Presentation PDF File
Transcription
Presentation PDF File
Yi-Hsuan Tu, National Cheng Kung University Adrian Tola, Virginia Tech University Forrest Lanning, Miyamoto International EERI / Hemant Kaushik April 16, 2016 Ecuador Earthquake EERI Learning from Earthquakes Briefing Webinar EERI team: Forrest Lanning, Mei Kuen Liu, Arturo Schultz, Gabriela Haro, Hector Monzon, Alberto Jose Monzon, Adrian Tola PERFORMANCE OF HOSPITALS Adrian Tola T. Virginia Tech EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospitals visited Chone Bahia de Caraquez Bahia de Caraquez Chone Manta Portoviejo Portoviejo Manta Hospital City Day of visit (days after earthquake) IESS Manta 05/09/2016 (23) No operational IESS Portoviejo 05/10/2016 (24) Operational SOLCA Portoviejo 05/10/2016 (24) 1st floor operational, others NOT Miguel Hilario Alcivar Bahia de Caraquez 05/11/2016 (25) No operational Napoleon Davila Chone 05/12/2016 (26) No operational EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Status Structural System Typical: - Concrete Moment Frames at all bays (not just at the perimeter), with concrete “waffle” slab. IESS (Manta) - Concrete Moment Frames (particularly at the exterior bays) are usually infilled with unreinforced masonry (URM). - Interior partition walls are also made of URM, with very week attachments to resist out of plane forces. SOLCA (Portoviejo) EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Structural System - Old hospitals used to be built in segments; where each of them could have different height, structural system, and age. Napoleon Davila (Chone) Bahia Bahia EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital IESS (Manta) Roof of 1st story www.eldiario.com.ec EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake MANTA 2.0 Hospital IESS (Manta) AMNT-N SA (g) 1.5 AMNT-E 1.0 0.5 0.0 0 1 2 3 Period (sec) Roof of 1st story ●PGA from station in Manta: 0.52 g (Ref. only) Report # 18. AMNT Station. Geophysics Institute of the National Polytechnic School (Ecuador) EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake 4 Hospital IESS (Manta) ● Severe cracking or total collapse of several interior and exterior walls made of unreinforced masonry. ● Lack of proper attachment for mechanical equipment. EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital IESS (Manta) EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital IESS (Portoviejo) PORTOVIEJO 2.5 APO1-E APO1-N SA (g) 2.0 1.5 1.0 0.5 0.0 0.0 1.0 2.0 3.0 Period (sec) 4.0 Courtesy of Hector Monzon ●PGA from station in Portoviejo: 0.38 g (Ref. only) Report # 18. APO1 Station. Geophysics Institute of the National Polytechnic School (Ecuador) EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital IESS (Portoviejo) ● Operational now. Shut down for short time after the earthquake. ● No cracks observed in stairs / corridor / hallways. ● Crack observed at seismic joint. EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Multy-story building 1 story building Roof of 1st story EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake http://www.viewphotos.org/ecuador Hospital SOLCA (Portoviejo) Photo taken before the earthquake Hospital SOLCA (Portoviejo) No ties observed in this region ● Picture on the left shows pieces of interior wall in the floor, due to inappropriate construction system of these walls. ● Picture on the right shows structural damage in one of the columns. EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital SOLCA (Portoviejo) Upper floors EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital SOLCA (Portoviejo) 1 story building EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital Miguel Hilario Alcivar (Bahia) Shear Walls Front view Shear Walls Lateral view ● This hospital was retrofitted in 2000 after a M7.2 earthquake in Bahia in 1998. ● Part of the seismic retrofit included the cast of 6 shear walls, and jacketing of some concrete columns at the perimeter. EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital Miguel Hilario Alcivar (Bahia) Steel Angle EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital Miguel Hilario Alcivar (Bahia) ● No attachment of partition wall. EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital Miguel Hilario Alcivar (Bahia) ● Severe cracking of URM walls was observed in the 1st floor; however, several off these walls did not fall down towards the ground. Smaller drifts due to rigidity of shear walls might have influence on this behavior ?? EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital Miguel Hilario Alcivar (Bahia) Upper floors ● Minor damage in some walls at levels other than the 1st one. EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital Napoleon Davila (Chone) CHONE 2.0 ACHN-N SA (g) Block 1 Block 2 ACHN-E 1.5 1.0 0.5 Block 3 0.0 0.0 1.0 2.0 Period (sec) Block 3 3.0 4.0 Block 2 ●PGA from station in Chone: 0.37 g (Ref. only) Report # 18. ACHN Station. Geophysics Institute of the National Polytechnic School (Ecuador) Block 1 EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Block 2 Block 3 Hospital Napoleon Davila (Chone) ●Significant damage in Block 2. due to crashing with adjacent blocks. EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital Napoleon Davila (Chone) Block 3 Block 2 Block 1 ●Permanent Deformation in Block 2 EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospital Napoleon Davila (Chone) Upper floors Level 3 Level 4 Level 5 EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake Hospitals - Conclusions ● Poor performance of interior/exterior URM walls. Major damage was concentrated at the first two stories for multi-story building segments, with the exception of the Hospital IESS in Manta, where all the stores had poor behavior of URM. ● Minor damage observed in structural system (beams & columns). ● Good performance of seismic retrofitting techniques, as observed in the Hospital Alcivar in Bahia. ● Damage caused by inadequate separation at seismic joints could have been avoided. IMPORTANT: Few casualties within these hospitals at the time of the earthquake. THOUGHTS: - Level of damage in hospitals that implies DEMOLITION ?? - Costs of Retrofit vs. New Construction vs. INSTRUMENTATION ?? - Awareness of structural engineers in using URM for partition walls ??? OTHER TEAMS: - Eduardo Miranda, Stanford University - Enrique Morales, University of Buffalo. EERI LFE Briefing for the April 16, 2016 Ecuador Earthquake