presentation - Command and Control Research Portal

Transcription

presentation - Command and Control Research Portal
Headquarters U. S. Air Force
Integrity - Service - Excellence
Joint Expeditionary Force
Experiments (JEFX)
Lessons Learned
Mr. Bill Euker
AFC2ISRC/AFEO
UNCLASSIFIED
Overview
„
„
„
„
„
„
„
„
„
JEFX Overview
Concept Development
Initiative Selection Process
Evolutionary Acquisition
Design and Planning
Execution
Assessment
Reporting
Pathway to JEFX 06
Integrity - Service - Excellence
What is JEFX ?
„
Multi-national, Multi-service
„
„
Integration
Large-Scale C2
“Experiment”
Multi-functional exploration
Spiral development
„ End-to-end process
„ Rigorous assessment
„
„
Live-fly
Simulations
Multi-dimensional environment
Controlled, operationally- realistic
„ Live, virtual and constructive
simulation
„
„
A catalyst to accelerate critical
warfighting capabilities
Technologies
Integrity - Service - Excellence
Air Force Experimentation
Campaign Plan
Year
Past and Planned Experimentation Areas
EFX 98
Distributed Command and Control
JEFX 99
Integration of Air and Space and Coalition Warfare
JEFX 00
Agile Combat Support and TCT
APTX 2001
Alliance Information Sharing
JEFX 02
TCT, ISR Management, and Right-sizing the AOC (Global Strike)
2003
TCT using Paul Revere (an airborne C2 and ISR laboratory) (Global Strike)
JEFX 04
Network Centric Operations: Effects Based Operations, Predictive Battlespace
Awareness, Network Centric Infrastructure (Space and C4ISR)
APTX 2005
Network Centric Operations for an Integrated/Responsive Mobility Capability: GDSS II;
ACS processes for Base Opening; Tactical Collaboration (Global Mobility and
Space and C4ISR)
JEFX 06
Network Centric Operations: Continuous Air Planning and Execution; ISR Fusion;
ConstellationNet; HLS/HLD
Integrity - Service - Excellence
Concept Development
„
Senior leadership support is key
„
„
Senior mentor involvement helpful
Some concepts require long-term campaign
TCT…TST…
„ EBO
„
„
Collaborative process is required
Doctrine Center, Air Staff, Industry, Battle Labs ….
„ Well developed concepts with documentation and
communities of interest understanding needed
„ AF CONOPS provide experimentation foundation
„
Integrity - Service - Excellence
CONOPS Construct
Global Power
Global Reach
Global Vigilance
Integration CRRA
Global
Strike
CONOPS
Homeland
Security
CONOPS
Global
Mobility
CONOPS
Global
Persistent
Attack
CONOPS
Nuclear
Response
CONOPS
Space &
C4ISR
CONOPS
Integrity - Service - Excellence
Agile Combat
Support
CONOPS
Initiative Selection Process
„
Step 1 – Define the Capability Gaps
Capability Review and Risk Assessment (CRRA) process
„ Functional needs analysis
„
„
Call for Initiatives
Consider both processes and technology
„ Industry vs AF spiral development IPT portfolios
„ Pay-to-play has worked
„
„
Initiative Selection
85 percent able to transition within 6-18 months
„ Standardized Risk, Cost, and Performance criteria needed
„ Classified and Joint initiatives need to be part of process
„
Integrity - Service - Excellence
Evolutionary Acquisition
„
„
„
Program
funds to
transition
initiatives
Staff to
manage
transition
100.0%
100.0%
12
11
11
10
80.0%
9
63.6%
Goal = 65%
8
60.0%
W/In 18 Months
40.0%
Total Transitioned
20.0%
Approved Initiatives
0.0%
6
4
2
0
JEFX 02
JEFX 04
Integrity - Service - Excellence
JEFX 06
# of Initiatives Approved
„
Require initiative Transition Plans before EndEx
Require sponsor commitment to POM for sustainment
Involve the System Program Office early in the process
% of Initiatives Transitioned
„
Experiment Enterprise
„
An established core team is key to success
„
„
„
„
„
“The Experiment Enterprise”
Engineers, professional control force, experiment
management, assessment, communicators,
operators
Team embedded in existing organizations
enables networking and management
flexibility
Senior mentors provide useful role in advising
control, assessment and operators
Team continuity crucial
Integrity - Service - Excellence
JEFX 04 Distributed Sites
Threat Broadcast
Voice, Data, Imagery
JSTARS
AWACS
Combat
Forces
RJ
Mobility Aircraft
AFWA / STRATCOM
Live Fly
14 AF
AOC
AFSPC
CAOC
AAMDC / Patriot
NRO / NGA
TACC
vv
FECC
CFLCC
vv
DGS-X
AF M&S / Exp Control /
JSOTF / JSOAC
AFIWC
Integrity - Service - Excellence
Collaboration via a Portal
Jefxlink.langley.af.mil
Web Tools
Integrity - Service - Excellence
Design and Planning
Critical Path to Spiral 3
p. 5
„
Coalition
involvement
requires long-term
effort, additional
resources, and
senior leadership
commitment
CDS / DSAWG Process
Sp 2
39
29 Mar-7 Apr 04
42
43
44
49
45
50
ES C /C X E
40
A C C /S C S C
41
42
43
44
D IS A / D S A W G
A F EO
A F EO
A F EO , ES C /C X E
45
46
47
48
ES C /C X E
A F EO , ES C /C X E
A F EO , ES C /C X E
A F EO , ES C /C X E
49
ES C /C X E
50
51
52
ES C /C X E
ES C /C X E
ES C /C X E
Stopped
Yellow
40
46
51
39
Red
„
23 Jan 02
In Progress
41
47
48
52
Spiral 3
17-26 May 04
R e v ise J EF X 0 4 S S A A s to re fl e ct S p i ra l 2 re su lts a n d
su b m i t to A C C fo r co n n e c ti o n a p p ro va l a n d D S A W G fo r
a u th o rity to h o st n o n -U S p e o p le .
D A A A p p ro ve a n d su b m i t S P 3 S I P R N ET JEF X 04
S S A A 's to D I S A fo r co n n e ctio n a p p ro va l
P ro vi d e S I P R N ET co n n e ctio n a p p ro va l w i th o r w i th o u t
fo re ig n n a tio n a ls
S u b m i t i n fo rm a ti o n fo r C D S tic ke t a ssi g n m e n t
C D S ticke t n u m b e rs a ssig n e d
C o n d u ct in fo rm a l b rie fin g to C D S
S u b m i t te ch n ic a l d o c u m e n ta ti o n fo r e a c h g u a rd
im p le m e n ta tio n (S S A A d o cu m e n ta tio n
C D S a p p ro ve s i m p le m e n ta tio n (IA T O fo r G u a rd s)
C o n d u ct a p p ro va l b rie fin g to D S A W G
O b ta in D S A W G A p p ro va l
Id e n ti fy a ll syste m s a n d so ftw a re u se d o n th e C o a li ti o n
L A N o r a n y syste m o r so ftw a re a cc e ssi b l e b y C o a li ti o n
p a rticip a n ts in th e C o a li ti o n e n cla ve
C o n tra ct o w n in g a g e n cy a n d co m p o se re le a se
so ftw a re a n d syste m d o cu m e n ta tio n fo r su b m issi o n to
S A F / IA
O b ta in re le a se a p p ro va l
P u rch a se Eq u ip m e n t fo r IS S E a n d R M G u a rd s
White
Pending
Green
Complete
Operational threads are a useful experiment design
and assessment framework
Integrity - Service - Excellence
Army Close Air Support, Situational
Awareness (ACASSA)
Addressed CSAF guidance
to close AF-Army seams in
Blue Force Tracking (BFT),
close air support, and
flexible reconnaissance
„ JFCOM/J8 used this
initiative to partially satisfy
Congressional
requirement to do BFT
experimentation
„ Navy participated using
their F/A-18 to receive BFT
in the cockpit
„
Integrity - Service - Excellence
Headquarters U. S. Air Force
Integrity - Service - Excellence
Design Process Overview
I-CRRA
Capability
Gaps
NCO Conceptual
Framework &
Attributes
1
2
4 CDT Formation
CDT-1
CDT-2
CDT-n
Sponsor:
Sponsor:
Sponsor:
DO/IN/
DO/IN/
DO/IN/
Support
LG/SC/
LG/SC/
LG/SC/
CDT-1
CDT-2
CDT-n
IPTs
8AF Sponsor:
8AF Sponsor: 8AF Sponsor:
CDT Member DO/IN/
CDT Member DO/IN/CDT MemberDO/IN/
Comm
Support
LG/SC/
LG/SC/CDT MemberLG/SC/
CDT Member
M&S
CDT-1
CDT-2
CDT-n
IPTs CDT Member 8AF
8AF
Sponsor:
Sponsor: 8AF Sponsor:
CDT Member
CDT Member
CDT Member
Coalition
CDT Member DO/IN/
CDT Member DO/IN/CDT MemberDO/IN/
Comm
Support
LG/SC/
LG/SC/CDT MemberLG/SC/
CDT Member
M&S
CDT-1
CDT-2
CDT-n
IPTs CDT Member 8AF
8AF
Sponsor:
Sponsor: 8AF Sponsor:
CDT Member
CDT Member
Etc.
CDT Member
CDT Member
Coalition CDT MemberCDT Member
CDT Member DO/IN/
CDT Member DO/IN/CDT MemberDO/IN/
Comm
Support
LG/SC/
LG/SC/CDT MemberLG/SC/
CDT Member
M&S
IPTs CDT Member 8AF
8AF
8AF
CDT Member
CDT Member
Etc.
CDT Member
CDT Member
Coalition CDT MemberCDT Member
CDT Member
CDT Member
CDT Member
Comm
…
…
CDT Member
CDT Member
…
…
…
…
…
Color Legend:
Info given from
external
authorities.
Info produced by
the JEFX Planning
Process.
CDT Member
CDT Member
CDT Member
CDT Member
CDT Member
CDT Member
CDT Member
CDT Member
…
CDT Member
…
…
…
5 Success
Indicators
…
…
…
…
Coalition
Etc.
…
…
…
…
M&S
Etc.
…
Capability
Capability
Goal
Capability
Goal
Capability
(CG)
Goal
(CG)
Goal
3 (CG)
(CG)
CDT Member
6 Experiment
Methods
(Threads)
7 Call for
Initiatives
8 Initiative
Selection
10 Support Plans
9 Ops
Threads
Integrity - Service - Excellence
•
•
•
•
•
Scenario & MSELs
Live Assets
M&S
C&A
Etc.
Planning
TOTAL JEFX ENTERPRISE
TOTAL STRATEGIC SITES (NON-NELLIS)
TOTAL NELLIS ENVIRONMENT
NELLIS UPRANGE AND COMPOUND
CAOC-N SUPPORT-ASSESSOR-CONTROL
CAOC PARTICIPANT STAFF (P00-P11)
CFACC & STAFF (P00)
CFACC LEADERSHIP (P00)
CFACC (Floor)
CFACC (Office)
Commanders Conference Room
ADVISOR TO CFACC 2
DEP CFACC RAF
DIRMOBFOR
ADVISOR TO CFACC
I
CFACC AIDE
ntegr
P00
P00
CONF
P00
P00
P00
P00
iP00
ty
-
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
001
KLSV 202
001
KLSV 202
001
KLSV 202
002
KLSV 202
003
KLSV 202
004
KLSV 202
007
KLSV 202
S
e
r
vice
008
KLSV
202-
636
0
636
119
121
396
17
14
1
120
2 218
2 211
1
120
1
120
1
120
2
218
E2x c 218
el
l
C4
A1
211
C3
C5
C2
A2
e
A3n c
e
0
0
0
0
0
0
0
0
1 cfacc
2 cfacc
1 cfacccon
1 acfacc2
1 dcfacc
1 dirmob4
1 acfacc1
1 cfaccade
0
0
0
0
0
0
0
0
695
0
695
120
73
502
26
20
2
2
1
2
2
2
2
1
CPCC Assr
PC Scr
ID Assgnd
UserLogin
Computer
Seat
Room
Bldg
Site
ULN
CREW POSITION
Floor
Configuration control is a process that requires a
tracking and collaboration tool – Operator, Position,
System, Application, Training, Hardware (OPSATH)
PNum
„
54
1
53
0
53
0
0
0
Execution
„
„
„
„
„
Spiral
development
process
benefits from
permanent
infrastructure
Professional
control force
is not a luxury
Experimentation is harder than “real-world”
Combined large-scale exercise and experiment is not
ideal
End-to-end validation requires live fly
Integrity - Service - Excellence
Assessment
•
Data Collection, Translation, & Visualization:
– Real-time & Post-test Input
– Translation into Common Format and Storage
•Trackers
Quick-Look
Stats/Plots
I/O
Services
Data
Logger
Scenario
Gen/Ex
Environment
Generation
Shared
Memory
„
•Fighters
•SAMs
•Behaviors
Translator
2D/3D
Viewer
•Truth
•Track
•Data Link
Log
File
= Supplemental Interfaces
„
User-Def & •Sensors
Local
•Data Links
Models
Posttest
Data
Sources
Real-Time
Event
Database
Data
Reduction
Post-Test
Ground-truth and timely C2 debrief is a challenge
Automate data collection and analysis to meet timeline
Integrity - Service - Excellence
Reporting
„
„
„
„
Web-based
reports
Use portal and
document
management
tools for report
writing
Write reports on
network that
supports release
Frame recommendations in DOTMLPF terms,
validate with senior leadership, and track actions
Integrity - Service - Excellence
JEFX 06 Way-ahead
„
Achieve and field four capability goals with Joint and
Coalition play (4-Eyes) using a JFCOM-approved,
real-world scenario
Continuous Air Planning and Execution (CAPE)
„ ISR Fusion (ISR)
„ ConstellationNet (CN)
„ Homeland Security / Defense (HLS/HLD)
„
„
Accomplish four overall effects
Tighten CAOC integration: reduce applications, H/W, and
seats via TBONE
„ Prepare for fielding of TBONE by conducting DT/OT
„ Expand datalink use
„ Extend network to link Operational-to-Tactical
„
Integrity - Service - Excellence
JEFX 06 Draft Major Event
Schedule Spirals & MainEx
S
O
2005
N
D
J
F
M
2006
A
M
6 - 29 Sep 05 – Infrastructure Build
3 - 9 Oct 05 – TBONE/TBMCS DT
11 - 15 Oct 05 – Spiral 1
28 Nov - 22 Dec 05 – Infrastructure Build
3 - 15 Jan 06 – TBONE/TBMCS DT
17 - 27 Jan 06 – Spiral 2
2 - 28 Feb 06 – Infrastructure Build
28 Feb - 10 Mar 06 – TBONE/TBMCS DT
12 - 20 Mar 06 – Spiral 3 (live fly 2-3 days)
Infrastructure
Testing
Experimentation
Teamed with Acquisition,
Labs, Testers, and Operators
27 Mar - 17 Apr 06 – MainEx Build
17 - 29 Apr 06 – OT
1 - 13 May 06 – MainEx (live fly 4 days)
Integrity - Service - Excellence
Summary
„
„
„
JEFX has captured Experimentation Management
Lessons Learned since 1998
Design, Planning, Execution, Assessment and
Reporting of large-scale C2 experiments continues to
evolve
JEFX 06 will continue to explore innovative ways to
speed the transition of capabilities to the warfighter
by pushing the envelope and leveraging test and
experimentation
Integrity - Service - Excellence
Integrity - Service - Excellence
Operational Level Way Ahead
06
07
08
09
OT
Notional
10
11
New Capability
New Capability
05
Application Development1
3rd Party Applications2
Air & Space Applications
JEFX
JC2
(AF Capabilities)
OT
AOC WSI Integration
Field, Sustain, Maintain, Integrate
AOC WSI Infrastructure
AOC WS
OT
Modernize with 2 yr dev/test/train/field cycle with spiral fielding spaced between
Standardize with 10.1
10.2
Integrity - Service - Excellence
10.3
JEFX 04 Initiatives
JEFX… accelerating capabilities to the warfighter
ISISP
Enhances C2 of space
forces
M2M Weather
Automated weather to the
AOC
SIRS
Vest
Detect and locate
SATCOM jamming
Automated basing
decisions
TTNT
GCS
Tactical wideband
networking
M2M synchronization of
CAF/MAF C2 systems
DLARS
GRIDLOCK
Enhances SA and BDA
through Link-16
Point and click coords
from video imagery
JSCOPE
BCC-X
Synch COP with SOF
C2 nodes
Next generation control
and reporting center (CRC)
Army CAS/ SA
Close USA/AF Seams; BFT;
CAS
Project Suter III
Horizontal integration of Nat’l,
tactical and IO C4ISR assets
PBA/EBO
Joint / Coalition Battlespace
NCCT
M2M sensor collaboration of
C2ISR assets
Integrated architecture
to support PBA and EBO
ICCOPI
Integrates air, space & C2
Integrity - Service - Excellence
What’s Come Out of JEFX?
Empirically validate capabilities
Developing and Refining
Warfighter Processes
ƒUsed Non-traditional sensors
(2002)
Evaluate emerging technology
Rapidly Transitioning
Warfighting Systems
ƒTheater Battle Management/
Space Battle Management Core
Systems (1999)
ƒReduced TPFDD from 2 days to 4
mins (1999)
ƒIntegrated Space into AOC
operations (1999)
ƒDeveloped Coal Warfighter IO Tools (2000)
ƒImproved Dynamic ISR Management (2002)
ƒReduced the Combat
Search and Rescue tasking
timeline to < 1 hour (2002)
ƒCombat Track II (1998)
ƒADOCS (2002)
ƒProject Suter III (2004)
ƒACE Portal (2004)
ƒBroadsword (1999)
ƒB-2 C2 for Rapid Halt (1999)
ƒGlobal Air Mobility Operational Display (1999)
ƒB-1 Enroute Retargeting Capability (1998)
ƒEnhanced Distributed Ops (1999)
ƒCollaborative Tools (1998-2002)
ƒReduced MAAP by 30% (2002-2004)
ƒAgile Combat Support Logistics Tools (1999)
ƒDecreased Time Critical Targeting
from hours to minutes (2000-2004)
ƒDesigned AOC IM Plan (1999-2004)
ƒTime Sensitive Targeting (2004)
ƒAgile Combat Support Processes (2004)
Provide DOTMLPF Recommendations
Improving Warfighter
Information
ƒEstablished baseline for AOC (2000)
ƒIncreased the TCT prosecution success by
90% using datalinks (2000)
ƒImplemented first-ever theater-wide Integrated
Services Digital Network (2000)
ƒSlashed decision cycle with 600% increase in
data/video throughput (1998)
ƒUsed airborne platform to direct ISR sensors and
strike platforms- a first (2002)
ƒDeveloped an affordable COTS solution for
distributing Predator and other ISR video to
multiple locations (1999)
ƒTime Critical Targeting Functionality (2002)
Spot Target
ƒMoving Target Information Exploitation (2000)
ƒMachine to Machine Weather (2004)
ƒMulti-Asset Synchronizer (2004)
ƒSATCOM Interference Response System (2004)
Sensor
Field of View
Automatic
SIGINT Overlays
Wide Area
Search Box
Sensor LOS to Target
Auto Collection Planning
Direct Uplink to Sensor
Define/Import
Flight Track
Aircraft
Position
Monitoring
ƒReduced effects
of satellite
latency from 2
hrs to 11 mins
(1998)
ƒIntegrated AccessNet and Global Broadcast
Service (1999)
ƒValidated and increased LAN speed 10X using
GigE (2000)
ƒTactical Targeting Network Technology (2004)
ƒNetwork Centric Collaborative Targeting (2004)
KNOWLEDGE FORIINFORMED
PROCESS
n t e g r iDECISIONS
t y - S e rTO
v iINFLUENCE
c e - E x THE
c e lMODERNIZATION
lence
MainEx – Exp 1st
17 Apr – 11 May 06
Sun
Mon
Tue
Wed
Thu
Fri
Sat
16 Apr 06
17 Apr 06
18 Apr 06
19 Apr 06
20 Apr 06
21 Apr 06
22 Apr 06
Easter – OFF
Players
Arrive
In-Brief
23 Apr 06
24 Apr 06
25 Apr 06
g
rainin
T
t
n
rime
Expe
MiniEx
Experimentation
LF Arrival
Aircrew
Tng
27 Apr 06
28 Apr 06
29 Apr 06
LF
Hotwash
MainEx
H/W & RTB
26 Apr 06
Live-Fly
Backup
Experimentation
30 Apr 06
01 May 06
Backup
Config Rst
& OT Tng
02 May 06
03 May 06
Live-Fly
Config
Reset
04 May 06
Regression Testing
05 May 06
06 May 06
Operational Testing
OTRR
AIPT RTB
Data Reduction/ Quick Look Prep
07 May 06
Backup
08 May 06
09 May 06
10 May 06
Operational Testing
11 May 06
12 May 06
13 May 06
Save Test
Config
CAOC T/D
Integrity - Service - Excellence
MF 39