Submerged Floating Tunnel
Transcription
Submerged Floating Tunnel
Technical drawings Project: Parcel: Feasibility study for crossing the Sognefjord Submerged floating tunnel Lavik - Oppedal Kvinnherad Municipality Technical data Sognefjorden From - to profile : 0 - 4083 Sizing class: : S4 Speed limit : 80 km/t E 39 Lavik Traffic basis (ADT) : 4000 year 2032 Oppedal N Statens vegvesen 2000m 0 Scale 2000m 4000m 1:200000 Region West 1. Draft November 2012 Drawing list Project: Statens vegvesen Page 1 of 2 Feasibility study for crossing the Sognejord List no. Concept development of submerged floating tunnel Revision SFT Lavik - Oppedal Tegn.nr. Title Drawing Revision date Index A101 Frontpage 28.11.2012 A A102 Drawing list 28.11.2012 A 28.11.2012 A 28.11.2012 A 28.11.2012 A 28.11.2012 A B101 Sognefjord SFT crossing - Overview B102 Sognefjord SFT crossing - Navigation channel F101 Normal profiles - Submerged floating tunnel - Typical sections F102 Normal profiles - Landfalls - Typical sections 28.11.2012 A K101 Submerged floating tunnnel - General plan and elevation 28.11.2012 A K102 Submerged floating tunnnel - Typical sections 28.11.2012 A K111 Submerged floating tunnnel - Mid span 28.11.2012 A K112 Submerged floating tunnnel - Landfall Lavik K113 Submerged floating tunnnel - Landfall Lavik - Elevation and sections 28.11.2012 A 28.11.2012 A K121 Concrete tubes - Form - Typical sections 28.11.2012 A K131 Concrete tubes - Reinforcement layout - Typical sections 28.11.2012 A K132 Concrete tubes - Reinforcement layout - Landfall section 28.11.2012 A K133 Concrete tubes - Reinforcement layout - Bracings and cross tunnels 28.11.2012 A K141 Concrete tubes - Post tensioning - Typical sections 28.11.2012 A K142 Concrete tubes - Post tensioning - Landfall section 28.11.2012 A K143 Concrete tubes - Element joints 28.11.2012 A K201 Submerged floating tunnel - Element key plan 28.11.2012 A K202 Submerged floating tunnel - Landfall element Lavik - Isometric view 28.11.2012 A K203 Submerged floating tunnel - Tunnel element nº 1 - Isometric view 28.11.2012 A K211 Submerged floating tunnel - Floating sequences 28.11.2012 A Y101 Construction sequence - Jointing of elements - Jetty and outrigger support 28.11.2012 A Y102 Construction sequences - Jointing of elements 1 28.11.2012 A Y103 Construction sequences - Jointing of elements 2 28.11.2012 A Y104 Construction sequences - Towing of tunnel 28.11.2012 A Y105 Construction sequences - Pontoon installation 28.11.2012 A Date Remarks 1 28.11.2012 Sognefjorden Oppedal 250m 0 500m Horizontal Scale A Rev. N Lavik 1000m 1:25000 ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Feasibilitystudy for crossing the Sognefjord File no. Statens vegvesen Concept development of Submerged Floating Tunnel Rev. date 2011145371 Drawing date - - Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Project number Sognefjord SFT crossing PROF number Overview File number Sea bed equidistance: 200m Building code Scale A1 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 Drawing number / Revision index As shown B101 K001 A 24 00 m Sognefjorden # (20) Oppedal 31 83 . 24 m Lavik R 3 0 0 0 m 3 0 250m 0 500m Horizontal Scale A Rev. N = 1000m 1:25000 ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Feasibilitystudy for crossing the Sognefjord File no. Statens vegvesen Concept development of Submerged Floating Tunnel Rev. date 2011145371 Drawing date - - Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Project number Sognefjord SFT crossing PROF number Navigation channel Suggested main ship routing based on Norvegian Coastal Directorate’s fairlead recommendations. File number Sea bed equidistance: 200m Building code Scale A1 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 Drawing number / Revision index As shown B102 K001 A 1 2 3 4 5 6 7 8 9 10 11 12 A A B B 200 1 5 5 0 0 0 3 R6 C 5 C 4600 0 0 5 R5 5 6 5 6 3 000 % 0 . 3 3 000 2 D D 4 3 3 80 0 3000 300 517 300 E E =8m 3800 5000 3800 12600 F F Cross tunnel Tunnel section 1 1:100 1:100 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 1. Rev. ARP Issued for client approval Feasibilitystudy for crossing the Sognefjord Submerged floating tunnel - General plan and elevation K101 Net cross - sectional area Ac = 37,4 m File no. Wearing layer (75 mm) 3. Solid ballast compartment EXC 3 Submerged floating tunnel - Mid span K111 Statens vegvesen Concrete: Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 Water ballast compartment 6. Bridge railing (strength class H2) Submerged floating tunnel 2 4 5 6 7 8 9 Region vest Originator: Building code Y-1860-S7 (EN 10138-3) 3 Produced for File number Typical sections Post-tensioning: 1 K110. Lidvard Skorpa PROF number B500NC (NS 3576-3) Post - cladding fire protection Rev. date - - Client rep. Project number Normal profiles Reinforcement: 5. 2012-11-28 Lavik - Oppedal Mix specification SV-40 4. H SAH 2011145371 Drawing date Execution class: 2. SAH Drawn by Checked Approved Description Prosesskode 2, Hndbok 26 2007 2 Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown F101 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A Grouted 0 0 0 7 B B R 0 5 5 1 0 0 0 6 R 0 5 7 1 C 0 5 7 1 0 0 5 3 0 0 5 3 C 4600 5 5 6 5 6 1000 1210 4 530 D 300 2 000 % 0 . 3 2 6 000 D 300 300 500 4 5 582 5 582 1126 1000 3 2 000 10 00 3 3 000 E 462 E 4500 5000 4500 14000 F F End section Tunnel section 2 1:100 1:100 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 1. Rev. ARP Issued for client approval Feasibilitystudy for crossing the Sognefjord Submerged floating tunnel - General plan and elevation K101 Net cross - sectional area Ac = 37,4 m File no. Wearing layer (75 mm) 3. Solid ballast compartment EXC 3 Submerged floating tunnel - Landfall Lavik K112 Statens vegvesen Concrete: Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 Water ballast compartment 6. Bridge railing (strength class H2) 2 4 5 6 7 8 9 Region vest Originator: Building code Y-1860-S7 (EN 10138-3) 3 Produced for File number Typical sections Post-tensioning: 1 K110. Lidvard Skorpa PROF number Landfalls B500NC (NS 3576-3) Post - cladding fire protection Rev. date - - Client rep. Project number Normal profiles Reinforcement: 5. 2012-11-28 Lavik - Oppedal Mix specification SV-40 4. H SAH 2011145371 Drawing date Execution class: 2. SAH Drawn by Checked Approved Description Prosesskode 2, Hndbok 26 2007 2 Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown F102 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A Elevation 1:10000 Lavik Oppedal 2 1 B 3 4 5 6 7 8 9 10 -12 m 11 12 13 14 15 16 17 18 MSL -20 m B C C Plan 1:10000 A B 430 0 5 1 D 5 0 2 1 5 0 D 2 0 5 2 0 5 5 0 2 2 0 5 5 0 2 20 5 5 20 B R= 268 2m A 5 20 Steel pontoon 0 15 740 E Concrete tube 0 50 20 5 15 0 E 50 0 Horizontal bracing C F F Closure joints Closure joints 3700 200m 0 200m 400m Horizontal scale N C 1: 10000 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 K111 Submerged floating tunnel - Mid span Feasibilitystudy for crossing the Sognefjord File no. K112 Submerged floating tunnel - Landfall Lavik 2011145371 Drawing date Execution class: EXC 3 Statens vegvesen Concrete: Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Mix specification SV-40 Project number H Submerged floating tunnel General plan and elevation Reinforcement: B500NC (NS 3576-3) PROF number File number Post-tensioning: Building code Y-1860-S7 (EN 10138-3) 1 2 3 4 5 6 7 8 9 - - Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K101 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A Sections 1 : 750 MSL MSL MSL B B C C Section A - A Section B - B Section C - C Plans 1 : 750 D D E E A A B B C C F F G G Plan A Plan B REMARKS: Plan C REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 K101 Submerged floating tunnel - General plan and elevation Feasibilitystudy for crossing the Sognefjord File no. EXC 3 Statens vegvesen Concrete: Concrete grade B55 Pl ottedat2 o9 :. 1 1. 201 2 H 2011145371 Drawing date Execution class: Concept development of Submerged Floating Tunnel Durability class MF40 Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Mix specification SV-40 Project number Reinforcement: B500NC (NS 3576-3) Submerged floating tunnel PROF number Typical sections File number 06: 23: 54 Post-tensioning: Building code Y-1860-S7 (EN 10138-3) Filnavn: 1 Scale A3 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K102 - Submerged floating tunnel - Typical sections.dgn 2 3 4 5 6 7 8 9 - - 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K102 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A 8 10 9 11 B B 26 400 (min) 26 Ship channel Steel pontoon Steel shaft MSL Min -20 m C C Concrete tube Elevation 1:2000 D D 430 1 5 0 12. 6 0 5 1 E 5 E F F 80 40 Concrete bracing Plan 1:2000 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 Feasibilitystudy for crossing the Sognefjord File no. EXC 3 Statens vegvesen Concrete: Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 5 6 7 8 9 Region vest Originator: Building code Y-1860-S7 (EN 10138-3) 4 Produced for File number Plan and elevation Post-tensioning: 3 Lidvard Skorpa PROF number Mid span B500NC (NS 3576-3) 2 Client rep. Project number Submerged floating tunnel Reinforcement: 1 - - Lavik - Oppedal Mix specification SV-40 H 2011145371 Drawing date Execution class: Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K111 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A Closure joint 0 2 H 3 7 5 H ,6 2 1 14 B 12, 6 0,5 B 1 2 4 1 2 Temp. support C C 1 5 4 1 Detail H 1:250 D D 3 D E F E E D G E F F F G G G A Rev. ARP Issued for client approval SAH Feasibilitystudy for crossing the Sognefjord File no. 2012-11-28 Statens vegvesen Pl ottedat2 o9 :. 1 1. 201 2 Concept development of Submerged Floating Tunnel Rev. date 2011145371 Drawing date H SAH Drawn by Checked Approved Description - - Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Project number Submerged floating tunnel PROF number Plan 1:1000 Landfall Lavik File number 06: 08: 50 Plan Building code Scale A3 Filnavn: 1 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K112 - Submerged floating tunnel - Landfall Lavik - Plan.dgn 2 3 4 5 6 7 8 9 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K112 K001 12 A 1 2 3 4 5 6 7 8 9 A 10 11 12 A 1 Monolitic end joint M.S.L. G F E D Rock cut Grouted B B C tunnel L Prefab. landfall element 1 1 Temporary bulkhead C C G F E D D D Longitudinal section 1:500 E E F F Section G - G Section F - F 1 Section E - E Section D -D Detail 1:50 Different cross sections 1:500 G REMARKS: G REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 1. Rev. ARP Issued for client approval Temporary jacking point for positioning and locking during grouting F102 Normal profiles - Landfalls - Typical sections Feasibilitystudy for crossing the Sognefjord K101 Submerged floating tunnel - General plan and elevation Execution class: K112 Submerged floating tunnel - Landfall Lavik - Plan EXC 3 File no. Statens vegvesen Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 Rev. date Landfall Lavik 7 8 9 Region vest Originator: Building code Y-1860-S7 (EN 10138-3) 6 Produced for File number Elevation and sections Post-tensioning: 5 Lidvard Skorpa PROF number B500NC (NS 3576-3) 4 - - Client rep. Project number Submerged floating tunnel Reinforcement: 3 2012-11-28 Lavik - Oppedal Mix specification SV-40 H 2 SAH 2011145371 Drawing date Concrete: 1 SAH Drawn by Checked Approved Description Prosesskode 2, Hndbok 26 2007 Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K113 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 B B R 300 3 695 300 E 500 2 000 1 258 517 5 000 500 200 500 500 200 1 104 300 0 0 0 517 ( var . ) 3 134 300 ( var . ) 1 000 1 4 741 1 000 300 500 2 000 200 500 500 D VAR. 0 0 8 E COG VAR. 300 300 C R 9 6 16 1 500 1 000 R 0 0 0 0 00 6 1 000 520 COG 8 3 06 1 300 200 1 000 5 0 50 7 oad CL r oad CL r R 5 060 D 6 0 0 3 800 629 C CL t unnel A CL t unnel A 5 000 F F General tube section Landfall section Axis 1+150 m to 18-150 m Axis 1 to 1+150 m / 17 to 18-150 m 1:100 1:100 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 K101 Feasibilitystudy for crossing the Sognefjord Submerged floating tunnel - General plan and elevation K102 Submerged floating tunnel - Typical sections K131 Concrete tubes - Reinforcement layout - Typical sections K141 Concrete tubes - Post-tensioning - Typical sections File no. EXC 3 Statens vegvesen Concrete: Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 5 6 7 8 9 Region vest Originator: Building code Y-1860-S7 (EN 10138-3) 4 Produced for File number Typical sections Post-tensioning: 3 Lidvard Skorpa PROF number Form B500NC (NS 3576-3) 2 K110. Client rep. Project number Concrete tubes Reinforcement: 1 - - Lavik - Oppedal Mix specification SV-40 H 2011145371 Drawing date Execution class: Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K121 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A B B ł25c200 ł25c200 ł16c400c400 2ł32c200 2ł32c200 C ł32c200 ł32c200 ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 ł16c400c400 ł16c200 ł16c200 ł16c200 C ł16c200 ł16c200 D D ł16c200 ł16c200 ł16c200 ł16c200 BS ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 BS ł16c200 T-head ł16c200 T-head ł20c200 ł20c200 E ł20c200 ł20c200 ł16c200 T-head ł25c200 7ł16c65 ł16c200 T-head ł25c200 E 7ł16c65 ł20c200 ł16c400c400 ł16c200c200 Headed stirrups ł20c200 ł16c400c400 ł16c200c200 Headed stirrups F F Reinforcement layout - Type 1 Reinforcement layout - Type 2 Axis 1+150 m to 3 / 7 to 12 / 16 to 18 -150 m Axis 3 to 7 / 12 to 16 1:100 1:100 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 K101 3. Average reinforcement intensity: 1. Concrete cover: Feasibilitystudy for crossing the Sognefjord Submerged floating tunnel - General plan and elevation - Outer face : 70 mm - Type 1 : 245 kg/m3 K102 - Inner face main compartment) : 45 mm - Type 2 : 175 kg/m3 K121 Concrete tubes - Form - Typical sections K141 Concrete tubes - Post-tensioning - Typical sections Submerged floating tunnel - Typical sections EXC 3 Statens vegvesen Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 Reinforcement layout 4 5 6 7 8 9 Produced for Region vest Originator: File number Typical sections Building code Y-1860-S7 (EN 10138-3) 3 Lidvard Skorpa PROF number B500NC (NS 3576-3) Post-tensioning: 2 K110. Client rep. Project number Concrete tubes Reinforcement: Lap splices to be fully staggered. 1 - - Lavik - Oppedal Mix specification SV-40 2. Min. lap length for longitudinal reinforcement ł32 is 1 200 mm. 2011145371 Drawing date Concrete: - Inner face ballast compartments : 80 mm H File no. Execution class: Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K131 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A B B ł25c200 ł16c400c400 ł25c200 C C 2ł32c200 2ł32c200 D D ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 ł16c200 T-head ł16c200 BS E E ł20c200 ł20c200 ł16c200 T-head ł25c200 7ł16c65 F ł20c200 ł16c400c400 ł16c200c200 Headed stirrups F Reinforcement layout - Landfall elements 1:100 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 K101 3. Average reinforcement intensity: 1. Concrete cover: - Landfall elements :215 K102 kg/m3 Feasibilitystudy for crossing the Sognefjord Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections - Outer face : 70 mm - Inner face main compartment) : 45 mm K121 Concrete tubes - Form - Typical sections - Inner face ballast compartments : 80 mm K142 Concrete tubes - Post-tensioning - Landfall section EXC 3 Statens vegvesen Concrete: Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 2. Min. lap length for longitudinal reinforcement ł32 is 1 200 mm. 4 5 6 7 8 9 Lidvard Skorpa Produced for Region vest Originator: PROF number B500NC (NS 3576-3) Reinforcement layout File number Landfall section Building code Y-1860-S7 (EN 10138-3) 3 K110. Client rep. Project number Concrete tubes Reinforcement: Post-tensioning: 2 - - Lavik - Oppedal Lap splices to be fully staggered. 1 2011145371 Drawing date Mix specification SV-40 H File no. Execution class: Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K132 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 Segment / casting joint A A Segment i+1 Segment i Outer face 112 400 800 288 6-19 hoop tendons B B Fixed multiplane coupler 6-31 tendon Detail coupling of longitudinal PT 1:50 C C PT 6-19 c 1000 PT 6-19 c 1000 7 15 1 2 71 PT 6-31 PT 6-31 E R 6 005 R 6 005 E R 6 005 D R 6 005 D Active 6-19 multiplane anchor R 68 040 Active 6-19 multiplane anchor R 68 040 Active 6-19 multiplane anchor R 68 040 F R 68 040 F Active 6-19 multiplane anchor Post-tensioning layout - Type 1 Post-tensioning layout - Type 2 Axis 1+150 m to 3 / 7 to 12 / 16 to 18-150 m Axis 3 to 7 / 12 to 16 G G 1:100 1:100 REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 1. Metal sheats complying with EN 523 shall be used. K101 3. Hoop cables are stressed from both ends. K102 Sheat inner diameter ID: H - 6-19 tendons : 90 mm - 6-31 tendons : 110 mm 4. Maximum stressing force during stressing shall not Submerged floating tunnel - Typical sections K121 Concrete tubes - Form - Typical sections K131 Concrete tubes - Reinforcement layout - Typical sections EXC 3 Statens vegvesen Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 - 6-19 tendons : 6 860 kN Mix specification SV-40 - 6-31 tendons : 4 210 kN Reinforcement: 3 5 6 7 8 9 Lidvard Skorpa Produced for Region vest Originator: PROF number Post-tensioning layout File number Typical sections Building code Y-1860-S7 (EN 10138-3) 4 K110. Client rep. Project number Concrete tubes Post-tensioning: 2 - - Lavik - Oppedal B500NC (NS 3576-3) over 3 segment joints, average cable length is 90 m. 2011145371 Drawing date using fixed multiplane coulpers. The couplers are staggered 1 File no. Execution class: Concrete: exceed 0.95 x Fp0,1k: 2. Longituinal cables are contiuous and stressed from one end Feasibilitystudy for crossing the Sognefjord Submerged floating tunnel - General plan and elevation Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K141 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A B B PT 6-19 c 1000 7 56 PT 6-31 C D D E E R 19 072 Active 6-19 multiplane anchor F R 19 072 R 6 60 5 5 R 6 60 C Active 6-19 multiplane anchor F Post-tensioning layout - Landfall elements 1:100 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 1. Metal sheats complying with EN 523 shall be used. K101 3. Hoop cables are stressed from both ends. K102 Sheat inner diameter ID: H - 6-19 tendons : 90 mm - 6-31 tendons : 110 mm 4. Maximum stressing force during stressing shall not Submerged floating tunnel - Typical sections K121 Concrete tubes - Form - Typical sections K132 Concrete tubes - Reinforcement layout - Landfall section EXC 3 Statens vegvesen Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 - 6-19 tendons : 6 860 kN Mix specification SV-40 - 6-31 tendons : 4 210 kN Reinforcement: 3 5 6 7 8 9 Lidvard Skorpa Produced for Region vest Originator: PROF number Post-tensioning File number Landfall section Building code Y-1860-S7 (EN 10138-3) 4 K110. Client rep. Project number Concrete tubes Post-tensioning: 2 - - Lavik - Oppedal B500NC (NS 3576-3) over 3 segment joints, average cable length is 90 m. 2011145371 Drawing date using fixed multiplane coulpers. The couplers are staggered 1 File no. Execution class: Concrete: exceed 0.95 x Fp0,1k: 2. Longituinal cables are contiuous and stressed from one end Feasibilitystudy for crossing the Sognefjord Submerged floating tunnel - General plan and elevation Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K142 K001 12 A 1 2 3 Element i A 4 5 6 7 8 9 10 11 12 Element i+1 A B B C C Longitundinal section - Element joint 1:50 D D E E F F Section - Element joint G G 1:100 REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 1. Metal sheats complying with EN 523 shall be used. K101 3. Hoop cables are stressed from both ends. K102 Sheat inner diameter ID: H - 6-19 tendons : 90 mm - 6-31 tendons : 110 mm 4. Maximum stressing force during stressing shall not Submerged floating tunnel -Typical sections K121 Concrete tubes - Form - Typical sections K131 Concrete tubes - Reinforcement layout - Typical sections : 6 860 kN - 6-31 tendons : 4 210 kN K141 EXC 3 Statens vegvesen Concrete grade B55 Concrete tubes - Post-tensioning - Typical sections Concept development of Submerged Floating Tunnel 3 5 6 7 8 9 Produced for Region vest Originator: File number Element joints Building code Y-1860-S7 (EN 10138-3) 4 Lidvard Skorpa PROF number Post-tensioning B500NC (NS 3576-3) Post-tensioning: 2 K110. Client rep. Project number Concrete tubes Reinforcement: using fixed multiplane coulpers. The couplers are staggered 1 - - Lavik - Oppedal Mix specification SV-40 over 3 segment joints, average cable length is 90 m. 2011145371 Drawing date Durability class MF40 - 6-19 tendons File no. Execution class: Concrete: exceed 0.95 x Fp0,1k: 2. Longituinal cables are contiuous and stressed from one end Feasibilitystudy for crossing the Sognefjord Submerged floating tunnel - General plan and elevation Scale A3 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K143 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A ”5 tn n me e l e l e n n u T 3m 7 , 8 0 3 L= ”4 tn n e m e l e l e 6m n 6 , n 4 6 Tu 2 = P L B 3 n” t en m em el 73 el 8, n 0 n 3 = Tu L ”7 tn n me e l e l e n n u T ”6 tn n me e l e l e n n u T 3m 7 , 8 0 L=3 4m 7 , 4 6 L=2 T P P P B T P T P P P T T P P C C P T 2 n” t n e m em 73 , el 8 l e 30 nn = L Tu P P P P D D 1 n” t n e m em , 17 l e 8 l 26 ne = un L T T P T E t n e m e m l le 45 l , fa 8 d 2 n 2 a = L L P E T Element key plan 1: 5000 T F F P P Permanent shaft T Temporary shaft G G A Rev. ARP Issued for client approval SAH Feasibilitystudy for crossing the Sognefjord File no. Statens vegvesen Start rotationq = 0.5 2 Approachingq = 0.2 3 Final positionq = 0 4 Continuity cast 2012-11-28 Concept development of Submerged Floating Tunnel Rev. date 2011145371 Drawing date 1 SAH Drawn by Checked Approved Description - - K110. Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Project number Submerged floating tunnel H PROF number Pivot launching sequence Tunnel section 1 File number Building code 1: 2000 1 2 3 4 5 Scale A3 6 7 8 9 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown F101 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A B B 1 1 C C D D 1 E E 1 F F 2 3 2 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 1. Rev. ARP Issued for client approval Temporary shaft OD 8000mm Feasibilitystudy for crossing the Sognefjord File no. 2. Temporary bulkhead EXC 3 3. Sliding support beam (pivot launching) Concrete: Statens vegvesen Pl ottedat2 o9 :. 1 1. 201 2 Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 03: 41: 43 Scale A3 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K202 Submerged floating tunnel - Landfall element Lavik - Isometric view.dgn 5 6 7 8 9 Region vest Originator: Building code Y-1860-S7 (EN 10138-3) 4 Produced for File number Isometric view Post-tensioning: 3 - Lidvard Skorpa PROF number Landfall element Lavik B500NC (NS 3576-3) 2 Rev. date - Client rep. Project number Submerged floating tunnel Reinforcement: 1 2012-11-28 Lavik - Oppedal Mix specification SV-40 Filnavn: SAH 2011145371 Drawing date Execution class: H SAH Drawn by Checked Approved Description Prosesskode 2, Hndbok 26 2007 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K202 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A 1 1 B B C C D D 1 1 E E 2 F F 3 2 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 1. Rev. ARP Issued for client approval Temporary shaft OD 8000mm Feasibilitystudy for crossing the Sognefjord File no. 2. Temporary bulkhead EXC 3 3. Sliding support beam (pivot launching) Concrete: Statens vegvesen Pl ottedat2 o9 :. 1 1. 201 2 Concrete grade B55 Concept development of Submerged Floating Tunnel Durability class MF40 4. Access / escape tunnel Mix specification SV-40 03: 43: 33 Isometric view 5 6 7 8 9 Region vest Originator: Building code Scale A3 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K203 - Submerged floating tunnel - Tunnel element no 1 - Isometric view.dgn 4 Produced for File number Y-1860-S7 (EN 10138-3) 3 - Lidvard Skorpa PROF number Tunnel element N” 1 Post-tensioning: 2 Rev. date - Client rep. Project number Submerged floating tunnel B500NC (NS 3576-3) 1 2012-11-28 Lavik - Oppedal Reinforcement: Filnavn: SAH 2011145371 Drawing date Execution class: H SAH Drawn by Checked Approved Description Prosesskode 2, Hndbok 26 2007 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K203 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 Cross sections 1:750 A A MSL MSL MSL B B C C 1. D Test submergence 2. Tow to site 3. Element assembly Displacement : 76000 tonnes Displacement : 71000 tonnes Displacement : 341000 tonnes Draft : 35 meters Draft : 2 meters Draft : 12.6 meters G.M : 2.1 meters G.M : 0.8 meters G.M : Solid ballast : 30 - 35 m Solid ballast : 30 - 35 m Solid ballast : 30 - 35 m Water ballast : 2 2 2 Water ballast : 2 2 7m Water ballast MSL : D 1.0 meters 2 7m MSL 7m MSL E E F F 4. G 5. Tunnel assembly In place installation 6. Test submergence Displacement : 353000 tonnes Displacement : 1050000 tonnes Displacement : 1050000 tonnes Draft : 32 meters Draft : Draft : G.M : 1.7 meters G.M : G.M : Solid ballast : 30 - 35 m Solid ballast : 30 - 35 m Solid ballast : 30 - 35 m 32 meters > 30 meters 32 meters > 30 meters 2 2 Water ballast 2 Water ballast : 7m REMARKS: : G 2 2 2 7m Water ballast REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. : 7m ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 K101 Submerged floating tunnel - General plan and elevation Feasibilitystudy for crossing the Sognefjord File no. EXC 3 Statens vegvesen Concrete: Concrete grade B55 Pl ottedat2 o9 :. 1 1. 201 2 H 2011145371 Drawing date Execution class: Concept development of Submerged Floating Tunnel Durability class MF40 Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Mix specification SV-40 Project number Reinforcement: B500NC (NS 3576-3) Submerged floating tunnel PROF number Floating sequences File number 06: 1 2: 45 Post-tensioning: Building code Y-1860-S7 (EN 10138-3) Filnavn: 1 Scale A3 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Floating phases.dgn 2 3 4 5 6 7 8 9 - - 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown K211 K001 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A Plan 1:2000 B A B B Jetty A C C Access road Section A - A : Jetty 1:1000 Wire bracing Barge D D MSL B E E Access road Section B - B : Outrigger support 1:1000 F F MSL G G A Rev. ARP Issued for client approval SAH Feasibilitystudy for crossing the Sognefjord File no. 2012-11-28 Statens vegvesen Pl ottedat2 o9 :. 1 1. 201 2 Concept development of Submerged Floating Tunnel 03: 50: 04 Jetty and outrigger support Rev. date 2011145371 Drawing date H SAH Drawn by Checked Approved Description - - Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Project number Construction sequences PROF number Jointing of elements File number Building code Scale A3 Drawn by Filnavn: 1 Checked by Approved by 11744 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y101 Construction sequences - Jointing of elements - Jety and outrigger support.dgn 2 3 4 Project no. 5 6 7 8 9 10 11 Drawing number / Revision index - H As shown Y101 12 1 2 3 4 5 6 7 8 9 10 11 12 A A Remarks Step 1 A Tunnel, length = 1200m B Tunnel, length = 1200m 1 Quay, see drawing Y101 2 Barge, see drawing Y101 B B 1 Sea 2 Land C C Step 2 D D A E E Sea Land F F Step 3 A 250m G 0 500m 1000m Horizontal Scale G N 1:25000 B A Rev. ARP Issued for client approval SAH Feasibilitystudy for crossing the Sognefjord File no. Concept development of Submerged Floating Tunnel Pl ottedato: 29. 1 1. 201 2 H Statens vegvesen Land 2012-11-28 Rev. date 2011145371 Drawing date Sea SAH Drawn by Checked Approved Description - - Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Project number Construction sequences PROF number Jointing of elements 1 File number Building code 06: 36: 21 Scale A3 Drawn by Filnavn: 1 Checked by Approved by 11744 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y102 Construction sequences - Jointing of elements 1.dgn 2 3 4 Project no. 5 6 7 8 9 10 11 Drawing number / Revision index - H As shown Y102 12 1 2 3 4 5 6 7 8 9 10 11 12 A A Step 4 B A B B C C C Sea Land D D Step 5 E E Tow to site Sea F G Land F 250m Remarks 0 500m 1000m Horizontal Scale A Tunnel, length = 1200m B Tunnel, length = 1200m A Rev. 1:25000 ARP Issued for client approval Tunnel, length = 1200m 1 Quay, see drawing Y101 SAH File no. Concept development of Submerged Floating Tunnel Barge, see drawing Y101 Produced for Region vest Originator: Construction sequences PROF number Jointing of elements 2 File number Building code Scale A3 Checked by Approved by Project no. 11744 2 - Lidvard Skorpa Lavik - Oppedal Drawn by 1 Rev. date - Client rep. Project number 2 2012-11-28 2011145371 Drawing date Statens vegvesen H SAH Drawn by Checked Approved Description Feasibilitystudy for crossing the Sognefjord C G N 3 4 5 6 7 8 9 10 11 Drawing number / Revision index - H As shown Y103 12 1 2 3 4 5 6 7 8 9 10 11 12 A A Lavik B B 3 B 4 C Joint C 5 2 D D 1 Joint A E E Oppedal F F 500m 0 1000m Horizontal Scale G A Standards / provisions: Hndbok 185 Eurocode ed. 2011 Rev. N 2000m 1:50000 G ARP Issued for client approval SAH SAH 2012-11-28 Drawn by Checked Approved Description Rev. date Prosesskode 2, Hndbok 26 2007 Feasibilitystudy for crossing the Sognefjord File no. EXC 3 Statens vegvesen Concrete: Concrete grade B55 Pl ottedat2 o9 :. 1 1. 201 2 H 2011145371 Drawing date Execution class: Concept development of Submerged Floating Tunnel Durability class MF40 Client rep. Lidvard Skorpa Produced for Region vest Originator: Lavik - Oppedal Mix specification SV-40 Project number Reinforcement: B500NC (NS 3576-3) Construction sequences PROF number Towing of tunnel File number 04: 28: 38 Post-tensioning: Building code Y-1860-S7 (EN 10138-3) Filnavn: 1 Scale A3 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y106 Construction - Installation.dgn 2 3 4 5 6 7 8 9 - - 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown Y104 12 A 1 2 3 4 5 6 7 8 9 10 11 12 A A B B C C D D MSL MSL E E F F Pontoon installation Final position 1:1000 1:1000 G G REMARKS: REFERENCES: A Standards / provisions: Hndbok 185 Eurocode ed. 2011 1. Rev. ARP Issued for client approval Pontoons are installed after the tunnel has been installed Feasibilitystudy for crossing the Sognefjord File no. Total weight of pontoon : EXC 3 tonnes Statens vegvesen Concrete: Concrete grade B55 Pl ottedat2 o9 :. 1 1. 201 2 H Concept development of Submerged Floating Tunnel Durability class MF40 B500NC (NS 3576-3) Produced for Region vest Originator: PROF number Pontoon Installation File number 06: 00: 26 Building code Y-1860-S7 (EN 10138-3) Scale A3 L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y107 Pontoon installation.dgn 3 4 5 6 7 8 9 - Lidvard Skorpa Construction sequences Post-tensioning: 2 Rev. date - Client rep. Project number Reinforcement: 1 2012-11-28 Lavik - Oppedal Mix specification SV-40 Filnavn: SAH 2011145371 Drawing date Execution class: 2. SAH Drawn by Checked Approved Description Prosesskode 2, Hndbok 26 2007 10 Drawn by Checked by Approved by Project no. ARP SAH SAH 11744 11 Drawing number / Revision index - H As shown Y105 12 A