ESPAI BARÇA

Transcription

ESPAI BARÇA
ESPAI BARÇA
Projekterläuterung Umbau und Erweiterung
Stadion FC Barcelona
10. September 2015
ESPAI BARÇA
AGENDA
CITY: MASTER PLAN
PROJECTS
ECONOMY & FINANCE
CALENDAR
ARCHITECTURAL COMPETITIONS
ESPAI BARÇA
PROJECT UNITS
UP1
UP2
UP3
UP4
UP5
URBANISM LES CORTS
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
CAMPUS BARÇA
CITY: MASTER PLAN
ESPAI BARÇA
CITY: MASTER PLAN
PROTECT & INCREASE FC BARCELONA’S PROPERTY:
36 HECTARES FOR SPORTS USE
ESPAI BARÇA
CITY: MASTER PLAN
•  TAKE ADVANTAGE OF 19 HECTARES IN LES CORTS
•  RE-VALUE OUR PROPERTY, A MOTOR FOR GROWTH
ESPAI BARÇA
URBANISM LES CORTS
•  COLABORATION WITH EXPERTS: GARRIGUES LAW FIRM, BCA ARQUITECTURA, RACC, PROMOACSA, SGM, JUAN PABLO MITJANS
•  MEETINGS WITH TECHNICHAL TEAMS: FCB & BARCELONA MUNICIPALTIY: 9 MONTHS
•  AGREED DRAFT WORKING DOCUMENT BETWEEN TECHNICAL TEAMS: CLUB & BARCELONA
UP1
URBANISM LES CORTS
UP2
UP3
UP4
UP5
ESPAI BARÇA
URBANISM LES CORTS: OBJECTIVES
A.  FREE-UP LES CORTS CAMPUS
B.  REORGANIZE IMMEDIATE AREA
C.  ELIMINATE VEHICLES FROM SURFACE AREAS
D.  SEPARATE PEDESTRIAN & VEHICULAR TRAFFIC
E.  WIDEN SIDEWALKS
F.  IMPROVE MOBILITY & ACCESSES
G.  URBANIZE: CREATE PUBLIC PLAZA
H.  OPEN UP TO NEIGHBORHOOD
UP1
URBANISM LES CORTS
UP2
UP3
UP4
UP5
ESPAI BARÇA
URBANISM: CIUTAT ESPORTIVA
•  PB2 ARQUITECTES, PWC
•  PROVISIONAL APPROVAL SJD 14 MAY 2015
•  INICIAL APPROVAL SJD 22 JANUARY 2015
•  PENDING DEFINITIVE APPROVAL FROM GENERALITAT
UP1
UP2
URBANISM ST JOAN
DESPÍ, MINIESTADI
UP3
UP4
UP5
PROJECTS
ESPAI BARÇA
WHAT HAVE WE DONE?
1.  FUNCTIONAL PROGRAMS
2.  BIM MODEL OF CAMP NOU
3.  STRUCTURE & FOUNDATIONS STUDIES OF CAMP NOU
4.  GEOTECHNICAL STUDIES OF LES CORTS CAMPUS
5.  EXISTING & FUTURE INSTALLATION STUDIES
6.  ROOF STUDIES FOR NOU CAMP NOU
7.  F&B STUDIES
8.  MOBILITY STUDIES
9.  SMART
10.  SUSTAINABILITY
UP1
UP2
UP3
UP4
UP5
URBANISM LES CORTS
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
CAMPUS BARÇA
ESPAI BARÇA
WHAT BENEFITS HAVE WE ATTAINED?
1.  ENSURE THE PROGRAM FITS WITHIN THE 600 M€ APPROVED BUDGET
2.  DEVELOP PRECISE BUDGETS FOR EACH AREA OF THE PROJECT
3.  PLANNING CONTROL: DEVELOP A CONSTRUCTION SCHEDULE
4.  REDUCE RISKS AND UNKNOWNS DURING ALL PHASES OF PROJECT
UP1
UP2
UP3
UP4
UP5
URBANISM LES CORTS
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
CAMPUS BARÇA
ESPAI BARÇA
1. FUNCIONAL PROGRAM
OBJECTIVE
•  ELABORATE REPORTS AND SCHEMATIC PLANS WITH ALL
STAKEHOLDER REQUIREMENTS
RESULTS & BENEFITS
•  DEFINITION OF REQUIRED AREAS SO THAT ARCHITECTS
DEVELOP INFORMED PROPOSALS
•  CALCULATE THE PRECISE COSTS CORRESPONDING TO
FUNCTIONAL REQUIREMENTS
CONSULTANT
•  MB&A
UP1
UP2
UP3
UP4
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
UP5
ESPAI BARÇA
2. BIM: CAMP NOU STRUCTURE
OBJECTIVE
•  CREATION OF A 6D MODEL ‘BUILDING INFORMATION MODELLING’:
3D + COSTS + SCHEDULE + FACILITY MANAGEMENT
RESULTS & BENEFITS
•  AN INNOVATIVE PROJECT, WITH INFORMATION REGARDING STRUCTURE,
INSTALLATIONS, MATERIALS, COSTS, MAINTENANCE"
•  FACILITATE THE EXCHANGE AND COORDINATION OF INFORMATION BETWEEN THE
DIFFERENT PLANNERS AND CONSULTANTS
CONSULTANTS
•  SOLUMETRICS, ELOI COLOMA, EIPM & ENGIPROJECTS
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
3. STRUCTURE & FOUNDATIONS
OBJECTIVES
•  25 EXCAVATIONS TO TEST THE POSITION & CONDITION OF
STRUCTURE
•  STUDY THE EFFECT OF NOU CAMP NOU ON THE CURRENT
STRUCTURE
RESULTS & BENEFITS
•  IDENTIFY ALL THE IMPROVEMENTS REQUIRED FOR THE NEXT 100
YEARS
•  FACILITATE THE CONSTRUCTION PROCESS AND REDUCE UNKNOWNS
AND RISKS
CONSULTANT
•  BAC
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
4. GEOTECHNICAL STUDY
OBJECTIVE
•  ANALIZE THE SOIL AND STUDY COMPOSITION
•  OBTAIN RECOMMENDATIONS REGARDING THE MOST APPROPRIATE
CONSTRUCTION TECHNIQUES
RESULTS & BENEFITS
•  34 TESTS REACHING A DEPTH OF 40 METERS
•  ENSURE THE CONSOLIDATION OF THE CONSTRUCTION ON THE LAND
CONSULTANT
•  BOSCH & VENTAYOL
UP1
UP2
UP3
UP4
UP5
URBANISM LES CORTS
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
CAMPUS BARÇA
ESPAI BARÇA
5. INSTALLATIONS
OBJECTIVE
•  SCAN, IDENTIFY & DOCUMENT ALL THE CURRENT ELECTRICAL, GAS &
WATER INSTALLATIONS
•  PLAN & DIMENSION THE FUTURE NECESSITIES
RESULTS & BENEFITS
•  IMPROVE CONSTRUCTION PLANNING TO MINIMIZE IMPACT ON
OPERATIONS
•  IDENTIFY EXISTING INSTALLATIONS FOR REUSE & OPPORTUNITIES
FOR RENEWABLE ENERGY
•  INCORPORATE GAS FOR KITCHENS
CONSULTANTS
•  ELIN & GESCONRED
UP1
UP2
UP3
UP4
UP5
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
CAMPUS BARÇA
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OBJECTIVE
•  STUDY ROOF OPTIONS WHICH COMPLY WITH REQUIREMENTS
•  COST CONTROL: 15% OF NOU CAMP NOU BUDGET
RESULTS & BENEFITS
•  REPORT WITH 6 POSSIBLE ROOF OPTIONS TO INCLUDE IN ARCHITECTURE COMPETITION BRIEF
•  COVER & PROTECT ALL SPECTATORS, IMPROVE ATMOSPHERE, COMFORT, TEMPERATURE, SHADOWS, AIRFLOWS"
•  OPPORTUNITY TO INCORPORATE PHOTOVOLTAIC AND GREY WATER SYSTEM
•  MINIMIZE IMPACT ON THE GRASS
CONSULTANT
•  SBP
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OPTION 1. CABLE DOME
•  MARACANA (RIO DE JANEIRO)
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OPTION 2. RING TRUSS ROOF
•  AVIVA (DUBLIN)
•  VTB-ARENA OF MOSCOW (UNDER
CONSTRUCTION)
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OPTION 3. CANTILEVER
•  ALLIANZ ARENA (MUNICH)
•  OLIMPIC STADIUM OF BERLIN
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OPTION 4. MEGA-TRUSS
•  SAN SIRO (MILAN)
•  AMSTERDAM ARENA
•  EMIRATES STADIUM (LONDON)
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OPTION 5. RING CABLE ROOF (ONE
COMPRESSION RING)
•  NATIONAL STADIUM IN BRASILIA
•  VOLKSWAGEN ARENA (WOLFSBURG)
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OPTION 6. RING CABLE ROOF (TWO
COMPRESSION RINGS)
•  BAYARENA (BAYER LEVERKUSEN)
•  OLIMPIC STADIUM IN SEVILLA
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OPTION 1. CABLE DOME
OPTION 2. RING TRUSS ROOF
OPTION 3. CANTILEVER
OPTION 4. MEGA-TRUSS
OPTION 5. RING CABLE ROOF (ONE COMPRESSION
RING)
OPTION 6. RING CABLE ROOF (TWO COMPRESSION
RINGS)
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
6. NOU CAMP NOU ROOF OPTIONS
OPTION 1. CABLE DOME
OPTION 2. RING TRUSS ROOF
OPTION 3. CANTILEVER
OPTION 4. MEGA-TRUSS
OPTION 5. RING CABLE ROOF (ONE COMPRESSION
RING)
OPTION 6. RING CABLE ROOF (TWO COMPRESSION
RINGS)
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
ESPAI BARÇA
7. FOOD & BEVERAGE
OBJECTIVE
•  F&B REQUIREMENTS 365 DAYS A YEAR
RESULTS & BENEFITS
•  NEW & MODERN F&B SERVICES
•  ATTAIN A MORE ATTRACTIVE BUSINESS PLAN FOR THE CLUB
CONSULTANT
•  CENTERPLATE
UP1
UP2
UP3
UP4
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
UP5
ESPAI BARÇA
8. MOBILITY
OBJECTIVE
•  CREATE A PUBLIC PLAZA FREE OF VEHICLES
•  NEW UNDERGROUND PARKING
RESULTS & BENEFITS
•  IMPROVE MOBILITY & MORE EFFICIENT EVACUATION
•  CREATION OF AN OPEN PLAZA & CAMPUS FOR CITY
CONSULTANT
•  BCA ARQUITECTURA, PCG, RACC, IDOM & MOMENTUM
UP1
UP2
UP3
UP4
UP5
CAMPUS BARÇA
ESPAI BARÇA
9. SMART BARÇA
OBJECTIVE
•  CONNECTIVITY WIFI & 4G
•  IMPROVED EXPERIENCE
•  INTERACTIVITY & PERSONALIZATION
RESULTS & BENEFITS
•  APP WITH REAL TIME INFORMATION, REPLAYS, F&B,
MERCHANDISING, ACCESS, TRANSIT, & SECURITY INFORMATION
•  E-TICKETING
•  ON DEMAND F&B
UP1
UP2
UP3
UP4
UP5
URBANISM LES CORTS
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
CAMPUS BARÇA
ESPAI BARÇA
10. SUSTAINABILITY – URBAN CERTIFICATE
UP1
UP2
UP3
UP4
UP5
UP6
URBANISME LES
CORTS
URBANISME SJD I
NOU MINIESTADI
NOU CAMP NOU
NOU PALAU
BLAUGRANA
CAMPUS BARÇA
GLOBAL
ESPAI BARÇA
10. SUSTAINABILITY – ORGANIZATIONAL CHART
UP1
UP2
UP3
UP4
UP5
UP6
URBANISME LES
CORTS
URBANISME SJD I
NOU MINIESTADI
NOU CAMP NOU
NOU PALAU
BLAUGRANA
CAMPUS BARÇA
GLOBAL
ESPAI BARÇA
10. SUSTAINABILITY - DIAGRAM
UP1
UP2
UP3
UP4
UP5
UP6
URBANISME LES
CORTS
URBANISME SJD I
NOU MINIESTADI
NOU CAMP NOU
NOU PALAU
BLAUGRANA
CAMPUS BARÇA
GLOBAL
ESPAI BARÇA
10. SUSTAINABILITY
INICIATIVES
1. DEMOLITION
•  MAINTAIN 45.000 M2 OF EXISTING FLOOR SLABS
•  RECYCLING FROM DECONSTRUCTION
•  ENVIRONMENTAL CERTIFICATION
•  REDUCTION OF ELECTRICAL CONSUMPTION THROUGH SELF
GENERATION
5. OPERATION
•  SOLAR PANELS ON THE ROOF
2. SCRAP
•  LED TECHNOLOGY
•  REDUCTION OF WATER CONSUMPTION THROUGH
IMPLEMENTATION OF GREY WATER SYSTEM
•  REDUCE FUTURE MAINTENANCE COSTS
CONSULTANTS
•  SBP, TRANSSOLAR, ELIN & GESCONRED
4. CONSTRUCTION
3. PRODUCTION
UP1
UP2
UP3
UP4
UP5
URBANISM LES CORTS
URBANISM ST JOAN
DESPÍ, MINIESTADI
NOU CAMP NOU
NOU PALAU BLAUGRANA
CAMPUS BARÇA
ESPAI BARÇA
UP3 NOU CAMP NOU
1.  NEW 47.000 M2 ROOF THAT COVERS 100% SPECTATORS
4.  6.000 M2 PHOTOVOLTAIC PANELS
5.  GUTTERS FOR WATER COLLECTION
2.  CATWALK WITH LED PITCH LIGHTING, NEW SOUND SYSTEM
& WIFI ACCESS POINTS
6.  FAMILY TIER WITH VIEWS OF FCB’S PUBLIC PLAZA
3.  HIGH RESOLUTION LED SCOREBOARDS
7.  NEW TRIBUNA 3RD TIER
ESPAI BARÇA
UP3 NOU CAMP NOU
8.  AWAY FANS CORNER GOL NORD-LATERAL FOR IMPROVED
SECURTIY
11.  NEW PRESS ZONE WITH IMPROVED SERVICES
12.  MASTER CAMERA LOWERED TO IMPROVE BROADCASTING
9.  NEW BATHROOMS COMPLIANT WITH REGULATIONS
10.  NEW, IMPROVED CONCESSIONS & KITCHEN FACILITIES
13.  DOUBLE HEIGHT ATRIUM
14.  RAISED PLATFORM TO OPTIMIZE INGRESS, EGRESS & SAFETY
ESPAI BARÇA
UP3 NOU CAMP NOU
15.  LED FASCIA BOARDS FOR SEATING BOWL ANIMATION
18.  NEW HORIZONTAL CIRCULATIONS
16.  FIRST TIER WITH IMPROVED SIGHTLINES
19.  NEW VERTICAL CIRCULATIONS WITH ELEVATORS & ESCALATORS
17.  NEW POSITIONS FOR REDUCED MOBILITY PERSONS WITH
IMPROVED SERVICES
20.  RING OF 91 VIP SUITES, 4 SUPERBOXES & 1 RESTAURANT
ESPAI BARÇA
UP3 NOU CAMP NOU
21.  PITCH CLUB WITH CAPACITY FOR 1.000 SPECTATORS
23.  NEW UNDERGROUND PARKING
22.  PITCH WITH LATEST TECHNOLOGICAL SYSTEMS
24.  NEW FOUNDATION WITH RECYCLED STEEL FROM
DECONSTRUCTIONS
ESPAI BARÇA
RESULTS
ARCHITECTURAL COMPETITION BRIEFS FOR NOU CAMP NOU
& NOU PALAU (MORE THAN 1.500 PAGES):
•  URBANISM - LES CORTS
•  FUNCTIONAL PROGRAMS NOU PALAU I NOU CAMP NOU
•  BIM MODEL OF CAMP NOU
•  TOPOGRAPHY STUDY
•  GEOTECHNICAL STUDY
•  UTILITIES – ELECTRICAL, WATER & GAS INFRASTRUCTURE
•  CAMP NOU STRUCTURAL STUDIES
•  NCN ROOF OPTIONS
•  FOOD & BEVERAGE
•  MOBILITY
•  CONSTRUCTION PHASING
•  COST ANALYSIS
UP1
UP2
UP3
ENSURE THE CREATIVITY OF THE ARCHITECTS BY
PROVIDING A DETAILED BASE OF INFORMATION
DEFINING REQUIREMENTS OF THE CLUB & CITY:
•  INSTALLATIONS REQUIRED BY FCB
•  CONSTRUCTION CALENDAR 2017-2021
•  BUDGET OF 600 M€
UP4
UP5
CAMPUS BARÇA
ECONOMY & FINANCE
ESPAI BARÇA
FINANCING
OBJECTIVE
•  GUARANTEE THAT THE FINANCING WILL NOT LIMIT CLUB
RESOURCES:
o  TO CONTINUE INVESTING IN OUR SPORTS TEAM
o  NO INCREASE TO SOCIO SEASON TICKET PRICES
o  REPAY DEBT FINANCING WITHIN 5 YEARS
RESULTS & BENEFITS
•  PROCESS TO FIND A CONSULTANT TO ADVISE ON THE SALE OF
TITLE RIGHTS
o  AEG, G2, HIGHLIGHT EVENT, IEG, IMG, NAVIGATE
RESEARCH, REPUCOM, VAN WAGNER
•  MEETINS WITH FINANCIAL INSTITUTIONS & INVESTORS
o  OVER 10 MEETINGS & CONFERENCES
TOTAL ESPAI BARÇA
600 M€
ESPAI BARÇA
BUSINESS PLAN
OBJECTIVE
•  BUSINESS PLAN DEVELOPMENT
•  GUARANTEE THE CLUB AN INCREASE OF 30% IN EBITDA
RESULTS & BENEFITS
•  MARKET RESEARCH TO MEASURE MARKET DEMAND:
o  5.600 COMPANIES IN CATALUNYA/MADRID
o  6.786 SOCIS
ANALYSIS OF SPONSORSHIP VALUATIONS: TITLE RIGHTS
AND OTHER SPONSORSHIP
CONSULTANTS
•  ISG & AEG
40M€
EBITDA
ESPAI BARÇA
125M€
EBITDA FCB
Stabilized Estimated
2021 / 2022
+ 30%
125M€
EBITDA FCB
VIP / HOSPITALITY Stabilized Estimated
GA TICKETING
2021 / 2022
MARKETING
PARKING
FOOD & BEVERAGE
MEETINGS & EVENTS
ESPAI BARÇA
COSTS CONTROL
OBJECTIVES
•  GUARANTEE THAT THE PROGRAM COMPLIES
WITH BUDGET
RESULTS & BENEFITS
•  DETAILED COST ANALYSIS BASED ON
MEASUREMENTS, MATERIALS, EQUIPMENTS"
•  IDENTIFICATION OF RISKS IN TIME FOR VALUE
ENGINEERING
CONSULTANTS
•  RLB & PFM
PRESSUPOST
600 M€
ESPAI BARÇA
PROCUREMENT PROCESS - TRANSPARENCY & OBJECTIVITY
OBJECTIVES
•  GUARANTEE THE INDEPENDENCE & OBJECTIVITY OF
PROCUREMENT PROCESSES
PUBLICITY
RESULTS & BENEFITS
•  DESIGN OF A PROCUREMENT PROCEDURE
TRANSPARENCY
ECONOMIC
•  ADVICE REGARDING THE DEFINITION OF EVALUATION
CRITERIAS FOR PROCUREMENT
PRINCIP
LES
•  PROCUREMENT AUDIT
•  ESPAI BARÇA WEBSITE TO IMPROVE TRANSPARENCY
CONSULTANTS
QUALITY
EFFCIENCY
•  ERNST & YOUNG
EFFECTIVENESS
CALENDAR
ESPAI BARÇA
CALENDAR 2015
JUNE - JULY 2015
ARCHITECTURE
COMPETITION NCN I
NPB – Phase 1
24 MAY 2015
MUNICIPAL
ELECTIONS
GEN
FEB
22 JAN 2015
INICIAL APPROVAL
URBANISM SJD
MAR
ABR
MAR – MAY 2015
ARCHITECTURE
COMPETITION NOU
MINIESTADI
MAI
NOV. – DEC. 2015
TECHNICAL REVISION
ARCHITECTURE
COMPETITION NCN I
NPB
AUGUST 2015
FINALIST LIST
ARCHITECTURE
COMPETITION NCN I NPB
JUN
MAY 2015
NOU MINIESTADI
ARCHITECTURE
WINNER
14 MAY 2015
PROVISIONAL
APPROVAL
URBANISM SJD
JUL
AGO
JULY 2015
DEFINITIVE
APPROVAL
URBANISM
SJD
JULY 2015
ELECTIONS
FC BARCELONA
SEP. 2015
SUBMISSION
URBANISM LES
CORTS
SET
OCT
NOV
DES
AUGUST - OCT. 2015
ARCHITECTURE
COMPETITION NCN I
NPB – Phase 2
DEC. 2015
WINNER ANNOUNCED
NCN I NPB
ESPAI BARÇA
CALENDAR 2016-2021
SEASON 2017/18
INAUGURATION NOU MINIESTADI
SEASON 2017/18
CONSTRUCTION NCN I NPB
2016
JAN 2016
CONSTRUCTION NOU MINIESTADI
JAN 2016
PROJECT DEVELOPMENT NCN I NPB
2017
2018
2019
SEASON 2019/20
INAUGURATION NOU PALAU
BLAUGRANA
2020
2021
SEASON 2021/22
INAUGURATION NOU CAMP NOU
ARCHITECTURAL COMPETITIONS
ESPAI BARÇA
INTERNATIONAL ARCHITECTURAL COMPETITIONS –
NOU CAMP NOU & NOU PALAU BLAUGRANA
COMPETITION WITH TWO PHASES
JURY: FORMED BY 9 MEMBERS
•  5 FCB: 4 BOARD MEMBERS + 1 ARCHITECT
•  3 COAC MEMBERS
•  1 BARCELONA CITY COUNCIL MEMBER
TECHNICAL COMMISSION: FORMED BY 9 MEMBERS
•  7 FCB
•  2 COAC MEMBERS
ESPAI BARÇA
INTERNATIONAL ARCHITECTURE COMPETITIONS –
NOU CAMP NOU & NOU PALAU BLAUGRANA
COMPETITION WITH TWO PHASES: RFQ + RFP
FIRST PHASE: PREQUALIFICATION
•  5 JUNE: COMPETITION BRIEF WITH RULES & CRITERIAS FOR THE SELECTION OF THE SHORTLIST PUBLISHED ON
FCB’S WEBSITE
•  5 JUNE – 6 JULY: SUBMISSION PERIOD FOR TEAM PREQUALIFICATION
• JULY / AUGUST: REVIEW BY THE TECHNICAL COMISSION & SELECTION OF FINALISTS BY JURY
SECOND PHASE: REQUEST FOR PROPOSAL
•  SEPTEMBER: COMPETITION BRIEF WITH RULES & REGULATIONS COMPLETE WITH TECHNICAL DOCUMENTATION
SUBMITTED TO FINALIST TEAMS
•  NOVEMBER: SUBMISSION OF ARCHITECTURAL PROPOSALS
•  DECEMBER: REVIEW BY TECHNICAL COMMISSION & FINAL SELECTION BY JURY
•  JANUARY: WINNERS ANNOUNCED
ESPAI BARÇA
CALENDARI COMPETICIONS
AGOST 2015
LA COMISSIÓ TÈCNICA
ENTREGA LES
RECOMANACIONS AL
JURAT
JUN
5 JUNY 2015
PUBLICACIÓ
DOCUMENTS
CONCURSOS
UP3 & UP4
UP1
JUL
AGO
6 JULIOL 2015
ENTREGA
DOCUMENTACIONS 1a
VOLTA CONCURSOS
UP2
03 SETEMBRE 2015
COMENÇA 2a VOLTA
CONCURSOS
15 NOVEMBRE 2015
ENTREGA
DOCUMENTACIONS 2a
VOLTA CONCURS UP4
SEP
AUGUST 2015
EL JURAT
SELECCIONA 6-8
PARTICIPANTS
PER LA 2a VOLTA
OCT
GENER 2016
EL JURAT ESCULL ALS
GUANYADORS DE LES
COMPETICIONS D’UP3
& UP4
GENER 2016
CONTRACTE I INICI
PROJECTE
NOV
DEC
1 DESEMBER 2015
ENTREGA
DOCUMENTACIONS 2a
VOLTA CONCURS UP3
UP3
UP4
NOU CAMP NOU
NOU PALAU
BLAUGRANA
GEN
DESEMBRE 2015
LA COMISSIÓ TÈCNICA
ENTREGA LES
RECOMANACIONS AL
JURAT
UP5
UP6
ESPAI BARÇA
COMPETITION ANNEXES – APPROX. 1.500 PAGES
UP3
•  PLEC DE BASES
•  PROPOSTA MPGM LES CORTS-PLANTA
•  NOU CAMP NOU PROGRAMA
•  ESPAI BARÇA CAMPUS-PROJECTE BÁSIC APARCAMENT
•  CAMP NOU ESTUDI TOPOGRÁFIC EMPLAÇAMENT
•  CAMP NOU ESTUDI GEOTÉCNIC
•  CAMP NOU MODEL ASBUILT 3D BIM
•  CAMP NOU ESTUDI DE L’ESTRUCTURA EXISTENT
•  NOU CAMP NOU ESTUDI DE LES PROPOSTES DE COBERTA
•  CAMP NOU ASBUILT INSTALACIONS
•  NOU CAMP NOU REQUERIMENTS F&B
•  NOU CAMP NOU REQUERIMENTS SMART
•  NOU CAMP NOU CONCEPTES DE SOSTENIBILITAT
•  DOCUMENTACIÓ GRÁFICA DESCRIPTIVA DE LES PROPOSTES I DETALL
D’ENTREGABLES
•  PLANTILLA D’ESTIMACIÓ DE COST
•  CALENDARI GLOBAL BÁSIC D’EXECUCIÓ DEL PROJECTE
•  MODEL DE CONTRACTE DE SERVEIS DE GENERAL PLANNER
•  NOU CAMP NOU RENDERINGS CONCEPTUALS
•  CAMP NOU IMATGES HISTÓRIQUES
•  DECLARACIÓ RESPONSABLE
UP1
UP2
UP4
•  PLEC DE BASES
•  PROPOSTA MPGM LES CORTS-PLANTA
•  NOU PALAU BLAUGRANA PROGRAMA
•  ESPAI BARÇA CAMPUS-PROJECTE BÁSIC APARCAMENT
•  PALAU BLAUGRANA ESTUDI TOPOGRÁFIC EMPLAÇAMENT
•  PALAU BLAUGRANA ESTUDI GEOTÉCNIC
•  PALAU BLAUGRANA MODEL ASBUILT 3D BIM
•  PALAU BLAUGRANA ASBUILT INSTALACIONS
•  NOU CAMP NOU REQUERIMENTS F&B
•  NOU CAMP NOU REQUERIMENTS SMART
•  NOU CAMP NOU CONCEPTES DE SOSTENIBILITAT
•  DOCUMENTACIÓ GRÁFICA DESCRIPTIVA DE LES PROPOSTES I
DETALL D’ENTREGABLES
•  PLANTILLA D’ESTIMACIÓ DE COST
•  CALENDARI GLOBAL BÁSIC D’EXECUCIÓ DEL PROJECTE
•  MODEL DE CONTRACTE DE SERVEIS DE GENERAL PLANNER
•  NOU PALAU BLAUGRANA RENDERINGS CONCEPTUALS
•  DECLARACIÓ RESPONSABLE
UP3
UP4
NOU CAMP NOU
NOU PALAU
BLAUGRANA
UP5
UP6
ESPAI BARÇA
UP3 PARTICIPANTS - 26 TOTAL (LOCAL PARTICIPATION REQUIRED)
•  !"#$%&'&()*+&
•  2$B&'&%!9:!7$&!08534"#4$1&'&(!#2&!08534"#4"1&'&0C1!9!(03!&'&
3:9!#3$&6!03#3$&
•  !,-&'&%.!!&./!01&!0#234"#41&
•  B!!9&!0#234"#4"9&'&!16&!0#234"#4"9&
•  !056&'&($,3--&4!--"0&7"&!08534"#450!&
•  B11&7"13:9&:0$56&'&%!4"$&!08534"#4$1&
•  !4"-3"0&4$%&12""2!9&'&%!%"9&7$%39:$;"09"14&,"00<&
•  93BB"9&1"BB"3&'&D$!9&6!1#5!-&;&0!%$9&!513@&
•  (3:&'&37$%&'&(!!1&
•  6!44"09&'&:6$&'&!3(&
•  #05=&.&$043=&'&:!0#"1&7"&1"4!&>&($9"4&'&4.61!&
•  6$65-$51&'&D$1"6&%3!1&!08534"#4"1&'&0#0&!08534"#4"1&
•  76&!0#234"#41&'&(53?!7";%!0:!034&'&(:#&!08534"#450!&
•  64A&!0#234"#41&'&##73&:0$56'12!0"&
•  ,"09!97"1&!08534"431&!1$#3!7$1&'&"1639"4&5(!#2&!08534"#4"1&
•  :"91-"0&16$041&'&$!(&
•  :%6&'&!-$91$&(!-!:5"0&03"0!&'&!3!&'&(!0#"-$;(!-!9=@&!08534"#4"1&
•  1$54$&%$50!&!08534"#4$1&'&"14"(!9&4"00!7"1&%594!E$-!&
•  1/F+&'&,0!9#&,"09!97"=&!08&
•  5914573$&'&!11&!0#234"#B4"9'D6!%'%!913--!&
•  :03%12!A'!4"-3"0&,"00"4&'&"14573&#!0%"&639$1&
•  /!-$7"&3&63140"&
•  2"!42"0A3#B&14573$&'&A$$&'&"%(4&
•  /313$9G/"95"&'&(C3C:&
•  2B1&!0#234"#450"&'&#$?&'&(!4--"&3&0$3:&!08534"#4"1
•  =!2!&2!737&!0#234"#41&'&:!15--!&!08534"#450!&
UP1
UP2
UP3
NOU CAMP NOU
UP4
UP5
UP6
ESPAI BARÇA
UP3 EVALUATION
UP3 FINAL DISTRIBUTION (26 TOTAL)
COMPLEIX
REQUERIMENTS
ADMINISTRATIUS
EXCELLENT CVS &
EXPERIENCE
BONS GENERAL
PLANNERS
27%
MODERATE CVS
31%
EXPERIÈNCIA
EXCEL·LENT EN
ESTADIS
12%
31%
MODERATE
EXPERIENCE
ELIMINATED FOR
ADMINISTRATIVE
REASONS
UP1
UP2
UP3
NOU CAMP NOU
RECOMANATS
UP4
UP5
UP6
ESPAI BARÇA
Projekterläuterung Umbau und Erweiterung
Stadion FC Barcelona
10. September 2015