1 Guido Kumbatzky
Transcription
1 Guido Kumbatzky
Offshore Windfarms in Germany – Challenges and Technical Solutions Example „BARD Offshore 1“ The Offshore Wind Power Conference Den Helder, Netherlands 12. February 2009 BARD Engineering GmbH Presentation Structure: 1. BARD-Group 2. Offshore Sites in the North Sea 3. Wind Turbine Manufacturing in Emden 4. Rotor Blade Production in Emden 5. Foundation Solution BARD-Tripile 6. Grid Connection and Transformer Platform 7. Wind Lift I the Installation- and Service Vessel 8. Construction Concept Offshore 9. Harbor Logistics 10.BARD Building, BARD Service & Training Center 11.Nearshore Project Hooksiel Guido Kumbartzky 2009-02-12 2 BARD Engineering GmbH BARD-Group: Business Development, Locations and Jobs Company locations Activities of the BARD-Group with currently over 10 affiliates: 2003 2004 2005 2006 2007 2008 2009 Establishment of BARD Engineering GmbH in Bremen Design of Offshore Foundation Development of 5 MW wind turbine generator Set-up of WTG and rotor blade production in Emden Permit for BARD Offshore 1 Installation of 2 prototypes Onshore Set-up of foundation production in Cuxhaven Installation of Nearshore Turbine Hooksiel Installation of BARD Offshore 1 Employment growth: 2004 2005 2006 2007 2008 Jan 2009 until end 2009 expected Guido Kumbartzky 2009-02-12 3 20 30 61 205 450 642 1000 BARD Offshore Projects BARD Engineering GmbH BARD-Group: The Structure / Organisation for Turn key supply The aim of the BARD Building is the smooth installation of the offshore wind farms. A professional team is coordinating the erection of the foundation system, tower segments, nacelle, hub and blades. After the grid connection the wind turbines are handed over to BARD Service company who is responsible for operation and service of the offshore wind farms. BARD Holding GmbH BARD Engineering GmbH Construction / Projects BARD Building GmbH & Co. KG BARD Service GmbH Cuxhaven Steel Construction GmbH Installation Service / Maintenance Tripile Fondation BARD Emden Energy GmbH & Co. KG BARD Schiffsbetriebs. Natalie GmbH & Co. KG BARD 5.0 / blades Vessel coordination Guido Kumbartzky 2009-02-12 4 BARD Engineering GmbH BARD-Group: Offshore Sites in the North Sea The German North Sea More than 1.400 WTGs permitted More than 7.000 MW of power. BARD-Group Applied for 10 further projects Water depths ca. 30-40m Distance to coast ca. 80-110 km Average wind speeds 10 m/s ca. 4250 full load hours BARD Offshore 1 1,7 TWh for more than 400.000 households Guido Kumbartzky 2009-02-12 5 BARD Engineering GmbH BARD-Group: A4 Wind Turbine Manufacturing in Emden BARD 5.0 (designed by Aerodyne) • Capacity: 5MW, Rotor Ø: 122m • Hub: electrical pitch, ca. 86 t • Generator type: double-fed, asynchronous • Nacelle weight: 260 t • Rotor weight: 150 t (28 t / rotor blade) Series production in Emden 100 units/year starting 2011 Guido Kumbartzky 2009-02-12 6 BARD Engineering GmbH Slide 6 A4 Wenn mit Artikel Die BARD-Gruppe, dann konsekvent ABoguna; 24-10-2008 BARD-Group: Rotor Blade Manufacturing in Emden Rotor blade „BARD 61“ Blade length: 59.4 m Max. blade depth: 5.9 m Connection diameter: 4.0 m Total weight: approx. 28.5 t Energy research Centre of the Netherlands Series production 300 units /year starting 2011 Guido Kumbartzky 2009-02-12 7 BARD Engineering GmbH BARD-Group: Foundation solution BARD-Tripile Series production at the CSC in Cuxhaven 100 units/ year starting 2011 in two production areas with in total 600 jobs Tripile made up of steel piles connected by a transition triangle for water depths: pile length: Ø pile : Ø total construction pile weight: weight of transition triangle: Height tower flange service platform Guido Kumbartzky 2009-02-12 8 approx. approx. up to approx. approx. approx. 25 - 40 m 80 - 115 m 3,35 m 26 m 420 t 470 t 25 m LAT 18,5 m LAT Assembly and coating hall BARD Engineering GmbH BARD-Group: Wind Lift I : Installation Jack-up Barge • Developed with Gusto, NL • • • • • • • • • Construction: Western Shipyard in Klaipeda/Lithuania (Delivery 05/2009) approx. 100 m length and 36 m width Hydraulic legs approx. 70 m length Deployment up to 45 m water depth Payload 2.600 t Heavy lift crane for 500 t with 125 m hook height & secondary crane Attachable guiding frame and own pile driver ram Max. crew of 50 Ship operation by Otto Wulf, Cuxhaven Guido Kumbartzky 2009-02-12 9 BARD Engineering GmbH BARD Offshore 1: Grid Connection and Transformer Plattform Transformer platform: -- swimming & self-installing platform -- lattice like substructure -- 5 decks with service station, bunker and spare part storage area -- residential units for up to 40 persons -- BARD communication station and VTA -- helicopter deck In Germany the TSO is responsible for the offshore grid connection since December 2006: For BARD Offshore 1 this is E.ON Netz GmbH Deutschland Guido Kumbartzky 2009-02-12 10 BARD Engineering GmbH BARD Offshore 1: Construction Concept Deployment of vehicles: Installation vessel Wind Lift I – Installation and transport of major components Pontoons with towboats and assistence vessels (AV stationary) – transport of major components Service vessel – Transport of service personnel & transport of small parts (2,5- 3 m wave) Supply vessel – Supply, transportation of service- and maintenance containers Traffic safety vessel – Safe guarding of construction site Helicopters – Transfer of personnel Construction times: Foundation ca. 48 h WTG with Tower ca. 48 h Cabling ca. 24 h Transformer station ca. 2 weeks Guido Kumbartzky 2009-02-12 11 BARD Engineering GmbH BARD-Group: Harbor Logistics Loading port Emden: Nacelle and rotor blades Own heavy lifting platform and own portal crane Loading port Cuxhaven: Foundations, Towers by Co. Anbau und Smulders Own heavy lifting platform and own portal crane Wiking Helikopter: Wilhelmshaven/Norddeich Home port of the Wind Lift 1: Cuxhaven Reederei Wulf Roermond/Vlissingen (NL): Foundation piles Guido Kumbartzky 2009-02-12 12 Additional storage area in Brake BARD Engineering GmbH BARD Building GmbH, BARD Service GmbH and Training Center BARD Building GmbH: Installation BARD Offshore Training Center in Emden 2009 BARD Service GmbH: Service & Maintenance, A3 Offshore-Training Guido Kumbartzky 2009-02-12 13 BARD Engineering GmbH Slide 13 A3 BARD Service GmbH, nicht Services ABoguna; 24-10-2008 BARD-Group: Nearshore Project Hooksiel Transport of the Offshore Foundation BARD Tripile in Hooksiel in Cuxhaven on a self propelled modular transporters (SPMTs from Goldhofer) • • • • • • Guido Kumbartzky 2009-02-12 14 2-10 m water depth Test location for „BARD Tripile“ Test of the offshore logistics Training location for personnel Hub height: 90 m Total height : 151 m BARD Engineering GmbH Thank you for your attention! Your Contact: BARD Engineering GmbH Office Bremen Otto-Lilienthal-Str. 21 D-28199 Bremen Tel: 0049(0)421-59660-0 Fax: 0049(0)421-59660-420 web: www.bard-offshore.de Guido Kumbartzky 2009-02-12 15 BARD Engineering GmbH