Westfield UTC - Westfield Tenant Coordination
Transcription
Westfield UTC - Westfield Tenant Coordination
West field UTC Retail Tenant Criteria Manual APRIL . 2 013 Mission Statement It is our mission at Westfield to distinguish ourselves through superior performance in retail development and continuous improvement of our portfolio to meet the changing needs of our customers and the retailers we serve. Our commitment to you is to furnish a well-designed, wellmaintained and well-marketed retail environment capable of maximizing traffic and sales. Westfield will become your partner in upgrading the quality of retailing through better Tenants. We are very pleased to become partners with retailers striving for these same goals and are ready to meet your needs, facilitate communication and share our expertise with you to complete your store on time. Welcome to Westfield University Town Center. We wish you great success with the completion of your store and look forward to a mutually profitable relationship. Westfield University Town Center 4545 La Jolla Village Drive, Suite E-25 San Diego, CA 92122 858.546.8858 Retail Criteria Manual 3 Table of Contents MALL PLAN 1.1 Vicinity Map 1.2 Site Plan 1.3 Floor Plan 1.4 Retail Districts Lifestyle/Fashion Main+Main Trends/Youth Active Kids Market/Everyday Convenience Luxury DESIGN GUIDELINES 2.1 Design Intent 2.2 The Storefront 2.3 Store Interiors 2.4 Store Signage and Graphics 2.5 Solar Control STOREFRONT TYPES 3.1 Storefront Types Typical Plan ECHNICAL CRITERIA T (ARCHITECTURAL) 4.1 Storefront Type A Details 4.2 Storefront Type B Details 4.3 Storefront Type C Details 4.4 Storefront Type D Details 4.5 Storefront Typical Footing Detail (All Zones) TENANT SUBMISSION PROCESS 5.1 Phase I: Preliminary Drawings 5.2 Phase II: Final Drawings 5.3 Phase III: Signage Drawing Phase 5.4 Phase IV: Completion Requirements STORE CONSTRUCTION G E N E R A L I N F O R M AT I O N 7.1Landlord Coordinating Stuff 7.2 Base Building Information 7.3Utilities 7.4 Government Agencies 7.5 Code References 7.6Glossary 10.0 ENGINEERING 8.1Plumbing Design 8.2 Mechanical Design 8.3 Electrical and Telephone Design 8.4 Fire Suppression Design 8.5 Smoke and Fire Alarm Design 8.6 General Construction ADDENDA 9.1 Construction Addendum 9.2 Additional Details 9.3 Building-Specific Requirements 9.4 Tenant Construction Barricade Criteria GREEN CRITERIA 10.1 Tenant Green Criteria The new UTC Imagine open air plazas, lush curated landscape, new and exciting shops, restaurants and entertainment venues set in a resort-inspired outdoor environment that celebrates the unique character and lifestyle of San Diego. This is the vision for the revitalization of Westfield UTC. New landscape throughout, updated furniture, refined amenities, elevated level of services and conveniences in a contemporary yet environmentally responsible design are all part of creating the fresh new look and feel of the new UTC. The New UTC will also include: • New casual, fine, and first-to-market restaurants • State-of-the- art movie theatre experience unlike any other in San Diego • Total renovation of the existing food court to a world class Westfield Dining Terrace • Renovation of the existing Ice Rink • Complete common area renovation with new landscape and amenities The New UTC is one of the first projects in the country to achieve Gold-level approval from the U.S. Green Building Council under its pilot LEED-ND (Leadership in Energy and Environmental Design – Neighborhood Development) program. Also planned for Westfield UTC are solar PV arrays on top of new parking structures and potentially more on the retail rooftops. In conjunction with many other energy-efficiency measures, innovative water conservation strategies, alternative transportation choices, waste reduction and sustainable construction techniques, the New UTC revitalization will set a high standard for green development in San Diego and the shopping center industry nationwide. Retail Criteria Manual 5 6 Westfield University Town Center Mall Plans Retail Criteria Manual 7 1.1 Vicinity Map University Town Center 4545 La Jolla Village Drive, Suite E-25 San Diego, CA 92122 4 5 4 5 L A J O L L A V I L L A G E D R I V E , S U I T E E -2 5 • S A N D I E G O • C A 9 212 2 VICINITY MAP 8 Westfield University Town Center 1.2 Site Plan SITE PLAN Retail Criteria Manual 9 I7 SI5 I6 I5 I4 I1 1.3 Floor Plan FLOOR PLAN 10 Westfield University Town Center 1.4 Retail Districts Retail Districts Retail Districts have been introduced at UTC to create a layered customer experience. The atmosphere of each district will be expressed through multiple facets: tenancy mix, common area furnishings and amenities, and areas of activation. The districts are: • Lifestyle/Fashion • Main+Main • Trends /Youth Active • Kids • Market/Everyday Convenience • Luxury Districts are distinct from storefront types, which are described in Section 4 of this manual. While the storefront type prescribes the way a storefront works in section, the district types speaks to the way a tenant’s brand is expressed. Tenants storefronts will contribute significantly to the District experience; tenants should review the following material and ensure that their shops reflect the ambience of their District. The following pages contain descriptions of the character and mood of each district. Retail Criteria Manual 11 1.4 Retail Districts Iconic Electric glow Regular shapes White + pops of color Translucency Technology Boutique Bold graphics Vertical supersignage Showcase 3-Dimensional texture Superscale Recycled materials Natural colors C H H2 D E G F C H H2 MAIN+MAIN D E G F C H H2 MACY’S LIFESTYLE/ FASHION SEARS G F MACY’S E SEARS SEARS D MACY’S Warm glow TRENDS/ YOUTH ACTIVE Districting 12 Westfield University Town Center 1.4 Retail Districts Rounded corners Asymmetry Irregular shapes Joyful Vivid color Chalkboards Sculptural Informal Relaxed Inviting retail Local Feel Eclectic Bazaar Inventive Geometry Clean lines Rectilinear Pattern Repeating, regular “Luxe” palette Quality materials Shimmer Reflectivity C H H2 E G F C H H2 M A RK ET/ EVERYDAY CONVENIENCE D E G F C H H2 MACY’S KIDS D SEARS G F MACY’S E SEARS D MACY’S SEARS Low-Iron Glass LUXURY Districting II Retail Criteria Manual 13 Design Guidelines 14 Westfield University Town Center 2.1 Design Intent DE S I G N I N T E N T The following Design Criteria establish the standards of quality and design for each Retail Tenant to encourage compatibility with adjacent Tenants as well as the overall design philosophy of the project. The Design Criteria are divided into two main sections — Design Guidelines and Technical Criteria. The Design Guidelines cover overall general requirements for all Tenants, regardless of their type or location. The Technical Criteria, Architectural & MEP, each address requirements specific to the different shop types. The Design Guidelines are a basic “set of rules” that the Tenant is required to work with and expand upon. It is written to encourage freedom of expression for all Tenants. New Century Modern Through the Criteria, Tenants are encouraged to create innovative and creative storefronts and shop interiors through the use of graphics, fixturing, detailing, dramatic lighting and color. By following the Criteria, each Tenant can create an inviting and effective retail establishment compatible with the overall UTC Transformation Presentation Inspiration Design 7 Date: 02.22.2011 design concept and image of Westfield malls. Retail Criteria Manual 15 2.1 Design Intent The design of each Retail Tenant at the Westfield mall includes three major components, each subject to separate guideline requirements. These components are: • Storefront • Store Interiors • Store Signage and Graphics Each Tenant, its Architect or Designer, Contractor and Representative should familiarize themselves with the intent, scope, requirements and details of the Criteria. National and Regional Tenants, who have recognizable store designs, are also expected to review these Criteria and modify their design prototypes to ensure compatibility with and compliance to the following Criteria. Any modifications of or deviations from these Criteria must be reviewed with the Landlord and will be subject to approval by the Landlord. 16 Westfield University Town Center t Walk Trends 2.2 The Storefront S T O R E F RO N T DE S I G N The environment of the Westfield mall is largely dependent on the design of Tenant storefronts. The Tenant and the Tenant design team should familiarize themselves with the overall image and design of the Westfield mall to encourage compatibility of their storefront with the project. Storefronts within the Westfield mall are intended to display merchandise in an exciting and innovative promotional manner. Proper attention should be paid to the design and detailing of the storefront and display areas within their Design Control Zone including proportion, scale, color and detailing so as to be compatible with the character of the surrounding environment and district in which they are located. Additionally, careful attention to detail should extend to all public portions of the store. Each store will be reviewed individually for compatibility with the surrounding architectural context and overall project image. Design Date: 02.22.2011 Retail Criteria Manual 16 17 2.2 The Storefront We have developed a Storefront Criteria with specific design elements that should be incorporated into each Tenant’s storefront design. These are: • Provide an individual look while complementing the overall design intent of the project. • Maximize the height of the storefront. • Incorporate three-dimensional design elements at storefront (i.e., signage, entries, display windows and architecture). • Provide maximum transparency from the public area into the lease space. • Create innovative signage. • Incorporate high quality graphics in displays and sales areas. • Showcase your product and your brand. • Create a mood with lighting. • Give careful attention to detail. • Use innovative, high quality and durable materials appropiate to your district such as: glass, glossy metal panels and stone. 18 Westfield University Town Center 2.2 The Storefront Tenants must carefully review the base building design as well as that of neighboring Tenants to ensure that its design complements the Center’s aesthetic and does not conflict with the storefronts of neighboring Tenants. Generally speaking, designs should incorporate horizontal, vertical or framed design elements. GENERAL DESIGN GUIDELINES • Vertical mullions will not be permitted. Caulked • Entry doors must be at least 10’-0” in height and be fully glazed. • Tenants must use hinged entry doors. Butt joint glazing with vertical mullion behind will be considered. Doors • Tenants must use materials that complement the must have self-closing hardware. The use of inno- center’s surrounding material palette. Materials vative sliding or folding doors (vertical and hori- should be panelized, i.e., framed, inside of the fa- All storefronts shall be designed, fabricated and zontal) will be considered on a case by case basis. çade to complement the design aesthetic of the installed by the Tenant at the Tenant’s expense and • Any storefront entry door, which swings toward subject to landlord approval. base building. the public area, shall not be permitted to swing • Tenants with designated patio areas must provide past the store’s lease line (or storefront zone) into plans and sections illustrating railing placement in the public space or beyond adjacent storefront relationship to the storefront. surfaces into the flow of traffic. • Opaque doors or standard aluminum doors are not permitted. Retail Criteria Manual 19 2.2 The Storefront • For service or café Tenants without designated patio areas, incorporating small outside bistro seating underneath sun shading is encouraged. These seating areas should be partially recessed behind the lease line and may partially extend into the sidewalk. Tenants should coordinate with Landlord on specific dimensions of such seating areas. 20 Westfield University Town Center 2.2 The Storefront Storefront Materials Tenants must employ high quality materials in the U S E O F T H E F O L LO W I N G M AT E R I A L S I S construction of their storefront. PROHIBITED: U S E O F T H E F O L LO W I N G F I N I S H M AT E RIALS IS ENCOURAGED: • Marble, granite, terrazzo, limestone and other natural stones. • Metals, mechanically finished (brushed and polished) or factory painted. • Finished woods - paneling, trim, flooring, moldings and millwork. • Glossy materials such as glass, transparent and back painted. • High quality synthetic textured finishes. • Plastic laminates • Vinyl wall covering or wallpaper • Painted drywall • Textured paint, stucco, shingles, cork, or carpet • Vinyl tile or sheet vinyl • Clear mirror • Plywood or MDF panels • Any other material which, in the sole opinion of the Landlord, is of poor quality, inappropriate finish, or is incompatible with adjacent Tenant or common area finish materials. • Other types of quality, durable materials. Retail Criteria Manual 21 2.2 The Storefront Display Windows Add Dimension With increased transparency of the Storefront, Push and pull your storefront. Add layers of interest. additional attention must be placed on Display Grab your customers’ attention with innovative between Landlord common area and Tenant space merchandising outside the storefront envelope, and becomes more transparent, dynamic display areas let them discover all you have to offer in stages. offer the Tenant an opportunity to visually bring their store interior beyond the lease line and present the customer with vibrant and innovative merchandising that changes through the seasons. Tenants must use a minimum of 60% of the storefront width for display. Although display areas may at times be backed by partial or full height partitions, Tenants are required to maximize transparency from the public area into the Tenant’s sales area. Backing walls or fixtures in the display window that partially block views into the sales floor, from the common area, are permitted as long as sight lines into the space are maintained across the entire storefront width. Opaque portions of the storefront facing the public area shall not exceed 10% of the storefront area, i.e. 90% of storefront shall be either transparent, clear glass, or openings designed to provide a view into the display area or store. Excessive use of continuous full height length opaque material will not be permitted. Poster rails with suction cups to hang graphics is not permitted. 22 Westfield University Town Center 2.2 The Storefront Extension of Project Floor Materials and Storefront Base The Landlord shall provide common area flooring T H E S T O R E F R O N T B A S E M AY B E A N Y material to the lease line. The Tenant must ensure, ONE OF THE FOLLOWING: at its sole cost and expense, that the Landlord’s • A 4” – 8” high granite, marble, or other natural common area floor finish abuts the Storefront stones base matching the Tenant’s storefront and is carried into entry vestibules to the materials. storefront closure line unless otherwise approved • A 4” – 8” high stainless steel, brass, anodized by landlord. (See transition detail in Technical aluminum, or enameled base integrated with the Criteria). rest of the storefront design. The level of the tenant’s finished floor must match the level of the common/public area finished floor at storefront entry. No threshold, reducer strips, or other wide transition devices shall be permitted at the intersection of the project flooring and the store interior flooring. Thin stainless steel (SS) transition strips are allowed. Vinyl or rubber bases will not be permitted. Retail Criteria Manual 23 2.3 Store Interiors STOR E INTER IOR S Design control zone Store interiors at the Westfield mall should project The Design Control Zone is the entire sales area of the • A hard surface floor treatment (marble, granite, a high standard of presentation equal to the Tenant space, unless otherwise noted. For shallow limestone, terrazzo, porcelain tile or wood) is storefront and the two must be compatible in their spaces, the Design Control Zone may be shortened required within the Design Control Zone. design. All interior treatments are subject to the on a case by case basis; this determination is up to the approval of Landlord as they pertain to durability and sole discretion of the Landlord. appropriateness to overall image of the project. Since the Design Control greatest exposure, special recessed into the ceiling. Track fixtures may not be Zone receives the attention must be visible from the Mall common area. • Cash wrap may not be located within this zone. merchandising, displays, and fixtures. • Slat wall, plastic laminate fixtures, grid displays, hard surface material. • Acoustical tile is not permitted. Westfield University Town Center used unless they are recessed into a coffer and not given to materials, colors, lighting, signage, • Ceiling must be painted gypsum board or other 24 • All lighting within the design control zone must be and mirrors are prohibited within this area. • Sprinkler heads must be fully recessed with a cover plate painted to match ceiling color. 2.3 Store Interiors Visual Presentation and Merchandising Strong visual presentation and merchandising are • Fixtures shall not be overstocked. Tenant’s essential and integral components of store design. drawings shall indicate fixture quantities, quality, Displays in the storefront and within the interior location, details and finishes. should be bold, strong and imaginative. Tenants are encouraged to retain a visual presentation design consultant to assist in providing the most effective merchandising concept. Tenants shall install custom designed and color-coordinated fixtures including, but not limited to the following: • Cash wrap/counter • Display counters and shelves • Wall cabinets • Showcases • Pedestals, platforms, tables, etc. • Manufactured wall display systems • Changing rooms (where applicable) • Chrome racks, rounders, four-ways and basic display tables are not acceptable. • All standards for shelves and fixtures shall be recessed. • Cash wraps shall provide a recess for cash registers. • Trash containers and supplies shall be concealed. • Displays are not permitted beyond the lease line. • Visible stacks of inventory, lengthy rows of clothing racks, folding tables, cluttered entrances or merchandise set on the floor are not permitted. • Use of the following material are prohibited: - slat wall. - grid racks surface mounted to drywall. Retail Criteria Manual 25 2.3 Store Interiors Flooring Floor treatments can assist in defining areas, act • Floor materials should be limited to the line of the as a directional indicator, and encourage desired storefront and not extend into the public area or in circulation patterns throughout the space. Hard recessed storefront areas. surface floor finishes are required in all public (sales) • All finishes must be flush with one another with no areas of the Tenant’s space. The use of carpet as tripping hazards. Lips of more than 1/16” and slopes an accent element to define sales spaces shall be of more than 1/2” per foot are not acceptable. considered on a case by case basis and is subject to Landlord’s written approval. E N CO U R A G E D F L O O R I N G M AT E R I A L S : • A hard surface floor treatment (marble, granite, limestone, terrazzo, stained concrete, ceramic or porcelain tile, wood) is required within the storefront Design Control Zone. Vinyl or imitation materials are not acceptable. • Hardwood floors are acceptable if suitable finishes are selected. Inexpensive parquet squares and laminated wood floor treatments are not acceptable. • Carpet used as inserts, borders, in connection with wood, stone, and ceramic tile is permitted. Direct glue down is preferred to carpeting with a pad. 26 Westfield University Town Center USE OF THE FOLLOWING FLOORING M AT E R I A L S I S P R O H I B I T E D : • Indoor/outdoor carpet is not permitted. • Quarry tile is not permitted within the sales area. It is permitted in back-of-house areas only. • Vinyl tile and vinyl or rubber bases are not permitted within the sales area. They are permitted in back-of-house areas only. • Laminate flooring will not be permitted in the sales area. • Tenant floor materials may not extend into the public area or in recessed storefront areas. • Square tiles smaller than 24”x24” (i.e. 4”x4”, 6”x6”, 18”x18”) 2.3 Store Interiors Ceiling A store concept can be established in the ceiling plane • The use of open ceilings will be considered on a case with regards to identity, character and uniqueness. by case basis as approved by building department. The Landlord encourages Tenants to be particularly If approved, Landlord may specify colors and innovative in articulating ceilings with raised, dropped, treatments of elements that are exposed. vaulted or covered treatments. Use of a variety of • Painted gypsum board may be acceptable when framed with other elements to protect all corners. • The rear wall of the sales area is an important feature of the overall design concept and is often a focal point for displays, signage and ceiling materials is encouraged within the store interior merchandise; design consideration should be (including gypsum board, wood and metal). given to this area. • Ceiling heights shall be maximized to provide a spacious interior. Ceiling heights within the USE OF THE FOLLOWING WALL Storefront shall not be lower than the top of the M AT E R I A L S A R E P R O H I B I T E D : storefront glazing. Tenants should refer to the • Inexpensive paneling, simulated wood laminates, Technical criteria for specific zone in which space corkboard, carpeting and pegboard are not is located. acceptable. • Where the interior ceiling is lower than the • Excessive use of mirrors or slat panels on walls storefront height, careful attention shall be and columns is not acceptable. given to the transitions between ceiling heights. • Entries and doors to storage/ stock areas should Dropped fascias at right angles to the ceilings are not be placed in customers’ direct line of sight. encouraged and gradual transitions with lit coves encouraged. • All ceilings in the public sales area must be constructed of painted gypsum board or other hard surface materials and must be integrated with other acceptable materials. • Acoustical Ceiling Tiles are not permitted in the sales area. Walls • All interior partitions must be finished with suitable materials whether exposed to the public or not. • Acceptable finishes include, but are not limited • Innovative suspended ceiling systems will be to, commercial grade wallpaper, contact vinyl considered by the Landlord on a case by case materials, and flame resistant paneling in wood, basis and is subject to Landlord’s written approval. metal, stone or fabric. Standard Acoustical Ceiling systems will not be permitted within the public (sales) areas. Retail Criteria Manual 27 2.3 Store Interiors Lighting Lighting sources and fixture types must be carefully INTERIOR LIGHTING REQUIREMENTS & selected in order to create a variety of ambient, RESTRICTIONS: decorative and accent illumination. The Landlord encourages the Tenant to retain a lighting design consultant to assist in providing the most effective lighting concept. STOREFRONT LIGHTING REQUIREMENTS AND RESTRICTIONS: • Direct visual exposure of lamps is prohibited. • All visible lighting is to be glare free. • All lighting of storefront and signage is to be provided by Tenants. • Track fixtures are permitted if they are not visible from the Public Zone and are contained within a light pocket in the window display. • All storefront lighting shall operate during mall hours and shall be controlled by a time clock. • Decorative Metal Halide spotlighting within storefront display areas is encouraged. • Exposed Neon signage is not permitted. 28 Westfield University Town Center • Specialty fixtures that can be suspended off walls or store fixtures and pendant fixtures that add definition are encouraged. • Dramatic lighting of the ceiling and wall planes is encouraged. • Occupancy sensors are required in all back of house areas to control lighting. 2.3 Store Interiors Security Devices Additional Requirements Freestanding Tenant security devices or security • Tenant shall provide accessible facilities as • All Tenants must specify dual flush toilets, touch system, if any, shall not be installed or placed in required by governing codes and The Americans free faucets and waterless urinals (if applicable) operation unless the Tenant has specifically received with Disabilities Act (ADA) whichever is more in their rest rooms as outlined in the criteria. Landlord’s prior written consent as to the size, stringent. Tenants remodeling an existing space that plan location, and design. The use of concealed or underground security systems is required. • The Tenant shall not disturb, disrupt, or modify the building’s structural system, unless approved to reuse the existing rest room must replace old fixtures with those outlined above. in writing by the Landlord, and the Landlord’s Structural Engineer. The Tenant shall also ensure that finishes remain unimpaired. Retail Criteria Manual 29 2.4 Signage and Graphics S T O R E S I G N AG E A N D G R A PH I C S The purpose of the storefront signage and graphics design criteria is to encourage the design of Retail Tenant signage and ensure it is appropriate for the store and the surrounding context, contributing to the Center’s image and character, and is visually attractive. Consequently, creative interpretation of the following criteria is encouraged. Tenants are to install Blade Signs on Tenant’s storefront (not on Landlord’s neutral pier) per design criteria. Signage Design Philosophy Unlike many other retail centers, the image and design of Westfield malls warrants a unique and original approach to signage and graphics. The primary intent of these Store Signage and Graphics Design Criteria is to enhance this image by providing the groundwork for imaginative, innovative and avantgarde graphics and signage for each shop and its storefront. Each Tenant is encouraged to develop signage and graphics that are bold and dynamic in image, color, materials, and design. Signage should not only incorporate text that identifies the Tenant, but also graphics and forms that indicate identity, character, and image. The use of graphics at the storefront and in display windows adds a vibrant and possibly dynamic element to the design of the retail space. Tenants are encouraged to explore innovative use of graphics and technology as both a store signage and marketing element. 30 Westfield University Town Center 2.4 Signage and Graphics Store Signage and Graphic Guidelines The following are general graphic guidelines to be • The individual letter height may not exceed • Sign cabinets or boxes must be recessed into used in the development of all signage and graphics 18” high (any exceptions must be approved the storefront, flush with the storefront and have elements unless otherwise noted: by landlord), and linear footage of signage a faceplate that matches the adjacent storefront should not exceed more than one half the finish material. Such signage applications may not total width of the storefront. project past the storefront. • Signage and environmental graphics must be conceived as an integral part of the design so they do not appear as an afterthought application. • All signs shall be presented to the Landlord for approval prior to commencement of fabrication. • All submitted Tenant shop and storefront elevations must illustrate proposed signage in each phase of the presentation. • Primary storefront identification shall be limited • All illuminated signs must be controlled by • All graphics and signage shall be professionally Tenant’s time clock and illuminated during assembled and displayed in a first-class manner. general operating hours as defined by the Hand-written signage will not be allowed. Landlord. Storefront glazing (maximum height of letters • Exposed signage lamps and fixtures are subject to is 3” and mounted 36” above finish floor) must approval by the Landlord. • Light leaks will not be permitted. to Tenant’s trade name, as approved in the Lease, • All “UL” labels to be placed out of public’s view. or as otherwise approved in writing by Landlord. • All signage must be placed out of reach. • Nationally recognized Tenants may use a crest, • Signage and graphics applied directly to the shield, logo, or other established corporate storefront glass must have matching letters and insignias, but are encouraged to incorporate features on both sides of the glass to create a them in a three dimensional approach befitting of finished look when viewed from either side. the image of the district in which they are located. • All signs must fit comfortably into their storefront architecture, leaving sufficient margins and negative space on all sides. Thickness, height, and colors of sign lettering and graphics must be visually balanced and in proportion with other • Vinyl or other appliqués to the interior face of the • All signage lighting must be baffled or concealed. be submitted in the Tenant’s signage package for Landlord approval. Graphics on the exterior face of glazing will not be permitted. Storefront window vinyl sale stickers not permitted. Vinyl advertisment is permitted as part of a seasonal display window presentation. • Individual pin mounted letters may project past the storefront up to 6” and must be placed no less than 10’-0” AFF. • The Tenant must verify signage complies with all local codes and jurisdictions. signs within the project. Retail Criteria Manual 31 2.4 Signage and Graphics Accepted Signage Approaches and Types • Mixed media signs incorporating multi- dimensional forms and combinations of colors, shapes, materials, and lighting. • Dimensional geometric shapes and three- dimensional forms. • Contemporary elements to create an avant-garde appearance. • Silhouette illumination • Front lighting, i.e., billboard lighting • Channel letters with light transmitting acrylic letters are allowable for Tenants with street-facing storefronts only. • Sign must be UL listed. • Internally illuminated: • Application of innovative technologies. - reversed channel letters • Dimensional letter forms with seamless edge - push through letters treatments • Reverse channel lettering • Cut or fabricated steel, painted or unfinished. • Etched metal or glass, sandblasted glass • Polished metal • Dimensional shapes and forms of metal, hardwood, glass, or other material with a permanent appearance. • Glazed ceramic tile work forming patterns and/or fields. • Fiber Optic and L.E.D. illumination 32 Westfield University Town Center • Sign contractor is responsible to insure that sign is on separate circuit and on 7 day time clock set to Westfield mall requirements. Sign must have provisions to be turned off during daylight hours. 2.4 Signage and Graphics PR O H I B I T ED SI G N APPR OACH E S AN D T Y PE S • Internally illuminated channel letters with plexi face and trim cap. • Signs made of paper, fabric or sheet of acrylic • Credit card signs or symbols • Neon signage will not be permitted • Noise-making signs • Conventional plastic faced box or cabinet signs • Animated signs: signs consisting of anything • Formed plastic or injection molded plastic signs • Channel letters with light transmitting acrylic faces. swinging, rotating, flashing, blinking, scintillating, strobing, including any moving electronic message boards or centers, or temporary lighting, such as but not limited to search, flood, or • Luminous vacuum formed letters fluorescent gel lights. • Temporary wall signs, window signs, pennants, - Any other materials and/or designs deemed banners, flags, inflatable displays, or sandwich unsuitable by Landlord. boards. • Cloth, paper, cardboard or foam signs, or decals hung around on or behind storefronts. Retail Criteria Manual 33 2.4 Signage and Graphics Blade Sign Each Tenant blade sign should conform to the following criteria: • Tenants must incorporate blade signs into the exterior facade in all zones except for the Main + Main district. • Signage must be designed for outdoor use and meet all applicable building codes. Blade sign design approval and location is subject to landlord approval. • Sign must be double sided. • Sign must be illuminated . • Tenant to brand sign with their signature color and finish. • Minimum mounting height to bottom of sign is 8’-9”. • Check with Tenant Coordinator to determine mounting justification to left or right of storefront. • Innovative approaches are encouraged and will be considered on an individual basis: a blade sign integrated with sun shading, for example. • Maximum blade sign face is 4 sq. ft. • Blade signs may not have visible mounting hardware. 34 Westfield University Town Center 2.5 Solar Control S O L A R C O N T RO L Tenants should perform a solar study for the façade and incorporate solar shading as needed to minimize heat gain through storefront glazing. Solar protection must be integrated with the overall design of the storefront. Location, proportion, dimensionality, finishes, and illumination should be considered. Solar protection should be appropriate to the tenant’s retail district. Some considerations: • Solar film may by used, subject to Landlord approval. • Combustible canopy structures (wood, canvas, etc) will require sprinkler protection since the material and/or finish is “combustible” and NFPA 13 would require sprinkler protection. Noncombustible canopy structures that cover only pedestrian walkway surfaces do not require sprinkler protection. Noncombustible canopy structures that cover any combustible materials (bench, trash can, sign, merchandise, etc) requires sprinkler protection if the canopy extends from the exterior wall 4 feet or more. • Recessing a part of the storefront will naturally result in shade. • A variety of materials and types may be considered: wood, steel, aluminum, or glass; solid or perforated; fixed or adjustable; horizontal or vertical louvers. • Standard aluminum canopy systems will not be permitted • Standard fabric awnings will not be permitted • Placement of sun shading must take into account the storefront design of adjacent Tenants. Tenants may not install shading elements at the same height as an adjacent Tenant. Retail Criteria Manual 35 S SF SF C C8 C9 SF I5 I4 I1 2.5 Solar Control I7 SI5 I6 SUN SHADING PLAN hot Sun shading devic e by tenant required wa r m Sun shading devic e by tenant required cool B e l o w L a n d l o r d c a n o p y. Te n a n t s u n s h a d i n g cool M a r k e t P l a c e z o n e . Te n a n t s u n s h a d i n g devic e per mit ted devic e per mit ted. Must be c oor indated with L andlord Buklhead ( This area is not expo e s e d t o a l o t o f s u n) 36 Westfield University Town Center S SH SH 14 SH 15 SH 16 SH 17 SH 18 SH 19 S 2 S H2 5 S H3 9 SJ H31 0 5 1 7 SF C2 C8 C9 SF SF C1 SF 2 SF 3 SF 4 SF 5 SF 6 SF SF I5 I4 I1 SF 2.5 Solar Control I7 SI5 I6 SUN SHADING PLAN Affected by Fire Rated Walls 2-Hour and 4-Hour fire rated area separation walls *Note: Canopy construction should not occur within 4’-0” of the separation walls. Retail Criteria Manual 37 2.5 Solar Control 3’- 0 ” min 12’-0” (10’-0” permitted at LL discretion) 12’-0” (10’-0” permitted at LL discretion) SEE BELOW FOR PARAMETERS SUN SHADING OPTION 1 : PROJECTING SHADING DEVICE SCALE : NTS 38 Westfield University Town Center SEE BELOW FOR PARAMETERS SUN SHADING OPTION 2 : LOUVERS SCALE : NTS 2.5 Solar Control Retail Criteria Manual 39 PAGE INTENTIONALLY LEFT BLANK 40 Westfield University Town Center Storefront Types Retail Criteria Manual 41 3.1 Storefront Types *Heights given are to Top of Tenant Storefront. TENANTS TO VERIFY ALL DIMENSIONS AND BASE BUILDING CONDITIONS 12’-6” 19’-3” 0” ’-1 21 22’-0” 22’-6” 20’-6” 23’-0” 22’-3” 21’-4” 24’-0” 20’-3” 31’-0” 27’-0” 21’-7” 23’-3” 20’-6” 20’-6” 22’-6” 19’-5” 20’-9” 20’-9” 24’-6” 22’-3” 24’-2” 20’-9” 21’-0” 0” ’-1 ” 21 ’-4 20 21’-3” 31’-9” 22’-0” 24’-6” ” ’-1 18 26’-0” 0” ’-1 21 22’-6” 12’-6” 22’-0” 34’-0” 32’-6” I1 27’-0” I4 Type A I5 Type B I6 Type C I7 SI5 Type C.1 Type D Type D.1 42 Westfield University Town Center 23’-10” N Technical CriteriaArchitectural Retail Criteria Manual 43 Storefront Technical Criteria The following guidelines are specific to the various zones and storefront types at Westfield University Town Center. In addition to the design guidelines outlined in Section 2.0 of these criteria, Tenants must adhere to the zone specific criteria defined in this section. The storefront sections and elevations contained in these criteria are for reference use only; the Tenant’s design team must verify the conditions of the space they are designing for thorough site surveys . In the event that the criteria in this section conflict with those outlined in Section 2.0, those in this section will govern. While all Tenants are expected to conform to the General and Technical Criteria, the Design Criteria addresses the specific requirements related to various architectural conditions depending on Tenant location. This section of the Design Criteria is intended to define parameters and stimulate creative design resolutions relative to different areas of the Center. The objectives are: • to encourage design diversity • to emphasize character and identity through architectural expression • to promote the use of quality materials and detailing • bring visual excitement, enhancing the overall shopping experience Tenant must refer to key plans to determine which condition and criteria to follow. 44 Westfield University Town Center 4.1 Storefront Type A Details T Y PE A Type A shops are conceived as independent, jewellike buildings. Tenants in Type A storefronts have the opportunity to fully express their identity by creating a recognizable, landmark building at UTC. • Tenant brands entire facade • Minimum 90% transparency full-height glazing • Iconic • Flagship • Signature • Showcase • Superscale Retail Criteria Manual 45 4.1 Storefront Type A Details ANODIZED ALUMINUM ANODIZED ALUMINUM CHANNEL AND ACCOUNT FOR VERTICAL AND LATERAL LOADS 46 Westfield University Town Center 4.2 Storefront Type B Details T Y PE B Characteristics of Type B storefronts include: • Tenant brands entire facade up to Landlord cornice • Entirely or predominantly glass • Clean lines • Framed • Vitrine Retail Criteria Manual 47 4.2 Storefront Type B Details ANODIZED ALUMINUM CHANNEL ANODIZED ALUMINUM CHANNEL REVEAL BETWEEN AND ACCOUNT FOR VERTICAL AND LATERAL LOADS 48 Westfield University Town Center 4.3 Storefront Type C Details T Y PE C Characteristics of Type C storefronts include: • Linear • Taught • Streamlined • Tenant brands entire facade up to Landlord cornice Tenants must use transparent glass up to the existing structure (approximately 14’-0”); above that, an opaque material will be required to conceal the structure. Retail Criteria Manual 49 4.3 Storefront Type C Details AND ACCOUNT FOR VERTICAL AND LATERAL LOADS 50 Westfield University Town Center 4.3 Storefront Type C1 Details ANODIZED ALUMINIUM CHANNEL ANODIZED ALUM. CHANNEL REVEAL AND ACCOUNT FOR VERTICAL AND LATERAL LOADS Retail Criteria Manual 51 4.4 Storefront Type D Details T Y PE D Characteristics of Type D storefronts include: • Informal • Indoor-outdoor • Three-dimensional • Tenant brands entire facade up to Landlord cornice Tenants must use transparent glass up to the existing structure (approximately 12’-6” to 14’-0”); above that, an opaque material will be required to conceal the structure. 52 Westfield University Town Center 4.4 Storefront Type D Details ANODIZED ALUM. CHANNEL REVEAL ANODIZED ALUMINUM CHANNEL AND ACCOUNT FOR VERTICAL AND LATERAL LOADS Retail Criteria Manual 53 4.4 Storefront Type D1 Details ANODIZED ALUMINUM CHANNEL ANODIZED ALUM. REVEAL CHANNEL BETWEEN STOREFRONTS AND ACCOUNT FOR VERTICAL AND LATERAL LOADS 54 Westfield University Town Center 4.5 Storefront Typical Footing Detail - All Zones Retail Criteria Manual 55 Tenant Submission Process 56 Westfield University Town Center T E N A N T SU B M I SS I O N PR O C E SS Drawing Submissions The Tenant, at Tenant’s expense, must select an architect to prepare complete plans and specifications for the improve- Plans must be submitted to Landlord for approval ments to the premises. The Tenant and the Tenant’s architect may be subject to certain contracting, first source refer- in three phases: Preliminary Design Documents, ral, hiring and job training programs. The Tenant must contact coordinator for specific requirements. Please refer to Construction Documents and Sign Shop Drawings. the first section under “Store Construction” of this handbook for additional information. These phases are detailed in this Section. Tenants needing assistance in locating an experienced, locally licensed architect should contact the Tenant Coordination Administrator. The Tenant must forward a copy of this Handbook along with a print of the Tenant Lease All drawing submittals shall be in full size (42”x30”) Adobe PDF format. Plan, Design Control Drawings and associated details to their architect. It is the Tenant’s and Tenant’s architect’s All drawings shall be submitted electronically at responsibility to obtain, review, and comply with all applicable codes and criteria contained herein. The Tenant shall www.westfieldtenantcoordination.com. Please notify the Tenant Coordinator of the architect’s name, address and telephone number within 10 days of Lease execu- contact Westfield Tenant Services Administrator or tion or receipt of Tenant Lease Plan Package. TSA for project specific login information. All drawings must be signed and sealed by an architect registered in the State of California. Tenants are required to submit, for final Landlord approval, one color rendered Storefront Elevation After receiving the Exhibit A2 or Lease Outline Drawing (L.O.D), carefully reviewing the design criteria and applicable correctly illustrating the Tenant’s colors and finishes. codes, and field verifying the space conforms with the Exhibit A2 or Lease Outline Drawing (L.O.D), the Tenant’s archi- This shall be in the form of PDF, JPEG or comparable tect (in conjunction with the Tenant) shall proceed with the preliminary design of the Tenant’s premises. image file. It is the responsibility of the Tenant and Tenant’s architect to schedule adequate time for Landlord’s preliminary review, Tenant’s subsequent revisions if required, final construction drawings and Landlord’s final review. Tenants must submit a 11”x 17” physical color sample board which shall be mailed to the Landlord’s Tenant Coordination Office. Retail Criteria Manual 57 T E N A N T SU B M I SS I O N PR O C E SS 5.1 Phase I: Preliminary Drawings PH A S E I : PR E L I M I N A RY DR AW I N G S The purpose of this phase is to acquaint the Landlord with Drawings must include the following information as a The Tenant Coordinator will review the preliminary the Tenant’s design intent so that the Landlord may com- minimum: design and make necessary corrections or suggestions ment and/or advise Tenant of any changes necessary to • Minimum drawing size shall be 11” x 17”. and return, with comments and/or approval, one marked- meet the criteria prior to commencing the working draw- • Preliminary floor plans (scale 1/4”=1’-0”) indicat- up set of prints to the Tenant and Tenant’s architect. ing phase. ing interior design concept, approximate location of fixtures and equipment, interior partitions, toilet As soon as the preliminary design has been completed rooms, exits, etc., identifying all materials& colors. and approved by the Tenant and, before proceeding with • Reflected ceiling plan (scale: 1/4”=1’-0”) indicating final working drawings, Tenant’s architect shall submit the all soffits, ceiling heights, materials, lighting lay-outs, preliminary design to the Tenant Coordinator for review and and location of HVAC diffusers. approval. • Typical interior transverse and longitudinal sections (scale: 1/4” = 1’-0”) indicating interior elevations. The preliminary design shall be submitted within 20 days • Storefront elevation (scale: 3/8”=1’-0” minimum) and after the Lease is executed or receipt of the Tenant Lease section (scale: 3/4”=1’-0” minimum), including any Plan Package. graphics and signage. Indicate all materials and finishes. Drawings shall clearly identify on a key plan the Project name, Tenant’s store name, and space number. • Submit a color rendered elevation of the storefront. • Sketches, perspectives, sections or other details that If Tenant’s Storefront design follows a specific prototype, photographs of existing stores should be submitted to aid the Tenant Coordinator in the review process. will clarify the design of the Storefront. • Material finish and color sample board(s), properly mounted and labeled. Photos of materials will not be accepted. 58 Westfield University Town Center T E N A N T SU B M I SS I O N PR O C E SS 5.2 Phase II: Final Drawings PH A S E I I : F I N A L DR AW I N G S After the preliminary drawings have been approved, Tenant’s architect shall proceed with the final Construction Documents and specifications. These drawings shall incorporate the design suggestions and comments of the Tenant Coordinator, in accordance with the criteria contained in this Handbook and the Lease Exhibit B. Additional information may be required as deemed necessary by Landlord upon review of Tenant’s drawings. Tenant shall submit final Construction Documents within 21 days of receipt of Landlord’s approval of preliminary drawings. Tenant shall submit the final Construction Documents to the Tenant Coordinator. All drawings and specifications must be clearly identified with the Project name, the Tenant’s store name, the Tenant space number, and the name and seal of the architect or engineer preparing these drawings indicating that he or she is registered with the State of California. Tenants are required to submit a color rendered elevation of the storefront in the final submittal package. Re-submittal of rendering with finals package can be waived if no significant changes were made to façade. Final working drawings and specifications shall consist of a minimum of the following: Responsibility Matrix Landlord at Landlord’s expense Items listed in this manner shall be provided by the Landlord, at the Landlord's expense, in accordance with the Landlord's plans and specifications and constitutes the Landlord's complete responsibility with regard to the construction of the Lease space. All items not listed in this manner, which are required to complete the premises in accordance with Tenant's plans and specifications, shall be performed at the Tenant's sole cost and expense (subject to the conditions imposed by the Landlord). Landlord at Tenant’s expense Items listed in this manner will be provided by the Landlord, at the Tenant's expense, in order to either maintain complete control over quality and workmanship of critical installations for work which can best be performed and coordinated by a single contractor; or where uniformity of material, color and workmanship of finished surfaces is required. If for any reason the Tenant fails to pay amounts due the Landlord hereunder, then such amounts, along with accrued interest charges, will be considered to be additional rent due and payable pursuant to the Lease, or deducted from the Tenant Allowance. Landlord’s designated contractor at Tenant’s expense Items listed in this manner shall be provided by the Landlord's Designated Contractors, at the Tenant's expense, in order to either maintain complete control over quality and workmanship of critical installations for work which can best be performed and coordinated by a single contractor; or where uniformity of material, color and workmanship of finished surfaces is required. This work must be contracted directly with the Landlord designated contractor, by the Tenant, at Tenant's expense. Landlord shall competitively bid all parts of construction that require Tenant use of Landlord designated contractor, to assure the best, lowest price. If for any reason Tenant fails to pay amounts due to the Landlord's Designated Contractor, then such amounts along with accrued interest charges will be considered rent due and payable pursuant to the Lease or deducted from Tenant's allowance. Tenant at Tenant’s expense Items of construction and expenses not specifically listed in the prior sections which are required to complete the Tenant’s premises in accordance with the Landlord criteria shall be the Tenant’s responsibility and shall be provided by the Tenant at Tenant’s expense. Retail Criteria Manual 59 T E N A N T SU B M I SS I O N PR O C E SS 5.2 Phase II: Final Drawings Architectural Plans Drawings must contain the following information: • Detailed Plot Plan, including: building footprint Reflected Ceiling Plan (1/4” = 1’-0”) • Ceiling heights including drops and soffits. site plan, Tenant address, name of business, type of • Types of ceiling construction. building construction, and if sprinklered. • Decor at ceiling. • Occupancy load. • Construction type classification. • Location of lighting fixtures, sprinkler heads, air diffusers, grilles, and access panels. Regulations and Title 24. • An approved ADA path of travel should be incorporated in each Tenant’s improvement package. • Longitudinal and transverse sections through store from slab to rough ceiling (1/4”=1’-0”). • Large scale section through storefront from floor to rough ceiling (3/4”=1’-0”). • Store closure details. • Details at neutral piers and Landlord’s bulkhead at • Use or occupancy classification. • Compliance with California Disabled Access Necessary Sections and Details Storefront Elevations (3/8” = 1’-0” minimum) and Interior Elevations (1/4”=1’-0”) • Color storefront elevation and/or submit photograph of similar stores as required. ceiling (1-l/2”=1’-0”). • Wall sections and details. • Dimensioned Slab Penetration Plans. • Storefront Structural Drawings • Finishes and colors. Floor Plan (1/4” = 1’-0”) • Signage. Schedules • Demising wall locations and dimensions. • Menu boards for food Tenants. • Door and hardware schedules/details. • Dimensioned interior partitions. • Toilet room interior elevations locating all toilet • Room finish schedule. • Existing and proposed walls. room accessories indicating ADA compliant mount- • Rest room facilities. ing heights. • Door locations, sizes, direction of swing. • Location of fixtures and equipment. • Floor Plans are required to have details showing that rest room facilities, public telephones, drinking fountains, door hardware, handrails, stairs, and point of sale locations are in compliance with Title24 California Administrative Code. 60 Westfield University Town Center T E N A N T SU B M I SS I O N PR O C E SS 5.2 Phase II: Final Drawings Plumbing Plans The plumbing drawings shall incorporate all minimum design and construction requirements. Heating, Ventilating & Air Conditioning Plans The HVAC drawings shall incorporate all minimum design and construction requirements, including complete cal- Plumbing Plan (1/4” = 1’-0”) culations indicating heat gain to and heat loss from the • Toilet facilities space for all lights, occupancy, exterior exposure (if any) • Location of all plumbing fixtures and other heat producing elements. • Specifications of exhaust equipment • Location of equipment (including front and side elevations) • Methods of installation Schedules and Details • Diffuser and Grille Schedule • Location of sewer connection • Location of plumbing vent connection Exhaust Systems HVAC Plan (1/4” = 1’-0”) • Equipment schedule • Location of clean-outs and floor drains • Location and size of HVAC equipment • Toilet exhaust duct connection detail • Domestic water distribution system • Ductwork layout and sizes • Title 24 Energy Conservation Calculations • Water meter location • Ductwork material schedule • Height above finished floor Necessary Isometrics and Details • Sanitary system isometric • Domestic water isometric • Damper locations • Combination fire/smoke dampers at penetrations through fire-rated construction • Water heater detail with relief valve and piping • Type of insulation • Detail of connection to Landlord’s systems • Location of diffusers, grilles and registers • Piping details for air handling units • Thermostat location • Title 24 Energy Conservation Calculations • Return Air Path • Ductwork • Transfer Openings • Air Handling Unit mixing box detail Retail Criteria Manual 61 T E N A N T SU B M I SS I O N PR O C E SS 5.2 Phase II: Final Drawings Electrical Plans Minimum design and construction requirements includ- Electrical Plan (1/4” = 1’0”) Schedules ing complete calculations and show the total simultane- • Location of all floor and wall outlets • Lighting Fixture Schedule ous load maintained at three hours or more for the store • Location of main service panels • Electrical Panel Schedules for 277/480V area and all other light, HVAC, and miscellaneous loads per • Location of connections, disconnects and controllers for toilet exhaust and other fans, motors and all square foot. HVAC equipment Electrical drawings and specifications shall show power and transformation for voltages, all circuits for store lighting (including emergency and night lighting), sign lighting, receptacles, toilet exhaust and other fans and service • Location of all transformers, electrical and phone panels • All loads assigned to circuits including an itemized load break down Lighting Plan (1/4” = 1’-0”) Show single line power riser diagram indicating main disconnects, size of wire, conduit, panels, trans-formers, time • Lighting fixture layout including night and sign lighting clock, etc. Show panel schedule and itemized load break- • Emergency and exit light locations down in connected kilowatts for the premises including • All lighting assigned to circuits lighting, receptacles, sign lighting, water heating, special • Indicate sign and lights which are connected to time appliances, toilet exhaust fans, make-up air fan, miscellaneous space heating, sales door operator motor, fan coil unit, return air fans, air curtains, heat pumps, and large motors, etc… clock • Emergency lighting and connection to Landlord provided Circuit • Fire Alarm Plan • Location of all devices • Logic and sequencing • Load calculations and voltage drop Westfield University Town Center Miscellaneous Details • Electrical Distribution Riser Diagram • Feeder conduit and wire size • Arrangement of panels, transformer, time clock, disconnects, meter, etc. • Indicate telephone and conduit locations to HVAC and supplementary equipment. 62 or 120/208V. • Conduit and wire size to HVAC equipment and panels as applicable • Title 24 Energy Conservation Calculations and controls compliance statement • Provide Electrical load calculations showing loads less than 15 watts/sf connected load allowance T E N A N T SU B M I SS I O N PR O C E SS 5.2 Phase II: Final Drawings Fire Protection Plans Final Drawing Approval These plans must be submitted for approval in order to It must be understood that the Landlord’s approval of the verify compliance in accordance with the requirements of construction documents is for compliance with the crite- Landlord’s insurance carrier. Show on the reflected ceil- ria established in this Handbook only. By reviewing these ing plan the sprinkler lay out, clearly identifying all heads drawings, the Landlord, its agent(s) and consultant(s) as required. Plan submittal shall comply with NRPA13 assume no responsibility for code compliance (including requirements and shall include, but not be limited to: ADA requirements), dimensional accuracy, engineering • Location of existing sprinkler grid with main and accuracy or completeness of these drawings for construc- branch pipe sizes tion purpose. • Location of heads and branch piping. It is the Tenant’s sole responsibility to comply with all • Heights of ceilings and dropped soffits, etc. laws, codes, and regulations as may apply. • Location of smoke detectors, file alarm speakers and The Tenant Coordinator reserves the right to request strobe lights • Location of surface mounted or dropped lighting and decorative beams • Location and height of walls or lighting baffles • Hydraulic information used for design of system • Other construction which will affect sprinklers • Cross section In the Tenant’s storage areas, fully exposed or semirecessed heads can be used. Sprinkler heads must be of the fully recessed type. All heads shall be quick response. Tenant shall submit three sets and calculations for review and approval to Landlord’s insurance underwriter. It is the Tenant’s sprinkler contractor’s responsibility to comply with Landlord’s insurance underwriter’s requirements. additional detailed shop drawings for review after final working drawings have been approved. Upon receipt of complete sets of drawings and specifications as outlined above, the Landlord will review these drawings for compliance with the previously approved preliminary design and other criteria of this Handbook, and return one set of prints to the Tenant and the Tenant’s architect. Simultaneously, one set of approved drawings is forwarded to the Landlord Tenant Construction Superintendent for field coordination during construction. It is the Tenant’s responsibility to see that the approved sets of drawings with comments, if any, are distributed to its contractor and in-house construction staff. Retail Criteria Manual 63 T E N A N T SU B M I SS I O N PR O C E SS 5.3 Phase III: Singage Drawings PH A S E I I I : S I G N AG E DR AW I N G PH A S E Signage And Environmental Graphics Shop Drawing Submittal Resubmittals Tenant shall submit one (1) set of PDF formatted and a resubmittal, Tenant shall, within 10 calendar days, copy of the proposed signage during the preliminary revise and resubmit to Landlord. Once Tenant drawings phase, showing location, color, materials and attachment are approved, no changes shall be made unless approved devices. by Landlord in writing. Upon approval, Tenant shall furnish Landlord with one (1) set of PDF formatted copy of shop drawings, including color and materials samples prior to fabrication. Shop drawings for signage and/or menu boards shall include the following criteria: Signage Shop Drawings (1/2” = 1’-0” or larger) • Elevation of main identity • Plan of signage • Section through signage • Detail of all attachments • Proposed graphics, photos and/or colors, including all materials in .PDF or similar format 64 Westfield University Town Center In event that any drawing submittal requires revisions T E N A N T SU B M I SS I O N PR O C E SS 5.4 Phase IV: Completion Requirements PH A S E I V: C O M PL E T I O N R E Q U I R E M E N T S Default If Tenant fails to adequately perform any of the following items, Landlord may, at any time thereafter, give Tenant notice that Tenant is in default of its Lease. Such notice will describe the nature of the Tenant’s default and will • Tenant shall commence Tenant work promptly after • Complete operating, maintenance and spare parts Landlord’s approval of the Final Working Drawings. manuals for all mechanical, electrical and similar Upon completion of the Tenant work, Tenant shall equipment installed as part of Tenant work. deliver to Landlord the following: • Items above shall be forwarded to: • Tenant’s final notarized original affidavit that specify a date after the giving of such notice by which Tenant’s work has been completed to Tenant’s Westfield, LLC such default must be cured. Unless prior to such date satisfaction and in strict accordance with the Final Tenant Coordination Tenant makes the required submissions, Tenant will be Working Drawings and Tenant’s and Landlord’s 11601 Wilshire Blvd. deemed incur-ably in default of this Lease and Landlord construction requirements. Such affidavit may be 11th Floor will be entitled to all remedies specified in the Lease: relied on by Landlord. Any deliberate or negligent Los Angeles, CA 90025 misstatement or false statement made by Tenant Tel: 310.478.4456 therein shall constitute breach of the Lease. Fax: 310.575.5991 • Submit to Landlord preliminary plans and final working drawings and specifications. • Submit to Landlord final approved sprinkler shop and fire alarm drawings and specifications. • Present a full set of final working drawings approved by the Landlord and endorsed with the approval stamp and permit number of the Building Department to On-site Tenant Coordinator, before commencement of construction. • The final notarized original affidavit and waiver of lien by the General Contractor performing Tenant’s work to the effect that Tenant work was completed in accordance with the Landlord-approved working drawings. Affidavit shall also state that all subcontractors, laborers, material suppliers engaged in furnishing materials and/or rendering services for Tenant work, have been paid in full. • Cause Tenant’s space to be built strictly in accordance with the final set of Landlord’s approved plans. Retail Criteria Manual 65 Store Construction 66 Westfield University Town Center S TO R E CO N S T R U C T I O N Introduction Contractors and subcontractors shall not discriminate Prerequisites To Tenant Construction Building permit(s) must be obtained and a copy of same against any person or group of persons on account of Before Tenant’s Contractor will be permitted to start con- submitted to On-site Tenant Coordinator. The original(s) race, sex, marital status, age, handicaps, color, creed, reli- struction, the contractor must comply with certain pre- must be posted at the job site. gion, national origin or ancestry. All contractors shall have requisites. Tenants and Tenant’s Contractors must under- Certificates of current, in-force insurance for the mini- good labor relations, be capable of performing quality stand the complexity of the logistics of building in such mum requirements as specified by the Landlord must be workmanship and work in harmony with Landlord’s con- constrained site. filed with On-site Tenant Coordinator. tractors and other contractors on the job, and any other A pre-construction meeting must be held with the Tenant’s Contractor must pay all required fees, including, On-site Tenant Coordinator to determine suitable access but not limited to, security deposit, trash removal fee, routes to the site and the premises, designated loading, vertical transportation fee, and temporary utility fees, to unloading and storage areas for materials, use of verti- the On-site Tenant Coordinator. Security deposit shall not cal transportation, working hours, tap-ins to utility lines, be released until issuance of the Tenant’s Certificate of safety precautions and procedures, rubbish removal Occupancy and completion of the Landlord’s punch list, The Tenant’s Contractor shall require each of its subcon- and location of Tenant’s trash receptacles, scheduling of and final lien release have been secured. tractors, to the extent of the work to be per-formed by the Tenant’s construction, temporary utilities and many other subcontractors, to be bound to the terms and conditions requirements of the On-site Tenant Coordinator. of the agreement between the Landlord and Tenant, and The Contractor must obtain from, and review with the the project. On-site Tenant Coordinator shall verify that On-site Tenant Coordinator, the Tenant Contractors’ the Notice of Non-Responsibility has been posted and Construction Guidelines and Project Safety and Health has been filed with the County Records. labor entity at or servicing the center. Tenant’s contractor shall cooperate with the On-site Tenant Coordinator and any other contractor by coordinating its work in order not to interfere with the operations of existing stores, or impede or endanger the safety of the public. to the Tenant Criteria Manual. Procedures Manual containing the Project’s rules and regulations with which the Tenant’s contractor must comply. Final working drawings and specifications must have been approved for construction by the Landlord’s Tenant Coordinator. The Tenant’s Contractor must verify with On-site Tenant Coordinator that the contract documents incorporate all of the Tenant Coordinator’s comments. The contractor must submit to On-site Tenant Coordinator a subcontractor list of all the subs that will be working on The Tenant’s Contractor must verify on-site dimensions and existing conditions of the demised premises. The Tenant’s Contractor shall promptly submit to the On-site Tenant Coordinator construction schedule showing the work schedule and anticipated completion of the store. Retail Criteria Manual 67 S TO R E CO N S T R U C T I O N Permits Insurance Bond The Tenant, or the Tenant’s Contractor, must submit The Tenant’s General Contractor shall carry and maintain Any contractor engaged by Tenant having a contract of the required number of sets of final working drawings at its sole cost and expense construction insurance in fifty thousand dollars or more shall furnish a performance and specifications, apply for a building permit and pay accordance with the following minimum requirements for bond naming both the Tenant and the Landlord as addi- all associated fees .All permits and one set of approved comprehensive general liability: $3,000,000 per person tional obligees, as their interest may appear. Evidence drawings must be kept at the construction site during per occurrence, $3,000,000 per occurrence for bodily inju- of the bond must be filed with the On-site Tenant construction. Consult the building department for the ry, and $2,000,000 for property damage per occurrence. Coordinator before construction may begin. required number of signed and stamped drawings to be This insurance must be endorsed to show products and submitted. Building Department and Fire Department completed operations coverage including Waiver of X, C, fees are collected at the time of submittal and upon issu- and U exclusions, broad form property damage. Tenant’s ance of the permit. These fees are based on the cost of General Contractor shall also carry automobile liability Tenant’s construction. insurance covering bodily injury and property damage in The Building Official will coordinate the review of the the amount of $1,000,000 combined single limit. Worker’s Tenant’s prints and specifications. The Building Official compensation with statutory requirements, including will forward the prints and specifications to the Fire employer’s liability of $1,000,000 must also be carried. Marshal’s office for their review and approval, before All insurance policies shall name the Landlord and its a permit can be issued. Tenant’s licensed sign contrac- subsidiaries as additional insured, as their interest may tor shall also submit sign shop drawings to the Building appear. Landlord will provide names in the reconstruc- Department in order to obtain a sign permit. tion meeting. Certificates of insurance shall provide that no change or cancellation of such insurance will be undertaken without thirty days written notice to Landlord. Certificates of current in-force insurance must be filed with the On-site Tenant Coordinator before the commencement of construction. Renewal certificates must be submitted ten days prior to the expiration of existing coverage. Insurance must remain in force for one year after completion of the work. 68 Westfield University Town Center S TO R E CO N S T R U C T I O N Contractors / Vendors Access Access to the demised premises will be restricted to only All persons entering the site must sign a release form those employees working on the project. No children are which indemnifies Westfield, the Landlord and their allowed on the project site during the construction peri- General Contractor from any responsibility for accidents od. At no time are pets allowed on the project site. or injuries that may occur while the person is on site. Access to the Project and Tenant spaces during off-hours Proper jobsite attire is required to be worn at all times must be coordinated through the Landlord’s on site rep- while on site (i.e. hard hats, OSHA approved footwear, resentative and Mall Security; any additional costs associ- long pants, etc.). Westfield, the Landlord, and their ated with off-hours work shall be borne by the Tenant. General Contractor have prepared and issued a Project Parking is only permitted in designated areas of the project. A map denoting approved parking areas shall be distributed by the Landlord’s on site representative at the Pre-construction meeting. Parking is not allowed along the curb at the building or in the truck dock. All Contractor/ Vendors/ Tenants shall comply with the traf- Site Safety and Health Procedures Manual, which will be distributed at the pre-construction meeting. This manual further details the safety requirements for this project. All Contractors/ Vendors/ Tenants must sign an acceptance form acknowledging receipt of this safety manual prior to issuance of security badges. fic control and parking requirements of the Project. The Landlord reserves its right to tow any vehicle parked in violation of posted parking procedures at the Tenant’s and/or General Contractor’s sole cost and expense. All Contractors/Vendors/Tenants must receive a security badge in order to be allowed on site. Before security badges will be issued to Contractor’s employees, the employer must have submitted all required insurance documentation. The insurance requirements for the project are detailed in this Tenant handbook. Retail Criteria Manual 69 S TO R E CO N S T R U C T I O N Visitor Access Deliveries All visitors must check in at the Project Office immediate- All deliveries must be scheduled with the Landlord’s receive a temporary badge and a vehicle site pass. This ly upon arrival at the site. Construction Superintendent or his designated represen- pass must be displayed in the windshield of the vehicle at Visitors will receive a temporary badge that must be tative. Material deliveries not arriving on the predeter- tall times while the vehicle is on site. Only the driver of the mined schedule will be sent back due to limited unload- vehicle will be allowed on site and must obey all project ing areas and vertical transportation. Tenant’s Access and safety regulations. deliveries of material and equipment shall be restricted to In addition to the above, all delivery personnel enter- service corridors and rear service doors. Deliveries will not ing the site must sign a release form which indemnifies be allowed through the Existing Mall Entrances. Delivery of Westfield Corporation, the Landlord and his General materials and equipment to spaces that do not have rear Contractor from any responsibility for accidents or inju- longer be considered a visitor and will be subject to all service doors may be restricted to off-hours. ries that may occur while the person is on site. the procedures listed above for Contractors/Vendors/ The delivery of casework or equipment too large for All deliveries will be through the loading docks or des- Tenants. access through the rear service door must be coordinated ignated area as explained in the pre-construction meet- Any accidents and/or injuries must be reported to the with the On-site Tenant Coordinator or his designated ing. All Contractors/ Vendors/ Tenants will be required to representative. Tenant shall be responsible for protecting schedule daytime deliveries at least 72 hours in advance, the building floor with 1/2 inch plywood when making subject to availability, with the Landlord’s Dock Master such deliveries. No steel-wheel carts or equipment will be during normal business hours. Arrangements for night- permitted on the Project flooring. time deliveries must be scheduled at least 72 hours in All materials, equipment, tools, etc. for use in Tenant advance with Landlord’s Dock Master. Due to the limited from any responsibility for accidents or injuries that may Construction must be stored within the Tenant space. number of loading dock spaces, unattended vehicles will occur while the visitor is on site. Landlord’s Superintendent or his representative shall also worn at all times during their site visit. The visitor will be required to abide by all the rules and regulations listed on the badge, including proper jobsite attire. The visitor badge is valid for one day only. Returning visitors must check in each day at the Project Office and receive a new badge. After three consecutive days, the person will no Project Office before visitor leaves the site and an accident report must be completed. In addition to the above, all visitors entering the site must sign a release form which indemnifies Westfield Corporation, the Landlord and his General Contractor schedule the use of vertical transportation within the Project. All delivery drivers must stop at the Project Office to 70 Westfield University Town Center not be tolerated and will remove at owner’s expense. Also, as there is limited dock space, all deliveries must be scheduled so that materials can be delivered to the point of installation. No materials or equipment will be allowed to be stored outside the Tenant space. All deliveries shall S TO R E CO N S T R U C T I O N Deliveries, Cont’d. Security / safety be made through the loading dock and through desig- Neither Westfield, the Landlord nor their General No flammable materials are to be stored inside the build- nated service corridors and elevators. A representative Contractor shall be responsible for security in the Tenant ing except those materials which will be consumed dur- of the Contractor/ Vendor/ Tenant must be available to spaces and will not be responsible for loss or damage to ing that work day. receive deliveries since no deliveries will be allowed to any materials, tools or equipment. Any security required The playing of radios, CD and tape players, etc., will not remain in the loading dock area. Delivery of dry wall and above and beyond that provided by the Landlord shall be be allowed. metal studs and other large, bulk items shall be during at the sole cost of the Tenant’s Contractor/Vendor/Tenant. off-hours. Additional Tenant security arrangements must be coordi- Contractors/Vendors/Tenants shall examine the site and nated with the On-site Tenant Coordinator. the areas of access and delivery. Any additional provisions It is the safety policy of the Landlord, to provide a safe required for access or deliveries shall be the responsibility and healthful place of employment for all employees, of the Tenant Contractor/ Vendor/ Tenant. No additional and to abide by all applicable regulations as they apply to provisions will be allowed without prior written consent this project. Therefore, without exception, Landlord has of the Landlord. adopted as the Project’s safety program, all the State of California safety rules and the entire Occupational Safety The Tenant Contractor shall maintain a fully charged fire extinguisher within the Tenant space throughout construction. The Landlord’s has initiated a “no smoking” policy with the building at all times. The Tenant’s Contractor is requested to use caution in stocking materials and equipment on the Upper Levels as to not overload the structure. and Health, Safety Standards Part 1926, and any amendments thereto as the safety rules that must be followed by all persons and/or companies employed on the project. Proper work clothing, and shoes must be worn on site. No gasoline powered equipment such as welders, compressors, concrete saws, power buggies, etc. will be allowed to be used in the Atrium or Tenant spaces. Retail Criteria Manual 71 S TO R E CO N S T R U C T I O N Construction schedule Temporary Tenant Enclosure Construction Utilities The Tenant’s Contractor shall promptly submit to the If Tenant can not meet the Grand Opening Date, the During construction, Landlord will make available to the On-site Tenant Coordinator a construction schedule Landlord will require the Tenant’s premises be separat- Tenant’s Contractor temporary utilities, consisting of showing the work schedule and anticipated completion ed from the mall’s common area by a temporary Tenant 120/220 Volt Single Phase electrical power and toilet facil- of the store. enclosure. The Landlord shall determine which Tenants ities, from the time Tenant’s Contractor starts construc- When necessary, it will be the Tenant’s Contractor’s shall be required to have a temporary Tenant enclosure. tion until the sooner of: responsibility to make arrangements for access into adjacent occupied Tenant spaces and to protect that Tenant’s If the Tenant’s Contractor does not comply with this requirement, the Landlord shall construct a temporary finishes and merchandise as required. The Tenant’s Tenant enclosure for the Tenant, at Tenant’s expense. Contractor shall be responsible for any damage or loss as The enclosure shall be 12’-0” high and constructed of a result of their operations. metal studs with 1/2” drywall taped and sanded, with Any work on the mall’s common side of the Storefront, one coat of flat latex paint to match the mall standard once the barricade has been removed, must be scheduled with the Landlord’s Superintendent and may only be allowed during off-hours. During such work, the mall’s flooring and finishes must be protected with 1/2” plywood and the area cleaned after each work period. and shall be located no more than three feet in front of the lease line. The entire enclosure must be installed on carpet strips so as not to damage the mall flooring. The enclosure must form a solid smoke barrier and an air seal from the mall. An access door will be permitted in the temporary Tenant enclosure only if there is no service/exit door. Modifications to the temporary Tenant enclosure during construction will be the Tenant’s Contractor’s responsibility, with approval of the On-site Tenant Coordinator. Advertising or project signs are not allowed to be displayed on the barricade. Any graphics on the barricade shall be in conformance with the Landlord’s graphics program, and installed only by the Landlord. 72 Westfield University Town Center a. Four weeks prior to grand opening, or b. Tenant’s permanent power is available. Tenant’s Contractor shall reimburse Landlord at the Project’s established rate for such services. Temporary power will be supplied from a 4 plug outlet at service corridor or in Tenant Space. Temporary power cords and special power requirements shall be provided by Tenant. Tenant’s Contractor shall be required to provide ground fault protection for all power equipment used in the premises. S TO R E CO N S T R U C T I O N Landlord’s Prior Rights Changes In Design Or Material The Tenant’s Contractor shall not be permitted to modify, The Landlord will furnish the standard mall flooring mate- attach to or hang any loads from the Landlord’s duct- rial at Tenant’s expense to the Tenant’s Contractor. The work, water lines, sprinkler lines, conduit or bridging from Tenant’s Contractor shall be responsible for the installa- roof deck above. tion of the finish flooring up to the Tenant’s Storefront Access to building roof is restricted to Landlord’s person- and closure line. Tenant Contractor shall purchase mall nel and Landlord’s Designated Contractors. No Tenant finish flooring for this purpose from the Landlord. Contractor or Subcontractor will be permitted on the All mall finishes and adjacent Tenant spaces must be pro- roof. tected from damage and dirt. The penetration of the roof deck and the installation of It is the Tenant’s responsibility to repair all existing all flashing and curbing for Tenant related equipment Landlord or adjacent Tenant construction finishes which shall be by Landlord’s designated roofing contractor at may have become damaged as a result of Tenant’s con- Tenant’s expense. struction. Tenant shall use Landlord’s Authorized Contractor for fire alarm to the mall’s main system. Tenant’s Contractor shall not deviate from approved drawings and specifications without obtain ’s Tenant Coordinator, and the Building Department and/or other governmental agency. Retail Criteria Manual 73 S TO R E CO N S T R U C T I O N Adjacent Finishes Clean-Up The Landlord will furnish the standard mall flooring mate- Tenant’s Contractor shall pay a fee at the pre-construction with the necessary clean-up, demolition and removal at rial at Tenant’s expense to the Tenant’s Contractor. The meeting for the use of the Project’s trash facilities. Tenant’s expense. Tenant’s Contractor shall be responsible for the installa- All Contractors/Vendors/Tenants are responsible for The mall, public corridors, service corridors, and adjacent clean-up and trash removal from their work areas on Tenant spaces must be kept clear of Tenant’s equipment, a daily basis. Storage of debris in Tenant spaces or mall merchandise, fixtures, refuse and trash at all times. areas will not be allowed. Non-compliance will result in Landlord’s designated construction trash containers may All mall finishes and adjacent Tenant spaces must be pro- clean-up by others with all associated costs charged to not be used for disposal of Tenant’s boxes, wrappings, tected from damage and dirt. the non-complaint party. The Landlord will provide con- paper and other containers originating from fixturing It is the Tenant’s responsibility to repair all existing tainers at loading docks or designated area. Landlord will and/or merchandising after completion of construction. empty the containers. All Contractors/Vendors/Tenants Landlord shall provide a separate trash container for this will be responsible for cleaning and transporting their purpose at Tenant’s expense. tion of the finish flooring up to the Tenant’s Storefront and closure line. Tenant Contractor shall purchase mall finish flooring for this purpose from the Landlord. Landlord or adjacent Tenant construction finishes which may have become damaged as a result of Tenant’s construction. own debris from the work areas to the container through designated service corridors and elevators, as well as sorting construction debris from raw cardboard. Any trash or construction debris considered to be hazardous or environmentally dangerous materials will not be allowed to be placed in the containers. Contractors/Vendors/Tenants will not be allowed to provide their own dumpster on site. Upon completion of the Tenant’s construction and, with the approval of On-site Tenant Coordinator, the Tenant shall promptly dismantle, remove and dispose of the temporary Tenant enclosure and any excess materials from the premises. Should the Tenant fail to comply with the above, the Landlord may proceed, upon 24-hour notice, 74 Westfield University Town Center S TO R E CO N S T R U C T I O N Inspection And Acceptance Violations It is the Tenant’s Contractor’s responsibility to schedule Tenant Contractor shall notify the On-site Tenant In the event the Tenant is notified of any violation of inspections by the appropriate Department of Building Coordinator upon completion of the space. The On-site codes, ordinances, or regulations, or of its obligations Inspection, Fire Department and other inspectors as nec- Tenant Coordinator will inspect the construction and hereunder, either by the jurisdictional authorities or essary, and to comply with their requirements, and all issue a punch list if remedial action is required. by Landlord, Tenant shall correct such violations and codes and regulations. A copy of all inspection reports Remedial work must be completed by the date provided pay corresponding fines within three calendar days, or must be submitted to the On-site Tenant Coordinator. or the work will be completed by the Landlord at the Landlord will correct, at Tenant’s expense, such viola- Inspections should be scheduled so that there is ade- Tenant’s expense. tions at Landlord’s actual cost plus fifteen percent cost for quate time to make any changes required by the inspec- administration. Failure to comply with Landlord rules and tors prior to the store opening. regulations will be grounds for additional fines. No Tenant will be allowed to open for business without first obtaining approval from the Building Department, Plumbing, Electrical, Fire Department, and On-site Tenant Coordinator. From time to time, and upon completion, Landlord’s Tenant Coordinator will inspect Tenant’s construction for compliance with approved drawings and specifications. Deviations or unsatisfactory workmanship must be immediately corrected, regardless of their acceptance by public authority or the Tenant. Retail Criteria Manual 75 S TO R E CO N S T R U C T I O N Certificate Of Occupancy Tenant shall obtain a Certificate of Occupancy from the Building Department and submit a copy of this certificate to Landlord’s On-site Tenant Coordinator before opening the premises to the public. The original must be posted within the Tenant space. Waivers of Lien In making progress and final payments to contractors, The construction of the Tenant's premises is to be per- Tenant should obtain valid Final Waivers of Lien, indi- formed in accordance with the Tenant's approved plans cating payment in full for labor, materials, and subcon- and specifications. Tenants needing assistance in locat- tractors. Landlord may request to see evidence of such ing experienced local general contractors should con- Waivers before permitting Tenant to open the premises tact the Tenant Coordinator for assistance. All general for business. All payment and liens must be resolved prior contractors as well as all subcontractors, including, but to release of full Tenant Allowance. not limited to heating and air conditioning, plumbing, gas piping, electrical and sign contractors must be licensed by the State of California, and possess a local business license. The Tenant must forward a copy of this Handbook to their general contractor. The General Contractor selected by the Tenant must employ a competent, full-time superintendent on site at all times during construction and must observe suitable safety practices. 76 Westfield University Town Center General Information Retail Criteria Manual 77 G E N E R A L I N F O R M AT I O N 7.1 Landlord Coordinating Staff L A N DL O R D C O O R DI N AT I N G S TA F F Our coordinating staff will provide a liaison service between the Landlord, the Tenant, the Tenant’s Architect and/or Designer and the General Contractor. These individuals are available to assist you. LANDLORD T E N A N T CO O R D I N AT I O N Westfield, LLC. Westfield, LLC.- San Diego Region 11601 Wilshire Boulevard 11th Floor 225 Broadway, Suite 1700 Los Angeles, CA 90025 San Diego, CA 92101 Phone:310.478.4456 Phone:619.544.8189 LEASING CENTER MANAGEMENT Westfield, LLC.- San Diego Region Westfield 225 Broadway, Suite 1700 University Towne Center San Diego, CA 92101 4545 La Jolla Village Drive, Suite E-25 Phone:619.544.8189 San Diego CA 92122-1212 Phone:858.453.2930 78 Westfield University Town Center G E N E R A L I N F O R M AT I O N 7.2 Base Building Information B A S E B U I L DI N G I N F O R M AT I O N UTC ADDRESSES BuildingAddress C 4505 D 4525 E 4545 F 4485 G 4373 H1 4353 H2 4445 H3 4465 I 4405 J 4315 K 4313 L 4305 N 4417 P 4415 Q 4417 Sears 4575 Macy’s 4333 Robinson May 4425 Nordstrom4321 Dormans Tire 4335 Retail Criteria Manual 79 G E N E R A L I N F O R M AT I O N 7.3 Utilities U T I L I T Y C O M PA N Y DI R E C T O RY E L E C T R I C /G A S CO M PA N Y San Diego Gas & Electric The City of San Diego Water Department 8326 Century Park Court Phone:619.515.3500 San Diego, CA 92123 General:800.411.7343 Express:800.711.7343 T E L E P H O N E CO M PA N Y AT&T Phone:800-750.2355 80 Westfield University Town Center WAT E R CO M PA N Y G E N E R A L I N F O R M AT I O N 7.4 Government Agencies G OV E R N M E N T AG E N C I E S Call City Information at 619-236-5555 for the nearest B U I L D I N G D E PA R T M E N T location and operating hours. City of San Diego For more information about the City of San Diego and Development Services the services provided, please visit their web site at 1222 First Avenue, MS 301 http://ci.san-diego.ca.us. San Diego, CA 92101 E N G I N E E R I N G A N D C A P I TA L P R O J E C T S D E P T. , T R A FFI C E N G I N E E R I N G . Civic Center Plaza 1200 Third Ave. NEIGHBORHOOD CODE COMPLIANCE Phone:619.446.5000 Community Service Centers are located in many neighborhoods, including Clairemont, Market Street, DEVELOPMENT SERVICES Mid-City, Navajo, Otay Mesa/Nestor, Peninsula, Rancho (Building Development Review, Information & Appli- Bernardo and San Ysidro. cation Services, Land Development Review, Support Services). H E A LT H D E PA R T M E N T Stadium/Kearny Mesa area 9 601 Ridgehaven Ct., Suite 220 County of San Diego - Environmental Health 1600 Pacific Highway DEVELOPMENT SERVICES INSPECTION San Diego, CA 92101 SERVICES Phone:858.694.3900 (Selected permit issuance, reinspection fee pay- ment (checks only), 7 a.m. to 4 p.m., office open to 5. Construction, sign, demolition inspectors.) City Administration Building 202 C St. P L A N N I N G D E PA R T M E N T (Long Range Planning, Multiple Species Conservation Program, Transportation Planning, Facilities Financing) Executive Complex 1010 Second Ave. FI R E D E PA R T M E N T City of San Diego Development Services 1222 First Avenue, MS 301 San Diego, CA 92101 Phone: 619.446.5440 NOTE: Fire Marshall review is a separate process and must be completed prior to the start of construction. Retail Criteria Manual 81 G E N E R A L I N F O R M AT I O N 7.4 Government Agencies G OV E R N M E N T AG E N C I E S EXPRESS PLAN CHECK LIMITED Construction Plan Check Phone:619.446.5300 Engineering Services Phone:619.446.5460 Fire Plan Check Phone:619.446.5440 After Hours/Weekend Building Inspections Phone:619.492.5070 SER V I CE S BY FA X For printouts of plan clearances. You shall be faxed the printout or mailed a copy. Plan Finder Touchtone Line. Phone:858.581.7171 Permit Fax Line Phone:619.236.7687 APPOINTMENT REQUIRED SERVICES Community Plans Phone:619.235.5200 Electrical Plan Check Phone:619.446.5300 Engineering Project Close-Out, Time Extension, Bond Release Phone:619.446.5363 82 Westfield University Town Center Facilities Financing Phone:619.235.5700 Fire Prevention New Construction Plan Check, Hazardous Materials Plan Check, Subdivision Review Phone:619.446.5440 Home Owners Night Phone:619.446.5300 Master Plans Phone:619.446.5052 Sign Permits Phone:619.446.5300 Structural Plan Check Phone:619.446.5300 Transportation Planning Phone:619.235.5231 G E N E R A L I N F O R M AT I O N 7.4 Government Agencies G OV E R N M E N T AG E N C I E S APPOINTMENT OPTIONAL SERVICES Police Department Crime Prevention Through Address Coordinator Design Phone:619.446.5411 Demolition/Removal/Relocation; Grading; Electrical, Mechanical, Plumbing, Gas Permits; Public Improvements; Tenant Improvements; Transportation; Wet Taps; Water & Sewer, Zoning Phone:619.446.5000 Development & Permit Information, Submittal Appointments Phone:619.446.5300 Engineering Information Phone:619.446.5460 Hazardous Materials Inspections Phone:619.533.4477 Code Enforcement Phone:619.236.5500 Land Dev. Review Info. Phone:619.446.5460 Over-The-Counter Plan Review Appointments Phone:619.446.5300 Plumbing/Mechanical Plan Check Phone:619.531.2837 Publications Phone:619.446.5100 Records Phone:619.446.5200 San Diego Regional Permit Assistance Center: CALEPA, Caltrans, Air Resources Control Board, Regional Water Quality, County Environmental Health Services, Air Pollution Control Phone:619.236.5938 Seismic/Geologic Hazards Phone:619.446.5460 Traffic Control Plan Check Phone:619.446.5150 SCHEDULE IN ADVANCE SERVICES New Construction, Relocation, Removal, Demolition Inspections Phone:858.581.7111 Engineering Field Inspections Phone:619.627.3200 Phone:619.446.5300 Retail Criteria Manual 83 G E N E R A L I N F O R M AT I O N 7.5 Applicable Codes A PPL I C A B L E C O DE S The following is provided as a general guide only BUILDING: CALIFORNIA BUILDING CODE MECHANICAL: CALIFORNIA MECHANICAL CODE PLUMBING: CALIFORNIA PLUMBING CODE code or codes which are applicable (including supple- FIRE PREVENTION: LIFE SAFETY CODE ments and state amendments) as codes are frequently NFPA SAFETY CODE and does not release the Tenant from complying with all applicable codes and regulations, as required by jurisdictional authorities. It shall be the Tenant’s responsibility to determine the edition of the above revised and updated. Construction permit applications submitted on or after January 1, 2008, will have to comply with the new State building standards as well as approved local ELECTRICAL: CALIFORNIA ELECTRICAL CODE TITLE 19 AND 24 OF THE CALIFORNIA ADMINISTRATION CODE HANDICAP CODE: FEDERAL ACCESSIBILITY STANDARDS (UFAS) amendments published in the Municipal Code. AMERICAN DISABILITIES ACT Construction permit applications that are closed when LOCAL CODES: ALL LOCAL ORDINANCES HAVING JURISDICTION a permit is not issued within one year of the initial application file date must be resubmitted as required. BUILDINGS C, D, F, G, H, I, N, P, & Q: TYPE V-N SPRINKLERED BUILDING E: TYPE III / ONE (1) HOUR / SPRINKLERED OLD ROB/MAY BOX LEVEL 1: TYPE 1-B - NON COMBUSTIBLE LEVEL2 SPACES H1-H4 & H10: TYPE 1-B - NON COMBUSTIBLE SPACES H5-H9 & H11-H17: LEVEL 3: BUILDING L, J & K: 84 Westfield University Town Center TYPE V-N SPRINKLERED TYPE 1-B - NON COMBUSTIBLE NOT SPRINKLERED G E N E R A L I N F O R M AT I O N 7.6 Glossary G L O S S A RY BASE BUILDING EXTENDED LEASE LINE MECHANICAL DIFFUSER STORE CLOSURE, LINE OF CLOSURE Overall project envelope construction, includ- The line, shown on the tenant lease plan, Grille in the wall or ceiling connected to an Line at which store is closed for security. ing Common and Service Areas. Excludes all defining the confines of the tenant’s demised air duct. work which is the responsibility of the Tenant. premises that extends furtherinto the mall LANDLORD BULKHEAD interior than the typical lease line. Element above the Tenant’s storefront and be- GLAZING low the Landlord’s ceiling. Defines maximum Glass treatment (window, glass block, etc.) STOREFRONT MERCHANDISE Front face of the store. In the case of a store All items for sale within a given store. with more than one exposure to the Mall Con- NEUTRAL PIER course, the storefront refers to all facades. Architectural element separating two adjacent STORE NAME GRAPHICS storefronts or a storefront and a service Official name of the store as written in the DEMISING PARTITION/WALL Lettering, symbols and logos used for signage corridor. Neutral piers are maintained by the Lease documents. (Also referred to as DBA). A common wall between two adjoining shops at the storefront or throughout the store Landlord. or between a shop and a Common Area. The interior. height of the Tenant’s storefront. TLP PARABOLIC Tenant Lease Plan. Detailed drawing of the GRILLE HOUSING A type of reflective lens which provides better Tenant’s Leased Premises, including important Enclosed housing which supports a security control of light, reduces glare and maintains lease line and Tenant Base Building design DESIGN CONTROL ZONE grille and fully encloses it when in the open better light output. information. Information contained in the TLP That area between the lease line and the De- position. demising partition extends back from the neutral pier. sign Control Line in which the Landlord controls all aspects of design and materials. REVEAL LEASE LINE Recessed separator strip between two dif- The line, shown on the Tenant Lease Plan, ferent materials. Also used to separate the DESIGN CONTROL DRAWINGS defining the confines of the Tenant’s demised Tenant’s storefront from the Landlord’s neutral Landlord supplied design drawings containing premises. piers and bulkheads. LIMIT OF CONSTRUCTION LINE SHOW WINDOW The line, shown on the Tenant Lease Plan, Transparent portion of the storefront used for defining the limits beyond which the Tenant merchandise display; display window. architectural, mechanical and electrical details and specifications which must be incorporated into the Tenant’s construction documents. DUCT cannot extend its storefront construction. This An enclosed air channel for distributing con- line is not necessarily coincidental with the ditioned air. lease line. COMMON AREA Concourse, the Food Court, Service Halls, Rest rooms, and all other areas of the Mall not part of a Tenant space. is not guaranteed for accuracy or coordination with field conditions. SIGN BAND Long, horizontal strip containing store signage. SIMULATED Artificially produced to look or seem like a natural material. Retail Criteria Manual 85 Engineering 86 Westfield University Town Center Los Angeles, CA 90025 ENGINEERING Telephone (310) 478-4456 Facsimile (310) 478-4468 PLEASE NOTE: TENANT'S ARCHITECT AND ENGINEER IS TO PLACE THIS COMPLIANCE BLOCK IN THE COVER SHEET WITHIN THE GENERAL NOTES SECTION OR LANDLORD COMMENTS AREA Landlord requires the Tenant's Architect incorporate and meet certain sustainabiltiy measures. The Westfield University Town Center reviatlization plan has been certified at the LEED-ND Gold Level and Tenants are required to comply with the following in connection with this program (each item to be signed by Tenant's Architect) 1A. I have used water conserving fixtures such as dual flush toilets, waterless urinals and metered and/or aerated faucets, for all fixtures. 1B. Designed Tenant's space to be 10% more energy efficient that Title 24 requirements. 1C. Designed to use a minimum 15% post consumer recycled content in building materials (excluding MEP components and vertical transportation) 1D. Construction and demolition debris recycling of at least 65% of C&D waste. 1E. Compliance with waste management plan (construction and recycling operational waste management) Signed by: _____________ ______________ _______________ _______________ _______________ 2A. Comply with Green Tenant Criteria Manual, so include local sourcing of materials, use of low VOC paints/finishes/carpet. energy efficient use of natural light, increased insulation, lighting controls and efficient fixtures/lamps, HVAC commissioning etc. ________________ Tenant's Architect or Engineer must sign off the above to acknowledge he understands and has complied with all of the above. Retail Criteria Manual 87 FC SF SF SF SF SF SF SF SF 7 SF C1 SF C2 C8 C9 SF 6 5 4 3 2 1 FC 14 FC 12 11 SH SH 1 SH 2 SH 3 4 S SH H5 SH 10 SH 11 SH 12 SH 13 SH 14 SH 15 SH 16 SH 17 SH 18 19 S S H2 S H2 5 SH H 3 9 0 SJ 31 5 ER IV N U WN O T F FC FC 6 FC 7 FC 8 9 10 FC ENGINEERING BUILDING E OLD ROB/MAY BOX BUILDING H3 I1 BUILDING H2 In addition to the general requirements for the engineering disciplines, Building E and the old Rob/May I4 box have specific criteria, which can be found in each section following the general criteria. Tenants should I5 ensure that they meet the criteria specific to their I7 SI5 I6 location. 88 Westfield University Town Center ENGINEERING 8.1 Plumbing Design PLUMBING SYSTEM DESIGN LANDLORD WORK Tenant shall design and develop a complete plumb- A cold water service distribution system and valved so that all roof penetrations occur at a minimum of ing system with all the necessary facilities to serve the outlet connection shall be located within or adjacent ten feet (10’-0”) away from any mechanical equipment Tenant Space. This includes installing a sanitary sewer to the Demised Premises. The outlet shall be valved, intakes or outside air intake hoods. system, a domestic hot and cold water system and gas sized, and placed at a location determined by West- Tenant shall provide floor or wall clean-outs at every system. Tenant shall make all connections to the exist- field. fifty feet (50’-0”) (minimum) length of sanitary piping, ing utility services provided by Westfield. A sanitary sewer service main line and four-inch (4”) at the most remote end of each sanitary sewer branch As a minimum, Tenant shall design, furnish and install plugged wye (Y) connection shall be installed beneath and at each change of direction of the waste line one (1) complete Handicapped accessible toilet room the slab and/or grade of the Demised Premised, at a which is greater than forty-five (45) degrees. Ready facility for Tenant’s employees meeting local, ADA, location and invert elevation selected by Westfield. access to the clean out shall be furnished. and LEED requirements. Toilet room shall include at Natural gas service shall be available for food service Three-inch (3”) floor drains are required in the toilet least one (1) water closet, one (1) hand sink (with hot Tenants from the gas service manifold and meter and storage room areas. Trap primers shall be made and cold water provisions), one (1) floor drain, and one area located outside the Tenant Space, as selected by available. (1) sanitary floor clean out. Westfield. Traps shall be on all fixtures, except those with integral TENANT WORK GENERAL REQUIRE- traps. Trap primer shall be provided, if denoted by Sanitary sewer vents are required to be routed and connected to the existing sanitary sewer vent system (where available) to lower level Tenants or run along the rear demising walls and building columns, if possible, and through the upper level and roof, as directed and approved by Westfield. Sanitary sewer vents shall be routed and connected to the existing sanitary sewer vent system, where available to Food Court Tenants. MENTS Code. All roof and slab penetrations in all buildings shall be Cast iron grease traps and/or hair interceptors, as approved by Tenant Coordinator and verified by onsite Engineer. Weatherproofing of any roof penetrations shall be performed by Westfield’s authorized roofing contractor. Tenant’s general contractor shall required by code and Westfield for use in Tenant’s food processing, product processing, hair styling or pet stores, shall be procured and installed by Tenant in accordance with code and must be below grade with pay for all costs therefore, directly to such roofing a catch basin. contractor. FOR COLD WATER SERVICE TENANT SHALL High water usage tenants, such as restaurants, food service, salons, pet stores, etc. shall install a water meter and pressure regulating valve within their premises. Tenant shall route and/or locate, all toilet vent stacks 1. (For high water usage tenants) Connect to the existing valved outlet, as provided by Westfield, extend piping as required, and furnish a water sub-meter (if required, registering in gallons), pressure regulator, ground jumper wire, and all Retail Criteria Manual 89 ENGINEERING 8.1 Plumbing Design further installations and connections, in accor- Manager. All gas regulating and metering facilities and suitable for 200 psi. Connections to dissimilar materi- dance with all given requirements. all gas piping from the service meter to the gas fired als shall be made with dielectric unions. Joints shall be 2. Place the cold water sub-meter assembly at equipment servicing the premises shall be included in 95-5 tin antimony for 200 psi. the Tenant work and at Tenant’s expense. The entire All gas piping shall be by Tenant and shall be schedule the rear portion of the Demised Premises in a readily accessible and readable location, at a maximum forty-eight inches (48”) above the finished floor Westfield. Tenant shall provide and install an electric domestic hot-water heater supported from the floor or on a platform above the toilet room with an ASME approved temperature and pressure relief valve. Discharge from said hot-water heater temperature and pressure relief valve shall be piped to a floor drain. At installation, including all pipe routing, shall appear on Tenant’s construction submittal for Westfield’s review and approval. 40 black steel, ASTM A120 with 150 lb. banded Malleable iron screwed fittings and in compliance with all governing codes and requirements of the utility com- Tenant shall ensure that all slab penetrations within pany, as it relates to piping and equipment installation the Tenant Space (and through the roof) are properly and testing methods and procedures. sealed and remain watertight to prevent possible All exposed piping above Tenant’s ceiling shall be in- water leakage and/or damage. Any damages caused from failure to do so shall be at Tenant’s sole risk and expense. sulated with minimum of one-half inch (½”) glass fiber with non-combustible UL rated vapor barrier jacket, and insulation shall conform wRh and/or exceed all Shutoff valves shall be provided at all connections to fire and smoke ratings per ASTM E84, NFPA 255, UL used. fixtures. 723 and Westfield’s Insurance Carrier. Tenant shall furnish drip pans under all water heaters All underground sanitary and vent piping shall be ser- All materials shall be new and of commercial grade vice-weight cast-iron, with fittings of the same weight and bare underwriter’s label(s), where such labeling as pipe. ABS Schedule 80 may be used in accordance applies. with the requirements of the local authority. All above The entire installation shall be performed by a Tenant’s option, instantaneous water heaters may be (located above the floor) with a drain piped to the mop sink. All piping, clamps, supports, etc., shall be fastened to joists or beams. Do not attach anything directly to the deck or ductwork above. Furnish seismic support per C.B.C. Tenants requiring gas service shall submit load requirements to San Diego Gas & Electric for approval. Tenant shall, at Tenant’s sole expense, arrange with the utility company for service to Tenant’s premises from the gas service meter area designated by UTC’s 90 Westfield University Town Center ground sanitary piping shall be serviceweight castiron, with fittings of the same weight as the pipe. Water and sewer services are only available to certain kiosk locations. All cold and hot water piping shall be-type “L” seamless hard-drawn copper tubing above ground and type “K” below ground and be in conformance with ASTM B88-48. Fittings are required to be wrought, licensed plumbing contractor in a firstclass, workmanlike manner. ENGINEERING 8.1 Plumbing Design FOOD SERVICE TENANTS: DESIGN SPECIFIC REQUIREMENTS FOR LANDLORD WORK BUILDING E: locations without Landlord Structural Engineer Gas service shall be available from the gas service Roof/ ceiling assembly to be 1 hour rated. Any pen- review. manifold and meter area located outside the Demised etrations by Tenant through the rated ceiling must be Premises as selected and designated by Westfield. maintained by Tenant at Tenant’s expense. signed by the Tenant’s Structural Engineer and be A three-quarter inch (¾”) cold water service system Nothing can be attached to the roof/ ceiling assembly. reviewed and approved by Landlord’s Structural and valved outlet connection shall be located within Tenant will be required to create a support system Engineer. or adjacent to Food Service lease spaces. which is independent from roof/ ceiling assembly. A four-inch (4”) sewer connection shall be located Any columns within the Tenant’s space must be ceiling assembly except spaces FC7, FC12 and below grade for Food Service lease space. enclosed within a 1 hour rated enclosure which will be FC14. Exempted spaces must be reviewed and TENANT WORK Tenant at Tenant’s expense. approved by Landlord’s Structural Engineer. All the items indicated within the Plumbing General Landlord has installed a grease interceptor and grease Requirements apply, with the following additional criteria: 1. Tenant shall provide a separate grease line Any extension from Landlord’s point of connection to sub framing but detailed by Tenant’s Structural Tenant’s space will be by Tenant at Tenant’s expense. Engineer. 7. Tenant may attach to Landlord 2x8 metal studs Additional information concerning the 1 hour rated Grease-producing waste lines shall be separate ceiling: 2. A grease drain and line are required from all grease catching equipment located on the roof. The drain line shall return to tenant space for proper disposal by the Tenant. 3. Tenant is solely responsible for routine maintenance of grease equipment and to correct any problems or damage caused by such. 6. General items (less than 400 lbs.) can be attached to both the Glue Lam beams and the 4x16 producing appliance used in Tenant’s operation. plumbing line within the Tenant Space. 5. No Tenant drywall may be added to the roof/ waste line which Tenant will be allowed to connect to. or preparation areas with pot sink or any grease- from sanitary waste lines and extend to Tenant’s 4. Addition of loads exceeding 400 lbs. must be de- 1. The floor for the Dining Terrace, 2nd Level to accept 100 PSF uniform live loading. 2. General items including duct work, sprinklers, menu boards, hoods etc. can be attached to the Base Bldg roof structure. All attachments and structural details are to be by Tenant’s Structural Engineer. 3. New mechanical units of equal or less weight than existing units can be installed in previous between Glue Lam beams where occurs. This must be calculated and detailed by Tenant’s Structural Engineer. 8. All fire rating must be restored by Tenant at completion of construction. 9. All T-bar ceilings may be considered for attachment to Base Bldg roof structural but will require Landlord Structural Engineer review and approval. For additional information see details on Dining Terrace Base Bldg Drawings sheet A0.02 Retail Criteria Manual 91 ENGINEERING 8.1 Plumbing Design DESIGN SPECIFIC REQUIREMENTS FOR Coordinator. Any required roof penetrations shall be O L D R O B / M AY B O X performed in coordination with Westfield’s roofing Landlord will not be providing any grease interceptor contractor and as outlined in HVAC Design and Con- at this building. struction Criteria. DESIGN / CONSTRUC TION All mechanical equipment, pipes, and ducts penetrat- CO O R D I N AT I O N Prior to making any pipe or duct roof penetration and/ or positioning of any equipment on the roof, all the proposed locations and/or penetrations shall match locations, as indicated on the Westfield -approved plans, and approved by Westfield’s construction field coordinator. All equipment is to be supported from structural members. No weight shall be placed on the roofing ing and/or located on roof shall be painted to match color of the existing roof. Use the appropriate coats of primer pretreatment, prior to the final coat. The final coat of the roof matching color shall be approved by Westfield. Tenant’s store space number shall be permanently stenciled on one side of the roof-mounted HVAC unit with minimum three-inch (3”) high letters. Tenant contractor is to furnish air-balancing reports for HVAC equipment. materials or insulation. Tenant’s general contractor shall be required to furnish temporary weatherproofing of all roof penetrations, until Westfield’s roofing contractor has made the final patch. Tenant’s general contractor shall provide a fire watch and portable fire extinguisher (minimum size 2A:20BC), wherever any welding is done within the Tenant Space. The person performing the fire watch shall remain in the Demised Premises for at least one (1) hour after the completion of any welding. No roof work of any kind shall be allowed prior to an on-site meeting with Westfield’s Tenant Construction 92 Westfield University Town Center Westfield UTC 7 ENGINEERING 8.2 Mechanical Design MECHANICAL SYSTEM DESIGN With the exception of Building ‘H’ Tenant air condi- 8. C.B.C. ventilation requirements. required to handle the load and/or as required by tioning systems at UTC are individual package units Tenant shall design and install a heating system, to governing codes, whichever is greater. (split systems may exist in a few cases). The Tenant is serve the Demised Premises, based upon the follow- 3. All condensing equipment, air cooled, shall responsible to field verify existing equipment and to ing design perimeters: be designed to handle the design load at 99 F. make modifications as are deemed necessary at the Tenant’s expense. Heating shall be installed at Tenant’s option and expense. Tenant shall design an install an air-conditioning system to serve the Tenant Space, based upon the following design conditions: 1. Outside temperature: 94 degrees F (DB), 75 degrees F (WB) (Use ASHREA fundamentals 1% data column). 2. Inside temperature: 78 degrees F (DB) 50% R.H. 3. Actual inside lighting, people and equipment load. 4. Minimum working pressure of all Tenant cooling equipment: 125 #PSIG. 1. Outside temperature: 10 degrees F (DB) (Use ASHREA 99% column). 2. inside temperature: 70 degrees F (DB) (minimum throughout the Tenant Space). Provide supplementary heating as required and in compli- outdoor dry bulb design temperature. Equipment shall also be provided with low ambient control if recommended by unit manufacturer. 4. Tenants with spaces greater than 6,000 square feet are required to furnish multiple rooftop or ance with Title 24. split system HVAC units. 3. Tenant shall provide a 5KW minimum electri- 5. “U” factor of roof is .09 BTUH/FT2 degrees F. cal duct heater. “U” factor for walls is .2 BTUH/FT2 degrees F. 4. C.B.C. ventilation requirements. Tenants located under the mechanical bay shall design and install the HVAC system in a manner that allows the system to operate on 100% outside air ventilation (economizer cycle). The ventilation system shall be based on the following design conditions: 1. Minimum outside air quantities shall be based 5. Minimum allowable pressure drop through on 0.2 CFM per square foot of sales area and .1 all Tenant equipment, valves, and piping at the CMF per square foot of service and stock area and/ required maximum chilled water flow: 13 psi. or as required by governing codes, whichever is 6. Peak load maximum-water-temperature rise greater. through cooling coil: 12 degrees F. 2. System shall designed to furnish 1.2 CFM 7. Actual inside lighting load, people load, and of air flow per square foot of sales area, .5 CFM equipment load. per square foot of service and stock areas or as Retail Criteria Manual 93 ENGINEERING 8.2 Mechanical Design LANDLORD WORK TENANT WORK GENERAL REQUIRE- Westfield has a common Mall HVAC system for the MENTS by Westfield ‘s Site Representative. common areas of UTC only in Building E (See Dining Tenant shall furnish and install air-conditioning, heat- 2. Tenant’s condensing unit and/or packaged Terrace Criteria Manual, under separate cover). ing and ventilation equipment that shall serve the roof-mounted units shall be located on the roof in Demised Premises at all times during business hours. areas specifically designated for such equipment. Tenant shall provide and install make-up air and These units shall conform to Westfield require- exhaust system, as required, including balancing and ments with respect to weight and size, shall not back-draft dampers, fire dampers, curbs, exhaust and exceed six feet (6’-0”) in height (installed), and intake air hood(s). shall furnish a minimum eight inch (8”) clearance In general, Westfield has not provided a toilet exhaust ductwork system. The Tenant shall furnish exhaust fan and related ductwork. In building N, Q, I and P, Westfield has installed a toilet exhaust duct loop. Tenant is not permitted to use a water-cooling tower or any evaporative cooling apparatus. Any additional reinforcement of the room structure necessary to support equipment shall be at Tenant’s expense. Maximum size of RTU shall be 15 tons. In any given bay there shall not be more than two tenant RTU’s and two tenant condensing units. And no tenant RTU or condensing unit can tor for all re-roofing and patching procedures. All roof- rest on a joist supporting another tenant’s unit. mounted equipment shall conform to the following: 3. Tenants whose Demised Premises extend 1. All roof-mounted equipment shall be curb under Westfield’s roof mechanical equipment mounted on raised support platforms with all bay area, that has been specifically designed and ducts, conduits, drains and refrigerant lines designated for Tenant’s roof mounted equipment, penetrating the roof inside the curb support. may use either the split and/or packaged roof- Fabricated support platforms for all roof-mounted mounted HVAC equipment. equipment shall be sized to span from centerline 4. Tenants whose Demised Premises are not bay as approved by Westfield. Tenant shall install one-half inch (½”) thick roof pads around all roof top equipment for service personnel as directed Westfield University Town Center platforms to the top finished surface of the roof. Tenant shall use a Landlord-approved roofing contrac- to centerline of the supports within the equipment 94 from the top of the roof-mounted curb support located directly under the existing roof areas specifically designated for mechanical equipment, shall use a split type HVAC system. Compressor/ condenser or heat pump shall be located on the ENGINEERING 8.2 Mechanical Design roof areas designed for such equipment, and the install a forced-draft ventilation system to maintain down fuel or power supply shall be furnished. fan coil section located within the Tenant Space. a negative pressure within the Tenant Space and dis- 5. A range exhaust hood shall be fabricated in 5. Tenant shall procure and install walkways to charge into the atmosphere via the roof area. Tenant is accordance with all codes and shall be at least and around all rooftop equipment, as shown in responsible for proper diffusion of the exhaust in detail. This work may be done by Westfield’s roof such a manner as to prevent odors from entering air all joints welded. contractor and paid by Tenant’s general contractor. intakes of other ventilation systems. 6. Kitchen range hood exhaust ducts shall be sixteen (16) -gauge or heavier stainless steel, with 6. All roof penetrations made by Tenant shall be 1. All roof-mounted kitchen exhaust fans, which insulated with fire-rated-type insulation or rated subject to Westfield approval as related to location handle a grease discharge, shall have a grease chase per NFPA standards, Westfield’s insurance and construction details. Weatherproofing of all catch pan and gutter. Ducts shall be welded carrier’s requirements and be UL rated, at specified Tenant roof installations shall be performed by sixteen (16) -gauge metal enclosed with a two-(2) heat temperature design. Please provide complete Westfield’s authorized roofing contractor. Tenant’s hour fire-rated shaft in accordance with all ap- specification of type of insulation on the submittal general contractor shall pay all costs directly to plicable codes. drawings. such roofing contractor. Units shall be placed so 2. Tenants who specify the use of a rooftop cen- 7. Hoods and exhaust systems for food process- trifugal exhaust fan for their cooking facilities shall ing shall be protected by a chemical extinguishing provide proper clearance between the exhauster system, as required by Code, installed in accor- Air handling units, heating equipment, water heat- and the roof. dance with all the requirements of the jurisdic- ers and other equipment located within the Demised 3. Make-up air systems are required for all ex- tional authorities and Westfield’s insurance carrier. that they are not visible from the perimeter Mall roadway. Premises shall be floor mounted or located over the toilet or storage areas on supports provided by Tenant, not to exceed maximum live load. haust systems designed for a maximum of ninety percent (90%) of all exhausted air quantity. The exhaust and make-up air systems shall be electri- All systems shall be integrated with fire/life safety systems and be furnished with access panels, as required. Tenant’s air-conditioning system shall be provided cally interlocked so that one switch activates both. Tenant shall furnish complete data indicating system with all necessary controls and devices and be com- 4. All cooking-exhaust ducts shall be seamlessly air balance in the Demised Premises and a certified patible with the enclosed Business Center air-conditioning welded and comply with N.F.P.A. #96 require- third-party balance report no more than thirty (30) ments. Access doors are required and are to be days after opening. system and fire alarm system. Low voltage controls on the vertical face of the horizontal run, at the Tenant is responsible for isolation of all equipment so shall be in conduit. bottom of the vertical riser and/or as required by that vibrations and noises are not transmitted. Any Tenants that have odor-producing operations shall Code. Automatic and manual devices for shutting noises deemed objectionable by Westfield’s Site Rep- Retail Criteria Manual 95 ENGINEERING 8.2 Mechanical Design resentative shall be corrected at Tenant’s expense. All ductwork shall be fabricated from galvanized sheet of any installation shall be performed by Westfield’s HVAC system shall be in operation whenever West- metal, stainless steel or black steel in accordance with authorized roofing contractor and Tenant’s general the standards of American Society of Heating, Refrig- contractor shall pay all costs directly to such roofing field -provided HVAC services are operating. Tenants are required to install a seven-day time clock for controlling their HVAC system and be connected to the fire/smoke alarm system. Tenant shall procure and install a complete forced air toilet exhaust system, consisting of fan(s), backdraft damper(s), duct register, exhaust hood, sized for 75 CFM per water closet or urinal, as required to meet code and Tenant’s requirements. Such system shall discharge to the atmosphere via the roof. No exhaust(s) or vent(s) shall be located within a minimum of ten feet (10’-0”) of any supply or air intakes. No combustible materials of any type shall be allowed above suspended ceilings. eration and Air Conditioning Engineers (ASHRAE), and Sheet Metal and Air Conditioning Contractors National Association (SMACCNA) for low pressure, low velocity ductwork. Flexible metal ductwork shall be allowed only in branch ducts, in a length not to exceed weatherproofing for all roof penetrations until Westfield’s roofing contractor has made the final patch. All materials shall be new and of commercial grade, reinforcement is not permitted. and bear an underwriter’s label, where such labeling Branches from main low-velocity trunk ductwork is required. shall be furnished with splitters, dampers or similar The entire installation shall be performed by a balancing devices in accordance with the standards of licensed HVAC contractor in a first-class, workman-like SMACCNA and the Associated Air Balancing council. manner. Fire dampers shall be provided, as required. Supply and return ductwork shall be insulated with a minimum of one-inch (1”) thick blanket-type insulation with a vapor barrier. Acoustical liner may be be fastened to joists and/or beams above and con- furnished, as required per NFPA standards, Westfield’s form to the Mechanical Code of the State of California. insurance carrier’s requirements, and be UL rated. Do not attach anything directly to the roof deck and Flame spread shall not exceed twenty-five (25) and furnish seismic support per C.B.C. smoke developed shall not exceed fifty (50). Tenant shall specify the type of duct and duct insula- Air distribution supply registers and/or diffusers shall tion used, as per NFPA standards and Westfield’s insur- be designed and specified for 50 fpm terminal veloc- ance carrier’s requirements. ity. All ductwork systems shall be designed as low velocity All roof penetrations made by Tenant’s general con- (under 2500 fpm) and low pressure (under 2” water tractor shall be subject to Westfield’s approval as to gauge). location and construction details. Weatherproofing Westfield University Town Center Tenant’s general contractor shall provide temporary six feet (6’-0”). Plastic liner ductwork with internal wire Hanger-wires, duct-straps, fastening devices, etc. shall 96 contractor. ENGINEERING 8.2 Mechanical Design DESIGN SPECIFIC REQUIREMENTS FOR BUILDING E: 4. Addition of loads exceeding 400 lbs. must be de- Roof/ ceiling assembly to be 1 hour rated. Any pen- signed by the Tenant’s Structural Engineer and be etrations by Tenant through the rated ceiling must be reviewed and approved by Landlord’s Structural maintained by Tenant at Tenant’s expense. Engineer. Nothing can be attached to the roof/ ceiling assembly. 5. No Tenant drywall may be added to the roof/ Tenant will be required to create a support system ceiling assembly except spaces FC7, FC12 and which is independent from Landlord’s roof ceiling. FC14. Exempted spaces must be reviewed and Any columns within the Tenant’s space must be enclosed within a 1 hour rated enclosure which will be Tenant at Tenant’s expense. Tenant will be required to remove all abandoned HVAC rooftop equipment and restore roof to its original condition at Tenant’s expense. Additional information concerning the 1 hour rated ceiling: 1. The floor for the Dining Terrace, 2nd Level to accept 100 PSF uniform live loading. 2. General items including duct work, sprinklers, menu boards, hoods etc. can be attached to the Base Bldg roof structure. All attachments and structural details are to be by Tenant’s Structural Engineer. approved by Landlord’s Structural Engineer. 6. General items (less than 400 lbs.) can be attached to both the Glue Lam beams and the 4x16 sub framing where it occurs but detailed by Tenant’s Structural Engineer. 7. Tenant may attach to Landlord 2x8 metal studs between Glue Lam beams where it occurs. This must be calculated and detailed by Tenant’s Structural Engineer. 8. All fire rating must be restored by Tenant at completion of construction. 9. All T-bar ceilings may be considered for attachment to Base Bldg roof structural but will require Landlord Structural Engineer review and approval. 3. New mechanical units of equal or less weight than existing units can be installed in previous For additional information see details on Dining Ter- locations without Landlord Structural Engineer race Base Bldg Drawings sheet A0.02 review. Retail Criteria Manual 97 ENGINEERING 8.2 Mechanical Design FOOD TENANT DESIGN SPECIFIC REQUIREMENTS FOR 1. Outside air temperature ……… 38 deg. F. (DB) All the items indicated with the General Requirements O L D R O B / M AY B O X / B U I L D I N G S ‘ H 2 ’ 2. Inside air temperature ………… 70 deg. F. (DB) apply with the following additional criteria: AND ‘H3’: Landlord is providing Condenser Water for Tenant’s provided water source heat pumps. Tenant shall design and install an air conditioning system, to serve the space based upon the following design conditions: 1. Outside air temperature ……………………… 84 deg. F. (DB) – 69 deg. F. (WB) 2. Inside air temperature ………………………… 78 deg. F. (DB) – 50 % (RH) 3. Temperature of cooling Condenser Water Service ……………… 85 deg. F. 4. Cooling service available during normal summer center operating hours when outdoor temperature is equal to or above ………… 64 deg. F. (DB) 5. Minimum working pressure of all Tenant cooling equipment ……… 125 # psig 6. Maximum allowable pressure drop through all Tenant equipment, valves and piping at the required maximum chilled water flow … 22.6 ft. W.G. 7. Peak load maximum water temperature rise through the Condenser coil … 10deg. F. Tenant shall design and install a heating system, to serve the space based upon the following design conditions: 3. Temperature of cooling Condenser Water Service …………………… 65 deg. F. 1. The Tenant shall review and comply with 4. Cooling service available during normal winter center operating hours when outdoor temperature is equal to or below ………………… 70 deg. F. (DB) exhaust system requirements. 5. Minimum working pressure of all Tenant cooling equipment ………1 25 # psig an integral grease collector assembly and grease 6. Maximum allowable pressure drop through all Tenant equipment, valves and piping at the required maximum chilled water flow . . . . 22.6 ft. W.G. line to the Tenant’s waste line, and connected 7. Peak load maximum water temperature rise through the Condenser coil … 10 deg. F. trifugal exhauster for their cooking facilities shall Westfield University Town Center 2. All roof-mounted kitchen exhaust fans, which handle a grease discharge, shall be provided with drain. The grease drain shall be emptied via a drain at a point prior to that line entering the grease interceptor. 3. Tenants who specify the use of a rooftop cenfurnish proper clearance between the exhauster Tenant shall design and install the HVAC system in and the roof. such a manner so as to allow the system outside air 4. All cooking exhaust ducts shall be seamless ventilation to operate at code minimums. Said venti- and welded. lation system shall be based on the following design conditions: 5. Range exhaust doors shall be fabricated in accordance with all codes and shall be at least 1. CFM circulated based on cooling requirements, with 85 deg condenser water available, but not less than required by Codes having Jurisdiction. sixteen (16) –gauge, or heavier, black steel, with all 2. Maximum outside air supply – equal to code minimums of CFM circulated. bottom of the vertical riser and/or as required by 3. Minimum outside air supply – as required by Code. down fuel or power supply shall be furnished. 4. Maximum re-circulated air – equal to code minimums of CFM circulated. 98 NFPA #96 and all other codes concerning cooking joints welded. Access doors shall be provided and be in the vertical face of the horizontal run, at the code. Automatic and manual devices for shutting 6. Kitchen range hood exhaust ducts shall be ENGINEERING 8.2 Mechanical Design insulated with a fire-rated type insulation or rated (10’-0”) of any rooftop supply air vent. 18. No roof work of any kind shall be allowed chase per NFPA standards, Westfield’s insurance 13. When locating restaurant supply and return prior to an on-site meeting with Westfield’s Ten- carrier’s requirements and UL rating, as specified heat temperature design. Tenant shall furnish complete specifications of type of insulation on their submittal drawings. air ducts at the roof level, special consideration shall be given to the distance between supply air intake ducts and exhaust ducts. Also, the direction ant Construction Coordinator. Any required roof penetrations shall be performed in coordination with Westfield’s roofing contractor and as outlined of discharge from exhaust vents shall be such to in HVAC Design and Construction Criteria. 7. Hoods and exhaust systems for food pro- prevent odors from entering other systems. 19. All mechanical equipment, pipes, and ducts, cessing shall be protected by a fire extinguish- 14. Prior to making any pipe or duct roof pen- penetrating and/or located on roof shall be ing system, installed in accordance with all the requirements of the jurisdictional authorities and Westfield’s insurance carrier. All systems shall be furnished with access panels, as required. etration and/or positioning of any equipment on the roof, all the proposed locations and/or penetrations shall match locations, as indicated on the Westfield -approved plans, and approved by Please note: Presently, Tenant smoke exhaust systems Westfield’s construction field coordinator. are not required. 15. All equipment is to be supported from structural members. No weight shall be placed on the D E S I G N / C O N S T R U C T I O N C O O R D I N AT I O N roofing materials or insulation. All roofing details shall be installed per the sketches 16. Tenant’s general contractor shall be required shown in the back of this section. 8. Roof curbs shall by “THY” curbs or equal. 9. All conduit or pipe penetrations shall be within ten inches (10”) from equipment curb but not more than fourteen inches (14”) from equipment curb. to furnish temporary weatherproofing of all roof penetrations, until Westfield’s roofing contractor has made the final patch. 17. Tenant’s general contractor shall provide a fire watch and portable fire extinguisher (minimum size 2A:20BC), wherever any welding is done within the Tenant Space. The person performing the fire 10. Conduit may not be run horizontally on roof watch shall remain in the Demised Premises for 11. surface. at least one (1) hour after the completion of any 12. No exhaust or vent shall be within ten feet painted to match color of the existing roof. Use the appropriate coats of primer pre-treatment, prior to the final coat. The final coat of the roof matching color shall be approved by Westfield’s Tenant Construction Coordinator. Tenant’s store space number shall be permanently stenciled on one side of the roof-mounted HVAC unit, with minimum three-inch (3”) high letters. 20. Tenant contractor is to furnish air-balancing reports for HVAC equipment located in Building E only. Access to UTC roof is restricted to Westfield’s personnel and Westfield’s designated contractors ONLY. No Tenant contractor or sub-contractor shall be permitted on the roof unless written permission has been obtained. welding. Retail Criteria Manual 99 ENGINEERING 8.2 Mechanical Design 100 Westfield University Town Center ENGINEERING 8.2 Mechanical Design Westfield UTC 81 Retail Criteria Manual 101 ENGINEERING 8.2 Mechanical Design 102 Westfield University Town Center ENGINEERING 8.2 Mechanical Design Retail Criteria Manual Westfield UTC 83 103 ENGINEERING 8.2 Mechanical Design AMP DISCONNECT SWITCH MAIN CIRCUIT BREAKER IN PANEL PROVIDED BY TENANT U 104 Westfield University Town Center 84 ENGINEERING 8.2 Mechanical Design CT AMP DISCONNECT SWITCH MAIN CIRCUIT BREAKER IN PANEL PROVIDED BY TENANT U 1 GEN 2B Retail Criteria Manual 105 ENGINEERING 8.3 Electrical and Telephone Design ELECTRICAL/TELEPHONE SYSTEM DESIGN Tenants with a service size of 200 amps or below shall 4. Conduit that extends Westfield’s CT cabinet, Tenant shall provide flexible metal conduits only for provide the following: meter socket, main disconnect switch or main connections to vibrating equipment, lighting fixtures, circuit breaker equipped panelboard. show cases, etc., as required, maximum length six feet 1. Properly sized fuses in the main fusible discon- (6’-0”), minimum one-half inch (½”) electrical trade nect switch (minimum of 100 amps) in Westfield’s Conduits shall be galvanized steel, rigid heavy wall or swtichboard. electrical metallic tubing. Flexible metal conduit shall size. Furnish liquid-tight flexible conduits for be used only for connections inside casework and as outdoor installations. Install all flexible conduit in the final connection to recessed fixtures, motors and accordance with NEC. Watertight fittings shall be electrical equipment that may generate vibration furnished, as required by NEC. through the conduit system (6’ maximum). Conduit All wiring shall be installed in the conduit. “BX” “AC”, 2. Provide a meter base and meter, per servicing company requirements and as directed by Westfield. 3. Extend, as required within the Tenant Space, hangers, clamps, light fixture supports, etc., shall be the electrical service conduit to Tenant’s main fastened to purlins or beams. No attachment or sup- disconnect switch. port from any roof deck is allowed. Exposed conduits 4. Five (5) properly sized copper conductors shall be in straight lines parallel with or at right angles from Westfield switchgear, through the Westfield to column lines or beams and separated at least three conduit to the Tenant’s main disconnect device inches (3”) from water lines, wherever they run along- Minimum wire size shall be No. 12 AWG, excluding low within the Demised Premises. Tenant shall install. side or across such lines. voltage wiring. Tenants with a total electrical load of 201 amps and Tenant shall make application to servicing company All wiring shall be color coded per NEC. Same color above shall furnish the following: for meter and metered electrical service. Tenant shall shall identify same phase throughout the system. comply with all guidelines. Motors ½ HP or less shall be 120 volts, single phase. switch gear with UL listed circuit breaker or fused Tenant shall extend Westfield’s conduit, as needed, Motors ¾ HP or more shall be 208 volts, 3 phase. disconnect. within the Demised Premises to Tenant’s main discon- Main service feeders, as a minimum, shall be sized for nect switch and panel board. the sum of all loads, plus twentyfive percent (25%) All conduits shall be concealed in finished areas. spare capacity. Branch circuits connected loads shall Minimum conduit shall be threequarter inch (¾”) thick not exceed eighty percent (80%) of rated capacity. and concealed in slab that shall be three-quarters inch Tenants are required to utilize electric hot water (¾”). No conduit shall allowed to be installed in the heaters for domestic hot water and electric heaters for slab unless absolutely necessary. space heating. 1. Utility and City-approved meter section 2. A main fusible disconnect switch. 3. Tenant shall install five (5) properly sized copper service conductors, from free standing single section in Westfield’s switchgear room, through Tenant’s conduit and to Tenant’s main disconnect switch and/or panelboard within the Tenant Space. 106 Westfield University Town Center “MC” or “ROMEX” type wiring shall not be permitted. Except for fixture connections (maximum 6’-0”). All wiring shall be copper only. All conductors are to have 600-volt insulation, type THW, THWN, or THHN. ENGINEERING 8.3 Electrical and Telephone Design Panel connected loads within the Demised Premises alarm system. Furnish a complete typewritten identifi- in Westfield’s switchboard. Nameplates shall be one- and main feeder conductors (from Westfield switch cation directory card for all main and branch circuits in eighth inch (1/8”) thick plastic, black on white, and gear to panel) shall be balanced within plus or minus the panel door. etched letters. The minimum size shall be one inch 10% across all phases. All devices and equipment in finished areas shall be (1”) with only the Tenant’s space number engraved on As required by governing codes, furnish exit and flush mounted, where possible. such, permanently affixed. emergency lights throughout the Tenant Space. No lighting shall be installed outside the Demised All conduits shall be galvanized rigid heavy wall steel, Provide weatherproof disconnect switch and 120 volt Premises, in the common area, and/ or ceiling for duplex service outlet service light with switch on the storefront lighting or sign illumination. fittings shall be provided, as required by Code. roofmounted HVAC unit. Prior to making any conduit, pipe or duct-roof pen- Floor boxes shall be watertight with cast-threaded Conduit and raceway hangers, clamps, light fixtures, etration and/or positioning any equipment on the conduit hubs and watertight fittings, where required. junction boxes, supports, etc. shall be fastened to roof, all the proposed locations and/or penetrations Pull boxes or junction boxes are required to be of joists or beams. Do not attach anything directly to the shall match locations, as indicated on the Westfield minimum twelve (12) -gauge galvanized steel. Boxes upper level slab, roof deck or ductwork above. approved plans, and be approved by Westfield’s on- in walls shall be galvanized pressed steel or cast metal. The electrical system serving the Demised Premises site representative. Caulk around boxes to eliminate noise transmission. shall be grounded in accordance with the latest All roof penetrations made by Tenant’s general con- Lighting panels shall have quick-lag molded case requirements of the NEC. System shall be grounded to tractor shall be subject to Westfield ‘s approval as to breakers bolted to buss. Half-size or tandem breakers the main cold water pipe in the Tenant Space. location and construction details. Weatherproofing, or plug-ins shall not be allowed. Distribution panels Ground fault circuit interrupters shall be installed in of any installation, shall be performed by Westfield’s shall be either fusible-type (with quick-make, quick- authorized roofing contractor. Tenant’s general break interrupter switches) or molded case breaker- contractor shall pay all costs directly to such roofing type. contractor. Manual or magnetic starters, switches, contacts, Tenant’s general contractor shall be required to pro- relays, time switches, safety devices and other controls vide temporary weatherproofing for all roof penetra- shall be commercial-type with heavy-duty ratings and tions until Westfield’s roofing contractor has made the shall be installed in strict conformance with the manu- one-half inch (½”) thick. final patch. facturer’s recommendations and applicable codes. As required, provide lock-on devices on panel circuit Tenant’s electrical contractor shall furnish an identifi- Tenant shall furnish and install complete wiring within cation nameplate on Tenant’s main disconnect switch the Tenant Space for the telephone system, includ- branch circuits, where required by code. Voltage drop, based on actual loads, shall be indicated on the one line riser diagrams for all feeders and subfeeders, per NEC. Furnish flexible conduits only for short connections to vibrating equipment, lighting fixtures, show cases, etc., as required. Minimum size is breakers for exit and emergency light and fire/smoke or EMT. Sizes shall be determined per NEC. Watertight Retail Criteria Manual 107 ENGINEERING 8.3 Electrical and Telephone Design WIRELESS INTERNET LANDLORD WORK ing backboard cabinet, outlets, and service cable to There is an existing license at the property for wireless Westfield has provided 120/208 volts, three-phase theDemised Premises from the main terminal board internet. All leases prevent any tenant or licensee from power source to Building C, D, E, F, G, H, I, N, P, and Q. located outside the Tenant Space. Apply for telephone interfering with the quiet enjoyment of any other ten- service to the serving telephone company and comply ant or licensee. Accordingly, wireless internet systems Tenant may be furnished with a main electrical service with their regulations and requirements. at the property must be equipped with such hardware Tenant shall provide and install complete telephone as to ensure they do not cause any interference with service support facilities as required by the serving the existing licensee’s wireless internet service. Any telephone company. Tenant shall furnish a three- wireless internet service installed by Tenant which quarter inch (¾”) firerated telephone backboard, a interferes with the existing licensee’s wireless internet 120-volt, 20 AMP circuit with pull string to Tenant’s services will constitute a violation of the above-refer- telephone service equipment. Tenant shall make enced provisions of the lease. application to the serving telephone company for Alternately, Tenant may elect to contract with the service and shall comply with their requirements. existing wireless internet licensee to provide wireless All materials are required to be new and of commer- internet services inside Tenant’s premises. cial grade and have affixed underwriter’s labels, where such labeling applies. fusible disconnect switch in Westfield’s switchboard. Field verify. Westfield may provide a service conduit from Westfield’s service area to a location within Tenant’s Demised Premises selected by Westfield. Field verify. Conduit to be sized on the basis of a combined connected lighting and power load of fifteen (15) watts per square foot of floor area. Westfield shall furnish a main telephone terminal board at location outside the Tenant Space selected by Westfield, for Tenant connection to telephone service. Westfield may provide three-quarter inch (¾”) conduit to Tenant’s Demised Premises for telephone system. 108 Westfield University Town Center ENGINEERING 8.3 Electrical and Telephone Design DESIGN SPECIFIC REQUIREMENTS FOR BUILDING E: 4. Addition of loads exceeding 400 lbs. must be de- Roof/ ceiling assembly to be 1 hr. rated. Any penetra- signed by the Tenant’s Structural Engineer and be tions by Tenant through the rated ceiling must be reviewed and approved by Landlord’s Structural maintained by Tenant at Tenant’s expense. Engineer. Nothing can be attached to the roof/ ceiling assembly. 5. No Tenant drywall may be added to the roof/ Tenant will be required to create a support system ceiling assembly except spaces FC7, FC12 and which is independent from Landlord’s roof ceiling. FC14. Exempted spaces must be reviewed and Any columns within the Tenant’s space must be enclosed within a 1 hour rated enclosure which will be by Tenant at Tenant’s expense. Landlord is supplying only 120/208V, 3 phase, 4 wire service to this building. Tenant is to verify with Landlord as to the amount of amps each Tenant will be supplied. Additional information concerning the 1 hour rated ceiling: 1. The floor for the Dining Terrace, 2nd Level to accept 100 PSF uniform live loading. 2. General items including duct work, sprinklers, menu boards, hoods etc. can be attached to the Base Bldg roof structure. All attachments and structural details are to be by Tenant’s Structural approved by Landlord’s Structural Engineer. 6. General items (less than 400 lbs.) can be attached DESIGN SPECIFIC REQUIREMENTS FOR O L D R O B / M AY B O X : Landlord is providing to Tenants 277/480V, 3 phase, 4 wire service. Landlord is installing 2” conduit, 4 wire, and Terminal Lug Box to Tenant’s space. Tenants H5,H6,H7,H8,H9, and H12 will have 120/208V, 3 phase, 4 wire service to existing panel within Tenant’s space. Step down transformer for these spaces will be located on Level 2 between column lines 9.7 & 11 and to both the Glue Lam beams and the 4x16 sub B & C. (behind Restroom and Janitor Closet) Spaces framing where it occurs but detailed by Tenant’s H5, H6, H7, H8 and H9 will have 30KVA while space Structural Engineer. H12 will have 45 KVA. 7. Tenant may attach to Landlord 2x8 metal studs between Glue Lam beams where it occurs. This must be calculated and detailed by Tenant’s Structural Engineer. 8. All fire rating must be restored by Tenant at completion of construction. 9. All T-bar ceilings may be considered for attachment to Base Bldg roof structural but will require Landlord Structural Engineer review and approval. Engineer. 3. New mechanical units of equal or less weight than existing units can be installed in previous For additional information see details on Dining Terrace Base Bldg Drawings sheet A0.02 locations without Landlord Structural Engineer review. Retail Criteria Manual 109 ENGINEERING 8.3 Electrical and Telephone Design DESIGN / CONSTRUCTION COORDINATION The following items shall be noted on Tenant’s plans tion details. Weatherproofing of any roof penetra- for clarification: tions required by Tenant shall be performed by 1. Prior to making any pipe or duct roof penetration and/or positioning of any equipment on the roof, all the proposed locations and/or penetrations shall match locations as indicated on Westfield -approved plans, and approved by Westfield’s construction field coordinator. 2. No roof work of any kind shall be performed prior to an on-site meeting with the Tenant Construction Coordinator. Any required roof penetrations shall be performed in coordinator with Westfield’s roofing contractor, as outlined in HVAC Design and Construction Criteria. Westfield’s authorized roofing contractor. Tenant’s general contractor shall pay all such costs, therefore, directly to such roofing contractor upon their demand. Any failure to follow this procedure, and any damages resulting therefrom, shall be at the Tenant’s sole cost and expense. 6. All pipes penetrating and/or located on the roof shall be painted to match the color of the existing roof. Use the appropriate coats of pretreatment primer prior to the final coat. Final coat of the roof matching color shall be approved by Westfield. 3. Tenant’s general contractor shall be required to furnish temporary weatherproofing for all roof penetrations, until Westfield’s roofing contractor has made the final patch. 4. Tenant’s general contractor shall provide a fire watch whenever any welding is done within the Demised Premises. The person performing the fire watch shall remain in the Tenant Space for at lest one (1) hour after the completion of any welding. 5. All roof and slab penetrations made by Tenant’s general contractor shall conform to Westfield’s standard criteria and shall be subject to Westfield’s approval as to location and construc- 110 Westfield University Town Center Westfield UTC 93 ENGINEERING 8.3 Electrical and Telephone Design Retail Criteria Manual 111 ENGINEERING 8.3 Electrical and Telephone Design F I R E Westfield UTC 95 112 Westfield University Town Center ENGINEERING 8.4 Fire Suppression Design FIRE SUPPRESSION SYSTEM DESIGN Tenant shall connect a fire protection system, to either sary, a sprinkler system for the Demised Premises Westfield’s sprinkler main or a branch line connec- which is in compliance with all local codes and West- are not required within Tenant system calcu- tion to the Tenant Space, using approved mechanical field ‘s insurance carrier. Sizing of the service main or lations. Hose stream allowances have been fittings. Tenant shall furnish all branch piping and capped branch connection is based on one sprinkler included in the calculations for the service main. sprinklers required to complete the sprinkler system head per eighty (80) square feet of floor area of the within the Demised Premises. Tenant Space. Tenant shall modify and upgrade the nection to service main 129 psi static, 70 psi system as required by the store design. residual, while flowing 750 gpm. Tenant’s sprinkler system design in remodel ar- e. Hose Allowance: Hose stream allowances f. Water supply available at the Tenant con- g. Note: The service main has been hydrauli- eas shall be based upon a single source of supply, For hydraulically designed systems, Westfield shall fur- ordinary hazard pipe schedule system as outlined in nish either a service main for Tenant’s connection of a NFPA pamphlet #13 and Westfield ‘s insurance carrier’s four-inch (4”) capped outlet connection to the Tenant requirements. New Tenant sprinkler system design Space, at a location selected by Westfield. in the expansion area shall be hydraulically designed TENANT WORK GENERAL REQUIRE- systems only. MENTS Any sprinkler heads, which are required to be re- Tenant hydraulically calculated systems shall be Tenant sprinkler system control valves are not re- designed, as follows: quired nor shall they be allowed. If valves exist, Tenant located or are required in addition to the existing grid shall be completed by Westfield’s sprinkler contractor, at Tenant’s expense. Also, any revoking of existing branch lines or mains, due to the Tenant’s design, shall also be at Tenant’s expense. It is the responsibility of Tenant’s General Contractor to coordinate Tenant’s construction work in conjunction with Westfield’s sprinkler contractor. LANDLORD WORK only be taken to the connection to the service main. Calculations ending at any other location shall be ejected. shall remove all valves and controls at sprinkler main hydraulically designed to provide 750 gpm to the connections. most remote Tenant Space within each Tenant All sprinkler system tests shall be witnessed by zone is: Westfield’s Tenant Construction Coordinator and local a. Density – 0.17 gpm/square foot. b. Operating Area: Hydraulically most remote 3000 square feet (The location at partitions shall be ignored when choosing the remote area). c. Temperature Rating: 165º F. Orifice Size: one-half inch (½”) or 17/32” (no mixing either a service main or a capped branch line con- orifice sizes). Westfield. Westfield may furnish, as deemed neces- water supply. Tenant sprinkler calculations need 1. 1. The Tenant fire sprinkler main has been For pipe schedule systems, Westfield shall provide nection to the Tenant Space, at a location selected by cally proven to furnish the above described d. Sprinkler Spacing: 130 square feet maximum. jurisdictional authorities, as required. All piping shall be supported from beams/joists only. Do not attach anything directly to the upper lever slab or roof deck. Fastening and/or suspension devices shall be attached to the building structure only. Final connection to Westfield’s sprinkler main shall not be made until the entire system within the Demised Premises is pressure-tested and ready for service. Tenant shall not be allowed to stock the Tenant Space Retail Criteria Manual 113 ENGINEERING 8.4 Fire Suppression Design until the entire sprinkler system has been inspected, and Factory Mutual for fire protection system approved and put into operation. All sprinkler system installation, and approved by all authorities having tests shall be witnessed by Westfield’s on-site representative and local jurisdictional authorities, as required. All piping shall be designed in accordance with NFPA jurisdiction and governing codes. The entire installation shall be performed by a licensed sprinkler contractor in a first class, workman- 3. New mechanical units of equal or less weight than existing units can be installed in previous locations without Landlord Structural Engineer review. 4. Addition of loads exceeding 400 lbs. must be de- like manner. signed by the Tenant’s Structural Engineer and be requirements. All piping shall be threaded schedule DESIGN SPECIFIC REQUIREMENTS FOR Engineer. 40 black steel meeting ASTM A135. All pipe fittings are BUILDING E: required to be pressure class 175. Roof/ ceiling assembly is 1 hour rated. Any penetra- ceiling assembly except spaces FC7, FC12 and All hangers are to be of an approved type and spaced tions by Tenant through the rated ceiling must be FC14. Exempted spaces must be reviewed and in accordance with NFPA #13. Seismic bracing to be maintained by Tenant at Tenant’s expense. approved by Landlord’s Structural Engineer. installed per C.B.C. Nothing can be attached to the roof/ ceiling assembly. Sprinklers, for areas below the ceiling, shall be re- Tenant will be required to create a support system to both the Glue Lam beams and the 4x16 sub cessed or semi-recessed, UL listed, and Factory Mutual which is independent from the roof/ ceiling assembly. framing where it occurs but detailed by Tenant’s approved. Outside in the entry the sprinkler must be Any columns within the Tenant’s space must be Structural Engineer. exposed. enclosed within a 1 hour rated enclosure which will be Tenant shall provide appropriate-type fire extinguish- by Tenant at Tenant’s expense. between Glue Lam beams where it occurs. This ers in stock room areas and elsewhere throughout the Additional information concerning the 1 hour rated must be calculated and detailed by Tenant’s Demised Premises, as required by all local authorities ceiling: Structural Engineer. #13 and installed per Westfield’s insurance carrier’s having jurisdiction and Westfield’s insurance carrier. Fire extinguishers shall be furnished, as directed by the Fire Marshal, and be easily accessible. As a matter of routine practice, fire extinguishers shall be serviced and inspected monthly. All materials and equipment under this section shall be new and listed by Underwriters Laboratories, Inc. 1. The floor for the Dining Terrace, 2nd Level to accept 100 PSF uniform live loading. 2. General items including duct work, sprinklers, reviewed and approved by Landlord’s Structural 5. No Tenant drywall may be added to the roof/ 6. General items (less than 400 lbs.) can be attached 7. Tenant may attach to Landlord 2x8 metal studs 8. All fire rating must be restored by Tenant at completion of construction. 9. All T-bar ceilings may be considered for attach- menu boards, hoods etc. can be attached to the ment to Base Bldg roof structural but will require Base Bldg roof structure. All attachments and Landlord Structural Engineer review and ap- structural details are to be by Tenant’s Structural proval. Engineer. For additional information see details on Dining Terrace Base Bldg Drawings sheet A0.02 114 Westfield University Town Center ENGINEERING 8.5 Smoke and Fire Alarm Design SMOKE & FIRE ALARM TENANT WORK GENERAL REQUIRE- FI NAL T E S T I N G O F FI R E AL AR M S YS T EM MENTS Tenant shall install an independent internal communi- Each Tenant fire alarm system shall be final tested by cation system, alarm system or smoke control system the Local Building and Fire Marshal and witnessed by as may be required by any governmental agency. Westfield’s on-site representative. Tenants’ spaces are to be monitored by an indepen- Written approval of the Tenant’s system and opera- dent third party monitoring company. tion shall be obtained from the Building Department and Fire Marshall’s offices and a copy submitted to Westfield’s onsite representative. Retail Criteria Manual 115 ENGINEERING 8.6 General Construction GENERAL CONSTRUC TION REQUIREMENTS Tenant convents and agrees that “General Conditions strict compliance. of the Contract For Construction,” standard form 5. Contact Westfield’s Tenant Construction Tenant’s General Contractor and all sub-contractors A-201, current edition of the American Institute of Coordinator for a list of pre-construction docu- participating in Tenant’s work shall: Architects (AIA), shall be made a part of any contract ments required of the General Contractor prior to between Tenant and any of Tenant’s contractors for commencing construction. the performance of Tenant’s Work, except where they are in conflict with matters set forth in this Tenant’s lease. and install Tenant rooftop equipment walkways. 1. Construct the Tenant Space in accordance with all applicable codes, lease Documents, Tenant 6. Deposit a check in the sum of $5,000.00 with Design Handbook and Tenant plans bearing West- Westfield’s Tenant Construction Coordinator as field’s final approval. security for the completion of construction and as 2. Provide a full time supervisor and/or repre- Prior to commencing construction, Tenant’s General security for the removal of trash and debris shall Contractor shall: the General Contractor fail to do so. sentative for either the General Contractor and/ or Tenant, who shall be present at all times when 1. Present to Westfield’s Tenant Construction 7. UTC reserves the right to increase the deposit construction is being performed in the Demised Coordinator and maintain on site, at all times, one up to $10,000.00 if work is determined potentially Premises. This individual shall make their presence (1) full set of Westfield-approved final working hazardous to surrounding Tenants or property. known to Westfield’s Tenant Construction Coordi- drawings, endorsed with the approval stamp and permit number of the Building Department of the Municipality, Local Fire Marshall and any other governmental entity having jurisdiction over the construction. 2. Furnish Westfield’s Tenant Construction Coordinator with a certificate of insurance at the time of signing for the Tenant Space. 3. Furnish Westfield’s Tenant Construction Coordinator one (1) set of Tenant plans with Westfield’s final approval, and shall inspect and sign for Demised Premises. 4. Familiarize themselves with all sections and/ or requirements of this design handbook to ensure 116 Westfield University Town Center The following provisions, with respect to construction nator before the start of work. procedures, shall apply to Tenant’s Work: 3. Furnish temporary toilet facilities for work- 1. Tenant’s work shall be performed in a thor- men. oughly first-class and workmanlike manner and 4. Make appropriate arrangements, as directed shall be in good and usable condition at the date by Westfield, for temporary utility connections, as of completion. available within the Business Center. Pay the cost 2. Tenant shall pay for all necessary permits and/ of connection, proper maintenance, and removal or fees required by public authorities and/or utility of the same. Pay all utility charges incurred by such companies with respect to Tenant Work. contractor and/or subcontractor. 3. Tenant’s General Contractor shall be respon- 5. Direct Tenant’s Electrical Contractor to make sible for reimbursing Westfield’s roofing contractor for their portion of work to be completed for Tenant. Westfield’s roofing contractor shall weatherproof all roof penetrations, supporting platforms application for electrical service to the serving utility company for construction power purposes (as Westfield shall not make power available). This shall be the first item accomplished within the Ten- ENGINEERING 8.6 General Construction ant Space. Adequate protection to that portion of UTC floor tect all private and public property as per OSHA 6. (For high water usage tenants) Shall procure enclosed by barricade shall be provided, and any codes. damage to the floor, including (but not limited to) 16. Furnish a fire watch, with adequate fire and install a water meter and pressure regulator immediately upon commencement of Tenant’s staining by liquid or food stuff, shall be repaired or suppression equipment, whenever any welding construction for construction and permanent replaced by Westfield at the Tenant’s expense. water service. 10. Coordinate with any affected Tenant any me- forming the fire watch shall remain for a minimum 7. Store all building materials, tools and equip- chanical, electrical or plumbing item(s) which need of one (1) hour after the completion of any weld- ment within the Demised Premises or other to be routed through another Tenant’s space. ing. locations as may be specifically designated by 11. Foot prints in UTC common mopped by the 17. Be responsible for obtaining approval of Westfield. General Contractor. sprinkler shop drawings from the Fire Marshal and/ 8. Be responsible for all trash removal from the 12. .Noise abatement – loud noises (saw cutting, or any and all local authorities having jurisdic- Tenant Space at the end of each working day. jack hammer, etc.) TA-101A. Tenant’s contractor shall place trash in the proper 13. Fire extingusher and first aid kits required dur- receptacles, as designated by Westfield. All debris shall be broken down. Trash receptacles are not furnished by UTC, Tenant’s Contractor shall provide containers and pay all associated costs. Refuse receptacles shall only be located as directed by Westfield’s Field Representative. 9. Properly protect Tenant’s work with lights, guardrails and barricades and secure all parts of Tenant’s work against accident, storm and any other hazard. Prior to the start of Tenant work, Tenant’s contractor may be required to erect a dust proof solid barricade which shall extend to UTC ceiling above, shall be located two feet (2’-0”) in front of the lease line of the Demised Premises, and shall be without opening or passage to UTC. ing construction. 14. Be responsible for any roof and/or slab penetrations and conform to Westfield’s standard criteria and approval. Westfield shall determine location. Weatherproofing of any roof installation by Tenant shall be performed by Westfield’s authorized roofing contractor and Tenant’s contractor shall pay all costs directly to such. Prior to making any roof penetrations and/or positioning any equipment or penetration on the roof, Tenant’s General Contractor shall obtain approval of such from Westfield. 15. Take all necessary precautions to safeguard all workmen and the public from accident and pro- is done within the Tenant Space. The person per- tion. Any installation of Tenant’s sprinkler system without approved plans shall be at the sole risk and expense of Tenant and/or Tenant’s General Contractor. 18. Final connection to Westfield’s sprinkler main shall not be made until the entire system within the Demised Premises is completed, pressure tested and ready for service. When the preceding work has been completed, Tenant’s General Contractor shall contact Westfield’s Tenant Coordinator who shall then notify the following of such: Westfield’s insurance carrier and the local Fire Department prior to draining and/or refilling Westfield’s sprinkler main. Tenant work shall be coordinated, with all work being performed or to be executed by Westfield and other Occupants of the Business Center, to such extent that Retail Criteria Manual 117 ENGINEERING 8.6 General Construction COMPLETION REQUIREMENTS Tenant’s work shall not interfere with and/or delay the Tenant shall commence Tenant work promptly after Items above shall be forwarded to: completion of any other work. No contractor and/or Westfield’s approval of the Final Working Drawings. subcontractor participating in Tenant work shall, at Management Office Upon completion of the Tenant work, Tenant shall any time, damage, injure, interfere with, and/or delay Westfield Corporation, Inc. deliver to Westfield the following: 4545 La Jolla Village Drive the completion of the building of any other construction within the Business Center. Each entity shall comply with all procedures and regulations prescribed by Westfield for the execution of Tenant work with the work to performed in connection with the building and all other construction with the Business Center. 1. Tenant’s final notarized original affidavit that Ste. E25 Tenant’s work has been completed to Tenant’s San Diego, CA 92122-1212 satisfaction and in strict accordance with the Final 858-453-2930 Working Drawings and Tenant’s and Westfield’s 858-552-9065 Fax construction requirements. Such affidavit may be relied on by Westfield. Any deliberate or negligent misstatement or false statement made by Tenant therein shall constitute breach of the lease. 2. The final notarized original affidavit and waiver of lien by the General Contractor performing Tenant’s work to the effect that Tenant work was completed in accordance with the Westfield -approved working drawings. Affidavit shall also state that all sub-contractors, laborers, material suppliers engaged in furnishing materials and/or rendering services for Tenant work, have been paid in full. 3. Complete operating, maintenance and spare parts manuals for all mechanical, electrical and similar equipment installed as part of Tenant work. 4. Failure to abide by construction requirements will forfeit deposit and additional assessments may be charged $500.00 per infraction. 118 Westfield University Town Center Addenda Retail Criteria Manual 119 A D D E N DA 9.1 Construction Addendum Required for all properties in Los Angeles, Orange, The contacts for the carpenters union are: Riverside and San Diego Counties For Finish Millwork, Concrete Forming, Wood TENANT CONTRAC TORS Framing/Siding, and Fixture Installation. Whenever carpenters are utilized on site they must Jim Flores be union carpenters. Union Carpenters perform the Office: 714-978-6232 following types of work that include stud framing, Cell: 714-231-4228 drywall, door and hardware installation, acoustical (Los Angeles, Orange, San Diego and Riverside ceilings, wall insulation, etc. Counties.) For D/W, Steel Stud, and Acousitc Ceiling. Steve Paskow Office: 323-660-1506 (Los Angeles, Orange and Riverside Counties) Randy Thornhill Office: 858-621-2670 (San Diego County) 120 Westfield University Town Center A D D E N DA 9.2 Additional Details Westfield UTC 105 Retail Criteria Manual 121 A D D E N DA 9.2 Additional Details Westfield UTC 106 122 Westfield University Town Center A D D E N DA 9.2 Additional Details Westfield UTC 107 Retail Criteria Manual 123 A D D E N DA 9.2 Additional Details Westfield UTC 108 124 Westfield University Town Center A D D E N DA 9.2 Additional Details Westfield UTC 109 Retail Criteria Manual 125 A D D E N DA 9.2 Additional Details Westfield UTC 110 126 Westfield University Town Center A D D E N DA 9.2 Additional Details Westfield UTC 111 Retail Criteria Manual 127 A D D E N DA 9.2 Additional Details Westfield UTC 113 128 Westfield University Town Center A D D E N DA 9.2 Additional Details Westfield UTC 115 Retail Criteria Manual 129 A D D E N DA 9.2 Additional Details Westfield UTC 117 130 Westfield University Town Center A D D E N DA 9.2 Additional Details Westfield UTC 119 Retail Criteria Manual 131 A D D E N DA 9.2 Additional Details Westfield UTC 120 132 Westfield University Town Center A D D E N DA 9.3 Building-Specific Requirements DESIGN SPECIFIC REQUIREMENTS FOR BUILDING E: All Tenants within the Building E will be required to ceiling: install a 1 hour rated ceiling within the Tenant’s space 1. The floor for the Dining Terrace, 2nd Level to ac- at Tenant’s expense. Tenant will install 1 hour rated ceiling up against Landlord’s existing roof joists. Because of the attachment of the 1 hour rated ceiling to the existing roof and it joists there are limitations to what can be attached to the roof. Please reference the nine points at the end of this section. Tenant’s new ceiling and any infastructures (HVAC, Elec, Plumb, etc) must be self supporting and independent of Landlord’s roof structure. For any penetration that the Tenant requires through the 1 hour roof; roof rating must be maintain by Tenant at Tenant’s expense. cept 100 PSF uniform live loading. 2. General items including duct work, sprinklers, menu boards, hoods etc. can be attached to the Base Bldg roof structure. All attachments and completion of construction. 9. All T-bar ceilings may be considered for attachment to Base Bldg roof structural but will require Landlord Structural Engineer review and approval. structural details are to be by Tenant’s Structural For additional information see details on Dining Engineer. Terrace Base Bldg Drawings sheet A0.02 found on 3. New mechanical units of equal or less weight pages 154 and 155 of this criteria than existing units can be installed in previous locations without Landlord Structural Engineer F I R E R E S I S TA N C E P R O V I D E D BY G Y P - review. SUM BOARD MEMBRANE PROTECTION 4. Addition of loads exceeding 400 lbs. must be designed by the Tenant’s Structural Engineer and be Any columns within the Tenant’s space must be reviewed and approved by Landlord’s Structural enclosed within a 1 hour rated enclosure which will be Engineer. Tenant at Tenant’s expense. 8. All fire rating must be restored by Tenant at 5. No Tenant drywall may be added to the roof/ Introduction: Dividing buildings into distinct fire-protected areas is typically accomplished by providing fire-resistance rated separations between those areas. This type of Landlord is supplying only 120/208V, 3 phase, 4 ceiling assembly except spaces FC7, FC12 and separation is easily achieved by the use of gypsum wire service to this building. Tenant is to verify with FC14. Exempted spaces must be reviewed and board applied to either wood or steel framing mem- Landlord as to the amount of amps each Tenant will approved by Landlord’s Structural Engineer. bers. These fire-rated separations are usually pro- be Supplied. 6. General items (less than 400 lbs.) can be at- vided as total assemblies, consisting of the structural Landlord is providing a Grease Interceptor and Grease tached to both the Glue Lam beams and the 4x16 member, the gypsum board and structural flooring Waste Line for Tenants. Tenant will be responsible to sub framing but detailed by Tenant’s Structural material (if a floor/ceiling assembly). Listings of many extend service from Landlord’s Point of Connection to Engineer. fire-rated assemblies or Designs are found in the GA- Tenant’s space at Tenant’s expense. 7. Tenant may attach to Landlord 2x8 metal studs 600, UL Fire Resistance Directory, etc. Tenant is not required to install a water meter or between Glue Lam beams where it occurs. This However, often no fire-rated assembly exists to match remote meter in Tenant’s space. must be calculated and detailed by Tenant’s a particular configuration to be built. This is often the Additional information concerning the 1 hour rated Structural Engineer. case for retrofit work, but may also occur in new con- Retail Criteria Manual 133 A D D E N DA 9.3 Building-Specific Requirements struction. In this case all of the fire resistance may be (38x235 mm) floor framing. Hundreds of fire tests Gypsum board membranes most commonly used to provided by a gypsum board “membrane”; typically were conducted prior to the development of engi- meet fire-resistance requirements in unique circum- several layers of fire-rated (type X) gypsum board. neered wood trusses, wood I-joists, and lightweight stances are described and shown herein; the details steel joists. In certain types of new construction, it and sketches are based on UL Designs U301 and L556, may be neither practical nor economical to use the and on GA File Nos. FC 5406 and RC 2601. Fire Tests and Finish or Membrane Ratings type of structural components found in tested and The finish rating is derived from the same test method listed systems. In addition, engineered systems tak- (ASTM E 119) that establishes fire-resistance ratings ing into account the actual loads and spans enable for systems. The finish rating is the time necessary designers to specify systems that may not require One-Hour Ceiling for an average rise in temperature of 250ºF (140º C), 2x10 (38x235 mm) joists. These engineered systems or a maximum rise of 325ºF (180ºC), as measured on (Based on GA File Nos. FC 5406 and RC 2601) often specify smaller dimension lumber, wood trusses, the face of the wood (i.e., framing) nearest the fire. In wood I-joists, other engineered lumber products, a gypsum board system, this is the time required for steel channel joists, or other materials as the structural the back (unexposed) surface of the gypsum board to framing. reach one of the limiting conditions as defined above. The ceiling membrane consists of two layers of 5/8” (15.9 mm) type X gypsum board directly applied to framing or furring. The base layer of gypsum board is applied at right angles to ceiling framing 24” (610 The effect of using smaller lumber sizes where shorter Finish ratings have been established for most fire- mm) o.c. and attached with 1” (25 mm) Type S or S-12 spans and lower loads are encountered has not been resistance rated systems that incorporate combustible drywall screws (for steel framing) or 1-1/4” (32 mm) documented by full-scale tests. Due to the larger size (i.e., wood) framing components. In gypsum board Type W or S drywall screws (for wood framing) spaces of the test specimen required in the ASTM E 119 fire construction, the finish rating can be determined to 24” (610 mm) o.c. The face layer of gypsum board is ap- test method, it may not be possible to evaluate such be the fire-resistance rating provided by the gypsum plied at right angles to the framing and attached with designs by full scale tests. 1-5/8” (41 mm) Type S or S-12 drywall screws (for steel Retrofit construction often presents unique situa- framing) or 1-7/8” (48 mm) Type W or S drywall screws tions for designers, contractors, and building officials. (for wood framing) 12” (305 mm) o.c. at end joints and Upgrading existing walls or floor-ceiling systems may intermediate joists and 1-1/2” (38 mm) Type G drywall involve limited access to the space or the presence of screws 12” (305 mm) o.c. placed 2” (50 mm) back on construction materials that may not be used in any either side of end joints. Joints of the face layer are currently available tested or listed system. When it is offset 24” (610 mm) from the joints in the base layer. not possible to construct a specific tested system, the Face layer joints and fasteners are finished to Level 1 use of the finish rating of a system may be the only as specified in GA-214, Levels of Gypsum Board Finish. board membrane on the fire exposed side. While the use of the finish rating data is common and generally accepted practice to validate and document the required fire resistance of a membrane, its use must be approved by the authority having jurisdiction. When to use a Membrane Rating Fire tests on floor-ceiling systems are historically conducted with fully loaded solid-sawn nominal 2x10 134 Westfield University Town Center practical method to determine the rating. A D D E N DA 9.3 Building-Specific Requirements 1 2 3 4 6 5 7 8 11 10 9 12 13 14 KEYNOTE - FIRE UPGRADE 15 A E 11 E 06 1 1 B 1 1 E 05 E 07 E 03 E 04 E01A 1 6 1 1 HOUR FIRE RATED CEILING BY FUTURE TENA 2 ROOF / CEILING OVER 20'-0" - NO FIRE RATING R 3 1 HOUR FIRE RATED LIGHT / SPEAKER COVER. FF109-300 BY TENMAT INC. OR UL APPROVED E LIGHT FIXTURES AND SPEAKERS THAT PENETR HOUR CEILING. 4 EXISTING GLU-LAM (SIZES VARY FROM 5 1/8" X X 72") 1 HOUR RATED 5 ALL EXISTING STRUCTURAL STEEL PIPE COLUM WIDE FLANGE COLUMNS TO RECEIVE NEW 1-HO RATED ASSEMBLY PER UL DESIGN # XR301 - SE A0.02. C 1 HOUR CEILING ASSEMBLY ENTRANCE #1 E 02 5 200 CORRIDOR #1 FC 06 s CORRIDOR #2 240 202 s 236 E 02A 210 D s 2 s FC 07 s s STAIR #3 FC 08 FC 09 FC 10 ENTRANCE #2 204 205 206 201 024 s s 219 TRAY WASH s s s 1 s JANITOR #1 207 s E 01 208 FC 11 UPPER DINING #2 FC 05 E 17 1 E LEGEND F NEW 1-HOUR RATED CEILING @ + (9'-10" IN PASSAGE #2 & RESTROO U.N.O. - (2) LAYERS 5/8" GYP. BD. OVER 8" METAL STUDS SUPPORT FROM GLU-LAMSAT EACH END - SEE DETAIL 1 / A0.02 G NEW 1-HOUR RATED CEILING @ + (2) LAYERS 5/8" TYPE X GYP. BD. O 8" METAL RAFTERS AT 24" O.C. SPANNING BETWEEN EXISTING G - SEE DETAIL 2 / A0.02 209 s PASSAGE #2 1 221 s CORRIDOR #3 s 5 217 FC 04 s s s 4 UNISEX RESTROOM 5 s s s 216 s LOWER DINING FC03A 228 214 s WOMEN MEN 227 226 s JANITOR #2 215 5 FC 03 231 ELEVATOR VESTIBULE H 220 STAIR #2 232 J s PASSAGE #3 234 UPPER DINING #3 s 213 ELEVATOR CORRIDOR #4 FC 02 235 212 2 UPPER DINING #1 s 218 s 1 K EQUIPMENT ROOM NEW 1-HOUR RATED CEILING @ + U.N.O. - (2) LAYERS 5/8" TYPE X GY OVER 1 1/2" METAL FRAMING AT 2 SUSPENDED FROM 8" METAL RAF BETWEEN EXISTING GLU-LAMS AB - SEE DETAIL 3 / A0.02 NEW 1-HOUR RATED CEILING - CE TO BE DETERMINED BY TENANT FC 01 s L L1 STAIR #1 O PASSAGE #1 EXISTING 1-HOUR RATED CEILING REMAIN - VERIFY 1 HOUR ASSEMB IN FIELD - UPGRADE OR INSTALL N 1 HOUR RATED CEILING AS REQU 211 REFLECTED CEILING PLAN - 1 HOUR FIRE RATING UPGRADE 1 HOUR RATED WALL PER UL DES NUMBER U419 NTS 1 HOUR COLUMN ASSEMBLY EXISTING BUILT-UP ROOF OVER 1/2" STRUCTURAL PLYWOOD 4 4 4 A0.02 A0.02 A0.02 EXISTING BUILT-UP ROOF OVER 1/2" STRUCTURAL PLYWOOD EXISTING 2X4 @ 24" O.C. 1 1/2" 6" 5 8" Enlarged Details see page 155 EXISTING G.L. BEAM - SIZES VARY EXISTING 2X4 @ 24" O.C. NEW 400S 162-33 @ 24" O.C. WITH (4) 16d TO EXISTING G.L. BEAM & (3) #8 SCREWS TO 8" RAFTERS NOTE: SEE DETAIL 1 / A0.02 FOR MORE INFORMATION NOTE: SEE DETAIL 1 / A0.02 FOR MORE INFORMATION NEW 400S 162-33 @ 24" O.C. WITH (4) 16d TO EXISTING G.L. BEAM & (3) #8 SCREWS TO 8" RAFTERS (3) #8 SCREWS EXISTING 4X16 @ 8'-0" O.C. EXISTING 4X16 BEYOND @ 8'-0" O.C. (2) #8 SCREWS 400 S 162-33 @ ENDS 400 S 137-33 @ 8'-0" O.C. (2) #8 SCREW TO 8" STUDS 250 S137-33 @ 24" O.C. NEW 800 S162-54 @ 24" O.C. SHEET A0.02 400 S 137-33 @ 8'-0" O.C. (2) #8 SCREW TO 8" STUDS 1 1/2" MTL. FRAMING OR AS REQUIRED NEW 800 S162-54 @ 24" O.C. L 2 X 2 X 20 GA. (2) LAYERS 5/8" TYPE X GYP.BD. - SEE DETAIL 6 / A0.02 (2) LAYERS 5/8" TYPE X GYP.BD. - SEE DETAIL 6 / A0.02 L 2 X 2 X 20 GA. L 2 X 2 X 20 GA. - BEYOND GYP. BD. CONTINUES @ SMALLER G.L. BEAMS WHEREVER POSSIBLE 4 1 HOUR CEILING DETAIL NTS 3 1 HOUR CEILING DETAIL NTS 2 1 HOUR CEILING DETAIL NTS 1 1 HOUR CEILING DETAIL NTS Retail Criteria Manual 135 A D D E N DA 9.3 Building-Specific Requirements 136 Westfield University Town Center A D D E N DA 9.3 Building-Specific Requirements DESIGN SPECIFIC REQUIREMENTS FOR O L D R O B / M AY B O X : wire service. Landlord is installing 2” conduit, 4 wire, This building is Type 1 and Type V (Verify by Tenant’s and Terminal Lug Box to Tenant’s space. space) . Wall between Type 1 building and Type V is 3 Tenants (H5,H6,H7,H8,H9, and H12 will have 120/208V, hour rated to match existing Rob/ May building. 3 phase, 4 wire service to existing panel within Ten- (Verify after Landlord receive Expansion Permit) Store- ant’s space. Step down transformer for these spaces front that intersect the Type 1 and Type V will have a will be located on Level 2 between column lines 9.7 water curtain (sprinkler heads on both sides of glass, & 11 and B & C. (behind Restroom and Janitor Closet) 1 hour rated walls, and verify if a barrier at floor to Spaces H5, H6, H7, H8 and H9 will have 30KVA while prevent anything from touching glass and whether no space H12 will have 45 KVA. horizontal mullions will be allowed. Landlord is providing a Condensed Water System All Tenants within the Dining Terrace will be required (with Central Plant) for Tenant HVAC system. Tenant to install a 1 hour rated ceiling within the Tenant’s must use this system. (See Design Criteria for the Con- space at Tenant’s expense. Tenant will install 1 hour densed Water System – attached) rated ceiling up against Landlord’s existing roof joists. Because of the attachment of the 1 hour rated ceiling to the existing roof and it joists Tenant will not be allowed to attach anything to said roof. Anything attached to said roof could compromise the roof integrity. Tenant’s new ceiling and any infrastructures (HVAC, Elec, Plumb, etc) must be self supporting and independent of Landlord’s roof structure. For any penetration that the Tenant requires through the 1 hour roof; roof rating must be maintain by Tenant at Tenant’s expense. Landlord will not be providing any grease interceptor at the old Rob/May box. Landlord is providing to Tenants 277/480V, 3 phase, 4 Retail Criteria Manual 137 A D D E N DA 9.4 Barricade Criteria TENANT CONSTRUCTION BARRICADE CRITERIA: Westfield UTC has developed specific standards for 4. Premier Barricades may be used for graphic pro- tenant construction barricades to preserve the luxuri- duction and installation, but is not a required vendor. ous image of the center, prevent dust, debris, and Barricade graphics must be installed the same day as sound from disturbing the quiet enjoyment of our barricade installation. customers and retailers, and to provide protection for 5. Barricades must be placed no further than 4’ from our patrons. These standards must be met prior to the tenant lease line. commencement of any construction activity. 6. Barricade doors must be secured at all times. Con- 1. Westfield has negotiated volume pricing with Pre- struction materials must be delivered before or after mier Barricades. Barricades are required to be the full mall hours. The area outside the construction barri- height of the base-building parapet, between 20’ and cade must be kept clean and free of debris at all times. 24’ depending on location. Barricade pricing is $76 PLF inclusive of one set of double doors, installation, and takedown. 2. Tenant or tenant contractor is required to order barricades directly through Premier at: Premier Barricades 2470 South Santa Fe Ave. Vista, CA 92084 877.345.9700 [email protected] 3. Tenant is required to provide graphics that cover the full surface area of the barricade. Graphics must be approved in advance by Westfield UTC at: Adrienne Bergeron Marketing Director, Westfield UTC 858.453.2930 [email protected] 138 Westfield University Town Center In order to ensure compliance with these criteria, we strongly encourage tenants to design and coordinate barricade graphics during store design. If you have any questions, please contact the Westfield UTC Management Office or your Westfield Tenant Coordinator. 10.1 Tenant Improvement Green Tenant Criteria INTRODUCTION As part of this project, Tenants are expected to adhere to Westfield University Town Center’s Tenant Criteria Manual which includes the Green Tenant Criteria outlined in this section. The criteria includes required and suggested practices for the design, construction and operation of the Tenant’s premises. Westfield strongly recommends all Tenants visit the USGBC website and apply for LEED certification. By complying with the required sections in this manual, Tenants will make considerable progress toward earning enough credits to achieve LEED certification. Developed by the U.S. Green Building Council (USGBC), LEED provides building owners and operators a concise framework for identifying and implementing practical and measurable green building design, construction, operations and maintenance solutions. recycle 140 organic LEED is an internationally recognized green building certification system, providing third-party verification that a building or community was designed and built using strategies aimed at improving performance across all the metrics that matter most: energy savings, water efficiency, CO2 emissions reduction, improved indoor environmental quality, and stewardship of resources and sensitivity to their impacts. 2010.12.17 ecological footprint Why Design and Construct a Green Retail Space? Simply put, applying the Green strategies benefits your company’s bottom line. In many cases, it is more cost effective in up front and/or life cycle costs, saving money on utility bills and operation costs. It creates a positive reputation for your company in the community. It increases sales and productivity by making both your employees and customers more comfortable through improved indoor quality. Finally, and arguably most importantly, it helps the overall environment by reducing our impact on energy and natural resource consumption and cutting down on the waste and pollution we create. We know how important it is to conserve our natural resources and protect the health of occupants. Lighting and Heating/Air Conditioning of commercial buildings uses about half of the world’s fossil fuel consumption and represents one-third of the US’s electricity consumption. The construction and operation of commercial buildings have enormous impacts on both natural resources and the well being of our customers and employees. Construction consumes vast quantities of energy, water, wood, and other natural resources. Poorly designed buildings can also be hazardous to occupants’ health. 2010.12.17 Cost Benefit The most frequent question surrounding a green TI relates to the first cost of the build out. “Will these measures cost more money up front?” The Tenant and its Design/ Construction team should work together to choose a set of green measures from this criteria that make sense to the specific Tenant in terms of costs and benefits. Many green measures will add no cost to your project. Some measures involve a modest first cost increase, but save money over the long run by lowering utility bills. Some green measures may cost more, but yield benefits that are hard to quantify, such as improved occupant experience and productivity. In all cases, the key to eliminating or minimizing added costs is to set your goals early and have them included as part of your project from the very beginning. The desired green measures for the project should be clearly quantified during the selection of the Design team and it is important that the selected team has adequate knowledge of and/or experience in sustainable design. 141 Green Tenant Criteria table of contents 1.0 Water Efficiency sustainable 142 fresh 1.1 Water Use Reduction 2010.12.17 reusable 2010.12.17 2.0 Energy & Atmosphere 3.0 Materials & Resources 4.0 Indoor Environmental Quality 2.1 Commissioning 2.2 Energy Performance 2.3 Refrigerant Management 3.1 Storage and Collection of Recyclables 3.2 Construction Waste Management 3.3 Recycled Content 3.4 Regional Materials 4.1 Minimum Indoor Air Quality Performance 4.2 Low-Emitting Material - Adhesives, Sealants, Paints and Coatings 143 1.0 Water Efficiency 1.1 Water Use ReductionRequired Intent – To increase water efficiency within the tenant space to reduce the burden of municipal water supply and wastewater systems. Requirements – Tenants including at minimum the following: • Dual-flush toilets • Waterless urinals • Metered and/or aerated faucets Potential – Technologies WaterSense Dual Flush Toilets/Waterless Urinals - http://www.caromausa.com/WaterSense Dual Force Toilets - http://www. sterlingplumbing.com/whats-new/dual-force must use water-conserving fixtures, Strategies Waterless Urinals - http://www. falconwaterfree.com/products/us.htm & certified fixtures and fixture fittings should be used where available. Dual flush toilets and waterless urinals (where applicable) must be installed in all Tenant restrooms. 144 sustainable recycle 2010.12.17 2.0 reusable Energy & Atmosphere 2.1 Commissioning Recommended Intent – To verify that the project’s energy-related • systems are installed and calibrated to perform plan. according to the owner’s project requirements, basis of design and construction documents. Benefits of commissioning include reduced energy • callbacks, report. better building documentation, that the systems perform in accordance with the owner’s project requirements. Recommendations commissioning process Designate an Verify the installation and performance of Complete a summary Commissioning process – The activities following should be individual the commissioning activities HVAC and refrigeration lighting controls, Domestic hot water systems. Potential Technologies & Strategies – Engage a CxA as early as possible in the overs ee the completion of the commissioning project requirements, develop and maintain a process activities. commissioning plan for use during design and requirements into the construction documents. must design Develop and incorporate commissioning with recommendations prior to accepting the commissioned systems. commissioning authority (CxA) to lead, review and • Complete the commissioning reports including associated controls, Lighting and day as systems. be completed for the following energy-related systems at a minimum: completed by the project team: • • commissioning team, and prior to occupancy verify the performance of energy consuming the systems to be commissioned. use, lower operation costs, fewer contractor improved occupant productivity and verification 2010.12.17 • Develop and implement a commissioning process. construction and Determine the owner’s incorporate commissioning requirements in bid documents. Assemble the 145 2.0 Energy & Atmosphere (continued) 2.2 Energy Performance- 2.3 Refrigerant Management- Required Intent – To establish the 11) of ANSI/ASHRAE/IESNA Standard Intent – To reduce stratospheric 90.1-2007. ozone depletion. the tenant space systems to reduce • environmental and economic impacts a minimum of 10% below that allowed by ANSI/ associated with excessive energy use. of ASHRAE/IESNA Standard 90.1-2007. refrigerants in tenant heating, ventilation, • Requirements – Design Reduce connected lighting power density Install ENERGY STAR® qualified portions of the building as covered by equipment for a minimum of 50% (by rated- the tenant’s scope of work to increase power) energy efficiency by a minimum of installed as part of the tenant’s scope of work. 10 percent This of California above the Title requirements 24 regulations, Comply with ENERGY requirement equipment, service STAR eligible includes electronics, equipment. and equipment appliances, office commercial Excluded are food heating, ventilating and air conditioning (HVAC), lighting, Additional Recommendations: • of the mandatory and building envelope products. provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4 and 10.4) of ANSI/ASHRAE/IESNA 6 in place of ANSI/ASHRAE/IESNA Standard 90.1- Standard 90.1-2007. 2007. Achieve requirements the (Sections prescriptive 5.5, 6.5, 7.5 and 9.5) or performance requirements Potential Technologies & Strategies – Design the systems impacted in the tenant’s scope of work to maximize energy performance. Visit: http://www.ashrae.org/ chlorofluorocarbon – Zero (CFC) use based air conditioning and refrigeration (HVAC&R) systems. Potential Technologies & Strategies – For new installations, specify new HVAC equipment that uses no CFC based refrigerants. When reusing existing HVAC systems, conduct an inventory to identify equipment that uses CFC based refrigerants and replace or retrofit these Projects in California may use Title 24-2005, Part • Recommendations environmental minimum level of energy efficiency for satisfactory to the City Engineer. 146 (Section Recommended systems with non CFC refrigerants. 2010.12.17 3.0 Materials & Resources 3.1 Storage and Collection of Recyclables Required Intent – To facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills. Requirements – Provide an easily accessible dedicated 3.2 Construction Waste Management Required Intent – To divert construction and demolition debris from disposal in landfills and incineration facilities. Redirect recyclable recovered resources back to the manufacturing process and reusable materials to appropriate sites. area or areas for the collection and storage of materials for recycling for the tenant space. Materials must include at a minimum paper, waste management plan, including recycling and/or salvaging a minimum of 65% corrugated cardboard, glass, plastics and metals. nonhazardous construction and demolition debris during the construction of the Potential Technologies & Strategies – Designate an area for recyclable collection and storage that is appropriately sized and located in a convenient area. Instruct occupants on the recycling procedures. Requirements – Tenant shall conform with all requirements of the on-site project, satisfactory to the City Engineer. Recycling materials shall be sorted by material type and taken to specific recycling facilities, a list of which can be found in the City of San Diego’s recycling guide. Potential Technologies & Strategies – Establish goals for diversion from disposal in landfills and incineration facilities and adopt a construction waste management plan to achieve these goals. Consider recycling cardboard, metal, brick, concrete, plastic, clean wood, glass, gypsum wallboard, carpet and insulation. reusable 2010.12.17 147 3.0 Materials & Resources (continued) 3.3 Recycled Content 3.4 Regional Materials Required Recommended Intent – To increase demand for building products Intent – To increase demand for building materials and products that incorporate recycled content materials, thereby reducing that are extracted and manufactured within the region, thereby impacts resulting from extraction and processing of virgin supporting the regional economy and reducing the environmental materials. impacts resulting from transportation. Requirements – Use a minimum of 15 percent post consumer recycled content in building materials, including of construction and Division 12 (Furniture) materials and products that furniture and furnishings, and excluding MEP components and are manufactured regionally within a radius of 500 miles. vertical transportation. Potential Technologies & Strategies – Identify Requirements – Use a minimum of 20% of the combined value Potential Technologies & Strategies – Establish a project goal for locally sourced materials and identify materials and material material suppliers that can achieve the recycled content goal. suppliers that can achieve this goal. During construction, ensure that the specified recycled content that the specified local materials are installed and quantify the materials are installed. total percentage of local materials installed. Consider a range of environmental, Consider a range of environmental, economic and performance attributes when selecting and materials. products and materials. clean economic and performance attributes when selecting products sustainable 148 During construction, ensure 2010.12.17 4.0 Indoor Environmental Quality 4.1 Minimum Indoor Air Quality Performance 4.2 Low-Emitting Materials – Adhesives, Sealants, Paints and Coatings Recommended Intent – To establish minimum indoor air quality Intent – To reduce the quantity of indoor air contaminants that are odorous, (IAQ) performance to enhance indoor air quality in the potentially irritating and/or harmful to the comfort and well being of installers and building, thus contributing to the comfort and well-being of occupants. the occupants. Recommendations – For mechanically ventilated Recommendations – Adhesives, sealants and sealant primers must comply with South Coast Air Quality Management District (SCAQMD) Rule 1168. Paints and coatings spaces, modify or maintain existing building outside air applied to interior walls and ceilings must not exceed the Volatile Organic Compound ventilation distribution system to supply at least the outdoor (VOC) content limits established in Green Seal Standard GS-11, Paints, 1st Edition, May air ventilation rate required by ASHRAE 62.1-2007, Ventilation 20, 1993. Clear wood finishes, floor coatings, stains and primers applied to interior for Acceptable Indoor Air Quality. elements must not exceed the VOC content limits established in South Coast Air Quality Potential Technologies & Strategies – Design Management District (SCAQMD) Rule 1113, Architectural Coatings, effective Jan 1, 2004. ventilation systems to meet or exceed the minimum outdoor air ventilation rates as described in the ASHRAE standard. construction documents. Ensure that VOC limits are clearly stated in each section of the Balance the impacts of ventilation rates on energy use specifications where adhesives, sealants, paints and coatings are addressed. and indoor air quality to optimize for energy efficiency products to evaluate include: general construction adhesives, flooring adhesives, fire- and occupant comfort. stopping sealants, caulking, duct sealants, plumbing adhesives, cove base adhesives, Use the ASHRAE Standard 62.1- 2007 Users Manual for detailed guidance on meeting the referenced requirements. 2010.12.17 Recommended Potential Technologies & Strategies – Specify low (VOC) materials in Common paints, coatings, stains and primers. SCAQMD - http://www.aqmd.gov/rules/reg/reg11/r1168.pdf 149