B H A N E S S T E E L

Transcription

B H A N E S S T E E L
B H A N E S
T he
P er fe ct
S T E E L
Co n ne c t or s
PROFILE
About Us:
Bhanes Steel initially started with two experienced Xsteel modelers jointly working with one of the
engineering & fabrication company two years ago. Today Bhanes Steel having well trained and
experienced Xsteel modelers with Tekla Licenses.
Bhanes Steel, have excellent experience as an individual detailing company serving to support the
Engineering & Fabrication companies in Oil & Gas, Power, Petrochemical, Process Industries,
Cement Plants and also Commercial Projects. Our Engineering solutions contribute to better business
outcome for clients.
With our dedicated staff of Engineers & Designers we have the capability of handling projects of all
sizes. The services afford by us are Good in the industry in the field of any kind of Structural
Engineering
Infra Structures:
Office Space:
1000 Sq.m
22 High configured Work Stations with 1Gbps Network connections
24 hrs 512 kbps Internet
Unlimited FTP Server
5000 E-mail Id’s
Software:
Structures - Xsteel & Auto Cad
Capability of Detailing in Xsteel:
3000 - 3500 Tons per month*
Our Strength:
1) 1 Structural Engineer
2) 26 Xsteel Operator
3) 2 Cad Draughtsmen
* We can mobilise more licenses and Xsteel modelers depends upon the project size/quantity.
w w w . b h a n e s s t e e l . c o m
P .O. Box : 215798, Dubai, U.A.E
Tel: +971 4 268 2208 Fax: +971 4 268 2207
Email: [email protected]
B H A N E S
T he
S T E E L
P er fe ct
Co n ne c t or s
Staff Experience:
A) Design:
1. Designer 1 - 2 years in Structural steel Design and Detailing
B) Detailing:
Name
X Steel Experience
1. Detailer - 1
- 5 years
2. Detailer - 2
- 3 years
3. Detailer - 3
- 4 years
4. Detailer - 4
- 31/2 years
5. Detailer - 5
- 2 years
6. Detailer - 6
- 2 years
7. Detailer - 7
- 1 year
8. Detailer - 8
- 2 years
9. Detailer - 9
- 11/2 years
10. Detailer - 10
- 11/2 years
11. Detailer - 11 – 26
- 3 years
Projects Handled:
Total Experience
- 9 years
- 8 years
- 6 years
- 6 years
- 8 years
- 5 years
- 3 years
- 4 years
- 3 years
- 3 years
-6 years
1.
Chiyoda
- 1800 Tons
-
Oil and gas - Abu Dhabi
2.
IHI
- 1500 Tons
-
Qassim Cement Factory
3.
Petrofac
- 650 Tons
-
Rag and Flare Mitigation
Integrated Project
4. Alstom
- 430 Tons
-
FCC Seawater Scrubber Project
5.
Emirates Engg Center
- 800 Tons
-
Emirates Hanger - Misc. Structures
7.
Sidem
- 250 Tons
-
Layyah Power Station
8. Kirchner Italia
- 400 Tons
-
Ras Laffan QP
9. Bechtel
- 3400 Tons
-
Sohar Smelter Project
Projects Recently Completed:
1. Qurayyah Seawater Plant – Snamprogetti
-6000Tons
-
Completed
2. Saudi Arabian Oil Company – Khurais
-4800Tons
-
Completed
3. Chiyoda-Technip JV (CTJV)
Qatar RasGas – Train 6 & 7
-6500Tons
-
Completed
4. Olefins plant – Yanbu - Technip
Italy
-1800Tons
-
Completed
5. Yemengas LNG – Technip Italy
-1800Tons
-
Completed
6. FPSO top side Modules – Saipem
-2500Tons
-
Completed
7. Aweer Gas Turbine power Station
(Station H – Phase III) – Fichtner Gmbh
-4000Tons
-
Completed
8. Rabigh Expansion – Technip Italy
(Misc. Steel Detailing)
- 800Tons
-
Under Progess
9. Dubai Metro – Concourse Structure
-2000 tons
-
Under Progress
w w w . b h a n e s s t e e l . c o m
P .O. Box : 215798, Dubai, U.A.E
Tel: +971 4 268 2208 Fax: +971 4 268 2207
Email: [email protected]

Similar documents