corbins electric
Transcription
corbins electric
CORBINS ELECTRIC M O H A V E J O C RESOURCE MANUAL TABLE OF CONTENTS CORBINS ELECTRIC Your Mohave Electrical Contractor................................................................................................................................4 Meet Your Team...........................................................................................................................................................4 Relevant Project Experience.........................................................................................................................................5 References...................................................................................................................................................................5 Virtual Construction......................................................................................................................................................6 Prefabrication...............................................................................................................................................................6 MOHAVE EDUCATIONAL SERVICES COOPERATIVE Work Order to Project Close-Out Process....................................................................................................................7 Integrated with Corbins Electric Processes...................................................................................................................8 Electrical Inspection Checklist.......................................................................................................................................9 Additional Resources....................................................................................................................................................9 CORBINS ELECTRIC Mohave Electrical Contractor 13V-CORBIN-0307 3 CORBINS ELECTRIC YOUR MOHAVE JOC ELECTRICAL CONTRACTOR Our Commitment to You Corbins Electric strives to make clients for life – and that’s what Mohave members can expect. With that goal comes years of trust and proven experience. We will work with you to ensure that your facilities are safe and efficient – that is something that is just as important to Corbins as it is to you. Along with safety and facility efficiency comes cost-effective and innovative solutions. We will work as part of your team to ensure you are receiving added value from our services. Why Corbins Electric Corbins is one of the largest electrical contractors in the Southwest, and as such can provide Mohave members with a broad range of electrical contracting services and innovative solutions. Our depth of project experience includes a balance of both small and large projects, similar to what is expected from your facility electrical contracting services through the Mohave Job Order Contract (JOC). Our Services • Energy Efficient Lighting • Preventative Maintenance • Outdoor Lighting • Navaid Installation & Maintenance • Power Distribution • • • • • Energy Management • Power Monitoring • Power Factor Correction • Lighting Controls • PLC Wiring Energy Audits Service & Repair Infrared Scans Low & High Voltage Installation • LED Lighting 4 MOHAVE EDUCATIONAL SERVICES COOPERATIVE MEET YOUR TEAM CORBINS ELECTRIC Things You Didn’t Think to Ask About Us • Founded in 1975 • 0.47 EMR • JOC contractor for more than 10 years • More than $150 million in JOC type work • Industry leader for BIM implementation in the Southwest • Full service electrical contractor YOUR MOHAVE JOC TEAM PHIL SIMONE JOC Market Manager [email protected] p. 602.794.6023 c. 602.320.8013 KEVIN SCHULLER Construction Manager [email protected] p. 602.794.6065 c. 602.721.6728 MARK HENDERSON Construction Manager [email protected] p. 602.794.6062 c. 602.206.8160 EXECUTIVE TEAM MARK FLEMING President & CEO JUSTIN MARTIN Director of Operations JOC Resource Manual RELEVANT PROJECT EXPERIENCE Recent Projects • Central Arizona Project (CAP) Little Harquahala Pumping Plant (awarded through the Mohave JOC) • Intel Progressive Build • Honeywell Spring 2014 Shutdown • FAA Grounding at Sky Harbor International Airport • Intel Data Center DETD Upgrades School Districts Where We’ve Worked • • • • Scottsdale Unified School District Washington Elementary School District Casa Grande Elementary School District Gila River Indian Community – Blackwater Community School • Mesa Public Schools CORBINS CORBINS ELECTRIC ELECTRIC REFERENCES At Corbins Electric, we pride ourselves on our ability to create longlasting relationships. We encourage you to contact our references. Our Clients Say it Best VENDOR REFERENCES GENERAL CONTRACTOR & OWNER REFERENCES Jim McFadzen Border States Electric p. 602.885.4508 Telma Reyes Central Arizona Project p. 602.869.2333 Doug Walo Essco / Independent Electric Supply p. 480.497.8000 Steve Grauer Hensel Phelps Construction p. 480.383.8480 Craig Rusk Summit Electric p. 602.267.1000 Bob LaFreniere Turner Construction p. 480.554.9721 Russell Rettus Graybar p. 602.359.0333 John Brakeman H2 Group p. 480.305.2048 David Stalker ACME p. 480.398.4770 Eric Hedlund Sundt Construction p. 480.293.3000 Mohave Electrical Contractor 13V-CORBIN-0307 5 VIRTUAL CONSTRUCTION Building Information Modeling BIM Project Experience Corbins Electric has an extensive Virtual Construction (VC) Department available to assist in the construction process. Our experience with Building Information Modeling (BIM) began in 2005 with the construction of the Barrow Neurological Institute (BNI) Tower at St. Joseph’s Hospital in Phoenix. That’s when we created our VC Department and began building a team of individuals with field experience and trained in BIM. Since then, we have become your electrical contracting leader in the utilization of multiple platforms and uses for BIM. • Phoenix Sky Train • Phoenix Sky Harbor International Airport Terminal 3 Electrical Upgrades • Intel Fab 12 / 22 / 32 • Intel Fab 11 / 11X • Tucson Air Traffic Control Tower • Chicago Cubs Spring Training Facility • NAU Heath and Learning Center Modeling ensures efficient installation in the field without surprises We currently use Revit for the majority of our work, which is becoming the industry standard. We are also well versed in AutoCAD MEP. Some benefits include in-house project drawings, conflict resolution, 3D, 4D, 5D, and 6D integration. Corbins’ VDC Department aids clients in resolving constructability conflicts in design rather than on the job site. BIM reduces interference in the field, allows us scheduling in our build process, and determines prefabrication opportunities. Ultimately, BIM will save you time, energy, and money. PREFABRICATION Prefabrication speeds up installation in the field We carry more than 15 licenses for Navisworks and AutoCAD MEP, and currently have 15 designers on staff. Software that we utilize includes: • Navisworks Manage 2013, 2014, 2015 BIM ensures specified materials and equipment fill correctly MOHAVE EDUCATIONAL SERVICES COOPERATIVE What Prefabrication Can Do For You • • • • Reduce cost Accelerate schedule Reduce project footprint Increase safety Services • Revit 2013, 2014, 2015 • Autocad MEP 2013, 2014, 2015 6 • Scottsdale Community College • Ironwood Hall • Harmon Library • Goodyear Spring Training Ballpark • John C. Lincoln North Mountain Hospital • Barrow Neurological Institute at St. Joseph’s Hospital and Medical Center • • • • • Welding Conduit Bending Racking Packaging / Kitting Lighting Whips JOC Resource Manual • • • • Labeling / Engraving Assembly Threading Temporary Power Res to a Soli MOHAVE EDUCATIONAL SERVICES COOPERATIVE WORK ORDER TO PROJECT CLOSE-OUT PROCESS Mohave’s formal competitive procurement is governed by a nu containing processes and requirements by which it must compl MOHAVE MEMBER Mohave contracts provide it’s members a means to purchase n form this formal competitive process. Start Request JOC Work Order Quote Send Estimate to MESC for Review MESC Approval & Issue Work Order Invoice Review & Submit for Payment Mohave uses three types of procurement solicitations: • Invitation for Bids (IFB) • Request for Proposals (RFP) Pay Vendor a Each solicitation contains the terms, conditions, contract. They also contain submittal requirements. Co requirements is an essential element of a vendors response. End Frequently Asked Questions (FAQ): What are the common mistakes vendors make when responding to a Mohave IFB, RFP or RFQ? • Not complying with the instructions. • Taking shortcuts. • Using boilerplate responses rather than responses to the requirements stated. • Incomplete or unacceptable pricing. • Material exceptions to the terms and conditions. VENDOR MOHAVE ESC • Assuming rather than clarifying. What are the common outcomes of these mistakes? Compliance Yes Review “M Ve How long contract • Subm a con comp • Evalu all ve awar date. • Material deviations from the and scope of work. • Missing information. No • Requ • The most serious outcome is a determination that the offer is nonresponsive and cannot be awarded a contract. Audit If there is • The a offer an op revisio Feel free to contact us should you have at 928-753-6945 or by email at cont Prepares JOC Estimate CORBINS ELECTRIC Revise Until Compliant Complete Work & Submit Invoice Send Monthly Usage Report Mohave Electrical Contractor 13V-CORBIN-0307 7 Responding to a Mohave Solicitation WORK ORDER TO PROJECT CLOSE OUT PROCESS INTEGRATED WITH CORBINS ELECTRIC MOHAVE MEMBER Mohave’s formal competitive procurement is governed by a number of rules, regulations and statutes containing processes and requirements by which it must comply. Start Request JOC Work Order Quote Send Estimate to MESC for Review MESC Approval & Issue Work Order Invoice Review & Submit for Payment Mohave contracts provide it’s members a means to purchase needed goods and services resulting form this formal competitive process. Submit Payment Mohave uses three types of procurement solicitations: • Invitation for Bids (IFB) • Request for Proposals (RFP) • Request for (RFQ) End and scope of work for a Mohave Each solicitation contains the terms, conditions, contract. They also contain submittal requirements. Compliance with the submittal requirements is an essential element of a vendors response. Frequently Asked Questions (FAQ): MOHAVE ESC What are the common mistakes vendors make when responding to a Mohave IFB, RFP or RFQ? No Compliance Review • Taking shortcuts. • Using boilerplate responses rather than responses to the requirements stated. Yes • Incomplete or unacceptable pricing. • Material exceptions to the terms and conditions. • Material deviations from the and scope of work. • Missing information. CORBINS PM • Assuming rather than clarifying. Receives & Sends to Estimating Resource / Schedule Meeting Submit Estimate & Schedule Revise Until Compliant Verifies MESC Approved No What are the common outcomes of these mistakes? MESC Review & Approval Close Work Order • The most serious outcome is a determination that the offer is nonresponsive and cannot be awarded a contract. Create Bid CORBINS FIELD How long does it take to be awarded a contract after I submit my offer? • Submitting an offer does not guarantee a contract for your You offer must compete with all other responses. • Evaluation and award times vary. However, of the outcome and all vendors are award four to eight weeks after the due date. If there is a problem, can I MOHAVE EDUCATIONAL SERVICES COOPERATIVE it? • The ability to correct a mistake or revise an offer is limited. You should never anticipate an opportunity to make a correction or revision. Project Initiation Complete Work Enter Budget in Spectrum Prepare Invoice Enter in Bid Tracker CORBINS ACCT. CORBINS EST. Project Walk & Define Scope WO End Audit Feel free to contact us should you have any further questions at 928-753-6945 or by email at [email protected] Yes 8 “Member trusted, Vendor respected” • Not complying with the instructions. Enter Invoice in Spectrum Receive Payment & Close Invoice JOC Resource Manual Send Usage Report ADDITIONAL RESOURCES ELECTRICAL INSPECTION CHECKLIST Please see the attached flash drive for additional resources: Electrical Inspection Checklist General Requirements Visual Inspection Date: _______________ Inspector: _____________________________ Location: __________________________________________________ Comments: ________________________________________________ __________________________________________________________ __________________________________________________________ • • • • • • • • • • Becoming a Mohave Vendor Corbins Sample Proposal Electrical Inspection Checklist Mohave JOC and Corbins Electric Mohave JOC Org Chart Mohave Member Handbook Phil Simone Contact Information Resource What is Arc Flash? Work Order to Payment Mohave and Corbins Process Work Order to Payment Mohave Only Process BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &KHFNOLVW*HQHUDO5HTXLUHPHQWVIRU(OHFWULFDO,QVSHFWLRQV ✔ Item Inspection Activity with NEC Reference Comments 1. Verify that unused openings have been effectively closed. 110.12(A), 408.7 2. Check for secure mounting and adequate ventilation space for equipment. 110.13 3. Check for proper use and ratings of splices and terminations. 110.14(A) and (B) 4. Check temperature ratings of terminations. 110.14(C) 5. Check for arc flash protection warning signs. 110.16 CORBINS ELECTRIC Mohave Electrical Contractor 13V-CORBIN-0307 9 CONTACT US Phil Simone, JOC Market Manager o. 602.794.6024 | c. 602.320.8013 [email protected] 4829 South 38th Street, Phoenix, AZ 85040 | p. 602.275.8500 | corbinselectric.com December 2014