ESPAI BARÇA
Transcription
ESPAI BARÇA
ESPAI BARÇA Projekterläuterung Umbau und Erweiterung Stadion FC Barcelona 10. September 2015 ESPAI BARÇA AGENDA CITY: MASTER PLAN PROJECTS ECONOMY & FINANCE CALENDAR ARCHITECTURAL COMPETITIONS ESPAI BARÇA PROJECT UNITS UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA CITY: MASTER PLAN ESPAI BARÇA CITY: MASTER PLAN PROTECT & INCREASE FC BARCELONA’S PROPERTY: 36 HECTARES FOR SPORTS USE ESPAI BARÇA CITY: MASTER PLAN • TAKE ADVANTAGE OF 19 HECTARES IN LES CORTS • RE-VALUE OUR PROPERTY, A MOTOR FOR GROWTH ESPAI BARÇA URBANISM LES CORTS • COLABORATION WITH EXPERTS: GARRIGUES LAW FIRM, BCA ARQUITECTURA, RACC, PROMOACSA, SGM, JUAN PABLO MITJANS • MEETINGS WITH TECHNICHAL TEAMS: FCB & BARCELONA MUNICIPALTIY: 9 MONTHS • AGREED DRAFT WORKING DOCUMENT BETWEEN TECHNICAL TEAMS: CLUB & BARCELONA UP1 URBANISM LES CORTS UP2 UP3 UP4 UP5 ESPAI BARÇA URBANISM LES CORTS: OBJECTIVES A. FREE-UP LES CORTS CAMPUS B. REORGANIZE IMMEDIATE AREA C. ELIMINATE VEHICLES FROM SURFACE AREAS D. SEPARATE PEDESTRIAN & VEHICULAR TRAFFIC E. WIDEN SIDEWALKS F. IMPROVE MOBILITY & ACCESSES G. URBANIZE: CREATE PUBLIC PLAZA H. OPEN UP TO NEIGHBORHOOD UP1 URBANISM LES CORTS UP2 UP3 UP4 UP5 ESPAI BARÇA URBANISM: CIUTAT ESPORTIVA • PB2 ARQUITECTES, PWC • PROVISIONAL APPROVAL SJD 14 MAY 2015 • INICIAL APPROVAL SJD 22 JANUARY 2015 • PENDING DEFINITIVE APPROVAL FROM GENERALITAT UP1 UP2 URBANISM ST JOAN DESPÍ, MINIESTADI UP3 UP4 UP5 PROJECTS ESPAI BARÇA WHAT HAVE WE DONE? 1. FUNCTIONAL PROGRAMS 2. BIM MODEL OF CAMP NOU 3. STRUCTURE & FOUNDATIONS STUDIES OF CAMP NOU 4. GEOTECHNICAL STUDIES OF LES CORTS CAMPUS 5. EXISTING & FUTURE INSTALLATION STUDIES 6. ROOF STUDIES FOR NOU CAMP NOU 7. F&B STUDIES 8. MOBILITY STUDIES 9. SMART 10. SUSTAINABILITY UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA ESPAI BARÇA WHAT BENEFITS HAVE WE ATTAINED? 1. ENSURE THE PROGRAM FITS WITHIN THE 600 M€ APPROVED BUDGET 2. DEVELOP PRECISE BUDGETS FOR EACH AREA OF THE PROJECT 3. PLANNING CONTROL: DEVELOP A CONSTRUCTION SCHEDULE 4. REDUCE RISKS AND UNKNOWNS DURING ALL PHASES OF PROJECT UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA ESPAI BARÇA 1. FUNCIONAL PROGRAM OBJECTIVE • ELABORATE REPORTS AND SCHEMATIC PLANS WITH ALL STAKEHOLDER REQUIREMENTS RESULTS & BENEFITS • DEFINITION OF REQUIRED AREAS SO THAT ARCHITECTS DEVELOP INFORMED PROPOSALS • CALCULATE THE PRECISE COSTS CORRESPONDING TO FUNCTIONAL REQUIREMENTS CONSULTANT • MB&A UP1 UP2 UP3 UP4 URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA UP5 ESPAI BARÇA 2. BIM: CAMP NOU STRUCTURE OBJECTIVE • CREATION OF A 6D MODEL ‘BUILDING INFORMATION MODELLING’: 3D + COSTS + SCHEDULE + FACILITY MANAGEMENT RESULTS & BENEFITS • AN INNOVATIVE PROJECT, WITH INFORMATION REGARDING STRUCTURE, INSTALLATIONS, MATERIALS, COSTS, MAINTENANCE" • FACILITATE THE EXCHANGE AND COORDINATION OF INFORMATION BETWEEN THE DIFFERENT PLANNERS AND CONSULTANTS CONSULTANTS • SOLUMETRICS, ELOI COLOMA, EIPM & ENGIPROJECTS UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 3. STRUCTURE & FOUNDATIONS OBJECTIVES • 25 EXCAVATIONS TO TEST THE POSITION & CONDITION OF STRUCTURE • STUDY THE EFFECT OF NOU CAMP NOU ON THE CURRENT STRUCTURE RESULTS & BENEFITS • IDENTIFY ALL THE IMPROVEMENTS REQUIRED FOR THE NEXT 100 YEARS • FACILITATE THE CONSTRUCTION PROCESS AND REDUCE UNKNOWNS AND RISKS CONSULTANT • BAC UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 4. GEOTECHNICAL STUDY OBJECTIVE • ANALIZE THE SOIL AND STUDY COMPOSITION • OBTAIN RECOMMENDATIONS REGARDING THE MOST APPROPRIATE CONSTRUCTION TECHNIQUES RESULTS & BENEFITS • 34 TESTS REACHING A DEPTH OF 40 METERS • ENSURE THE CONSOLIDATION OF THE CONSTRUCTION ON THE LAND CONSULTANT • BOSCH & VENTAYOL UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA ESPAI BARÇA 5. INSTALLATIONS OBJECTIVE • SCAN, IDENTIFY & DOCUMENT ALL THE CURRENT ELECTRICAL, GAS & WATER INSTALLATIONS • PLAN & DIMENSION THE FUTURE NECESSITIES RESULTS & BENEFITS • IMPROVE CONSTRUCTION PLANNING TO MINIMIZE IMPACT ON OPERATIONS • IDENTIFY EXISTING INSTALLATIONS FOR REUSE & OPPORTUNITIES FOR RENEWABLE ENERGY • INCORPORATE GAS FOR KITCHENS CONSULTANTS • ELIN & GESCONRED UP1 UP2 UP3 UP4 UP5 URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OBJECTIVE • STUDY ROOF OPTIONS WHICH COMPLY WITH REQUIREMENTS • COST CONTROL: 15% OF NOU CAMP NOU BUDGET RESULTS & BENEFITS • REPORT WITH 6 POSSIBLE ROOF OPTIONS TO INCLUDE IN ARCHITECTURE COMPETITION BRIEF • COVER & PROTECT ALL SPECTATORS, IMPROVE ATMOSPHERE, COMFORT, TEMPERATURE, SHADOWS, AIRFLOWS" • OPPORTUNITY TO INCORPORATE PHOTOVOLTAIC AND GREY WATER SYSTEM • MINIMIZE IMPACT ON THE GRASS CONSULTANT • SBP UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OPTION 1. CABLE DOME • MARACANA (RIO DE JANEIRO) UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OPTION 2. RING TRUSS ROOF • AVIVA (DUBLIN) • VTB-ARENA OF MOSCOW (UNDER CONSTRUCTION) UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OPTION 3. CANTILEVER • ALLIANZ ARENA (MUNICH) • OLIMPIC STADIUM OF BERLIN UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OPTION 4. MEGA-TRUSS • SAN SIRO (MILAN) • AMSTERDAM ARENA • EMIRATES STADIUM (LONDON) UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OPTION 5. RING CABLE ROOF (ONE COMPRESSION RING) • NATIONAL STADIUM IN BRASILIA • VOLKSWAGEN ARENA (WOLFSBURG) UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OPTION 6. RING CABLE ROOF (TWO COMPRESSION RINGS) • BAYARENA (BAYER LEVERKUSEN) • OLIMPIC STADIUM IN SEVILLA UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OPTION 1. CABLE DOME OPTION 2. RING TRUSS ROOF OPTION 3. CANTILEVER OPTION 4. MEGA-TRUSS OPTION 5. RING CABLE ROOF (ONE COMPRESSION RING) OPTION 6. RING CABLE ROOF (TWO COMPRESSION RINGS) UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 6. NOU CAMP NOU ROOF OPTIONS OPTION 1. CABLE DOME OPTION 2. RING TRUSS ROOF OPTION 3. CANTILEVER OPTION 4. MEGA-TRUSS OPTION 5. RING CABLE ROOF (ONE COMPRESSION RING) OPTION 6. RING CABLE ROOF (TWO COMPRESSION RINGS) UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 ESPAI BARÇA 7. FOOD & BEVERAGE OBJECTIVE • F&B REQUIREMENTS 365 DAYS A YEAR RESULTS & BENEFITS • NEW & MODERN F&B SERVICES • ATTAIN A MORE ATTRACTIVE BUSINESS PLAN FOR THE CLUB CONSULTANT • CENTERPLATE UP1 UP2 UP3 UP4 URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA UP5 ESPAI BARÇA 8. MOBILITY OBJECTIVE • CREATE A PUBLIC PLAZA FREE OF VEHICLES • NEW UNDERGROUND PARKING RESULTS & BENEFITS • IMPROVE MOBILITY & MORE EFFICIENT EVACUATION • CREATION OF AN OPEN PLAZA & CAMPUS FOR CITY CONSULTANT • BCA ARQUITECTURA, PCG, RACC, IDOM & MOMENTUM UP1 UP2 UP3 UP4 UP5 CAMPUS BARÇA ESPAI BARÇA 9. SMART BARÇA OBJECTIVE • CONNECTIVITY WIFI & 4G • IMPROVED EXPERIENCE • INTERACTIVITY & PERSONALIZATION RESULTS & BENEFITS • APP WITH REAL TIME INFORMATION, REPLAYS, F&B, MERCHANDISING, ACCESS, TRANSIT, & SECURITY INFORMATION • E-TICKETING • ON DEMAND F&B UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA ESPAI BARÇA 10. SUSTAINABILITY – URBAN CERTIFICATE UP1 UP2 UP3 UP4 UP5 UP6 URBANISME LES CORTS URBANISME SJD I NOU MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA GLOBAL ESPAI BARÇA 10. SUSTAINABILITY – ORGANIZATIONAL CHART UP1 UP2 UP3 UP4 UP5 UP6 URBANISME LES CORTS URBANISME SJD I NOU MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA GLOBAL ESPAI BARÇA 10. SUSTAINABILITY - DIAGRAM UP1 UP2 UP3 UP4 UP5 UP6 URBANISME LES CORTS URBANISME SJD I NOU MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA GLOBAL ESPAI BARÇA 10. SUSTAINABILITY INICIATIVES 1. DEMOLITION • MAINTAIN 45.000 M2 OF EXISTING FLOOR SLABS • RECYCLING FROM DECONSTRUCTION • ENVIRONMENTAL CERTIFICATION • REDUCTION OF ELECTRICAL CONSUMPTION THROUGH SELF GENERATION 5. OPERATION • SOLAR PANELS ON THE ROOF 2. SCRAP • LED TECHNOLOGY • REDUCTION OF WATER CONSUMPTION THROUGH IMPLEMENTATION OF GREY WATER SYSTEM • REDUCE FUTURE MAINTENANCE COSTS CONSULTANTS • SBP, TRANSSOLAR, ELIN & GESCONRED 4. CONSTRUCTION 3. PRODUCTION UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN DESPÍ, MINIESTADI NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA ESPAI BARÇA UP3 NOU CAMP NOU 1. NEW 47.000 M2 ROOF THAT COVERS 100% SPECTATORS 4. 6.000 M2 PHOTOVOLTAIC PANELS 5. GUTTERS FOR WATER COLLECTION 2. CATWALK WITH LED PITCH LIGHTING, NEW SOUND SYSTEM & WIFI ACCESS POINTS 6. FAMILY TIER WITH VIEWS OF FCB’S PUBLIC PLAZA 3. HIGH RESOLUTION LED SCOREBOARDS 7. NEW TRIBUNA 3RD TIER ESPAI BARÇA UP3 NOU CAMP NOU 8. AWAY FANS CORNER GOL NORD-LATERAL FOR IMPROVED SECURTIY 11. NEW PRESS ZONE WITH IMPROVED SERVICES 12. MASTER CAMERA LOWERED TO IMPROVE BROADCASTING 9. NEW BATHROOMS COMPLIANT WITH REGULATIONS 10. NEW, IMPROVED CONCESSIONS & KITCHEN FACILITIES 13. DOUBLE HEIGHT ATRIUM 14. RAISED PLATFORM TO OPTIMIZE INGRESS, EGRESS & SAFETY ESPAI BARÇA UP3 NOU CAMP NOU 15. LED FASCIA BOARDS FOR SEATING BOWL ANIMATION 18. NEW HORIZONTAL CIRCULATIONS 16. FIRST TIER WITH IMPROVED SIGHTLINES 19. NEW VERTICAL CIRCULATIONS WITH ELEVATORS & ESCALATORS 17. NEW POSITIONS FOR REDUCED MOBILITY PERSONS WITH IMPROVED SERVICES 20. RING OF 91 VIP SUITES, 4 SUPERBOXES & 1 RESTAURANT ESPAI BARÇA UP3 NOU CAMP NOU 21. PITCH CLUB WITH CAPACITY FOR 1.000 SPECTATORS 23. NEW UNDERGROUND PARKING 22. PITCH WITH LATEST TECHNOLOGICAL SYSTEMS 24. NEW FOUNDATION WITH RECYCLED STEEL FROM DECONSTRUCTIONS ESPAI BARÇA RESULTS ARCHITECTURAL COMPETITION BRIEFS FOR NOU CAMP NOU & NOU PALAU (MORE THAN 1.500 PAGES): • URBANISM - LES CORTS • FUNCTIONAL PROGRAMS NOU PALAU I NOU CAMP NOU • BIM MODEL OF CAMP NOU • TOPOGRAPHY STUDY • GEOTECHNICAL STUDY • UTILITIES – ELECTRICAL, WATER & GAS INFRASTRUCTURE • CAMP NOU STRUCTURAL STUDIES • NCN ROOF OPTIONS • FOOD & BEVERAGE • MOBILITY • CONSTRUCTION PHASING • COST ANALYSIS UP1 UP2 UP3 ENSURE THE CREATIVITY OF THE ARCHITECTS BY PROVIDING A DETAILED BASE OF INFORMATION DEFINING REQUIREMENTS OF THE CLUB & CITY: • INSTALLATIONS REQUIRED BY FCB • CONSTRUCTION CALENDAR 2017-2021 • BUDGET OF 600 M€ UP4 UP5 CAMPUS BARÇA ECONOMY & FINANCE ESPAI BARÇA FINANCING OBJECTIVE • GUARANTEE THAT THE FINANCING WILL NOT LIMIT CLUB RESOURCES: o TO CONTINUE INVESTING IN OUR SPORTS TEAM o NO INCREASE TO SOCIO SEASON TICKET PRICES o REPAY DEBT FINANCING WITHIN 5 YEARS RESULTS & BENEFITS • PROCESS TO FIND A CONSULTANT TO ADVISE ON THE SALE OF TITLE RIGHTS o AEG, G2, HIGHLIGHT EVENT, IEG, IMG, NAVIGATE RESEARCH, REPUCOM, VAN WAGNER • MEETINS WITH FINANCIAL INSTITUTIONS & INVESTORS o OVER 10 MEETINGS & CONFERENCES TOTAL ESPAI BARÇA 600 M€ ESPAI BARÇA BUSINESS PLAN OBJECTIVE • BUSINESS PLAN DEVELOPMENT • GUARANTEE THE CLUB AN INCREASE OF 30% IN EBITDA RESULTS & BENEFITS • MARKET RESEARCH TO MEASURE MARKET DEMAND: o 5.600 COMPANIES IN CATALUNYA/MADRID o 6.786 SOCIS ANALYSIS OF SPONSORSHIP VALUATIONS: TITLE RIGHTS AND OTHER SPONSORSHIP CONSULTANTS • ISG & AEG 40M€ EBITDA ESPAI BARÇA 125M€ EBITDA FCB Stabilized Estimated 2021 / 2022 + 30% 125M€ EBITDA FCB VIP / HOSPITALITY Stabilized Estimated GA TICKETING 2021 / 2022 MARKETING PARKING FOOD & BEVERAGE MEETINGS & EVENTS ESPAI BARÇA COSTS CONTROL OBJECTIVES • GUARANTEE THAT THE PROGRAM COMPLIES WITH BUDGET RESULTS & BENEFITS • DETAILED COST ANALYSIS BASED ON MEASUREMENTS, MATERIALS, EQUIPMENTS" • IDENTIFICATION OF RISKS IN TIME FOR VALUE ENGINEERING CONSULTANTS • RLB & PFM PRESSUPOST 600 M€ ESPAI BARÇA PROCUREMENT PROCESS - TRANSPARENCY & OBJECTIVITY OBJECTIVES • GUARANTEE THE INDEPENDENCE & OBJECTIVITY OF PROCUREMENT PROCESSES PUBLICITY RESULTS & BENEFITS • DESIGN OF A PROCUREMENT PROCEDURE TRANSPARENCY ECONOMIC • ADVICE REGARDING THE DEFINITION OF EVALUATION CRITERIAS FOR PROCUREMENT PRINCIP LES • PROCUREMENT AUDIT • ESPAI BARÇA WEBSITE TO IMPROVE TRANSPARENCY CONSULTANTS QUALITY EFFCIENCY • ERNST & YOUNG EFFECTIVENESS CALENDAR ESPAI BARÇA CALENDAR 2015 JUNE - JULY 2015 ARCHITECTURE COMPETITION NCN I NPB – Phase 1 24 MAY 2015 MUNICIPAL ELECTIONS GEN FEB 22 JAN 2015 INICIAL APPROVAL URBANISM SJD MAR ABR MAR – MAY 2015 ARCHITECTURE COMPETITION NOU MINIESTADI MAI NOV. – DEC. 2015 TECHNICAL REVISION ARCHITECTURE COMPETITION NCN I NPB AUGUST 2015 FINALIST LIST ARCHITECTURE COMPETITION NCN I NPB JUN MAY 2015 NOU MINIESTADI ARCHITECTURE WINNER 14 MAY 2015 PROVISIONAL APPROVAL URBANISM SJD JUL AGO JULY 2015 DEFINITIVE APPROVAL URBANISM SJD JULY 2015 ELECTIONS FC BARCELONA SEP. 2015 SUBMISSION URBANISM LES CORTS SET OCT NOV DES AUGUST - OCT. 2015 ARCHITECTURE COMPETITION NCN I NPB – Phase 2 DEC. 2015 WINNER ANNOUNCED NCN I NPB ESPAI BARÇA CALENDAR 2016-2021 SEASON 2017/18 INAUGURATION NOU MINIESTADI SEASON 2017/18 CONSTRUCTION NCN I NPB 2016 JAN 2016 CONSTRUCTION NOU MINIESTADI JAN 2016 PROJECT DEVELOPMENT NCN I NPB 2017 2018 2019 SEASON 2019/20 INAUGURATION NOU PALAU BLAUGRANA 2020 2021 SEASON 2021/22 INAUGURATION NOU CAMP NOU ARCHITECTURAL COMPETITIONS ESPAI BARÇA INTERNATIONAL ARCHITECTURAL COMPETITIONS – NOU CAMP NOU & NOU PALAU BLAUGRANA COMPETITION WITH TWO PHASES JURY: FORMED BY 9 MEMBERS • 5 FCB: 4 BOARD MEMBERS + 1 ARCHITECT • 3 COAC MEMBERS • 1 BARCELONA CITY COUNCIL MEMBER TECHNICAL COMMISSION: FORMED BY 9 MEMBERS • 7 FCB • 2 COAC MEMBERS ESPAI BARÇA INTERNATIONAL ARCHITECTURE COMPETITIONS – NOU CAMP NOU & NOU PALAU BLAUGRANA COMPETITION WITH TWO PHASES: RFQ + RFP FIRST PHASE: PREQUALIFICATION • 5 JUNE: COMPETITION BRIEF WITH RULES & CRITERIAS FOR THE SELECTION OF THE SHORTLIST PUBLISHED ON FCB’S WEBSITE • 5 JUNE – 6 JULY: SUBMISSION PERIOD FOR TEAM PREQUALIFICATION • JULY / AUGUST: REVIEW BY THE TECHNICAL COMISSION & SELECTION OF FINALISTS BY JURY SECOND PHASE: REQUEST FOR PROPOSAL • SEPTEMBER: COMPETITION BRIEF WITH RULES & REGULATIONS COMPLETE WITH TECHNICAL DOCUMENTATION SUBMITTED TO FINALIST TEAMS • NOVEMBER: SUBMISSION OF ARCHITECTURAL PROPOSALS • DECEMBER: REVIEW BY TECHNICAL COMMISSION & FINAL SELECTION BY JURY • JANUARY: WINNERS ANNOUNCED ESPAI BARÇA CALENDARI COMPETICIONS AGOST 2015 LA COMISSIÓ TÈCNICA ENTREGA LES RECOMANACIONS AL JURAT JUN 5 JUNY 2015 PUBLICACIÓ DOCUMENTS CONCURSOS UP3 & UP4 UP1 JUL AGO 6 JULIOL 2015 ENTREGA DOCUMENTACIONS 1a VOLTA CONCURSOS UP2 03 SETEMBRE 2015 COMENÇA 2a VOLTA CONCURSOS 15 NOVEMBRE 2015 ENTREGA DOCUMENTACIONS 2a VOLTA CONCURS UP4 SEP AUGUST 2015 EL JURAT SELECCIONA 6-8 PARTICIPANTS PER LA 2a VOLTA OCT GENER 2016 EL JURAT ESCULL ALS GUANYADORS DE LES COMPETICIONS D’UP3 & UP4 GENER 2016 CONTRACTE I INICI PROJECTE NOV DEC 1 DESEMBER 2015 ENTREGA DOCUMENTACIONS 2a VOLTA CONCURS UP3 UP3 UP4 NOU CAMP NOU NOU PALAU BLAUGRANA GEN DESEMBRE 2015 LA COMISSIÓ TÈCNICA ENTREGA LES RECOMANACIONS AL JURAT UP5 UP6 ESPAI BARÇA COMPETITION ANNEXES – APPROX. 1.500 PAGES UP3 • PLEC DE BASES • PROPOSTA MPGM LES CORTS-PLANTA • NOU CAMP NOU PROGRAMA • ESPAI BARÇA CAMPUS-PROJECTE BÁSIC APARCAMENT • CAMP NOU ESTUDI TOPOGRÁFIC EMPLAÇAMENT • CAMP NOU ESTUDI GEOTÉCNIC • CAMP NOU MODEL ASBUILT 3D BIM • CAMP NOU ESTUDI DE L’ESTRUCTURA EXISTENT • NOU CAMP NOU ESTUDI DE LES PROPOSTES DE COBERTA • CAMP NOU ASBUILT INSTALACIONS • NOU CAMP NOU REQUERIMENTS F&B • NOU CAMP NOU REQUERIMENTS SMART • NOU CAMP NOU CONCEPTES DE SOSTENIBILITAT • DOCUMENTACIÓ GRÁFICA DESCRIPTIVA DE LES PROPOSTES I DETALL D’ENTREGABLES • PLANTILLA D’ESTIMACIÓ DE COST • CALENDARI GLOBAL BÁSIC D’EXECUCIÓ DEL PROJECTE • MODEL DE CONTRACTE DE SERVEIS DE GENERAL PLANNER • NOU CAMP NOU RENDERINGS CONCEPTUALS • CAMP NOU IMATGES HISTÓRIQUES • DECLARACIÓ RESPONSABLE UP1 UP2 UP4 • PLEC DE BASES • PROPOSTA MPGM LES CORTS-PLANTA • NOU PALAU BLAUGRANA PROGRAMA • ESPAI BARÇA CAMPUS-PROJECTE BÁSIC APARCAMENT • PALAU BLAUGRANA ESTUDI TOPOGRÁFIC EMPLAÇAMENT • PALAU BLAUGRANA ESTUDI GEOTÉCNIC • PALAU BLAUGRANA MODEL ASBUILT 3D BIM • PALAU BLAUGRANA ASBUILT INSTALACIONS • NOU CAMP NOU REQUERIMENTS F&B • NOU CAMP NOU REQUERIMENTS SMART • NOU CAMP NOU CONCEPTES DE SOSTENIBILITAT • DOCUMENTACIÓ GRÁFICA DESCRIPTIVA DE LES PROPOSTES I DETALL D’ENTREGABLES • PLANTILLA D’ESTIMACIÓ DE COST • CALENDARI GLOBAL BÁSIC D’EXECUCIÓ DEL PROJECTE • MODEL DE CONTRACTE DE SERVEIS DE GENERAL PLANNER • NOU PALAU BLAUGRANA RENDERINGS CONCEPTUALS • DECLARACIÓ RESPONSABLE UP3 UP4 NOU CAMP NOU NOU PALAU BLAUGRANA UP5 UP6 ESPAI BARÇA UP3 PARTICIPANTS - 26 TOTAL (LOCAL PARTICIPATION REQUIRED) • !"#$%&'&()*+& • 2$B&'&%!9:!7$&!08534"#4$1&'&(!#2&!08534"#4"1&'&0C1!9!(03!&'& 3:9!#3$&6!03#3$& • !,-&'&%.!!&./!01&!0#234"#41& • B!!9&!0#234"#4"9&'&!16&!0#234"#4"9& • !056&'&($,3--&4!--"0&7"&!08534"#450!& • B11&7"13:9&:0$56&'&%!4"$&!08534"#4$1& • !4"-3"0&4$%&12""2!9&'&%!%"9&7$%39:$;"09"14&,"00<& • 93BB"9&1"BB"3&'&D$!9&6!1#5!-&;&0!%$9&!513@& • (3:&'&37$%&'&(!!1& • 6!44"09&'&:6$&'&!3(& • #05=&.&$043=&'&:!0#"1&7"&1"4!&>&($9"4&'&4.61!& • 6$65-$51&'&D$1"6&%3!1&!08534"#4"1&'&0#0&!08534"#4"1& • 76&!0#234"#41&'&(53?!7";%!0:!034&'&(:#&!08534"#450!& • 64A&!0#234"#41&'&##73&:0$56'12!0"& • ,"09!97"1&!08534"431&!1$#3!7$1&'&"1639"4&5(!#2&!08534"#4"1& • :"91-"0&16$041&'&$!(& • :%6&'&!-$91$&(!-!:5"0&03"0!&'&!3!&'&(!0#"-$;(!-!9=@&!08534"#4"1& • 1$54$&%$50!&!08534"#4$1&'&"14"(!9&4"00!7"1&%594!E$-!& • 1/F+&'&,0!9#&,"09!97"=&!08& • 5914573$&'&!11&!0#234"#B4"9'D6!%'%!913--!& • :03%12!A'!4"-3"0&,"00"4&'&"14573&#!0%"&639$1& • /!-$7"&3&63140"& • 2"!42"0A3#B&14573$&'&A$$&'&"%(4& • /313$9G/"95"&'&(C3C:& • 2B1&!0#234"#450"&'&#$?&'&(!4--"&3&0$3:&!08534"#4"1 • =!2!&2!737&!0#234"#41&'&:!15--!&!08534"#450!& UP1 UP2 UP3 NOU CAMP NOU UP4 UP5 UP6 ESPAI BARÇA UP3 EVALUATION UP3 FINAL DISTRIBUTION (26 TOTAL) COMPLEIX REQUERIMENTS ADMINISTRATIUS EXCELLENT CVS & EXPERIENCE BONS GENERAL PLANNERS 27% MODERATE CVS 31% EXPERIÈNCIA EXCEL·LENT EN ESTADIS 12% 31% MODERATE EXPERIENCE ELIMINATED FOR ADMINISTRATIVE REASONS UP1 UP2 UP3 NOU CAMP NOU RECOMANATS UP4 UP5 UP6 ESPAI BARÇA Projekterläuterung Umbau und Erweiterung Stadion FC Barcelona 10. September 2015