Benjamin Stoddert Middle School
Transcription
Benjamin Stoddert Middle School
Project Order 10 Benjamin Stoddert Middle School Map Legend Theodore G. Davis 82.9% >140% Mattawoman 116.9% 130%-139% John Hanson 110.4% 120%-129% 110%-119% Benjamin Stoddert 111.8% 100%-109% 90%-99% < 89% Priority Funding Area Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities Stoddert Middle School was originally constructed in 1976, and it was designed in an open space configuration. While classrooms have been enclosed by partial height walls, acoustics have not been appreciably improved, and daylight remains insufficient. Interior finishes are in fair condition, and show age-related wear. Hard gym surfaces are not conducive to athletic activity. Level changes throughout corridors create accessibility issues, and the spatial layout makes wayfinding difficult. Exterior cladding is in fair condition, and shows some staining. Exterior windows do not provide adequate thermal insulation, and frames show corrosion. Mechanical and plumbing systems, especially the HVAC system, require significant upgrades. A back-flow preventer is needed. Electrical systems are in fair condition. The site is constricted and vehicle circulation is not adequate. Pedestrian pathways to the school are not adequately monitored. Building Facts ((( ((( Poor Acoustics OS Open Space Poor Daylight Lack of Specialty Classrooms ADA Issues 122 Level Changes Hard Surfaces Poor Thermal Performance Security Upgrades Needed Current Building Score Prescribed Work Cost Analysis Description Qty. Unit County Share State Share Cost/Unit TOTAL ARCH Roof Replacement 105,800 sf $274,022 $466,578 $7 $740,600 Major Renovation 105,800 sf $3,718,870 $6,332,130 $95 $10,051,000 MEP Full Systemic Renovation 105,800 sf $2,544,490 $4,332,510 $65 $6,877,000 Lighting System Upgrade 105,800 sf $313,168 $533,232 $8 $846,400 Security System Upgrade 105,800 sf $50,890 $86,650 $1 $137,540 ADA Upgrades 1 ls $22,500 $- $22,500 $22,500 Exterior Lighting 20 ea $130,000 $- $6,500 $130,000 1 ls $138,750 $236,250 $375,000 $375,000 3,000 sy $266,000 $- $89 $266,000 ` SITE Stormwater Management/ Water Quality Parking Lot Subtotals $7,458,690 $11,987,350 $19,446,040 Total Including Soft Costs $15,401,668 $11,987,350 $27,389,018 Cost of New Construction (est.) $38,400,000 This School 2.45 ARCH 2.51 SITE SURVEY 2.57 >4 Maintenance 3-4 Reno. / Maint. 2-3 Replace / Reno. 711 2.99 MEP Building Score Optimum SRC 1150 711 Survey Categories Project Determination <2 Replace 1.42 Current Proposed Recommendations Major Renovation OR Replacement. It is recommended that Stoddert Middle undergo a major architectural and systemic renovation to select mechanical and plumbing systems. A feasibility study will demonstrate whether a major renovation or replacement is most appropriate. 123 2.57 Maintenance Priority N/A
Similar documents
Shore Wide Open House
6298 Circle Drive, Chincoteague 4 bedrooms - 1.5 baths - 1400 sq ft Shawn Jennings 757-894-2249 Coldwell Banker Harbour Realty
More information