 January 2016 Monthly Activity Report
Building Inspections & Code Enforcement
Commercial Plan Review Project Name Address Estimated Cost Ledges Maintenance Garage Triple Oak 18,432.00
Century Park 3605 Brushy Creek Road
unknown
K & K Boiler Replacement 300 Connecticut Avenue 80,000
Lumbee Enterprises 356 W. Phillips Road 55,000
The Southern Growl 6 S. Buncombe
4,500
Wal‐mart 1638 Old Hwy 14
10,000
1 January 2016 Monthly Activity Report Building Inspections & Code Enforcement
Commercial Permits ‐Total Cost of Construction: $137,325.00 Mechanical Permits ‐ Total Cost of Construction: $1,646,960.00 Total New Housing Starts ‐ 24 Total New SFD Attached ‐0 Total Cost of all Residential Permits (Including Renovations &Remodels) ‐ $6,472,774.13 Total Misc. Permits ‐ $90,308.20 Total Valuation of all Permits ‐ $8,347,367.33 Total Inspections ‐828 Total Code Enforcement Inspections – 234 2 City of Greer
Engineering and Stormwater Division
TO:
ED DRIGGERS, CITY ADMINISTRATOR
TAMMY DUNCAN, CITY CLERK
FROM:
ENGINEERING/STORMWATER DIVISION
SUBJECT:
DATE:
ACTIVITY REPORT for January 2016
February 17, 2016
Riverside Crossing (Lowes Grocery) – photos by A. Copeland
CITY ENGINEER – Steve Grant
Storm water Issues – Preparing R/W documents with city attorney for drainage on Wildwood Drive.
Subdivision/Development Issues – Continue
to meet regularly with engineers and developer
representatives in pre-submittal and pre-construction meetings to work out details with new subdivisions or
commercial sites that are in the early stages of planning. Also working through field issues discovered once
construction has started.
1





Green Road Industrial
Velocity Park
Richglen (next phase)
Enoree River project (Gray Engineering)
Victor Hill Road (potential project)
Projects:







Wildwood Drive drainage
Recycle Center Upgrade Phase 2
2016 paving coordination
Brushy Creek road sidewalk project
Review Redcroft Phase 2 grading plans
Recycle Center slope erosion inspection and meeting with consultant
Allen Bennett demolition progress meetings
Misc:













Drainage at 202 Springdale Dr
Drainage at Holly Circle
Departmental Yearly report due in March
Encroachment permit approvals (2)
Site check Botswain Ct for proposed retaining wall
Sewer service issue at Chartwell homes
Integrating stormwater fees into GIS meetings
Researching latest version of AutoCAD
Century Park improvement meetings
Attended Greenville ASCE meeting (American Society of Civil Engineers)
Cotton Road drainage problem (referred to Public Services)
Flashing Beacon letter coordination to FHWA and SCDOT
PAC site reviews and meeting
STORMWATER ENGINEER – Lillian Hanley
Construction/ Post-construction Program - Plan Reviews, Pre-construction
meetings, As-built Reviews and Project Meetings (Construction and Post-construction
BMPs) - Stormwater site plan reviews that incorporate consideration for water quality impacts and
attempt to maintain pre-development runoff conditions are required by our SMS4 permit.
Plan reviews were conducted during January for: AT&T Store Redesign, Parkside at Lismore
Eastwood Homes Lots, Lavender Flats, Redcroft Phase II Lot Grading Plan, and Aran Packaging
Facility Upfit.
Pre-submittal meetings were conducted for: The Residences at Century Park, Wade Hampton Mini
Storage and Renovations at Century Park.
Pre-construction meetings were held for: AT&T Store Redesign.
As-built Reviews were completed for: Victor Hill Electric Substation and Enclave at Lismore.
2
Project-closeout Inspections were conducted for Thrive Greer and Cook Out.
Post-construction: Post-construction stormwater pond inspection for Avalon Chase Apartments.
Bonds – Stormwater bonds were received for: AT&T Store Redesign.
Miscellaneous –
`
1) Continued with scanning plans for electronic filing project.
2) Attended a meeting on the new dog kennel so that it could be incorporated in the Recycle Center
plans.
3) Selected a consultant for the GIS/Stormwater Billing project.
4) Attended a meeting regarding an illicit discharge complaint from a residential home.
5) Continued with quarterly Recycle Center stormwater sampling.
6) Continued with quarterly stream stormwater sampling.
7) PAC site reviews and meeting.
STORMWATER INSPECTOR: Anthony Copeland
Stormwater Inspections - Stormwater Construction Inspections – Per the 2014 Small Municipal
Storm Sewer System Permit, (SMS4), all newly permitted sites must be inspected within the first two weeks
of beginning land disturbing activity and at least monthly during construction. All inactive sites must be
inspected at least bi-monthly.
SUBDIVISION NAME INSPECTION DATE OPERATION Frequency New Hope Baptist Ch. 1‐4‐2016 Storm Water/Site Inspection Monthly O’Neal Village Ph‐2 1‐4‐2016 Storm Water/Site Inspection Monthly O’Neal Village Ph‐1 Orchard Crest The Ledges Pleasant Dr. Pho Quang Budhist Temple Darien Properties Swafford Transport Lowes Riverside Crossing Riverside Commons Belshires Enclave At Lismore Woodland Ridge Benson Memorial Dr. Ext. 1‐4‐2016 1‐4‐2016 1‐6‐2016 1‐7‐2016 1‐7‐2016 1‐7‐2016 1‐7‐2016 1‐7‐2016 1‐7‐2016 1‐11‐2016 1‐11‐2016 1‐11‐2016 1‐11‐2016 Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly 3
Greystone Ph‐4 Redcroft Manor at Abner Creek Franklin Pt. RV Boat and Storage Hartwood Lake Westhaven Velocity Park Culvers 1‐11‐2016 1‐11‐2016 1‐11‐2016 1‐11‐2016 1‐13‐2016 1‐14‐2016 1‐14‐2016 1‐14‐2016 1‐20‐2016 Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water Site Inspection Storm Water Site Inspection Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Allen Bennett Franklin Pt. Green Road Industrial 1‐20‐2016 1‐20‐2016 1‐20‐2016 Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Monthly Monthly Monthly Addressed Citizen Complaints
Issue Complaint Date Stormwater Runoff 1‐6‐2016 117 Boxwood Ln. Place Asphalt Berm Completed In‐Progress 1‐7‐2016 Place Asphalt Berm In‐Progress Stormwater Runoff Address 108 Holly Circle Resolution Pre-Construction Meeting
Subdivision Name
Date
AT&T Building at Town Center
1/26/2016
Lot Drainage Review
Development
Belshire at Riverside
Woodland Forest
Woodland Forest
Woodland Forest
Franklin Point Subd.
Franklin Point Subd.
Woodhaven
Woodhaven
Private
Westhaven Subd.
Westhaven Subd.
Westhaven Subd.
Heatherfield Subd.
Date
1-4-16
1-4-16
1-5-16
1-5-16
1-8-16
1-8-16
1-8-16
1-8-16
1-8-16
1-11-16
1-11-16
1-11-16
1-12-16
Address
163 Belshire Dr.
124 Cascade Dr.
120 Cascade Dr.
116 Cascade Dr.
139 Willow Bottom
139 Willow Bottom
412 Simsbury Wy.
416 Simsbury Wy.
201 Drace Ave.
417 Simsbury Wy.
404 Simsbury Wy.
5 Mansfield
111 Heatherwood Ln.
4
Lot #
91
29
30
31
10
87
53
52
n/a
51
54
2
2
Heatherfield Subd.
Heatherfield Subd.
Heatherfield Subd.
Heatherfield Subd.
Redcroft Subd.
Redcroft Subd.
Brushy Meadow
Brushy Meadow
Redcroft Subd.
Westhaven Subd.
Private
Franklin Point Subd.
Franklin Point Subd.
Redcroft Subd.
Private
Private
Franklin Point Subd.
Private Out Bldg.
1-12-16
1-12-16
1-12-16
1-12-16
1-12-16
1-12-16
1-12-16
1-14-16
1-14-16
1-14-16
1-22-16
1-26-16
1-26-16
1-26-16
1-26-16
1-26-16
1-28-16
1-28-16
119 Heatherwood Ln.
122 Heatherwood Ln.
126 Heatherwood Ln.
118 Heatherwood Ln.
580 Allenton Wy.
553 Allenton Wy.
138 Cathedral View
6 Meadow Breeze
564 Allenton Wy
114 Heatherwood Ln.
504 Tryon St.
191 Willow Bottom
308 Bucklebury Rd.
405 Combahee Ct.
502 Tryon St.
500 Tryon St.
203 Willow Bottom
508 Riello Dr.
3
67
68
68
191
201
n/a
113
187
69
1
23
61
229
2
3
20
n/a
Final Engineering Visit
Name
Address
Date
The Ledges
501 Everhope Ave.
1-13-16
The Ledges
503 Everhope Ave.
1-13-16
The Ledges
O’Neal Village Ph-1
Franklin Point Subd.
505 Everhope Ave.
113 Meritage St.
300 Tucksbourgh
1-13-16
1-13-16
1-19-16
Stillwater Subd.
217 Stillwater Bay Dr.
1-20-16
Stillwater Subd.
133 Woodgrove Wy
1-20-16
Stillwater Subd.
132 Woodgrove Wy
1-20-16
Riverside Commons
50 Irvington Dr
1-27-16
Dillard Creek Crossing
211 Ermont Ct
1-27-16
Redcroft Subd.
604 Greywell
1-27-16
5
Planning & Zoning
Division
January 2016
These reports comprehend monthly and year to date information as it relates to Boards and Commissions of
the City of Greer. It further contains activity of Planning and GIS staff with fees collected.
0
Summary
January 2016
The Planning Commission (GPC), reviewed two annexations and one rezoning,
our Annexation Planning Committee (APC), also reviewed the annexation for
property located beside Greer High for a single family detached dwellings and
property located at Genoble and Robinson Roads for the expansion of Velocity
Industrial Park. The rezoning for property located that fronts Wade Hampton Blvd.
at the intersection of Finley Ave. with the intent to construct a fast food restaurant.
Board of Zoning Appeals (BZA) and Board of Architectural Review (BAR) had no
docket items submitted for their regularly scheduled meetings for the month of
January.
The Planning Advisory Committee (PAC) met to go over the development of the
properties located at 107 & 111 Brannon Drive for retail space for the Grain Loft.
Property at S. Buncombe Road & Lancaster Ave for the construction of mini
warehouses located behind the old Ryan’s Corporate Headquarters. The expansion
of the Rich Glenn community to include 45 new single family homes with a starting
price point of approx. $250,000.00. The committee also reviewed another
expansion of Velocity Park with property located on the southwest corner of
Genoble and Robinson Roads.
We issued only 50 residential and commercial zoning permits for construction and
new business start-ups, along with sign permits, collecting $2,567.15 in fees.
1
Public Hearings and Business Meetings
Commission, Boards
and Committees
Cases
Reviewed
January
Annexation Planning
Committee (APC)
2
Board of Architectural
Review (BAR)
0
Board of Zoning
Appeals (BZA)
0
Planning Commission
(GPC)
3
Planning Advisory
Committee (PAC)
4
Cases Approved/Recommendation
Cases
Pending
Pending Review/Approval
East Gap Creek Road
NW Corner of Genoble Road
AN2016-01- NW Corner of Genoble Road
AN 2016-02- East Gap Creek Road
RZ 2016-03- Finley Ave/709 N. Main St
PAC 2016-01 107 & 111 Brannon Drive
PAC 2016-02 South Buncombe
PAC 2016-03 16 Quail Creek-Rich Glen
PAC 2016-04 1010 &1014 Robinson Road
2
Approved
Approved
Approved
TOTAL PERMITS
TOTAL PERMITS
TOTAL PERMIT
January
FEES
Residential
20
$400.00
$400.00
Commercial
12
$600.00
$600.00
8
$392.15
$392.15
BZA: Residential
0
$0.00
$0.00
BZA: Commercial
0
$0.00
$0.00
Planning Commission Filing Fees
3
$225.00
$225.00
Planning Advisory Review Filing Fees
4
$925.00
$925.00
Zoning Verification Letters
1
$25.00
$25.00
Annexation Planning Committee
2
Board of Architectural Review
0
$2,567.15
$2,567.15
YTD
TOTAL FEES
YTD
PERMIT TYPE
Signs
Board of Zoning Appeals Filing Fees
TOTAL
50