document in English
Transcription
document in English
Desalination Dossier “Water for human progress” Desalination Dossier References of Reverse Osmosis Plants Name of the Plant (Country) Client Water type and Treatment Capacity (CMD - MGD) Final Use Year of Operation DB SW DAF+UF+RO 75,800 20 MGD Industrial Drinking UC EPC SW RO 14,000 3.69 MGD Drinking UC EPC O&M DBOO Jorf Lasfar (Morocco) OCP Granadilla (Spain) Gobierno de Canarias Al-Zawrah (United Arab Emirates) FEWA SW DAF+UF+RO 45,500 12 MGD Drinking 2015 EPC Al Ghubrah (Oman) OPWP SW DAF+RO 191,000 50.4 MGD Drinking 2015 EPC Ceuta III (Spain) MARM SW RO 10,000 2.64 MGD Drinking 2014 EPC El Morro (Chile) GoldCorp. Inc. SW DAF+UF+RO 64,000 16.89 MGD Industrial Drinking 2012 E Águilas-Guadalentín (Spain) ACUAMED SW RO 210,000 55.48 MGD Drinking Irrigation 2012 EPC 15 years Rincón de León (Spain) EPSAR SS UF+UVD+RO 25,700 6.77 MGD Irrigation 2010 EPC 2 years La Llagosta (Spain) AGBAR BW RO 12,960 3.42 MGD Drinking 2010 EPC Sant Joan Despí (Spain) AGBAR BW UF + RO 206,064 54.44 MGD Drinking 2010 EPC La Aldea (Spain) Consejo Insular de Aguas de Gran Canaria SW RO 5,000 1.32 MGD Drinking 2009 Campo de Dalías (Spain) ACUAMED SS MF + RO 12,000 3.16 MGD Irrigation 2008 EPC Dhekelia IV Refurbishment and Extension (Cyprus) Caramondani Desalination Plants SW RO 60,000 15.85 MGD Drinking 2008 EPM Los Jameos (Spain) Los Jameos, S.L. SW RO 250 0.06 MGD Drinking 2007 Valdelentisco (Spain) ACUASEGURA SW RO 200,000 52.8 MGD Drinking Irrigation 2008 EPC Dhekelia III Refurbishment (Cyprus) Caramondani Desalination Plants SW RO 40,000 10.57 MGD Drinking 2007 EPM Melilla (Spain) MMA SW RO 20,000 5.28 MGD Drinking 2007 EPC X Rincón de León (Spain) EPSAR SS UF + RO 25,000 6.6 MGD Irrigation 2006 EPC 6 years Madinat Yanbu (Saudi Arabia) Royal Commission for Jubail and Yanbu SW RO 50,400 13.32 MGD Drinking 2006 EPM Hotel HL Paradise (Spain) Isla del Paraíso, S.L. SW RO 300 0.08 MGD Drinking 2006 Alicante I &II (Spain) MMA SW RO 65,000 17.17 MGD Drinking II - 2006 I - 2003 EPC X 15 years SW RO 23,286 6.15 MGD Drinking II – 2004 EPC X 30 years I - 1998 EPC 4 years Ceuta I & II (Spain) ACEMSA MOPTMA X 20 years 7 years 1 year 7 years 12 years 2 years Name of the Plant (Country) Client Water type and Treatment Capacity (CMD - MGD) Final Use Year of Operation DB EPC O&M Formentera I & II (Spain) Ministerio de Fomento MMA SW RO 4,000 1.06 MGD Drinking II - 2004 I - 1995 Hotel Costa Calero (Spain) Costa Canaria, S.A. SW RO 300 0.08 MGD Drinking 2003 5 years Hotel Timanfaya (Spain) Playa Blanca 2000, S.A. SW RO 200 0.05 MGD Drinking 2003 3 years Hotel Calimera (Spain) Calimera Aktivhotels SW RO 300 0.08 MGD Drinking 2003 2 years Zarzis I & II - (Tunisia) SONEDE BW RO 15,000 3.96 MGD Drinking II - 2002 I - 1999 EPC 1 year Jerba I & II - (Tunisia) SONEDE BW RO 15,000 3.96 MGD Drinking II - 2002 I - 1999 EPC 1 year San Nicolás de Tolentino (Spain) Consejo Insular de Aguas de Gran Canaria SW RO 5,000 1.32 MGD Drinking 2001 EPC 8 years & 10 months Sta. Cruz Tenerife (Spain) MMA SW RO 20,700 5.46 MGD Drinking 2001 EPC 5 years & 4 months Oliva Beach (Spain) Riusa II, S.A. SW RO 350 0.09 MGD Drinking 1999 Dhekelia I & II (Cyprus) Caramondani Desalination Plants SW RO 40,000 10.57 MGD Drinking II - 1998 I - 1997 EPM Agragua I & II (Spain) AGRAGUA, S.A. SW RO 15,000 3.96 MGD Irrigation II - 1998 I - 1991 EPC Ibiza (Spain) Gobierno de las Islas Baleares SW RO 9,000 2.38 MGD Drinking 1996 Bajo Almanzora (Spain) Junta de Andalucía BW NF 30,000 7.93 MGD Drinking 1996 Hotel Lanzarote Park (Spain) Costa Los Limones SW RO 350 0.09 MGD Drinking 1990 26 years Hotel Riu Paraíso (Spain) Riusa II, S.A. SW RO 600 0.16 MGD Drinking 1990 26 years Galdar (Spain) Ayuntamientos de Galdar y Agaete SW RO 3,500 0.92 MGD Drinking 1989 EPC X La Oliva I (Spain) Suministros de Agua La Oliva, S.A. SW RO 1,000 0.26 MGD Drinking 1989 EPC 1 year Costa Lanzarote (Spain) Costa Lanzarote Promociones, S.A. SW RO 300 0.08 MGD Drinking 1989 EPC 19 years Lanzarote II (Spain) MOPU SW RO 7,500 1.98 MGD Drinking 1986 EPC 18 years & 9 months 9 years X EPC 1 year Type of Water and Treatment: SW Seawater MF Microfiltration BW Brackish Water SS Secondary Sewage RO Reverse Osmosis UF Ultrafiltration NF Nano-filtration DAF Dissolved air flotation Capacity: 1 MGD 3,785 CMD (m3/d) Year of Operation: UC Under Construction Type of Contract: DBOO: Design, Build, Own and Operate (or BOOT) DBO: Design, Build and Operate (or EPC + O&M) DB: Design and Build (or EPC / EPM). EPC: Engineering, Procurement and Construction (Turn-Key). EPM: Engineering, Procurement and Management (Main Subcontractor without construction) E: Engineering 22 years 12 years & 4 months LEGEND: O&M: Operation and Maintenance Contract DBOO 8 years SWDP Jorf Lasfar MOROCCO Capacity: 75,800 m3/day (20 MGD) Type of treatment: DAF+UF+RO Year of operation: Under construction cadagua Client: Office Chérifien des Phosphates (OCP) Location: Jorf Lasfar (Morocco) Capacity: 75,800 m3/d - (20 MGD) Raw water: Seawater – TDS=37,000 mg/l Use: Industrial/Drinking Contract type: EPC Process Line Main Equipment SEAWATER COLLECTION 2+1 Horizontal centrifugal pumps 3+1 Coarse bar screens with 15 mm openings 3+1 Self-cleaning fine screens with 3 mm openings 5+1 DAF PRE-TREATMENT 5+1 Horizontal centrifugal pumps supplying UF 3+1 Self-cleaning mesh filters 20 UF racks 2 REVERSE OSMOSIS POST-TREATMENT Ultrafiltered water tank, 1,000 m3 5+1 Horizontal centrifugal filtered water pumps 16 Cartridge filters with 5 m selectivity 1 Dosing system: sodium hypochlorite, ferric chloride, dispersant, and sodium bisulphite, sulphuric acid and sodium hydroxide 5+1 Booster pumps 5+1 High pressure horizontal pumps 5+1 Energy recovery systems using pressure exchangers 5+1 High pressure booster pumps 5+1 1st stage RO Racks x 16,114 m3/d 5+1 Feed pumps to 2nd stage 5+1 2nd stage RO Racks x 5,360 m3/d 1 Membrane cleaning system 1 Permeate tank, 200 m3 1 Dosing systems: calcium hydroxide, CO2 and sodium hydroxide PRODUCT WATER PUMPING 2+1 PRODUCT WATER STORAGE 2 Tanks, 5,000 m3 WASTEWATER TREATMENT 1 Treatment plant of the effluents generated at the facility Horizontal centrifugal pumps Desalination Dossier UNDER CONSTRUCTION Process Description SWDP Granadilla SPAIN Capacity: 14,000 m3/day (3.69 MGD) Type of treatment: RO Year of operation: Under Construction cadagua Client: Gobierno de Canarias Location: Tenerife (Spain) Capacity: 14,000 m3/day (3.69 MGD) Raw water: Seawater - TDS = 38,600 mg/l Use: Drinking Contract type: EPC Process Line Main Equipment SEAWATER INTAKE 6+2 Submersible Pump, 246-450 m3/h at 60 m 1+1 Diaphragm metering pump PRE-TREATMENT 2 Air scouring blowers, 2.076 Nm3/h/unit 3 Sand bed horizontal DM gravity filters 3 Dispersant, sodium bisulphite and ferric chloride dosing systems 2+1 REVERSE OSMOSIS POST-TREATMENT PRODUCT WATER PUMPING PRODUCT WATER STORAGE UNDER CONSTRUCTION Process Description Selectivity cartridge filters, µ5 m 2+1 High pressure pumps 16 Pressure Exchange Chambers 2 Booster Pumps 2 7 elements racks X 7,700 m3/day, conversion 40% 1 membranes displacement and cleaning system 3 Hydroxyde, CO2 and sodium hypochlorite dosing systems 2+1 Multistage Pumps , 390 m3/h at 228 m 2+1 Multistage Pumps, 225 m3/h at 165 m 1 Double glass regulator tank, 7,000 m3 Desalination Dossier SWDP Al-Zawrah UNITED ARAB EMIRATES Capacity: 45,500 m3/day (12 MGD) Type of treatment: DAF+UF+RO Year of operation: 2015 cadagua Client: Federal Electricity & Water Authority (FEWA) Location: Ajman (United Arab Emirates) Capacity: 45,500 m3/day (12 MGD) Raw water: Seawater - TDS = 42,000 mg/l Use: Drinking Contract type: EPC Process Description SEAWATER INTAKE PRE-TREATMENT Main Equipment 5 Centrifugal pumps, 1,240 m3/h, 315 kW, 15 mWC with DAF-47 mWC without DAF 2 Intake screens 2 Pre-chlorination system 4 Floculation and DAF units 3 DAF recirculation pumps 5 UF feed pumps, 1,238 m3/h, 250 kW, 37 mWC 3 Self cleaning filters 14 UF racks x 5,015 m3/h, conversion ratio 95,38%, PENTAIR Seaflex 100 No. of modules per train 2 UF backwash pumps 1 UF backwash tank, 150 m3 2 UF air scour 4 High pressure pumps, 488 m3/h unit capacity, 1,400 kwe, 627 mWC, KSB 4 RO racks x 11,480 m3/h, conversion factor 40%, Toray 100 No. of modules per train 4 Energy recovery systems, 13 modules of Pressure exchangers – ERI PX-260 1 Flushing system 1 Cleaning system POST-TREATMENT 2 Post-chlorination system EFFLUENT TREATMENT 1 Flushing system REVERSE OSMOSIS Desalination Dossier YEAR OF OPERATION: 2015 Process Line SWDP Al Ghubrah OMAN Capacity: 191,000 m3/day (50.4 MGD) Type of treatment: DAF+RO Year of operation: 2015 cadagua Client: Oman Power and Water Procurement Company (OPWP) Location: Al Ghubrah (Oman) Capacity: 191,000 m3/day (50.4 MGD) Raw water: Seawater - TDS = 37,000 - 45,000 mg/l Use: Drinking Contract type: DBOO (O&M 20 years) Process Description SEAWATER INTAKE PRE-TREATMENT REVERSE OSMOSIS Main Equipment 2 Intake Pipes (1.5 km each) 3+1 Vertical pumps 4 Passive screens 7+1 DAF 7+1 Horizontal centrifugal pumps supplying DMF 52 Dual media filters (DMF) 16 Cartridge filter vessels with 5 µm selectivity 1 Dosing system: sodium hypochlorite, ferric chloride, sodium silicofluoride, antisclant, sodium bisulphite, sulphuric acid and sodium hydroxide 7+1 High pressure horizontal pumps 7+1 Energy recovery systems using pressure exchangers 7+1 High pressure booster pumps 7+1 1st pass RO Racks x 30,536 m3/d 7+1 Feed pumps to 2nd pass 7+1 2nd pass RO Racks x 16,911 m3/d 1 RO Membrane cleaning system POST-TREATMENT 1 Dosing systems: calcium hydroxide, CO2 and sodium hypochlorite PRODUCT WATER PUMPING 2 Product water tanks, 2x200 m3 EFFLUENT TREATMENT PLANT WASTEWATER TREATMENT 3+1 Horizontal centrifugal pumps 3+1 Centrifuges (dewatering of DAF solids) 1 Treatment plant for the wastewater generated at the facility Desalination Dossier YEAR OF OPERATION: 2015 Process Line SWDP Ceuta III SPAIN Capacity: 10,000 m3/day (2.64 MGD) Type of treatment: RO Year of operation: 2014 cadagua Client: Ministerio de Medio Ambiente, y Medio Rural y Marino (MARM) Location: Ceuta (Spain) Capacity: 10,000 m3/d (2.64 MGD) Raw water: Seawater - TDS = 39,800 mg/l Use: Drinking Contract type: EPC Process Line Main Equipment SEAWATER INTAKE 2+1 PRE-TREATMENT HIGH-PRESSURE PUMPING Horizontal Centrifugal pumps 3 Sand filters 5 Sodium hypochlorite, Ferric chloride, sulfuric acid, antiscalant and sodium bisulphite dosing systems 2+1 Cartridge filters 2 Driving engines 3+1 Booster Pumps 2+1 High pressure Pumps 2 Booster Pumps 2 RO Racks x 5,000 m3/day, FILMTEC SW30HR-380 1 RO Racks, 2 stages - FILMTEC Recovery rate: 90% 1 Sodium hydroxide dosing system CHEMICAL CLEANING 1 Chemical cleaning device POST-TREATMENT 2 Sodium hypochlorite and lime dosing systems REVERSE OSMOSIS PRODUCT WATER PUMPING EFFLUENT TREATMENT 2+1 Centrifugal pumps 1 Backwashing treatment device 2 Submergible pumps 1 Sludge thickening device 1 Neutralization system Desalination Dossier YEAR OF OPERATION: 2014 Process Description SWDP El Morro CHILE Capacity: 64,000 m3/day (16.89 MGD) Type of treatment: DAF+UF+RO Year of completion: 2012 cadagua Client: GoldCorp Inc. Location: Punta Cachos (Chile) Capacity: 64,000 m3/day (16.89 MGD) Raw water: Seawater – TDS=35,337 mg/l Use: Industrial/Drinking Contract type: E Process Line Main Equipment PRE-TREATMENT 5+1 DAF 5+1 Horizontal centrifugal pumps supplying UF 11+1 Self-cleaning disc filters 10+1 UF racks 1 4+2 REVERSE OSMOSIS POST-TREATMENT PRODUCT WATER TRANSFER PUMPING WASTEWATER TREATMENT Ultrafiltered water tank, 250 m3 Horizontal centrifugal filtered water pumps 9 Cartridge filters with 5 m selectivity 1 Dosing system: sodium hypochlorite, ferric chloride, antiscalant, and sodium metabisulphite, sulphuric acid and caustic soda 5+1 High pressure horizontal pumps 5+1 Energy recovery systems using pressure exchangers 5+1 High pressure booster pumps 5+1 1st stage RO Racks x 12,917 m3/d 1 Membrane cleaning system 1 Dosing systems: calcium hydroxide and carbon dioxide 2+1 Horizontal centrifugal pumps 1 Neutralization tank, 200 m3 Desalination Dossier YEAR OF COMPLETION: 2012 Process Description SWDP Águilas - Guadalentín SPAIN Capacity: 210,000 m3/day (55.48 MGD) Type of treatment: RO Year of operation: 2012 cadagua Client: Aguas de las Cuencas Mediterráneas, S.A. (ACUAMED) Location: Murcia (Spain) Capacity: 210,000 m3/day (55.48 MGD) Raw water: Seawater - TDS = 39,700 mg/l Use: Drinking/Irrigation Contract type: EPC + O&M (15 years) Process Description Main Equipment SEAWATER INTAKE Seawater Intake Pipe Seawater Intake Pumping St. Open Sea Intake 1 Submersible Centrifugal Pumps, 4,090 m3/h at 48 m, 760 kW. 20 DM Gravity Filters, 200 m2/ud PRE-TREATMENT First Step Filtration L= 870 m, DN-2000 HDPE seabed laid pipe, capacity 20.4 ML/h 6+1 2 Stage Dual Media Filtration 1st Filters Backwashing System 2+1 Backwashing water pumps / Air scouring blowers Intermed. Filtered water Pumping 12+1 Centrifugal Pumps Second Step Filtration 44 DM Pressure Filters, 3.6 m diam x L = 13 m 2nd Filters Backwashing System 2+1 Backwashing water pumps / Air scouring blowers Reactive Dosing Antiscalant, sodium bisulphite, sodium carbonate, sodium hypochlorite, coagulant, polyelectrolyte, sulfuric acid and ferric chloride dosing systems. REVERSE OSMOSIS Fine Filtration 24 Cartridge filters Reactive Dosing 4 Sulphuric acid, sodium bisulphite, antiscalant and sodium hydroxide Booster Pumping Station 12 Centrifugal Pumps 700 m3/h at 120 m, 315 kW High Pressure Pumping Station 12 Centrifugal Pumps, 700 m3/h at 605 m, 1,550 kW RO Racks 1st Pass 12 RO Racks x 16,800 m3/day, Recovery rate 45%, 190 pressure vessels, 7 elements/ vessel. Filmtec SW 30HR LE400i Energy Recovery Devices 36 Pressure Exchange devices - DWEER Energy Recovery Pumping 12 Centrifugal Pumps, 840 m3/h at 47 m, 160 kW Pumping Feed Second Pass 4 Centrifugal Pumps, 1,500 m3/h at 127 m, 750 kW RO Racks 2nd Pass 5 RO Racks x 25,000 m3/d, Recovery rate 90%, 138 pressure vessels, 7 elements/ vessel DOW. Filmtec LE440i Chemical Cleaning and Flushing 2 Tank + pumps for cleaning and neutralization 1 Calcium contact bed and CO2 for LSI and SA adjustment. POST- TREATMENT Product Pumping Station 11+ 2 Centrifugal pumps EFFLUENT TREATMENT 1 Clarification of backwash effluent, thickening & dewatering of sludge 1 pH adjustment of wasted cleaning chemical solution 1 Sodium Hypochlorite dosing system Desalination Dossier YEAR OF OPERATION: 2012 Process Line WWTP Rincón de León SPAIN Capacity: 50,000 m3/day (UF) (13.21 MGD) 8,800 m3/day (UVD) (2.12 MGD) 25,700 m3/day (RO) (6.77 MGD) Type of treatment: UF + UVD + RO Year of operation: cadagua 2010 Client: Entidad Pública de Saneamiento de Aguas Residuales de la Comunidad Valenciana (EPSAR) Location: Alicante (Spain) (I) ULTRAFILTRATION (II) UV DISINFECTION (III) REVERSE OSMOSIS Capacity: 50,000 m /day Capacity: 8,800 m /day Capacity: 25,700 m3/day Raw Water: SS Effluent Raw Water: SS Effluent Raw Water: Ultrafiltrated water Conductivity: 3,500 µS/cm Conductivity: 3,500 µS/cm Conductivity 3,500 µS/cm Use: Irrigation 3 3 Process Description Process Line PRE-TREATMENT Main Equipment 2 60 UV DISINFECTION REVERSE OSMOSIS Lines of mixing and flocculation chambers, 21.13 m3/line Sand filters. Continuous washing 3 Protection filters 6 Ultrafiltration cassettes, 60 modules/cassette 6 Ferric chloride, polyelectrolyte, nitric acid, sodium hypochlorite, sodium bisulphite and sodium hydroxide dosing systems. 1 UV radiation system, 32 lamps 2 Submersible pumps 5 Feed pumps 5 Cartridge filters 3 RO Racks - TRISEP 8040-X201-TSA 2 Two Staged RO Racks - Filmtec BW-30-400/34i 2 Antiscalant and sulfuric acid dosing systems 3 Blending pumps 5 Booster pumps CHEMICAL CLEANING 1 Chemical cleaning equipment NEUTRALIZATION 1 Neutralization system ENERGY RECOVERY DEVICES 2 Energy recovery devices Desalination Dossier YEAR OF OPERATION: 2010 Contract type: EPC + O&M BWDP La Llagosta SPAIN Capacity: 12,960 m3/day (3.42 MGD) Type of treatment: RO Year of operation: 2010 cadagua Client: Sociedad General de Aguas de Barcelona (AGBAR) Location: Barcelona (Spain) Capacity: 12,960 m3/day (3.42 MGD) Raw water: Brackish water - TDS=1,254 mg/l. Use: Drinking Contract type: EPC Process Line Main Equipment INTAKE Intake pumping from Donadeu Well 1 Submersible Pump (from deep well), 540 m3/h at 10 mlc 75 kW Intake pumping from Montcada-Regants Well 1 Submersible Pump (from deep well), 180 m3/h at 10 mlc 24 kW PRE-TREATMENT Raw water tank pumping 2+1 Vertical pump, 360 m3/h at 40 mlc 75 kW UV disinfection in cartridge filters 4 UV Rays items to unitary Capacity 360 m3/h Cartridge filters 4 Unitary capacity 360 m3/h. Material: GRP REVERSE OSMOSIS Nº RO Racks / Composition / Capacity 4 1 pass 2 stages, Recovery Rate 75%, final capacity per train: 135 m3/h 1st Stage Set-up 16 Pressure vessels, 6 membranes/vessel, Dow spiral wound 2nd Stage Set-up 8 Pressure vessels, 6 membranes/vessel, Dow spiral wound High-Presssure Pumps 4 Horizontal Pumps, 180 m3/h at 130 mlc 110 kW Chemical cleaning system 1 Tank of 8 m3, (2x100%) horizontal pumps, 144 m3/h at 55 mlc 30 kW Osmotic Balance Tank 1 Tank of 100 m3, diameter 3.5 m and height 12 m Ethylene tretrachloride removal 2 Stripping towers. Diameter 2.2 m and height 7.5 m. Fan for 4,000 m3/h of air per tower. Capacity to be treated per tower: 270 m3/h POST-TREATMENT Remineralization 1 Liquid/gas storage tank and CO2 distribution grids in the product water tank. 1 Lime storage silo of 40 m3 and dosing system. 1 Lime saturator (Metal clarifier Accentrifloc). Diameter 4.4 m. SUPPLY Product water pumping 3+1 Vertical pump, 180 m3/h at 65 mlc 55 kW Desalination Dossier YEAR OF OPERATION: 2010 Process Description DWTP Sant Joan Despí SPAIN Capacity: 206,064 m3/day (54.44 MGD) Type of treatment: UF+RO Year of operation: 2010 cadagua Client: Sociedad General de Aguas de Barcelona (AGBAR) Location: Barcelona (Spain) Capacity: 206,064 m3/day (54.44 MGD) Raw Water: Brackish water - TDS= 1,100 to 1,300 mg/l Use: Drinking Contract type: EPC Process Description Main Equipment PRETREATMENT (ULTRAFILTRATION) UF Racks/Configuration/Capacity UF Permeate Pumps UF Water Pumps to RO 8+1 8 sets/train and 57 modules of UF membranes/set. 1,193 m3/h and train 9 10+2 Horizontal Centrifugal, 1,365 m3/h at 13 mlc, 75 kW Vertical Centrifugal, 954 m3/h at 60 mlc, 250 kW CIP System - Dosing System: Caustic Soda, Phosphoric Acid, Sodium Bisulphite, Hypochlorite Cartridge Filters Pre-Desinfection 5 UV units, high density lamps, pressurized, unitary capacity 1,908 m3/h Cartridge Filters Pre-Desinfection 5 Unitary capacity 1,908 m3/h, PP cartridges, 2.5x50”, 5 nominal micron RO Pre-Desinfection 5 UV units, high density lamps, pressurized, 1,908 m3/h unitary flow RO Chemical Products System - Dosing: Sulphuric Acid, Sodium Bisulphite, Antiscalant RO racks/Composition/Capacity 10 1 pass, 3 stages, total conversion 90%, 858.6 m3/h unit REVERSE OSMOSIS SYSTEM 1st Stage Configuration 90 Pressure vessels, 7 membranes/vessel, 630 membranes per train 2nd Stage Configuration 40 Pressure vessels, 7 membranes/vessel, 280 membranes per train 3rd Stage Configuration 28 Pressure vessels, 7 membranes/vessel, 196 membranes per train High Pressure Pumps (1st Stage) 10 Centrifugal Pumps, 954 m3/h at 131 mlc, 500kW Inter-Stage Pumps (booster) (3rd Stage) 10 Pump Group-Motor, 230 mv/h at 50 mlc, 55kW Chemical Cleaning System 1 Tank 70 m3 working capacity, (2+1S) 405 m3/h pumps at 60 mlc Shifting System 1 Tank 100 m3 working capacity POST- TREATMENT Remineralization System: Calcite Filters and CO2 Calcite Filters 4 Cells 6x4 m2, regular bed 2.50 m high, maximum 2.80 m high CO2 Systems 1 Liquid/Gas Storage Tank and linear injection Desalination Dossier YEAR OF OPERATION: 2010 Process Line WWTP Campo de Dalías SPAIN Capacity: I MF: 28,600 m3/day (7.54 MGD) II RO: 12,000 m3/day (3.16 MGD) Type of treatment: MF + RO Year of operation: 2008 cadagua Client: Aguas de las Cuencas Mediterráneas, S.A. (ACUAMED) Location: Almería (Spain) Capacity: 28,600 m /day (7.54 MGD) Capacity: 12,000 m3/day (3.16 MGD) Raw Water: SS Effluent Conductivity= 3,800 µS/cm Raw Water: Microfiltered water Conductivity= 3,800 µS/cm Use: Irrigation Contract type: EPC 3 Process Description Process Line Main Equipment ADRA PRE-TREATMENT REVERSE OSMOSIS CHEMICAL CLEANING EL EJIDO ROQUETAS 4 7 11 Self-backwashing sand filters 2 3 7 Microfiltration modules Ferric chloride, sulfuric acid, sodium hypochlorite, sodium, bisulphite and sodium hydroxide dosing systems 2 2 3 Feed pumps 2 2 3 Cartridge filters 1 1 1 RO Racks, 3,500 m3/day/unit. PERMETEC 1 1 1 Chemical cleaning equipment 1 1 1 Antiscalant and sulfuric acid dosing systems Desalination Dossier YEAR OF OPERATION: 2008 (II) REVERSE OSMOSIS (I) MICROFILTRATION SWDP Dhekelia IV CYPRUS Capacity: 60,000 m3/day (15.85 MGD) Type of treatment: RO Year of operation: 2008 cadagua Client: Caramondani Desalination Plants Location: Dhekelia (Cyprus) Capacity: 60,000 m3/day (15.85 MGD) Raw water: Seawater - TDS = 42,000 mg/l Use: Drinking Contract type: EPM Process Description Main Equipment YEAR OF OPERATION: 2008 Process Line PRE-TREATMENT Seawater Pumping 4 Centrifugal Pumps Pre-treatment 3 Gravity Dual Media Filters (sand+anthracite) 4 Filtered seawater Pumping 3+3 Cartridge Filters Centrifugal Pumps (two groups for HPP and ERS) 1st RO PASS RO Racks 0 6,000 m3/day per unit High Pressure Pumping 3 H.P. Centrifugal Pumps Energy Recovery System 9 Booster Pumps Second Pass Feedwater Pumping 5 Centrifugal Pumps RO Racks 5 4,000 m3/day Boron Removal Feedwater Pumping 4 Centrifugal Pumps Treated Water Pumping 4 Centrifugal Pumps IX vessels 9 2,800 mm. diameter 2nd RO PASS BORON REMOVAL Resin Type Rohm & Hass - AMBERLITE IRA 743 Desalination Dossier SWDP Valdelentisco SPAIN Capacity: 200,000 m3/day (52.8 MGD) I - 75,000 m3/day II - 137,500 m3/day Type of treatment: RO Year of operation: I - 2007 II - 2008 cadagua Client: Aguas de la Cuenca del Segura, S.A. (ACUASEGURA) Location: Murcia (Spain) Capacity: 200,000 m3/day (52.83 MGD) I: 75,000 m3/day II: 137,500 m3/day Raw water: Seawater - TDS=38,500 mg/l Use: I - Drinking II - Drinking/Irrigation Process Description Process Line I II Seawater Intake Pipe 1 1 L= 1,474 m, DN-18000, Partial tunnelling + HDPE laid pipe, capacity 16.8 ML/h Seawater Intake Pumping St. 1 1 Pit built in deep tower 5 m diameter x 5 m high, depth 25 m. 7+1 7+1 4 4 Sulphuric Acid, Ferric Chloride, Sodium Hypochlorite, Polyelectrolyte dosing systems Booster Pumping to Filters 6 11 Centrifugal Pump with frequency converter, 1,030 m3/h at 60 m, 250 kW. Coarse Filtration 36 42 1 Step Dual Media Pressure Filters (sand + anthracite), 3.6 m day x L= 10.5 m Chemical Dosings 3 3 Sodium Hydroxide, Sodium Bisulphite, Antiscalant dosing systems Fine Filtration 14 14 Cartridge Filters, capacity 1,000 m3/h/each High Pressure Pumping 6 11 Pump Groups - Motor - Pelton Turbine, 515 m3/h at 640m, 1,600 kW. Interstage Pumping (booster) 6 11 Centrifugal Pump with frequency converter, 660 m3/h at 110m, 315 kW. Reverse Osmosis 6 6 Two Stage Racks x 12,500 m3/day, conversion rate 50%, DOW. 1st Stage 85 pressure vessels, 7 elements/vessel, 595 elements/stage, SW30HRLE400i 2nd Stage 57 pressure vessels, 7 elements/vessel, 399 elements/stage, SW30HRLE400i 5 Two Stage Racks, conversion rate 50%, HYDRANAUTICS. 1st Stage 78 pressure vessels, 7 elements/vessel, 595 elements/stage, SWC4 MAX. 2nd Stage 52 pressure vessels, 7 elements/vessel, 399 elements/stage, SWC5 MAX. SEAWATER INTAKE Chemical Dosings Main Equipment Open Sea Intake Submersible Centrifugal Pumps, 1,800 m3/h at 45 m, 415 kW. PRETREATMENT REVERSE OSMOSIS Chemical Cleaning and Flushing 2 2 Tank for cleaning and neutralization 35 m3, 2+1S 400 m3/h pumps @ 50m POST- TREATMENT 1 1 Calcium Hydroxide Storage and Dosing and CO2 for LSI and SA adjustment. EFFLUENT TREATMENT 1 1 Thickening & Dewatering of sludge from backwash effluent. pH adjustment of wasted cleaning chemical solution. SEAWATER OUTFALL 1 1 1,259 m, DN-1600, HPPE pipe Desalination Dossier YEAR OF OPERATION: Phase I - 2007 / Phase II - 2008 Contract type: EPC + OM SWDP Dhekelia III CYPRUS Capacity: 40,000 m3/day (10.57 MGD) Type of treatment: RO Year of operation: 2007 cadagua Client: Caramondani Desalination Plants Location: Dhekelia (Cyprus) Capacity: 40,000 m3/day (10.57 MGD) Raw water: Seawater - TDS = 42,000 mg/l Use: Drinking Contract type: EPM Process Description Main Equipment YEAR OF OPERATION: 2007 Process Line SEAWATER INTAKE Seawater pumping 4 Centrifugal pumps 3 Gravity Dual Media Filters (sand + anthracite) 4 Cartridge Filters PRE-TREATMENT Filtered seawater pumping 3+3 Centrifugal pumps (two groups for HPP and ERS) FIRST RO PASS High pressure pumping 3 HP Centrifugal pumps Energy Recovery System 9 Booster Pumps Second pass feedwater pumping 4+4 Centrifugal pumps (two groups in series) Boron removal feedwater pumping 4 Centrifugal pumps Treated water pumping 4 Centrifugal pumps Desalination Dossier SWDP Melilla SPAIN Capacity: 20,000 m3/day (5.28 MGD) Type of treatment: RO Year of operation: 2007 cadagua Client: Ministerio de Medio Ambiente (MMA) Location: Melilla (Spain) Capacity: 20,000 m3/day (5.28 MGD) Raw water: Seawater - TDS=38,500 mg/l Use: Drinking Contract type: DBOO (O&M 12 years) Process Line Main Equipment SEAWATER PUMPING 3+1 PRE-TREATMENT Filtered water pumping 3 Sodium hypochlorite, coagulant and polyelectrolyte dosing systems. 6 Pressure dual media filters (sand + anthracite) - 1st stage 3+1 4 Filters backwashing system Submersible centrifugal pumps 2+1 1+1 Centrifugal pumps Pressure dual media filters (sand + anthracite) - 2nd stage Backwashing water pumps Air scouring blowers 3 Sulfuric acid, antiscalant, sodium bisulphite dosing systems. 4 Cartridge filters REVERSE OSMOSIS High-Pressure pumping Reverse Osmosis Shifting System/Chemical cleaning POST-TREATMENT 3+1 3 2+1 2 1 Treated water pumping 2+1 Pump - Motor -Turbine Groups RO Racks; Recovery: 45%. Filmtec SW30HR LE-400 Centrifugal pumps Lime and CO2 remineralization systems Sodium hypochlorite dosing system Centrifugal pumps Desalination Dossier YEAR OF OPERATION: 2007 Process Description WWTP Rincón de León SPAIN Capacity: 50,000 m3/day (UF) (13.21 MGD) 25,000 m3/day (RO) (6.60 MGD) Type of treatment: UF + RO Year of operation: 2006 cadagua Client: Entidad Pública de Saneamiento de Aguas Residuales de la Comunidad Valenciana (EPSAR) Location: Alicante (Spain) (III) REVERSE OSMOSIS (I) ULTRAFILTRATION Capacity: 50,000 m /day (13.21 MGD) Capacity: 25,000 m3/day (6.60 MGD) Raw Water: SS Effluent Conductivity= 2,800 S/cm Raw Water: Ultrafiltrated water Conductivity= 2,800 µS/cm Use: Irrigation. Contract type: EPC + O&M 3 Process Line Main Equipment ULTRAFILTRATION 2 REVERSE OSMOSIS Lines of mixing and flocculation chambers 2 Lamellar settling tanks 3 Protection filters 6 Ultrafiltration modules 6 Ferric chloride, polyelectrolyte, nitric acid, sodium hypochlorite, sodium bisulphite and sodium hydroxide dosing systems. 5 Feed pumps 5 Cartridge filters 4 RO Racks - TRISEP 3 Blending pumps 2 Antiscalant and sulfuric acid dosing systems CHEMICAL CLEANING 1 Chemical cleaning equipment NEUTRALIZATION 1 Neutralization system Desalination Dossier YEAR OF OPERATION: 2006 Process Description SWDP Madinat Yanbu Al-Sinaiyah SAUDI ARABIA Capacity: 50,400 m3/day (13.32 MGD) Type of treatment: RO Year of operation: 2006 cadagua Client: Royal Commission for Jubail and Yanbu Location: Yanbu (Saudi Arabia) Capacity: 50,400 m3/day (13.32 MGD) Raw water: Seawater - TDS = 42,000 mg/l Use: Drinking Contract type: EPM Process Line Main Equipment PRE-TREATMENT 14 Gravity dual media filters (sand + anthracite) 5 Ferric chloride, polyelectrolyte, sulfuric acid, sodium bisulphite and antiscalant dosing systems 8 Cartridge filters High-Pressure Pumping 6 Pump-Motor-Turbine Groups Reverse Osmosis 6 REVERSE OSMOSIS RO Racks x 8,400 m3/day, Toyobo Membranes Recovery Rate: 38.5% POST-TREATMENT Chemical Cleaning 1 Chemical cleaning equipment Post-Treatment 3 Chlorine, lime and caustic soda dosing systems Testing Unit 1 RO Membrane Test Unit Desalination Dossier YEAR OF OPERATION: 2006 Process Description SWDP Alicante I - II SPAIN Capacity: 65,000 m3/day (17.17 MGD) Type of treatment: RO Year of operation: I - 2003 / II - 2006 cadagua Ministerio de Medio Ambiente (MMA) Location: Alicante (Spain) Capacity: 65,000 m3/day (17.17 MGD) Raw water: Seawater -TDS = 42,500 mg/l Use: Drinking Contract type: DBOO (O&M 15 years) Process Description Process Line I-II SEAWATER PUMPING 22 + 8 Well pumps 10 Sand filters 5 Sodium hypochlorite, ferric chloride, sulfuric acid, sodium bisulphite and antiscalant dosing systems PRE-TREATMENT HIGH-PRESSURE PUMPING REVERSE OSMOSIS Main Equipment 6+1 Cartridge filters 7+2 Pump-Motor-Pelton Wheel Turbine Groups 7 RO Racks x 7,200 m3/d, RO membranes Toray SU-820 FA 2 RO Racks, RO membranes Toray TM-820-400 Design Pressure: 69 bar (1,000 psi); Recovery Rate > 42 - 43% CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 2 Sodium hypochlorite and lime dosing systems Desalination Dossier YEAR OF OPERATION: Phase I - 2003 / Phase II - 2006 Client: SWDP Ceuta I - II SPAIN Capacity: 23,286 m3/day (6.15 MGD) Type of treatment: RO Year of operation: I - 1998 / II - 2004 cadagua I - Ministerio de Obras Públicas, Transporte y Medio Ambiente (MOPTMA) II - Aguas de Ceuta Empresa Municipal, S.A. (ACEMSA) Location: Ceuta (Spain) Capacity: 23,286 m3/day (6.15 MGD) Raw water: Seawater - TDS = 38,000 mg/l Use: Drinking Contract type: I - EPC + O&M II - DBOO (O&M 30 years) Process Description Process Line I-II SEAWATER PUMPING 5 Centrifugal pumps 4+3 Pressure sand filters PRE-TREATMENT HIGH-PRESSURE PUMPING Main Equipment 2 Filter backwashing brine pumps 3 Sodium hypochlorite, sodium bisulphite and antiscalant dosing systems 4+2 Cartridge filters 4+1 Pump-Motor-Turbine Groups 1 Inter-stage Booster pumping group 3 RO Racks x 5,333 m3/day, FILMTEC SWHR-380; Recovery rate: 40-42% 1 RRO Racks x 7,286 m3/day, FILMTEC SWHR-380; Recovery rate: 55% 1 Brine concentrator CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 2 Sodium hypochlorite and lime dosing systems REVERSE OSMOSIS PRODUCT WATER PUMPING 4+1 Centrifugal pumps Desalination Dossier YEAR OF OPERATION: Phase I - 1998 / Phase II - 2004 Client: SWDP Formentera I - II SPAIN Capacity: 4,000 m3/day (1.06 MGD) Type of treatment: RO Year of operation: I - 1995 / II - 2004 cadagua I - Ministerio de Medio Ambiente (MMA) II - Ministerio de Fomento Location: Formentera (Spain) Capacity: 4,000 m3/day (1.06 MGD) Raw water: Seawater -TDS=42,000 mg/l Use: Drinking Contract type: EPC + O&M Process Description Process Line I-II Main Equipment SEAWATER PUMPING 4+2 Multistage submersible pumps PRE-TREATMENT 3+2 3 HIGH-PRESSURE PUMPING REVERSE OSMOSIS Pressure sand filters Sodium hypochlorite, sodium bisulphite and antiscalant dosing systems 3+1 Cartridge filters 3+2 Pump-Motor-Turbine Groups 2 RO Racks x 1,000 m3/day, Dupont B10T-6845 Design Pressure: 83.7 bar (1,200 psi); Recovery Rate: 40% 1 RO Racks x 2,000 m3/day, Toray SU-820 FA Design Pressure: 70 bar (1,000 psi); Recovery Rate: 45% 1 500 m3 painted carbon steel tank 1 17,500 m3 concrete tank CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 1 Remineralisation system by calcium carbonate and CO2 1 Sodium hypochlorite dosing system PRODUCT STORAGE TANK Desalination Dossier YEAR OF OPERATION: Phase I - 1995 / Phase II - 2004 Client: BWDP Zarzis I - II TUNISIA Capacity: 15,000 m3/day (3.96 MGD) Type of treatment: RO Year of operation: I - 1999 / II - 2002 cadagua La Société Nationale d’Exploitation et de Distribution des Eaux (S.O.N.E.D.E.) Location: Zarzis (Tunisia) Capacity: 15,000 m3/day (3.96 MGD) Raw water: Brackish water - TDS = 6,000 - 8,000 mg/l Use: Drinking Contract type: I - EPC + O&M / II - EPC YEAR OF OPERATION: Phase I - 1999 / Phase II - 2002 Client: Process Description Process Line PRE-TREATMENT REVERSE OSMOSIS POST-TREATMENT I-II Main Equipment 1 Oxidation / aeration pond 2 Sludge blanket recirculation settlers 4 Gravity dual media filters (sand + anthracite) 4 Sodium hypochlorite, coagulant, soda and lime dosing systems 3 Filtered water pumps 3 Cartridge filters 3 Sulfuric acid, antiscalant and sodium bisulphite dosing systems. 3 High-Pressure Pumps 3 RO Racks x 5,000 m3/d. Hydranautics CPA3 Design Pressure: 14 bar; Recovery Rate. 75% 3 Degassers 1 Caustic soda dosing system. Desalination Dossier BWDP Jerba I - II TUNISIA Capacity: 15,000 m3/day (3.96 MGD) Type of treatment: RO Year of operation: I - 1999 / II - 2002 cadagua Client: La Société Nationale d’Exploitation et de Distribution des Eaux (S.O.N.E.D.E.) Location: Jerba (Tunisia) Capacity: 15,000 m3/day (3.96 MGD) Raw water: Brackish water - TDS = 5,500 - 7,000 mg/l Use: Drinking Contract type: I - EPC + O&M / II - EPC Process Line PRE-TREATMENT REVERSE OSMOSIS POST-TREATMENT I-II Main Equipment 1 Oxidation / aeration pond 2 Sludge blanket recirculation settlers 4 Gravity dual media filters (sand + anthracite) 4 Sodium hypochlorite, coagulant, soda and lime dosing systems 3 Filtered water pumps 3 Cartridge filters 3 Sulfuric acid, antiscalant and sodium bisulphite dosing systems. 3 High-Pressure Pumps 3 RO Racks x 5,000 m3/day, Hydranautics CPA3 Design Pressure: 14 bar; Recovery Rate. 75% 3+1 1 YEAR OF OPERATION: I - 1999 / II - 2002 Process Description Degassers Caustic soda dosing system. Desalination Dossier SWDP San Nicolás de Tolentino SPAIN Capacity: 5,000 m3/day (1.32 MGD) Type of treatment: RO Year of operation: 2001 cadagua Client: Consejo Insular de Aguas de Gran Canaria Location: Canary Islands (Spain) Capacity: 5,000 m3/day (1.32 MGD) Raw water: Seawater -TDS=38,000 mg/l Use: Drinking Contract type: EPC + O&M Process Line Main Equipment SEAWATER PUMPING 3 Centrifugal pumps PRE-TREATMENT 2 Pressure sand filters 4 Sodium hypochlorite, sulfuric acid, sodium bisulphite and antiscalant dosing systems 2 Cartridge filters HIGH-PRESSURE PUMPING 1 Pump-Motor-Turbine Group REVERSE OSMOSIS 1 RO Racks x 5,000 m3/d, Hydranautics SWC-3; Recovery Rate: 45% CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 1 Lime dosing system Desalination Dossier YEAR OF OPERATION: 2001 Process Description SWDP Sta. Cruz de Tenerife SPAIN Capacity: 20,700 m3/day (5.46 MGD) Type of treatment: RO Year of operation: 2001 cadagua Client: Ministerio de Medio Ambiente (MMA) Location: Santa Cruz de Tenerife (Spain) Capacity: 20,700 m3/day (5.46 MGD) Raw water: Seawater - TDS = 39,000 mg/l Use: Drinking Contract type: EPC + O&M Process Line Main Equipment SEAWATER PUMPING 8 Centrifugal pumps PRE-TREATMENT 8 Pressure sand filters - 1st Filtration Stage 4 Pressure dual media filters (sand+anthracite) - 2nd Filtration Stage 6 Sodium hypochlorite, ferric chloride, sulfuric acid, sodium bisulphite, coagulant and antiscalant dosing systems 6 Cartridge filters HIGH-PRESSURE PUMPING 4 Pump-Motor-Turbine Groups (1st pass) LOW-PRESSURE PUMPING 3 Motor-Pump Groups (2nd pass) REVERSE OSMOSIS 3 RO Racks. Hydranautics SWC-3. Design Pressure: 69 bar (1,000 psi); Recovery Rate: 42%, 6,900 m3/day 3 RO Racks. Hydranautics ESPA2. Design Pressure: 12 bar (174 psi); Recovery Rate: 85%, 4,284 m3/day CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 3 Sodium hypochlorite, lime and CO2 dosing systems. Desalination Dossier YEAR OF OPERATION: 2001 Process Description SWDP Dhekelia I - II CYPRUS Capacity: 40,000 m3/day (10.57 MGD) Type of treatment: RO Year of operation: I - 1997 / II - 1998 cadagua Caramondani Desalination Plants Location: Dhekelia (Cyprus) Capacity: 40,000 m3/day (10.57 MGD) Raw water: Seawater - TDS = 42,000 mg/l Use: Drinking Contract type: EPM Process Description Process Line I-II Main Equipment OPEN SEA INTAKE SEAWATER PUMPING 3+2 PRE-TREATMENT 6+5 6 Centrifugal pumps Gravity dual (sand+anthracitte) media filters Coagulant, polyelectrolyte, sodium hypochlorite, sulfuric acid, sodium bisulphite and antiscalant dosing systems 7+6 Cartridge filters HIGH PRESSURE PUMPING 5+4 Pump-Motor-Turbine Groups REVERSE OSMOSIS 4+4 RO Racks x 5,000 m3/d - Dupont B10T-6880 TWIN Design Pressure: 82.7 bar (1,200 psi) Recovery Rate: 50% CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 3 Sodium hypochlorite, CO2 and lime dosing systems Desalination Dossier YEAR OF OPERATION: I - 1997 / II - 1998 Client: SWDP Agragua I - II SPAIN Capacity: 15,000 m3/day (3.96 MGD) Type of treatment: RO Year of operation: I - 1991 / II - 1998 cadagua Agragua, S.A. Location: Gran Canaria (Spain) Capacity: 15,000 m3/day (3.96 MGD) Raw water: Seawater -TDS=38,000 mg/l Use: Irrigation Contract type: I - II - DBOO (O&M 22 years) Process Description Process Line I-II SEAWATER PUMPING 3 Centrifugal pumps PRE-TREATMENT Main Equipment 3 Pressure sand filters 5 Coagulant, sodium hypochlorite, sulfuric acid, sodium bisulphite and antiscalant dosing systems 3 Cartridge filters HIGH PRESSURE PUMPING 3 Pump-Motor-Turbine Groups REVERSE OSMOSIS 2 RO Racks x 5,000 m3/d - Dupont B10T-6845 1 RO Racks x 5,000 m3/day – Filmtec SW30HR-380 Design Pressure: 69 bar (1,000 psi); Recovery Rate: 45% CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 2 Sodium hypochlorite and lime dosing systems Desalination Dossier YEAR OF OPERATION: I - 1991 / II - 1998 Client: SWDP Ibiza SPAIN Capacity: 9,000 m3/day (2.38 MGD) Type of treatment: RO Year of operation: 1996 cadagua Client: Gobierno de las Islas Baleares Location: Ibiza (Spain) Capacity: 9,000 m3/day (2.38 MGD) Raw water: Seawater - TDS=38,000 mg/l Use: Drinking Contract type: O&M Process Line Main Equipment SEAWATER PUMPING 6 Centrifugal pumps PRE-TREATMENT 4 Sodium hypochlorite, polyelectrolyte, sulfuric acid and sodium bisulphite dosing systems 8 Pressure sand filters 4 Cartridge filters HIGH-PRESSURE PUMPING 3 Pump - Motor -Turbine Groups REVERSE OSMOSIS 3 RO Racks x 3,000 m3/day - Toray SU 820 Design pressure: 68 bar. Recovery Rate: 40% CHEMICAL CLEANING 1 Chemical cleaning equipment. POST-TREATMENT 2 Lime and sodium hypochlorite dosing systems. Desalination Dossier YEAR OF OPERATION: 1996 Process Description BWDP Bajo Almanzora SPAIN Capacity: 30,000 m3/day (7.93 MGD) Type of treatment: Nanofiltration Year of operation: 1996 cadagua Client: Junta de Andalucía Location: Almería (Spain) Capacity: 30,000 m3/day (7.93 MGD) Raw water: Brackish water - TDS=1,776 mg/l. Use: Drinking Contract type: EPC + O&M Process Description PRE-TREATMENT Main Equipment 3 Sulfuric acid, antiscalant and sodium bisulphite dosing systems. 4 Cartridge filters HIGH-PRESSURE PUMPING 4 Centrifugal pumps NANOFILTRATION 3 Racks x 10,000 m3/d - Filmtec NF 70-345 Design pressure: 10.3 bar (150 psi) ; Recovery Rate: 78% CHEMICAL CLEANING 1 Chemical cleaning equipment YEAR OF OPERATION: 1996 Process Line Desalination Dossier SWDP Galdar - Agaete SPAIN Capacity: 3,500 m3/day (0.92 MGD) Type of treatment: RO Year of operation: 1989 cadagua Client: Ayuntamientos de Galdar y Agaete Location: Gran Canaria (Spain) Capacity: 3,500 m3/day (0.92 MGD) Raw water: Seawater - TDS=38,000 mg/l Use: Drinking Contract type: DBOO (O&M 8 years) Process Line Main Equipment SEAWATER PUMPING 3 Centrifugal pumps PRE-TREATMENT 4 Pressure sand filters 5 Coagulant, sodium hypochlorite, sulfuric acid, sodium bisulphite and antiscalant dosing systems 3 Cartridge filters HIGH-PRESSURE PUMPING 3 Pump-Motor-Turbine Groups REVERSE OSMOSIS 2 RO Racks x 1,750 m3/d - Dupont B10T-6845 Design Pressure: 69 bar (1,000 psi) Recovery Rate: 45% CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 2 Sodium hypochlorite and lime dosing systems. Desalination Dossier YEAR OF OPERATION: 1989 Process Description SWDP Lanzarote II SPAIN Capacity: 7,500 m3/day (1.98 MGD) Type of treatment: RO Year of operation: 1986 cadagua Client: Ministerio de Obras Públicas y Urbanismo (MOPU) Location: Lanzarote (Spain) Capacity: 7,500 m3/day (1.98 MGD) Raw water: Seawater – TDS=37,000 mg/l Use: Drinking Contract type: EPC Process Line Main Equipment SEAWATER PUMPING 5 PRE-TREATMENT 4 Pressure sand filters 3 Coagulant, sulfuric acid and antiscalant dosing systems 4 Cartridge filter HIGH-PRESSURE PUMPING 4 Pump-Motor-Turbine Groups REVERSE OSMOSIS 3 RO Racks x 2,500 m3/d - Dupont B10T-6840 Design Pressure: 82.7 bar (1,200 psi) Recovery Rate: 45% CHEMICAL CLEANING 1 Chemical cleaning equipment POST-TREATMENT 2 Sodium hypochlorite and sodium carbonate dosing system YEAR OF OPERATION: 1986 Process Description Centrifugal pumps Desalination Dossier “Water for human progress” Offices in Spain BILBAO (HEAD OFFICE) Gran Vía, 45 – 7th & 8th - 48011 Bilbao - SPAIN Phone: +34 94 481 73 00 - Fax: +34 94 481 73 01 e-mail: [email protected] MADRID (GENERAL MANAGEMENT) Ribera del Loira, 42 - Parque Empresarial Puerta de las Naciones 28042 Madrid - SPAIN Phone: +34 91 300 99 96 - Fax: +34 91 300 89 24 e-mail: [email protected] International offices POLAND Cadagua SA Oddział w Polsce - ul. Dzielna, 58 01-029 Warszawa - POLAND Phone: +48 22 290 42 17 - Fax: +48 22 636 16 80 e-mail: [email protected] PORTUGAL Rua Adelino Amaro da Costa, 9º C/V Esq. 2720 002 Amadora - PORTUGAL Phone: +351 91 345 18 67 - Fax: +351 499 61 48 UNITED ARAB EMIRATES Suite No. 103E Ibn Battuta Gate Office (next to Ibn Battuta Mall) Jebel Ali P.O. Box 450655 Dubai - UAE Phone: +971 4 4429803 - Fax: +971 4 4429581 e-mail: [email protected] OMAN KINGDOM OF SAUDI ARABIA B.O. Bldg. 4th Floor, P.O. Box 2923 Al Sahafa District, Riyadh 13321 - KSA Phone: (+966) 11 510 4925 /27 /28 - Fax: (+966) 11 510 4929 MOROCCO Boulevard d’Anfá 140, 1st, apart Nº1 20050 Casablanca - MOROCCO Phone: +212 (0) 522368218 - Fax: +212 (0) 522368221 e-mail: [email protected] UNITED STATES OF AMERICA 9600 Great Hills Trail , Suite 200 E, Austin TX 78759 (USA) Phone:+1 512 637 8587 /88 - Fax: +1 512 637 1499 e-mail: [email protected] PERU Coronel Andres Reyes 350-360 - Edificio Onyx - Oficina 601-602 San Isidro – Lima (Perú) Phone: +51 1 2027110 - Fax: +51 1 2214849 CHILE Avda. Andrés Bello, 2711, Piso 18, Las Condes - Santiago (Chile) Phone: +56 25606200/80/81 - Fax: +56 23343071 www.cadagua.es www.cadagua.es P.B. No: 1884, Jibroo - Al Nadha Press Building Al Wattayah Street - OMAN Phone: +968 24566704 / 804 - Fax: +968 24566304 e-mail: [email protected]