Turning a Legacy Landfill into an Asset Presentation Outline
Transcription
Turning a Legacy Landfill into an Asset Presentation Outline
Turning a Legacy Landfill into an Asset April 13, 2015 Turning a Legacy Landfill into an Asset SWANA NJ Annual Spring Conference April 13, 2015 John Carlton, PE, BCEE, Gershman Brickner & Bratton, Inc. James Sherman, Esquire, McManimon Scotland Baumann, LLC Presentation Outline I – About GBB and MSB II – Challenges of Legacy Landfills III – A Brighter Way to Close a Landfill IV – The Edison Landfill Project V – Questions Gershman, Brickner & Bratton, Inc. 1 Turning a Legacy Landfill into an Asset April 13, 2015 Established in 1980 Solid Waste Management and Technology Consultants Helping Clients Turn Problems into Opportunities Established in 1971 Law Firm focused on New Jersey Renewable Energy, Brownfields Redevelopment, and Cutting Edge Financing Techniques 3 THE CHALLENGES OF LEGACY LANDFILLS 4 Gershman, Brickner & Bratton, Inc. 2 Turning a Legacy Landfill into an Asset April 13, 2015 5 “Legacy Landfill” is a landfill that ceased operations prior to January 1, 1982, and received household, commercial or industrial solid waste for disposal 6 Gershman, Brickner & Bratton, Inc. 3 Turning a Legacy Landfill into an Asset April 13, 2015 Challenges of Legacy Landfills Unlined and uncontrolled Closure and postclosure often unfunded NJAC 7:26-2A.9 does not require Closure and PostClosure Plan Quantity, location and nature of wastes undefined Legacy Landfill Law, June 26, 2013 7 A BRIGHTER WAY TO CLOSE A LANDFILL 8 Gershman, Brickner & Bratton, Inc. 4 Turning a Legacy Landfill into an Asset April 13, 2015 Source: PV Navigator 9 NJ Landfill Solar Projects as of 2012 Operational Design Pre-Design • 6 Projects • 17.9 MW • 5 Projects • 15.9 MW • 7 Projects • 25.2 MW Preliminary • 12 Projects • 73.1 MW 10 Gershman, Brickner & Bratton, Inc. 5 Turning a Legacy Landfill into an Asset April 13, 2015 Pennsauken Renewable Energy Park 11 BP Site in Paulsboro 12 Gershman, Brickner & Bratton, Inc. 6 Turning a Legacy Landfill into an Asset April 13, 2015 Geomembrane Solar (Atlanta) 13 THE EDISON LANDFILL PROJECT 14 Gershman, Brickner & Bratton, Inc. 7 Turning a Legacy Landfill into an Asset April 13, 2015 15 16 Gershman, Brickner & Bratton, Inc. 8 Turning a Legacy Landfill into an Asset April 13, 2015 Summary of Project 35 Acre Edison Landfill (post 1982) 35 Acre legacy landfill (pre 1982) Current closure fund insufficient Seeking a Design Build Own Operate (DBOO) contractor to close both sites and install utilityscale solar array 17 Project Goals Environmental protection • Engineered cap • Environmental controls • Long-term care Renewable energy • Utility-scale electrical generation Savings to the Township of Edison • Reduced closure/postclosure costs • Lease or other revenues 18 Gershman, Brickner & Bratton, Inc. 9 Turning a Legacy Landfill into an Asset April 13, 2015 What Makes This Project Different? Combined landfill closure and utilityscale PV project Request for Proposals to be issued (not a bid) Expected reduced construction costs Economics of PV project to support closure saving Township money 19 Project Schedule Closure Plan (9-12 months) Request for Proposals (6-9 months) Construction (24-36 months) 20 Gershman, Brickner & Bratton, Inc. 10 Turning a Legacy Landfill into an Asset April 13, 2015 Thank you! Questions and comments? John G. Carlton, P.E., BCEE Senior Vice President, GBB 908-319-5992 [email protected] James Sherman, Esq. Counsel McManimon Scotland Baumann, LLC 973-622-5672 [email protected] 21 Gershman, Brickner & Bratton, Inc. 11