Status and Opportunities in Transmission Company of Nigeria
Transcription
Status and Opportunities in Transmission Company of Nigeria
Status and Opportunities in Transmission Company of Nigeria Presentation 10th January, 2011 By Engr. A.S.A. Bada Senior Special Assistant to President (Transmission) Presidential Task force on Power OUTLINE Nigerian Electricity Transmission Today • Overview of transmission system • System Operations Challenges • Grid stability • Rules Implementation • Vegetation Management • Finance Transmission Tomorrow • Transmission Strategies • Opportunities 2 Overview of Transmission System Distribution System Power Station Substation Transmission Lines Control Centre Transmission System 3 Overview of Transmission System Enabling Capability Basic Better Best Meeting Optimization and Energy efficient need Meeting System Security Need Meeting Basic Connectivity Need Desired Status Current Status Transmission Capability 4 Transmission System Data MAXIMUM VOLTAGE STATUTORY LIMITS NOMINAL FREQUENCY STATUTORY LIMITS PEAK DEMAND FORECAST GENERATION CAPABILITY PEAK GENERATION MAXIMUM INSTALLED CAPACITY MAXIMUM ENERGY GENERATED 330KV 313.5KV – 346.5KV 50HZ 49.75HZ – 50.25HZ 8080MW 4004MW 3804MW 5482MW 85,457MWH 5 Transmission Data 1 2 3 4 5 6 7 8 9 10 11 Capacity 330/132kV (MVA) Capacity 132/33kV (MVA) Number of 330kV Substations Number of 132kV Substations Total Number of 330kV circuits Total Number of 132kV circuits Length of 330kV lines (kM) Length of 132kV lines (kM) National Control Centre Supplementary National Control Centre Regional Control Centres 6,894 8,882 28 119 60 153 5,650 6,687 1 1 3 Existing 330KV TCN Grid REPUBLIC OF CHAD Niamey NIGER SOKOTO Sokoto Katsina 132 kV YOBE Hadejia JIGAWA Birnin Kebbi BORNO Gusau Damaturu KATSINA ZAMFARA Potiskum Kano KEBBI Maiduguri KANO REPUBLIC OF BENIN KADUNA BAUCHI Bauchi Kaduna 2 SHIRORO Jos NIGER KAINJI Gombe ADAMAWA GOMBE 2 Minna 2 KWARA 2 JEBBA/GS Yola Abuja JEBBA/TS PLATEAU Jalingo ABUJA IIorin OYO Lafia NASSARAWA 3 NIGERIA REPUBLIC OF CAMEROON TARABA Lokoja Osogbo Makurdi Ado Ekiti Ibadan AJAOKUTA MAKURDI EKITI OSUN OGUN Bali BENUE KOGI Abeokuta Mambila Akure Aliade ALAGBADO 2 ONDO ENUGU EGBIN P/ST. EDO 2 Ikeja Benin Enugu Akwa EBONYI Asaba LAGOS ONITSHA 4 Abakaliki TRANSMISSION LINE LEGEND AN AMBRA SAPELE P/ST. IMO CROSS RIVER Umuahia 330KV LINES – MULTIPLE CIRCUITS 330KV LINES - EXISTING ABIA DELTA POWER ST. Owerri DELTA 2 330 KV RIVERS Port Harcourt BULK SUPPLY POINT H Uyo 2 Calabar AKWA IBOM THERMAL POWER STATIONS BAYELSA AFAM POWER ST. HYDROELECTRIC POWER STATION ATLANTIC OCEAN 7 Control Centre Structure System NCC: National Control Centre SNCC: Supplementary National Control Centre RCC: Regional Control Centre NCC Oshogbo 132 kV SNCC Shiroro RCC3 330 kV 132 kV 132 kV RCC2 BENIN RCC1 IKEJA WEST 8 System Operations System Operations in TCN (Transmission Company of Nigeria) is presently a ring fenced entity in readiness for a robust and independent role in a matured electricity market. The responsibility of System Operations include: • Maintenance of operational standard of security as much as possible under the present circumstances; • Dispatch all available generation; •Schedule maintenance outages; •Operations planning • Restoration of the grid system; •Administration of the Grid Code. 9 Challenges in the Transmission Industry 10 Challenges • Grid Stability Radial Voltage • Rules Implementation Improve Efficiency • Vegetation Management • Finance Aging Infrastructure Losses Frequency Grid Code Dictates Line Outages Grid Expansion 11 Mitigation Strategies Increase reliability and expansion of Transmission network Improve evacuation gap by at least 30% Elimination of grid bottle necks Increase The Transmission To Generation Capacity gap Implementing a 700KV super grid Increase Reliability through Government Investment 500 400 USD 300 200 100 0 2004 2005 2006 2007 2008 2009 2010 2011 13 Increase Reliability by Grid Expansion Drive (Substations) 10000 9000 8000 MVA 7000 6000 5000 4000 3000 2000 1000 0 Existing TCN +NIPP On-going 330KV 132KV 14 Increase Reliability by Grid Expansion Drive (Lines) 8000 KM 7000 6000 5000 Existing 4000 3000 TCN +NIPP Ongoing 2000 1000 0 330KV 132KV 15 330KV GRID STRUCTURE AFTER COMPLETION OF ALL ON-GOING PROJECTS REPUBLIC OF CHAD 2015 : new Niamey NIGER SOKOTO Sokoto Katsina 132 kV 2015 : new YOBE Hadejia JIGAWA Birnin Kebbi BORNO Gusau Damaturu KATSINA ZAMFARA Potiskum 2015 : new Kano KEBBI Maiduguri KANO 2010 : new Zaria REPUBLIC OF BENIN KADUNA 2015 : 2nd Circuit 2015 : 3rd Circuit Bauchi 2 3 SHIRORO Jos NIGER KAINJI BAUCHI Kaduna Gombe ADAMAWA GOMBE 2 SAPELE P/ST. 2 KWARA Minna 2010: new JEBBA/GS 2015 : new 4 JEBBA/TS Abuja PLATEAU OYO NASSARAWA Lafia 3 Geregu MAKURDI 2 Mambila Akure Aliade Okitipupa ENUGU EGBIN P/ST. 2015 : new EDO Benin Ikeja 2005 : new Mambila Hydro 2 ONDO 2 Bali BENUE KOGI Abeokuta ALAGBADO TARABA 2015 : new AJAOKUTA EKITI OSUN NIGERIA Makurdi Ado Ekiti 2 Jalingo 2015 : new Lokoja Osogbo Ibadan Yola ABUJA IIorin OGUN REPUBLIC OF CAMEROON 2 Enugu Akwa EBONYI Asaba LAGOS 2 ONITSHA 4 Abakaliki AN AMBRAAgip SAPELE P/ST. IMO CROSS RIVER Umuahia ABIA DELTA POWER ST. Owerri DELTA RIVERS Uyo Port Harcourt 2 2 BAYELSA Calabar AKWA IBOM AFAM POWER ST. Some 330kV lines especially in Lagos and Delta areas could not be indicated on this geographical Map. See attached single diagram for Details. 2 330KV LINES – MULTIPLE CIRCUITS 330KV LINES - EXISTING 330 KV BULK SUPPLY POINT H HYDROELECTRIC POWER STATION THERMAL POWER STATIONS 2015 : new 2015 : new NOTE: ATLANTIC OCEAN 17 TCN NETWORK WITH SUPERGRID REPUBLIC OF CHAD 2015 : new Niamey NIGER SOKOTO Sokoto Katsina 132 kV 2015 : new YOBE Hadejia JIGAWA BORNO TRANSMISSION GRID STRUCTURE WITH THE SUPER GRID IN PLACE Birnin Kebbi Gusau Damaturu KATSINA ZAMFARA Potiskum 2015 : new Kano KEBBI Maiduguri KANO 2010 : new Zaria REPUBLIC OF BENIN KADUNA 2015 : 2nd Circuit 2015 : 3rd Circuit Bauchi 2 3 SHIRORO Jos NIGER KAINJI BAUCHI Kaduna Gombe ADAMAWA GOMBE 2 SAPELE P/ST. 2 KWARA 2 Minna 2010: new JEBBA/GS 2015 : new 4 JEBBA/TS Abuja PLATEAU ABUJA IIorin OYO NASSARAWA Lafia 3 Ibadan Geregu MAKURDI 2 Mambila Akure Aliade Okitipupa ENUGU EGBIN P/ST. 2015 : new EDO Benin TRANSMISSION LINE LEGEND Ikeja 2005 : new Mambila Hydro 2 ONDO 2 Bali BENUE KOGI Abeokuta ALAGBADO TARABA 2015 : new AJAOKUTA EKITI OSUN REPUBLIC OF CAMEROON Makurdi Ado Ekiti 2 NIGERIA 2015 : new Lokoja Osogbo OGUN Yola Jalingo Enugu Akwa EBONYI 700KV LINES – SUPER GRID Asaba LAGOS 2 ONITSHA 4 Abakaliki 700 / 330KV SUBSTATION Agip AN AMBRA SAPELE P/ST. IMO CROSS RIVER Umuahia ABIA DELTA POWER ST. Owerri DELTA RIVERS Uyo Port Harcourt 2 2 BAYELSA Calabar AKWA IBOM AFAM POWER ST. 330KV LINES – MULTIPLE CIRCUITS 330KV LINES - EXISTING 330 KV BULK SUPPLY POINT H HYDROELECTRIC POWER STATION THERMAL POWER STATIONS 2015 : new 2015 : new NOTE: Some 330kV lines especially in Lagos and Delta areas could not be indicated on this geographical Map. See attached single diagram for Details. 2 ATLANTIC OCEAN Opportunities Line/Trace Maintenance Civil Works Services Network Maintenance Transmission Industry 19 Destination of Transmission Company of Nigeria To cost effectively provide, operate and maintain the transmission grid network for evacuating and dispatching with minimal technical losses and delivering reliable and quality electricity supply to its clients 20 THANK YOU 21