bloco carnide

Transcription

bloco carnide
BLOCO
CARNIDE
Carnide historical district, Lisbon, 1999 – 2003
RESIDENTIAL
Location Carnide historical district, Lisbon
Programme 24 units of 2-, 3- and 4-bdr apartments
in addition to the renovation of two adjoining old houses
Client Cooperativa de Habitacao Vila Rosa, CRL
Gross Built Area 3,200 sq.m (plus parking)
Total Building Cost EUR 4.260.000.00
Plot Size 1,020 sq.m
Construction Cost EUR 630.00 per sq.m
Project Status 1999 (concept design) – 2003 (built)
View towards West
Presentation model
www.promontorio.net
BLOCO CARNIDE
Carnide historical district, Lisbon, 1999 – 2003
NOTA: TODAS AS COTAS DEVEM SER VERIFICADAS EM OBRA. TODAS AS
ALTERAÇÕES DEVEM SER COMUNICADAS AOS PROJECTISTAS DAS
ESPECIALIDADES. AS INFORMAÇÕES CONSTANTES NESTES DESENHOS
CARECEM DA CONSULTA DE OUTROS ELEMENTOS DO PROJECTO.
A
CB
D
E
ARQ.02.001
EDIFÍCIO CONFINANTE
13,17
2,08
0,55
0,64
1,22
0,64
1,22
0,84
VE2
0,64
1,22
0,64
VE2
J
K
0,55
0,64
1,22
0,64
1,22
0,84
VE2
L
M
N
ARQ.02.004
0,55
0,64
1,22
0,64
VE2
0,55
0,60
1,15
0,60
VE5
0,55
0,60
1,15
0,60
VE5
0,55
0,60
1,15
0,60
1,15
0,80
VE5
0,60
0,55
0,60
1,15
0,60
VE5
0,55
ARQ.20.073-01
3,02
3
,05
3
,05
3
,05
3
,05
3
,05
3
,05
ARQ.02.001
3
,05
ARQ.02.002
3
0,77
0,66
1,27
1,27
0,66
0,86
0,15
0,66
0,87
1,27
0,66
0,79
0,55
0,29
0,80
0,66
1,27
1,27
0,66
0,86
0,55
0,15
0,67
2,14
1,27
0,61
0,76
0,61
0,56
0,61
1,65
1,15
0,61
0,81
0,55
0,15
0,81
0,61
1,15
1,15
0,61
0,81
0,55
0,15
0,81
0,61
1,15
1,15
0,61
0,81
0,55
0,15
0,61
0,81
0,61
0,81
0,55
0,15
0,61
1,15
2,70
0,61
0,55
0,29
0,74
1,15
0,61
0,15
0,55
[email protected]
azinhaga da torre do fato, 7 a
1600 lisboa portugal
t: +351 21 7112480
f: +351 21 7112489
0,61
0,81
2 ,77
1,15
0,09
VE5
AVAC
pgi [email protected]
r. s. domingos de benfica, 33 2º dto
1500 lisboa portugal
t: +351 21 7221380
f: +351 21 7221389
0,61
0,81
ESPAÇOS EXTERIORES
global
[email protected]
r. da esperança, 9 2º e
1200 lisboa portugal
t:+351 21 3929270
f:+351 21 3929279
0,55
0,81
V3
1,15
0,81
5
,62
5,02
2,67
1,15
0,09
0,60
0,15
0,15
VE5
0,81
V3
1,10
4,88
DONO DE OBRA
coociclo
cooperativa de habitação e construção, c.r.l.
r. fernando lopes graça, 9 a
1600-067 lisboa portugal
t:+351 21 7578673
f:+351 21 7578676
VE5
PROJECTO
edifício de habitação
LOCAL
travessa do pregoeiro ,10 - carnide, lisboa
1,62
ARQ.20.073-01
0,49
1,15
ARM7
0,75 0,11
0,89
1,15
1,75
0,71
0,39
eppe
1,15
0,70
0.55
0,87
ELECTRICIDADE, COMUNICAÇÕES, SEGURANÇA E GÁS
pgi
0,15
0,15
V3
0,22
1,15
cenor
[email protected]
av.gago coutinho, 133
1700 lisboa portugal
t: +351 21 8437300
f: +351 21 8437301
1,72
0,62
0,10 0,15
0,11
0,11 0,75
0,10 0,75
0,09
ARM3a
1,60
2,67
1,82
1,75
VE5
0,55
1,15
ARQUITECTURA E COORDENAÇÃO
joão perloiro
joão luis ferreira
paulo perloiro
paulo martins barata
pedro appleton
www.promontorio.net
r. fábrica de material de guerra, 10
1900-690 lisboa portugal
t: +351 21 8620970
f: +351 21 8620971
5,02
6,80
0.70
0,15
0,27
1,10
0,55
VE5
0,60
1,15
.05
0,60
0,55
VE5
0,60
1,15
2.90
0,60
0,55
VE5
0,60
1,15
2,90
ARQ.02.003
0,60
0,55
aprovou
ESTABILIDADE, ÁGUAS E ESGOTOS
ARMÁRIO
5,62
1,72
0,62
assunto
promontório arquitectos
ARQ.02.005
1,32
ARM3
0,75 0,10 0.26
0,75 0,10
0,15
0,15
0,81
1,15
0,71
0,61
ARM9
VE5
0,81
0,10
ESPENSEIRO
0.60
0,13
1,10
data
Módulo de fachada 2,92
Ver desenho ARQ.20.070-02
0,61
MLR
MSR
2
0,15
ARM8
0,70
0,55
0,15
0,11
0,09
0,17
0,10 0,75
0,15
2,90
1,72
0,23
0,87
0,99
V3
1.99
6
0,81
0,61
0,55
VE5
- Reboco/enchimento
0,09
0,20
0,15
DESPENSEIRO DESPENSEIRO FRIGORÍFICO
D
0,18
V3
1,36
- Pedra
VE10
,20
V3
0,75 0,10
V3
- Isolamento térmico
1,72
1,50
0,27
0,29
0,60
1,55
0,15
1,15
0,15 1,00
0,18 0,75
0,15
0,15
- Betão pré-fabricado
MLL
0,95
V3
I.S.14
2,31
0,76
5,62
- Betão celular
5,62
4
0,10
0,15 1,00 0,11
0,15
0.75
2.05
,63
4,88
DESPENSEIRO
0,15
I.S.12
0,15
CW11
0,61
1,15
2,89
15
4
COZ5
0,75 0,20
V3
0,75 0,10
0,35
1,20
0.19
1
1,15
0,29
VE5
ARM3
I.S.13
1,77
0,55
,57
0,61
4,53
- Betão armado
,40
ARM3
0,62
0,11 0,75
,70
V3
0,55
0,61
1,15
2,92
VE5
- Alvenaria bloco de betão
3,78
4
0,10 0,75
0,20
1,25
2,31
14
0,60
CALDEIRA
+
DEPÓSITO
CK5
2
0,15
1,77
1,15
1,15
2,92
CW10
- Alvenaria tijolo
ARQ.02.006
rev.
1,15
,72
2
1 ,87
0,25
0,80
0,95
0,17
0,27
0,80
APA5
,30
1,15
0,61
0,55
0,61
2,11
13
0,22
0,03
PS6
0,90
4,68
0,15
1,70
APA10
0,27
0,77
V5
VE5
1,30
Q.E.9
1,41
0,66
0,15
LEGENDA
,50
0,13
1,72
1,59
0,74 0,27
0,55
1,15
2,92
PS4
0,12
PC60
0,27
0,76
0,61
2,67
0,12
1,15
1,15
2,92
0,61
4,53
0,85
2,20
VE5
5
V3
2,34
Z.T.C 1,75
0,12
0,25
1,10
4,60
104.36
VE5
1,15
V3
V3
1,75
1,14
0,76 0,27
0,80
110.35
12
0,15 0,76
0,09
1,82
5
V3
0,15
,72
2
1,85
0,74
0,61
0,75 0,10
0,15
0,15
0,81
0,75 0,10
2,45
0,55
0,61
1,75
NÚCLEO C
VE5
,50
0,19 0,75
ARM10
1,18
1,13
11
0.11
0.99
0,13
,15
0,09
0,15
V3
ventilador estático
Ver proj. AVAC
VE5
4,88
0
1,10
CW9
10
ARQ.02.005
MLR
MSR
0,09
0,15
V3
0,15
ARQ.20.073-03
ARQ.02.007
1,91
CALDEIRA
+
DEPÓSITO
1,72
,84
0,65
0.26
1.94
I.S.17
1.75
1,15
VE5
VE5
CK4
5
0,15
0,81
0,61
0,55
0,61
1,15
ARM3
0,27
0,27
0.70
Módulo de fachada 2,92
sem portadas
1,16
VE9
0,71
ARM3a
4,53
2,92
,15
0,15
0,90
0,90
0,75
2,15
V3
6
1,15
1,15
2,92
9
0,15 0,74
I.S.16
,58
0,55
0,61
CW8
0,10
COZ9
3,00
0,18
V3
0,18 0,75
1,77
2,31
5,43
RIGORÍFICO
4,36
0,15
I.S.15
0,75 0,15
0,15
1,15
V3
0,15
0,35
1
1,20
1,95
F
0,33
V3
0,75 0,10
0,15
1,77
0,65
0,61
1,15
2,92
0,20
0,18 0,75
0,15
0,61
0,55
0,61
4,53
VE5
ARM2a
1,68
DESPENSEIRODESPENSEIRODESPENSEIRO
1,50 V3
0,29
8
6
0,19
0,95
0,20
0,11
0,13
1,15
110.35
1,15
2,47
V5
0,15
0,15
CW7
Módulo de fachada 2,92
Ver desenho ARQ.20.070-02
0,15
0,09
0,38
PS6
6,88
VE5
1,27
1.80
0,90
0,61
4,53
1,50
1,30
0,12
0,61
0,15
0,55
1,14
0,27
0,12
0,02
1,15
0,27
0,27
0,61
VE5
0
0.69
0.76
,60
1,86
3
0,62
0,60
ARQ.20.073-02
Módulo de fachada 3,05
Ver desenho ARQ.20.071.02
ARQ.20.073-01
1,24
0,27
VE2
0,64
0,15
1 ,22
0,55
2 ,77
1 ,83
0,64
0,15
1,22
2,77
1,22
VE2
0,64
0,15
0,77
0,10
0,29
0,55
0,11 0,75
0,77
0,64
0,09
1,22
0,15
0,64
2,70
1 ,22
VE2
0,55
0,29
1 ,83
0,64
,70
1,22
0,15
1,22
VE2
0,64
VE1
0,15
0,77
ARQ.02.008
4,81
2 ,77
0,29
0,55
VE1
3,56
0,60
0,45
0,77
0,64
0,60
V3
0,15
1,22
0,15
V3
0,10
0,44
APA12
0,80
0,95
1,42
4
PC60
PS2
1,22
0,64
4,18
4,18
1,68
0,77
0,15
0,55
0,77
0,29
VE2
0,63
0,27
0,76
1,27
1,47
1,25
VE2
0,60
APA7
0,76
1.10
Q.E.8
0,29
0,55
Módulo de fachada 3,15
Ver desenho ARQ.20.071-01
ARM2a
0,13
0,13
0,22
1,30
0,09
0,77
0,64
0,43
1,22
1,10
V3
1,50
0,95
0,80
PC60
4
1,22
VE2
0,64
VE1
3,56
0,99
0
0,25
NÚCLEO B
0,27
0,77
1.56
PS4
0,27
0,29
0,55
0,15
0,15
ARM2
Z.T.B
0,11
0,33
0.11
0,90
2,46
0,77
0,64
0,47
1,22
1,18
0,64
1,25
1,25
PS6
0,17
,47
,06
4,06
VE7
0,10
MLR
MSR
0,09
0,70
1,66
0,15
1,50
5,65
6,05
6,05
5,45
MLR
MSR
0,63
110.34
0,61
0,55
0,60
1,82
0,21
2,41
0,27 0,02
1 ,22
VE2
0,64
0,18 0,15
I.S.8
0,27
1,20
2,54
1,15
1,22
0,17 0,75
1,10
0,13
0,15
V4
,10
0,29
110.35
3,63
,30
1 ,83
VE2
0,64
,64
0,29
3,65
DESPENSEIRO
1,15
1,22
1,15
0,74
0,55
0,89
V3
2
V3
0,36
COZ8
4,20
0,10
VE7
0,93
CW6
,59
6
2,90
2,69
0,13
V3
1
0,29
DESPENSEIRO
V3
1,33
0,42
0,75
APA3
VE1
0.61
,54
0,95
0,10
,29
5,81
0
0,15
MLL
2,90
MLL
0,29
0.70
1,82
2
0,15
CW4
2,38
2,15
CALDEIRA
+
DEPÓSITO
0,15
0,15
1,64
V3
FRIGORIFICO
0,60
CK3a
0,27
CW3
0
0,60
DESPENSEIRO
5
0,64
,85
0,09 0,75
2
0,15
I.S.5
0,15
0,15
0,15
1,23
1,70
0,75
0,15
2,21
0,60
1,72
0,15
,15
V3
I.S.4
0,15
0,85
0,15
0,18
0,29
FRIGORÍFICO
0
1,10
0
0,13
0,60
0,13
0,18
0,15
1,10
,68
4,81
0,29
0.26
2,61
Q.E.6
0,27
0.75
0,29
CK3b
ARM4
2,57
1,72
,15
4,75
0,09
DESPENSEIRO
5,05
4,80
0,17
V3
V3
0,90
DESPENSEIRO
2,90
4,20
0,15
0,10 0,75
V3
1,20
0,70 0,10
0,60
0,60
0,15
ARM3
1,70
0,75
FRIGORÍFICO
CK1
1,72
0,15
0,09
0,17 0,75
0,60
7
DESPENSEIRO
1,45
0,17
1,20
0,15
V4
V3
0,10
0,10 0,75
0,11 0,75
0,29
ARM3
1,15
4.95
V3
0,15
1,72
0.60
I.S.7
0,15
0,09
1,10
1,40
,98
V3
CW5
V3
2,33
0,17
DESPENSEIRO
0,85
1,75
ARM2
0,15
ARM5
V3
I.S.6
1,33
MLL
0,38
5,65
DESPENSEIRO
4
CW2
1,35
I.S.3
V3
V3
0,15
0,15
0,15
V3
,15
CALDEIRA
+
DEPÓSITO
0,15
4
4
0,85
0,75 0,18
2
V3
0,15
0,29
110.35
,15
0,60
CK2
3
0,27
1,15
VE5
1,15
CL
1,30
0,32
0,15
0,22
APA2
1,67
0,90
0,25
0,20
1,42
0,60
DESPENSEIRO
1,31
0,15
0,15
0,95
1.64
Z.T.A
Q.E.4
PS6
7
ARQ.02.006
0,60
0.82
2
2,68
0,20
0,95
2,50
0.11
0,25
0,27
0,90
0,25
0,80
DESPENSEIRO
0,76
0,66
ARQ.02.007
0,55
0.13
1,00
0,29
COZ3
0,25
1,20
PS4
0,11
110.34
1,75
2,70
2,83
1,15
0,60
0,15
,20
2,83
0,80
,80
0 ,29
4,20
,83
4,82
2
4,82
4,20
0,15
0,15
0,10
DESPENSEIRO
3,35
,91
0,80
VE8
1,15
1,15
1,15
0,73
1,72
0,29
0,96
0,77
0,24
1,22
1,50
2
2,68
6
ARQ.20.073-01
2,07
0,84
,67
0,15
1,10
0,77
0,13
0,29
0,15
0,77
2,11
1,22
,40
0,84
,61
0,15
,50
0,44
APA11
0,10
0,27
1,30
DESPENSEIRO
ARM11
0,24 0,75
0,66
0,55
0,85
0,55
5
O
Módulo de fachada 3,05
Ver desenho ARQ.20.070-01
0,55
0,55
I
ARQ.02.003
MLR
MSR
1,70
NÚCLEO A
0,15
0,15
0,75
1 ,88
3
0,11
PC60
COZ7
0,66
,12
PS2
PS6
CALDEIRA
+
DEPÓSITO
0,75
1,27
1,27
VE1
0,15
0,20
,30
0,15
DESPENSEIRO
4
1,40
0,39
0,27
1,48
2
1,25
,90
0,15
,15
Q.E.3
110.35
V3
2
V3
VE1
0,15
0,80
1
1,45
1,70
,19
2,42
,90
0
0,15
V4
1,15
2 ,42
APA6
DESPENSEIRO
0,15
0,27
0,13
3
0,10
0,15
0,27
I.S.2
0,13
0,09 0,75
0,15
0,15
1,10
0,12
4,80
0,09
2,76
,00
3
1,84
0,66
0,86
0,55
3
0,13
ARM2
V3
1,17
0,29
1,15
1,50
0,27
1,70
0,44
0,15
0,15
V3
1,10
2,16
0,15
CW1
0,75 0,10
V3
0,58
5,78
ARQ.02.008
H
ARQ.02.002
1,30
2
1,70
,75
0,15
1,38
V3
0,85
0,15
0,24 0,75 0,10
0,66
0,86
0,55
3
0,15
0,66
0,87
1,27
1,27
,15
2,30
0,75
4,55
0,15
0,66
0,87
1,27
1 ,27
3
0,11
PC60
2 .44
,61
1,27
0
4,85
3,95
VE1
1,40
.76
0,75
.05
4,07
Módulo de fachada 3,15
Ver desenho ARQ.20.071.01
0,15
0,51
2 ,42
0,80
0,27
0,95
1,70
V3
1,50
0,13
0,60
ARM1
2,38
1 .25
0,15
3
,12
1,27
1,27
VE1
1.49
0,20
0 .63
0,15
1.05
0,66
0.92
4,12
I.S.1
2
G
Módulo de fachada 3,05
Ver desenho ARQ.20.071-02
ARQ.20.064-05
0,55 0.01
ARQ.20.073-04
1
F
ARQ.20.064
ARQ.20.064-06
VE5
0,60
1,15
2,90
0,60
0,55
VE5
0,60
1,15
2,90
0,60
0,55
2,87
Módulo de fachada 2,90
Ver desenho ARQ.20.070-01
ARQ.02.004
TÉCNICO RESPONSÁVEL
joão luís ferreira
NIP
99.05.258
COLABORADORES
miguel pires
sofia reis; joana cancela
DATA
março 2001
DESIGNAÇÃO
FASE DO PROJECTO
ESCALA
DESENHO Nº
planta piso 2
1:50 [1:150]
execução
arq.01.005
NOTA: TODAS AS COTAS DEVEM SER VERIFICADAS EM OBRA. TODAS AS
ALTERAÇÕES DEVEM SER COMUNICADAS AOS PROJECTISTAS DAS
ESPECIALIDADES. AS INFORMAÇÕES CONSTANTES NESTES DESENHOS
CARECEM DA CONSULTA DE OUTROS ELEMENTOS DO PROJECTO.
A
B
C
3.02
DD
3.05
EE
3.05
FF
3.05
GG
3.05
H
3.05
JI
3.05
LJ
3.05
0.59
N
2.90
O
2.90
2.87
CHK3a
Guarda da cobertura
Ver desenho ARQ.20.042
123,31
CHW3
Módulo de fachada 2,90m
sem portada
123,31
123,31
Ventilador estático
Ver proj. A.V.A.C.
Modulo de fachada de 2,90m
com quatro paineis fixos
123,16
123,11
123,11
123,11
122,66
0.18
122,52
M
2.90
124,48
CHK2
123,31
L
N
2.87
124,48
CHK1
K
3.08
122,52
122,34
+122,21
0.15
0.55
122,34
VE2
VE2
VE2
VE2
VE2
VE2
VE2
VE2
VE2
VE5
VE5
0.61
VE5
V
E5
0.57
2.21
2.21
2.42
Módulo de fachada 2,90 m
0.55
+119,22
VE2
VE2
0.03
0.61
VE2
0.61
0.03
VE2
VE2
VE2
VE2
VE2
VE5
VE5
0.55
0.57
1.14
2.21
2.42
1.22
0.57
VE5
V
VE5
V
E5
0.03
2.21
VE2
Módulo de fachada 3,05m
Ver desenho ARQ.20.071-02
0.55
+116,23
115,51
VE2
VE2
VE2
VE2
VE2
VE2
VE2
VE2
VE5
VE2
VE5
VE2
VE2
VE2
VE2
VE2
VE5
VE2
VE2
VE2
VE2
VE2
VE2
VE2
VE2
VE5
VE2
VE2
VE2
VE2
VE2
VE2
VE2
VE5
114,34
CHW12
114,19
0.15
113,55
113,37
VE5
VE5
VE5
VE5
+113,24
VE5
VE5
VE5
VE5
VE5
VE5
VE5
Módulo de fachada 2,90 m
2.42
VE2
114,34
0.03
0.03
0.55
0.55
VE2
2.42
VE2
E5
CHK5
CHW11
114,14
0.55
113,55
113,37
VE2
0.15
0.15
0.59
2.42
Guarda da cobertura
Ver desenho ARQ.20.042
0.55
2.42
rev.
0.30 0.05
data
assunto
aprovou
0.55
+107,26
0.55
107,73
2.42
0.55
+110,25
VE2
ARQUITECTURA E COORDENAÇÃO
VE3
V
promontório arquitectos
E5
2.42
2.42
105,53
0.95
3.39
VE2
Torre de ventilação
Ver desenho ARQ.20.051
0.05
0.40
+104,27
103,98
joão perloiro
joão luis ferreira
paulo perloiro
paulo martins barata
pedro appleton
www.promontorio.net
r. fábrica de material de guerra, 10
1900-690 lisboa portugal
t: +351 21 8620970
f: +351 21 8620971
ESTABILIDADE, ÁGUAS E ESGOTOS
cenor
102,70
Módulo de entrada núcleo A
Torre de ventilação das caves
Ver desenho ARQ.20.051
[email protected]
av.gago coutinho, 133
1700 lisboa portugal
t: +351 21 8437300
f: +351 21 8437301
ELECTRICIDADE, COMUNICAÇÕES, SEGURANÇA E GÁS
eppe
[email protected]
azinhaga da torre do fato, 7 a
1600 lisboa portugal
t: +351 21 7112480
f: +351 21 7112489
AVAC
pgi
pgi [email protected]
r. s. domingos de benfica, 33 2º dto
1500 lisboa portugal
t: +351 21 7221380
f: +351 21 7221389
ESPAÇOS EXTERIORES
global
[email protected]
r. da esperança, 9 2º e
1200 lisboa portugal
t:+351 21 3929270
f:+351 21 3929279
DONO DE OBRA
coociclo
cooperativa de habitação e construção, c.r.l.
r. fernando lopes graça, 9 a
1600-067 lisboa portugal
t:+351 21 7578673
f:+351 21 7578676
PROJECTO
edifício de habitação
LOCAL
travessa do pregoeiro ,10 - carnide, lisboa
TÉCNICO RESPONSÁVEL
joão luís ferreira
COLABORADORES
miguel pires
sofia reis; joana cancela
DESIGNAÇÃO
www.promontorio.net
DATA
março 2001
FASE DO PROJECTO
alçado sul
execução
ESCALA
DESENHO Nº
1:50 [1:150]
Detail design / 2nd floor plan and south elevation
NIP
99.05.258
arq.03.002
BLOCO CARNIDE
Carnide historical district, Lisbon, 1999 – 2003
South facade
Facade detail
The housing development was promoted
by a cooperative on a site located in
Lisbon, in the historical district of
Carnide. Along with the vacant site, the
row of historical houses that remains from
what was formerly Vila Rosa, is also to
be renovated for the purpose of housing.
Situated in the small historical center,
the plot confines with the backyards and
annexes of the old nucleus of Carnide,
classified by the national heritage institute
(IPPAR).
The full ensemble comprises the new
block with 24 apartments, the renovation
of the old houses of the Pregoeiro
Passageway, and a small shop to be rented
for local commerce.
The new building, given its location and
volume, intends to form a protective
shield for the historical nucleus against
the surrounding dense and shabby legacy
of the 1970s. The devised L-shaped
configuration guarantees a tolerant urban
arrangement, both in its relation with
historical surrounding and the resulting
courtyard, where public space is not
only granted an agreeable scale but also
a mediating role in its relation with the
interstitial spaces of the old and the new.
The urban surroundings depict an
amalgamate of epochs and urban politics.
www.promontorio.net
The concept of the new block is based on
the idea of monolithism and repetition.
The severe monumentality that emanates
from the compositional system of the
façades suggests the representational
transposition of the load and bearing
running across the building with its
mineral skeleton resting on a heavy
stereotomic plinth.
Thus, far from a literal representation of
structure, our aim is the tactile and visual
representation of a mise en scène capable
of generating a solid and stable urban
type-form. This configuration evidently
suggests a remission to heavyweight
tectonics in the sense that the fragile
tympanums of the modules –conceived
as aluminum porte-fenêtre, steel
handrails and wood paneling shutters–
are visually supported by a powerful
skeleton of pre-cast concrete elements.
Meanwhile, a phenomenon of randomness
springs from the different positions in
which prospective users will leave the
shutters, one that is also indicative of the
unrestrained and physical presence of
dwelling.
DOLCE VITA
MIRAFLORES
Miraflores (Greater Lisbon), Portugal, 2004 – 2005
RETAIL AND MIXED-USE
Location Miraflores (Greater Lisbon), Portugal
Developer Chamartín Imobiliária, SA
Programme Community mall (in-depth renovation)
GLA 5,728 sq.m
Shops 65
Parking 300
Project Status 2001 (concept design) – 2002 (built and open to public)
East facade
Main entrance
www.promontorio.net
Facade detail
DOLCE VITA MIRAFLORES
Miraflores (Greater Lisbon), Portugal, 2004 – 2005
Central court
Central court
Food court
Central court
Level 2 plan
Level 1 plan
Level 0 plan
www.promontorio.net
Mall
DOLCE VITA MIRAFLORES
Miraflores (Greater Lisbon), Portugal, 2004 – 2005
Facade details
Food court balcony on west facade
The design consists in the partial
renovation of a small shopping centre
in a residential quarter of the northern
periphery of Lisbon. The existing
building, although relatively recent,
was physically degraded and financially
insolvent. To revitalise this building, the
new owner had a slim budget allowing
minimal changes to the original layout.
North facade
East facade
www.promontorio.net
However, to be effective, this revamping
should turn around the image of the
building and attract better shop brands
and more visitors. On the outside, the
operation consisted in covering the existing
stone façade with a new skin of galvanised
metal sheets as a support for a graphic
design informing the visitor on the mall’s
commercial contents.
In addition, a new wing of cinemas was
built adjoining the building as a double
skin frosted glass box veiling the same
colour palette that is painted behind, on
the masonry wall. Dolce Vita Miraflores is
now an exciting and successful centre with
a highly performing food court.
PREGAIA
BUILDING
Vila Nova de Gaia (greater Porto), Portugal, 2000
WORKPLACES
Location Vila Nova de Gaia (greater Porto), Portugal
Client Pregaia, SA
Programme Office building and showroom
Gross Built Area 1,500 sq.m
Project Status 2000 (shortlist competition)
N
Site plan
Presentation model
www.promontorio.net
PREGAIA BUILDING
Vila Nova de Gaia (greater Porto), Portugal, 2000
The pre-cast concrete company Pregaia
held a short-list competition for the
designs of its offices on an industrial
campus, on the outskirts of Porto.
Inscribed within the orthogonal matrix of
the plant, the proposed building occupies
the given plot with a single and monolithic
pitched roof shed and a sunken patio
adjoining the boundary of the plot, on the
west edge of the industrial complex.
Conceptually, the proposed scheme
evokes the classical theme of “the house
inside the house”, in that the rigorously
shaped monolithic shell envelops a loose
three-storey glass volume of office rooms
generating and interstitial space that
serves as circulation.
Elevations and floor plans
Detail sections
www.promontorio.net
Eminently tectonic, the embryo of this
space-form springs from the articulation
between structure and construction: a
system of pre-fabricated panels, that
function both as structure and walling,
shape and sustain the shed which encloses
the office glass box. Inside this shed, the
tectonic form is revealed in its essentiality,
with the surface of white concrete of
the porticos exceptionally interrupted
by the punched sash windows and the
vertical joints between panels, while the
tympanum of the shed is fully enclosed by
a concrete wall, cast in-situ.
Outside, however, subverting the logic of
concrete as an all-encompassing material,
the building is clad in exposed concrete
panels, gripped onto to the structural
porticos, with a stereotomy reminiscent of
their mineral condition. On the outside,
the austerity of this self-contained volume,
echoing the roughness of the industrial
campus, contrasts with the quasi-scenic
lighting of its interior. On the foyer of
the building, the triple-height showroom
displays the concrete prototypes
and samples like in the 18th-century
Pinakotheks where the works where
exhibited by optimizing all the available
space of the walls.