bloco carnide
Transcription
bloco carnide
BLOCO CARNIDE Carnide historical district, Lisbon, 1999 – 2003 RESIDENTIAL Location Carnide historical district, Lisbon Programme 24 units of 2-, 3- and 4-bdr apartments in addition to the renovation of two adjoining old houses Client Cooperativa de Habitacao Vila Rosa, CRL Gross Built Area 3,200 sq.m (plus parking) Total Building Cost EUR 4.260.000.00 Plot Size 1,020 sq.m Construction Cost EUR 630.00 per sq.m Project Status 1999 (concept design) – 2003 (built) View towards West Presentation model www.promontorio.net BLOCO CARNIDE Carnide historical district, Lisbon, 1999 – 2003 NOTA: TODAS AS COTAS DEVEM SER VERIFICADAS EM OBRA. TODAS AS ALTERAÇÕES DEVEM SER COMUNICADAS AOS PROJECTISTAS DAS ESPECIALIDADES. AS INFORMAÇÕES CONSTANTES NESTES DESENHOS CARECEM DA CONSULTA DE OUTROS ELEMENTOS DO PROJECTO. A CB D E ARQ.02.001 EDIFÍCIO CONFINANTE 13,17 2,08 0,55 0,64 1,22 0,64 1,22 0,84 VE2 0,64 1,22 0,64 VE2 J K 0,55 0,64 1,22 0,64 1,22 0,84 VE2 L M N ARQ.02.004 0,55 0,64 1,22 0,64 VE2 0,55 0,60 1,15 0,60 VE5 0,55 0,60 1,15 0,60 VE5 0,55 0,60 1,15 0,60 1,15 0,80 VE5 0,60 0,55 0,60 1,15 0,60 VE5 0,55 ARQ.20.073-01 3,02 3 ,05 3 ,05 3 ,05 3 ,05 3 ,05 3 ,05 ARQ.02.001 3 ,05 ARQ.02.002 3 0,77 0,66 1,27 1,27 0,66 0,86 0,15 0,66 0,87 1,27 0,66 0,79 0,55 0,29 0,80 0,66 1,27 1,27 0,66 0,86 0,55 0,15 0,67 2,14 1,27 0,61 0,76 0,61 0,56 0,61 1,65 1,15 0,61 0,81 0,55 0,15 0,81 0,61 1,15 1,15 0,61 0,81 0,55 0,15 0,81 0,61 1,15 1,15 0,61 0,81 0,55 0,15 0,61 0,81 0,61 0,81 0,55 0,15 0,61 1,15 2,70 0,61 0,55 0,29 0,74 1,15 0,61 0,15 0,55 [email protected] azinhaga da torre do fato, 7 a 1600 lisboa portugal t: +351 21 7112480 f: +351 21 7112489 0,61 0,81 2 ,77 1,15 0,09 VE5 AVAC pgi [email protected] r. s. domingos de benfica, 33 2º dto 1500 lisboa portugal t: +351 21 7221380 f: +351 21 7221389 0,61 0,81 ESPAÇOS EXTERIORES global [email protected] r. da esperança, 9 2º e 1200 lisboa portugal t:+351 21 3929270 f:+351 21 3929279 0,55 0,81 V3 1,15 0,81 5 ,62 5,02 2,67 1,15 0,09 0,60 0,15 0,15 VE5 0,81 V3 1,10 4,88 DONO DE OBRA coociclo cooperativa de habitação e construção, c.r.l. r. fernando lopes graça, 9 a 1600-067 lisboa portugal t:+351 21 7578673 f:+351 21 7578676 VE5 PROJECTO edifício de habitação LOCAL travessa do pregoeiro ,10 - carnide, lisboa 1,62 ARQ.20.073-01 0,49 1,15 ARM7 0,75 0,11 0,89 1,15 1,75 0,71 0,39 eppe 1,15 0,70 0.55 0,87 ELECTRICIDADE, COMUNICAÇÕES, SEGURANÇA E GÁS pgi 0,15 0,15 V3 0,22 1,15 cenor [email protected] av.gago coutinho, 133 1700 lisboa portugal t: +351 21 8437300 f: +351 21 8437301 1,72 0,62 0,10 0,15 0,11 0,11 0,75 0,10 0,75 0,09 ARM3a 1,60 2,67 1,82 1,75 VE5 0,55 1,15 ARQUITECTURA E COORDENAÇÃO joão perloiro joão luis ferreira paulo perloiro paulo martins barata pedro appleton www.promontorio.net r. fábrica de material de guerra, 10 1900-690 lisboa portugal t: +351 21 8620970 f: +351 21 8620971 5,02 6,80 0.70 0,15 0,27 1,10 0,55 VE5 0,60 1,15 .05 0,60 0,55 VE5 0,60 1,15 2.90 0,60 0,55 VE5 0,60 1,15 2,90 ARQ.02.003 0,60 0,55 aprovou ESTABILIDADE, ÁGUAS E ESGOTOS ARMÁRIO 5,62 1,72 0,62 assunto promontório arquitectos ARQ.02.005 1,32 ARM3 0,75 0,10 0.26 0,75 0,10 0,15 0,15 0,81 1,15 0,71 0,61 ARM9 VE5 0,81 0,10 ESPENSEIRO 0.60 0,13 1,10 data Módulo de fachada 2,92 Ver desenho ARQ.20.070-02 0,61 MLR MSR 2 0,15 ARM8 0,70 0,55 0,15 0,11 0,09 0,17 0,10 0,75 0,15 2,90 1,72 0,23 0,87 0,99 V3 1.99 6 0,81 0,61 0,55 VE5 - Reboco/enchimento 0,09 0,20 0,15 DESPENSEIRO DESPENSEIRO FRIGORÍFICO D 0,18 V3 1,36 - Pedra VE10 ,20 V3 0,75 0,10 V3 - Isolamento térmico 1,72 1,50 0,27 0,29 0,60 1,55 0,15 1,15 0,15 1,00 0,18 0,75 0,15 0,15 - Betão pré-fabricado MLL 0,95 V3 I.S.14 2,31 0,76 5,62 - Betão celular 5,62 4 0,10 0,15 1,00 0,11 0,15 0.75 2.05 ,63 4,88 DESPENSEIRO 0,15 I.S.12 0,15 CW11 0,61 1,15 2,89 15 4 COZ5 0,75 0,20 V3 0,75 0,10 0,35 1,20 0.19 1 1,15 0,29 VE5 ARM3 I.S.13 1,77 0,55 ,57 0,61 4,53 - Betão armado ,40 ARM3 0,62 0,11 0,75 ,70 V3 0,55 0,61 1,15 2,92 VE5 - Alvenaria bloco de betão 3,78 4 0,10 0,75 0,20 1,25 2,31 14 0,60 CALDEIRA + DEPÓSITO CK5 2 0,15 1,77 1,15 1,15 2,92 CW10 - Alvenaria tijolo ARQ.02.006 rev. 1,15 ,72 2 1 ,87 0,25 0,80 0,95 0,17 0,27 0,80 APA5 ,30 1,15 0,61 0,55 0,61 2,11 13 0,22 0,03 PS6 0,90 4,68 0,15 1,70 APA10 0,27 0,77 V5 VE5 1,30 Q.E.9 1,41 0,66 0,15 LEGENDA ,50 0,13 1,72 1,59 0,74 0,27 0,55 1,15 2,92 PS4 0,12 PC60 0,27 0,76 0,61 2,67 0,12 1,15 1,15 2,92 0,61 4,53 0,85 2,20 VE5 5 V3 2,34 Z.T.C 1,75 0,12 0,25 1,10 4,60 104.36 VE5 1,15 V3 V3 1,75 1,14 0,76 0,27 0,80 110.35 12 0,15 0,76 0,09 1,82 5 V3 0,15 ,72 2 1,85 0,74 0,61 0,75 0,10 0,15 0,15 0,81 0,75 0,10 2,45 0,55 0,61 1,75 NÚCLEO C VE5 ,50 0,19 0,75 ARM10 1,18 1,13 11 0.11 0.99 0,13 ,15 0,09 0,15 V3 ventilador estático Ver proj. AVAC VE5 4,88 0 1,10 CW9 10 ARQ.02.005 MLR MSR 0,09 0,15 V3 0,15 ARQ.20.073-03 ARQ.02.007 1,91 CALDEIRA + DEPÓSITO 1,72 ,84 0,65 0.26 1.94 I.S.17 1.75 1,15 VE5 VE5 CK4 5 0,15 0,81 0,61 0,55 0,61 1,15 ARM3 0,27 0,27 0.70 Módulo de fachada 2,92 sem portadas 1,16 VE9 0,71 ARM3a 4,53 2,92 ,15 0,15 0,90 0,90 0,75 2,15 V3 6 1,15 1,15 2,92 9 0,15 0,74 I.S.16 ,58 0,55 0,61 CW8 0,10 COZ9 3,00 0,18 V3 0,18 0,75 1,77 2,31 5,43 RIGORÍFICO 4,36 0,15 I.S.15 0,75 0,15 0,15 1,15 V3 0,15 0,35 1 1,20 1,95 F 0,33 V3 0,75 0,10 0,15 1,77 0,65 0,61 1,15 2,92 0,20 0,18 0,75 0,15 0,61 0,55 0,61 4,53 VE5 ARM2a 1,68 DESPENSEIRODESPENSEIRODESPENSEIRO 1,50 V3 0,29 8 6 0,19 0,95 0,20 0,11 0,13 1,15 110.35 1,15 2,47 V5 0,15 0,15 CW7 Módulo de fachada 2,92 Ver desenho ARQ.20.070-02 0,15 0,09 0,38 PS6 6,88 VE5 1,27 1.80 0,90 0,61 4,53 1,50 1,30 0,12 0,61 0,15 0,55 1,14 0,27 0,12 0,02 1,15 0,27 0,27 0,61 VE5 0 0.69 0.76 ,60 1,86 3 0,62 0,60 ARQ.20.073-02 Módulo de fachada 3,05 Ver desenho ARQ.20.071.02 ARQ.20.073-01 1,24 0,27 VE2 0,64 0,15 1 ,22 0,55 2 ,77 1 ,83 0,64 0,15 1,22 2,77 1,22 VE2 0,64 0,15 0,77 0,10 0,29 0,55 0,11 0,75 0,77 0,64 0,09 1,22 0,15 0,64 2,70 1 ,22 VE2 0,55 0,29 1 ,83 0,64 ,70 1,22 0,15 1,22 VE2 0,64 VE1 0,15 0,77 ARQ.02.008 4,81 2 ,77 0,29 0,55 VE1 3,56 0,60 0,45 0,77 0,64 0,60 V3 0,15 1,22 0,15 V3 0,10 0,44 APA12 0,80 0,95 1,42 4 PC60 PS2 1,22 0,64 4,18 4,18 1,68 0,77 0,15 0,55 0,77 0,29 VE2 0,63 0,27 0,76 1,27 1,47 1,25 VE2 0,60 APA7 0,76 1.10 Q.E.8 0,29 0,55 Módulo de fachada 3,15 Ver desenho ARQ.20.071-01 ARM2a 0,13 0,13 0,22 1,30 0,09 0,77 0,64 0,43 1,22 1,10 V3 1,50 0,95 0,80 PC60 4 1,22 VE2 0,64 VE1 3,56 0,99 0 0,25 NÚCLEO B 0,27 0,77 1.56 PS4 0,27 0,29 0,55 0,15 0,15 ARM2 Z.T.B 0,11 0,33 0.11 0,90 2,46 0,77 0,64 0,47 1,22 1,18 0,64 1,25 1,25 PS6 0,17 ,47 ,06 4,06 VE7 0,10 MLR MSR 0,09 0,70 1,66 0,15 1,50 5,65 6,05 6,05 5,45 MLR MSR 0,63 110.34 0,61 0,55 0,60 1,82 0,21 2,41 0,27 0,02 1 ,22 VE2 0,64 0,18 0,15 I.S.8 0,27 1,20 2,54 1,15 1,22 0,17 0,75 1,10 0,13 0,15 V4 ,10 0,29 110.35 3,63 ,30 1 ,83 VE2 0,64 ,64 0,29 3,65 DESPENSEIRO 1,15 1,22 1,15 0,74 0,55 0,89 V3 2 V3 0,36 COZ8 4,20 0,10 VE7 0,93 CW6 ,59 6 2,90 2,69 0,13 V3 1 0,29 DESPENSEIRO V3 1,33 0,42 0,75 APA3 VE1 0.61 ,54 0,95 0,10 ,29 5,81 0 0,15 MLL 2,90 MLL 0,29 0.70 1,82 2 0,15 CW4 2,38 2,15 CALDEIRA + DEPÓSITO 0,15 0,15 1,64 V3 FRIGORIFICO 0,60 CK3a 0,27 CW3 0 0,60 DESPENSEIRO 5 0,64 ,85 0,09 0,75 2 0,15 I.S.5 0,15 0,15 0,15 1,23 1,70 0,75 0,15 2,21 0,60 1,72 0,15 ,15 V3 I.S.4 0,15 0,85 0,15 0,18 0,29 FRIGORÍFICO 0 1,10 0 0,13 0,60 0,13 0,18 0,15 1,10 ,68 4,81 0,29 0.26 2,61 Q.E.6 0,27 0.75 0,29 CK3b ARM4 2,57 1,72 ,15 4,75 0,09 DESPENSEIRO 5,05 4,80 0,17 V3 V3 0,90 DESPENSEIRO 2,90 4,20 0,15 0,10 0,75 V3 1,20 0,70 0,10 0,60 0,60 0,15 ARM3 1,70 0,75 FRIGORÍFICO CK1 1,72 0,15 0,09 0,17 0,75 0,60 7 DESPENSEIRO 1,45 0,17 1,20 0,15 V4 V3 0,10 0,10 0,75 0,11 0,75 0,29 ARM3 1,15 4.95 V3 0,15 1,72 0.60 I.S.7 0,15 0,09 1,10 1,40 ,98 V3 CW5 V3 2,33 0,17 DESPENSEIRO 0,85 1,75 ARM2 0,15 ARM5 V3 I.S.6 1,33 MLL 0,38 5,65 DESPENSEIRO 4 CW2 1,35 I.S.3 V3 V3 0,15 0,15 0,15 V3 ,15 CALDEIRA + DEPÓSITO 0,15 4 4 0,85 0,75 0,18 2 V3 0,15 0,29 110.35 ,15 0,60 CK2 3 0,27 1,15 VE5 1,15 CL 1,30 0,32 0,15 0,22 APA2 1,67 0,90 0,25 0,20 1,42 0,60 DESPENSEIRO 1,31 0,15 0,15 0,95 1.64 Z.T.A Q.E.4 PS6 7 ARQ.02.006 0,60 0.82 2 2,68 0,20 0,95 2,50 0.11 0,25 0,27 0,90 0,25 0,80 DESPENSEIRO 0,76 0,66 ARQ.02.007 0,55 0.13 1,00 0,29 COZ3 0,25 1,20 PS4 0,11 110.34 1,75 2,70 2,83 1,15 0,60 0,15 ,20 2,83 0,80 ,80 0 ,29 4,20 ,83 4,82 2 4,82 4,20 0,15 0,15 0,10 DESPENSEIRO 3,35 ,91 0,80 VE8 1,15 1,15 1,15 0,73 1,72 0,29 0,96 0,77 0,24 1,22 1,50 2 2,68 6 ARQ.20.073-01 2,07 0,84 ,67 0,15 1,10 0,77 0,13 0,29 0,15 0,77 2,11 1,22 ,40 0,84 ,61 0,15 ,50 0,44 APA11 0,10 0,27 1,30 DESPENSEIRO ARM11 0,24 0,75 0,66 0,55 0,85 0,55 5 O Módulo de fachada 3,05 Ver desenho ARQ.20.070-01 0,55 0,55 I ARQ.02.003 MLR MSR 1,70 NÚCLEO A 0,15 0,15 0,75 1 ,88 3 0,11 PC60 COZ7 0,66 ,12 PS2 PS6 CALDEIRA + DEPÓSITO 0,75 1,27 1,27 VE1 0,15 0,20 ,30 0,15 DESPENSEIRO 4 1,40 0,39 0,27 1,48 2 1,25 ,90 0,15 ,15 Q.E.3 110.35 V3 2 V3 VE1 0,15 0,80 1 1,45 1,70 ,19 2,42 ,90 0 0,15 V4 1,15 2 ,42 APA6 DESPENSEIRO 0,15 0,27 0,13 3 0,10 0,15 0,27 I.S.2 0,13 0,09 0,75 0,15 0,15 1,10 0,12 4,80 0,09 2,76 ,00 3 1,84 0,66 0,86 0,55 3 0,13 ARM2 V3 1,17 0,29 1,15 1,50 0,27 1,70 0,44 0,15 0,15 V3 1,10 2,16 0,15 CW1 0,75 0,10 V3 0,58 5,78 ARQ.02.008 H ARQ.02.002 1,30 2 1,70 ,75 0,15 1,38 V3 0,85 0,15 0,24 0,75 0,10 0,66 0,86 0,55 3 0,15 0,66 0,87 1,27 1,27 ,15 2,30 0,75 4,55 0,15 0,66 0,87 1,27 1 ,27 3 0,11 PC60 2 .44 ,61 1,27 0 4,85 3,95 VE1 1,40 .76 0,75 .05 4,07 Módulo de fachada 3,15 Ver desenho ARQ.20.071.01 0,15 0,51 2 ,42 0,80 0,27 0,95 1,70 V3 1,50 0,13 0,60 ARM1 2,38 1 .25 0,15 3 ,12 1,27 1,27 VE1 1.49 0,20 0 .63 0,15 1.05 0,66 0.92 4,12 I.S.1 2 G Módulo de fachada 3,05 Ver desenho ARQ.20.071-02 ARQ.20.064-05 0,55 0.01 ARQ.20.073-04 1 F ARQ.20.064 ARQ.20.064-06 VE5 0,60 1,15 2,90 0,60 0,55 VE5 0,60 1,15 2,90 0,60 0,55 2,87 Módulo de fachada 2,90 Ver desenho ARQ.20.070-01 ARQ.02.004 TÉCNICO RESPONSÁVEL joão luís ferreira NIP 99.05.258 COLABORADORES miguel pires sofia reis; joana cancela DATA março 2001 DESIGNAÇÃO FASE DO PROJECTO ESCALA DESENHO Nº planta piso 2 1:50 [1:150] execução arq.01.005 NOTA: TODAS AS COTAS DEVEM SER VERIFICADAS EM OBRA. TODAS AS ALTERAÇÕES DEVEM SER COMUNICADAS AOS PROJECTISTAS DAS ESPECIALIDADES. AS INFORMAÇÕES CONSTANTES NESTES DESENHOS CARECEM DA CONSULTA DE OUTROS ELEMENTOS DO PROJECTO. A B C 3.02 DD 3.05 EE 3.05 FF 3.05 GG 3.05 H 3.05 JI 3.05 LJ 3.05 0.59 N 2.90 O 2.90 2.87 CHK3a Guarda da cobertura Ver desenho ARQ.20.042 123,31 CHW3 Módulo de fachada 2,90m sem portada 123,31 123,31 Ventilador estático Ver proj. A.V.A.C. Modulo de fachada de 2,90m com quatro paineis fixos 123,16 123,11 123,11 123,11 122,66 0.18 122,52 M 2.90 124,48 CHK2 123,31 L N 2.87 124,48 CHK1 K 3.08 122,52 122,34 +122,21 0.15 0.55 122,34 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 VE5 0.61 VE5 V E5 0.57 2.21 2.21 2.42 Módulo de fachada 2,90 m 0.55 +119,22 VE2 VE2 0.03 0.61 VE2 0.61 0.03 VE2 VE2 VE2 VE2 VE2 VE5 VE5 0.55 0.57 1.14 2.21 2.42 1.22 0.57 VE5 V VE5 V E5 0.03 2.21 VE2 Módulo de fachada 3,05m Ver desenho ARQ.20.071-02 0.55 +116,23 115,51 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 VE2 VE5 VE2 VE2 VE2 VE2 VE2 VE5 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 114,34 CHW12 114,19 0.15 113,55 113,37 VE5 VE5 VE5 VE5 +113,24 VE5 VE5 VE5 VE5 VE5 VE5 VE5 Módulo de fachada 2,90 m 2.42 VE2 114,34 0.03 0.03 0.55 0.55 VE2 2.42 VE2 E5 CHK5 CHW11 114,14 0.55 113,55 113,37 VE2 0.15 0.15 0.59 2.42 Guarda da cobertura Ver desenho ARQ.20.042 0.55 2.42 rev. 0.30 0.05 data assunto aprovou 0.55 +107,26 0.55 107,73 2.42 0.55 +110,25 VE2 ARQUITECTURA E COORDENAÇÃO VE3 V promontório arquitectos E5 2.42 2.42 105,53 0.95 3.39 VE2 Torre de ventilação Ver desenho ARQ.20.051 0.05 0.40 +104,27 103,98 joão perloiro joão luis ferreira paulo perloiro paulo martins barata pedro appleton www.promontorio.net r. fábrica de material de guerra, 10 1900-690 lisboa portugal t: +351 21 8620970 f: +351 21 8620971 ESTABILIDADE, ÁGUAS E ESGOTOS cenor 102,70 Módulo de entrada núcleo A Torre de ventilação das caves Ver desenho ARQ.20.051 [email protected] av.gago coutinho, 133 1700 lisboa portugal t: +351 21 8437300 f: +351 21 8437301 ELECTRICIDADE, COMUNICAÇÕES, SEGURANÇA E GÁS eppe [email protected] azinhaga da torre do fato, 7 a 1600 lisboa portugal t: +351 21 7112480 f: +351 21 7112489 AVAC pgi pgi [email protected] r. s. domingos de benfica, 33 2º dto 1500 lisboa portugal t: +351 21 7221380 f: +351 21 7221389 ESPAÇOS EXTERIORES global [email protected] r. da esperança, 9 2º e 1200 lisboa portugal t:+351 21 3929270 f:+351 21 3929279 DONO DE OBRA coociclo cooperativa de habitação e construção, c.r.l. r. fernando lopes graça, 9 a 1600-067 lisboa portugal t:+351 21 7578673 f:+351 21 7578676 PROJECTO edifício de habitação LOCAL travessa do pregoeiro ,10 - carnide, lisboa TÉCNICO RESPONSÁVEL joão luís ferreira COLABORADORES miguel pires sofia reis; joana cancela DESIGNAÇÃO www.promontorio.net DATA março 2001 FASE DO PROJECTO alçado sul execução ESCALA DESENHO Nº 1:50 [1:150] Detail design / 2nd floor plan and south elevation NIP 99.05.258 arq.03.002 BLOCO CARNIDE Carnide historical district, Lisbon, 1999 – 2003 South facade Facade detail The housing development was promoted by a cooperative on a site located in Lisbon, in the historical district of Carnide. Along with the vacant site, the row of historical houses that remains from what was formerly Vila Rosa, is also to be renovated for the purpose of housing. Situated in the small historical center, the plot confines with the backyards and annexes of the old nucleus of Carnide, classified by the national heritage institute (IPPAR). The full ensemble comprises the new block with 24 apartments, the renovation of the old houses of the Pregoeiro Passageway, and a small shop to be rented for local commerce. The new building, given its location and volume, intends to form a protective shield for the historical nucleus against the surrounding dense and shabby legacy of the 1970s. The devised L-shaped configuration guarantees a tolerant urban arrangement, both in its relation with historical surrounding and the resulting courtyard, where public space is not only granted an agreeable scale but also a mediating role in its relation with the interstitial spaces of the old and the new. The urban surroundings depict an amalgamate of epochs and urban politics. www.promontorio.net The concept of the new block is based on the idea of monolithism and repetition. The severe monumentality that emanates from the compositional system of the façades suggests the representational transposition of the load and bearing running across the building with its mineral skeleton resting on a heavy stereotomic plinth. Thus, far from a literal representation of structure, our aim is the tactile and visual representation of a mise en scène capable of generating a solid and stable urban type-form. This configuration evidently suggests a remission to heavyweight tectonics in the sense that the fragile tympanums of the modules –conceived as aluminum porte-fenêtre, steel handrails and wood paneling shutters– are visually supported by a powerful skeleton of pre-cast concrete elements. Meanwhile, a phenomenon of randomness springs from the different positions in which prospective users will leave the shutters, one that is also indicative of the unrestrained and physical presence of dwelling. DOLCE VITA MIRAFLORES Miraflores (Greater Lisbon), Portugal, 2004 – 2005 RETAIL AND MIXED-USE Location Miraflores (Greater Lisbon), Portugal Developer Chamartín Imobiliária, SA Programme Community mall (in-depth renovation) GLA 5,728 sq.m Shops 65 Parking 300 Project Status 2001 (concept design) – 2002 (built and open to public) East facade Main entrance www.promontorio.net Facade detail DOLCE VITA MIRAFLORES Miraflores (Greater Lisbon), Portugal, 2004 – 2005 Central court Central court Food court Central court Level 2 plan Level 1 plan Level 0 plan www.promontorio.net Mall DOLCE VITA MIRAFLORES Miraflores (Greater Lisbon), Portugal, 2004 – 2005 Facade details Food court balcony on west facade The design consists in the partial renovation of a small shopping centre in a residential quarter of the northern periphery of Lisbon. The existing building, although relatively recent, was physically degraded and financially insolvent. To revitalise this building, the new owner had a slim budget allowing minimal changes to the original layout. North facade East facade www.promontorio.net However, to be effective, this revamping should turn around the image of the building and attract better shop brands and more visitors. On the outside, the operation consisted in covering the existing stone façade with a new skin of galvanised metal sheets as a support for a graphic design informing the visitor on the mall’s commercial contents. In addition, a new wing of cinemas was built adjoining the building as a double skin frosted glass box veiling the same colour palette that is painted behind, on the masonry wall. Dolce Vita Miraflores is now an exciting and successful centre with a highly performing food court. PREGAIA BUILDING Vila Nova de Gaia (greater Porto), Portugal, 2000 WORKPLACES Location Vila Nova de Gaia (greater Porto), Portugal Client Pregaia, SA Programme Office building and showroom Gross Built Area 1,500 sq.m Project Status 2000 (shortlist competition) N Site plan Presentation model www.promontorio.net PREGAIA BUILDING Vila Nova de Gaia (greater Porto), Portugal, 2000 The pre-cast concrete company Pregaia held a short-list competition for the designs of its offices on an industrial campus, on the outskirts of Porto. Inscribed within the orthogonal matrix of the plant, the proposed building occupies the given plot with a single and monolithic pitched roof shed and a sunken patio adjoining the boundary of the plot, on the west edge of the industrial complex. Conceptually, the proposed scheme evokes the classical theme of “the house inside the house”, in that the rigorously shaped monolithic shell envelops a loose three-storey glass volume of office rooms generating and interstitial space that serves as circulation. Elevations and floor plans Detail sections www.promontorio.net Eminently tectonic, the embryo of this space-form springs from the articulation between structure and construction: a system of pre-fabricated panels, that function both as structure and walling, shape and sustain the shed which encloses the office glass box. Inside this shed, the tectonic form is revealed in its essentiality, with the surface of white concrete of the porticos exceptionally interrupted by the punched sash windows and the vertical joints between panels, while the tympanum of the shed is fully enclosed by a concrete wall, cast in-situ. Outside, however, subverting the logic of concrete as an all-encompassing material, the building is clad in exposed concrete panels, gripped onto to the structural porticos, with a stereotomy reminiscent of their mineral condition. On the outside, the austerity of this self-contained volume, echoing the roughness of the industrial campus, contrasts with the quasi-scenic lighting of its interior. On the foyer of the building, the triple-height showroom displays the concrete prototypes and samples like in the 18th-century Pinakotheks where the works where exhibited by optimizing all the available space of the walls.