Submerged Floating Tunnel

Transcription

Submerged Floating Tunnel
Technical drawings
Project:
Parcel:
Feasibility study for crossing the Sognefjord
Submerged floating tunnel Lavik - Oppedal
Kvinnherad Municipality
Technical data
Sognefjorden
From - to profile
:
0 - 4083
Sizing class:
:
S4
Speed limit
:
80 km/t
E 39
Lavik
Traffic basis (ADT) :
4000 year 2032
Oppedal
N
Statens vegvesen
2000m 0
Scale
2000m
4000m
1:200000
Region West
1. Draft November 2012
Drawing list
Project:
Statens vegvesen
Page 1 of 2
Feasibility study for crossing the Sognejord
List no.
Concept development of submerged floating tunnel
Revision
SFT Lavik - Oppedal
Tegn.nr.
Title
Drawing
Revision
date
Index
A101
Frontpage
28.11.2012
A
A102
Drawing list
28.11.2012
A
28.11.2012
A
28.11.2012
A
28.11.2012
A
28.11.2012
A
B101
Sognefjord SFT crossing - Overview
B102
Sognefjord SFT crossing - Navigation channel
F101
Normal profiles - Submerged floating tunnel - Typical sections
F102
Normal profiles - Landfalls - Typical sections
28.11.2012
A
K101
Submerged floating tunnnel - General plan and elevation
28.11.2012
A
K102
Submerged floating tunnnel - Typical sections
28.11.2012
A
K111
Submerged floating tunnnel - Mid span
28.11.2012
A
K112
Submerged floating tunnnel - Landfall Lavik
K113
Submerged floating tunnnel - Landfall Lavik - Elevation and sections
28.11.2012
A
28.11.2012
A
K121
Concrete tubes - Form - Typical sections
28.11.2012
A
K131
Concrete tubes - Reinforcement layout - Typical sections
28.11.2012
A
K132
Concrete tubes - Reinforcement layout - Landfall section
28.11.2012
A
K133
Concrete tubes - Reinforcement layout - Bracings and cross tunnels
28.11.2012
A
K141
Concrete tubes - Post tensioning - Typical sections
28.11.2012
A
K142
Concrete tubes - Post tensioning - Landfall section
28.11.2012
A
K143
Concrete tubes - Element joints
28.11.2012
A
K201
Submerged floating tunnel - Element key plan
28.11.2012
A
K202
Submerged floating tunnel - Landfall element Lavik - Isometric view
28.11.2012
A
K203
Submerged floating tunnel - Tunnel element nº 1 - Isometric view
28.11.2012
A
K211
Submerged floating tunnel - Floating sequences
28.11.2012
A
Y101
Construction sequence - Jointing of elements - Jetty and outrigger support
28.11.2012
A
Y102
Construction sequences - Jointing of elements 1
28.11.2012
A
Y103
Construction sequences - Jointing of elements 2
28.11.2012
A
Y104
Construction sequences - Towing of tunnel
28.11.2012
A
Y105
Construction sequences - Pontoon installation
28.11.2012
A
Date
Remarks
1
28.11.2012
Sognefjorden
Oppedal
250m
0
500m
Horizontal Scale
A
Rev.
N
Lavik
1000m
1:25000
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Feasibilitystudy for crossing the Sognefjord
File no.
Statens vegvesen
Concept development of Submerged Floating Tunnel
Rev. date
2011145371
Drawing date
-
-
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Project number
Sognefjord SFT crossing
PROF number
Overview
File number
Sea bed equidistance: 200m
Building code
Scale A1
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
Drawing number /
Revision index
As shown
B101
K001
A
24
00
m
Sognefjorden
#
(20)
Oppedal
31
83
.
24
m
Lavik
R
3
0
0
0
m
3
0
250m
0
500m
Horizontal Scale
A
Rev.
N
=
1000m
1:25000
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Feasibilitystudy for crossing the Sognefjord
File no.
Statens vegvesen
Concept development of Submerged Floating Tunnel
Rev. date
2011145371
Drawing date
-
-
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Project number
Sognefjord SFT crossing
PROF number
Navigation channel
Suggested main ship routing based on Norvegian Coastal Directorate’s fairlead recommendations.
File number
Sea bed equidistance: 200m
Building code
Scale A1
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
Drawing number /
Revision index
As shown
B102
K001
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
B
B
200
1
5
5
0
0
0
3
R6
C
5
C
4600
0
0
5
R5
5
6
5
6
3 000
%
0
.
3
3 000
2
D
D
4
3
3
80
0
3000
300
517
300
E
E
=8m
3800
5000
3800
12600
F
F
Cross tunnel
Tunnel section 1
1:100
1:100
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
1.
Rev.
ARP
Issued for client approval
Feasibilitystudy for crossing the Sognefjord
Submerged floating tunnel - General plan and elevation
K101
Net cross - sectional area Ac = 37,4 m
File no.
Wearing layer (75 mm)
3.
Solid ballast compartment
EXC 3
Submerged floating tunnel - Mid span
K111
Statens vegvesen
Concrete:
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
Water ballast compartment
6.
Bridge railing (strength class H2)
Submerged floating tunnel
2
4
5
6
7
8
9
Region vest
Originator:
Building code
Y-1860-S7 (EN 10138-3)
3
Produced for
File number
Typical sections
Post-tensioning:
1
K110.
Lidvard Skorpa
PROF number
B500NC (NS 3576-3)
Post - cladding fire protection
Rev. date
-
-
Client rep.
Project number
Normal profiles
Reinforcement:
5.
2012-11-28
Lavik - Oppedal
Mix specification SV-40
4.
H
SAH
2011145371
Drawing date
Execution class:
2.
SAH
Drawn by Checked Approved
Description
Prosesskode 2, Hndbok 26 2007
2
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
F101
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
Grouted
0
0
0
7
B
B
R
0
5
5
1
0
0
0
6
R
0
5
7
1
C
0
5
7
1
0
0
5
3
0
0
5
3
C
4600
5
5
6
5
6
1000
1210
4 530
D
300
2 000
%
0
.
3
2
6 000
D
300
300
500
4
5 582
5 582
1126 1000
3
2 000
10
00
3
3 000
E
462
E
4500
5000
4500
14000
F
F
End section
Tunnel section 2
1:100
1:100
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
1.
Rev.
ARP
Issued for client approval
Feasibilitystudy for crossing the Sognefjord
Submerged floating tunnel - General plan and elevation
K101
Net cross - sectional area Ac = 37,4 m
File no.
Wearing layer (75 mm)
3.
Solid ballast compartment
EXC 3
Submerged floating tunnel - Landfall Lavik
K112
Statens vegvesen
Concrete:
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
Water ballast compartment
6.
Bridge railing (strength class H2)
2
4
5
6
7
8
9
Region vest
Originator:
Building code
Y-1860-S7 (EN 10138-3)
3
Produced for
File number
Typical sections
Post-tensioning:
1
K110.
Lidvard Skorpa
PROF number
Landfalls
B500NC (NS 3576-3)
Post - cladding fire protection
Rev. date
-
-
Client rep.
Project number
Normal profiles
Reinforcement:
5.
2012-11-28
Lavik - Oppedal
Mix specification SV-40
4.
H
SAH
2011145371
Drawing date
Execution class:
2.
SAH
Drawn by Checked Approved
Description
Prosesskode 2, Hndbok 26 2007
2
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
F102
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
Elevation 1:10000
Lavik
Oppedal
2
1
B
3
4
5
6
7
8
9
10
-12 m
11
12
13
14
15
16
17
18
MSL
-20 m
B
C
C
Plan 1:10000
A
B
430
0
5
1
D
5
0
2
1
5
0
D
2
0
5
2
0
5
5
0
2
2
0
5
5
0
2
20
5
5
20
B
R=
268
2m
A
5
20
Steel pontoon
0
15
740
E
Concrete tube
0
50
20
5
15
0
E
50
0
Horizontal bracing
C
F
F
Closure joints
Closure joints
3700
200m
0
200m
400m
Horizontal scale
N
C
1: 10000
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
K111
Submerged floating tunnel - Mid span
Feasibilitystudy for crossing the Sognefjord
File no.
K112
Submerged floating tunnel - Landfall Lavik
2011145371
Drawing date
Execution class:
EXC 3
Statens vegvesen
Concrete:
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Mix specification SV-40
Project number
H
Submerged floating tunnel
General plan and elevation
Reinforcement:
B500NC (NS 3576-3)
PROF number
File number
Post-tensioning:
Building code
Y-1860-S7 (EN 10138-3)
1
2
3
4
5
6
7
8
9
-
-
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K101
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
Sections
1 : 750
MSL
MSL
MSL
B
B
C
C
Section A - A
Section B - B
Section C - C
Plans
1 : 750
D
D
E
E
A
A
B
B
C
C
F
F
G
G
Plan A
Plan B
REMARKS:
Plan C
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
K101
Submerged floating tunnel - General plan and elevation
Feasibilitystudy for crossing the Sognefjord
File no.
EXC 3
Statens vegvesen
Concrete:
Concrete grade B55
Pl
ottedat2
o9
:.
1
1.
201
2
H
2011145371
Drawing date
Execution class:
Concept development of Submerged Floating Tunnel
Durability class MF40
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Mix specification SV-40
Project number
Reinforcement:
B500NC (NS 3576-3)
Submerged floating tunnel
PROF number
Typical sections
File number
06:
23:
54
Post-tensioning:
Building code
Y-1860-S7 (EN 10138-3)
Filnavn:
1
Scale A3
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K102 - Submerged floating tunnel - Typical sections.dgn
2
3
4
5
6
7
8
9
-
-
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K102
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
8
10
9
11
B
B
26
400 (min)
26
Ship channel
Steel pontoon
Steel shaft
MSL
Min -20 m
C
C
Concrete tube
Elevation 1:2000
D
D
430
1
5
0
12.
6
0
5
1
E
5
E
F
F
80
40
Concrete bracing
Plan 1:2000
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
Feasibilitystudy for crossing the Sognefjord
File no.
EXC 3
Statens vegvesen
Concrete:
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
5
6
7
8
9
Region vest
Originator:
Building code
Y-1860-S7 (EN 10138-3)
4
Produced for
File number
Plan and elevation
Post-tensioning:
3
Lidvard Skorpa
PROF number
Mid span
B500NC (NS 3576-3)
2
Client rep.
Project number
Submerged floating tunnel
Reinforcement:
1
-
-
Lavik - Oppedal
Mix specification SV-40
H
2011145371
Drawing date
Execution class:
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K111
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
Closure joint
0
2
H
3
7
5
H
,6
2
1
14
B
12,
6
0,5
B
1
2
4
1
2
Temp. support
C
C
1
5
4
1
Detail H
1:250
D
D
3
D
E
F
E
E
D
G
E
F
F
F
G
G
G
A
Rev.
ARP
Issued for client approval
SAH
Feasibilitystudy for crossing the Sognefjord
File no.
2012-11-28
Statens vegvesen
Pl
ottedat2
o9
:.
1
1.
201
2
Concept development of Submerged Floating Tunnel
Rev. date
2011145371
Drawing date
H
SAH
Drawn by Checked Approved
Description
-
-
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Project number
Submerged floating tunnel
PROF number
Plan 1:1000
Landfall Lavik
File number
06:
08:
50
Plan
Building code
Scale A3
Filnavn:
1
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K112 - Submerged floating tunnel - Landfall Lavik - Plan.dgn
2
3
4
5
6
7
8
9
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K112
K001
12
A
1
2
3
4
5
6
7
8
9
A
10
11
12
A
1
Monolitic end joint
M.S.L.
G
F
E
D
Rock cut
Grouted
B
B
C tunnel
L
Prefab. landfall element
1
1
Temporary bulkhead
C
C
G
F
E
D
D
D
Longitudinal section
1:500
E
E
F
F
Section G - G
Section F - F
1
Section E - E
Section D -D
Detail
1:50
Different cross sections
1:500
G
REMARKS:
G
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
1.
Rev.
ARP
Issued for client approval
Temporary jacking point for positioning and locking during grouting
F102
Normal profiles - Landfalls - Typical sections
Feasibilitystudy for crossing the Sognefjord
K101
Submerged floating tunnel - General plan and elevation
Execution class:
K112
Submerged floating tunnel - Landfall Lavik - Plan
EXC 3
File no.
Statens vegvesen
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
Rev. date
Landfall Lavik
7
8
9
Region vest
Originator:
Building code
Y-1860-S7 (EN 10138-3)
6
Produced for
File number
Elevation and sections
Post-tensioning:
5
Lidvard Skorpa
PROF number
B500NC (NS 3576-3)
4
-
-
Client rep.
Project number
Submerged floating tunnel
Reinforcement:
3
2012-11-28
Lavik - Oppedal
Mix specification SV-40
H
2
SAH
2011145371
Drawing date
Concrete:
1
SAH
Drawn by Checked Approved
Description
Prosesskode 2, Hndbok 26 2007
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K113
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
B
B
R
300
3 695
300
E
500
2 000
1 258
517
5 000
500
200
500 500
200
1 104
300
0
0
0
517
(
var
.
)
3 134
300
(
var
.
)
1 000
1
4 741
1 000
300 500
2 000
200
500 500
D
VAR.
0
0
8
E
COG
VAR.
300
300
C
R
9
6
16
1
500
1 000
R
0
0
0
0
00
6
1 000
520
COG
8
3
06
1
300
200
1 000
5
0
50
7
oad
CL r
oad
CL r
R
5 060
D
6
0
0
3
800
629
C
CL t
unnel
A
CL t
unnel
A
5 000
F
F
General tube section
Landfall section
Axis 1+150 m to 18-150 m
Axis 1 to 1+150 m / 17 to 18-150 m
1:100
1:100
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
K101
Feasibilitystudy for crossing the Sognefjord
Submerged floating tunnel - General plan and elevation
K102
Submerged floating tunnel - Typical sections
K131
Concrete tubes - Reinforcement layout - Typical sections
K141
Concrete tubes - Post-tensioning - Typical sections
File no.
EXC 3
Statens vegvesen
Concrete:
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
5
6
7
8
9
Region vest
Originator:
Building code
Y-1860-S7 (EN 10138-3)
4
Produced for
File number
Typical sections
Post-tensioning:
3
Lidvard Skorpa
PROF number
Form
B500NC (NS 3576-3)
2
K110.
Client rep.
Project number
Concrete tubes
Reinforcement:
1
-
-
Lavik - Oppedal
Mix specification SV-40
H
2011145371
Drawing date
Execution class:
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K121
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
B
B
ł25c200
ł25c200
ł16c400c400
2ł32c200
2ł32c200
C
ł32c200
ł32c200
ł16c200
ł16c200
ł16c200 ł16c200
ł16c200
ł16c400c400
ł16c200 ł16c200
ł16c200
C
ł16c200
ł16c200
D
D
ł16c200
ł16c200
ł16c200
ł16c200 BS
ł16c200
ł16c200
ł16c200
ł16c200
ł16c200
ł16c200 BS
ł16c200
T-head
ł16c200
T-head
ł20c200
ł20c200
E
ł20c200
ł20c200
ł16c200
T-head
ł25c200
7ł16c65
ł16c200
T-head
ł25c200
E
7ł16c65
ł20c200
ł16c400c400
ł16c200c200
Headed stirrups
ł20c200
ł16c400c400
ł16c200c200
Headed stirrups
F
F
Reinforcement layout - Type 1
Reinforcement layout - Type 2
Axis 1+150 m to 3 / 7 to 12 / 16 to 18 -150 m
Axis 3 to 7 / 12 to 16
1:100
1:100
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
K101
3. Average reinforcement intensity:
1. Concrete cover:
Feasibilitystudy for crossing the Sognefjord
Submerged floating tunnel - General plan and elevation
- Outer face
: 70 mm
- Type 1
: 245 kg/m3
K102
- Inner face main compartment)
: 45 mm
- Type 2
: 175 kg/m3
K121
Concrete tubes - Form - Typical sections
K141
Concrete tubes - Post-tensioning - Typical sections
Submerged floating tunnel - Typical sections
EXC 3
Statens vegvesen
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
Reinforcement layout
4
5
6
7
8
9
Produced for
Region vest
Originator:
File number
Typical sections
Building code
Y-1860-S7 (EN 10138-3)
3
Lidvard Skorpa
PROF number
B500NC (NS 3576-3)
Post-tensioning:
2
K110.
Client rep.
Project number
Concrete tubes
Reinforcement:
Lap splices to be fully staggered.
1
-
-
Lavik - Oppedal
Mix specification SV-40
2. Min. lap length for longitudinal reinforcement ł32 is 1 200 mm.
2011145371
Drawing date
Concrete:
- Inner face ballast compartments : 80 mm
H
File no.
Execution class:
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K131
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
B
B
ł25c200
ł16c400c400
ł25c200
C
C
2ł32c200
2ł32c200
D
D
ł16c200
ł16c200
ł16c200
ł16c200
ł16c200
ł16c200
ł16c200
ł16c200
ł16c200
ł16c200
T-head
ł16c200 BS
E
E
ł20c200
ł20c200
ł16c200
T-head
ł25c200
7ł16c65
F
ł20c200
ł16c400c400
ł16c200c200
Headed stirrups
F
Reinforcement layout - Landfall elements
1:100
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
K101
3. Average reinforcement intensity:
1. Concrete cover:
- Landfall elements :215
K102
kg/m3
Feasibilitystudy for crossing the Sognefjord
Submerged floating tunnel - General plan and elevation
Submerged floating tunnel - Typical sections
- Outer face
: 70 mm
- Inner face main compartment)
: 45 mm
K121
Concrete tubes - Form - Typical sections
- Inner face ballast compartments : 80 mm
K142
Concrete tubes - Post-tensioning - Landfall section
EXC 3
Statens vegvesen
Concrete:
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
2. Min. lap length for longitudinal reinforcement ł32 is 1 200 mm.
4
5
6
7
8
9
Lidvard Skorpa
Produced for
Region vest
Originator:
PROF number
B500NC (NS 3576-3)
Reinforcement layout
File number
Landfall section
Building code
Y-1860-S7 (EN 10138-3)
3
K110.
Client rep.
Project number
Concrete tubes
Reinforcement:
Post-tensioning:
2
-
-
Lavik - Oppedal
Lap splices to be fully staggered.
1
2011145371
Drawing date
Mix specification SV-40
H
File no.
Execution class:
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K132
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
Segment / casting joint
A
A
Segment i+1
Segment i
Outer face
112
400
800
288
6-19 hoop tendons
B
B
Fixed multiplane coupler
6-31 tendon
Detail coupling of longitudinal PT
1:50
C
C
PT 6-19 c 1000
PT 6-19 c 1000
7
15
1
2
71
PT 6-31
PT 6-31
E
R 6 005
R 6 005
E
R 6 005
D
R 6 005
D
Active 6-19 multiplane anchor
R 68 040
Active 6-19 multiplane anchor
R 68 040
Active 6-19 multiplane anchor
R 68 040
F
R 68 040
F
Active 6-19 multiplane anchor
Post-tensioning layout - Type 1
Post-tensioning layout - Type 2
Axis 1+150 m to 3 / 7 to 12 / 16 to 18-150 m
Axis 3 to 7 / 12 to 16
G
G
1:100
1:100
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
1. Metal sheats complying with EN 523 shall be used.
K101
3. Hoop cables are stressed from both ends.
K102
Sheat inner diameter ID:
H
- 6-19 tendons
:
90
mm
- 6-31 tendons
: 110
mm
4. Maximum stressing force during stressing shall not
Submerged floating tunnel - Typical sections
K121
Concrete tubes - Form - Typical sections
K131
Concrete tubes - Reinforcement layout - Typical sections
EXC 3
Statens vegvesen
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
- 6-19 tendons
: 6 860 kN
Mix specification SV-40
- 6-31 tendons
: 4 210 kN
Reinforcement:
3
5
6
7
8
9
Lidvard Skorpa
Produced for
Region vest
Originator:
PROF number
Post-tensioning layout
File number
Typical sections
Building code
Y-1860-S7 (EN 10138-3)
4
K110.
Client rep.
Project number
Concrete tubes
Post-tensioning:
2
-
-
Lavik - Oppedal
B500NC (NS 3576-3)
over 3 segment joints, average cable length is 90 m.
2011145371
Drawing date
using fixed multiplane coulpers. The couplers are staggered
1
File no.
Execution class:
Concrete:
exceed 0.95 x Fp0,1k:
2. Longituinal cables are contiuous and stressed from one end
Feasibilitystudy for crossing the Sognefjord
Submerged floating tunnel - General plan and elevation
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K141
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
B
B
PT 6-19 c 1000
7
56
PT 6-31
C
D
D
E
E
R 19 072
Active 6-19 multiplane anchor
F
R 19 072
R 6 60
5
5
R 6 60
C
Active 6-19 multiplane anchor
F
Post-tensioning layout - Landfall elements
1:100
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
1. Metal sheats complying with EN 523 shall be used.
K101
3. Hoop cables are stressed from both ends.
K102
Sheat inner diameter ID:
H
- 6-19 tendons
:
90
mm
- 6-31 tendons
: 110
mm
4. Maximum stressing force during stressing shall not
Submerged floating tunnel - Typical sections
K121
Concrete tubes - Form - Typical sections
K132
Concrete tubes - Reinforcement layout - Landfall section
EXC 3
Statens vegvesen
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
- 6-19 tendons
: 6 860 kN
Mix specification SV-40
- 6-31 tendons
: 4 210 kN
Reinforcement:
3
5
6
7
8
9
Lidvard Skorpa
Produced for
Region vest
Originator:
PROF number
Post-tensioning
File number
Landfall section
Building code
Y-1860-S7 (EN 10138-3)
4
K110.
Client rep.
Project number
Concrete tubes
Post-tensioning:
2
-
-
Lavik - Oppedal
B500NC (NS 3576-3)
over 3 segment joints, average cable length is 90 m.
2011145371
Drawing date
using fixed multiplane coulpers. The couplers are staggered
1
File no.
Execution class:
Concrete:
exceed 0.95 x Fp0,1k:
2. Longituinal cables are contiuous and stressed from one end
Feasibilitystudy for crossing the Sognefjord
Submerged floating tunnel - General plan and elevation
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K142
K001
12
A
1
2
3
Element i
A
4
5
6
7
8
9
10
11
12
Element i+1
A
B
B
C
C
Longitundinal section - Element joint
1:50
D
D
E
E
F
F
Section - Element joint
G
G
1:100
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
1. Metal sheats complying with EN 523 shall be used.
K101
3. Hoop cables are stressed from both ends.
K102
Sheat inner diameter ID:
H
- 6-19 tendons
:
90
mm
- 6-31 tendons
: 110
mm
4. Maximum stressing force during stressing shall not
Submerged floating tunnel -Typical sections
K121
Concrete tubes - Form - Typical sections
K131
Concrete tubes - Reinforcement layout - Typical sections
: 6 860 kN
- 6-31 tendons
: 4 210 kN
K141
EXC 3
Statens vegvesen
Concrete grade B55
Concrete tubes - Post-tensioning - Typical sections
Concept development of Submerged Floating Tunnel
3
5
6
7
8
9
Produced for
Region vest
Originator:
File number
Element joints
Building code
Y-1860-S7 (EN 10138-3)
4
Lidvard Skorpa
PROF number
Post-tensioning
B500NC (NS 3576-3)
Post-tensioning:
2
K110.
Client rep.
Project number
Concrete tubes
Reinforcement:
using fixed multiplane coulpers. The couplers are staggered
1
-
-
Lavik - Oppedal
Mix specification SV-40
over 3 segment joints, average cable length is 90 m.
2011145371
Drawing date
Durability class MF40
- 6-19 tendons
File no.
Execution class:
Concrete:
exceed 0.95 x Fp0,1k:
2. Longituinal cables are contiuous and stressed from one end
Feasibilitystudy for crossing the Sognefjord
Submerged floating tunnel - General plan and elevation
Scale A3
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K143
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
”5
tn
n
me
e
l
e
l
e
n
n
u
T
3m
7
,
8
0
3
L=
”4
tn
n
e
m
e
l
e
l
e
6m
n
6
,
n
4
6
Tu
2
=
P
L
B
3
n”
t
en
m
em
el
73
el
8,
n
0
n
3
=
Tu
L
”7
tn
n
me
e
l
e
l
e
n
n
u
T
”6
tn
n
me
e
l
e
l
e
n
n
u
T
3m
7
,
8
0
L=3
4m
7
,
4
6
L=2
T
P
P
P
B
T
P
T
P
P
P
T
T
P
P
C
C
P
T
2
n”
t
n
e
m
em
73
,
el
8
l
e
30
nn
=
L
Tu
P
P
P
P
D
D
1
n”
t
n
e
m
em ,
17
l
e
8
l
26
ne
=
un
L
T
T
P
T
E
t
n
e
m
e
m
l
le 45
l
,
fa
8
d
2
n
2
a
=
L
L
P
E
T
Element key plan
1: 5000
T
F
F
P
P Permanent shaft
T Temporary shaft
G
G
A
Rev.
ARP
Issued for client approval
SAH
Feasibilitystudy for crossing the Sognefjord
File no.
Statens vegvesen
Start rotationq = 0.5
2
Approachingq = 0.2
3
Final positionq = 0
4
Continuity cast
2012-11-28
Concept development of Submerged Floating Tunnel
Rev. date
2011145371
Drawing date
1
SAH
Drawn by Checked Approved
Description
-
-
K110.
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Project number
Submerged floating tunnel
H
PROF number
Pivot launching sequence
Tunnel section 1
File number
Building code
1: 2000
1
2
3
4
5
Scale A3
6
7
8
9
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
F101
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
B
B
1
1
C
C
D
D
1
E
E
1
F
F
2
3
2
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
1.
Rev.
ARP
Issued for client approval
Temporary shaft OD 8000mm
Feasibilitystudy for crossing the Sognefjord
File no.
2.
Temporary bulkhead
EXC 3
3.
Sliding support beam (pivot launching)
Concrete:
Statens vegvesen
Pl
ottedat2
o9
:.
1
1.
201
2
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
03:
41:
43
Scale A3
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K202 Submerged floating tunnel - Landfall element Lavik - Isometric view.dgn
5
6
7
8
9
Region vest
Originator:
Building code
Y-1860-S7 (EN 10138-3)
4
Produced for
File number
Isometric view
Post-tensioning:
3
-
Lidvard Skorpa
PROF number
Landfall element Lavik
B500NC (NS 3576-3)
2
Rev. date
-
Client rep.
Project number
Submerged floating tunnel
Reinforcement:
1
2012-11-28
Lavik - Oppedal
Mix specification SV-40
Filnavn:
SAH
2011145371
Drawing date
Execution class:
H
SAH
Drawn by Checked Approved
Description
Prosesskode 2, Hndbok 26 2007
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K202
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
1
1
B
B
C
C
D
D
1
1
E
E
2
F
F
3
2
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
1.
Rev.
ARP
Issued for client approval
Temporary shaft OD 8000mm
Feasibilitystudy for crossing the Sognefjord
File no.
2.
Temporary bulkhead
EXC 3
3.
Sliding support beam (pivot launching)
Concrete:
Statens vegvesen
Pl
ottedat2
o9
:.
1
1.
201
2
Concrete grade B55
Concept development of Submerged Floating Tunnel
Durability class MF40
4.
Access / escape tunnel
Mix specification SV-40
03:
43:
33
Isometric view
5
6
7
8
9
Region vest
Originator:
Building code
Scale A3
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K203 - Submerged floating tunnel - Tunnel element no 1 - Isometric view.dgn
4
Produced for
File number
Y-1860-S7 (EN 10138-3)
3
-
Lidvard Skorpa
PROF number
Tunnel element N” 1
Post-tensioning:
2
Rev. date
-
Client rep.
Project number
Submerged floating tunnel
B500NC (NS 3576-3)
1
2012-11-28
Lavik - Oppedal
Reinforcement:
Filnavn:
SAH
2011145371
Drawing date
Execution class:
H
SAH
Drawn by Checked Approved
Description
Prosesskode 2, Hndbok 26 2007
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K203
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
Cross sections 1:750
A
A
MSL
MSL
MSL
B
B
C
C
1.
D
Test submergence
2.
Tow to site
3.
Element assembly
Displacement
: 76000 tonnes
Displacement
: 71000 tonnes
Displacement
:
341000 tonnes
Draft
:
35 meters
Draft
:
2 meters
Draft
:
12.6 meters
G.M
:
2.1 meters
G.M
:
0.8 meters
G.M
:
Solid ballast
: 30 - 35 m
Solid ballast
: 30 - 35 m
Solid ballast
: 30 - 35 m
Water ballast
:
2
2
2
Water ballast
:
2
2
7m
Water ballast
MSL
:
D
1.0 meters
2
7m
MSL
7m
MSL
E
E
F
F
4.
G
5.
Tunnel assembly
In place installation
6.
Test submergence
Displacement
: 353000 tonnes
Displacement
: 1050000 tonnes
Displacement
: 1050000 tonnes
Draft
:
32 meters
Draft
:
Draft
:
G.M
:
1.7 meters
G.M
:
G.M
:
Solid ballast
: 30 - 35 m
Solid ballast
: 30 - 35 m
Solid ballast
: 30 - 35 m
32 meters
> 30 meters
32 meters
> 30 meters
2
2
Water ballast
2
Water ballast
:
7m
REMARKS:
:
G
2
2
2
7m
Water ballast
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
:
7m
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
K101
Submerged floating tunnel - General plan and elevation
Feasibilitystudy for crossing the Sognefjord
File no.
EXC 3
Statens vegvesen
Concrete:
Concrete grade B55
Pl
ottedat2
o9
:.
1
1.
201
2
H
2011145371
Drawing date
Execution class:
Concept development of Submerged Floating Tunnel
Durability class MF40
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Mix specification SV-40
Project number
Reinforcement:
B500NC (NS 3576-3)
Submerged floating tunnel
PROF number
Floating sequences
File number
06:
1
2:
45
Post-tensioning:
Building code
Y-1860-S7 (EN 10138-3)
Filnavn:
1
Scale A3
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Floating phases.dgn
2
3
4
5
6
7
8
9
-
-
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
K211
K001
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
Plan
1:2000
B
A
B
B
Jetty
A
C
C
Access road
Section A - A : Jetty
1:1000
Wire bracing
Barge
D
D
MSL
B
E
E
Access road
Section B - B : Outrigger support
1:1000
F
F
MSL
G
G
A
Rev.
ARP
Issued for client approval
SAH
Feasibilitystudy for crossing the Sognefjord
File no.
2012-11-28
Statens vegvesen
Pl
ottedat2
o9
:.
1
1.
201
2
Concept development of Submerged Floating Tunnel
03:
50:
04
Jetty and outrigger support
Rev. date
2011145371
Drawing date
H
SAH
Drawn by Checked Approved
Description
-
-
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Project number
Construction sequences
PROF number
Jointing of elements
File number
Building code
Scale A3
Drawn by
Filnavn:
1
Checked by
Approved by
11744
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y101 Construction sequences - Jointing of elements - Jety and outrigger support.dgn
2
3
4
Project no.
5
6
7
8
9
10
11
Drawing number /
Revision index
-
H
As shown
Y101
12
1
2
3
4
5
6
7
8
9
10
11
12
A
A
Remarks
Step 1
A
Tunnel, length = 1200m
B
Tunnel, length = 1200m
1
Quay, see drawing Y101
2
Barge, see drawing Y101
B
B
1
Sea
2
Land
C
C
Step 2
D
D
A
E
E
Sea
Land
F
F
Step 3
A
250m
G
0
500m
1000m
Horizontal Scale
G
N
1:25000
B
A
Rev.
ARP
Issued for client approval
SAH
Feasibilitystudy for crossing the Sognefjord
File no.
Concept development of Submerged Floating Tunnel
Pl
ottedato: 29.
1
1.
201
2
H
Statens vegvesen
Land
2012-11-28
Rev. date
2011145371
Drawing date
Sea
SAH
Drawn by Checked Approved
Description
-
-
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Project number
Construction sequences
PROF number
Jointing of elements 1
File number
Building code
06:
36:
21
Scale A3
Drawn by
Filnavn:
1
Checked by
Approved by
11744
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y102 Construction sequences - Jointing of elements 1.dgn
2
3
4
Project no.
5
6
7
8
9
10
11
Drawing number /
Revision index
-
H
As shown
Y102
12
1
2
3
4
5
6
7
8
9
10
11
12
A
A
Step 4
B
A
B
B
C
C
C
Sea
Land
D
D
Step 5
E
E
Tow to site
Sea
F
G
Land
F
250m
Remarks
0
500m
1000m
Horizontal Scale
A
Tunnel, length = 1200m
B
Tunnel, length = 1200m
A
Rev.
1:25000
ARP
Issued for client approval
Tunnel, length = 1200m
1
Quay, see drawing Y101
SAH
File no.
Concept development of Submerged Floating Tunnel
Barge, see drawing Y101
Produced for
Region vest
Originator:
Construction sequences
PROF number
Jointing of elements 2
File number
Building code
Scale A3
Checked by
Approved by
Project no.
11744
2
-
Lidvard Skorpa
Lavik - Oppedal
Drawn by
1
Rev. date
-
Client rep.
Project number
2
2012-11-28
2011145371
Drawing date
Statens vegvesen
H
SAH
Drawn by Checked Approved
Description
Feasibilitystudy for crossing the Sognefjord
C
G
N
3
4
5
6
7
8
9
10
11
Drawing number /
Revision index
-
H
As shown
Y103
12
1
2
3
4
5
6
7
8
9
10
11
12
A
A
Lavik
B
B
3
B
4
C
Joint
C
5
2
D
D
1
Joint
A
E
E
Oppedal
F
F
500m
0
1000m
Horizontal Scale
G
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
Rev.
N
2000m
1:50000
G
ARP
Issued for client approval
SAH
SAH
2012-11-28
Drawn by Checked Approved
Description
Rev. date
Prosesskode 2, Hndbok 26 2007
Feasibilitystudy for crossing the Sognefjord
File no.
EXC 3
Statens vegvesen
Concrete:
Concrete grade B55
Pl
ottedat2
o9
:.
1
1.
201
2
H
2011145371
Drawing date
Execution class:
Concept development of Submerged Floating Tunnel
Durability class MF40
Client rep.
Lidvard Skorpa
Produced for
Region vest
Originator:
Lavik - Oppedal
Mix specification SV-40
Project number
Reinforcement:
B500NC (NS 3576-3)
Construction sequences
PROF number
Towing of tunnel
File number
04:
28:
38
Post-tensioning:
Building code
Y-1860-S7 (EN 10138-3)
Filnavn:
1
Scale A3
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y106 Construction - Installation.dgn
2
3
4
5
6
7
8
9
-
-
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
Y104
12
A
1
2
3
4
5
6
7
8
9
10
11
12
A
A
B
B
C
C
D
D
MSL
MSL
E
E
F
F
Pontoon installation
Final position
1:1000
1:1000
G
G
REMARKS:
REFERENCES:
A
Standards / provisions:
Hndbok 185 Eurocode ed. 2011
1.
Rev.
ARP
Issued for client approval
Pontoons are installed after the tunnel has been installed
Feasibilitystudy for crossing the Sognefjord
File no.
Total weight of pontoon
:
EXC 3
tonnes
Statens vegvesen
Concrete:
Concrete grade B55
Pl
ottedat2
o9
:.
1
1.
201
2
H
Concept development of Submerged Floating Tunnel
Durability class MF40
B500NC (NS 3576-3)
Produced for
Region vest
Originator:
PROF number
Pontoon Installation
File number
06:
00:
26
Building code
Y-1860-S7 (EN 10138-3)
Scale A3
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rłrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y107 Pontoon installation.dgn
3
4
5
6
7
8
9
-
Lidvard Skorpa
Construction sequences
Post-tensioning:
2
Rev. date
-
Client rep.
Project number
Reinforcement:
1
2012-11-28
Lavik - Oppedal
Mix specification SV-40
Filnavn:
SAH
2011145371
Drawing date
Execution class:
2.
SAH
Drawn by Checked Approved
Description
Prosesskode 2, Hndbok 26 2007
10
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
11
Drawing number /
Revision index
-
H
As shown
Y105
12
A