06. valvetrain
Transcription
06. valvetrain
\ EngineMechanical CylinderHead SpecialTools 6-2 Comoonent LocationIndex 6-3 EngineCompression Inspection b-t' VTECRocker Arm Test ........... ............ 6-7 VTCActuatorInspection .................... 6-8 ValveClearance Adjustment ............. 6-9 Crankshaft PulleyRemovaland Installation.............. 6-11 C a mC h a i nR e m o v a l . . . . . . . . . . . . . . . . . . .6. -. 1 . .2. . . . C a mC h a i nI n s t a l l a t i o n . . . . . . . . . . . . . . . .6. .-.1. .5. . Auto-Tensioner Removal/1nsta11ation ......................... 6-19 ChainCaseOil SealInstallation ........6-21 CyfinderHeadCoverRemoval .......... 6-22 CylinderHeadRemoval ..................... 6-23 WC Actuator.ExhaustCamshaftSorocket R e paf c e m e n t .........6-24 Head Cylinder Inspection for Warpage...................... 6-25 Rocker Arm AssemblyRemoval................................. 6-26 Rocker ArmsandShafts Disassembly/Reassembly .............. 6-27 Rocker ArmsandShaftsInspection............................ 6-28 Camshaft Inspection .......................... 6-29 Valves,Springs,andValveSealsRemoval................ 6-31 ValveInsoection...................... ........... 6-32 ValveStem-to-Guide Clearance Insoection............... 6-32 ValveGuideReolacement ................. 6-33 ValveSeatReconditioning ................ 6-35 Valves,Springs, andValveSealsInstallation............ 6-37 Rocker Arm AssemblvInstallation .... 6-38 C v l i n d eHr e a dI n s t a l l a t i o.n. . . . . . . . . . . . . . . . . . . . . . . . . . . .6. -. 3 . .9. . . . . . . . . . CylinderHeadCoverInstallation ......6-41 CylinderHead a SpecialTools O .D o @ o G) E] O tro @ (D I ozoa I oz..rae-oot 07JAB-0010204 07NAB-0010404 07VAE-001010A OTZAJ.PNAAlOO OTZAJ-PNAA2OO I 07ZAJ-PNAA300 07742-0010100 07746-001o4oo 07749-0010000 - l-: ,. '' ,.-/ a:-t'" ,) r--\ Lq-, ',..)-)--' - o - 1jr- r- o ..'.,i2 .<:'':'v'' 5'r' a o ..# ..a:-" - -- -i 'a- ti-- @ ,- 1 1 1 1 1 1 2 1 1 Regulator Air Pressure V a l v eG u i d eR e a m e r5, . 5m m Socket,19 mm H o l d e rH a n d l e HolderAttachment,50 mm Valve Spring CompressorAttachment VTECAir Adapter VTECAlr Stopper Air Joint Adapter V a l v eGu i d eD r i v e r , 5 . 5m m Attachment,52 x 55 mm Driver OTAAJ.PNAA'IOO OTHAH-PJ7O1OB -- Oty Description Tool Number Ref. No. /": l? -- -''' 't'tY-,l a,/'/' @ 6-2 OD @ ComponentLocationlndex IGNITIONCOIL COVER CYLINDER HEAD COVER page6-22 Removal, page6-41 lnstallation, CAM CHAIN Bemoval,page6-'12 Installation,page6-15 frn "p CAM CHAINGUIDEB | ] t J, CAM CHAINGUIDEA VALVE VARIABLE TIMINGCONTROL twc) olL soLENotD VALVE PULLEY CRANKSHAFT R e p l a c e m e npt a , g e6 1 1 TENSIONER ARM AUTO.TENSIONER page6-'lI Replacement, O-RING (cont'd) 6-3 CylinderHead ComponentLocationIndex(cont'd) CAMSHAFT HOLDER Fg Y f\ R LI T fr F] CAMSHAFTPOSITION ICMP}SENSOR EEI g----- CAMCHAIN GUIDEB / -"-oowetew TOPDEADCENTER (TDC)SENSOR EXHAUSTCAMSHAFT SPROCKET Removal,page6 24 page6-25 Installation, EXHAUSTCAMSHAFT ROCKER ARM ASSEMBLY Overhaul,page6 27 Inspection,page 6-28 6-4 .\ ll" --€.i SPRING RETAINER vALvE EXHAUSTVALVE SEAL / .""or", uo.u, v ,H >il( d:l.\ aFl T1 l l l* I / uo.ur.r","o l l H \ l gg | | II vALVE -/ TNTAKE ^-'-- I I U- tl Y EI 1.U spntruc .-- G\-r_ 9E4L Replacement, Page6-31 H e , |NTAKEVALVE GUIDE page6-33 Replacement, _-/ i ,p 2bw 9) \*""'RArNERcovER wcsrRArNER \ HEATSHIELD HEAD CYLINDER Removal,page6'23 Inspection,page6-25 Installation,page6-39 EXHAUSTVALVE Removal,page6-31 Installation,page6-37 INTAKEVALVE Removal,page6 31 Installation,page6 37 CYLINDER HEAD GASKET 6-5 CylinderHead EngineCompressionInspection 1 . W a r m u p t h e e n g i n et o n o r m a lo p e r a t i n g temperature(coolingfan comes on). \ 9 . Open the throttlefully, then crankthe enginewith the startermotor and measurethe compression. 2. Turn the ignition switch OFF. 3. Removethe intakemanifoldcover (seestep 1 on page6-22). Compression Pressure Above 930 kpa (9.5 kgf/cm', 135 psi) 1 0 .Measurethe compressionon the remaining cylinders, 4, Disconnectall four injectorconnectors. Maximum vadation Within 200 kPa (2.0 kgf/cm', 28 psi) 5. Startthe engine,and let it run until it stalls. 6 . R e m o v et h e i o u r i g n i t i o nc o i l s( s e ep a g e4 - 1 8 ) . 7. Removethe four spark plugs. 8. Attachthe compressiongaugeto the spark plug note. 1 1 .lf the compressionis not within specifications, checkthese items,then remeasurethe compressron. . . . . Damagedorworn valvesand seats Damagedcylinder head gasket Damagedor worn piston rings Damagedorworn piston and cylinderbore \- V, 6-6 WEC RockerArmsTest Special Tools Required . Air pressureregulator07AAJ-PNAA100 . VTECair adaoter07ZAJ-PNAA100 . WEC air stoDoer07ZAJ-PNAA200 . Air joint adapter07ZAJ-PNAA300 1. Removethe cylinder headcover (seepage 6-22). 2. Set the No. 1 pistonat top dead center(TDC)(see step 1 on page6-12). 3. Verify that the intakeprimary rockerarm (A) moves independentlyof the intakesecondaryrockerarm (B). Repeatstep 3 on the remainingintakeprimary rockerarms with each piston at TDC.When all the primary rockerarms passthe test, go to step 5. Checkthat the air pressureon the shop air compressorgauge indicatesover 400 kPa (4 kgflcm',57 psi). 6 . Inspectthe valve clearance(seepage 6-9). 7 . Removethe sealingbolt (A)from the relief hole, and installthe VTECair stopper(B). OTAAJ.PNAAlOO D OTZAJ-PNAA3OO . lf the intakeprimary rockerarm does not move, removethe primary and secondaryrockerarms as an assemblyand checkthat the pistonsin the secondaryand primary rockerarms move smoothly.lf any rockerarm needs replacing, replacethe primary and secondaryrockerarms as an assemblv,and test. . lfthe intakeprimary rockerarm moves freely,go to step 4. OTZAJ.PNAAlOO Removethe No. 2 and No. 3 camshaftholder bolts, and installthe VTECair adapters(C)finger-tight. Connectthe air joint adapter(D),and air pressure regulatorwith a 0-100psi gauge (E). (cont'd) 6-7 CylinderHead WEC RockerArms Test (cont'dl '10. Loosenthe valve on the regulator,and apply the specifiedair pressure. Specified air pressure: 290 kPa 13.0kgt/cm', 42 psi) NOTE:lf the synchronizingpiston does not move after applyingair pressure;move the primary or secondaryrockerarm up and down manuallyby rotatingthe crankshaftclockwise. 1 1 . W i t h t h e s p e c i f i e da i r p r e s s u r ea p p l i e d m , o v et h e i n t a k ep r i m a r yr o c k e ra r m ( A ) f o r t h e N o , 1 c y l i n d e r . The primary rockerarm and secondaryrockerarm ( B )s h o u l dm o v e t o g e t h e r . lf the intakesecondaryrockerarm does not move, removethe primary and secondaryrockerarms as an assembly,and checkthat the pistonsin the primary and secondaryrockerarms move smoothly.lf any rockerarm needsreplacing, replacethe primary and secondaryrockerarms as an assembly,and test. VTGActuator Inspection '11. Removethe cylinder headcover (seepage 6-22lr. 2. Removethe auto-tensioner(seepage6-19). 3. Loosenthe rockerarm adjustingscrewslsee step 2 on page6-26). 4. Removethe camshaftholder (seestep 3 on page 6- 26t. 5. Removethe intakecamshaft. 6, Checkthat the variablevalve timing control (VTC) actuatoris lockedby turning the VTCactuator clockwiseand counterclockwise. lf the VTC actuator is not locked,replacethe VTCactuator. 7 . S e a lt h e a d v a n c eh o l e s( A ) a n dr e t a r dh o l e s( B )i n the No. 1 camshaftjournal with tape. Puncha hole through the tape over one of the advanceholes. 1 2 .Removethe specialtools. 1 3 .Tightenthe camshaftholder mounting boltslo 22N m 12.2kgf.m, 16 lbf.ft). 1 4 . T i g h t e nt h e s e a l i n gb o l t t o 2 0 N . m ( 2 . 0k g f . m , 14 tbf.ft). t5. 6-8 I n s t a l l t h ec y l i n d e rh e a dc o v e r( s e ep a g e6 - 4 1 ) . ValveGlearanceAdiustment 9. Apply air to the advancehole to releasethe lock. NOTE:Adjust the valvesonly when the cylinder head temperatureis lessthan 100'F (38'C). 1. Removethe cylinderhead cover (seepage6-22). 2. Set the No. 1 piston at top dead center(TDC).The punch mark (A) on the variablevalve timing control (VTC)actuatorand the punch mark (B)on the exhaustcamshaftsprocketshould be at the top. Align the TDC marks (C)on the VTC actuatorand exhaustcamshaftsprocket. 1 0 .Checkthat the VTCactuatormoves smoothly.lf the VTC actuatordoes not move smoothly, replacethe VTC acluator. {cont'd) 6-9 GylinderHead ValveClearanceAdjustment (cont'd) 3. Selectthe correctthickness feelergaugefor the valvesyou'regoingto check. Intake: 0.21 0.25mm (0.008-0.010 in.) Exhaust; 0.28 0.32mm (0.011 0.013in.) \. 5 . l f y o u f e e lt o o m u c h o r t o o l i t t l e d r a g ,l o o s e n t h e locknut(A),and turn the adjustingscrew {B) until the drag on the feelergauge is correct.. Adiustingscrew locations: EXHAUST No. 1 No. 1 N o .2 No.3 N o .4 No.4 Tightenthe locknut,and recheckthe clearance. Repeatthe adjustmentif necessary 7 . Rotatethe crankshaft180"clockwise(camshaft p u l l e yt u r n s9 0 ' ) . 4. Insertthe feeler gauge {A) betweenthe adjusting s c r e w( B )a n d t h e e n d o f t h e v a l v es t e m ,a n d s l i d ei t backand forth; you should feel a slight amount of d rag. t. \- 8. Checkand, if necessary,adjustthe valve clearance o n N o .3 c y l i n d e r . 6-10 I CrankshaftPulleyRemovaland Installation 9. Rotatethe crankshaft180"clockwise(camshaft pullevturns 90'). Special Tools Required . Holder handle07JAB-001020A . Holderattachment,50 mm 07NAB-001040A . Socket,19 mm 07JAA-001020,4 or a commercially a v a i l a b l e1 9 m m s o c k e t Removal 1. Removefront tires/wheels. 2. Removethe splashshield (seestep 23 on page 5-5). 3 . H o l dt h e p u l l e yw i t h h o l d e rh a n d l e( A )a n d h o l d e r attachment(B). B 07NAB-001040A 1 0 .Checkand, if necessary,adjustthe valve clearance on No.4 cylinder. 1 1 .Rotatethe crankshaft180"clockwise(camshaft p u l l e yt u r n s9 0 " ) . el / f / Srroo.oo,oroo (or commercially available) / Removethe bolt with a 19 mm socket(C)and breakerbar. 1 2 .Checkand, if necessary,adjustthe valve clearance o n N o .2 c y l i n d e r . Installthe cylinder headcover (seepage 6-41). (cont'd) 6-11 CylinderHead CrankshaftPulleyRemovaland Installation(cont'dl CamChainRemoval a NOTE:Keepthe cam chain away from magneticfields. Installation 1. Cleanthe crankshaftpulley (A),crankshaft(B),bolt (C).and washer (D).Lubricateas shown below. 1. Turn the crankshaftpulley so ils top dead center ( T D C )m a r k( A )l i n e su p w i t h t h e p o i n r e r( B ) . . .: Clean O; Lubricate ll ll t[] rL -'....-----=a (-, , 5U-1J It t - 2 . Removethe front tires/wheels. I n s t a l l t h ec r a n k s h a fpt u l l e y ,a n d h o l dt h e p u l l e y with holder handle(A) and holder attachment{B). 3 . R e m o v et h e s p l a s hs h i e l d . - , , - - . = . - - - - - _ _ - - _ B 07NAB-0010iroA \ A 07JAB-001020A 4. Removethe drive belt (seepage 4-26). Tightenthe bolt to 245 N.m (25.0kgf.m, 181 tbf.ft) with a torque wrench and 19 mm socket(C).Do not use an impactwrench. 5. Removethe cylinder headcover (see page6-22). 6 . R e m o v et h e c r a n k s h a fpt u l l e y( s e ep a g e6 - 1 1 ) . I n s t a ltl h e s p l a s hs h i e l d( s e es t e p2 0 o n p a g e5 - 1 2 ) . 5 . Install front tires/wheels. \- 6-12 7. Disconnectthecrankshaftposition(CKP)sensor connector{A) and variablevalvetiming control {VTC)oil control solenoidvalve connector(B). 1 1 . R e m o v et h e s i d ee n g i n em o u n tb r a c k e t . 1 2 . R e m o v et h e c h a i nc a s e . Removethe VTC oil control solenoidvalve (see s t e p1 o n p a g e1 1 - 1 2 7 ) . 9 . Supportthe enginewith a iack and wood block u n d e rt h e o i l p a n . 1 0 .Removethe ground cable (A).and removethe upper bracket(B). (cont'd) 6-13 CylinderHead CamChainRemoval(cont'd) Looselyinstallthe crankshaftpulley. ( \ 16. Removethe auto-tensioner. 1 4 . Turn the crankshaftcounterclockwiseto compress the auto-lensioner, 1 7 . R e m o v et h e c a m c h a i ng u i d eB . gffi llll t5. Align the holes on the lock (A) and the autot e n s i o n e (r B ) ,t h e n i n s e na 1 . 5m m ( 0 . 0 6i n . ) diameterpin (C)into the holes.Turn the crankshaft clockwiseto securethe Din. U U a \- 6 -14 CamChainInstallation 1 8 . R e m o v et h e c a m c h a i ng u i d eA ( A )a n d t e n s i o n e r a r m( B ) . t./6. | \ {n$1J; ,o NOTE:Keepthe cam chain away from magneticfields. 1. Set the crankshaftto top dead center(TDC).Align the TDC mark {A) on the crankshaftsprocketwith t h e p o i n t e r( B )o n t h e c y l i n d e rb l o c k . g"'1 9 . R e m o v et h e c a m c h a i n . t Setthe camshaftsto TDC.The punch mark (A) on the variablevalve timing control {VTC)actuatorand t h e p u n c hm a r k( B )o n t h e e x h a u s ct a m s h a f t sprocketshould be at the top. Align the TDC marks (C)on the VTC actuatorand exhaustcamshaft sprocKet. (cont'd) 6-15 GylinderHead CamChainInstallation(cont'dl 3. Installthecamchainon the crankshaft sprocket with thecoloredpiece(A)alignedwiththe punch mark(B)on the crankshaft sprocket. \ { 5 . I n s t a l l t h ec a m c h a i ng u i d eA ( A )a n d t e n s i o n ear r m (B). 6x1.0mm 1 2N . m {1,2kgf.m, 8.7 tbf.ftt '6I 8 x 1 . 2 5m m 22 N.m 12.2kgt.m, 16tbf.ft) Installthecam chain on the VTCactuatorand exhaustcamshaftsprocketwith the punch marks (A) alignedwith the two colored pieces(B). B 6. Installthe auto-tensi a 6x1,0mm 12Nm (1.2kgt.m,8.7 lbf ti) a 6-16 1 0 .Removeold liquid gasketfrom the chain case 7 , I n s t a ltlh e c a m c h a i ng u i d eB . 8 x 1.25mm 22 N.m (2.2kgf.m,16lbt.ft) H4 \ilt H g mating surfaces,bolts,and bolt holes. 1 1 .Cleanand dry the chain case mating surfaces. evenlyto the Apply liquid gasket.P/N 08718-0009, cylinder block mating surfaceofthe chain caseand t o t h e i n n e rt h r e a d so f t h e h o l e s . q 8. Removethe Dinfrom the auto-tensioner, Apply liquid gasket alongthe brokenline. Apply liquid gasketto the cylinder blockupper surfacecontactareas(A) on the chaincase. evenlyto the 1 4 . Apply liquid gasket,PiN 08718-0009, oil pan mating surfaceof the chain caseand to the innerthreadsof the holes. 9 . Checkthe chain caseoil sealfor damage.lf the oil seal is damaged,replacethe chain case oil seal ( s e ep a g e6 - 2 1 ) . NOTE:Do not installthe parts it 5 minutesor more have elapsedsinceapplying liquid gasket.lnstead, reapplyliquid gasketafter removing old residue. Apply liquid gasket alongthe brokenline. (cont'd) 6-17 GylinderHead CamChainInstallation(cont'd) '15. Installthe new O-ring(A) on the chain case.Set the edge of the chain case (B)to the edge of the oil pan ( C ) ,t h e n i n s t a ltl h e c h a i nc a s eo n t h e c v l i n d e rb l o c k (D). t { I a 1 6 . l n s t a l l t h es i d ee n g i n em o u n t . b r a c k e t . NOTE:When installingthe chain case,do not slide the bottom surfaceon the oil pan mounting surface. rbf.ft) ',.9 17. Installthe upper bracket(A),then tightenthe bolv nuts in the numberedseouenceshown. 6 x 1 . 0m m 12 N.m {1.2kgl m, 8.7 lbf ft} 6x1.0mm 1 2N . m (1.2kgt.m.8.7lbf.ft) 6x1.0mm 12Nm (1.2kgf.m,8.7lbf.ft) 1 2 x 1 . 2m 5m 54 N.m (5.5 kgt m, 40 lbf.ft) \ 1 8 . I n s t a ltl h e g r o u n dc a b l e( B ) . \- 6-18 Auto-TensionerRemovaU lnstallation 1 9 . lnstallthe variablevalve timing control (VTC)oil c o n t r o ls o l e n o i dv a l v e( s e es t e p 1 o n p a g e1 1 ' 1 2 7 ) . Removal: 20. Connectthe crankshaftposition(CKP)sensor connector{A) and VTC oil control solenoidvalve connector(B). 21. Installthe crankshaftpulley (seepage 6-12). 1 . R e m o v et h e c h a i nc a s ec o v e r . Turn the crankshaftcounterclockwiseto compress the auto-tensroner. 2 2 . I n s t a l l t h ec y l i n d e rh e a dc o v e r( s e ep a g e6 - 4 1 ) . 2 3 . I n s t a l l t h ed r i v eb e l t . 2 4 . I n s t a l l t h es p l a s hs h i e l d . €D@ {cont'd) 6-19 GylinderHead Auto-TensionerRemoval/lnstallation(cont'dl 3. Align the holes on the lock (A) and the autot e n s i o n e (r B ) ,t h e n i n s e r ta 1 . 5m m ( 0 . 0 6i n . ) diameterpin (C)into the holes.Turn the crankshaft clockwiseto securethe oin. 4. Removethe auto-tensioner. \ Installation: 1. Installthe auto-tensioner. 6x1.0mm 12 N.m {1.2kgt.m,8.7 lbt.tt) Remove the pin from the auto-tensioner. a \ \- 6-20 ChainCaseOil SealInstallation Removeold liquid gasketfrom the chain casecover mating surfaces,bolts,and bolt holes. SpecialToolsRequired . Driver07749-0010000 . Attachment,52 x 55 mm 07746-0010400 4 . Cleanand dry the chain casecover mating surfaces. Apply liquid gasket,P/N 08718-0009, evenlyto the chain case mating surfaceof the chain casecover and to the innerthreadsof the holes. NOTE:Do not installthe parts if 5 minutesor more have elapsedsinceapplyingliquid gasket.Instead, reapplyliquid gasketafter removing old residue. Apply liquid gasket a l o n gt h e b r o k e nl i n e . 1 . U s et h e s p e c i atl o o l st o d r i v ea n e w o l l s e a l squarelyinto the chain caseto the specified i n s t a l l e dh e i g h t . 07749-0010000 2. Measurethe distancebetweenthe chain case s u r f a c e( A )a n d o i l s e a l1 B ) . 6 . I n s t a l l t h ec h a i nc a s ec o v e r . Oil Seal InstalledHeight: 3 3 . 0 - 3 3 . 7m m ( 1 . 3 0 -1 . 3 3i n . ) 6x1.0mm 1 2N . m {1.2kgt.m, 8.7 tbf.ft) 33.0 33.7mm { 1 . 3 0 1 . 3 3i n . l 6-21 GylinderHead CylinderHeadCoverRemoval 1. Removethe intakemanifoldcover. ( \ 4, Removethe cylinder headcover V:t :;t 1 |,'.i/ 2. Removethe four ignition coils (seepage 4-'18). 3. Removethe dipstick(A) and breatherhose (B). ( \- 6-22 GylinderHeadRemoval NOTE: . Usefendercoversto avoiddamagingpainted surfaces. To avoid damage,unplug the wiring connectors carefullywhlle holdingthe connectorportion. To avoid damagingthe cylinderhead,wait until the enginecoolanttemperaturedrops below 100'F(38"C) betore looseningthe cylinder head bolts. Mark all wiring and hosesto avoid misconnection. Also, be sure that they do not contactother wiring or hoses,or interferewith other parts. ' 1 .Drainthe 8. Removethe enginewire harnessconnectorsand wire harnessclampsfrom the cylinder head. . Enginecoolanttemperature(ECT)sensor conneclor . Camshaftposition(Cl\4P)(top dead center(TDC)) sensor B connector . Camshaftposilion (CMP)sensorA connector 9. Removethe upper radiatorhose (A) and heater h o s e( B ) . enginecoolant(seepage 10-6). 2 . Removethe drive belt (seepage 4-26). 3 . Removethe intakemanifold {seepage 9-3). Removethe air cleanerhousing(seestep 7 on page 5-2t. 5. Removethe water bypasshose (A). '10. Removethe harnessholder (A)from the bracket, then removethe connectingpipe mounting boh {B) and brakeboostervacuum line mounting bolts {C). 6 . Removethe exhaustmanifold (seepage9-7) . 7 . Removethe cam chain (seepage 6-12). 11. Removethe water bvpasshose (D). (cont'd) 6-23 CylinderHead CylinderHeadRemoval(cont'd) VTCActuator,ExhaustCamshaft \ SprocketReplacement Removethe rockerarm assembly(seepage 6-26). tJ. Removethe cylinderhead bolts.To prevent warpage,unscrewthe bolts in sequence1/3turn at a t i m e ; r e p e a t h e s e q u e n c eu n t i la l l b o l t sa r e loosened. CYLINDERHEADBOLTSLOOSENINGSEQUENGE: Removal: 1 . R e m o v et h e c a m c h a i n( s e ep a g e6 - 1 2 ) . 2. Hold the camshaftwith an open-endwrench,then loosenthe variablevalve timing control (VTC) actuatormounting bolt and exhaustcamshaft sprocketmounting bolt. 1 4 . R e m o v et h e c y l i n d e rh e a d . I \ ( Removethe VTC actuatorand exhaustcamshaft sprocket. I 6-24 Installation: 1. Installthe VTC actuatorand exhaustcamshaft sprocket. CylinderHeadInspectionfor Warpage 1 , Removethe cylinder head{see page 6-23). Inspectthe camshaft(seepage 6-29). 2. Apply engineoil to the th readsof the VTC actuator mounting bolt and exhaustcamshaftmounting bolt, then installthem. 3. Hold the camshaftwith an open-endwrench,then tighten the bolts. Specified torque: VTC actuator mounting bolt: 1 1 3N . m ( 1 1 . 5k g l . m , 8 3l b l . f t ) Exhaust camshaft sprocket mounting bolt: 72 N m (7.3 kgf.m, 53 lbf.ft) Checkthe cylinder headfor warpage.Measure along the edges,and three ways acrossthe center. . lf warpage is lessthan 0.05mm (0.002in.) cylinder head resurfacingis not required. . lf warpage is between0.05 mm (0.002in.) and 0.2 mm (0.008in.),resurfacethe cylinder head. . Maximum resurfacelimit is 0.2 mm (0.008in,) basedon a height of 104mm (4.09in.). Cylinder Head Height; Standard{New}: 103.95 104.05mm {4.093 4.096in.} 4 . I n s t a ltl h e c a m c h a i n{ s e ep a g e6 - 1 5 ) . 6-25 CylinderHead RockerArm AssemblyRemoval '1. Removethe cam chain (seepage 6-12). 4 . Removethe cam chain guide B, camshaftholders, and camshafts. 2 . Loosenthe rockerarm adjustingscrews (A), A 5 . Insertthe bolts (A) Into the rockershaft holder,then removethe rockerarm assembly(B). 3. Removethe camshaftholder bolts.To Drevent damagingthe camshafts,unscrewthe bolts two turns at a time, in a crisscrosspattern. CAMSHAFTHOLDERBOLTS LOOSENING SEOUENCE: \- 6-26 { RockerArms and ShaftsDisassembly/Reassembly NOTE: ldentifypartsas they are removedto ensurereinstallationin original location. Inspectthe rockershaftsand rockerarms (seepage 6-28). The rockerarms must be installedin the same positionsif reused. When removing or installingthe rockerarm assembly,do not removethe camshaftholder bolts.The bolts will keep the holders,springsand rockerarms on the shaft. Priorto reassembling,cleanall the parts in solvent,dry them, and apply lubricantto any contactpoints. Bundlethe rockerarms with rubber bandsto keeDthem tooetheras a set. EXHAUSTROCKER SHAFT EXHAUSTROCKER ARM wASHEB Yr rY Y V rffin ,ffif- \nl I ltnrllln IJI_J;-L,JLI []1_L^|l] 'rl) 70) o .;. ..1 t:l P - l ,,_tl ,q 'l o INTAKE ROCKER ARM ASSEMBLY INTAKEROCKERSHAFT 6-27 CylinderHead RockerArms and ShaftsInspection 1 . Removethe rockerarm assembly(seepage 6-26). 2 . Measurethe diameterof the shaft at the first rocker location. \ 4. Measurethe insidediameterofthe rockerarm, and checkit for an out-of-roundcondition. Rocker Arm-to-Shaflt Clearance: Standard lNew): 0.025 0.052 mm lntake: (0.0010 0.0020in.) Exhaust: 0.018 0.056mm (0.0007 0.0022in.) 0.08 mm (0.003in.) Service Limit: 3. Zero the gauge (A)to the shaft diameter. 5. Repeatfor all rockerarms and both shafts.lfthe clearanceis over the Ilmit. replacethe rockershaft and all overtolerancerockerarms. lf any VTEC rockerarm needs replacement,replacethe rocker arms (primaryand secondary)as a set. ( \. 6. Inspectthe rockerarm pistons{A}.Pusheach p i s t o nm a n u a l l y . lf it does not move smoothly,replacethe rocker arm set. NOTE:Apply oil to the pistonswhen reassembling. ,,,@@ ( 6-28 GamshaftInspection NOTE:Do not rotatethe camshaftduring inspection. 1. Removethe rockerarm assembly(seepage 6-26). and disassembleit (seepage6-27). 2. Putthe rockershaft holders,camshaft,and camshaftholderson the cylinderhead,then tighten the bolts to the specifiedtorque. Specified torque: I mm bolis: 22 N.m {2.2kgt m, 16lbf.ft} 6 mm bolts: 12 N.m {1.2kgf.m,8.7 tbf.ftl 6 mm bolts: @, €0, @ 3. Seatthe camshaftby pushing it away from the camshafp t u l l e ye n d o f t h e c y l i n d e rh e a d . 4. Zero the dial indicatoragainstthe end of the camshaft,then push the camshaftbackand forth and read the end play. lf the end play is beyondthe servicelimit, replacethe camshafthead and recheck.lf it is still beyondthe servicelimit, replace thecylinder. CamshaftEnd Play: Standard{New}:0.05 0.20 mm (0.002 0.008in.l ServiceLimit: 0.4 mm (0.02in.) I I (cont'd) 6-29 CylinderHead CamshaftInspection(cont'dl Unscrewthe camshaftholder boltstwo turns at a time, in a crisscrosspattern.Then removethe camshaftholdersfrom the cylinder head. Lift the camshaftsout of the cylinder head,wipe them clean.then inspectthe lift ramps.Replacethe camshaftif any lobes are pitted,scored,or excessivelyworn, 1 . C l e a nt h e c a m s h a fjto u r n a ls u r f a c e si n t h e c y l i n d e r head,then set the camshaftsbackin place.Placea plastigagestrip acrosseachjournal. Installthe camshaftholders,then tighten the bolts to the specifiedtorque as shown in step 2. \ { \, I 10. Checkthe total runoutwith the camshaftsupported on V-blocks, . l f t h e t o t a l r u n o u to f t h e c a m s h a f its w i t h i nt h e servicelimit, replacethe cylinder head. . lf the total runout is beyondthe servicelimit, replacethe camshaftand recheckthe camshaftto-holderoil clearance.lf the oil clearanceis still beyondthe servicelimit, replacethe cylinder neao. Camshaft Total Runout: Standard(New):0.03mm (0.001in.) max. ServiceLimit: 0.04mm {0.002in.) 9 . Removethe camshaftholders.Measurethe widest portionof plastigageon eachjournal. . lf the camshaft-to-holder clearanceis within l i m i t s ,g o t o s t e p 11 . . lf the camshaft-to-holder clearanceis beyondthe servicelimit and the camshafthas been replaced, replacethe cylinder head. . lf the camshaft-to-holder clearanceis beyondthe servicelimit and the camshafthas not been replaced,go to step 10. Camshaft-to-Holder Oil Clearance: Standard (New): No. 1 Journal: 0.030 0.069mm No.2,3,4,5 Journals: ServiceLimit: {0.001 0.003in-) 0.060*0.099mm {0.002 0.004in.) 0 . 1 5m m { 0 . 0 0i6n . ) 1 1 . M e a s u r ec a m l o b eh e i g h t . Cam Lobe HeiohtStandard(New INTAKE PRI 3 3 . 9 2 5m m (1.3356 in.) 2 9 . 6 3m 8m ( 1 . 1 6 6i n8 . ) P R IP : rimary C/C:CamChain EXHAUST 34.092mm \1.3422in.l SEC SEC:Secondary \- 6-30 Valves,Springs,and ValveSealsRemoval Special Tools Bequired Valvespring compressorattachment07VAE-001010A 4 . I n s t a l l t h ev a l v eg u i d es e a lr e m o v e r . ldentifythe valvesand valve springsas they are removedso that each item can be reinstalledin its original position. 1. Removethe cylinder head (seepage 6-23). 2. Using an appropriate-sized socket(A) and plastic mallet {B),lightly tap the valve retainerto loosen the valve keepers. 5 . Removet h e v a l v es e a l . \ Installthe spring compressor.Compressthe spring, and removelhe valve keepers. 6-31 GylinderHead ValveInspection ValveStem-to-GuideClearance Inspection \ 1 . R e m o v et h e v a l v e s( s e ep a g e6 - 3 1 ) , 2 . Measurethe valve in these areas. lntake Valve Dimensions A StandardlNewl: 34.85 35.15mm { 1 . 3 7 2 1 . 3 8 4i n . l B Standard{Newl: 108.7- 109.5mm 14.280-4.311in.) C StandardlNew): 5.475 5.485 mm 1 0 . 2 1 5 6 - 0 . 2 1 5i n9 . ) C ServiceLimit: 5.445mm {0.214in.l ExhaustValve Dimensions A Standard(New):29.85-30.15 mm ( 1 . 1 7 5 -1 . 1 8 7i n . ) B Standard(New):108.3 109.1mm (4.264- 4.295 in.l C Standard(New):5.450 5.460mm (0.2146 0.2150in.) C ServiceLimit: 5.42mm (0.213in.) 1 . Removethe valves (seepage6-3'1). S l i d et h e v a l v eo u t o f i t s g u i d ea b o u t1 0 m m . t h e n measurethe guide-to-stemclearancewith a dial indicatorwhile rockingthe stem in the directionof normal thrust (wobble method). . l f t h e m e a s u r e m e net x c e e d s t h es e r v i c el i m i t , recheckit using a new valve. . lf the measurementis nowwithin the service limit, reassembleusing a new valve. . l f t h e m e a s u r e m e n t w i ta h n e w v a l v es t i l l exceedsthe servicelimit, go to step 3. lntake Valve Stem-to-Guide Clearance: StandardlNew): 0.06 0.11 mm {0.002 0.004in.} ServiceLimil: 0.16mm {0.006in.) Exhaust Valve Stem-to-Guide Clearance: S t a n d a r dl N e w l : 0 . 1 1- 0 . 1 6 m m 10.004 0.006in.) ServiceLimit: 0.22 mm 10.009in.) .< 4,. ( 3 . Subtractthe O.D.of the valve stem. measuredwith a micrometer,from the LD. of the valve guide, m e a s u r e dw i t h a n i n s i d em i c r o m e t eor r b a l lg a u g e . Takethe measurementsin three placesalong the v a l v es t e m a n dt h r e ep l a c e si n s i d et h e v a l v eg u i d e . The differencebetweenthe largestguide m e a s u r e m e nat n dt h e s m a l l e s st t e m m e a s u r e m e n t should not exceedthe servicelimit lntake Valve Stem-to-GuideClearance: Standard(New):0.030 0.055mm {0.0012 0.0022in.) ServiceLimit; 0.08mm (0.003in.l ExhaustValve Stem-to-GuideClearance: Standard{Newl: 0.055 0.080mm (0.0022-0.003rin.l ServiceLimit: 0.11mm (0.004in.) 6-32 t- I ValveGuideReplacement SpecialToolsRequired . Valveguidedriver,5.5mm 07742-0010100 . Valveguidereamer,5.5mm 07HAH-PJ7o108 1 . Inspectvalve stem-to-guideclearance(seepage 6- 32t. As illustratedbelow, use a commerciallyavailable air-impactvalve guide driver (A) modifiedto fit the diameterof the valve guides.In most cases,the same procedurecan be done usingthe specialtool and a conventionalhammer. Working from the camshaftside. usethe driver and an aarhammerto drive the guide about 2 mm (0.1 in.)towardsthe combustionchamber.This will knockoff some of the carbon and make removal easier.Hold the air hammer directlyin line with the valve guide to preventdamagingthe driver. Turn lhe head over, and drive the guide out toward the camshaftside of the head. tT -_|Jfillr-.-4fi'11., 10.8mm {0.,|2in.) 3. Selectthe proper replacementguides,and chill lhem in the freezersectionof a refriqeratorfor about an hour. 4. Use a hot plate or oven to evenly heatthe cylinder headto 300'F (150"C).Monitor the temperature with a cookingthermometer.Do not getthe head hotterthan 300'F (150"C);excessiveheat may loosenthe valve seats. 7 . lf a valve guide won't move, drill it out with a I mm ( 5 / 1 6i n c h )b i t .t h e nt r y a g a i n .D r i l lg u i d e so n l y i n extremecases;youcould damagethe cylinder head if the guide breaks. Removethe new guide(s)from the freezer,one at a time, as vou needthem. (cont'd) 6-33 CylinderHead ValveGuideReplacement(cont'dl Apply a thin coat of clean engineoil to the outside of the new valve guide. Installthe guide from the camshaftside of the head;usethe specialtool to drive the guide in to the specifiedinstalledheight ( A )o { t h e g u i d e( B ) .l f y o u h a v ea l l 1 6 g u i d e s t od o , you may have to reheatthe head. \ 1 0 .Coat both reamerand valve guide with cutting oil. 1 1 .Rotatethe reamerclockwisethe full length of the v a l v eg u i d eb o r e . O7HAH.PJ7O1OB Valve Guide Installed Height: 15.2 16.2mm (0.598-0.638in.) Intake: Exhaust: 15.5 16.5mm (0.610-0.650in.) ' - \ Continueto rotatethe reamerclockwisewhile removing it from the bore. Thoroughlywash the guide in detergentand water to remove any cutting residue. 1 4 . C h e c kt h e c l e a r a n c ew s i t h a v a l v e( s e ep a g e6 3 2 ) . Verifythat a valve slidesin the intakeand exhaust valve guideswithout exening pressure. 6-34 ValveSeat Reconditioning 1. Inspectvalve stem-to-guideclearance(seepage 632).lf the valve guidesare worn, replacethem (see page6-33)beforecuttingthe valve seats. 2 . R e n e wt h e v a l v es e a t si n t h e c y l i n d e rh e a du s i n ga valve seat cutter. 5. Make one more very light passwith the 45" cutter to removeany possibleburrs causedby the other cutters. Valve Seat Width: Standard(New): 1.25 1.55mm {0.049 0.061in.) ServiceLimit: 2.00 mm (0.079in.) 6. After resurfacingthe seat,inspectfor even valve s e a t i n gA: p p l y P r u s s i a nB l u ec o m p o u n d( A )t o t h e v a l v ef a c e .I n s e r t h e v a l v ei n i t s o r i g i n a l o c a t i o ni n the head,then lift it and snap it closedagainstthe seat severaltrmes. 3 , C a r e f u l l yc u t a 4 5 ' s e a t ,r e m o v i n go n l y e n o u g h materialto ensurea smooth and concentricseat. 4 . Bevelthe upper and lower edgesat the angles shown in the illustration. Checkthe width of the seat and adjustaccordingly. INTAKE:35" EXHAUST:30' - 45' , { 67.5' 1 . The actualvalve seatingsurface(B),as shown by the blue compound,should be centeredon the seat. . lf it is too high (closerto the valve stem),you must make a secondcut with the 67.5' cutterto move it down, then one more cut with the 45" cutterto restoreseatwidth. . lf it is too low (closeto the valve edge),you must make a secondcut with the 35'cutter (intake sidel or the 30" cutter (exhaustside)to move it up, then make one more cut with the 45" cutterto restoreseatwidth. N O T ET : h e f i n a lc u t s h o u l da l w a y sb e m a d ew i t h the 45'cutter. (cont'd) 6-35 CylinderHead ValveSeat Reconditioning(cont'dl ( \ 8 . Insen the intakeand exhaustvalves in the head, and measurevalve stem installedheight (A). Intake Valve Stem Installed Height: Standard{New):40.8 41.0mm ( 1 . 6 0 6 1 . 6 1 4i n . ) Exhaust Valve Stem Installed Height: Standard(New):54.6-54.8 mm |'2.150-2.157 in.l L lf valve stem installedheight is over the standard, replacethe valve and recheck.lf it is still over the standard,replacethe cylinder head;the valve seat in the head is too deeD. \- \- 6-36 Valves,Springs,and Valve SealsInstallation Special Tools Required Valve spring compressorattachment07VAE-00101 0A 1. Coatthe valve stemswith engine oil. lnstallthe valves in the valve guides. 2. Checkthat the valves move up and down smoothly. Installthespring seatson the cylinder head. l n s t a l l t h ev a l v es p r i n g .P l a c et h e e n d o f t h e v a l v e spring with closelywound coils toward the cylinder ne a o . 6 . Installthe valve retainer. 7 . Installthevalve spring compressor,Compressthe spring, and installthe valve keepers.Removethe valve spring compressor. Installthe new valve seals(A) usingthe valve guide s e a li n s t a l l e(rB ) . NOTE:The exhaustvalve seal (C)has a blackspring (D),and the intakevalve seal (E)has a white spring (F).They are not interchangeable. Lightlytap the end of each valve stem two or three times with a plasticmallet (A)to ensureproper seatingof the valve and valve keepers.Tap the valve stem only along its axis so you do not bend the stem. 6-37 CylinderHead RockerArm AssemblyInstallation :,ean and dry the No. 5 rockershaft holder mating surfaces. \ 5 . Removethe bolts from the rockershaft holder. 6 . M a k es u r et h e D U n c hm a r k so n t h e v a r i a b l ev a l v e eeassemblethe rockerarm assembly(seepage 62 1t . Apply liquid gasket,P/N 08718-0009, evenlyto the :ylinder head mating surfaceofthe No. 5 rocker shaft holder. \OTE: Do not lnstallthe partsif 5 minutesor more r a v e e l a p s e ds i n c ea p p l y i n gl i q u i dg a s k e tI.n s t e a d , 'eapply liquid gasketafter removingold residue. timing control (VTC)actuatorand exhaustcamshaft sprocketare facing up. then set the camshafts(A) in the holder. fl c I Apply liquid gasket alongthe brokenline. Insertthe bolts (A) into the rockershaft holder,then installthe rockerarm assembly(B)on the cylinder head. a \7 . Set the camshaftholders(B) and cam chain guide B ( C )i n p l a c e . Tightenthe bolts to the specifiedtorque. Specified torque: 8 mm bolts: 22 N.m (2.2 kgf.m, 16 lbl.ft) 6 mm bolts: 12 N.m {1.2kgf.m,8.7 lbf.fil 6 mm bolts: @),@.@ lnstallthe cam chain (seepage 6-15).and adjustthe valve clearance(seepage 6-9). 6-38 l- { CylinderHeadInstallation Installthe cylinder head in the reverseorder of removat: 5. Measurethe diameterof each cylinder head bolt at ooint A and DointB. a 50mm (2.0in.l 1. Cleanthe cylinderhead and blocksurface. f.f 2. Installthe new cylinder headgasket(A) anddowel pins (B)on the cylinderblock.Always use a new cylinder headgasket. )>- A '15mm {'1.8in.) " < > . l f e i t h e rd i a m e t e ri s l e s st h a n 1 0 . 6m m { 0 . 4 2i n . ) , replacethe cvlinder head bolt. Set the crankshaftto top dead center{TDC).Align the TDC mark (A) on the crankshaftsprocketwith the pointer(B)on the cylinderblock. 4. Installthe cylinderhead on the block. ( c o n td ) 6-39 CylinderHead CylinderHeadlnstallation(cont'd) 7 . Apply engine oil to the bolt threadsand under the b o l t h e a d so f a l l t h e c y l i n d e rh e a db o l t s . 8 . Tightenthe cylinder head bolts in sequenceto 39 \ { 10. Installthe rockerarm assembly{seepage6-38). 1 ' .t Installthe water bypasshose (A). N.m {4.0 kgf.m,29 lbf.ft).Use a beam-typetorque wrench.When using a preset-typetorque wrench, be sure to tighten slowly and do not overtighten.lf a bolt makesany noisewhile you are torquing it, loosenthe bolt and retightenit from the first step. ---l.-. B 6 x1.0mm 'r2 N.m c (1.2kgl.m,8.7lbf.ftl 6 x l . 0 m m '12N,m(1.2kgt.m,8.7 lbf.ft) 9 . After torquing,tighten all cylinderhead bolts in two steps(90" per step).lf you are using a new cylinder head bolt,tighten the bolt an extra 90.. 1 2 .Tightenthe connectingpipe mounting bolt (B)and brakeboostervacuum line mounting bolts (C),then i n s t a l l t h eh a r n e s sh o l d e r( D )o n t h e b r a c k e t . 't3. Installthe (B). upper radiatorhose {A) and heaterhose FIRSTSTEP SECOND STEP v 6-40 GylinderHeadCoverlnstallation 1 4 . I n s t a l l t h ew a t e rb v p a s sh o s e . 1. Thoroughlycleanthe headcover gasketand the groove. 2. Installthe head cover gasket(A) in the groove of t h e c y l i n d e rh e a dc o v e r( B ) . 1 5 . I n s t a l l t h ea i r c l e a n e rh o u s i n g( s e es t e p3 7 o n p a g e 5-15). 1 6 . I n s t a l l t h ei n t a k em a n i f o l d( s e ep a g e9 - 5 ) . 1 7 . I n s t a l l t h ee x h a u s tm a n i f o l d( s e ep a g e9 - 7 ) . Checkthat the mating surfacesare clean and dry. '18. I n s t a l l t h ec a m c h a i n ( s e ep a g e6 - 1 5 ) . on the chain Apply liquid gasket.P/N 08718-0009, caseand the No.5 rockershaft holder mating areas. 1 9 . A d j u s tt h e v a l v ec l e a r a n c e( s e e p a g e 6 - 9 ) . 2 0 . I n s t a l l t h ed r i v eb e l t( s e ep a g e4 - 2 6 ) . NOTE:Do not installthe parts if 5 minutesor more have elapsedsinceapplying liquid gasket.Instead, reapplyliquid gasketafter removing old residue. 21. Cleanthe batterypostsand cableterminalswith s a n d p a p e rt h , e n a s s e m b l et h e m a n d a p p l yg r e a s e to preventcorrosion. 2 2 . A f t e ri n s t a l l a t i o nc ,h e c k t h a t a ltl u b e s ,h o s e s a n d connectorsare installedcorrectly. . u r nt h e i g n i t i o ns w i t c hO N 2 3 . I n s p e c t f o r f u elle a k sT {ll) {do not operatethe starter)so that the fuel pump runs for about 2 secondsand pressurizesthe fuel line. Repeatthls operationtwo or three times, then c h e c kf o r f u e l l e a k a g ea t a n y p o i n ti n t h e f u e l l i n e . 24. Refillthe radiatorwith enginecoolant,and bleed air from the cooling systemwith the heatervalve open (seepage 10-6). 2 5 . I n s p e ctth e i d l es p e e d( s e ep a g e1 1 - ' 1 3 8 ) . 2 6 . I n s p e ctth e i g n i t i o nt i m i n g ( s e ep a g e4 - 1 7 ) . (cont'd) 6-41 GylinderHead CylinderHeadGoverInstallation(cont'd) Set the spark plug seals(A) on the spark plug tubes. O n c et h e c y l i n d e rh e a dc o v e r( B )i s o n t h e c y l i n d e r head,slide the cover slightly backand forth to seat the head cover gasket. 7. Tightenthe bolts in two or three steps.In the final s t e p ,t i g h t e na l l b o l t s ,i n s e q u e n c et ,o 9 . 8 N . m ( 1 . 0 kgf.m,7.2 lbf.ft). 8 . I n s t a ltlh e d i p s t i c k( A )a n d b r e a t h e hr o s ei B ) . Inspectthe cover washers(C).Replaceany washer that is damagedor deteriorated. \ \l 6-42 9 . Installthe four ignition coils (seepage 4-'18). 1 0 . Checkthat all tubes, hoses,and connectorsare installedcorrectly. 1 1 .lnstallthe intakemanifoldcover. 6 x 1 , 0m m '12 N.m{1.2kgf m. 8.7tbf.ftl 12. After assemblv,wait at least30 minutesbefore f i l l i n gt h e e n g i n ew i t h o i l . 6-43