Castellana Tower catalog

Transcription

Castellana Tower catalog
Torre Castellana
An example of integration
Industrial
Torre Castellana
An Example of Integration
1
FCC Industrial
Towards Integrated Projects
2
The Idea
A Complete Construction
3
The Site
A Special Location
4
The Process
Integrated Solutions From
Beggining to End
5
The Large Internal Machine
An Efficient Building From The Inside
6
An Intelligent Building
A LivingzAnd Efficient Building
FCC Industrial
Towards Integrated
Projects
FCC Industrial operates in 21 countries
and generates 2,000 employments in
the world
1
FCC Industrial is the company of the FCC Group specialized in the design, project execution and
implementation of industrial works. FCC Industrial performs integrated projects that require the
participation of all engineering branches. Since 2010, it operates in 21 countries and employs more than
2,000 people worldwide.
A C T I V I T I E S
INTEGRATED
PROJECTS
HYDROCARBON
PIPELINES
ELECTROMECHANICAL
FACILITIES
MAINTENANCE AND
ENERGY EFFICIENCY
DISTRIBUTION
NETWORKS
IT SYSTEMS
THE IDEA
A Complete Construction,
20 Floors for Retail Areas
and Offices
2
Torre Castellana materializes FCC Industrial
PROPERTY: ASON Inmobiliaria de Arriendos, S.L.
EXECUTION PERIOD: 2007-2013
SURFACE: 42.837 m2
FLOORS: 20 floors over the ground
capacities: civil works and facilities. The frame
and the interior of this building, which will
become an emblematic building, have been
made by FCC Industrial.
TECHNICAL STAFF
• Architect:
Pablo Muñoz López
Pedro Vilata Capont
• Arquitectural Support:
Eduardo González Clemente
Félix Ponce de León
Torre Castellana,
a structure of 42,837 m2
of surface and avantgarde facilities
• Construction Management:
Pablo Muñoz López
Pedro Vilata Capont
Torre Castellana represents an harmonic
Feliciano Zubillaga Estanga
alliance where the envelope, the structure and
Elisa Hernández G.
the internal conduits meet naturally.
Angel Luis Alvarez I.
42,837 m2 of constructed surface divided in 20
• Management Work Execution:
Manuel Escalante Isidoro
Oliva López Bombin
• Health&Safety Coordinator:
Carlos Trabadela Fernández
floors above ground, featuring technical areas,
retail areas and offices.
THE SITE
A Special Location in the
Financial District of Madrid
3
Located in the commercial area of Paseo de
la Castellana in the Finantial District Azca, Torre
Castellana is locaed in the same place where
previously was located the Windsor building,
next to one of the biggest Commercial Centres
of Spain. The building will house the ofices of
this commercial giant. Torre Castellana becomes
part of the emblematic buildings conforming
Madrid’s skyline. Its necessary integration with
the commercial centre has been one of the
premises of this project full of singularities.
• 4.512.000 m2 of offices
• Headquarter of main
Spanish companies
Torre Castellana,
a building at the heart of the
Finantial District of Spain.
• 20 ha and 15,000 underground
parking places
Calle de Alonso Cano
Calle de Raimundo
Paseo de la Castella
na
Calle Hernani
Calle de Orense
Plaza Pablo
Ruiz Picasso
Fernández Villaverd
e
Self-climbing formwork
THE PROCESS
Formwork detail
Integrated Solutions
THE FIRST WORKS > CIVIL WORKS
In the the first phase foundations are
reinforced and the concrete core is executed
over the metal decks of the floors.
Formworks pre-assembly
View of the East core
4
Engine room
Engine room
Integral Projects.
FCC Industrial procures,
installs and erects
THE EQUIPMENT > FACILITIES
The second phase consisted in the
preparation of the plants and in the
execution of the facilities to be used by
the offices.
• Power supply
• Plumbing and water sewage
• Air conditioning
• Communication systems:
- Emergency Public Address
- Anti intrusion system
- Video surveillance systems
• Fire detection and protection systems
Fire protection water tanks
THE LARGE
INTERNAL MACHINE
Design from The Inside,
an Efficient Building
from The Inside
Engine room at the roof
Engine room at the roof
5
Engine room at the roof
Electrical power boards
ELECTROMECHANICAL INSTALLATIONS
AIR-CONDITIONING
„„ The installation was executed from the main
low-voltage (LV) board and fed from two 1,250
kVA transformers. There are also two 500
kVA standby generators that supply common
lighting and power circuits.
„„ A hybrid air and water system, using outside
ventilation air, fan-coils for the air-conditioning
of perimeter areas and a variable-flow air
system, was installed for the central areas.
„„ Lighting has also been installed using 1,200 x
600-mm fixtures with fluorescent tubes on the
ground floor.
„„ LED lighting and presence sensors for controlling
building power costs were installed in common
areas. As special lighting, it is proposed to install
emergency lighting and other safety measures.
PLUMBING AND DRAINAGE
„„ Main network design from the accumulation
tanks to two pressure sets.
„„ The verticals are made up of two networks, one
for supplying service water and the other for
the fluxometer water. The fluxometer network
consists of urinals and toilets. Sanitary hot water
production is provided by heaters located in
the washroom blocks suspended ceilings on the
various floor levels.
NATURAL GAS PIPING
„„ Distribution from the mains connection to the
supply for the rooftop boiler.
„„ A tank, with a minimum 1,500-litre capacity,
supplies the rooftop standby generators and the
fire-fighting set diesel pump.
„„ The perimeter area was installed with a ceiling
fan-coil system, with four pipes to directly
balance the high thermal load caused by direct
sunlight.
FIRE PROTECTION AND DETECTION SYSTEMS
„„ Loudspeaker electro-acoustic design and
installation on a commercial level as well as for
emergency warnings.
„„ The safety system is integrated into the rest of
the building systems.
„„ Automatic closing of FBDs (Fire Break Doors)
„„ Centralised Technical Management System
„„ Emergency lifts
„„ Emergency public address
„„ NOVEC system fire extinguishing in high-risk rooms.
„„ Aspiration detection system
AN EFFICIENT
BUILDING
Much More than a Construction:
A Living and Efficient System.
6
Torre Castellana is an example of integration
and efficiency in its realization, location
and operation.
FCC Industrial as a company committed to
sustainable development, environmental
protection and energy saving, is aware of
the positive environmental impact it has had
the execution and subsequent operation of
this infrastructure.
View of the building
Integral projects.
FCC Industrial procures, installs
and erects.
Entry hall lighting
Illumination hall lighting
EUROPE
FCC Industrial Headquarters
Calle de Federico Salmón, 13
28016 Madrid, Spain
Tel: +34 91 757 28 00
www.fccindustrial.com
FCC Industrial UK
62-64 Cannon Street, EC4N 6AE London, England
FCC Industrial Italy
Corso Duca Degli Abruzzi, 14
10128 Torino
AMERICA
FCC Industrial Colombia
Carrera 13 Nº 98-70 Of. 205
Bogotá D.C. Colombia
Tel: +57 1 744 1527
FCC Industrial Mexico
Presidente Masaryk, n°29-6°
Col. Chapultepec Morales.
Del. Miguel Hidalgo, C.P. 11570 Mexico DF
Tels. (+52) 55 5203 3929
(+52) 55 5203 39 79
(+52) 55 5203 05
FCC Industrial Panama
Higinio Araúz, entre calle 2ª Pueblo Nuevo y 12 de Octubre
Panamá City. Panama
Tel: +507 203 2488. Fax: +507 203 2489
FCC Industrial Chile
Vitacura 2771, Of. 403
Las Condes, Santiago, Chile
Tel +56 2 25772700 Fax +56 2 22365003
FCC Industrial Peru
Avda. Víctor Andrés Belarude 181. Oficina 501
San Isidro. Lima 27-Peru
Industrial