Made-to-Measure Automation AS 620
Transcription
Made-to-Measure Automation AS 620
PG L. The Value Provider for Power Generation Management Made-to-Measure Automation AS 620 Power Generation l Instrumentation & Controls PG L. The Value Provider for Power Generation Management The Structure From Complete Overview to the Smallest Detail TELEPERM XP Power Generation l Instrumentation & Controls 2/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management AS 620 Made-to-Measure Automation For All Automation Functions from basic automation to fast closed-loop control for turbineinclusive failsafe solutions High Availability thanks to system-wide configurable redundancy Any Configuration through centralized and decentralized structures Decentralized with Remote I/O and field devices High Customer Benefit During Operation through powerful diagnostics and service functions using Intelligent Field Devices TELEPERM XP Power Generation l Instrumentation & Controls 3/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Basic Automation Centralized or Decentralized Plant bus Signal acquisition, closed-loop and openloop control with FUM (Function Modules) AP system bus All central components and FUM are capable of operating in redundancy FUM ... FUM Centralized I/O Cabinet bus redundancy incl. FUM interfaces PROFIBUS-DP Distributed signal I/O´s with SIM (Remote I/O) SIM TELEPERM XP ... SIM Remote I/O Power Generation l Instrumentation & Controls 4/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Safety-Related Automation with APF Management Plant bus All components redundant AP APF safety-related (2-out-of-2) and high availability due to redundancy (1-out-of-2) APF-B APF-A Series prototype test according to DIN VDE 0116, DIN V VDE 0801, DIN V 19250 (AK 1...6) System bus FUM-F TELEPERM XP FUM-F FUM-F FUM-F Power Generation l Instrumentation & Controls 5/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Safety-Related Automation with SIMATIC AG-F Management Plant bus AG F : - AG 95 F - AG 115 F AP SINEC L1 Series prototype test according to DIN VDE 0116, DIN V VDE 0801, AG-F DIN V 19250 (AK 1...6) System bus and IEC 61508 (SIL 1...3) for AG 95 F SIM-F TELEPERM XP ... SIM-F SIM-F ... SIM-F Power Generation l Instrumentation & Controls 6/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management AS 620 B without the Field Bus: Penetration of the I&C System limited to the Automation Systems Process control-and Information system Engineering- and Diagnostics system Plant bus Full access Automation Reduced access Cabinet bus Input Marshalling rack Output Switchgear Subdistributor M TELEPERM XP M Power Generation l Instrumentation & Controls 7/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management AS 620 B with the Field Bus: Total Penetration of the I&C System through the Field Level Process control- and Information system Engineering- and diagnostics system Full access Plant bus Automation PROFIBUS-DP Field bus remote I/O sensor PROFIBUS-DP actuator M TELEPERM XP sensor actuator Field bus remote I/O M Power Generation l Instrumentation & Controls 8/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management AS 620 B Automation Structures with TELEPERM XP Centralized structure Distributed structure with Remote I/O Plant bus Plant bus AP FUM Distributed structure with Remote I/O and Intelligent Field Devices Plant bus AP electronic room AP FUM Marshalling Marshalling rack rack Field bus PROFIBUS-DP Field bus PROFIBUS-DP Trunk cable SwitchSwitchgear gear Remote I/O Remote I/O plant area Single cable Subrack Subrack distributor distributor M M M M M M M FUM = function module TELEPERM XP Intelligent Field Devices SIM = signal module Power Generation l Instrumentation & Controls 9/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Configuration with non-redundant AP and Function Modules (FUM-B) Plant bus C P U C P I I M ... M C P U C P Non-Redundant AP I I M ... M System bus I M I M 1 . . 4 FUM-B FUM - rack (19 modules) I M I M FUM-B 5 . . 6 FUM-B FUM-B total of max. 6 FUM-B-rack’s per AP lockable TELEPERM XP Power Generation l Instrumentation & Controls 10/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Configuration with redundant AP and Function Modules (FUM-B) Plant bus C P U C P I M C P U C P I M Redundant AP System bus I M I M FUM-B FUM - rack (19 modules) I M I M FUM-B max. 6 FUM-B- rack’s per AP lockable TELEPERM XP Power Generation l Instrumentation & Controls 11/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Compact Range of FUM-B – Function Modules suitable for all Applications FUM 210-GB/GB-I/SYS/BIN Drive control interface module or M FUM 232 Analog transmitter signal conditioning module for Pt100 and thermocouples signal conditioning for binary signals (GB) High-speed binary signal acquisition (GB-I) Monitoring and message function (SYS) Output of binary signals (BIN) FUM 230 FUM 280 PID Analog transmitter signal conditioning module TELEPERM XP Module for continuous controllers # Power Generation l Instrumentation & Controls 12/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Configuration with non-redundant AP and Signal Module (SIM) Plant bus C P U C P I I M ... M C P U Non-Redundant AP I I M ... M C P Field bus 1... 5 PROFIBUS-DP SIM Distributed I/O system (Remote I/O) ET 200M SIM max. 32 ET 200M - Stations per AP TELEPERM XP Power Generation l Instrumentation & Controls 13/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Configuration with redundant AP and Signal Module (SIM) Plant bus C P U C P I I M ... M C P U Redundant AP C P I I M ... M 1..5 Field bus 1..5 PROFIBUS-DP SIM I M I M SIM I M Distributed I/O system (Remote I/O) ET 200M I M max. 32 ET 200M - Stations per AP TELEPERM XP Power Generation l Instrumentation & Controls 14/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Automation of the highest possible accuracy Management Central clock Plant bus SICLOCK Time resolution 1 ms Time accuracy 10ms (system wide) AP Time resolution 1 ms AP Option: FUM 210GB-I Time accuracy system wide 6 ms FUM FUM (typical) Time resolution 1 ms TELEPERM XP Power Generation l Instrumentation & Controls 15/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation FUM: Key Features Management In the module: Power plant-specific drive control functionality: Low voltage monitoring, command termination and time stamping in the module Monitoring: Short circuits from P and M, wire-break, antivalence, measurement range, plug-in and module-type check Channel-specific transmitter supply Fail-safe applications to be designed homogeneously Typ. 1ms resolution (FUM 210) 10 ms update cycle for binary signals 50 ms update cycle for analog signals Redundancy from cabinet bus to module Modules can be configured redundantly (0 to 100%) Function modules provide features for drive controls, closed-loop controls and signal conditioning for binary and analog values Compact module range TELEPERM XP Power Generation l Instrumentation & Controls 16/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management The Fail-Safe Automation System is highly available Group control level AP 2-outof-2 comparator APF-A APF-B CPU 1 CPU 1 Synchronous clock pulses CPU 2 Interface Synchronous cycles Interface Synchronous clock pulses CPU 2 2-outof-2 comparator Individual control level (FUM-F) TELEPERM XP Power Generation l Instrumentation & Controls 17/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Configuration with APF Management C P U Redundant AP C P I I I M MM C P U C P I I I MMM AP A A S I I P P Y M M F F S I I MM A A S I I P P Y M M F F S APF FUM-F FUM-F TELEPERM XP APF – rack (12 FUM-F slots) I I MM APF 1 . FUM-F max. 4 APF each redundant AP 1 . . . . . 3 3 extension rack FUM-F (18 FUM-F slots) max. 3 FUM-F rack each APF FUM-F Power Generation l Instrumentation & Controls 18/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Compact Range of FUM-F – Function Modules for all Applications FUM 310 FUM 360 Test Test Fail-safe binary transmitter signal conditioning module FUM 330 Fail-safe binary output module Test Fail-safe analog transmitter signal conditioning module TELEPERM XP Power Generation l Instrumentation & Controls 19/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Redundancy with FUM-F Fail-Safe Function Modules Module 2 Module 1 FUM 360 FUM 360 E E M M M M control channel 1 (L1/L+) (N/L-) control channel 2 E = Read back input TELEPERM XP Power Generation l Instrumentation & Controls 20/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation SIM: Key Features Management Uses SIMATIC S7 standard products Signal conditioning is provided by the AP Distributed configuration, located in field junction boxes 100 ms update and execution cycle Accepts higher voltages and currents (110 V / 220 V) 10 ms update cycle in the AP for appr. 60 binary signals with 1 ms time resolution TELEPERM XP Power Generation l Instrumentation & Controls 21/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Connection with Auxiliary Parts based on SIMATIC® S5® / S7® OM Plant bus ES Connection via plant bus or PROFIBUS Communication with OM via AP Interface in the AP engineered with ES 680 SIMATIC S5 / S7 engineered with S5 / S7 tools Time stamp in AP Optional: Time stamp from SIMATIC S5 / S7 incorporated in the AP AP PROFIBUS S7-300 TELEPERM XP S7-400H Power Generation l Instrumentation & Controls 22/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Fast-Closed Loop Control for Turbines AS 620T OM Plant bus AP ES APT Communication with OM via the AP SIMADYN processing units for fast-closed loop controls (position control: 6 ms in the case of gas and steam turbines) Fast-signal conditioning with AddFEM (1 ms) 1-out-of-2 redundancy design for closed-loop controls PROFIBUS- DP AddFEM TELEPERM XP AddFEM Power Generation l Instrumentation & Controls 23/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Neat and Tidy: Clear structure in the standard cabinet Cabinet lamp I&C monitor distributing module Shield bar SAE: Cabinet connection elements (as required) Cable duct for process cable Transmission module with automatic circuit breakers and suppressor diodes Subrack FUM Power bar Subrack redundant AP Cable duct for bus cable TELEPERM XP Diode block with integrated feed-in terminals for redundant 24V DC power supply Power Generation l Instrumentation & Controls 24/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Application Area of Function Modules (FUM) Management AS 620 B modules optionally redundant: FUM-B – range of modules AS 620 F FUM-F – range of modules channels Drive control FUM 210 max. 8 Step controller FUM 210 max. 4 Binary signal conditioning FUM 210 max. 28 ** Continuous controller FUM 280 max. 2 * Analog and binary signal coupling FUM 280 max. 6 analog I/O channels FUM 360 max. 24 FUM 310 max. 16 ** FUM 330 max. 4 max. 13 binary I/O Analog signal conditioning 20mA FUM 230 max. 16 Thermocouple FUM 232 max. 28 Resistance thermometer FUM 232 max. 14 Analog signal coupling I/O FUM 531 max. 4/4 FUM 531 max. 4/4 Binary signal coupling I/O FUM 511 max. 16/16 FUM 511 max. 16/16 * max. 4, with control algorithm in the AP TELEPERM XP ** single contacts Power Generation l Instrumentation & Controls 25/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Automation with AS 620: Highlights SIMATIC S5/S7 standard equipment used for every automation task Integrated system service for I&C diagnostics Integrated redundancy Central configuration of the AP and FUM’s in the standard cabinet Time resolution 1 ms Distributed configuration with SIMs in the field level Time accuracy 10 ms system wide TELEPERM XP Power Generation l Instrumentation & Controls 26/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Field bus: 5 Reasons to use the Field bus Decentralized Design – Intelligence where it belongs Field bus – The Trend Continues Well-Equipped for Decades to Come More Functions for the Same Price High Customer Benefit During Operation TELEPERM XP Power Generation l Instrumentation & Controls 27/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10 PG L. The Value Provider for Power Generation Management Decentralized Design: Intelligence Where It Belongs Operations Management Industrial Ethernet System bus Control PROFIBUS Field bus Remote I/O Field Remote I/O TELEPERM XP Sensor Actor Field device Power Generation l Instrumentation & Controls 28/28 AS620_15_and_more _e, PG L61, Andreas R. Lang, 2003-07-10
Similar documents
TR2000-01: Advances in DFS Theory
DFS theory [9] is an axiomatic theory of fuzzy natural language (NL) quantification. It aims at providing linguistically adequate models for approximate quantifiers like almost all, as well as for ...
More information