CREMATOR SUPPLIER SUMMARY

Transcription

CREMATOR SUPPLIER SUMMARY
CREMATOR SUPPLIER
SUMMARY
I N V ESTIGATION S U M M A RY TO DE T E RMINE W HI CH CR E M ATOR I S BEST S U I T ED
FOR M A I TL AND CR E M ATORI U M
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
OUTLINE
1.
Requirements
2.
Existing Building
3.
Required Building Modifications
4.
Evaluated Suppliers
5.
Evaluation Criteria
6.
Evaluation Results
7.
Chimney Configuration
8.
Recommendations
9.
Way Forward / Conclusion
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
1. REQUIREMENTS
• Install 2 new cremators at Maitland Crematorium
• Minimum Cremation Rate – 5 cremations per 8 hour shift
• Machines must be able to fit within the existing building constraints
• Existing machines to stay where they are
• Building’s outer structure / roof must preferably stay in tact
• Inside sections can be altered / demolished to suite
• Machines must comply with international environmental standards
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
2. Existing Building
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
2. EXISTING BUILDING
Existing Chimney
Main Cremation Entrance
Existing Office
LPG Gas Supply
Cold Store Entrance
Preparation Area
Main Electrical DB
Existing – Upper Level Machine
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
2. EXISTING BUILDING
Preparation area
Existing Upper Level Cremator
Existing Chimney
Cold Store
Office
Main Cremation Entrance
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
3. REQUIRED BUILDING MODIFICATIONS
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
3. REQUIRED BUILDING MODIFICATIONS
Current Building
Proposed section removal
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
3. REQUIRED BUILDING MODIFICATIONS
Maximize available internal space by removing
the existing office & wall indentation
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
3. REQUIRED BUILDING MODIFICATIONS
Existing Upper Level Machine
Main entrance is moved out slightly
Maximised available space
for ne machines
New office
Existing cold store
Existing preparation area
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
4. Evaluated Suppliers
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
4. TENDER REQUESTS SENT
1
2
3
Ruppmann
Matthews International - Cremation Division
NCE Crawford Emcotek
4
US Cremation Equipment
5
6
7
8
IFZW Maintenance Ltd
Facultatieve Technologies
B&L Cremation Systems Inc
Cremation Systems
9
10
11
12
13
14
15
16
Cremator Manufacturing & Services
TT Therm-Tec
American Crematory Equipment co
FC Industries
Major Cremators
Nanfang Cremation Machine Co
FC Cremators
Addfield
Highlighted companies responded
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
4. EVALUATED SUPPLIERS
1 x Leeds, UK
1 x Oklahoma, USA
1 x Stuttgart, Germany
1 x California, USA
1 x Melbourne,
Australia
3 x Florida, USA
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
4. EVALUATED SUPPLIERS
Cremator Manufacturers
No
Manufacturer
1
2
3
4
Matthews
US Cremation Equipment
B&L Cremation Systems Inc.
American Crematory Equipment
5
6
7
8 **
Crematory Manufacturing & Services
Facultative Technologies
Major
Ruppmann
Physical Address
America [2045 Sprint Boulevard, Apopka, FL 32703Florida]
America [598 Northlake Blvd., Suite 1016, Altamonte Springs, FL 32701]
U.S.A [7205-114th Avenue North Largo, Florida 33773]
U.S.A [9828 Arlee Ave. Santa Fe Springs, California]
U.S.A [6802 S. 65th W. Ave. Tulsa, Oklahoma 74131]
England [Moor Road, Leeds, LS10 2DD, United Kingdom]
Australia [92 Fairbank Road, Clayton, Victoria, 3169, Melbourne]
D-70567 Stuttgart, Germany
** Ruppmann supplied a quotation, but they were excluded from the study because
their machines must be built on site and we are looking for a turnkey machine
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
Area
Florida USA
Florida USA
Florida USA
California USA
Oklahoma USA
Leeds United Kingdom
Melbourne Australia
Stuttgart, Germany
4. EVALUATED MACHINES
Matthews Power Pack II Plus
Matthews Power Pack III Plus
US Cremation Equipment
Classic
US Cremation Equipment
Classic Plus
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
4. EVALUATED MACHINES
US Cremation Equipment
Classic X-Cel
B&L Cremation Systems
Phoenix II-1
US American Crematory
Equipment – A250WH
US American Crematory
Equipment – A300
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
4. EVALUATED MACHINES
Crematory Manufacturing
& Services - Equinox
Facultatieve Technologies
FT II
Facultatieve Technologies
FT III
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
Major – HD60
5. Evaluation Criteria
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
5. EVALUATION CRITERIA USED
EVALUATION CRITERIA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
# of cremations in 8 hour shift
Machine Width with control panel [m]
Machine Length [m]
Machine Height [m]
Exhaust Diameter [m]
Weight [kg]
Loading Door Width [m]
Controls
Loading/Insertion
Pollution Monitoring & Control
Primary Chamber View Port
Remote monitoring
Fuel consumption per cremation [l]
Refractory Quality
Corrosion resistance
Dust Filers
Ash Retrieval
Sound Dampening Ability
24h continuous operation
Maintenance
Maintenance teams
Availability of spares
Availability of supplier support
Worldwide offices
Cooperation from supplier
Installation teams
Training
Normalised Purchase Cost
Installation Requirements
Availability
Warm-up and Cool-down rates
Warranty
SCORING WEIGHT
7
6
4
3
2
2
3
5
3
5
1
2
4
4
1
1
4
2
3
3
3
4
4
1
4
4
4
7
1
1
1
1
DECRIPTION
Cremation rate?
Will the cremator and ancillary equipment fit into the available space?
Will the cremator and ancillary equipment fit into the available space?
Will the cremator and ancillary equipment fit into the available space?
Will the cremator and ancillary equipment fit into the available space?
Can the cremator be installed on the existing floor?
Larger doors provide can accommodate larger coffins
How autonomous is the cremator?
How is the cremator loaded? How much space is required
Is pollution monitoring equipment included
Is there a primary Chamber View Port Available?
Is remote monitoring over the internet / network possible?
On average, how much fuel does each cremation use?
What type of refractory is used during construction?
The units will be positioned approximately 50km from the ocean. Rust can be a concern
Are dust filers present?
How does this work? Which one will be preferred?
How noisy is the machine?
Can the machine be operated 24/7?
How frequently will the equipment need servicing?
Can local teams do the maintenance
Will spare parts be available in South Africa?
Will support be available?
Where is the closest supplier office to the Maitland crematorium site?
How willing is the supplier to provide required information
Who does the installation? Can local teams do the installation?
Will sufficient training / training material be available?
What does a complete solution cost?
Considering the space and available services, what will it cost to install?
How long does it take to manufacture? Off the shelf item?
how long does it take to warm up for use and cool down after use?
What is the standard warranty period?
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
5. EVALUATION CRITERIA WEIGHTS
Scoring Weights
8
7
A
E
B
6
C
5
D
4
3
2
1
0
Series1
Machine
# of
Fuel
Width
Loading
Pollution Primary
Corrosio
crematio
Machine Machine Exhaust
Remote consump
with
Weight Door
Loading/I Monitori Chamber
Refractor
n
ns in 8
Length Height Diameter
Controls
monitori tion per
control
[kg]
Width
nsertion ng &
View
y Quality resistanc
hour
[m]
[m]
[m]
ng
crematio
panel
[m]
Control
Port
e
shift
n [l]
[m]
7
6
4
3
2
2
3
5
3
5
1
2
4
4
1
Dust
Filers
1
24h
WarmAvailabili
Normalis Installati
Sound continuo
Mainten Availabili
Worldwi Cooperat
up and
Ash
Mainten
ty of
Installati
ed
on
Availabili
Warrant
Dampeni
us
ance
ty of
de
ion from
Training
CoolRetrieval
ance
supplier
on teams
Purchase Require
ty
y
ng Ability operatio
teams spares
offices supplier
down
support
Cost
ments
n
rates
4
2
3
3
3
4
4
1
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
4
4
4
7
1
1
1
1
5. EVALUATION CRITERIA USED
EVALUATION CRITERIA
SCORING WEIGHT
DECRIPTION
1
# of cremations in 8 hour shift
7
Cremation rate?
2
Machine Width with control panel [m]
6
Will the cremator and ancillary equipment fit into the available space?
3
Machine Length [m]
4
Will the cremator and ancillary equipment fit into the available space?
4
Machine Height [m]
3
Will the cremator and ancillary equipment fit into the available space?
5
Exhaust Diameter [m]
2
Will the cremator and ancillary equipment fit into the available space?
6
Weight [kg]
2
Can the cremator be installed on the existing floor?
7
Loading Door Width [m]
3
Larger doors provide can accommodate larger coffins
8
Controls
5
How autonomous is the cremator?
9
Loading/Insertion
3
How is the cremator loaded? How much space is required
10
Pollution Monitoring & Control
5
Is pollution monitoring equipment included
11
Primary Chamber View Port
1
Is there a primary Chamber View Port Available?
12
Remote monitoring
2
Is remote monitoring over the internet / network possible?
13
Fuel consumption per cremation [l]
4
On average, how much fuel does each cremation use?
14
Refractory Quality
4
What type of refractory is used during construction?
15
Corrosion resistance
1
The units will be positioned approximately 50km from the ocean. Rust can be a concern
16
Dust Filers
1
Are dust filers present?
17
Ash Retrieval
4
How does this work? Which one will be preferred?
18
Sound Dampening Ability
2
How noisy is the machine?
19
24h continuous operation
3
Can the machine be operated 24/7?
20
Maintenance
3
How frequently will the equipment need servicing?
21
Maintenance teams
3
Can local teams do the maintenance
22
Availability of spares
4
Will spare parts be available in South Africa?
23
Availability of supplier support
4
Will support be available?
24
Worldwide offices
1
Where is the closest supplier office to the Maitland crematorium site?
25
Cooperation from supplier
4
How willing is the supplier to provide required information
26
Installation teams
4
Who does the installation? Can local teams do the installation?
27
Training
4
Will sufficient training / training material be available?
28
Normalised Purchase Cost
7
What does a complete solution cost?
29
Installation Requirements
1
Considering the space and available services, what will it cost to install?
30
Availability
1
How long does it take to manufacture? Off the shelf item?
31
Warm-up and Cool-down rates
1
how long does it take to warm up for use and cool down after use?
32
Warranty
1
What is the standard warranty period?
MOST IMPORTANT CRITERIA FOR MAITLAND CREMATORIUM
A - # of cremations pe8 hour shift
B – Machine width + Control Panel
C – Autonomous Controls
D – Pollution Monitoring & Control
E – Normalized Purchase Cost
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
A - # OF CREMATIONS PER 8 HOUR SHIFT
# of cremations per 8 hour shift
8
7
6
5
4
3
2
1
0
Matthews
Matthews
Power Pack II Power Pack
Plus
III Plus
# of cremations in 8 hour shift
5
6
US
US
US
American
American
Crematory
B&L Crem
Facultatieve Facultatieve
Cremation
Cremation
Cremation
Crematory
Crematory Manufacturi
Systems Technologies Technologies Major - HD60
Equipment - Equipment - Equipment Equipment - Equipment - ng Services Phoenix II-1
- FT II
- FT III
Classic
Classic Plus Classic X-Cel
A250WH
A300
Equinox
5
6
7
5
5
6
6
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
5
6
5
B - Machine Size
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
C - Control Systems
Modern machines must:
• Operate autonomously
• Record field data during each Cremation
• Enable Remote internet / Ethernet access
• Continuously monitor environmental emissions
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
D - Pollution Monitoring and Control
The UK's most stringent regulations - PG 5/2 (12) [2012]
• Particulate Matter - 160 mg/m³ averaged over an hour for
all cremations
• Carbon monoxide - 200 mg/m³ averaged over the first hour
for all cremations
Maximum allowable emissions as per SA's government gazette dated 23 Nov 2012 - Doc no: 35894
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
5. South Africa compared to Europe
Consequently, current regulations require a full scale flue gas abatement filtration system configured
for Mercury, Particulate Matter, SO2 and NOX removal.
[Only 1 such system is currently installed in Europe and its not yet proven.]
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
5. International best practise for
Pollution Monitoring and Control
•
Visual emissions shall not exceed 5% opacity [15% for a max duration of 6 minutes in any 1 hour]
•
Particulate matter emissions shall not exceed 160mg/m³ of flue gas
•
CO emissions shall not exceed 200 mg/m³
•
Minimum Secondary combustion chamber temperature: 850˚C
•
Minimum retention time in secondary combustion chamber: 1 second [recommended: 2 seconds]
•
Cremation must not be allowed to start if the secondary chamber is not at least 850˚C
•
Cremators must continuously monitor and record internal temperatures
•
Each cremator must be operated with a pollutant monitoring system to automatically control combustion based on
continuous in-stack opacity measurements. [combustion in the primary chamber must automatically be restricted
whenever opacity exceeds 15%]
•
Opacity & additional environmental sensors must be cleaned / inspected daily
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
E - PURCHASE COST
Normalised cost calculation: Machine’s cost, multiplied
with 7 [max number of cremations in an 8 hour shift]
divided by the # of cremations that the machine can do in
an 8 hour shift.
Matthews
Power Pack II
Plus
Matthews
Power Pack III
Plus
US Cremation
Equipment Classic
US Cremation
Equipment Classic Plus
US Cremation
Equipment Classic X-Cel
B&L Crem
Systems Phoenix II-1
American
Crematory
Equipment A250WH
American
Crematory
Equipment A300
Crematory
Manufacturing
Services Equinox
Facultatieve
Technologies FT II
Facultatieve
Technologies FT III
Major - HD60
R 1061 844,21
R 1410 896,76
R 1025 394,30
R 1222 794,30
R 1370 844,30
R 1025 493,00
R 1282 261,05
R 1509 271,05
R 1340 346,00
R 1467 426,40
R 1579 626,40
R 1755 164,32
Normalised Purchase Cost R 1486 581,89
R 1646 046,22
R 1435 552,02
R 1426 593,35
R 1370 844,30
R 1435 690,20
R 1795 165,47
R 1760 816,23
R 1563 737,00
R 2054 396,96
R 1842 897,47
R 2457 230,05
Purchase Cost
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
6. Evaluation Results
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
6. EVALUATION RESULTS
Click here to open pdf.
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
6. EVALUATION RESULTS
Cremator - Weighted Score Summary
Evaluation Criteria
Matthews Power Pack Matthews Power Pack
II Plus
III Plus
US Cremation
Equipment - Classic
US Cremation
Equipment - Classic
Plus
US Cremation
Equipment - Classic XCel
B&L Crem Systems Phoenix II-1
American Crematory American Crematory
Equipment - A250WH
Equipment -A300
Crematory
Manufacturing
Services - Equinox
Facultatieve
Technologies - FT II
Facultatieve
Technologies - FT III
Major - HD60
# of cremations in 8 hour shift
21
28
21
28
35
21
21
28
28
21
28
21
Machine Width with control panel [m]
24
18
30
24
24
24
30
18
24
18
18
24
Machine Length [m]
16
20
16
16
16
20
16
20
16
20
20
16
Machine Height [m]
15
12
12
12
12
15
15
12
12
12
12
12
Exhaust Diameter [m]
8
8
8
8
8
8
9
9
10
6
6
6
Weight [kg]
8
8
10
8
6
8
8
8
10
8
8
10
Loading Door Width [m]
12
12
12
12
15
12
12
9
12
9
12
12
Controls
25
25
25
25
25
25
25
25
20
25
25
25
Loading/Insertion
15
15
15
15
15
9
15
15
15
9
9
15
Pollution Monitoring & Control
25
25
25
25
25
25
20
20
25
25
25
25
Primary Chamber View Port
5
5
5
5
5
0
0
0
0
5
5
5
Remote monitoring
10
10
10
10
10
10
10
10
10
10
10
10
Fuel consumption per cremation [l]
12
12
16
16
16
20
12
12
20
20
20
12
Refractory Quality
20
20
20
20
20
20
20
20
16
20
20
20
Corrosion resistance
5
5
5
5
5
5
5
5
5
5
5
5
Dust Filers
5
5
5
5
5
5
5
5
5
5
5
5
Ash Retrieval
20
20
20
20
20
12
20
20
20
12
12
20
Sound Dampening Ability
8
8
8
8
8
8
8
8
8
10
10
8
24h continuous operation
15
15
15
15
15
15
15
15
15
9
9
15
Maintenance
15
15
15
15
15
15
15
15
15
12
12
12
Maintenance teams
15
15
15
15
15
15
15
15
15
12
12
15
Availability of spares
20
20
20
20
20
20
20
20
20
20
20
20
Availability of supplier support
20
20
20
20
20
20
20
20
16
20
20
20
Worldwide offices
5
5
5
5
5
4
4
4
4
4
4
4
Cooperation from supplier
20
20
20
20
20
16
16
16
12
20
20
20
Installation teams
20
20
20
20
20
20
20
20
20
20
20
20
Training
20
20
20
20
20
20
20
20
20
20
20
20
Normalised Purchase Cost
28
28
35
35
35
35
28
28
28
21
28
21
Installation Requirements
5
5
5
5
5
5
5
5
5
5
5
5
Availability
5
5
5
5
5
4
4
4
4
3
3
2
Warm-up and Cool-down rates
4
4
5
5
5
3
5
5
4
3
3
3
Warranty
4
4
4
4
4
4
5
5
5
4
4
4
450
452
467
466
474
443
443
436
439
413
430
432
TOTAL WEIGHTED SCORE
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
6. FINAL CREMATOR SCORES
480
470
Weighted Score
460
450
440
430
420
410
400
390
380
Matthews
Matthews
US Cremation US Cremation US Cremation
Power Pack II Power Pack III Equipment Equipment Equipment Plus
Plus
Classic
Classic Plus
Classic X-Cel
Weighted Score
450
452
467
466
474
B&L Crem
Systems Phoenix II-1
American
Crematory
Equipment A250WH
American
Crematory
Equipment A300
443
443
436
Crematory
Facultatieve
Facultatieve
Manufacturing
Technologies - Technologies - Major - HD60
Services FT II
FT III
Equinox
439
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
413
430
432
6. TOTAL COST ESTIMATE
Cremator cost estimate summary
ITEM
QTY REQ
UNIT PRICE
TOTAL PRICE
NOTES
Purchase cost for a US Cremator XCel Unit
2
R 1 370 844.30
R 2 741 688.60
Based on a US exchange rate of
: 9.87
Transport from USA to Cape Town
2
R
123 786.43
R
247 572.86
Import Taxes & VAT etc.
2
R
233 897.65
R
467 795.30
On site gas connection costs
1
R
33 803.28
R
33 803.28
Estimated civil work
1
R
110 000.00
R
110 000.00
Estimated electrical work
1
R
80 000.00
Sub Total
Conting1ency [5%]
Project Management [10%]
Total cost estimate
Estimate - without external
stack
R
80 000.00
R 3 680 860.04
R 184 043.00
R 368 086.00
R 4 232 989.05
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
Estimate
7. Chimney Configuration
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
7. Combined vs. separate stacks
“Two or more cremations feeding into one stack are difficult to control,
consequently, this configuration is not advisable.”
**Australian Cemeteries & Crematoria association – Environmental Guidelines for crematoria and cremators
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
7. Chimney Configuration
OPTION 1
OPTION 2
Build a new external
stack and link internal
machines using separate
ducts
Install vertical stacks that exit
the roof as indicated [they can
be sized to extend 0.5m above
the roof’s pitch]
PLEASE NOTE: Stack height to be finalised
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
7. Chimney Configuration
OPTION 1
OPTION 2
PLEASE NOTE: Stack height to be finalised
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
8. Recommendation & Summary
1. Remove the highlighted internal structures to open the area and maximise available space
2. Build a new office in the corner of the preparation area [as indicated]
3. Buy two US Cremation Equipment X-Cel Cremators with remote control panels
4. Install the control panels on the opposing wall
5. If approved, install straight exhaust chimneys through the building’s roof
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
9. WAY FORWARD / CONCLUSION
1. Get confirmation on required civil work
2. Confirm proposed office position
3. Confirm which chimney configuration to use
4. Environmental standard confirmation & certification
THERMODYNAMICS FLUIDS & DESIGN
Physical Address: Unit 1, Devon Valley Road, Stellenbosch, 7600 | Tel: +27 21 887 9288 | Fax: +27 21 887 9299 | www.tfdesign.co.za
THANK YOU!