¿De Bo - United Independent School District
Transcription
¿De Bo - United Independent School District
District Growth Page 2 Bond Project Summary Page 4 Voting Information Page 6 Visit the School Bond 2013 website at www.uisd.net for more information New Schools For Increased Enrollment.............................................................$341,669,787 14 new schools: 7 elementary schools (Replacement of Salinas and Clark Elementary Schools) 3 middle schools, and 4 ninth grade campuses Safety and Security................................................$10,995,101 • Security stations at main entrance of all campuses • Building access control panels for perimeter doors at all campuses • Upgrade security surveillance camera systems • Replacement of fire/security alarm systems, public address systems and exit door panic devices at various campuses Technology..............................................................$22,023,377 • District-wide wireless network upgrades • Network infrastructure upgrades at various schools • District-wide instructional video distribution system • District-wide instructional interactive technology Additions, Renovations & Fees.............................$34,024,284 • Renovations • Building Additions • Bond Issuance Costs Total............$408,712,549 How Will the 2013 Bond Referendum Affect Property Taxes? Projections indicate that a bond referendum in the amount of $408.7 million would require an Interest & Sinking (I&S) tax rate increase of about $0.12930 per $100 valuation by the year 2018, starting with an increase of 3 cents in the year 2015. Passage of bonds only affects the I&S tax rate and not the Maintenance & Operations (M&O) tax rate used for the operating budget. For the bond referendum that passed in 2003, United I.S.D. voters authorized a 16 cent I&S tax rate increase. In reality, United I.S.D. only increased the tax rate by half the amount of the 16 cents (8 cents). In fact, United I.S.D. has had the same I&S tax rate of $0.15486 since 2007. Over-65 Tax Exemption Persons 65 years of age or older, who have a homestead exemption, will be exempt from tax rate increases unless new improvements are made to the home. Because United I.S.D. offers a 15 percent local homestead exemption, coupled with a state $15,000 homestead exemption, an average homeowner’s value of $137,400 is taxed on $101,800. The chart below shows the referendum’s maximum potential tax impact by 2018 on homesteads of various values in United I.S.D. A tax calculator worksheet is available on www.uisd.net under United I.S.D. 2013 Bond to assist in calculating the maximum potential tax impact of a home. Appraised Annual Value Increase $75,000 $100,000 $125,000 $137,400 $150,000 $175,000 $200,000 $63.03 $90.51 $117.99 $131.62 $145.46 $172.94 $200.42 Cost/ Month $5.25 $7.54 $9.83 $10.97 $12.12 $14.41 $16.70 It is the policy of the United Independent School District not to discriminate on the basis of race, color, national origin, sex, or disability in its Educational programs, services or activities, as required by Title VI of the Civil Rights Act of 1964, as amended; Title IX of the Educational Amendments of 1972; the Age Discrimination Act of 1975, as amended; and Section 504 of the Rehabilitation Act of 1973, as amended. Page 2 Bond Election Called to Address Enrollment Growth S ince 1961, United I.S.D. has provided its students with superior academic programs and a broad range of extracurricular activities. From its humble beginnings as a small school District serving approximately 340 students, United I.S.D. has grown into a District that currently serves over 42,900 students in 26 elementary schools, 9 middle schools, 4 high schools, 1 alternative education campus, and one special program facility (Cherish Center). It is essential to note that United I.S.D. is the second largest school District in Region One, which encompasses the South Texas border area, and is the 25th largest District in Texas by enrollment. Over the last decade, United I.S.D. has seen more than 10,000 new students enroll. The growth and economic development of the City of Laredo is on the rise and highly evident. More than 96 percent of residential permits issued by the city are within the United I.S.D. boundary. Projections indicate that United I.S.D.’s student enrollment will be 46,921 within the next five years. In Spring 2013, the Superintendent and the Board of Trustees established a 121 member Citizen’s Bond Committee, comprised of community members and teachers, to study the needs of a growing District. What followed was the committee members’ three month study process. The planning process culminated in the Citizen’s Bond Committee presenting a bond proposal to the Board on July 31st. The Board reviewed the proposal and then unanimously voted on August 21st to place a bond referendum in the amount of $408.7 million on the general election ballot for November 5, 2013. The bond would fund the construction of 14 new schools, the renovation of existing facilities, and address the technology and safety needs of the District. Five Year Enrollment 46,921 Projection 45,796 students 44,886 students 44,066 students 43,321 students 42,921 students 42,282 students 40,906 41,853 students students students 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 District-wide enrollment projected to in the next five years increase by 4,000 Bond to Address Aging Facilities to Receive Technology, Safety Repairs & Improvements & Security Needs The Citizen’s Bond Committee recommended technology improvements in the amount of $22 million for the 2013 Bond Referendum. The planned technology improvements will include: • District-wide wireless network upgrades; • Network infrastructure upgrades at various schools; • District-wide instructional video distribution system; and • Installation of digital interactive technology in classrooms across the District. The Committee also addressed the safety and security needs of the District by recommending $10.9 million in upgrades. Plans to enhance security and safety include: • Construction of security stations at the interior main entrances in all campuses; • Installation of building access control panels at perimeter doors in all campuses; • Security surveillance systems upgrades; and • Replacement of fire and security alarm systems, as well as, exit door panic devices at various campuses. Planned new construction will address student growth, yet many existing buildings need a variety of repairs and improvements Currently, United I.S.D. has 18 campuses that were built at least 20 years ago, three of which were built more than 40 years ago. The District has a maintenance department which repairs and provides upkeep for our buildings, increasing the life expectancy of the facilities and building systems through a maintenance plan. Still, our oldest facilities need renovations due to their age. Needed renovations include air conditioning systems, floors, electric wiring, etc. Members of the Citizen’s Bond Committee analyzed significant amounts of data that supported their decision to recommend $30 million in renovations and upgrades in the 2013 Bond Referendum. The Committee considered: curricular requirements for all grade levels; requests and recommendations from principals and other building administrators; information from a facilities assessment conducted by outside consultants; and input from District facilities and maintenance department personnel. The Committee also reviewed the estimated life expectancy of building systems and materials. For a listing of other renovations included in the bond referendum, go to United I.S.D. 2013 Bond at www.uisd.net. Page 3 Enrollment is projected to grow by over 4,000 students within the next five years. llment for ro n e d te c je ro P r is 43,321. this school yea FOR CHILDREN 44 schools: f o d e s ri p m o c The District is chools, 4 high s le d id m 9 , ls schoo grade center, th ix s 26 elementary 1 r, te n e th grade c ve school, ti a rn e lt schools, 1 nin a 1 r, . ood cente herish Center) 1 early childh (C y it il c fa m ra prog and 1 special s follows: a e r a s g Bond ratin d Poor’s is A+, an Standard ch’s AA-. it F d n a 2 Aa Moody’s is ’s Bond n e iz it C r e mb A 121-me udied the present e st Committe eeds of the District n and future summer of 2013. during the tee submitted a it The Comm ion for the Board’s dat . recommen n on July 31, 2013 tio considera Trustees called a bond election on August 21, 2013, for Tuesday, Nov. 5th, in the amount of $408.7 million. The projected maximum I&S tax impact to the owner of a $100,000 home is $90.51 a year, which is about $7.54 a month. The District has been awarded the Government Financial Officers Association (GFOA) certificate for Excellence in Financial Reporting for the past 14 years. Over 2,700 stu dents graduated fro m high schools in our four June 2013. United High S choo the distinction l earned of having the largest gra duating class in the history of schools at 925 Laredo graduates. nsports a r t . .D S I. United dents on a 3 u t s 0 0 ,0 4 1 8 hin its 2,4 it w is s a b daily oundary. b e il m e r squa nked the 25th United I.S.D. is ra trict out of largest school Dis ol Districts in 1,232 public scho in the nation. Texas and 105th 95% of the District’s boundary is still undeveloped. 96.2% of all City of Laredo residential permits issued are within the United I.S.D. boundary. United I.S.D. has a total of 326 portable classrooms at different campuses throughout the District, which equals to 9 elementary schools. As a result, 8,150 students receive instruction in a portable classroom. Page 4 2013 BOND PROJECT SUMMARY I. NEW SCHOOLS Cost($) Sub-Total Cost Total Cost Quantity Elementary Schools Middle Schools 5 3 $ 17,433,884 $ 87,169,420 $ 22,453,499 $ 67,360,497 9th Grade Campuses Replacement of Salinas Elementary Replacement of Clark Elementary Off-site Development Costs 4 1 1 $ 38,903,918 $ 155,615,672 $ 13,886,589 $ 13,886,589 $ 13,886,589 $ 13,886,589 $ 3,751,020 $ 3,751,020 $ 2,139,000 $ 2,139,000 $11,254,377 $11,254,377 $ $ $ 341,669,787 II. TECHNOLOGY UPGRADES DISTRICT-WIDE District-wide Wireless Network Upgrade Network Infrastructure Upgrade at Various Schools District-wide Instructional Video Distribution System District-wide Instructional Interactive Technology 630,000 630,000 $ 8,000,000 $ 8,000,000 $1,788,800 $1,788,800 $1,048,840 $1,048,840 $3,884,400 $3,884,400 $4,273,061 $4,273,061 $ 14,844,330 $ 14,844,330 $ 15,182,415 $ 15,182,415 $ 22,023,377 III. SAFETY & SECURITY UPGRADES DISTRICT-WIDE Security Stations at Main Entrance of all Campuses Building Access Control Panels for Perimeter Doors at all Campuses Upgrade Security Surveillance Camera Systems Replacement of Fire/Security Alarm Systems, Public Address Systems, and Exit Door Panic Devices at Various Campuses $ 10,995,101 IV. ADDITIONS & RENOVATIONS DISTRICT-WIDE Renovations Building Additions V. BOND ISSUANCE COSTS TOTAL BOND AMOUNT: $ 30,026,745 $ 3,997,539 $ 408,712,549 Page 5 New Schools Proposed in Bond 2013 Nuevas escuelas propuestas en el bono de 2013 Page 6 Early Early Voting Sites & Schedule Early Early Voting Sites & Schedule voting voting Oct. 21 - Nov. 1 Casillas para votaciones anticipadas y Oct. 21 - Nov. 1 Casillas para votaciones anticipadas y horario October 21-25, 2013 October 21-25, 2013 Billy Hall Jr. Admin. Building, 1110 Washington Street Billy Hall Jr. Admin. Building, 1110 Washington Street Finley Elementary School, 2001 Lowry Rd. Finley Elementary School, 2001 Lowry Rd. Providence Health Center, 230 Calle Del Norte Providence Health Center, 230 Calle Del Norte City Hall Annex Bldg., 1102 Bob Bullock Lp. City Hall Annex Bldg., 1102 Bob Bullock Lp. Cigarroa Recreation Center, 2201 Zacatecas St. Cigarroa Recreation Center, 2201 Zacatecas St. Leyendecker Elementary, 1311 Garden St. Leyendecker Elementary, 1311 Garden St. Milton Elementary, 2502 E. Elm St. Milton Elementary, 2502 E. Elm St. October 21, 2013 October 21, 2013 Alexander High School, 3600 E. Del Mar Blvd. Alexander High School, 3600 E. Del Mar Blvd. United South High School, 4001 Los Presidentes Ave. United South High School, 4001 Los Presidentes Ave. United I.S.D. Health Services Bldg., United I.S.D. Health Services Bldg., 700 E. Del Mar (Krueger Field) 700 E. Del Mar (Krueger Field) Texas A&M Intl. University, 5201 University Blvd. Texas A&M Intl. University, 5201 University Blvd. Laredo Community College Main, West End Washington St. Laredo Community College Main, West End Washington St. D.D. Hachar Elementary (LISD), 3000 Guadalupe D.D. Hachar Elementary (LISD), 3000 Guadalupe Sanchez Ochoa Elementary, 211 E. Ash St. Sanchez Ochoa Elementary, 211 E. Ash St. October 22, 2013 October 22, 2013 United 9th Grade Campus, 8800 McPherson United 9th Grade Campus, 8800 McPherson L.B.J. High School, 5626 Cielito Lindo Blvd. L.B.J. High School, 5626 Cielito Lindo Blvd. Kennedy Zapata Elementary, 3809 S. Espejo Molina Rd. Kennedy Zapata Elementary, 3809 S. Espejo Molina Rd. Texas A&M Intl. University, 5201 University Blvd. Texas A&M Intl. University, 5201 University Blvd. Laredo Community College Main, West End Washington St. Laredo Community College Main, West End Washington St. Dovalina Elementary, 1700 West Anna Ave. Dovalina Elementary, 1700 West Anna Ave. Macdonell Elementary, 1606 Benavides St. Macdonell Elementary, 1606 Benavides St. October 23, 2013 October 23, 2013 United I.S.D. Transportation North, 501 Eden Ln. United I.S.D. Transportation North, 501 Eden Ln. United I.S.D. Service Center, 3501 E. Saunders United I.S.D. Service Center, 3501 E. Saunders United I.S.D. SAC (Fine Arts), 5208 Santa Claudia Ln. United I.S.D. SAC (Fine Arts), 5208 Santa Claudia Ln. Texas A&M Intl. University, 5201 University Blvd. Texas A&M Intl. University, 5201 University Blvd. Laredo Community College South, 5500 S. Zapata Hwy. Laredo Community College South, 5500 S. Zapata Hwy. Ryan Elementary, 2401 Clark Blvd. Ryan Elementary, 2401 Clark Blvd. Martin High School, 2002 San Bernardo Ave. Martin High School, 2002 San Bernardo Ave. 8 AM - 5 PM 8 AM - 5 PM 8 AM - 5 PM 8 AM - 5 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 8 AM - 5 PM 8 AM - 5 PM 8 AM - 5 PM 8 AM - 5 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 5 PM - 9 PM 5 PM - 9 PM 8 AM - 6 PM 8 AM - 6 PM 8 AM - 6 PM 8 AM - 6 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 9 AM - 6 PM 9 AM - 6 PM 8 AM - 6 PM 8 AM - 6 PM 8 AM - 6 PM 8 AM - 6 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 9 AM - 5 PM 9 AM - 5 PM 7 AM - 3 PM 7 AM - 3 PM 5 PM - 9 PM 5 PM - 9 PM 8 AM - 6 PM 8 AM - 6 PM 8 AM - 6 PM 8 AM - 6 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM October 24, 2013 October 24, 2013 United I.S.D. Food Services/S.T.E.P. Academy, United I.S.D. Food Services/S.T.E.P. Academy, 5201 Bob Bullock 5201 Bob Bullock Arndt Elementary, 610 Santa Marta Blvd. Arndt Elementary, 610 Santa Marta Blvd. Killam Elementary, 5315 Fairfield Dr. Killam Elementary, 5315 Fairfield Dr. United I.S.D. Transportation South, 5256 Cielito Lindo United I.S.D. Transportation South, 5256 Cielito Lindo Laredo Community College South, 5500 S. Zapata Hwy. Laredo Community College South, 5500 S. Zapata Hwy. Alma Pierce Elementary, 800 Eistetter St. Alma Pierce Elementary, 800 Eistetter St. Child Nutrition Program (LISD), 101 W. Saunders St. Child Nutrition Program (LISD), 101 W. Saunders St. Gonzalez Middle School, 5208 Santa Claudia Ln. 9 AM - 5 PM Gonzalez Middle School, 5208 Santa Claudia Ln. 9 AM - 5 PM Bonnie Garcia Elementary, 1453 Concord Hills Blvd. 12 PM - 8 PM Bonnie Garcia Elementary, 1453 Concord Hills Blvd. 12 PM - 8 PM United I.S.D. SAC (Fine Arts), 5208 Santa Claudia Ln. 5 PM - 9 PM United I.S.D. SAC (Fine Arts), 5208 Santa Claudia Ln. 5 PM - 9 PM Clark Elementary, 500 W. Hillside Rd. 12 PM - 8 PM Clark Elementary, 500 W. Hillside Rd. 12 PM - 8 PM Gutierrez Elementary, 505 Calle Del Norte 7 AM - 3 PM Gutierrez Elementary, 505 Calle Del Norte 7 AM - 3 PM J.C. Martin Elementary, 1600 Monterrey Ave. 10 AM - 7 PM J.C. Martin Elementary, 1600 Monterrey Ave. 10 AM - 7 PM Memorial Middle School, 2002 Marcella Ave. 10 AM - 7 PM Memorial Middle School, 2002 Marcella Ave. 10 AM - 7 PM Juarez-Lincoln El Perez Elementary United I.S.D. SAC United I.S.D. Cen Zaffirini Element Farias Elementary Don Jose Gallego October 30 October 26, 2013 October 26, 2013 Billy Hall Jr. Admin. Building, 1110 Washington Street Trautmann Eleme 10 AM - 7 PM Billy Hall Jr. Admin. Building, 1110 Washington Street 10 AM - 7 PM Finley Elementary School, 2001 Lowry Rd. 10 AM - 7 PM Finley Elementary School, 2001 Lowry Rd. 10 AM - 7 PM Providence Health Center, 230 Calle Del Norte 10 AM - 7 PM Providence Health Center, 230 Calle Del Norte 10 AM - 7 PM City Hall Annex Bldg., 1102 Bob Bullock Lp. 10 AM - 7 PM City Hall Annex Bldg., 1102 Bob Bullock Lp. 10 AM - 7 PM Cigarroa Recreation Center, 2201 Zacatecas St. 10 AM - 7 PM Cigarroa Recreation Center, 2201 Zacatecas St. 10 AM - 7 PM Leyendecker Elementary, 1311 Garden St. 10 AM - 7 PM Leyendecker Elementary, 1311 Garden St. 10 AM - 7 PM Milton Elementary, 2502 E. Elm St. 10 AM - 7 PM Milton Elementary, 2502 E. Elm St. 10 AM - 7 PM United High School, 2811 United Ave. 7 AM - 3 PM United High School, 2811 United Ave. 7 AM - 3 PM United I.S.D. SAC (Fine Arts), 5208 Santa Claudia Ln. 5 PM - 9 PM United I.S.D. SAC (Fine Arts), 5208 Santa Claudia Ln. 5 PM - 9 PM Doctors Hospital, 10700 McPherson 10 AM - 7 PM Doctors Hospital, 10700 McPherson 10 AM - 7 PM Laredo Specialty Hospital, 2005 Bustamante 10 AM - 7 PM Laredo Specialty Hospital, 2005 Bustamante 10 AM - 7 PM Laredo Medical Center, 1700 E. Saunders 10 AM - 7 PM Laredo Medical Center, 1700 E. Saunders 10 AM - 7 PM Daiches Elementary, 1401 Green St. 10 AM - 7 PM Daiches Elementary, 1401 Green St. 10 AM - 7 PM Bruni Elementary, 1508 San Eduardo Ave. 10 AM - 7 PM Bruni Elementary, 1508 San Eduardo Ave. 10 AM - 7 PM Centeno Element United South Mid Salinas Elementar E. Salinas Commu 917 North Main, M Tarver Elementar Lamar Middle Sc Oct. 31-No Billy Hall Jr. Adm Finley Elementar Providence Healt City Hall Annex B Cigarroa Recreati Leyendecker Elem Milton Elementar October 28-30, 2013 October 28-30, 2013 Billy Hall Jr. Admin. Building, 1110 Washington Street 8 AM - 5 PM Billy Hall Jr. Admin. Building, 1110 Washington Street 8 AM - 5 PM Finley Elementary School, 2001 Lowry Rd. 8 AM - 5 PM Finley Elementary School, 2001 Lowry Rd. 8 AM - 5 PM City Hall Annex Bldg., 1102 Bob Bullock Lp. 10 AM - 7 PM City Hall Annex Bldg., 1102 Bob Bullock Lp. 10 AM - 7 PM Providence Health Center, 230 Calle Del Norte 10 AM - 7 PM Providence Health Center, 230 Calle Del Norte 10 AM - 7 PM Cigarroa Recreation Center, 2201 Zacatecas St. 10 AM - 7 PM Cigarroa Recreation Center, 2201 Zacatecas St. 10 AM - 7 PM Leyendecker Elementary, 1311 Garden St. 8 AM - 5 PM Leyendecker Elementary, 1311 Garden St. 8 AM - 5 PM Milton Elementary, 2502 E. Elm St. 8 AM - 5 PM Milton Elementary, 2502 E. Elm St. 8 AM - 5 PM October 28, 2013 October 28, 2013 8 AM - 4 PM 8 AM - 4 PM 3 PM - 8 PM 3 PM - 8 PM 3 PM - 7 PM 3 PM - 7 PM 9 AM - 5 PM 9 AM - 5 PM 8 AM - 6 PM 8 AM - 6 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM October 29 October 25, 2013 October 25, 2013 De Llano Elementary, 1415 Shiloh Dr. De Llano Elementary, 1415 Shiloh Dr. Ruiz Elementary, 1717 Los Presidentes Ave. Ruiz Elementary, 1717 Los Presidentes Ave. United I.S.D. Health Services Bldg., United I.S.D. Health Field) Services Bldg., 700 E. Del Mar (Krueger 700 E. Del Mar (Krueger Field) United Middle School, 700 E. Del Mar Blvd. United Middle School, 700 E. Del Mar Blvd. Laredo Medical Center, 1700 E. Saunders Laredo Medical Center, 1700 E. Saunders Zachary Elementary, 3200 Chacota St. Zachary Elementary, 3200 Chacota St. Nixon High School, 2000 E. Plum Nixon High School, 2000 E. Plum October 31 Colonel Santos Be Malakoff Elemen Borchers Elemen Sta. Teresita Com Bruni Communit Kawas Elementar Cigarroa High Sc November Nye Elementary, 9 AM - 5 PM 9 AM - 5 PM Los Obispos Mid 7 AM - 3 PM 7 AM - 3 PM United I.S.D. SAC 5 PM - 9 PM 5 PM - 9 PM 10 AM - 6 PM 10 AM - 6 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM 10 AM - 7 PM United I.S.D. Hea 700 E. Del Mar (K United I.S.D. C&I VMT Magnet Sch Santa Maria Elem Election Day horario del 21 de oct. al 1 de nov. Voting Sites e Votación anticipada Votaciónanticipada del 21 de oct. al 1 de nov. 9, 2013 October 29, 2013 lementary, 1600 Espejo Molina Rd. 9 AM - 5 PM Juarez-Lincoln Elementary, 1600 Espejo Molina Rd. y School, 500 Sierra Vista Dr. 7 AM - 3 PM Perez Elementary School, 500 Sierra Vista Dr. C (Fine Arts), 5208 Santa Claudia Ln. 5 PM - 9 PM United I.S.D. SAC (Fine Arts), 5208 Santa Claudia Ln. ntral Office, 201 Lindenwood 9 AM - 5 PM United I.S.D. Central Office, 201 Lindenwood tary School, 5210 Santa Claudia Ln. 7 AM - 3 PM Zaffirini Elementary School, 5210 Santa Claudia Ln. y, 1510 Chicago 10 AM - 7 PM Farias Elementary, 1510 Chicago o Elementary, 520 Clark Blvd. 10 AM - 7 PM Don Jose Gallego Elementary, 520 Clark Blvd. 0, 2013 October 30, 2013 entary, 810 Lindenwood Dr. 10 AM - 6 PM Trautmann Elementary, 810 Lindenwood Dr. tary, 2710 La Pita Mangana Rd. 3 PM - 7 PM Centeno Elementary, 2710 La Pita Mangana Rd. ddle School, 3707 Los Presidentes Ave. 9 AM - 5 PM United South Middle School, 3707 Los Presidentes Ave. ry, 1000 Century Dr. West 9 AM - 5 PM Salinas Elementary, 1000 Century Dr. West unity Center, E. Salinas Mirando City. Community Center, 9 AM - 6 PM 917 North Main, Mirando City. ry, 3200 Tilden Ave. 10 AM - 7 PM Tarver Elementary, 3200 Tilden Ave. chool, 1818 Arkansas Ave. 10 AM - 7 PM Lamar Middle School, 1818 Arkansas Ave. ote Día de las Your elecciones Casillas Counts! electorales 9 AM - 5 PM 7 AM - 3 PM 5 PM - 9 PM 9 AM - 5 PM 7 AM - 3 PM 10 AM - 7 PM 10 AM - 7 PM Pct. Location AddressAddress Pct. Location 500 10 AM - 6 PM 308 Clark Elementary Hillside Rd. Voting hours are: 7AM to 7PM 308 Clark Elementary 500 Hillside Rd. 309 Gutierrez Elementary 505 Calle Del Norte 9 AM - 5 PM 309 Gutierrez Elementary 505 Calle Del Norte 125 Roche Residence 218 South España 9 AM - 5 PM 125 Roche Residence 218 South España 226 Webb County Appraisal District 3302 Clark Blvd. 226 Webb County Appraisal District 3302 Clark Blvd. 227 5208 Santa Claudia Ln. 9 AM - 6UISD PM Student Activity Center 227 UISD Student Activity Center 5208 Santa Claudia Ln. 231 100 Century Dr. 10 AM - 7Salinas PM Elementary 231 Salinas Elementary 100 Century Dr. 10 AM - 7Prada PM Elementary 132 510 Soria Dr. 132 Prada Elementary 510 Soria Dr. 133 Centeno Elementary 2710 La Pita Mangana Rd. ov. 1, 2013 133 Centeno Elementary 2710 La Pita Mangana Rd. Oct. 31-Nov. 1, 2013 134 UISD D.D. Hachar Elementary 1003 Espejo Molina Rd. min. Building, 1110 Washington Street 8 AM - 8 PM 134 UISD D.D. Hachar Elementary 1003 Espejo Molina Rd. Billy Hall Jr. Admin. Building, 1110 Washington Street 8 AM - 8 PM ry School, 2001 Lowry Rd. 8 AM - 8 PM 135 El Cenizo Community Center 3519 Cecilia Lane Finley Elementary School, 2001 Lowry Rd. 8 AM - 8 PM 135 El Cenizo Community Center 3519 Cecilia Lane th Center, 230 Calle Del Norte 8 AM - 8 PM 338 Santa Teresita Community Center 15014 Hwy. 59 Providence Health Center, 230 Calle Del Norte 8 AM - 8 PM 338 Santa Teresita Community Center 15014 Hwy. 59 Bldg., 1102 Bob Bullock Lp. 8 AM - 8 PM 239 Elementary 1300 Alta Vista Dr. City Hall Annex Bldg., 1102 Bob Bullock Lp. 8 AM - 8Newman PM 239 Newman Elementary 1300 Alta Vista Dr. ion Center, 2201 Zacatecas St. 8 AM - 8 PM 340 7210 McPherson Cigarroa Recreation Center, 2201 Zacatecas St. 8 AM - 8Laredo PM Medical Ctr. Ambulatory 340 Laredo Medical Ctr. Ambulatory 7210 McPherson mentary, 1311 Garden St. 8 AM - 8 PM 341 101 E. Del Mar Blvd. Leyendecker Elementary, 1311 Garden St. 8 AM - 8Nye PM Elementary 341 Nye Elementary 101 E. Del Mar Blvd. ry, 2502 E. Elm St. 8 AM - 8 PM 342 Precint #4 8501 San Dario Ave. Milton Elementary, 2502 E. Elm St. 8 AM - 8JP PM 342 JP Precint #4 8501 San Dario Ave. 343 United Middle 700 E. Del Mar Blvd. 1, 2013 343 United Middle 700 E. Del Mar Blvd. October 31, 2013 344 Santos Benavides Elementary 10702 Kirby Ln. enavides Elementary, 10702 Kirby Dr. 7 AM - 3 PM 344 Santos Benavides Elementary 10702 Kirby Ln. Colonel Santos Benavides Elementary, 10702 Kirby Dr. 7 AM - 3 PM 345 United 9th Grade High School 8800 McPherson ntary, 2810 Havana Dr. 7 AM - 3 PM 345 United 9th Grade High School 8800 McPherson Malakoff Elementary, 2810 Havana Dr. 7 AM - 3 PM ntary, 9551 Backwoods Trail 7 AM - 3 PM 446 Finley Elementary 2001 Lowry Rd. Borchers Elementary, 9551 Backwoods Trail 7 AM - 3 PM 446 Finley Elementary 2001 Lowry Rd. mmunity Center, 15014 Hwy. 59 9 AM - 7 PM 447 Muller Elementary 4430 Muller Memorial Dr. Sta. Teresita Community Center, 15014 Hwy. 59 9 AM - 7 PM 447 Muller Elementary 4430 Muller Memorial Dr. ty Center, 303 E. 12th St. Bruni, TX 9 AM - 6 PM 448 F&A Bruni Community Ctr. 452 Rancho Peñitas Bruni Community Center, 303 E. 12th St. Bruni, TX 9 AM - 6 PM 448 F&A Bruni Community Ctr. 452 Rancho Peñitas ry, 2100 S. Milmo Ave. 10 AM - 7 PM 349 School 2811 United Ave. Kawas Elementary, 2100 S. Milmo Ave. 10 AM - 7United PM High349 United High School 2811 United Ave. chool, 2600 Zacatecas St. 10 AM - 7 PM 350 Ranch I H 35 N- 27 Miles OCL Cigarroa High School, 2600 Zacatecas St. 10 AM - 7Callaghan PM 350 Callaghan Ranch I H 35 N- 27 Miles OCL 252 United South High School 4001 Ave. Los Presidentes r 1, 2013 252 United South High School 4001 Ave. Los Presidentes November 1, 2013 154 L.B. Johnson High School 5626 Cielito Lindo Blvd. 101 E. Del Mar Blvd. 9 AM - 5 PM 154 L.B. Johnson High School 5626 Cielito Lindo Blvd. Nye Elementary, 101 E. Del Mar Blvd. 9 AM - 5Texas PM A & M Int’l University 255 5201 University Blvd. ddle School, 4801 S. Ejido Rd. 8 AM - 4 PM 255 Texas A & M Int’l University 5201 University Blvd. Los Obispos Middle School, 4801 S. Ejido Rd. 8 AM - 4Borchers PM 356 Elementary 9551 Backwoods Trail C (Fine Arts), 5208 Santa Claudia Ln. 5 PM - 9 PM Borchers Elementary 9551 Backwoods Trail United I.S.D. SAC (Fine Arts), 5208 Santa Claudia Ln. 5 PM - 9Los PM Botines356 457 Restaurant/Café 469 Well Ln-Hwy 83 N alth Services Bldg., 457 Los Botines Restaurant/Café 469 Well Ln-Hwy 83 N KruegerUnited Field)I.S.D. Health Services Bldg., 9 AM - 5 PM 458 Washington Middle 10306 River Bank Dr. 700 E. Del Mar (Krueger Field) 9 AM - 5 PM 458 Washington Middle 10306 River Bank Dr. I, 4410 State Hwy 359 9 AM - 1 PM 359 Hospital 10700 McPherson United I.S.D. C&I, 4410 State Hwy 359 9 AM - 1Doctors PM 359 Doctors Hospital 10700 McPherson hool, 820 Main 10 AM - 7 PM 360 Garden Apts. 5118 Gallagher Ave. VMT Magnet School, 820 Main 10 AM - 7Gallagher PM 360 Gallagher Garden Apts. 5118 Gallagher Ave. mentary, 3817 Santa Maria Ave. 10 AM - 7 PM 407 5810 San Bernardo Santa Maria Elementary, 3817 Santa Maria Ave. 10 AM - 7Walker PM Building 407 Walker Building 5810 San Bernardo 3 PM - 7 PM 5 November de noviembre Horario de votación: de 7AM a 7PM Page 8 Questions & Answers What are bonds? How long does it take to pay them off? Bonds for school projects are very similar to a mortgage on a home. To finance construction projects school Districts issue bonds which are purchased by investors. Payout is limited by law to 40 years. Current projections have United I.S.D. bonds being paid off in 25-30 years. How do bonds work? The sale of bonds begins with an election to authorize a specific amount – the maximum the District is allowed to sell. The school District sells tax exempt municipal bonds to raise money for capital projects such as new schools. Bids are taken from interested buyers, usually large institutional investors – and are sold at the lowest interest rate offered. The rate is based on the District’s bond rating – the higher the bond rating, the lower the interest rate to sell the bonds. Principal and interest on the bonds are repaid over an extended period of time with funds from the debt service tax rate. Will the Bond affect teacher salaries? Bonds that are sold do not affect teacher salaries. By law, bond money can only be used for new facility construction, facility renovation, technology and major capital improvements. Will the Bond increase my taxes if I am 65 years or older? Not necessarily. The Texas Constitution, Article VIII, Section 1-d, provides for persons 65 years of age or older, who have a homestead exemption, to be exempt from tax rate increases unless new improvements are made to the home. How was the bond package determined? The bond proposal was developed with the input from a citizen-based committee representing all areas of the District consisting of parents, local citizens and school staff, who met to study the requirements of the District and prioritize the program. The committee analyzed data including, but not limited to: the long-range facilities plan, safety and security, the long-range technology plan, financial analysis, and other data. What new schools are included in this bond election? United I.S.D. has included a total of $341.6 million in the 2013 bond package to construct 14 new schools which include the following: • Cielito Lindo Elementary School in the L.B. Johnson High School feeder pattern • State Hwy. 359 Elementary School in the United South High School feeder pattern • Cuatro Vientos North Elementary School in the United South High School feeder pattern • San Isidro Elementary School in the United High School feeder pattern • Coves Winfield Elementary School in the Alexander High School feeder pattern • Replacement school for Salinas Elementary • Replacement school for Clark Elementary • Cuatro Vientos South Middle School in the Lyndon B. Johnson High School feeder pattern • State Hwy. 359 Middle School in the United South High School feeder pattern • Mines Road Middle School in the United High School feeder pattern • Lyndon B. Johnson High School Ninth Grade Campus • United South High School Ninth Grade Campus • Alexander High School Ninth Grade Campus • United High School Ninth Grade Campus What major school renovations will be funded through this bond proposal? The schools listed below are scheduled for renovation or additions at a cost of $30 million. In United I.S.D. major renovations include replacing or upgrading the following systems: HVAC, electrical, plumbing, energy management, fire sprinkler and alarms, and upgrading to current standards. • Arndt Elementary School - 16 classrooms will be added and expansion of the parking area • Trautmann Elementary School - 16 classrooms will be added as well as the enclosure of the open area • Newman Elementary School - expansion of cafeteria and enclosure of the canopy to classroom wing • Clark Middle School - band hall expansion • Alexander High School - expansion of band hall, Career and Technology classrooms, and ROTC center • Kennedy - Zapata Elementary School - improvements in parking area • Gonzalez Middle School - Install lighting and new sidewalks • United South High School - Renovate existing science labs, replace gym floor • Replacement of Air Conditioning/Energy Management Systems at Gutierrez, Juarez - Lincoln, Kazen, Prada, Trautmann Elementary, Ruiz, Clark Middle, United 9th grade campus, and Brantley Hall • Expansion of food storage area at United I.S.D. Food Production Center Why include repairs and renovations on the ballot? The District must maintain 44 campuses and other District facilities. Major maintenance items for these campuses and other District facilities such as carpets, roofs, and HVAC systems, can cost the District millions of dollars. Spreading the costs over time, while not exceeding the life of the assets, has enabled the District, historically, to complete the work without significantly impacting the tax rate. What curriculum and technology initiatives are included in the bond proposal? United I.S.D.’s curriculum and technology needs total $22 million. They include: • District-wide wireless network upgrades • Network infrastructure upgrades at various schools • District-wide instructional video distribution system • District-wide instructional interactive technology How will the security of schools be affected by the bond? $10.9 million has been designated for safety and security across the District. They include: • Addition of security stations at main entrances of all campuses • Building access control panels for perimeter doors at all campuses • Upgrade security surveillance camera systems at all campuses • Replace fire/security alarm systems, public address systems, and install exit door panic devices at various campuses What is the District’s current tax rate? The current tax rate is $1.194860 per $100 valuation. However, because of the $15,000 state homestead exemption and 15 percent local homestead exemption, homeowners with a $100,000 house in United I.S.D. pay taxes on a valuation of $70,000. What has been the growth pattern in United I.S.D. over the past decade? A decade ago, the enrollment of the District was 30,710 compared to 42,921 for the 2012-2013 school year. This increase of 12,200 students reflects an annual growth of 1,221 students. What will be the impact of the bond funds on the District’s technology program? The technology funds will be used to accommodate new students and staff, replace aging technology, and increase access to technology. What are the options if the bond election fails? The Board and administration have looked at various alternatives including increasing class sizes in all schools; implementing AM and PM sessions for students; adding portable buildings at schools that can accommodate them; reallocating maintenance and operations budget funds to furnish and equip schools and purchase portables; capping enrollment at campuses and sending students to other schools that have space. Why was a high school on Mines Road not included in this bond referendum? Enrollment projections for the next five years indicate that United High School’s student enrollment will be at 4,380. United High School has capacity for this enrollment. In addition, United High School does not have any portable classrooms or teachers who float into classes. These alternatives can still be accommodated at United High School. Furthermore, our planning department has looked at the feasibility of constructing a high school on Mines Road and has determined that the student enrollment preliminarily projected to attend this new school would be small. Projections indicate that a high school can be supported within the next 8 years. Crecimiento estudiantil Página 2 Nuevas escuelas propuestas Página 5 Casillas electorales Página 6 Para más información, ingrese al portal del distrito en www.uisd.net y presione el ícono School Bond 2013 Escuelas nuevas para la creciente población estudiantil...........................................$341,669,787 14 escuelas nuevas: 7 primarias (remodelación de las primarias Salinas y Clark) 3 secundarias y 4 escuelas de 9no grado Seguridad...............................................................$10,995,101 • Casetas de seguridad en la entrada de todas las escuelas • Paneles de control de acceso en todas las puertas de los edificios de todas las escuelas • Actualización del sistema de cámaras de vigilancia • Reemplazo de alarmas contra incendios, sistemas de altavoz, sistemas de alarma de seguridad y barras anti-pánico de las puertas en varias escuelas Tecnología..............................................................$22,023,377 • Actualización del sistema de red inalámbrica en todo el distrito • Actualización de la infraestructura de red en varias escuelas • Instalación del sistema de distribución de video de enseñanza en todo el distrito • Instalación de tecnología interactiva de enseñanza en todo el distrito Adiciones, renovaciones y cuotas.........................$34,024,284 • Renovaciones • Adiciones a edificios • Costo de emisión de bonos Total........$408,712,549 ¿De qué manera afectará el referéndum del Bono 2013 los impuestos de propiedad? Las proyecciones indican que el referéndum de bono por la cantidad de $408.7 millones conllevaría un aumento en la tasa de interés Interest & Sinking (I&S) de aproximadamente $0.12930 por cada $100 de valor de la propiedad para el año 2018, iniciando con un pequeño aumento de .03 centavos para el año 2015. La aprobación del bono afectaría solamente a la tasa de interés I&S y no a la tasa de interés Maintenance & Operations (M&O) utilizada para el presupuesto de gastos de operación. Para el referéndum de bono que fue aprobado en el 2003, los electores de United I.S.D. autorizaron un aumento de 16 centavos en la tasa de interés I&S. En realidad, United I.S.D. solamente aumentó la tasa de interés a la mitad de los 16 centavos (8 centavos). De hecho, United I.S.D. ha tenido la misma tasa de interés de $0.15486 desde el 2007. Exención para personas mayores de 65 años Las personas mayores de 65 años que tengan una exención de impuestos de propiedad, estén exentos del aumento en la tasa de impuestos, a menos que se lleven a cabo renovaciones en el hogar. Debido a que United I.S.D. ofrece una exención local del 15 por ciento en las viviendas, aunado a la exención estatal de $15,000 en las residencias, el valor promedio de $137,400 de una casa es gravable a $101,800. La gráfica abajo muestra el posible máximo impacto en los impuestos por propiedad para el año 2018 de acuerdo con el valor de la vivienda en United I.S.D. Una hoja de cálculo de impuestos se encuentra disponible en www.uisd.net para ayudarle a calcular el posible máximo impacto en la tasa de interés de una vivienda. Valor de la Incremento Costo propiedad anual mensual $75,000 $100,000 $125,000 $137,400 $150,000 $175,000 $200,000 $63.03 $90.51 $117.99 $131.62 $145.46 $172.94 $200.42 $5.25 $7.54 $9.83 $10.97 $12.12 $14.41 $16.70 Es política de United Independent School District no discriminar por motivos de raza, color, nacionalidad, sexo o discapacidad en sus programas, servicios o actividades como lo requiere el Título VI de la Ley de Derechos Civiles de 1964, según su enmienda; el Título IX de las Enmiendas a la Educación de 1972; la Ley de Discriminación por Edad de 1975, según su enmienda, y la Sección 504 de la Ley de Rehabilitación de 1973, según su enmienda. Página 2 Convocan a elección de bonos para abordar problema de crecimiento estudiantil D esde 1961, United I.S.D. ha proporcionado a sus estudiantes programas académicos superiores y una gran variedad de actividades extracurriculares. Desde sus humildes inicios como un distrito escolar pequeño con aproximadamente 340 estudiantes, United I.S.D. se ha convertido en un distrito integrado actualmente por más de 42,900 estudiantes en 26 primarias, 9 secundarias, 4 preparatorias, 1 escuela de educación alternativa y un centro de programas de educación especial (Cherish Center). El bono financiará la construcción de 14 escuelas, la renovación de instalaciones existentes y actualizará los sistemas tecnológicos y las necesidades de seguridad del distrito. Es fundamental señalar que United I.S.D. es el segundo distrito escolar más grande de Región Uno, el cual comprende el área del Sur de Texas, y el 25to más grande en Texas debido a su número de inscripciones. En la última década, United I.S.D. ha tenido inscripciones de más 10,000 estudiantes de nuevo ingreso. El crecimiento y el desarrollo económico de la ciudad de Laredo continúa a la alza y es evidente. Más del 96 por ciento de los permisos de residencia emitidos por la ciudad se encuentran dentro de los límites de United I.S.D. Las proyecciones indican que la inscripción estudiantil de United I.S.D. será de 46,921 estudiantes en los próximos cinco años. En la primavera de 2013, el Superintendente y la mesa directiva establecieron un Comité Ciudadano de Bono de 121 miembros, integrado por miembros de la comunidad y maestros, para analizar las necesidades del creciente distrito. Después se llevó a cabo un estudio de tres meses por parte de los miembros del comité. Culminó el proceso de planificación cuando el Comité Ciudadano de Bono presentó una propuesta de bono ante la mesa directiva el 31 de julio. La mesa directiva revisó la propuesta y después votó por unanimidad el 21 de agosto para un referéndum de bono por la cantidad de $408.7 millones en la boleta de elecciones generales para el 5 de noviembre de 2013. Proyección de inscripción de los próximos 46,921 45,796 5 años 44,886 40,906 2009-2010 2010-2011 El Comité Ciudadano de Bono recomendó mejoras en la tecnología por la cantidad de $22 millones en el Referéndum de Bono 2013. Las mejoras planeadas en la tecnología incluirán: • La actualización de la red inalámbrica en todo el distrito; • La actualización de la infraestructura de red en varias escuelas; • La instalación del sistema de distribución de video de enseñanza en todo el distrito y • La instalación de tecnología interactiva digital en todos los salones del distrito. El comité también se enfocó en las necesidades de seguridad del distrito al recomendar $10.9 millones en actualizaciones. Los planes para mejorar la seguridad en todas las escuelas incluyen: • La construcción de casetas de seguridad en las entradas principales de todas las escuelas; • La actualización de los sistemas de cámaras de vigilancia y • El reemplazo de los sistemas de alarma contra incendios y seguridad, así como el reemplazo de las barras anti-pánico de las puertas en varias escuelas. 2011-2012 42,921 2012-2013 2013-2014 44,066 2014-2015 2015-2016 2016-2017 2017-2018 Se proyecta que la inscripción incrementará a estudiantes en los próximos 5 años Ingresos del bono actualizarán tecnología y necesidades de seguridad • La instalación de paneles de control de acceso en todas las puertas de los edificios de todas las escuelas; 41,853 42,282 43,321 4,000 Instalaciones antiguas tendrán reparaciones y mejoras La planeación de construcciones nuevas ayudará a aliviar la creciente población estudiantil, aunque muchos de los edificios actuales requieren de una gran variedad de reparaciones y mejoras. Actualmente, United I.S.D. cuenta con 18 escuelas que fueron construidas hace al menos 20 años, tres de las cuales fueron edificadas hace más de 40. El distrito cuenta con un departamento de mantenimiento que repara y da mantenimiento a nuestros edificios, incrementando la expectativa de vida de las instalaciones y los sistemas de los edificios a través de un plan de mantenimiento. Sin embargo, nuestras instalaciones más antiguas requieren de renovaciones importantes debido a su antigüedad. Las renovaciones necesarias incluyen: sistemas de aire acondicionado, pisos, cableado eléctrico, etc. Los miembros del Comité Ciudadano de Bono analizaron la información que apoyó la decisión de recomendar $30 millones para renovaciones y actualizaciones en el referéndum de Bono 2013. El comité tomó en consideración lo siguiente: los requisitos del plan de estudios para todos los grados, las solicitudes y recomendaciones de los directores escolares y demás administradores, la información de la evaluación de las instalaciones realizada por asesores externos, así como información del personal de instalaciones y mantenimiento del distrito. El comité también examinó la expectativa de vida de los sistemas y materiales de los edificios. Para revisar la lista de otras renovaciones incluidas en el referéndum del bono, ingrese a www. uisd.net y presione el ícono United I.S.D. Bond 2013. Página 3 Se estima que la població n estudiantil aumente a más de 4,000 estudiantes en los próximos cinco añ os. la población e u q la u lc a c e S de 43,321 a e s l ti n ia d tu s e ciclo escolar. te s e ra a p s te n estudia FOR CHILDREN s, s: 26 primaria la e u sc e 4 4 n nta co de El distrito cue 4 preparatorias, un centro 9 secundarias, tro de 6to grado, 1 centro cen de 9no grado, 1 tiva y 1 centro s a rn e lt a la e u diante infantil, 1 esc dos para estu a z li ia c e sp . e s programa herish Center) (C l ia c e sp e n de educació l bono son e d s e ic d Los ín Standard : s e t n ie u los sig , Moody + A s e r o o and P h es AA-. c it F y 2 a es A Más de 2,700 estudiante s de nuestras cuatro prepar atorias graduaron en junio de 2013. La preparatoria United obtuvo una distinción por habe r tenido la generación de grad uados más grande en la histor ia de las escuelas de Laredo, con un total de 925 graduados. nsporta a a r t . .D S I. United udiantes 14,000 est tro de sus te den diariamen s cuadradas. 2,483 milla de Bono, compuesto o an ad ud Ci ité m El Co s alizó las necesidade an , os br m ie m 1 12 por l distrito durante actuales y futuras de El comité entregó su el verano de 2013. consideración de la recomendación para de julio de 2013. mesa directiva el 31 El distrito ha recibido certificados de excelencia de parte del Government Financial Officers Association (GFOA) en los informes financieros en los últimos 14 años. El 21 de agosto de 2013, la mesa directiva pidió una elección de bonos para el martes 5 de noviembre por la cantidad de $408.7 millones. La máxima cantidad proyectada del impuesto I&S para el propietario de una vivienda con un valor de $100,000 es de $90.51 al año, lo que equivale aproximadamente a $7.54 al mes. á United I.S.D. est l lugar 25 clasificado en e distritos de 1,232 de los licas más de escuelas púb as y el grandes de Tex el país. número 105 en 95% de los límites del distrito aún se encuentran sin desarrollar. 96.2% de los permisos residenciales emitidos por la ciudad de Laredo se encuentran dentro de los límites de United I.S.D. United I.S.D. cuenta con un total de 326 salones portátiles en diferentes escuelas dentro del distrito, los cuales equivalen a 9 escuelas primarias. Un total de 8,150 estudiantes toman clases en salones portátiles. Página 4 Preguntas y respuestas ¿Qué son los bonos? ¿Cuánto tiempo se requiere para pagarlos? Los bonos para proyectos escolares son muy similares a las hipotecas de viviendas. Para financiar los proyectos de construcción, los distritos escolares emiten bonos que son adquiridos por inversionistas. El pago está limitado por la ley a 40 años. Actualmente se proyecta que los bonos de United I.S.D. se terminen de pagar en 25 a 30 años. ¿Cómo funcionan los bonos? La venta de bonos inicia con una elección para autorizar una cantidad específica - la cantidad máxima que el distrito tiene permitido vender. El distrito escolar vende los bonos municipales exentos de impuestos para recaudar dinero para proyectos importantes como la construcción de nuevas escuelas. Se toman las ofertas de los compradores interesados, generalmente grandes inversionistas institucionales - y se venden a la menor tasa de interés ofrecida. La tasa de interés se basa en la clasificación de bonos del distrito - entre mayor sea la clasificación de los bonos del distrito, menor será la tasa de interés para venderlos. El capital y el interés de los bonos se pagan durante un periodo de tiempo con fondos de la tasa de impuestos del servicio de deuda. ¿El bono afectará los salarios de maestros? La venta de bonos no afectará los salarios de maestros. Por ley, el dinero de la venta de bonos puede utilizarse solamente para la construcción de instalaciones nuevas, renovaciones, tecnología y para mejoras importantes. ¿Los bonos incrementarán los impuestos para las personas mayores de 65 años? No necesariamente. La Constitución de Texas, Artículo VIII, Sección 1-d, estipula que las personas mayores de 65 años, quienes tengan una exención por una vivienda, estarán exentos de los aumentos a los impuestos a menos que se lleven a cabo mejoras en la propiedad. ¿Cómo se determinó el paquete de bonos? La propuesta de bonos ha sido desarrollada con la información del comité de ciudadanos que representa todas las áreas del distrito que consiste de padres, ciudadanos y personal escolar, quienes se reunieron para estudiar los requisitos del distrito y dar prioridad al programa. El comité analizó la información, incluyendo pero sin limitarse a, el plan de instalaciones a largo plazo, seguridad, plan de tecnología de largo alcance, análisis financiero y demás información. ¿Cuáles escuelas nuevas se incluyen en esta elección de bonos? United I.S.D. ha incluido un total de $341.6 millones en el 2013 para la construcción de 14 escuelas nuevas, la cuales incluyen las siguientes: • Primaria Cielito Lindo en el patrón de escuelas de integración a la preparatoria Lyndon B. Johnson • Primaria carretera estatal 359 en el patrón de escuelas de integración a la preparatoria United South • Primaria Cuatro Vientos Norte en el patrón de escuelas de integración a la preparatoria United South • Primaria San Isidro en el patrón de escuelas de integración a la preparatoria United • Primaria Coves Winfield en el patrón de escuelas de integración a la preparatoria Alexander • Remodelación de la primaria Salinas • Remodelación de la primaria Clark • Secundaria Cuatro Vientos Sur en el patrón de escuelas de integración a la preparatoria Lyndon B. Johnson • Secundaria carretera estatal 359 en el patrón de escuelas de integración a la preparatoria United South • Secundaria Mines Road en el patrón de escuelas de integración a la preparatoria United • Escuelas de noveno grado Lyndon B. Johnson • Escuela de noveno grado United South • Escuela de noveno grado Alexander • Escuela de noveno grado United ¿Qué renovaciones importantes serán financiadas con la propuesta de este bono? Las siguientes escuelas están programadas para llevar a cabo renovaciones o adiciones a un costo de $30 millones. En United I.S.D., las renovaciones importantes incluyen reemplazar o actualizar los siguientes sistemas: HVAC, eléctrico, plomería, control de energía, aspersores y alarmas contra incendios y actualización de los estándares actuales. • Primaria Arndt - Se añadirán 16 salones, además de la ampliación del estacionamiento • Primaria Trautmann - Se añadirán 16 salones y se cerrará el área abierta entre los dos edificios • Primaria Newman - expansión de la cafetería y se cerrará el toldo que lleva al área de salones • Secundaria Clark - expansión del salón de banda • Preparatoria Alexander - expansión del salón de banda, de los salones de Profesiones y Tecnología y construcción de un centro de ROTC • Kennedy-Zapata - mejoras en el área de estacionamiento • Secundaria Gonzalez - instalación de alumbrado y banquetas nuevas • Preparatoria United South - renovación de laboratorios de ciencias existentes, reemplazo del piso del gimnasio • Reemplazo del sistema de aire acondicionado/ control de energía en las primarias Gutierrez, Juarez-Lincoln, Kazen, Prada, Trautmann, secundarias Ruiz, Clark, escuela de United de 9no grado y Brantley Hall • Expansión del área de almacenamiento de alimentos en el Centro de Producción de Alimentos de United I.S.D. ¿Por qué la votación incluye reparaciones y renovaciones? El distrito debe dar mantenimiento a 44 escuelas y a otras instalaciones del mismo. El mantenimiento de artículos importantes para estas escuelas y demás instalaciones del distrito, tales como alfombras, techos, sistemas de HVAC, pueden tener un costo de millones de dólares para el distrito. Dividir los gastos con el tiempo, pero sin exceder la vida de sus bienes, ha permitido al distrito, históricamente, terminar el trabajo sin tener un impacto importante en los impuestos. ¿Qué iniciativas en el plan de estudios y tecnología se incluyen en la propuesta del bono? Las iniciativas para el plan de estudios y tecnología de United I.S.D. tienen un costo total de $22 millones. Estas incluyen: • Actualización del sistema de red inalámbrica en todo el distrito • Actualización de la infraestructura de red en varias escuelas • Instalación del sistema de distribución de video de enseñanza en todo el distrito • Instalación de tecnología interactiva de enseñanza en todo el distrito ¿De qué manera se verá afectada la seguridad en las escuelas con el bono? Se han destinado $10.9 millones para la seguridad en todo el distrito. La propuesta para la seguridad incluye: • Construcción de casetas de seguridad en la entrada de todas las escuelas • Instalación de paneles de control de acceso en todas las puertas de todas las escuelas • Actualización del sistema de cámaras de vigilancia en todas las escuelas • Reemplazo de los sistemas de alarma contra incendio/seguridad, sistemas de altavoz e instalación de barras anti-pánico en las puertas de varias escuelas ¿Cuál es la tasa de impuestos actual del distrito? La tasa de interés actual es de $1.194860 por cada $100 dólares de valor. Sin embargo, debido a la exención estatal de $15,000 en viviendas y a la exención local de 15 por ciento en propiedades, los propietarios de viviendas de $100,000 en United I.S.D. pagan impuestos en valuaciones de $70,000. ¿Cuál ha sido el patrón de crecimiento en United I.S.D. en la última década? Hace una década, el número de inscripciones en el distrito fue de 30,710 estudiantes comparado con los 42,921 para el ciclo escolar 2012-2013. Este incremento de 12,200 estudiantes refleja un promedio de crecimiento de 1,221 estudiantes anualmente. ¿Cuál será el impacto de los fondos de bono en el programa de informática del distrito? Los fondos de informática serán utilizados para dar alojamiento a estudiantes de nuevo ingreso y a personal, reemplazar la tecnología obsoleta e incrementar el acceso a la misma. ¿Cuáles son las opciones si el bono no es aprobado? La mesa directiva y la administración han estudiado varias alternativas, incluyendo un mayor número de estudiantes en todas las escuelas; la implementación de sesiones matutinas y vespertinas para los estudiantes; la adición de edificios portátiles en las escuelas para alojarlos; la reubicación de los fondos del presupuesto para los gastos de operación y mantenimiento para amueblar y equipar las escuelas y la compra de salones portátiles; fijar una cantidad máxima de estudiantes en las escuelas y enviarlos a otras que tengan espacio. ¿Por qué no se incluyó una preparatoria en Mines Road en este referéndum de bono? Las proyecciones de inscripción en los próximos cinco años indican que la cantidad de estudiantes en la preparatoria United será de 4,380. La preparatoria United tiene la capacidad para alojar a estos estudiantes. Además, la preparatoria United no cuenta con salones portátiles o maestros que fluctúen entre clases. Estas alternativas aún pueden incorporarse en la preparatoria United. Además, nuestro departamento de planeación ha estudiado la posibilidad de construir una preparatoria en Mines Road y ha determinado que la proyección de inscripción preliminar para asistir a esta nueva escuela es muy pequeña. Las proyecciones indican que una preparatoria puede ser viable dentro de los próximos 8 años.