Western Corridor

Transcription

Western Corridor
Benefits
Increasing capacity and reach
Increases the capacity of the local transport network, catering to an expected population of two
million in the Western Corridor of the Greater Kuala Lumpur/Klang Valley by 2020.
Extends reach to Klang, Shah Alam, Petaling Jaya and Subang Jaya via 26 stations.
Connecting you to the
Improving accessiblity within the Western Corridor
Western Corridor
The corridor provides access to Port Klang - the 13th busiest port in the world - as well as other pockets
of industrial hubs located around the Shah Alam district. The LRT3 alignment will add tremendous
capacity to existing transportation linkages.
Boosting economic growth
SUNGAI BULOH
Supporting regeneration and the development across the Western Corridor.
Kampung
Selamat
LRT3 will spur the revitalisation of communities in Petaling Jaya, Shah Alam and Klang by encouraging
high density, mixed-use real estate development around the stations with an emphasis on Transit
Oriented Developments.
Kwasa
Damansara
LRT3 links townships together into integrated regions that can then function as a single, stronger
economy.
Kota
Damansara
LRT3 broadens labour markets and offers workers a wider network of employers to choose from.
Surian
9
10
LALUAN MRT SUNGAI BULOH - KAJANG
MRT SUNGAI BULOH - KAJANG LINE
Dalam
pembinaan
UNDER CONSTRUCTION
LALUAN LRT 3
Pedestrian Walkways/
Bridges
: Covered walkways, pedestrian bridges, facilities for people with disabilities
(OKU).
Public Facilities
: Lifts & escalators for enhanced access, ramps for people with disabilities
(OKU), public toilets, surau, shopping & retail space.
Ticket Sale & Top Up
Mutiara
Damansara
(S1)
Dalam
pembinaan
LRT BANDAR UTAMA - JOHAN SETIA
UNDER CONSTRUCTION
10
S2
: Bus/ taxi lay-bays, Park & Ride, Kiss & Ride, special parking bays for people
with disabilities (OKU).
Damansara
Utama
Kwasa
Sentral
Facilities
Pick-up & Drop-off
facilities
BANDAR UTAMA - JOHAN SETIA
9
S3
Akan datang.
Stesen Projek LRT3
Laluan Bandar Utama
- Johan Setia
Shah Alam
Akan datang.
Stesen Projek MRT
Laluan Sungai Buloh - Kajang
COMING SOON. MRT STATIONS ON
SUNGAI BULOH - KAJANG LINE
Tun Razak
Exchange
Taman Tun
Dr Ismail
Pusat Bandar
Damansara
Semantan
Muzium Negara
State
Mosque
Cochrane
BANDAR
UTAMA
Phileo
Damansara
UiTM
Taman
Midah
Merdeka
S14 S13 S12
S4
Integrates
with
Bus Rapid Transit
Taman
Suntex
Sri Raya
Bandar Tun
Hussein Onn
Shah Alam
Town Centre
Bukit
Dukung
Integrates
with
KTM Komuter
Taman
Koperasi
Cuepacs
(S7
)
Sungai
Kantan
S11
KAJANG
S15
S16
S17
S18
S19
9
Bandar
Kajang
Klang
Town Centre
Bandar
Bukit Tinggi
(S20)
S21
Taman
Sri Andalas
Klang
Bandar
Botanik
S22
S23
S24
S25
10
*for illustration purposes only, final station design may vary
JOHAN
SETIA
(S26)
1800-18-2585
PU
TR
AH
EIG
HT
S
www.lrt3.com.my
Kelana Jaya
Integrates
with
Kelana Jaya Line
Taman
Connaught
S6
S9 S8
Glenmarie
Section 7
Taman
Mutiara
S5
S10
Shah Alam
Stadium
BANDAR
UTAMA
Taman
Pertama
COMING SOON. LRT3 STATIONS ON
BANDAR UTAMA - JOHAN SETIA LINE
: Ticket vending machine, customer service counter.
Integrates
with
MRT
JOHAN
SETIA
[email protected]
Integrates
with
Bus Rapid Transit
What is LRT3
The Alignment
Light Rail Transit 3 (LRT3) is the third LRT system in the Greater Kuala Lumpur/Klang Valley (GKL/KV)
region and will serve an estimated population of two million in the Western Corridor by 2020. The LRT3
is estimated to benefit 500,000 commuters along the alignment.
LRT3 is a project developed in line with the Urban Rail Development Plan (URDP) of the GKL/KV Land
Public Transport Master Plan under the Land Public Transport Commission (SPAD).
LRT3 is part of a reliable, efficient, integrated and sustainable land public transport system targeted
at enhancing socio-economic development and quality of life.
LRT3 is a double track rail alignment of approximately 37 km operating between Bandar Utama to
Johan Setia.
LRT3 alignment will have 26 stations including 5 stations that integrate with existing and future public
transport systems.
Total transit time of approximately 58 minutes.
The line will cover the areas of Bandar Utama, Shah Alam and Klang before terminating at Johan
Setia.
Prasarana Malaysia Berhad is the project owner that formulated the brief of the project and will
assume operations of the project upon completion.
STATION
18
SUNGAI KLANG
KAWASAN
19
KTM
TELUK PULAI
MRCB George Kent (MRCBGK) is the appointed Project Delivery Partner (PDP) for the LRT3 and is
responsible for the successful completion of the project within a predetermined cost and time frame.
KTM
TELUK GADONG
KG. TELUK
GADONG
KAWASAN
6
LRT3 Features
BAYU
PERDANA
An Integrated Network
KAWASAN
18
STATION
19
PERINDUSTRIAN
BUKIT RAJA
KAWASAN
17
DESA ALAM
TAMAN
ENG ANN
STATION
20
TAMAN
BERKELEY
KLANG TOWN
CENTRE
KTM
KLANG
KAWASAN
1
TAMAN
CHI LIUNG
STATION
17
BANDAR BARU
KLANG
MRT PJU 5
STATION
16
BUKIT
KUDA
BUKIT TINGGI
Station 1 : Integration with MRT Line 1
STATION
22
SUBANG AIRPORT
STATION
15
I-CITY
MRT SURIAN
UiTM SHAH
ALAM CAMPUS
STATION
14
KAMPUNG PADANG
JAWA
TAMAN
SRI ANDALAS
TAMAN
KLANG RIA
BANDAR
BUKIT TINGGI 1
KTM
BUKIT BADAK
KTM
PADANG JAWA
SECTION 16
TROPICANA GOLF &
COUNTRY RESORT
SECTION 2
STATION
13
Station 20 : Integration with KTM Komuter Port Klang Line
BANDAR BOTANIK
SECTION 12
STATION
25
Train
LAMAN GLENMARIE
2
STATION
10
SAUJANA GOLF &
COUNTRY CLUB
HICOM GLENMARIE
INDUSTRIAL PARK
GLENMARIE GOLF &
COUNTRY CLUB
STATION
9
KTM
SHAH ALAM
AMBANG BOTANIK 2
ARA DAMANSARA
STATION
KTM
BATU TIGA
STATION
8
GLENMARIE
COURTS
KOTA BAYUMAS
STATION 7
SUBANG JAYA
STATION
BANDAR PUTERI
KLANG
SUBANG JAYA
TAMAN TEKNOLOGI
TINGGI SUBANG
STATION
26
BANDAR
PARKLANDS
Module: 6-coach train,
accessible end-to-end
Speed: 80 km/h
maximum speed
Capacity: 36,720 passengers
per hour per direction
SS18
STATION
LRT3 ALIGNMENT MAP
First rail project with green technology in Malaysia
Length
37km with 2 km underground tunnel
MRT TTDI
PETALING JAYA
KELANA JAYA
TAMAN BAHAGIA
STATION
Legend
LRT3 Alignment
Underground Alignment
PARAMOUNT
STATION
Station location
74,000
Number of stations
26 1 underground station
including
Integration at
5
ASIA JAYA
STATION
Kelana Jaya Line
KTM Port Klang Line
USJ 7
STATION
stations
Parking bays at stations
Ridership
Feeder bus network
DAMANSARA
UTAMA
Integration
Frequency: Minimum of
2 minutes headway
Key features include rainwater harvesting technology, noise
reduction system, energy management system and natural
ventilation
STATION
2
SUBANG
KTM
SUBANG JAYA COUNTRY CLUB
SS15
STATION
JOHAN SETIA
TAMAN
MAYANG
KAMPUNG
SUNGAI
KAYU ARA
AMAN SURIA
DAMANSARA
KELANA JAYA
STATION
GLENMARIE
STATION
MRT BANDAR UTAMA
TAMAN TUN
DR ISMAIL
LEMBAH SUBANG
STATION
STATION
6
STATION
1
STATION
3
STATION
5
SECTION 13
SECTION 15
SECTION 20
STATION
4
ARA DAMANSARA
STATION
11
SECTION 11
AMBANG BOTANIK
ONE UTAMA
BANDAR
UTAMA
STATION
12
STATION
24
Station 13 : Integration with BRT Federal Line (future)
TROPICANA
SHAH ALAM
TOWN CENTRE
BANDAR
BUKIT TINGGI 2
Station 10 : Integration with BRT Federal Line (future)
MUTIARA
DAMANSARA
MRT MUTIARA DAMANSARA
STATION
23
Station 7 : Integration with Kelana Jaya Line
KOTA DAMANSARA
SECTION 7
STATION
21
Five integrated stations designed to provide a more convenient travel
experience and better connectivity for passengers. LRT3 interchanges
with existing and future public transportation services at five points:
*for illustration purposes only, final station design may vary
passengers / day in 2020
6,000 in 2020
Feeder bus to expand transit's catchment area beyond walking
distance (more than 400m)
Coverage Distance - up to 3km from station
Travel Distance Time - 30 minutes
End-to-end journey time
58 minutes
from Bandar Utama to Johan Setia
*for illustration purposes only, final station design may vary

Similar documents