Benjamin Stoddert Middle School

Transcription

Benjamin Stoddert Middle School
Project
Order
10
Benjamin Stoddert
Middle School
Map Legend
Theodore G. Davis
82.9%
>140%
Mattawoman
116.9%
130%-139%
John Hanson
110.4%
120%-129%
110%-119%
Benjamin Stoddert
111.8%
100%-109%
90%-99%
< 89%
Priority
Funding Area
Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities
Stoddert Middle School was originally constructed in 1976, and it was designed in an
open space configuration. While classrooms have been enclosed by partial height walls,
acoustics have not been appreciably improved, and daylight remains insufficient. Interior
finishes are in fair condition, and show age-related wear. Hard gym surfaces are not
conducive to athletic activity. Level changes throughout corridors create accessibility
issues, and the spatial layout makes wayfinding difficult. Exterior cladding is in fair
condition, and shows some staining. Exterior windows do not provide adequate thermal
insulation, and frames show corrosion. Mechanical and plumbing systems, especially
the HVAC system, require significant upgrades. A back-flow preventer is needed.
Electrical systems are in fair condition. The site is constricted and vehicle circulation is
not adequate. Pedestrian pathways to the school are not adequately monitored.
Building Facts
((( (((
Poor
Acoustics
OS
Open Space Poor Daylight
Lack of
Specialty
Classrooms
ADA Issues
122
Level
Changes
Hard Surfaces Poor Thermal
Performance
Security
Upgrades
Needed
Current
Building Score
Prescribed Work Cost Analysis
Description
Qty. Unit
County Share
State Share
Cost/Unit
TOTAL
ARCH
Roof Replacement
105,800
sf
$274,022
$466,578
$7
$740,600
Major Renovation
105,800
sf
$3,718,870
$6,332,130
$95
$10,051,000
MEP
Full Systemic Renovation
105,800
sf
$2,544,490
$4,332,510
$65
$6,877,000
Lighting System Upgrade
105,800
sf
$313,168
$533,232
$8
$846,400
Security System Upgrade
105,800
sf
$50,890
$86,650
$1
$137,540
ADA Upgrades
1
ls
$22,500
$-
$22,500
$22,500
Exterior Lighting
20
ea
$130,000
$-
$6,500
$130,000
1
ls
$138,750
$236,250
$375,000
$375,000
3,000
sy
$266,000
$-
$89
$266,000
`
SITE
Stormwater Management/
Water Quality
Parking Lot
Subtotals
$7,458,690 $11,987,350
$19,446,040
Total Including Soft Costs
$15,401,668 $11,987,350
$27,389,018
Cost of New Construction (est.)
$38,400,000
This School
2.45
ARCH
2.51
SITE
SURVEY
2.57
>4 Maintenance
3-4 Reno. / Maint.
2-3 Replace / Reno.
711
2.99
MEP
Building
Score
Optimum
SRC 1150
711
Survey
Categories
Project Determination
<2 Replace
1.42
Current Proposed
Recommendations
Major Renovation OR Replacement.
It is recommended that Stoddert Middle undergo a
major architectural and systemic renovation to select
mechanical and plumbing systems. A feasibility
study will demonstrate whether a major renovation or
replacement is most appropriate.
123
2.57
Maintenance
Priority
N/A

Similar documents

Shore Wide Open House

Shore Wide Open House 6298 Circle Drive, Chincoteague 4 bedrooms - 1.5 baths - 1400 sq ft Shawn Jennings 757-894-2249 Coldwell Banker Harbour Realty

More information