Derby Street Road Safety Audit, Derby Street at Route 3

Transcription

Derby Street Road Safety Audit, Derby Street at Route 3
ROAD SAFETY AUDIT
Derby Street at Route 3 Ramps Town of Hingham December 2013 Prepared For:
MassDOT
On Behalf Of:
Town of Hingham
Prepared By:
CHA Consulting
101 Accord Park Drive
Norwell, MA 02061
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Table of Contents Background ................................................................................................................................. 1
Project Data ................................................................................................................................. 1
Project Location Description ..................................................................................................... 3
Audit Observations and Potential Safety Enhancements........................................................ 6
Summary of Road Safety Audit ............................................................................................... 12
List of Appendices
Appendix A.
Appendix B.
Appendix C.
Appendix D.
RSA Meeting Agenda
RSA Audit Team Contact List
Detailed Crash Data
Additional Information
List of Figures
Figure 1 Locus Map ................................................................................................................................... 2
Figure 2 Derby Street at Route 3 Intersections .......................................................................................... 5
List of Tables
Table 1.
Table 2.
Participating Audit Team Members ....................................................................................... 1
Potential Safety Enhancements Summary ............................................................................ 13
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Background
The intersections of Derby Street at the Route 3 Northbound and Southbound Ramps in Hingham,
Massachusetts are listed as High Crash Locations within the Metropolitan Area Planning Council
(MAPC) region. As such, the Massachusetts Department of Transportation (MassDOT) has determined
that Highway Safety Improvement Program (HSIP) funding would be allowed for reconstruction of these
intersections if a Road Safety Audit (RSA) is conducted and the proposed design included safety
improvements identified in the RSA. The intersections are currently under design (MassDOT Project
#607309) as part of the Reconstruction and Related work on Derby Street from Pond Park Road to
Cushing Street project for which the Town of Hingham is the proponent. The project is not currently
placed in a funding year on the Transportation Improvement Program (TIP) list.
The purpose for this RSA is to identify existing safety deficiencies and potential safety improvements that
could be implemented as part of the Reconstruction and Related Work on Derby Street project.
Additionally, potential short term low cost improvements are identified for consideration by MassDOT
for implementation prior to the reconstruction of the intersections. The location of the two intersections
included in the RSA is depicted in Figure 1.
Project Data
The audit team conducted a RSA for the intersections of Derby Street at the Route 3 Northbound and
Southbound Ramps on Wednesday November 6, 2013. The RSA Agenda is included in Appendix A.
Table 1 lists the audit team members and their affiliations. Appendix B includes contact information for
all team members.
Table 1. Participating Audit Team Members
Audit Team Member
Roger Fernandes
Ted C. Alexiades
Mary Savage-Dunham
Emily Wentworth
Sgt. Steven Dearth
Barbara Lachance
Corey O’Connor
Lisa Schletzbaum
Jason Walters
Promise Otaluka
John Morgan
Robert Cahoon
Andrew Valcovic
Agency/Affiliation
Town of Hingham Projects Engineer
Town Administrator
Town of Hingham Director of Community Planning
Town of Hingham
Town of Hingham Police
MassDOT District 5 Traffic
MassDOT Traffic Safety
MassDOT Traffic Safety
MassDOT District 5 Projects
FHWA
CHA Consulting
CHA Consulting
CHA Consulting
Page 1
OLD
DER
BY
T
TR
EE
GA
RD
NE
RS
HI
NG
3
ST
RE
ET
STR
CU
S
RO
UT
E
ST
RE
ET
W
HI
TI
NG
RSA
LOCUS
EET
W
HI
TI
NG
RT 3
NB RAMP
WEYMOUTH
D
EET
STR
Y
B
ER
RT 3
SB RAMP
ST
RE
ET
DERBY
SHOPPES
HINGHAM
Text
TE
U
O
R
3
Source: Office of Geographic Information (MassGIS), Commonwealth of Massachusetts Information Technology Division
0
TOWN OF HINGHAM, MA
DERBY STREET AT ROUTE 3
ROAD SAFETY AUDIT
±
155
310
620
930
1,240
FT
Figure 1. Locus Map
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Traffic data was provided to the audit team prior the RSA, including crash data and collision diagrams
based on crash records from the Town of Hingham Police Department and State Police for the three year
period of September 2010 to August 2013. It should be noted that twelve additional crash reports were
received after the audit was conducted. The additional reports have been reviewed and tabulated and are
included in the data contained in this report. Crash records were provided for a total of 18 accidents at
the Route 3 Northbound Ramps and 23 accidents at the Southbound Ramps. Of the 18 crashes reported at
the Northbound Ramps, eleven (61%) were angle crashes, three (17%) were rear end crashes, two (11%)
were sideswipe crashes, one (6%) was a head on crash and one (6%) was a single vehicle crash with a
fixed object. Of the 23 crashes reported at the Southbound Ramps, 12 (52%) were rear end crashes, five
(22%) were angle crashes, two (9%) were sideswipe crashes, two (9%) were head on crashes, and two
(9%) were single vehicle crash with a fixed object. Appendix C provides the detailed crash data for the
two intersections.
Project Location and Description
The RSA focused on the two intersection of Derby Street at the Route 3 Ramps in Hingham. Figure 2
depicts the existing intersections.
Exit 15 of Route 3 is a partial cloverleaf interchange with the southbound exit located west of
Route 3 intersecting Derby Street from the south and the northbound exit located east of Route 3
intersecting Derby Street from the north. Each exit arrangement allows “YIELD” controlled
movements for right turn exits and entrances to Route 3. At Derby Street, left turns from the
Route 3 off-ramps operate under “STOP” control. Currently there are no left turn lanes on Derby
Street at either on-ramp to Route 3 to provide queue storage. Between Old Derby Street and the
southbound ramps, the paved roadway surface is approximately 44 feet wide. Derby Street is
functionally classified as an urban minor arterial and has a posted speed limit of 40 miles per
hour (mph). Both Derby Street and the ramps to Route 3 are State Highways under the
jurisdiction of MassDOT.
Derby Street is a three-lane roadway west of the Route 3 southbound ramps that narrows to a two
lane, 44-foot wide roadway with 8-foot wide shoulders. A 15-foot wide westbound lane
provides limited room for vehicles to maneuver around the left turn queue onto the ramp. Along
the north side of the roadway, there is a 5.5 foot wide asphalt sidewalk continuing from Pond
Park Road with guardrail behind beginning at the southbound ramp entrance. Derby Street
maintains a 44-foot paved width over the Route 3 overpass with 14 foot lanes, 8-foot shoulders,
and a 5.5-foot wide concrete sidewalk. At the northbound ramps intersection, Derby Street has
the same layout as the southbound ramps with a wider 15’ eastbound lane, which allows vehicles
to maneuver around the left turn queue. Guardrail is located on both sides of the roadway
extending from the Route 3 overpass through the northbound ramps intersection, ending prior to
Old Derby Street. The 5.5-foot wide sidewalk along the north side continues through the ramp
intersection ending at Old Derby Street. East of the northbound ramps, Derby Street expands to a
50-foot wide, four lane roadway with 12-foot eastbound lanes, 11-foot westbound lanes, and 2foot shoulders.
Page 3
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
As stated previously, the Derby Street at Route 3 Ramps intersections are currently under design
(MassDOT Project #607309) as part of the Reconstruction and Related work on Derby Street from Pond
Park Road to Cushing Street project for which the Town of Hingham is the proponent. The timeline for
implementation is several years out as the project in not currently placed in a funding year on the
Transportation Improvement Program (TIP) list.
Page 4
WEYMOUTH
OL
D
E
UT
RO
ADT
=
3
16,2
00 v
pd
DE
RB
YS
TR
EE
T
RT 3
NB RAMP
MID-BLOCK
CROSSWALK
B
DER
EET
R
T
YS
ADT
,000
= 27
vpd
HINGHAM
3
ADT
= 17
,300
vp
E
UT
RO
RT 3
SB RAMP
d
Source: Office of Geographic Information (MassGIS), Commonwealth of Massachusetts Information Technology Division
0
TOWN OF HINGHAM, MA
DERBY STREET AT ROUTE 3
ROAD SAFETY AUDIT
±
60
120
240
360
480
FT
Figure 2. Derby Street at Route 3 Intersections
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Audit Observations and Potential Safety
Enhancements
During the RSA performed on November 6, 2013 the following safety issues were identified for the
intersections of Derby Street at Route 3 Northbound and Southbound Ramps:
1. Sight Distance/Geometry for Off-Ramp Right Turns
2. Lack of Traffic Control for Derby Street Westbound lane Reduction
3. Guide Sign Placement
4. Pedestrian Accommodations
5. Capacity deficiencies for left turns
Safety Issue #1: Sight Distance/Geometry for Off-Ramp Right Turns
Observations:
A review of crash data indicated a high number
of rear-end collisions on the Route 3
Southbound Off-Ramp for right turns. Vehicles
exiting the ramp are required to yield to
vehicles on Derby Street. Field observations
found that there is limited sight distance for
vehicles approaching Derby Street due to trees
and vegetation along the inside curve radius.
Also observed was the angle at which vehicles
are positioned while yielding to Derby Street
traffic. The sharp angle at which drivers must
look back over their shoulder may lead to
vehicles that are second in the queue not seeing
the movements of the first vehicle in the queue
in front of them, thus resulting in rear end collisions between the first two vehicles in the queue.
Enhancements:
1. A potential short-term enhancement would be to perform selective trimming and clearing along
the inside radius of the right turn off-ramps. This would improve visibility of approaching
vehicles of queues that are waiting to enter Derby Street.
Page 6
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
2. A potential long-term solution to help alleviate the rear-end collisions between vehicles at the
front of the queue would be to include the right turn movement as part of a future traffic signal.
With the right turns signalized, drivers would not need to look back over their shoulder to view
oncoming vehicles or find gaps in traffic in order to enter Derby Street. Drivers would then be
able to focus on the activity directly in front of them when turning onto Derby Street.
Safety Issue #2: Lack of Traffic Control for Derby Street Westbound Lane Reduction
Observations:
During field observations it was observed that
the transition from two lanes to one lane on the
Derby Street westbound approach to the Route
3 Northbound Ramps is not well defined.
Pavement striping for the two lanes ends
abruptly at the existing crosswalk near Old
Derby Street. There is no signage to alert
drivers of the impending lane reduction.
Additionally, the entrance to the Route 3
Northbound Ramps is a couple hundred feet
beyond the lane reduction. The lack of signage
and pavement markings make it unclear as to
whether vehicles should merge into one lane
before approaching the ramp or continue to
form two lanes with the right lane exiting. Drivers were observed continuing in the right lane, appearing
to be headed to the on-ramp, and then merging left at the location of ramp to continue on Derby Street.
While there were no reported crashes specifically attributed to this issue, this unexpected maneuver has
the potential to cause a collision.
Enhancements:
1. A potential short-term enhancement would be to add signage indicating the end of the two-lane
section of Derby Street and the need for vehicles to merge into one lane prior to the entrance to
Route 3.
2. An alternative short-term solution would be to extend the two lanes on Derby Street to the Route
3 Northbound on-ramp and add signage and pavement markings indicating that the right lane
must turn right. This solution is not ideal, as it would result in drivers that are traveling in a
through lane on Derby Street, suddenly finding they are in a right turn only lane. Vehicles that
were not intending to turn right would then need to merge left prior to reaching the Route 3 ramp.
Page 7
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
3. A potential long term solution would be to extend the two through lanes on Derby Street beyond
the entrance to the Route 3 Ramp, thus allowing vehicles to stay in the right lane if headed
westbound on Derby Street or to the Northbound Ramp.
Safety Issue #3: Guide Sign Placement
Observations:
During the audit it was recognized that Guide
signage placement on Derby Street and the
Route 3 off ramps appeared deficient and was
not properly alerting motorists of the
impending actions that are required. A guide
sign on Derby Street near the Derby Shoppes
that faces westbound traffic was partially
obstructed by vegetation. Traveling
westbound on Derby Street there is a guide
sign located approximately 250 feet prior to
the on-ramp. However, there are no existing
guide signs present at the on-ramp to guide
vehicles onto Route 3.
Guide signs for vehicles exiting the Route 3 off-ramps are located within the traffic islands where drivers
must decide to either turn left or right onto Derby Street and may not provide advance warning, because
of the limited visibility from brush and the tight ramp radius.
Enhancements:
1. A potential short-term enhancement would be to clear existing tree limbs and vegetation blocking
the guide sign on Derby Street westbound. This will help visibility of existing signs.
2. Installing additional guide signs on Derby Street and the Route 3 off-ramps would be another
short-term or medium-term enhancement. Guide signs placed on Derby Street near the ramp
entrances for right turns would help guide drivers that may not be sure which ramp they need to
take. Also, installing advance guide signs on the ramps may help alert drivers in advance as to
which direction on Derby Street they will need to turn at the end of the ramp depending on their
destination.
Page 8
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Safety Issue #4: Pedestrian Accommodations
Observations:
RSA team members noted several
concerns with regards to pedestrian
accommodation and safety. It was noted
that at the Route 3 Northbound ramps
sidewalks are provided, but there are no
delineated crosswalks or accessible
wheelchair ramps for pedestrian use to
cross the ramp entrances or exits. Also
noted was the concern for visibility of
pedestrians crossing the on and off ramps
due to vegetation along the right side of the
off-ramp. Although there were no reported
collisions involving pedestrians during the
three-year period reviewed, high traffic
volumes and the complexity of traffic maneuvers (turns and merges) at this location are concerns for the
pedestrian crossings.
Safety concerns were also noted for the
existing crosswalk located west of the Route 3
ramps near Old Derby Street. This midblock
crossing consists of a long crosswalk across
four travel lanes in a relatively high speed
location where vehicles are accelerating and
decelerating for the Route 3 Ramps. It is also
the location of a lane drop in the westbound
direction from two through lanes to a single
wide lane as described in Safety Issue #2
above. The lane drop could potentially divert
drivers’ attention from pedestrians in the
crosswalk. The existing signage at the
crosswalk does not meet current MUTCD
standards and there is no advance warning signage approaching the crossing. It was noted during the
audit that there was a past collision involving a pedestrian at this location that resulted in a fatality.
Enhancements:
1. A potential short-term enhancement would be to improve signage at the crosswalk on Derby
Street. MUTCD compliant signage advance warning signs could be installed to alert drivers of
the crossing.
Page 9
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
2. A potential mid-term enhancement would be to install ADA compliant wheelchair ramps at the
Route 3 Northbound ramps and to designate crosswalks with MUTCD compliant signage.
3. A potential long-term enhancement would be to provide signalized pedestrian crossings at the
Northbound Ramp intersection as part of a new traffic signal. Signalized crossings could be
provided for the crossing of the off-ramps as well as the on-ramp for left turning vehicles from
Derby Street.
4. Another potential long-term enhancement would be to relocate the mid-block crossing of Derby
Street. Consider continuing the sidewalk on the north side of Derby Street eastward to Cushing
Street. The crosswalk at Old Derby Street could be eliminated and a new crosswalk constructed
at the Derby Shoppes traffic signal.
Safety Issue #5: Capacity deficiencies for left turns
Observations:
There have been a relatively high number of
angle collisions involving vehicles turning left
from the northbound ramps (8) and southbound
ramps (4) over the three-year period reviewed.
RSA team members noted that left turns
movements from the Route 3 off-ramps are
difficult due to the high traffic volumes on
Derby Street. In addition to the high volumes,
left turning drivers from the northbound ramps
must also discern the intent of westbound
approaching vehicles that are merging from
two lanes to one lane as they approach the
ramps. Audit members noticed that in many
cases it was difficult to determine if vehicles
intended to turn right onto the Route 3 ramps or if they intended to proceed straight on Derby Street. As a
result of the lack of adequate gaps in traffic and the difficulty in discerning the intent of approaching
drivers, exiting vehicles experience lengthy delays while waiting to turn left onto Derby Street. The
calculated level of service (LOS) is “F” during each of the weekday morning, weekday evening and
weekend mid-day peak hour periods for left turns from both the Northbound and Southbound Ramps.
Although the Audit was performed at an off-peak time of day, vehicle queues of more than five cars were
noticed on multiple occasions. Often, drivers had to wait for Derby Street traffic to stop and let the
vehicles turn left from the ramp before they could find an adequate gap in traffic to proceed. Team
members have also observed U-turn type maneuvers involving vehicles exiting the northbound ramps
turning right onto Derby Street westbound and then making a left turn into the Hingham Industrial Park
and turning around in order to then head eastbound on Derby Street. This U-turn maneuver is done to
avoid making a left turn from the off-ramp onto Derby Street.
Page 10
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Enhancements:
1. A potential long-term enhancement would be to signalize the Northbound and Southbound Ramp
intersections. New fully actuated signals should be considered, which could be coordinated with
the existing signals on Derby Street to provide for optimal corridor progression. Widening for
turn lanes should also be considered for additional capacity.
2. A potential long-term improvement would be to construct a full four-quadrant clover interchange
at Exit 15. This would allow for all right turns onto and off of the ramps, thus reducing delays
and vehicle queues. In order to meet the capacity demands, this option would also likely include
widening of Derby Street to four lanes between the Northbound and southbound ramps. This
would require reconstruction of the bridge over Route 3, would have significant environmental
impacts, and would be a considered a major infrastructure project.
Page 11
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Summary of Road Safety Audit
Table 2 summarizes the safety issues, possible enhancements, estimated safety payoff, time frame,
estimated cost, and the responsible party. Safety payoff estimates are subjective and are based on
engineering judgment. Safety payoffs are classified as low medium, and high. The time frame is
categorized as short-term (<1 year), mid-term (1 to 3 years), or long-term (>3 years). The costs are
categorized as low (<$10,000), medium ($10,001 to $50,000), or high (>$50,001).
Page 12
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Table 2. Potential Safety Enhancement Summary
Safety Issue
Potential Safety Enhancement
Perform selective trimming and clearing
along the inside radius of the right turn offramps to improve visibility for approaching
drivers of vehicle queues that are waiting
Sight Distance/Geometry to enter Derby Street
for Off-Ramp right Turns Include the right turn movement from the
off-ramps as part of future traffic signals.
With the right turns signalized drivers
would not need to look back over their
shoulder to view oncoming vehicles.
Add signage indicating the need for
vehicles to merge into one lane after the
two lanes end prior to the Route 3
Northbound Ramps.
Extend the two lanes on Derby Street to
the Route 3 Northbound on-ramp and add
signage indicating that the right lane must
turn right. This solution is not ideal as it
would result in vehicles that are traveling
Lack of Traffic Control for
in a through lane on Derby Street,
Derby Street Westbound
suddenly finding themselves in a right turn
Lane Reduction
only lane. Additional advance signing and
pavement markings would be required.
Extend the two through lanes on Derby
Street beyond the entrance to the Route 3
Ramp, thus allowing vehicles to stay in
the right lane if headed westbound on
Derby Street or to the Northbound Ramp.
Requires widening of Derby Street and
could be implemented in conjunction with
traffic signal installation.
Safety Payoff
Time Frame
Cost
Responsible
Agency
Low
Short-term
Low
MassDOT
High
Long-term
High
MassDOT
Low
Short-term
Low
MassDOT
Low
Mid-term
Medium
MassDOT
Medium
Long-term
High
MassDOT
Page 13
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Table 2. Potential Safety Enhancement Summary
Safety Issue
Guide Sign Placement
Pedestrian
Accommodations
Potential Safety Enhancement
Clear existing tree limbs and vegetation
blocking the guide sign on Derby Street
westbound. This will help visibility of
existing signs.
Install additional guide signs on the offramps to help alert drivers in advance as
to which direction on Derby Street they
will need to turn at the end of the ramp
Install additional guide signs on Derby
Street for Route 3 prior to and at the onramps to better guide vehicles to the
appropriate on-ramp.
Improve signage at the crosswalk on
Derby Street. MUTCD compliant signage
and advance warning signs could be
installed to better alert drivers of the
crossing
Install ADA compliant wheelchair ramps at
the Route 3 Northbound ramps and
designate crosswalks with MUTCD
compliant signage.
As part of a signal system at the
Northbound ramps, consider providing
signalized crossings for the pedestrian
crossing of the off-ramps as well as the
on-ramp for left turning vehicles from
Derby Street.
Safety Payoff
Time Frame
Cost
Responsible
Agency
Low
Short-term
Low
MassDOT
Low
Short-term
Low
MassDOT
Low
Short-term
Low
MassDOT
Low
Short-term
Low
MassDOT
Low
Mid-term
Medium
MassDOT
High
Long-term
High
MassDOT
Page 14
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Table 2. Potential Safety Enhancement Summary
Safety Issue
Potential Safety Enhancement
Relocate the mid-block crossing of Derby
Street currently located east of the Route
3 Ramps. The mid-block crosswalk would
be eliminated and a new crosswalk
constructed at the Derby Shoppes traffic
signal providing a signalized crossing for
pedestrians. This would require the
continuation of the sidewalk on the north
side of Derby Street eastward to Derby
Shoppes.
Signalize the Northbound and
Southbound Ramp intersections. New
fully actuated signals may require
coordination with the existing signals on
Derby Street to provide for optimal
corridor progression. Intersection
improvements would also require
widening for turn lanes additional turn
lanes to meet capacity demands.
Capacity Deficiencies for
Construct a full four quadrant clover
Left Turns
interchange at Exit 15. This would allow
for all right turns onto and off of the
ramps. In order to meet the capacity
demands, this option would also likely
include widening of Derby Street to four
lanes between the Northbound and
Southbound ramps. This would require
reconstruction of the bridge over Route 3
and would be a considered a major
infrastructure project.
Safety Payoff
Time Frame
Cost
Responsible
Agency
High
Long-term
High
MassDOT
High
Long-term
High
MassDOT
High
Long-term
High
MassDOT
Page 15
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Appendix A. RSA Meeting Agenda Road Safety Audit
Hingham, MA
Derby Street at Route 3 Ramps
Meeting Location: Hingham DPW
25 Bare Cove Park Drive, Town Engineer’s Office
November 6th, 2013
10:00 AM – 12:00 noon
Type of meeting:
High Crash Location – Road Safety Audit
Attendees:
Invited Participants to Comprise a Multidisciplinary Team
Please bring:
Thoughts and Enthusiasm!!
10:00 AM
Welcome and Introductions
10:15 AM
Review of Site Specific Material
 Crash, Speed & Volume Summaries– provided in advance
 Existing Geometries and Conditions
11:00 AM
Visit the Site
 Drive to intersections of Derby Street at Route 3 NB and SB Ramps
 As a group, identify areas for improvement
11:30 AM
Post Visit Discussion / Completion of RSA
 Discuss observations and finalize findings
 Discuss potential improvements and finalize recommendations
12:00 noon
Adjourn for the Day – but the RSA has not ended
Instructions for Participants:
 Before attending the RSA on November 6th, participants are encouraged to drive
through the intersection and complete/consider elements on the RSA Prompt List
with a focus on safety.
 All participants will be actively involved in the process throughout. Participants
are encouraged to come with thoughts and ideas, but are reminded that the
synergy that develops and respect for others’ opinions are key elements to the
success of the overall RSA process.
 After the RSA meeting, participants will be asked to comment and respond to the
document materials to assure it is reflective of the RSA completed by the
multidisciplinary team.
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Appendix B. RSA Audit Team Contact List Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Participating Audit Team Members
Date: November 6, 2013
Audit Team Members
Roger Fernandes
Ted C. Alexiades
Mary Savage-Dunham
Emily Wentworth
Sgt. Steven Dearth
Barbara Lachance
Corey O’Connor
Lisa Schletzbaum
Jason Walters
Promise Otaluka
John Morgan
Robert Cahoon
Andrew Valcovic
Location:
Agency/Affiliation
Town of Hingham Projects Engineer
Town Administrator
Town of Hingham Director of Community
Planning
Town of Hingham
Town of Hingham Police
MassDOT District 5 Traffic
MassDOT Traffic Safety
MassDOT Traffic Safety
MassDOT District 5 Projects
FHWA
CHA Consulting
CHA Consulting
CHA Consulting
Derby Street at Route 3 Ramps, Hingham, MA
Email Address
[email protected]
[email protected]
Phone Number
781-804-2305
781-741-1400
[email protected]
781-741-1419
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
781-741-1494
781-804-2205
508-884-4260
857-368-9638
857-368-9634
508-884-4370
617-474-2528
781-982-5437
781-982-5469
781-792-2283
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Appendix C. Detailed Crash Data Crash Data Summary Table
Derby Street @ Rte. 3 Northbound ramp,Hingham, MA
9/2010 to 8/2013
Crash
Diagram
Ref #
1
2
3
4
5
Month #
Crash Date Day #
m/d/y
6
1
4
4
3
Crash Day
7
8
10
2
3
7/30/11
8/29/11
10/27/11
2/9/12
3/28/12
Saturday
Monday
Thursday
Thursday
Wednesday
20
18
18
15
6
8:58 PM
6:24 PM
6:24 PM
3:12 PM
6:44 AM
#
4
3
3
1
2
Manner of Collision
Type
Sideswipe, same direction
Angle
Angle
Single Vehicle Crash
Rear-end
#
99
99
99
99
99
6
7
8
9
10
7
1
1
5
8
7/20/12
1/23/13
1/31/13
5/25/13
8/5/13
5
3
4
6
1
Friday
Wednesday
Thursday
Saturday
Monday
10
14
15
15
13
10:44 AM
2:40 PM
3:41 PM
3:16 PM
1:08 PM
3
6
3
2
3
Angle
Head on
Angle
Rear-end
Angle
99
99
99
99
99
11
12
13
14
15
16
17
18
2
2/1/13
5/31/2011
10/31/11
11/13/11
12/20/11
9/27/12
12/7/12
11/23/12
5
Friday
19 7:12 PM
2
Rear-end
5
2
Tuesday
9
1
7
2
4
5
5
Monday
Sunday
Tuesday
Thursday
Friday
Friday
15
13
17
11
15
14
5
17
11
12
9
12
11
Time #
Time of Day
9:25
3:34 PM
1:58 PM
5:28 PM
11:01 AM
3:25 PM
2:30 PM
4 Sideswipe, same direction
3
3
3
3
3
3
Angle
Angle
Angle
Angle
Angle
Angle
Light Condition
Type
Unknown
Unknown
Unknown
Unknown
Unknown
Weather Condition
#
Type
99 Unknown
99 Unknown
99 Unknown
99 Unknown
99 Unknown
#
99
99
99
99
99
Unknown
Unknown
Unknown
Unknown
Unknown
Dark - roadway not
lighted
99
99
99
99
99
99
99
99
99
99
99 Unknown
99
99
99
99
99
99
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
1
Unknown
Unknown
Unknown
Unknown
Unknown
Clear
99 Unknown
99 Unknown
99 Unknown
99 Unknown
99 Unknown
99 Unknown
99 Unknown
#
6
4
19
1
1
Driver Contributing Code
Type
Made an improper turn
Failed to yield right of way
Inattention
No Improper Driving
No Improper Driving
Unknown
Unknown
Unknown
Unknown
Unknown
4
4
4
5
19
Failed to yield right of way
Failed to yield right of way
Failed to yield right of way
Followed too closely
Inattention
Dry
99 Unknown
99 Unknown
99 Unknown
99 Unknown
99 Unknown
99 Unknown
99 Unknown
19
1
Road Surface
Type
Unknown
Unknown
Unknown
Unknown
Unknown
Inattention
1 No Improper Driving
1
No Improper Driving
4
Failed to yield right of way
4
Failed to yield right of way
4
Failed to yield right of way
4
Failed to yield right of way
4
Failed to yield right of way
Summary based on Crash Reports obtained from the Hingham Police Dept. and MassDOT
*Courtesy Crash - A term used to describe a crash that occurs subsequent to a non-involved mainline driver who gives the right of way, contrary to the rules of the road, to another driver.
DOB
DOB
DOB
Ages
DOB
3/8/1943 11/20/1948
8/2/1991 12/28/1943
2/17/1951 11/6/1958
2/8/1958
10/1/1954 3/27/1960
8/23/1956 10/30/1971 1/20/1969
5/29/1983 2/17/1987
3/8/1965 8/16/1966
7/19/1961 5/31/1976
10/23/1972 3/26/1942
1/1/1970
1/1/1966
7/28/1959 6/16/1966
6/20/1941
5/8/1989
6/30/1981 9/14/1985
9/12/1961 4/29/1995
7/28/1932 7/10/1979
5/20/1936 11/7/1973
3/28/1981 12/16/1954
Comments
D1
D2
68
20
60
54
57
62
67
52
112
52
55
29
47
51
40
40
25
46
36
71
43
51
70
30
50
80
76
31
47
44
22
26
16
33
39
57
D3
112
112
43
D4
V1 attempted to change lanes, hitting V2
V1 failed to yield right of way and turned towards Rte 3 N on ramp
V1 failed to yield right of way
V2 avoided a collision with unidentified vehicle and struck a guardrail
V1 began to merge and stopped, V2 struck V1
V1 attempted to turn left onto Rte 3 N ramp and was struck by V1 traveling
west
V1 attempted to turn left onto Rte 3 N ramp and struck V2 head on
V1 attempted to turn left onto Derby St, striking V2 traveling west
V1 inched out too far while attempting to turn left onto Derby St
--------,
N
GJ
I
I
I
I
I
/
~ERBY STRE~
11 1\ sy ~~~ I\ /11
-----~
• .d------
I
I
I
"'­
_l_l_ -~-.
o ..
J
~
12
4
3,8,10,14,15,
16,17,18
TYPE Of ACCIDENT
RT. 3 NORTHBOUND RAMP 0
DERBY STREET
1 REAR-END
~HEAD-ON
~SIDESWIPE
::::::..
ft OVERTURNED
if;
FIXED-OBJECT
..o---..
TOWN OF' HINGHAM
•D
~ ANGLE
17
PARKED CAR
•1:8J
FROM 9-2010 TO 8-2013
~ OUT Of CONTROL _______.._
~ PEDESTRIAN
-----.......
TOTAL ACCIDENT REPORlS - 18
TITLE:
101 Accord Park Drive Norwell, MA 02061 Main: (761) 982-6400 • www.chacompaniea.com
COLLISION DIAGRAM RTE. 3 NORTHBOUND RAMP @
DERBY STREET
DATE:
NOVEMBER 2013
Crash Data Summary Tables and Charts
Derby Street @ Rte. 3 Northbound ramp,Hingham, MA
CRASH MONTH
14%
12%
10%
8%
6%
4%
2%
0%
12%
12%
12%
12%
12%
6%
0%
J
F
M
6%
6%
S
O
12%
12%
N
D
0%
A
M
J
J
A
CRASH DAY OF WEEK
25%
20%
22%
22%
17%
15%
11%
11%
11%
10%
6%
5%
0%
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
CRASH TIME OF DAY
60%
39%
40%
20%
0%
6% 6%
6AM- 8AM
8AM10AM
11% 11%
10AM12PM
17%
6%
6%
12PM- 2PM- 4PM4PM- 6PM6PM- 8PM
2PM
8PM10PM
0% 0% 0% 0%
10PM12AM
12AM- 2AM- 4AM4AM- 6AM
2AM
CRASH MANNER OF COLLISION
70%
60%
50%
40%
30%
20%
10%
0%
61%
17%
11%
6%
Single
Vehicle
Crash
0%
Rear-end
Crash Data Spreadsheet-NB ramp
Angle
Sideswipe, Sideswipe,
same
opposite
direction
direction
1 of 2
6%
Head on
0%
0%
Rear to Rear Unknown
12/2/2013
Crash Data Summary Tables and Charts
Derby Street @ Rte. 3 Northbound ramp,Hingham, MA
CRASH LIGHT CONDITION
94%
6%
0%
0%
0%
0%
Daylight
Dawn
Dusk
Dark Lighted
Roadway
Dark Roadway
not lighted
0%
0%
Dark unknown
roadway
lighting
Other
Unknown
0%
0%
0%
0%
0%
0%
Sleet, Hail,
Freezing
Rain
Fog, Smog,
Smoke
Severe
Crosswinds
Blowing
sand, snow
Other
0%
94%
Snow
0%
Rain
6%
Clear
100%
80%
60%
40%
20%
0%
Cloudy
CRASH WEATHER CONDITION
CRASH ROAD SURFACE
100%
80%
60%
40%
20%
0%
6%
Dry
0%
0%
0%
Wet
Snow
Ice
0%
Unknown
100%
80%
60%
40%
20%
0%
94%
0%
Sand, mud, Water
dirt, oil, (standing,
moving)
gravel
0%
0%
Slush
Other
Unknown
CRASH DRIVER AGES
30%
22%
20%
10%
0%
14%
25%
14%
11%
8%
3%
3%
15-20
21-29
Crash Data Spreadsheet-NB ramp
30-39
40-49
50-59
2 of 2
60-69
70-79
80+
12/2/2013
Crash Data Summary Table
Derby Street @ Rte. 3 Southbound ramp, Hingham, MA
9/2010 to 8/2013
Crash
Diagram
Ref #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Month #
10
12
6
7
10
1
4
5
5
5
3
6
4
3
5
7
8
10
10
,20
10
12
12
Crash Date Day #
m/d/y
10/29/10 5
12/2/10 4
6/9/11
4
7/21/11 4
10/20/11 4
1/19/12 4
4/3/12
2
5/10/12 4
5/17/12 4
5/27/12 7
3/3/13
7
6/18/12 1
4/25/12 3
3/5/13
2
5/25/13 6
7/17/13 3
8/1/13
4
10/12/12 5
10/28/2011 5
12/19/2011 1
Crash Day
Friday
Thursday
Thursday
Thursday
Thursday
Thursday
Tuesday
Thursday
Thursday
Sunday
Sunday
Monday
Wednesday
Tuesday
Saturday
Wednesday
Thursday
Friday
Friday
Monday
Time #
Time of Day
3:38 PM
3:19 PM
1:11 PM
2:12 PM
3:09 PM
5:11 PM
11:47 AM
7:01 AM
4:48 PM
12:24 PM
6:17 PM
2:40 PM
3:15 PM
3:45 PM
9:15 AM
3:08 PM
7:05 AM
6:15 AM
6:53 AM
14 2:59 PM
10/13/2012 6
12/8/11 4
12/10/12 1
Saturday
Thursday
Monday
20 8:56 PM
16 4:10 PM
19 7:09 PM
3
4
2
1
4
2
3
3
2
2
3
2
2
2
2
2
2
2
1
Manner of Collision
Type
Angle
Sideswipe, same direction
Rear-end
Single Vehicle Crash
Sideswipe, same direction
Rear-end
Angle
Angle
Rear-end
Rear-end
Angle
Rear-end
Rear-end
Rear-end
Rear-end
Rear-end
Rear-end
Rear-end
Single Vehicle Crash
2
Rear-end
6
Head on
3
6
Angle
Head on
#
15
15
13
14
15
17
11
7
16
12
18
14
15
15
9
15
7
6
6
#
99
99
99
99
99
99
99
99
99
99
99
1
1
1
1
1
1
1
99
Light Condition
Type
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Daylight
Daylight
Daylight
Daylight
Daylight
Daylight
Daylight
Unknown
Weather Condition
#
Type
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Rain
Unknown
Unknown
Unknown
Cloudy
Cloudy
Clear
Clear
Clear
Clear
Clear
Unknown
99
99
99
99
99
99
99
3
99
99
99
2
2
1
1
1
1
1
99
99
99
99
99
99
99
99
2
99
99
99
1
1
1
1
1
1
1
4
Road Surface
Type
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Wet
Unknown
Unknown
Unknown
Dry
Dry
Dry
Dry
Dry
Dry
Dry
Ice
#
99 Unknown
99
Unknown
99
Unknown
99
Unknown
99
99
99
99
Unknown
Unknown
99
99
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
99
99
Summary based on Crash Reports obtained from the Hingham Police Dept. and MassDOT
*Courtesy Crash - A term used to describe a crash that occurs subsequent to a non-involved mainline driver who gives the right of way, contrary to the rules of the road, to another driver.
Driver Contributing Code
Type
Failed to yield right of way
Failed to yield right of way
Followed too closely
running off road
Failed to yield right of way
Followed too closely
Failed to yield right of way
Inattention
Followed too closely
Followed too closely
Failed to yield right of way
No Improper Driving
Unknown
Inattention
No Improper Driving
Other improper action
Unknown
Followed too closely
No Improper Driving
5 Followed too closely
Failure to keep in proper lane or
9 running off road
4
Failed to yield right of way
19 Inattention
#
4
4
5
9
4
5
4
19
5
5
4
1
99
19
1
97
99
5
1
DOB
DOB
6/12/1986
10/15/1972
10/8/1945
11/1/1992
4/4/1968
12/21/1956
11/12/1973
8/1/1972
3/3/1964
9/7/1992
5/19/1988
1/1/1961
1/20/1961
12/3/1969
2/14/1989
1/1/1967
1/1/1975
1/1/1989
1/1/1991
1/1/1977
11/13/1970
6/2/1993
1/1/1967
1/1/1961
1/1/1952
DOB
Ages
DOB
9/14/1927
4/20/1994
4/27/1969
4/7/1995
2/12/1985
8/23/1963
1/24/1934
1/1/1977
1/1/1954
1/1/1992
5/8/1976
6/3/1971 10/14/1951 6/19/1984
10/27/1971
8/8/1958
4/7/1965
6/8/1991
Comments
D1
D2
D3
24
38
65
18
43
55
38
39
48
19
24
51
49
40
22
46
38
24
22
35
40
51
46
52
61
70
40
47
60
53
21
D4
V1 failed to yield to oncoming westbound traffic
V1 thought V2 was going to make a turn and attempted to pass
V1 rear ended V2 which was waiting to merge onto Derby St
V1 fell asleep and crossed over the centerline into the opposing lane
V2 failed to yield right of way to Derby St traffic and clipped V1
84
17
42
17
27
48
79
35
V2 traveling west on Derby St struck by V1 exiting Rte 3 S ramp
V1 was cut off by V2 exiting Rte 3 S ramp
V2 was stopped at yield sign and was rear ended by V1
V3 rear ended V1 who rear ended V2, V3 fled scene
V1 cut off V2 while attempting to turn onto Rte 3 S ramp
59
20
35
28
.-----------,- -
-
-
-
-
-
-
-
-
-
­
N
I
I
I
I
I
I
I
CD
21,23
---
o .. 4
I
DERBY SlREET
--{
• 2=---
I" __
e_ _
"""' - T T - / -- - "\:
:/ /
-DERBY SlREET
/.~ 1~14.1~10.17,10~
..
,I I, ~I I~c
~I I~ c
z
T't'PE OF ACCIDENT
z
~I I~ 1 REAR-END
...,:
2 HEAD-ON
J SIDESWIPE
ot
0::
~
O~lURNED
a:: I
•
RT. 3 SOUlHBOUND RAMP 0 DERBY STREET ...,:
Ia::
0'--...
TOWN OF HINGHAM
.. o
5 AXED-OB.ECT
8 ANGLE
.. 1:8]
7 PARKED CAR
FROM 9-2010 TO 8-201J
8 OUT OF CONlROL - - - - - - - . . . - ­
9 PEDESlRIAN
-~
TOTAL ACCIDENT REPORTS -
II TLE:
101 Accord Park Drive
Norwell, MA 02061
Main: (781) 982-5400 • www.chacompanies.com
COLLISION DIAGRAM RTE. 3 SOUTHBOUND RAMP @ DERBY STREET DATE:
2J
NOVEMBER 2013
I
Crash Data Summary Tables and Charts
Derby Street @ Rte. 3 Southbound ramp, Hingham, MA
CRASH MONTH
25%
22%
20%
17%
17%
15%
9%
10%
5%
9%
9%
9%
4%
4%
0%
0%
J
0%
F
M
A
M
J
J
A
S
0%
O
N
D
CRASH DAY OF WEEK
50%
39%
40%
30%
20%
13%
10%
0%
Monday
13%
9%
9%
Tuesday
Wednesday
Thursday
Friday
9%
9%
Saturday
Sunday
CRASH TIME OF DAY
60%
39%
40%
20% 17%
0%
6AM- 8AM
4% 4% 9%
8AM10AM
10AM12PM
13% 9%
4% 0% 0% 0% 0%
12PM- 2PM- 4PM4PM- 6PM6PM- 8PM
2PM
8PM10PM
10PM12AM
12AM- 2AM- 4AM4AM- 6AM
2AM
CRASH MANNER OF COLLISION
60%
50%
40%
30%
20%
10%
0%
52%
22%
9%
9%
9%
0%
Single
Vehicle
Crash
Rear-end
Crash Data Spreadsheet-SB ramp
Angle
Sideswipe, Sideswipe,
same
opposite
direction
direction
1 of 2
0%
Head on
0%
Rear to Rear Unknown
12/2/2013
Crash Data Summary Tables and Charts
Derby Street @ Rte. 3 Southbound ramp, Hingham, MA
CRASH LIGHT CONDITION
70%
80%
60%
40%
30%
20%
0%
Daylight
0%
0%
0%
0%
0%
0%
Dawn
Dusk
Dark Lighted
Roadway
Dark Roadway
not lighted
Dark unknown
roadway
lighting
Other
Unknown
CRASH WEATHER CONDITION
65%
0%
0%
0%
0%
0%
Severe
Crosswinds
Blowing
sand, snow
Other
Unknown
0%
Fog, Smog,
Smoke
Rain
Cloudy
4%
Sleet, Hail,
Freezing
Rain
9%
Snow
22%
Clear
70%
60%
50%
40%
30%
20%
10%
0%
CRASH ROAD SURFACE
80%
61%
60%
40%
30%
20%
0%
4%
Dry
Wet
4%
0%
Snow
Ice
0%
0%
Sand, mud, Water
dirt, oil, (standing,
moving)
gravel
0%
0%
Slush
Other
Unknown
CRASH DRIVER AGES
30%
26%
21%
20%
10%
0%
16%
14%
9%
15-20
7%
21-29
Crash Data Spreadsheet-SB ramp
30-39
40-49
50-59
2 of 2
60-69
5%
70-79
2%
80+
12/2/2013
Road Safety Audit
Derby Street at Route 3 Ramps, Hingham
Prepared by CHA Consulting
Appendix D. Peak Hour Traffic Volumes
PM Peak Hour
4:45 – 5:45 PM
AM Peak Hour
8:00 – 9:00 AM
480
580
55
740
EXIT 15
SOUTHBOUND
660
280
525
750
DERBY STREET
760
485
EXIT 15
SOUTHBOUND
160
1240
480
260
DERBY STREET
540
270
140
200
NORTHBOUND
190
95
EXIT 15
NORTHBOUND
355
80
EXIT 15
NORTHBOUND
30
595
125
400
395
275
EXIT 15
75
640
DERBY STREET
840
95
Saturday Peak Hour
12:00 – 1:00 PM
650
600
65
1070
EXIT 15
SOUTHBOUND
N
Not to Scale
2012 Existing Conditions
Peak Hour Traffic Volumes
MASS.
Road Safety Audit – Derby Street @ Route 3 Ramps
Hingham, Massachusetts
Figure
1