CREMATOR SUPPLIER SUMMARY
Transcription
CREMATOR SUPPLIER SUMMARY
CREMATOR SUPPLIER SUMMARY I N V ESTIGATION S U M M A RY TO DE T E RMINE W HI CH CR E M ATOR I S BEST S U I T ED FOR M A I TL AND CR E M ATORI U M THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za OUTLINE 1. Requirements 2. Existing Building 3. Required Building Modifications 4. Evaluated Suppliers 5. Evaluation Criteria 6. Evaluation Results 7. Chimney Configuration 8. Recommendations 9. Way Forward / Conclusion THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 1. REQUIREMENTS • Install 2 new cremators at Maitland Crematorium • Minimum Cremation Rate – 5 cremations per 8 hour shift • Machines must be able to fit within the existing building constraints • Existing machines to stay where they are • Building’s outer structure / roof must preferably stay in tact • Inside sections can be altered / demolished to suite • Machines must comply with international environmental standards THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 2. Existing Building THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 2. EXISTING BUILDING Existing Chimney Main Cremation Entrance Existing Office LPG Gas Supply Cold Store Entrance Preparation Area Main Electrical DB Existing – Upper Level Machine THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 2. EXISTING BUILDING Preparation area Existing Upper Level Cremator Existing Chimney Cold Store Office Main Cremation Entrance THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 3. REQUIRED BUILDING MODIFICATIONS THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 3. REQUIRED BUILDING MODIFICATIONS Current Building Proposed section removal THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 3. REQUIRED BUILDING MODIFICATIONS Maximize available internal space by removing the existing office & wall indentation THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 3. REQUIRED BUILDING MODIFICATIONS Existing Upper Level Machine Main entrance is moved out slightly Maximised available space for ne machines New office Existing cold store Existing preparation area THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 4. Evaluated Suppliers THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 4. TENDER REQUESTS SENT 1 2 3 Ruppmann Matthews International - Cremation Division NCE Crawford Emcotek 4 US Cremation Equipment 5 6 7 8 IFZW Maintenance Ltd Facultatieve Technologies B&L Cremation Systems Inc Cremation Systems 9 10 11 12 13 14 15 16 Cremator Manufacturing & Services TT Therm-Tec American Crematory Equipment co FC Industries Major Cremators Nanfang Cremation Machine Co FC Cremators Addfield Highlighted companies responded THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 4. EVALUATED SUPPLIERS 1 x Leeds, UK 1 x Oklahoma, USA 1 x Stuttgart, Germany 1 x California, USA 1 x Melbourne, Australia 3 x Florida, USA THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 4. EVALUATED SUPPLIERS Cremator Manufacturers No Manufacturer 1 2 3 4 Matthews US Cremation Equipment B&L Cremation Systems Inc. American Crematory Equipment 5 6 7 8 ** Crematory Manufacturing & Services Facultative Technologies Major Ruppmann Physical Address America [2045 Sprint Boulevard, Apopka, FL 32703Florida] America [598 Northlake Blvd., Suite 1016, Altamonte Springs, FL 32701] U.S.A [7205-114th Avenue North Largo, Florida 33773] U.S.A [9828 Arlee Ave. Santa Fe Springs, California] U.S.A [6802 S. 65th W. Ave. Tulsa, Oklahoma 74131] England [Moor Road, Leeds, LS10 2DD, United Kingdom] Australia [92 Fairbank Road, Clayton, Victoria, 3169, Melbourne] D-70567 Stuttgart, Germany ** Ruppmann supplied a quotation, but they were excluded from the study because their machines must be built on site and we are looking for a turnkey machine THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za Area Florida USA Florida USA Florida USA California USA Oklahoma USA Leeds United Kingdom Melbourne Australia Stuttgart, Germany 4. EVALUATED MACHINES Matthews Power Pack II Plus Matthews Power Pack III Plus US Cremation Equipment Classic US Cremation Equipment Classic Plus THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 4. EVALUATED MACHINES US Cremation Equipment Classic X-Cel B&L Cremation Systems Phoenix II-1 US American Crematory Equipment – A250WH US American Crematory Equipment – A300 THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 4. EVALUATED MACHINES Crematory Manufacturing & Services - Equinox Facultatieve Technologies FT II Facultatieve Technologies FT III THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za Major – HD60 5. Evaluation Criteria THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 5. EVALUATION CRITERIA USED EVALUATION CRITERIA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 # of cremations in 8 hour shift Machine Width with control panel [m] Machine Length [m] Machine Height [m] Exhaust Diameter [m] Weight [kg] Loading Door Width [m] Controls Loading/Insertion Pollution Monitoring & Control Primary Chamber View Port Remote monitoring Fuel consumption per cremation [l] Refractory Quality Corrosion resistance Dust Filers Ash Retrieval Sound Dampening Ability 24h continuous operation Maintenance Maintenance teams Availability of spares Availability of supplier support Worldwide offices Cooperation from supplier Installation teams Training Normalised Purchase Cost Installation Requirements Availability Warm-up and Cool-down rates Warranty SCORING WEIGHT 7 6 4 3 2 2 3 5 3 5 1 2 4 4 1 1 4 2 3 3 3 4 4 1 4 4 4 7 1 1 1 1 DECRIPTION Cremation rate? Will the cremator and ancillary equipment fit into the available space? Will the cremator and ancillary equipment fit into the available space? Will the cremator and ancillary equipment fit into the available space? Will the cremator and ancillary equipment fit into the available space? Can the cremator be installed on the existing floor? Larger doors provide can accommodate larger coffins How autonomous is the cremator? How is the cremator loaded? How much space is required Is pollution monitoring equipment included Is there a primary Chamber View Port Available? Is remote monitoring over the internet / network possible? On average, how much fuel does each cremation use? What type of refractory is used during construction? The units will be positioned approximately 50km from the ocean. Rust can be a concern Are dust filers present? How does this work? Which one will be preferred? How noisy is the machine? Can the machine be operated 24/7? How frequently will the equipment need servicing? Can local teams do the maintenance Will spare parts be available in South Africa? Will support be available? Where is the closest supplier office to the Maitland crematorium site? How willing is the supplier to provide required information Who does the installation? Can local teams do the installation? Will sufficient training / training material be available? What does a complete solution cost? Considering the space and available services, what will it cost to install? How long does it take to manufacture? Off the shelf item? how long does it take to warm up for use and cool down after use? What is the standard warranty period? THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 5. EVALUATION CRITERIA WEIGHTS Scoring Weights 8 7 A E B 6 C 5 D 4 3 2 1 0 Series1 Machine # of Fuel Width Loading Pollution Primary Corrosio crematio Machine Machine Exhaust Remote consump with Weight Door Loading/I Monitori Chamber Refractor n ns in 8 Length Height Diameter Controls monitori tion per control [kg] Width nsertion ng & View y Quality resistanc hour [m] [m] [m] ng crematio panel [m] Control Port e shift n [l] [m] 7 6 4 3 2 2 3 5 3 5 1 2 4 4 1 Dust Filers 1 24h WarmAvailabili Normalis Installati Sound continuo Mainten Availabili Worldwi Cooperat up and Ash Mainten ty of Installati ed on Availabili Warrant Dampeni us ance ty of de ion from Training CoolRetrieval ance supplier on teams Purchase Require ty y ng Ability operatio teams spares offices supplier down support Cost ments n rates 4 2 3 3 3 4 4 1 THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 4 4 4 7 1 1 1 1 5. EVALUATION CRITERIA USED EVALUATION CRITERIA SCORING WEIGHT DECRIPTION 1 # of cremations in 8 hour shift 7 Cremation rate? 2 Machine Width with control panel [m] 6 Will the cremator and ancillary equipment fit into the available space? 3 Machine Length [m] 4 Will the cremator and ancillary equipment fit into the available space? 4 Machine Height [m] 3 Will the cremator and ancillary equipment fit into the available space? 5 Exhaust Diameter [m] 2 Will the cremator and ancillary equipment fit into the available space? 6 Weight [kg] 2 Can the cremator be installed on the existing floor? 7 Loading Door Width [m] 3 Larger doors provide can accommodate larger coffins 8 Controls 5 How autonomous is the cremator? 9 Loading/Insertion 3 How is the cremator loaded? How much space is required 10 Pollution Monitoring & Control 5 Is pollution monitoring equipment included 11 Primary Chamber View Port 1 Is there a primary Chamber View Port Available? 12 Remote monitoring 2 Is remote monitoring over the internet / network possible? 13 Fuel consumption per cremation [l] 4 On average, how much fuel does each cremation use? 14 Refractory Quality 4 What type of refractory is used during construction? 15 Corrosion resistance 1 The units will be positioned approximately 50km from the ocean. Rust can be a concern 16 Dust Filers 1 Are dust filers present? 17 Ash Retrieval 4 How does this work? Which one will be preferred? 18 Sound Dampening Ability 2 How noisy is the machine? 19 24h continuous operation 3 Can the machine be operated 24/7? 20 Maintenance 3 How frequently will the equipment need servicing? 21 Maintenance teams 3 Can local teams do the maintenance 22 Availability of spares 4 Will spare parts be available in South Africa? 23 Availability of supplier support 4 Will support be available? 24 Worldwide offices 1 Where is the closest supplier office to the Maitland crematorium site? 25 Cooperation from supplier 4 How willing is the supplier to provide required information 26 Installation teams 4 Who does the installation? Can local teams do the installation? 27 Training 4 Will sufficient training / training material be available? 28 Normalised Purchase Cost 7 What does a complete solution cost? 29 Installation Requirements 1 Considering the space and available services, what will it cost to install? 30 Availability 1 How long does it take to manufacture? Off the shelf item? 31 Warm-up and Cool-down rates 1 how long does it take to warm up for use and cool down after use? 32 Warranty 1 What is the standard warranty period? MOST IMPORTANT CRITERIA FOR MAITLAND CREMATORIUM A - # of cremations pe8 hour shift B – Machine width + Control Panel C – Autonomous Controls D – Pollution Monitoring & Control E – Normalized Purchase Cost THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za A - # OF CREMATIONS PER 8 HOUR SHIFT # of cremations per 8 hour shift 8 7 6 5 4 3 2 1 0 Matthews Matthews Power Pack II Power Pack Plus III Plus # of cremations in 8 hour shift 5 6 US US US American American Crematory B&L Crem Facultatieve Facultatieve Cremation Cremation Cremation Crematory Crematory Manufacturi Systems Technologies Technologies Major - HD60 Equipment - Equipment - Equipment Equipment - Equipment - ng Services Phoenix II-1 - FT II - FT III Classic Classic Plus Classic X-Cel A250WH A300 Equinox 5 6 7 5 5 6 6 THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 5 6 5 B - Machine Size THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za C - Control Systems Modern machines must: • Operate autonomously • Record field data during each Cremation • Enable Remote internet / Ethernet access • Continuously monitor environmental emissions THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za D - Pollution Monitoring and Control The UK's most stringent regulations - PG 5/2 (12) [2012] • Particulate Matter - 160 mg/m³ averaged over an hour for all cremations • Carbon monoxide - 200 mg/m³ averaged over the first hour for all cremations Maximum allowable emissions as per SA's government gazette dated 23 Nov 2012 - Doc no: 35894 THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 5. South Africa compared to Europe Consequently, current regulations require a full scale flue gas abatement filtration system configured for Mercury, Particulate Matter, SO2 and NOX removal. [Only 1 such system is currently installed in Europe and its not yet proven.] THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 5. International best practise for Pollution Monitoring and Control • Visual emissions shall not exceed 5% opacity [15% for a max duration of 6 minutes in any 1 hour] • Particulate matter emissions shall not exceed 160mg/m³ of flue gas • CO emissions shall not exceed 200 mg/m³ • Minimum Secondary combustion chamber temperature: 850˚C • Minimum retention time in secondary combustion chamber: 1 second [recommended: 2 seconds] • Cremation must not be allowed to start if the secondary chamber is not at least 850˚C • Cremators must continuously monitor and record internal temperatures • Each cremator must be operated with a pollutant monitoring system to automatically control combustion based on continuous in-stack opacity measurements. [combustion in the primary chamber must automatically be restricted whenever opacity exceeds 15%] • Opacity & additional environmental sensors must be cleaned / inspected daily THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za E - PURCHASE COST Normalised cost calculation: Machine’s cost, multiplied with 7 [max number of cremations in an 8 hour shift] divided by the # of cremations that the machine can do in an 8 hour shift. Matthews Power Pack II Plus Matthews Power Pack III Plus US Cremation Equipment Classic US Cremation Equipment Classic Plus US Cremation Equipment Classic X-Cel B&L Crem Systems Phoenix II-1 American Crematory Equipment A250WH American Crematory Equipment A300 Crematory Manufacturing Services Equinox Facultatieve Technologies FT II Facultatieve Technologies FT III Major - HD60 R 1061 844,21 R 1410 896,76 R 1025 394,30 R 1222 794,30 R 1370 844,30 R 1025 493,00 R 1282 261,05 R 1509 271,05 R 1340 346,00 R 1467 426,40 R 1579 626,40 R 1755 164,32 Normalised Purchase Cost R 1486 581,89 R 1646 046,22 R 1435 552,02 R 1426 593,35 R 1370 844,30 R 1435 690,20 R 1795 165,47 R 1760 816,23 R 1563 737,00 R 2054 396,96 R 1842 897,47 R 2457 230,05 Purchase Cost THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 6. Evaluation Results THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 6. EVALUATION RESULTS Click here to open pdf. THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 6. EVALUATION RESULTS Cremator - Weighted Score Summary Evaluation Criteria Matthews Power Pack Matthews Power Pack II Plus III Plus US Cremation Equipment - Classic US Cremation Equipment - Classic Plus US Cremation Equipment - Classic XCel B&L Crem Systems Phoenix II-1 American Crematory American Crematory Equipment - A250WH Equipment -A300 Crematory Manufacturing Services - Equinox Facultatieve Technologies - FT II Facultatieve Technologies - FT III Major - HD60 # of cremations in 8 hour shift 21 28 21 28 35 21 21 28 28 21 28 21 Machine Width with control panel [m] 24 18 30 24 24 24 30 18 24 18 18 24 Machine Length [m] 16 20 16 16 16 20 16 20 16 20 20 16 Machine Height [m] 15 12 12 12 12 15 15 12 12 12 12 12 Exhaust Diameter [m] 8 8 8 8 8 8 9 9 10 6 6 6 Weight [kg] 8 8 10 8 6 8 8 8 10 8 8 10 Loading Door Width [m] 12 12 12 12 15 12 12 9 12 9 12 12 Controls 25 25 25 25 25 25 25 25 20 25 25 25 Loading/Insertion 15 15 15 15 15 9 15 15 15 9 9 15 Pollution Monitoring & Control 25 25 25 25 25 25 20 20 25 25 25 25 Primary Chamber View Port 5 5 5 5 5 0 0 0 0 5 5 5 Remote monitoring 10 10 10 10 10 10 10 10 10 10 10 10 Fuel consumption per cremation [l] 12 12 16 16 16 20 12 12 20 20 20 12 Refractory Quality 20 20 20 20 20 20 20 20 16 20 20 20 Corrosion resistance 5 5 5 5 5 5 5 5 5 5 5 5 Dust Filers 5 5 5 5 5 5 5 5 5 5 5 5 Ash Retrieval 20 20 20 20 20 12 20 20 20 12 12 20 Sound Dampening Ability 8 8 8 8 8 8 8 8 8 10 10 8 24h continuous operation 15 15 15 15 15 15 15 15 15 9 9 15 Maintenance 15 15 15 15 15 15 15 15 15 12 12 12 Maintenance teams 15 15 15 15 15 15 15 15 15 12 12 15 Availability of spares 20 20 20 20 20 20 20 20 20 20 20 20 Availability of supplier support 20 20 20 20 20 20 20 20 16 20 20 20 Worldwide offices 5 5 5 5 5 4 4 4 4 4 4 4 Cooperation from supplier 20 20 20 20 20 16 16 16 12 20 20 20 Installation teams 20 20 20 20 20 20 20 20 20 20 20 20 Training 20 20 20 20 20 20 20 20 20 20 20 20 Normalised Purchase Cost 28 28 35 35 35 35 28 28 28 21 28 21 Installation Requirements 5 5 5 5 5 5 5 5 5 5 5 5 Availability 5 5 5 5 5 4 4 4 4 3 3 2 Warm-up and Cool-down rates 4 4 5 5 5 3 5 5 4 3 3 3 Warranty 4 4 4 4 4 4 5 5 5 4 4 4 450 452 467 466 474 443 443 436 439 413 430 432 TOTAL WEIGHTED SCORE THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 6. FINAL CREMATOR SCORES 480 470 Weighted Score 460 450 440 430 420 410 400 390 380 Matthews Matthews US Cremation US Cremation US Cremation Power Pack II Power Pack III Equipment Equipment Equipment Plus Plus Classic Classic Plus Classic X-Cel Weighted Score 450 452 467 466 474 B&L Crem Systems Phoenix II-1 American Crematory Equipment A250WH American Crematory Equipment A300 443 443 436 Crematory Facultatieve Facultatieve Manufacturing Technologies - Technologies - Major - HD60 Services FT II FT III Equinox 439 THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 413 430 432 6. TOTAL COST ESTIMATE Cremator cost estimate summary ITEM QTY REQ UNIT PRICE TOTAL PRICE NOTES Purchase cost for a US Cremator XCel Unit 2 R 1 370 844.30 R 2 741 688.60 Based on a US exchange rate of : 9.87 Transport from USA to Cape Town 2 R 123 786.43 R 247 572.86 Import Taxes & VAT etc. 2 R 233 897.65 R 467 795.30 On site gas connection costs 1 R 33 803.28 R 33 803.28 Estimated civil work 1 R 110 000.00 R 110 000.00 Estimated electrical work 1 R 80 000.00 Sub Total Conting1ency [5%] Project Management [10%] Total cost estimate Estimate - without external stack R 80 000.00 R 3 680 860.04 R 184 043.00 R 368 086.00 R 4 232 989.05 THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za Estimate 7. Chimney Configuration THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 7. Combined vs. separate stacks “Two or more cremations feeding into one stack are difficult to control, consequently, this configuration is not advisable.” **Australian Cemeteries & Crematoria association – Environmental Guidelines for crematoria and cremators THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 7. Chimney Configuration OPTION 1 OPTION 2 Build a new external stack and link internal machines using separate ducts Install vertical stacks that exit the roof as indicated [they can be sized to extend 0.5m above the roof’s pitch] PLEASE NOTE: Stack height to be finalised THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 7. Chimney Configuration OPTION 1 OPTION 2 PLEASE NOTE: Stack height to be finalised THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 8. Recommendation & Summary 1. Remove the highlighted internal structures to open the area and maximise available space 2. Build a new office in the corner of the preparation area [as indicated] 3. Buy two US Cremation Equipment X-Cel Cremators with remote control panels 4. Install the control panels on the opposing wall 5. If approved, install straight exhaust chimneys through the building’s roof THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za 9. WAY FORWARD / CONCLUSION 1. Get confirmation on required civil work 2. Confirm proposed office position 3. Confirm which chimney configuration to use 4. Environmental standard confirmation & certification THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za THANK YOU! THERMODYNAMICS FLUIDS & DESIGN Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za