January 2016 - City Of Greer
Transcription
January 2016 - City Of Greer
January 2016 Monthly Activity Report Building Inspections & Code Enforcement Commercial Plan Review Project Name Address Estimated Cost Ledges Maintenance Garage Triple Oak 18,432.00 Century Park 3605 Brushy Creek Road unknown K & K Boiler Replacement 300 Connecticut Avenue 80,000 Lumbee Enterprises 356 W. Phillips Road 55,000 The Southern Growl 6 S. Buncombe 4,500 Wal‐mart 1638 Old Hwy 14 10,000 1 January 2016 Monthly Activity Report Building Inspections & Code Enforcement Commercial Permits ‐Total Cost of Construction: $137,325.00 Mechanical Permits ‐ Total Cost of Construction: $1,646,960.00 Total New Housing Starts ‐ 24 Total New SFD Attached ‐0 Total Cost of all Residential Permits (Including Renovations &Remodels) ‐ $6,472,774.13 Total Misc. Permits ‐ $90,308.20 Total Valuation of all Permits ‐ $8,347,367.33 Total Inspections ‐828 Total Code Enforcement Inspections – 234 2 City of Greer Engineering and Stormwater Division TO: ED DRIGGERS, CITY ADMINISTRATOR TAMMY DUNCAN, CITY CLERK FROM: ENGINEERING/STORMWATER DIVISION SUBJECT: DATE: ACTIVITY REPORT for January 2016 February 17, 2016 Riverside Crossing (Lowes Grocery) – photos by A. Copeland CITY ENGINEER – Steve Grant Storm water Issues – Preparing R/W documents with city attorney for drainage on Wildwood Drive. Subdivision/Development Issues – Continue to meet regularly with engineers and developer representatives in pre-submittal and pre-construction meetings to work out details with new subdivisions or commercial sites that are in the early stages of planning. Also working through field issues discovered once construction has started. 1 Green Road Industrial Velocity Park Richglen (next phase) Enoree River project (Gray Engineering) Victor Hill Road (potential project) Projects: Wildwood Drive drainage Recycle Center Upgrade Phase 2 2016 paving coordination Brushy Creek road sidewalk project Review Redcroft Phase 2 grading plans Recycle Center slope erosion inspection and meeting with consultant Allen Bennett demolition progress meetings Misc: Drainage at 202 Springdale Dr Drainage at Holly Circle Departmental Yearly report due in March Encroachment permit approvals (2) Site check Botswain Ct for proposed retaining wall Sewer service issue at Chartwell homes Integrating stormwater fees into GIS meetings Researching latest version of AutoCAD Century Park improvement meetings Attended Greenville ASCE meeting (American Society of Civil Engineers) Cotton Road drainage problem (referred to Public Services) Flashing Beacon letter coordination to FHWA and SCDOT PAC site reviews and meeting STORMWATER ENGINEER – Lillian Hanley Construction/ Post-construction Program - Plan Reviews, Pre-construction meetings, As-built Reviews and Project Meetings (Construction and Post-construction BMPs) - Stormwater site plan reviews that incorporate consideration for water quality impacts and attempt to maintain pre-development runoff conditions are required by our SMS4 permit. Plan reviews were conducted during January for: AT&T Store Redesign, Parkside at Lismore Eastwood Homes Lots, Lavender Flats, Redcroft Phase II Lot Grading Plan, and Aran Packaging Facility Upfit. Pre-submittal meetings were conducted for: The Residences at Century Park, Wade Hampton Mini Storage and Renovations at Century Park. Pre-construction meetings were held for: AT&T Store Redesign. As-built Reviews were completed for: Victor Hill Electric Substation and Enclave at Lismore. 2 Project-closeout Inspections were conducted for Thrive Greer and Cook Out. Post-construction: Post-construction stormwater pond inspection for Avalon Chase Apartments. Bonds – Stormwater bonds were received for: AT&T Store Redesign. Miscellaneous – ` 1) Continued with scanning plans for electronic filing project. 2) Attended a meeting on the new dog kennel so that it could be incorporated in the Recycle Center plans. 3) Selected a consultant for the GIS/Stormwater Billing project. 4) Attended a meeting regarding an illicit discharge complaint from a residential home. 5) Continued with quarterly Recycle Center stormwater sampling. 6) Continued with quarterly stream stormwater sampling. 7) PAC site reviews and meeting. STORMWATER INSPECTOR: Anthony Copeland Stormwater Inspections - Stormwater Construction Inspections – Per the 2014 Small Municipal Storm Sewer System Permit, (SMS4), all newly permitted sites must be inspected within the first two weeks of beginning land disturbing activity and at least monthly during construction. All inactive sites must be inspected at least bi-monthly. SUBDIVISION NAME INSPECTION DATE OPERATION Frequency New Hope Baptist Ch. 1‐4‐2016 Storm Water/Site Inspection Monthly O’Neal Village Ph‐2 1‐4‐2016 Storm Water/Site Inspection Monthly O’Neal Village Ph‐1 Orchard Crest The Ledges Pleasant Dr. Pho Quang Budhist Temple Darien Properties Swafford Transport Lowes Riverside Crossing Riverside Commons Belshires Enclave At Lismore Woodland Ridge Benson Memorial Dr. Ext. 1‐4‐2016 1‐4‐2016 1‐6‐2016 1‐7‐2016 1‐7‐2016 1‐7‐2016 1‐7‐2016 1‐7‐2016 1‐7‐2016 1‐11‐2016 1‐11‐2016 1‐11‐2016 1‐11‐2016 Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly 3 Greystone Ph‐4 Redcroft Manor at Abner Creek Franklin Pt. RV Boat and Storage Hartwood Lake Westhaven Velocity Park Culvers 1‐11‐2016 1‐11‐2016 1‐11‐2016 1‐11‐2016 1‐13‐2016 1‐14‐2016 1‐14‐2016 1‐14‐2016 1‐20‐2016 Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water/Site Inspection Storm Water Site Inspection Storm Water Site Inspection Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Allen Bennett Franklin Pt. Green Road Industrial 1‐20‐2016 1‐20‐2016 1‐20‐2016 Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Monthly Monthly Monthly Addressed Citizen Complaints Issue Complaint Date Stormwater Runoff 1‐6‐2016 117 Boxwood Ln. Place Asphalt Berm Completed In‐Progress 1‐7‐2016 Place Asphalt Berm In‐Progress Stormwater Runoff Address 108 Holly Circle Resolution Pre-Construction Meeting Subdivision Name Date AT&T Building at Town Center 1/26/2016 Lot Drainage Review Development Belshire at Riverside Woodland Forest Woodland Forest Woodland Forest Franklin Point Subd. Franklin Point Subd. Woodhaven Woodhaven Private Westhaven Subd. Westhaven Subd. Westhaven Subd. Heatherfield Subd. Date 1-4-16 1-4-16 1-5-16 1-5-16 1-8-16 1-8-16 1-8-16 1-8-16 1-8-16 1-11-16 1-11-16 1-11-16 1-12-16 Address 163 Belshire Dr. 124 Cascade Dr. 120 Cascade Dr. 116 Cascade Dr. 139 Willow Bottom 139 Willow Bottom 412 Simsbury Wy. 416 Simsbury Wy. 201 Drace Ave. 417 Simsbury Wy. 404 Simsbury Wy. 5 Mansfield 111 Heatherwood Ln. 4 Lot # 91 29 30 31 10 87 53 52 n/a 51 54 2 2 Heatherfield Subd. Heatherfield Subd. Heatherfield Subd. Heatherfield Subd. Redcroft Subd. Redcroft Subd. Brushy Meadow Brushy Meadow Redcroft Subd. Westhaven Subd. Private Franklin Point Subd. Franklin Point Subd. Redcroft Subd. Private Private Franklin Point Subd. Private Out Bldg. 1-12-16 1-12-16 1-12-16 1-12-16 1-12-16 1-12-16 1-12-16 1-14-16 1-14-16 1-14-16 1-22-16 1-26-16 1-26-16 1-26-16 1-26-16 1-26-16 1-28-16 1-28-16 119 Heatherwood Ln. 122 Heatherwood Ln. 126 Heatherwood Ln. 118 Heatherwood Ln. 580 Allenton Wy. 553 Allenton Wy. 138 Cathedral View 6 Meadow Breeze 564 Allenton Wy 114 Heatherwood Ln. 504 Tryon St. 191 Willow Bottom 308 Bucklebury Rd. 405 Combahee Ct. 502 Tryon St. 500 Tryon St. 203 Willow Bottom 508 Riello Dr. 3 67 68 68 191 201 n/a 113 187 69 1 23 61 229 2 3 20 n/a Final Engineering Visit Name Address Date The Ledges 501 Everhope Ave. 1-13-16 The Ledges 503 Everhope Ave. 1-13-16 The Ledges O’Neal Village Ph-1 Franklin Point Subd. 505 Everhope Ave. 113 Meritage St. 300 Tucksbourgh 1-13-16 1-13-16 1-19-16 Stillwater Subd. 217 Stillwater Bay Dr. 1-20-16 Stillwater Subd. 133 Woodgrove Wy 1-20-16 Stillwater Subd. 132 Woodgrove Wy 1-20-16 Riverside Commons 50 Irvington Dr 1-27-16 Dillard Creek Crossing 211 Ermont Ct 1-27-16 Redcroft Subd. 604 Greywell 1-27-16 5 Planning & Zoning Division January 2016 These reports comprehend monthly and year to date information as it relates to Boards and Commissions of the City of Greer. It further contains activity of Planning and GIS staff with fees collected. 0 Summary January 2016 The Planning Commission (GPC), reviewed two annexations and one rezoning, our Annexation Planning Committee (APC), also reviewed the annexation for property located beside Greer High for a single family detached dwellings and property located at Genoble and Robinson Roads for the expansion of Velocity Industrial Park. The rezoning for property located that fronts Wade Hampton Blvd. at the intersection of Finley Ave. with the intent to construct a fast food restaurant. Board of Zoning Appeals (BZA) and Board of Architectural Review (BAR) had no docket items submitted for their regularly scheduled meetings for the month of January. The Planning Advisory Committee (PAC) met to go over the development of the properties located at 107 & 111 Brannon Drive for retail space for the Grain Loft. Property at S. Buncombe Road & Lancaster Ave for the construction of mini warehouses located behind the old Ryan’s Corporate Headquarters. The expansion of the Rich Glenn community to include 45 new single family homes with a starting price point of approx. $250,000.00. The committee also reviewed another expansion of Velocity Park with property located on the southwest corner of Genoble and Robinson Roads. We issued only 50 residential and commercial zoning permits for construction and new business start-ups, along with sign permits, collecting $2,567.15 in fees. 1 Public Hearings and Business Meetings Commission, Boards and Committees Cases Reviewed January Annexation Planning Committee (APC) 2 Board of Architectural Review (BAR) 0 Board of Zoning Appeals (BZA) 0 Planning Commission (GPC) 3 Planning Advisory Committee (PAC) 4 Cases Approved/Recommendation Cases Pending Pending Review/Approval East Gap Creek Road NW Corner of Genoble Road AN2016-01- NW Corner of Genoble Road AN 2016-02- East Gap Creek Road RZ 2016-03- Finley Ave/709 N. Main St PAC 2016-01 107 & 111 Brannon Drive PAC 2016-02 South Buncombe PAC 2016-03 16 Quail Creek-Rich Glen PAC 2016-04 1010 &1014 Robinson Road 2 Approved Approved Approved TOTAL PERMITS TOTAL PERMITS TOTAL PERMIT January FEES Residential 20 $400.00 $400.00 Commercial 12 $600.00 $600.00 8 $392.15 $392.15 BZA: Residential 0 $0.00 $0.00 BZA: Commercial 0 $0.00 $0.00 Planning Commission Filing Fees 3 $225.00 $225.00 Planning Advisory Review Filing Fees 4 $925.00 $925.00 Zoning Verification Letters 1 $25.00 $25.00 Annexation Planning Committee 2 Board of Architectural Review 0 $2,567.15 $2,567.15 YTD TOTAL FEES YTD PERMIT TYPE Signs Board of Zoning Appeals Filing Fees TOTAL 50 3 4 5