH 22006,00 SETTING OUT COODINATES FOR Cll 21890.00 - CH 21t90.00 - CH 22m6.00 OL]T COODINATESFOR CH 21890.00 - CH 21890.00 - CH 22006.00 CII 2I89O.OO - CH 22006,00 DEPIII FOR CH PRTSTRESSINC Il l.l 4/38/01 c}I T\?E: IA. 21 89O.OO 21 - CH 22OO6,M 890.00 - CH 22006.00 23n DOtl DEIAII,S PRESTRESSING DETAILS 25t5t2017 23,6/2077 9.2 nt-14/3.8/U BEAM TYPE: I B . PRESTRESSING DETAILS R+ A. .R6ftr to JKSB 25t5/2017 23t6t2011 9.3 Jl I "1 4/38/03 BEAM T\?E: 2 - PRISTRESSING DETAILS ]KSB JKSB 23/6t2071 Ef JKSB(SyP3EyOPn lr/1 140109 Rd d .R.fa b 25/sl2011 ltu JKSB l. no.: &bd 2rd201 1, Ltu ef rc.: JKSB(SyP3B/OP/Uti,rl I{OI09 d.bd 24d20I L CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: UM CONSTRUCTION SDN BHD CONSULTANT .. KKJP? SDN BHD CONSTRUCTION/SHOP DRAWNGS SUBM ISSION AND APPROVAL 't1 ITEM NO. DRAWINGS REFERENCE NUMBER DRAWING TITLE DATE SUBMITTED DATE APPROVED APPROVED BY REMARKS 9.4 ]l l -I4138/01 BBAM TY?E: lA. PRESTRESSING DETAILS 29t6tm77 JKSB RdB 9.5 nt-14BB/O2 BEAM TYPE: IB. PRESTRESSING DETAILS 29/6tm17 JKSB R.v B Il I -l 4/38/03 BBAM TYPE: 2 - PRESI?ESSING DETAILS 29t612017 JKSB Rda CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KRJP2 SDN BHD CONSTRUCTION DRAWINGS AND CONTRACT DRAWINGS DIFFERENCES OR INADEQUACIES 12 DRAWINGS REFERENCE ITEM NO. DRAWING TITLE NUMBER WP2XPK3B/COO/BFULY/02 Rev 01 & 1 w tPz<lPKSAl COOI Gr lPElLT lDl t03 Rev 00 DESCR!PTION OF DIFFERENCES Land Bridge - Pile Cap and Piles Conflict between two aforementioned Layout & Centre Line of the Pile construction drawing at location Pier 5. Embankment CHANGES MADE DATE SUBMITTED REMARKS JKSB Replied the letter on 26t1112010 1311212010 Official construction drawings were received on21112110 CONTRAGT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38: BATU KAWAN E]XPRESSWAY CLIENT: JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUGTION SDN BHD CONSULTANT: KKJP2 SDN BHD 13 SUBMIS9ION OF AS.BUILT DRAWNGS ITEM NO. DRAWNGS REFERENCE NUMBER SCHEDULED SUBMISSION DRAW|NG TITLE t @ov. 0) sToNE COLT MN L.AYOIJI PLAN CH 2l89o'(n - CH 22006'00 2 I . AS BT'ILT DEPTH FOR CH 2I89O,OO CH 22006.@ AS BrrrLT DEPrH FORCH2lt90.00 ' cH 22006.00 3 4 SUBMITTED APPROVED DATE DATE APPROVING AUTHORITY REMARKS 23nn$l 23nnU1 23nm11 23t7ml1 23nn011 5 oJKSB lcftcr rcf. no: JKSB(S)'P3B/OP/lJMrl 00116 datcd 1nf201'l ' 1 - Rc$cst ae built drawing for 6 |JMC(PG!tsKE3B/1 0-022 (GFIW) PLAN SHOWING PILE AS.BUILT FOR PIER 4 & 5 u8nv1 (l-AND BRTOGE) thc complotcd filc6 d Land Bridgc. rIJMC lctter ref. no: uMc(PG)'tsKEWF3Br11566 (JKSB) datcd 5a/201 1 . Thc endors€d 6 built dravving has bccfl Bubmitbd lon Slone Column layout Phn CH t 7076.00 - cH 7 t\Bt'l WU ASCMA0 1 (Rev' 0) I ABtlOlS'l2lSClUoO1. 1 (Rev. 0) 9 2tscluo0l.2 10 1sftnm1 17125.O0 Stone Cdumn laYout Plan CH 171 2s.00 - cH 17180.00 CH -cH As Built Depth tor CH 17125.00 - CH 17180.00 ABI1OI8I2,SC[J002 (Rev 0) - $Bnu1 15nnfi'.l 15t8nm1 Nit 4/M011. CoNTRAGT: sEcoND PENANG BRIOGE LAND EXPRESSWAY PACKAGE 38: BATU KAWAN EXPRESSWAY CLIENT: JAMBATAN KEDUA SDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD 13 SUBMTSSION OF ASAUILT DRAWNGS ITEM NO. DRAWNGS REFERENCE NUMBER (Rov. 1 SCHEDULED SUBMISSION DRAWNG TITLE sToNE COIJI MN LIYoUT PLAI'I CE 2lt9O'0O ' CH [email protected] 2 (Rev. AS BTJILT DEPTI{ FORCH 2I89O,OO - CH 22m6,@ 3 (Rev. lAs su[,t 4 (Rov.0) DEPTH ron'cH DEPII FORCH cH 22006.@ - cH 22006.00 SUBMITTED APPROVED APPROVING DATE DATE AUTHORITY 1 2A7nU1 1 2 I 890.00 - 21E90.00 5 REMARKS 23nnofl 23nnu1 .JKSB lettrr ref. no: 6 rJuc(PGyBKE3B[l 0{122 (G}rw) PLAN SHOWING PILE AS-BUILT FOR PIER 4 & 5 (LAND BRIDGE) JKSB(SyP3B/OP/IJM/1 1001 16 datsd fi12011. Request as built dratving for the completed Piles at Land Bridge. .UMC letter ref. no: 4/8n01',l luMc(pe)BxewruB/11- lsoo (Jxse) dated 5/8/2ol'1. lThe endors€d as buitt ldrawing tras been submitted lon 4tBl2O11. I I 7 ABrI0/81ZSC/1J001 (Rev' 0) I AB/1 1 (Rev. 0) u812ts0lu001.2 9 't0 U8l2/SC/!l)01. AUl 0/81 ZSC/L002 (Rei'. 0) Stone Column laYout Plan CH 17076.00 - CH 1sfinm1 17125,O0 Ston€ Column layout Plan CH 17125.00 - CH 15/81201 1 15/81201 1 17180.00 - cH 17r80.00 As Built Depth lor CH 17125.00 - CH 17180.00 15l8ny1 Nit CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT : JAMBATAN KEDUA SDN BHD CONTRACTOR: tJM CONSTRUCTTON SDN BHD CONSULTANT: KKJP2 SDN BHD 15 SITE PHOTOGRAPHS I \ :! _t \ PHOTO 1 - Desilting at Bridge over Sungai Tengah CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRE$SWAY CLIENT : JAMBATAN KEDUA SDN BHD GONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD 16 SITE PHOTOGRAPHS I I .{.4 F I Fq ,T i. a ,'l ri { cl^^-- :n d L 't t-- llrl \ Iv [-r lr I PHOTO 2 - Demonstration of grouting of T-beams I .+.h. :T I t ,-i I CONTRACT! SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT: JAMBATAN KEDUASDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD REQUEST FOR INFORMATION (RFI) 16 Status No Ref No. Attn To Subiect Date Date Date Requested Required Replied / Remarks (Open / Cloeed) RFr/140 1 2 0KsB) 4 0KsB) 7 8 IKSB RII1197 IKSB 0KSB) 0KsB) Ground Treatment Drawings for Future PDC Local Road at CH 21000 (Pier 0 and Pier 1 Sg. Tengah Stf4gg) PDA Test on the Installed Raker Pile at Bridge Over PDC Road Center Pier using Piline Rig 2-fun Closed 15-Jun 17-Jun Nit Open -99 15-Jul 22-Jul Nir Open -64 1S-ful 22-Jul Nit Open -64 2-Aug 5-Aug 2-|un Open -50 5-Aug 8-Aug Nit Open -47 10-Aug 15-Aug 2-Jun Open -40 9-Sep 12-Sep Nit Open -12 -8 14-Sep 16-Sep Nit Open IKSB Confirmation of the design invert level for earth drain (ED1 and ED2) - Ch17050 to Ch18800 (LHS & RHS) 14-Sep 19-Sep 2-Jun Closed JKSB Bridge Over Sungai Tengah - PDA Test. 20-Sep 22-Sep Nit Open RFI/2OO 11 Column Works. 2-Jun Bridge Over PDC Road - Request for change of strands arrangment for Type 2 Precast T-Beam. RFI/199 10 20950 required (as of 249t1f) 30-May IKSB RFI/198 0KSB) Drawings Stone Column Installation Length at CH 20810 to CH Plate Load Test (KPLT - 7) at First Trial Area for Stone IKSB RFI/189 OKSB) 9 IKSB RFr/184 OKSB) Deviated Pile Group Bridge Over Sg. Tengah - Seismic Bearing Construction IKSB RFI/I80 OKSB) Water Pipe Bridge Over PDC Road - Design Load for Checking of The IKSB RFI/170 OKSB) 5 IKSB RFV166 OKSB) 5 Confirmation of Scope of Work and Material Size for RFI/148 OKSB) 3 IKSB Ground Treatment Below JPS Service Road at CH 22165 to CH 22380 for Stone Column Works No of days lapsed from date -2 CONTRACT: SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 38 : BATU KAWAN EXPRESSWAY CLIENT: JAMBATAN KEDUASDN BHD CONTRACTOR: IJM CONSTRUCTION SDN BHD CONSULTANT: KKJP2 SDN BHD REQUEST FOR TNFORMATION (RFr) 16 Status No Ref No. Attn To Subject Date Requested Date Required Date Replied / Remarks (Open/ Closed) 12 RFr/201 OKSB) 13 IKSB Pile embankment - PDA pile points number confirmation. 20-Sep 21-Sep Nlt Open Over Sg. Tengah - Revised Pile Plug Length 21-Sep 22-Sep 2-Jun Closed RFI/202 OKSB) IKSB lr.,rr" Open = 10 Closed = 190 KIV =f Cancelled = Total = 202 1 No of days lapsed from date required (as of 249nD -3