Item #52
Transcription
Item #52
SANTA CRUZ COUNTY BOARD OF SUPERVISORS INDEX SHEET Source Code: 9/8/10 COUNC Agenda Date: 9/14/10 I NVENUM: 64344 Creation Date: Resolution(s): Ordinance(s): 5074 Contract(s): Continue Date(s): Index: --Letter of County Counsel, dated September 8,2010, with attachments --Proposed ordinance Item: 52. CONSIDERED report of County Counsel outlining various options regarding PG& E's SmartMeter technology, including a temporary moratorium on the installation of additional SmartMeters; The Board of Supervisors took the following actions: (1) Directed staff to investigate whether County right-of-way investments by PG&E in support of SmartMeter technology have been properly accounted for by PG&E in calculating the County's franchise fee; (2) Authorized the Chair to communicate with and support Assemblymember Huffman's investigation into the potential health impacts of this technology; (3) Authorized the Chair to write to PG&E requesting meaningful community meetings at which the public can have their questions answered; (4) Asked the Legislature, through the County's Legislative Program, to launch a thorough investigation into the environmental and health effects of this technology; (5) Authorized the Chair to write to the CPUC (California Public Utility Commission) requesting a response to the San Jose Mercury News story of September 7,2010, regarding SmartMeters interference with common household devices; and (6) ADOPTED ORDINANCE NO. 5074 as an urgency ordinance imposing a moratorium on the installation of SmartMeters in the unincorporated area of the County, to remain in effect until December 31, 2010, unless repealed by the Board of Supervisors 0427 COUNTY OF SANTA CRUZ OFFICE OF THE COUNTY COUNSEL 701 OCEAN STREET, SUITE 505, SANTA CRUZ, CA 95060-4068 (831) 454-2040 FAX: (831) 454-2115 DANA McRAE, COUNTY COUNSEL RAHN GARCIA, CHIEF DEPUl Assistants Marie Costa Jane M. Scott Special Counsel Tamyra Rice Jason M. Heath Betsy L. Allen Jessica c. Espinoza Dwight L. Herr Shannon M. Sullvan Christopher R. Cheleden David Brick Sharon Carey-Stronck September 8, 2010 Agenda: September 14, 2010 Board of Supervisors County of Santa Cruz 701 Ocean Street, Room 500 Santa Cruz, CA 95060 Re: PG&E Smartmeters 11 Dear Members of the Board: Your Board directed this office to return today with a status report on PG&E's SmartMeter™ program and to present options your Board may have to ensure that PG&E's SmartMeter™ program does not adversely impact the residents of Santa Cruz County. As your Board is aware, the California Public Utility Commission (CPUC) authorized PG&E to fully deploy an Advanced Meter Infrastructure (AMI) Project within PG&E's territory. This project came to be known as the SmartMeter™ Program. SmartMeter™ installations began in 2007. By the fall of 2009, the CPUC had received hundreds of complaints from consumers about steep increases in their PG&E bills. In response, the CPUC contracted with Structure Consulting Group for an independent report on the billing accuracy of PG&E's residential SmartMeters™. Around the same time, various cities and counties began calling upon the CPUC to suspend PG&E's SmartMeter™ Program pending the conclusion of the work by the Structure Group. The CPUC and an administrative law judge assigned to adjudicate a petition filed by the City and County of San Francisco and joined by your Board and every city in the County, have yet to rule. The Structure Group issued its 41S-page report on September 2, 2010. The entire report is available on the CPUC's website, www.cpuc.ca.gov but the executive summary is attached to this letter for your convenience. The report concludes that: OveralL, Structure found that the AMI technology deployed by PG&E appears to be 1) consistent with industry standards, based upon the goals of the AMI implementation and upgrades approved t 62 0428 Page 2 by the CPUC, and 2) accurate from a metering and billing perspective. Structure identified gaps in Customer services and processes related to high bill complaints, and determined certain PG&E practices to be partially non-compliant relative to industry best practices. In addition to concerns raised about the accuracy of this technology, many residents are concerned about the potential health impacts of the SmartMeters™, which emit electromagnetic radiation. In response to concerns raised in his District, Assemblymember Jared Huffman has called for an independent agency to study the health effects of SmartMeters™. The California Council on Science and Technology has been asked to determine whether the Federal Communications Commission standards for SmartMeters™ are sufficiently protective when taking into account current exposure levels to radio frequency and electromagnetic fields. The Councils report is expected on or about October 14, 2010. Most recently, concerns have been raised about SmartMeters™ interfering with the proper functioning of common household devices like wireless phones, baby monitors and satellite television. Attached for your review is an article from the San Jose Mercury News dated September 7, 2010, on this topic. Within Santa Cruz County, PG&E has completed its infrastructure construction to support this new technology that included installing antennas on utility poles in the County rights-of-way pursuant to the County's franchise agreement. Such an investment in the rights-of-way may trigger an increase in the franchise fee PG&E pays annually to the County. The County should take steps to ensure that PG&E is properly accounting for their investment in the rights-of-way. There are several options available to your Board to make known your concerns about PG&E's SmartMeter™ Program and to attempt to preserve the status quo until more information is available. For example, your Board could: . Direct staff to investigate whether County right-of-way investments by PG&E in support of SmartMeter™ technology have been properly accounted for by PG&E in calculating the County's franchise fee; . Authorize the Chair to communicate with and support Assemblymember Huffman's investigation into the potential health impacts of this technology; . Authorize the Chair to write to PG&E requesting meaningful community meetings at which the public can have their questions answered; . Ask the Legislature, through the County's Legislative Program, to launch a thorough investigation into the environmental and health effects of this technology; : t'a2 0429 Page 3 . Authorize the Chair to write to the CPUC requesting a response to the San Jose Mercury News story of September 7, 2010, regarding SmartMetersr™ interference with common household devices; and . Consider passing an urgency ordinance, by a four-fifths vote, imposing a moratorium on the installation of SmartMeters™ in the unincorporated area of the County. A draft urgency ordinance is attached for your Board's consideration. If adopted, the urgency ordinance will stay in effect until December 31, 2010, unless repealed by your Board. RECOMMENDED: ~'~O\~ ~c7~ County Administrative Officer DANA McRAE COUNTY COUNSEL 62 0467 ORDINANCE NO. 5074 AN UNCODIFIED ORDINANCE OF THE COUNTY OF SANTA CRUZ ADOPTED AS AN URGENCY MEASURE IMPOSING A TEMPORAY MORATORIUM ON THE INSTALLATION OF SMARTMETERS AND RELATED EQUIPMENT IN, ALONG, ACROSS, UPON, UNDER AND OVER THE PUBLIC STREETS AND OTHER PLACES WITHIN THE UNINCORPORATED ARA OF SANTA CRUZ COUNTY The Board of Supervisors of the County of Santa Cru find as follows: WHEREAS, the County of Santa Cru (the "County"), through its police powers granted by Aricle XI of the Californa Constitution, retains broad discretion to legislate for public purposes and for the general welfare, including but not limited to matters of public health, safety and consumer protection; and WHEREAS, the County of Santa Cru has a franchise agreement with PG&E that has been in effect since 1955; and WHEREAS, in addition, the County retains authority under Aricle XII, Section 8 of the Constitution to grant franchises for public utilities, and pursuant to Californa Public Utilities Code section 6203, "may in such a franchise impose such other and additional terms and conditions..", whether governental or contractual in character, as in the judgment of the legislative body are to the public interest;" and WHEREAS, Public Utilities Code section 2902 reserves the County's right to supervise and regulate public utilties in matters affecting the health, convenience and safety of the general public, "such as the use and repair of public the poles, wires, mains, or conduits of any public utilty, on, under, or above any public streets, and the speed of common streets by any public utilty, the location of carrers operating within the limits of the muncipal corporation;" and WHEREAS, Pacific Gas & Electrc Company ("PG&E") is now installing SmartMeters in Central and Nortern Californa and is installing these meters withi the County of Santa Cru; and WHEREAS, concerns about the impact and accuracy of SmartMeters have been raised nationwide, leading the Marland Public Service Commission to deny permssion on June 21, 20 1 0 for the deployment of SmarMeters in that state. The Hawaii Public Utility Commssion also recently declined to adopt a smart grd system in that state. The CPUC curently has pending before it a petition from and County of San Francisco, and other muncipalities, seeking to delay State of the City ATIACHMENt 13, Page~oL£ 52 0468 the implementation of SmarMeters until the questions about their accuracy can be evaluated; and WHEREAS, major problems and deficiencies with SmartMeters in Californa have been brought to the attention of the Board of Supervisors of the Santa Cruz, including PG&E's confirmation that SmartMeters have provided incorrect readings costing ratepayers untold thousands of dollars in overcharges and PG&E' s records outlined "risks" and "issues" including an ongoing inability to recover real-time data because of faulty hardware originating with PG&E vendors; and County of WHEREAS, the ebb and flow of gas and electrcity into homes discloses detailed information about private details of daily life. Energy usage data, measured moment by moment, allows the reconstruction of a household's activities: when people wake up, when they come home, when they go on vacation, and even when they tae a hot bath. Smarteters represent a new form of technology that relays detailed hitherto confidential information reflecting the times and amounts of the use of electrical power without adequately protecting that data from being accessed by unauthorized persons or entities and as such pose utility customers' privacy rights and security interests. Indeed, the fact that the CPUC has not established safeguards for privacy in its an unreasonable intrsion of regulatory approvals may violate the priciples set fort by the U.S. Supreme Cour in Kyllo v. United States (2001),533 U.S. 27; and WHEREAS, significant health questions have been raised concerng the increased electromagnetic frequency radiation (EMF) emitted by the wireless technology in Smarteters, which wil be in every house, aparment and business, thereby adding additional man-made EMF to our environment around the clock to the already existing EMF from utility poles, individual meters and telephone poles; and WHEREAS, FCC safety standards do not exist for chronic long-term exposure to EMF or from multiple sources, and reported adverse health effects from electromagnetic pollution include sleep disorders, irritability, short term memory loss, headaches, aniety, nausea, DNA break, abnormal cell growt, untested technology, international scientists, environmental agencies, advocacy groups and doctors are calling for the use of caution in wireless technologies; and cancer, prematue aging, etc. Because of WHEREAS, the primary justification given for the SmarMeters program is the assertion that it wil encourage customers to move some of their electrcity usage from daytime to evening hours; however, PG&E has conducted no actual pilot projects to determine whether ths assumption is in fact correct. Non- transmitting time-of-day meters are already available for customers who desire 62 AnACHMENT~i Page~of ç 0469 them, and enhanced customer education is a viable non-technological alternative to encourage electrcity use timeshifting. Furher, some engineers and energy conservation experts believe that the SmartMeters program--in totality--could well actually increase total electrcity consumption and therefore the carbon footprint; and WHEREAS, Assembly member Jared Huffman has requested the Californa Council on Science and Technology to advise him on whether the Federal Communcations Commssion's standards for SmarMeters are sufficiently protective and assess whether additional technology-specific standards are needed for SmartMeters; and WHEREAS, a response to Assembly member Huffman from the Council November 1, 2010; and on Science and Technology is expected as early as WHEREAS, because the potential risks to the health, safety and welfare of County residents are so great, the Board of Supervisors wishes to adopt a moratorium on the installation of Smareters and related equipment withn the uncorporated area of the County of Santa Cruz. The moratorium period wil allow the CPUC petition process referenced above to be completed and for additional information to be collected and analyzed regarding potential problems with SmarMeters; and WHEREAS, there is a current and immediate theat to public health, safety and welfare because, without ths urgency ordinance, SmarMeters or supporting equipment wil be installed or constrcted or modified in the County without PG&E's complying with the CPUC process for consultation with the local jursdiction, the County's Code requirements, and subjecting residents of Santa Cru County to the privacy, securty, health, accuracy and consumer fraud risks of the unproven SmartMeter technology; and WHEREAS, the Board of Supervisors hereby finds that it can be seen with certainty that there is no possibilty that the adoption and implementation of ths Ordinance may have a signficant effect on the environment. This Ordinance does not authorize constrction or installation of any facilities and, in fact, imposes greater restrictions on such constrction and installation in order to protect the public health, safety and general welfare. This Ordiance is therefore exempt from the environmental review requirements of the Californa Environmental the Californa Code of Regulations. Title 14 of Quality Act (CEQA) pursuant to Section 15061(b)(3) of WHEREAS, there is no feasible alternative to satisfactorily study the potential impact identified above as well or better with a less burdensome or 3 ATIACHMENTl, Page~of '- ô,2 0470 restrctive effect than the adoption of this interim urgency moratorium ordinance; and WHEREAS, based on the foregoing it is in the best interest of public health, safety and welfare to allow adequate study of the impacts resulting from the SmartMeter technology; therefore it is appropriate to adopt a temporary moratorium that would remain in effect from the date of its adoption until December 31, 2010, uness your Board acts to repeal it prior to that date. NOW, THEREFORE BE IT ORDAINED by the Board of Supervisors of the County of Santa Cru as follows: I SECTION Moratorium. From and after the effective date of ths Ordinance, no SmarMeter may be installed in or on any home, aparent, condominium or business of any type withn the unincorporated area of the County of Santa Cru, and no equipment related to SmarMeters may be installed in, on, under, or above any public street or public right of way withi the uncorporated area of the County of Santa Cru II SECTION Violations of the Moratorium may be charged as infractions or misdemeanors as set fort in Chapter 1.12 of the Santa Cru County Code. In addition, violations shall be deemed public nuisances, with enforcement by injunction or any other remedy authorized by law. III SECTION This Board of Supervisors finds and determnes that: (a) there is a curent and imediate threat to the public peace, health, or safety; (b) the moratorium must be imposed in order to protect and preserve the public interest, health, safety, comfort and convenience and to preserve the public welfare; and (c) it is necessary to preserve the public health and safety of all residents or landowners adjacent to such uses as are affected by ths interim ordiance as well as to protect all of the citizens of Santa Cru County by preserving and improving the aesthetic and economic conditions of the County. IV SECTION If any provision of ths interim ordinance is held to be unconstitutional, it is the intent of the Board of Supervisors that such portions of such ordinance be severable from the remainder and the remainder be given full force and effect. 62 4 ATTACHMENT 3 i pageLof ç 0471 V SECTION This interim ordinance is not subj ect to the Californa Environmental Quality Act (CEQA) pursuant to Section l5060(c) (2) - the activity wil not result in a diect or reasonably foreseeable indirect physical change in the environment and Section 15060(c) (3) - the activity is not a project as defined in Section 15378 of the CEQA Guidelines, because it has no potential for resulting in physical change to the environment, directly or indirectly. IV SECTION Effective Dates. This ordinance shall take effect immediately based on the findigs by the Board of Supervisors that ths ordinance is necessar for the protection of the public health, safety, and general welfare. This ordinance shall be in full force and effect from the date of its adoption by the Board of Supervisors until December 31,2010, at which time it's terms and provision shall expire and no longer remain in effect. of September ,2010, by PASSED AND ADOPTED THIS 14th day the Board of Supervisors of the County of Santa Cruz by the following vote: AYES: NOES: ABSENT: ABSTAIN: SUPERVISORS Coonerty, Leopold, Pirie, Stone & Campos SUPERVISORS None SUPERVISORS None SUPERVISORS None TONY CAMPOS Chairerson of the Board of Supervisors AtteslESS, ATGÐ" Clerk of the Board ~M:?~ County Counsel .. 5 AnACHMENT~i Page ç of ç; 62 A.07-12-009 COM/MP1/jt2 0430 PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilities Commission Prepared and Presented by Structure Consulting Group, LLC. ~ Structure™ ATTACHMENtL. Page~of ~ t ,lf' &2 0431 A.07-12-009 COM/MP1/jt2 12335 Kíngsríde, #401 &Z Structure™ Houston. TX 77024 Voice: 713.7830500 Fax: 832482.0871 September 2, 2010 Ms. Julie Fitch, Director Energy Division California Public Utilities Commission Dear Ms. Fitch: We are pleased to present our final report, "PG&E Advanced Metering Assessment", focused on Smart Meter accuracy and Customer High Bill Complaints as contracted for by the California Public Utilities Commission on April1, 2010, and completed on September 2, 2010. Sincerely, Stacey Wood Principal The Structure Group Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. AnACHMENT~J PageLof ~L( ,r 4,2 0432 A.07-12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiities Commission Structure Consulting Group Overview Structure Consulting Group, LLC ("Structure"), is a global consulting firm focused exclusively on the energy and utility industry, providing services and technology solutions in North America and Europe. Since opening the doors in 1998, Structure has served over 100 organizations through all stages of business transformation, from the beginning of wholesale energy markets to the Smart Grid revolution. Structure focuses in providing a spectrum of services across business advisory, program management, solution delivery and implementation, and performance improvements and was recognized as the Advisory Firm of the Year 2010 by Energy Risk Magazine. Structure assists companies in implementing their Smart Grid initiatives through comprehensive strategy development, business case creation and refinement, vendor and system selection, program management, process re-engineering, system implementation, legacy system integration, and testing of components and/or end-to-end solutions. The Structure workforce is comprised of diverse utility and energy professionals with extensive experience in the energy industry, as well as regulatory program development with NERC, FERC, and other compliance standards. Structure specializes in key energy industry areas including Smart Grid/Distribution Operations/Distribution Automation, SCADA & Energy Management Systems, Energy Trading & Risk Management, and Competitive Energy Market Solutions. Copyright 2010. Confidential and Proprietary Page 3 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. Õ 20 Structure Consulting Group, LLC. AnACHMENT~, Page-.ot2 0433 A.07-12-009 COM/MP1/jt2 gg Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiliies Commission Limitations In connection with preparing this Report, Structure Consulting Group ("Structure") examined reproductions of documents provided by Pacific Gas & Electric ("PG&E") and the California Public Utilities Commission ("CPUC"). Structure relied upon the completeness and accuracy of all documents and other information requested by and provided to Structure, as well as such other records, agreements, test results, and documents requested from the CPUC and PG&E and deemed necessary or relevant as the basis for our Report. In such examinations, Structure assumed (i) the genuineness of all documents reviewed by Structure, (ii) the conformity of the copies received by Structure to the original documents, and (iii) the authenticity of the original documents. Structure further assumed that each of the parties to the documents and agreements reviewed by Structure had the full power, authority, and legal right under its governing documents, corporate legislation, and applicable laws and regulations to execute and perform its obligations under all documents executed by it. Structure assumed that the documents reviewed by Structure were free from any fraud or misrepresentation and the truth, as were the accuracy of representations and warranties in our interviews with PG&E employees and other representatives. This Report was based solely upon the information received by Structure from the CPUC, PG&E employees, PG&E Customers, PG&E vendors and representatives. Structure assumed that the information received was accurate and complete information and documentation. Subject to the foregoing, Structure has conducted an independent assessment of the matters that Structure believes to be reasonably necessary to produce this Report. Structure was limited in scope and was not requested nor performed an exhaustive review of all Smart Meter system deployment documentations, configurations, and meter installations. Structure has used its reasonable efforts and impartial assessment to ensure the independence and accuracy of the facts contained in this Report. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 4 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AITACHMENT-L, Page~of -3Ll 52 0434 A.07-12-009 COM/MP1/jt2 gg Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilties Commission Executive Summary Table of Contents Structure Consulting Group Overview....................................................................................................................................................................3 Limitations ..................................................................................................................................................................................................................4 Executive Summary ...................................................................................................................................................................................................6 A. Introduction ......................................................................................................................................................................................................6 B. Summary of Key Findings ...............................................................................................................................................................................8 C. Work Scope....................................................................................................................................................................................................12 C.1 Laboratory Meter Testing .....................................................................................................................................................................13 C.2 Field Meter Testing ................................................................................................................................................................................ 14 C.3 End-to-End System Testing................................................................................................................................................................... 14 C.4 High Bill Complaint Analysis..................................................................................................................................................................15 C.5 Best Practices Associated with Smart Meters ...................................................................................................................................... 16 C.6 Security Assessment ............................................................................................................................................................................. 17 D. Detailed Summary of Observations and Findings .........................................................................................................................................18 D.1 Laboratory Meter Testing ......................................................................................................................................................................18 D.1.1 Laboratory Meter Testing Findings Summary .....................................................................................................................18 D.1.2 Laboratory Meter Testing Findings Details ......................................................................................................................... 18 D.2 Field Meter Testing ................................................................................................................................................................................ 19 D.2.1 Field Meter Testing Findings Summary...............................................................................................................................19 D.2.2 Field Meter Testing Findings Details ...................................................................................................................................21 D.3 End-to-End System Testing...................................................................................................................................................................24 D.3.1 End-to-End System Testing Findings Summary .................................................................................................................24 D.3.2 End-to-End System Testing Findings Details......................................................................................................................25 D.4 High Bill Complaint Analysis..................................................................................................................................................................26 D.4.2.1 Customer Complaint Process ........................................................................................................................................... 27 D.4.2.2 Customer Interviews ......................................................................................................................................................... 30 D.5 Best Practices Associated with Smart Meters ...................................................................................................................................... 32 D.6 Security Assessment ............................................................................................................................................................................. 34 D.7 Other Observations................................................................................................................................................................................34 Copyright 2010. Confidential and Proprietary Page 5 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. . ) Õ ~ Structure Consulting Group, LLC. AnACHMENT~1 Page r; of ~ L( 0435 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the &Z Structure™ Caliornia Public Utilites Commission Executive Summary A. Introduction Pursuant to California Public Utilities Commission ("CPUC") decisions 0.06-07-027 and 0.09-03-026, Pacific Gas and Electric ("PG&E") was given approval for full deployment of an Advanced Meter Infrastructure (AMI) Project that included upgrading both metering and communications networks as well as the related computerized systems and software for 5.1 million electric meters and 4.2 millon gas meters within the PG&E territory. PG&E's AMI Project, subsequently named the SmartMeter™ Program, initiated meter deployment in 2007. During the first half of 2010, PG&E actively deployed Smart Meters at an average rate of 176,000 gas and electric meters per month. As of June 2010, 3,146,000 electric and 3,101,000 gas Smart Meters had been installed throughout PG&E's service territory. By the fall of 2009, the CPUC had received over 600 Smart Meter consumer complaints about "unexpectedly high" bils and allegations that the new electric Smart Meters were not accurately recording electric usage, almost all of which were from PG&E's service area. The initial CPUC complaints were supplemented by complaints provided by Senators Dean Florez (D-Shafter) and Roy Ashburn (R-Bakersfield), identified during town hall meetings in Bakersfield and Fresno. In response to these complaints, the CPUC committed to conduct an independent review to determine whether PG&E's Smart Meter system was correctly measuring and billng electric usage. On April 1, 2010, the CPUC contracted with Structure Consulting Group LLC ("Structure") to provide an independent report related to testing and validating meter and billng accuracy of PG&E's residential electric Smart Meters. The five month evaluation, labeled the PG&E Advanced Metering Assessment Report and hereafter referred to as "The Assessment", culminated in the production of this report, issued on September 2, 2010. The Assessment focused on addressing residential electric Customer concerns that Smart Meters caused higher energy bils. The Assessment's scope and objective was to independently assess whether PG&E's electric Smart Meter system and related billng system had been measuring and calculating electric usage accurately, and billing PG&E Customers appropriately for their usage. The Assessment included meter testing, end-to-end system testing, an evaluation of high bill complaints, and an evaluation of PG&E's Smart Meter deployment as compared to industry best practices. Structure segregated The Assessment's scope into the following areas: Conducted accurately at a functional environmental conditions. Field Meter Testing Involved testing Customer meters at their premises to determine Registration Accuracy within an established tolerance range. Customers were selected to provide a representative cross-section of PG&E's End-to-End System Testing a ulation base, as a licable to the field testin scenarios. Comprised of a combination of laboratory and field tests, to determine the effectiveness of PG&E SmartMeter and billing systems' efficacy to ca ture meter data information. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 6 of 34 Report is considered Final by "It;", G"~' Ll'§ ~ 911/1 0 $1,"',"' COM l\! jl\l,r-IiW'".,;I~ l~. . f.':""~vil 0436 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilities Commission ~ Structure™ Performed on a subset of the Customers identified as part of the High determine trends in high bills associated Bill Complaint population to with meter type, usage patterns, and billing issues. The Customer base for this analysis was drawn from complaints received by the CPUC, town hall meetings organized by state senators, and PG&E. Customer interviews were conducted from the High Bill Complaint group to evalute the circumstances related to the complaint, PG&E's handling of the com laint, and an associated resolutions. Best Practices Associated with Smart Meters Security Assessment Assessed across the energy industry to provide insight into Smart Meter operations compared to PG&E's Smart Meter program. Performed a review of PG&E's cyber security framework focused on PG&E's Smart Meter system as part of the evaluation. The review was limited and conducted with a focus on the smart grid system utilizing the applicable sections of the "AMI System Security Requirements" developed by the Smart Grid industry's OpenSG AMI-SEC Task Force. The security assessment was performed to determine whether controls were established and documented around industr -standard criteria. Figure 1: Structure's PG&E AMI Assessment Scope Structure performed an impartial and independent evaluation, employing reasonable efforts to complete the engagement work agreed to by the CPUC within a reasonable timeframe, and with the understanding that supporting documentation and information was provided by the CPUC and PG&E on a timely basis. Throughout the duration of the Assessment, Structure did not share the results or findings of the Assessment with PG&E, with the exception of results for a limited number of field meter tests that showed an out of tolerance or unable to test condition. This limited disclosure to PG&E was done independently of this report to allow PG&E the opportunity to promptly investigate the situation and take any mitigation measure at their discretion to minimize the impact on the Customer. The findings from this study were developed independently of the CPUC and PG&E with regards to previous or current litigation and or regulatory actions. While this report may be utilized by the CPUC to determine future requirements related to Smart Meters and the impact of Smart Meters on Customers, Structure's obligation associated with this evaluation should be considered complete upon delivery of this report to the CPUC. Dissemination of the report and its contents will be at the discretion of the CPUC in accordance with applicable State of California regulations. This Executive Summary should not be taken stand alone from the entirety of the report, and should be considered a culmination of information, facts, tests, explanations, and limitations described throughout the entirety of the report. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. , ; 12 Page 7 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATTACHMENT-L, Page :r of~ 0437 A.07-12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiities Commission B. Summary of Key Findings From April 1, 2010, to August 25, 2010, Structure reviewed relevant documentation related to PG&E's SmartMeter™ equipment, systems, and processes and compared it to industry standards, independentlyperformed customer inteNiews, and PG&E-provided vendor specifications and internal documentation. This evaluation principally consisted of an assessment of PG&E's accuracy and conformity to meter standards, analytical procedures applied to customer data, business processes, and practices. Due to the number of systems and process within the PG&E framework, this Assessment reflects Structure's opinion on only the scope of work which Structure was requested to perform. The CPUC tasked Structure with addressing three broad questions related to PG&E's SmartMeter™ system, focusing on residential electric Customers. Working independently and with the facilitation of the CPUC, Structure's Assessment yielded the following findings related to CPUC's inquiries involving PG&E's residential electric SmartMeters™: 1. Does PG&E's SmartMeter™ system measure and bill electric usage accurately, both now and since PG&E's Smart Meter deployment began? PRESENT: While Structure cannot ensure that all issues related to the SmartMete?M program have been identified or that future issues may not develop at a later date due to process, controls, or technical modifications instituted after the completion of The Assessment, Structure's evaluation provides the reasonable conclusion that PG&E's SmartMeters™ are accurately recording electric usage within acceptable CPUC tolerances, and are being accurately utiized in Customer biling. SINCE DEPLOYMENT: Although Structure was unable to test electromechanical and Smart Meters since PG&E's program began, Structure reviewed PG&E's SmartMete?M program documentation issue logs, incident reports, and analysis of historical customer complaints and did not identiy systemic issues in the measuring and billng of electric usage within PG&E's SmartMete?M system for the deployment period prior to our Assessment beyond those that had already been previously reported to the CPUC. Identified exceptions related to meter and billng issues appeared to have been limited and did not appear to have been prevalent in the overall deployed Smart Meter population. 2. What factors contributed to Smart Meter high bil complaints? High bil Customer complaint analysis took the form of scrutinizing PG&E's internal meter data processing activities, reviewing historical data provided by PG&E, and performing Customer interviews related to high bil complaints. Structure's Assessment identified multiple factors that appeared to contribute to the escalation of Smart Meter high bil complaints during late 2009 and early 2010, including: · Customer Usage: o Meter deployment schedules coincided with increased energy usage caused by a heat wave. o Some Customers experienced load changes that were reflective of changes in personal circumstances. Examples included room additions, pool additions, and equipment malfunctions. o Electromechanical meter degradation that was also identified as part of Structure's field meter testing. · Rates: Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. ATTACHMENT-L, PageL Page 8 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. of 3J ~i 62 0438 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiities Commission ~ Structure™ o Rate increases compounded the financial impact of the additonal weather-related usage, resulting in higher bíls that occurred as Smart Meters were being installed. o Incorrectly applied rates that were based upon historical premise assumptions. o Rate-based inquires that increased as Customer bíls escalated. Requests for new or renewed financial assistance through California Alternate Rates for Energy (CARE) were identified as potential reductions of financial impacts related to higher bils. · Customer Service: o PG&E processes did not address the Customer concerns associated with the new equipment and usage changes. o Customer skepticism regarding the new advanced meter technology was not effectively addressed by PG&E on a timely basis. o Customers interviewed during this assessment did not consider their complaint resolved, despite indications from PG&E and CPUC that the Customer agreed with the resolution o PG&E Customer complaint resolution did not provide of interval read information available with Smart Meters, which may have assisted Customers' understanding of hourly usage patterns. · Process Issues: o Customers indicated that communications/notifications surrounding physical meter installation were lacking, or that the Customer had issues with the installation personnel. o PG&E utiized field meter readers for an average of 131 days after Smart Meters were installed, resultng in similar meter reading errors as electromechanical meters. The transiton to automate the Smart Meter data for use in biling was not clearly addressed with Customers. o PG&E's system tolerances related to billng qualiy control were not stringent enough, resultng in multple bíl cancelations and re-billngs, which were confusing to Customers. 3. How does PG&E's SmartMete/M Program's past and current operational and deployment compare against the framework of industry best practices? Structure found PG&E to have been historically in compliance, or have recently come into compliance, with the majority of Best Practices Associated with Smart Meters. Structure identified several items of partial or non-compliance related to industry best practices during The Assessment, which have been recognized by PG&E through their presentations of information as shortcomings to be addressed: a. The lack of documentation verifying compliance with the Meter Deployment best practice to deploy WAN/LAN collectors prior to meter deployment. i. By not deploying the communication backbone prior to meter deployment, the time to transition meter reading from manual to Advanced Metering Infrastructure (AMI) system readings is exacerbated, extending to an average of 131 days over the implementation period. This allows a continuation of the higher error rate associated with manual meter reading, and may contribute to the perception that the Smart Meters are inaccurate. b. The inabílty to verify compliance around: Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. 52 Page 9 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnACHMENT~J Page--of N 0439 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiities Commission ~ Structure™ i. The Meter Data Managements (MDMS)lnterface best practice to correlate AMI meter events and alarms with Validation, Estimating and Editing (VEE) and Customer Information System (CIS) audits and checks for automated exception handling; and ii. The VEE Best Practice of MOMS must provide an on-line method, with workflow, resolving validation errors rather than reports. These lapses have created a situation where data required manual editing, causing cancel Ire-bils and delayed processing of Customer data in a relatively small portion of the bils processed. The cancel Ire-bils and delayed processing potentially increased the days within a biling cycle presented in Customer's bils, as reflected in a portion of the High Bil complaints, and furthered Customer perception that Smart Meters may not have been accurate. Based upon Structure's review of requested PG&E documentation and Structure's associated testing, Structure determined that previously-identified issues brought to CPUC's attention were being appropriately addressed by PG&E. Structure's testing did not uncover issues that would challenge that PG&E's Smart Meters were accurately measuring and recording electric usage, or that PG&E's internal systems were accurately utilizing this data for biling purposes. Structure identified no relevant correlation between installed Smart Meters, impacts to billing on installed Smart Meters, and residential Customer Smart Meter high bill complaints. Structure did identify certain events and circumstances, including sub-optimal Customer service and variable implementations of industry best practices that contributed to the increase in Smart Meter high bill complaints. The concerns uncovered should be addressed, but did not appear to be related to the ability of PG&E's Smart Meter System to measure and bill electric usage correctly. Overall, Structure found that the AMI technology deployed by PG&E appears to be 1) consistent with industry standards, based upon the goals of the AMI implementation and upgrades approved by the CPUC, and 2) accurate from a metering and billng perspective. Structure identified gaps in Customer services and processes related to high bil complaints, and determined certain PG&E practices to be partially noncompliant relative to industry best practices. The following Figure provides a high-level summary of Structure's findings for each of the PG&E AMI Assessment's areas of focus. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 10 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATIACHMENT.-, Page~of 31 62 0440 A.07-12-009 COM/MP1/jt2 Structure™ PG&E Advanced Metering Assessment Report Commissioned by the Caliornia Public Utilties Commission All of the Smart Meters tested in Structure's independent laboratory passed the accuracy testing. The Smart Meters subjected to environmental stress testing in a controlled temperature chamber at reference, high, and low temperatures all fell within the American National Standards Institute ANSI standards. . Structure's Pass/Fail Criteria was based upon the CPUC Field Meter Testing Standard of f2.0% for electromechanical meters and Smart Meters. . Of the 613 Smart Meter field tests, 611 meters were successfully tested and 100% passed Average Registration Accuracy. One meter was found to have serious errors and be malfunctioning on arrival, and one was found to have serious event errors upon installation; these meters were therefore excluded from testing. · Of the 147 completed electromechanical meter field tests, 141 meters passed and 6 failed Average Registration Accuracy. One meter was found to be non-functional, registering zero on all tests, and was therefore excluded from testing. End-to-End System Testing By utilizing a representative, small sample size to confirm meter-tobill system accuracy, Structure did not identify deviations during testing that indicated a systemic problem in the meter biling s stem's accurac . High Bill Complaint Analysis After reviewing and analyzing over 1,378 High Bill complaints, Structure did not identify pervasive issues with meter data or billing systems. Results from 20 High Bill Complaint Customer interviews identified service issues around complaint management by PG&E and the CPUC. Structure found PG&E to have been historically in compliance, or have recently come into compliance, with the majority of industry best practices associated with Smart Meters. Structure identified several items of some concern during the Assessment, which have been recognized by PG&E, through their presentation of information, Best Practices Associated with Smart Meters as shortcomin s to be addressed. Structure concluded that PG&E has developed a cyber security framework that meets the objectives established in the Smart Grid Security Assessment industry's OpenSG AMI-SEC Task Force "AMI System Security Re uirements" that were reviewed as art of this evaluation. Figure 2: Structure's PG&E AMI Assessment Findings Summary Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. 52 Page 11 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnAcHMENT-L, Page~of 34 0441 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the &5 Structure™ Caliornia Public Utilties Commission C. Work Scope Structure's evaluation focused primarily on evaluating meter accuracy and advanced metering system capabilities to accurately determine and bill Customer electric usage for PG&E's residential electric Smart Meter installations. Structure also evaluated PG&E's Smart Meter system deployment current and historical business practices against industry best practices and standards and assessed PG&E's AMI security framework. The Assessment also included addressing the influx of high bill complaints that were perceived by Customers as being Smart Meter-related. Historical meter accuracy and associated meter replacement firmware upgrades were not tested as part of the scope of this engagement, as Structure was not able to evaluate the meters at the time that those complaints were initiated. During project planning and initiation, PG&E provided a system overview that included previous meter testing performed, meter reading and biling transition scheduling, and high bil complaints received. Based upon the overview provided, Structure consulted with the CPUC to increase the meter accuracy testing and associated Customer complaint analysis on PG&E's electric Customers as part of The Assessment. Structure worked with the CPUC to modify the project scope to better evaluate PG&E's AMI systems based upon data availability, budget constraints, and the available timeframe. Some scope modifications resulted from additional efforts required to complete the proposed work, as discussed in the Scope of Work section of this report. During the course of The Assessment that spanned April to August of 2010, Structure independently tested over 750 Smart Meters and 147 electromechanical meters. Structure also reviewed the 1,378 electric Smart Meter Customer accounts from a PG&E provided list of 2,915 Smart Meter electric and gas high bill-based complaints. Structure requested that PG&E provide a detailed explanation of 73 accounts where Structure identified biling data anomalies that could not be attributed to the Customer's usage profile. Structure also attempted to contact over 100 of the high-bil complaint Customers, resulting in 20 high-bil complaint phone interviews. Structure reviewed the accounts of each of the interviews with PG&E's complaint resolution team for further analysis. Throughout the evaluation, less than a 1,000 pages of double sided hard-copy sheets were transmitted in consideration of California's green initiatives. Approximately 6GB of zipped compressed data in the form of 1,600 documents was provided by PG&E, which contained approximately 27,000 pages or slides and 2,000 worksheets. Structure electronically pulled 2.4 millon sample Customer stratifications from over 5.2 milion Customer meter locations. During the course of the project, Structure reviewed manufacturer specifications, procedures, and relevant data associated with meter manufacturers, communication network, and meter data management and billing systems. Structure also held interviews with PG&E vendors and performed site visits to PG&E and vendor facilities to observe processes and procedures. Detailed methodology, procedures, test results, and identified issues can be found in the appropriate sections of this Assessment. Structure's work included meetings and interviews with PG&E resources and subject matter experts and Customers to obtain insight and information relevant to our evaluation. Structure also maintained a call center associated with the field meter testing that allowed Customers to address questions associated with the evaluation meter testing. In addition, a meeting was held with the TURN consumer advocacy group at their request. As part of the assessment, Structure reviewed documents and held over numerous interviews with PG&E personnel, focused on process and methodology. Additional time was spent with PG&E security personnel to conduct the security assessment. The number of meter tests and customer interviews performed was based upon cost/benefit analysis conducted by Structure in conjunction with the CPUC at various points throughout the project. The sample Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 12 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AT IAL;HMl:N i-.i rdSJI: I ~ ul 3,- 62 0442 A.07-12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the Caliornia Public Utiliies Commission sizes selected were determined to provide a reasonable representation of the PG&E meter and high bil complaint populations based upon the CPUC-requested scope of work. The project scope was divided into the following areas: · · · · · Laboratory Meter Testing Field Meter Testing End-to-End System Testing High Bil Complaint Analysis Best Practices Associated with Smart Meters · Security Assessment From the initial RFP response throughout the project, Structure contracted for the services of Trimark Associates ("Trimark"). Trimark's credentials included certification as a Meter Service Provider (MSP) in California by the CPUC. Trimark has provided metering and meter data management services for over nine years within California and throughout North America. The synergy between the two companies allowed Structure to utilize Trimark as a dedicated contractor to perform the meter-based field and laboratory testing defined throughout this report. As the sole contractor to Structure for this Assessment, further reference to Trimark work within this report may be included under the Structure reference. The following sections provide scope overviews associated with each of the key project areas. C.1 Laboratory Meter Testing Laboratory meter testing was performed in a qualified, non-PG&E laboratory located within the PG&E territory and overseen by Structure resources. Structure verified meter accuracy and factory programming laboratory tests on a representative meter sample set obtained from PG&E's warehouse facilities. Structure allocated a portion of the sample set meters for end-to-end and environmental testing, and the remainder for installation at residential Customer premises. Structure utilized a subset of the PG&E warehouse randomly selected meters to perform environmental testing in the laboratory, where the meters were subjected to temperature-based stress tests. An additional set of meters were used for end-to-end system testing to monitor meter activity from installation through billing. The tests are highlighted in the following Figure, Summary of Structure's Test Scenarios, Scenarios 1 and 2. Laborator Laborator Field Field Field Field Field Field Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5 Scenario 6 Scenario 7 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Copyright .. ~ 62 Page 13 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. Ai iA('HMtl'J I~, râgE;~of =3'- 0443 A.07-12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilities Commission The laboratory and field test scenarios were developed as a representative set of tests normally used by utility companies to determine compliance to Public Utility Commission accuracy standards based on ANSI Standard C12.20. C.2 Field Meter Testing The Assessment's field meter testing utilized the Standards for Meter Installation, Maintenance, Testing and Calibration as set forth in the Direct Access Standards for Metering and Meter Data (DASMMD) and American National Standards Institute (ANSI) standards to verify the accuracy associated with PG&E's Smart Meters. Structure also performed field testing on a sample of electromechanical meters installed at electric residential Customer locations in order to confirm meter accuracy. The guidelines for testing were based on DASMMD standards that were established in 1998, which provided for electromechanical meters and did not include updates applicable to Smart Meter systems. Meter accuracy was monitored based upon the DASMMD requirements. Based upon discussion with CPUC, the DASMMD standards were the established regulatory guidelines to be followed. The PG&E and manufacturer comparisons were utilized for reference purposes only. Field meter testing was conducted using six scenarios that were identified by Structure to test both the electromechanical and Smart Meters in the field and evaluate both the accuracy of Customers' electromechanical and Smart Meters and the associated procedures. The conducted tests are summarized in Figure 3, Scenario 3 through Scenario 8. Customers whose meters were selected for testing were contacted by mail and/or by a Structure representative to describe the process and test coordination. Each of the field testing scenarios was conducted by Structure and accompanied by PG&E's meter technicians, and followed industry-standard established procedures as described in this report and associated documentation. All meter testing was performed by Structure technicians for Scenarios 3-7; in Scenario 8, Structure observed PG&E's field processes for shadow meter tests. The field meter testing included: · Site verification · Meter type and form factor verification · Proper installation · Meter program and accuracy verification Field-based testing focused on residential meters; thus, testing of commercial meters was excluded from the scope and the test scenarios. C.3 End-to-End System Testing End-to-End System Testing included both laboratory and field testing. End-to-End laboratory testing was performed on five PG&E Smart meters, with five Elster™ digital meters used as "shadow" meters. Each of these meter pairs were subjected to a different amount of load, reflecting measurement at various rate tiers over the test period. In addition, the end-to-end "shadow" meters were also subjected to common exceptions to normal conditions, including power outages, voltage swells, voltage sags, and loss of Radio Frequency reception. Inclusion of common exceptions facilitated testing PG&E's capability to perform validation, editing, and estimation (VEE) processes in compliance with CPUC rules, and without introducing errors into Customer bills. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 14 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATTACHMENT-L, Page~of 3'- t &2 0444 A.07-12-009 COM/MP1/jt2 &Z Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilties Commission "Proxy" Customer accounts were created within PG&E's billing system for each of the end-to-end meters, giving Structure the ability to determine PG&E's application of billing determinants and rate assignments, as well as the accuracy and the timeliness of physical bil issuance to residential electric Customers. The end-toend test process was designed for completion over the course of one PG&E biling cycle. End-to-End field testing utilized the field testing shadow meter installations for selected High Bill Complaint Customers as part of field meter testing Scenario 6. The field testing shadow meter setup used the existing installed PG&E Smart Meter and an Elster digital shadow meter installed side-by-side to measure the Customer's usage simultaneously through both meters. Structure also utilized these same installations to verify the flow of meter usage and event data from the Customer premise, through the AMI and Billng systems, to the Customer's receipt of the printed bilL. A PG&E-provided representation of PG&E's metering and billng system connectivity is found in the Figure below. The information tested in end-to-end system testing was processed through these systems. ¡ Bmií'~g e iI t ------------.. M...._ .-ncl' e- e ~ ~. e-8H "i.. A ~"".~ ~tj"'.~:~;~-~.. e:~~e:~=:é -..., ..---~- RFM.. e.-.e -s, ~~ En:/ / M....iit. \\)\\:1 1'\ I" Sf.... M.._t _dEn.. Figure 4: PG&E.Provided Representation of PG&E's Metering/Biling Systems Connectivity C.4 High Bill Complaint Analysis To perform the High Bil Complaint Analysis, Structure examined the entire population of 1,378 Smart Meter electric high bil complaints consisting of those offcially filed with the CPUC, those provided by the offce of Senate Majority Leader Dean Florez (D-Shafter), and Smart Meter High Bill Complaints specifically identified Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. :,~'12 Page 15 of 34 9/1/10 ATTACHMENT' Report is considered Final by Structure Consulting Group, LLC. l Page (i; of ?J '- 0445 A.07-12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilties Commission and provided by PG&E for the period September 17, 2007 to April 30, 2010. Structure further refined the High Bill complaint list to focus on determining the underlying nature of the complaint by utilizing account information and reviewing detailed historical usage for 1,066 of the Customer complaint accounts with available historical usage data specifically related to residential electric Smart Meters. The detailed analysis of 1,066 accounts was done by evaluating the High Bill Complaint Customers' usage patterns and account specific information prior to and after Smart Meter installation to identify impacts of weather, extended bill cycles, cancel/re-bills, estimated meter reads, and usage spikes on Customer complaints. A targeted selection of 73 Customer complaints was chosen based on account activity that suggested the potential for identifying underlying system or process issues, and was further analyzed to identify contributing factors for the complaints. The analysis on the 73 complaints included a detailed review of complaint resolution documentation, usage analysis, complaint history, account history, and Customer Service and Customer interaction notes. Structure utilized the 73 complaints reviewed and an additional 27 complaints with similar profiles to contact Customers for potential interviews. Of the 100 potential Customer interview participants, 20 agreed to participate in one-on-one interviews focused on documenting Customer rationale when initiating the complaint process, the Customer's experiences, premise conditions, energy usage, and the Customer's insight into the subsequent PG&E resolution process. Structure followed the 20 Customer interviews with an examination of each of their accounts with the PG&E Escalated Complaints team, to better understand the PG&E processes followed and the PG&E outcome of the Customer complaint. Structure also specifically reviewed Customer usage and resolution status associated with 231 of 300 Bakersfield and Fresno electric Smart Meter town hall complaints, including the underlying analysis performed by PG&E and the associated resolution process for these accounts. C.5 Best Practices Associated with Smart Meters To evaluate Best Practices, Structure reviewed PG&E's documentation of past and current operational and deployment policies, processes, and procedures against a framework of industry best practices. The framework was developed by Structure subject matter experts with combined electric and gas field, operations, and biling experience of over 75 years, and presented to three independent Smart Meter industry experts for review and input. Structure compiled the contributions of these experts, applied it to the framework, and compared PG&E's policies, processes, and procedures against the established framework. The Best Practices work included review of eight key areas associated with Smart Meters: · Meter manufacturing quality control · Meter installation standards · Meter equipment safety · Meter deployment · Meter Data Management interfaces . Validating, Estimating and Editing for monthly and interval data · Account biling . High bill complaint troubleshooting The Best Practice analysis also identified business process improvements initiated by PG&E since January 2010 to enhance meter accuracy and increase customer satisfaction. Inclusion of the improvements was intended to document PG&E's efforts to align with industry Best Practices associated with Smart Meters. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 16 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnACHMENT~, Page~of "3tf t 62 0446 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report ~ Structure™ Commissioned by the California Public Utiities Commission Best Practices included in this report are reflective of the current industry environment for the areas addressed, as provided by Structure and industry experts retained by Structure. The views and opinions expressed in The Assessment may not reflect the views or opinions of all industry experts, and may change as Smart Meter systems continue to mature. C.6 Security Assessment Structure performed a review of PG&E's cyber security framework focused on the smart grid system as part of The Assessment. The review was limited based on priority, time, and budget, and was conducted with a focus on the smart grid system, utilizing the applicable sections of the "AMI System Security Requirements" developed by the Smart Grid industry's OpenSG AMI-SEC Task Force. The security assessment was performed to provide a confirmation that controls were established and documented around: . . . . . . . . . . . . . . . Corporate Cyber Security Approach Confidentiality and Privacy Data and System Integrity System Availability Identification and Authentication of Users Authorization of Users Accounting and Non-Repudiation Anomaly Detection Services Boundary Services and Interfaces Cryptographic Services Resource Management Services Development Rigor Organization Rigor Handling and Operating Rigor Accou ntabi I ity Per The Assessment's scope, Structure utilized several methods to perform the review, including interviews and documentation reviews of PG&E policies and procedures, referred to as a "paper" review of PG&E's security framework. The review included interviews with key PG&E personnel tasked with managing security, inspection of relevant PG&E documents, and review of third-party audit reports where applicable and available. The information obtained through these methods was then compared against the applicable sections of the "AMI System Security Requirements" standards developed by the Smart Grid industry's OpenSG AMI-SEC Task Force. A comparison to cyber security "best practices" was also performed. An in-depth qualitative assessment of PG&E's framework implementation was beyond the scope of this Assessment. An evaluation of this nature would have taken several months to evaluate each major subsystem within the Smart Grid system, as well as additional time to evaluate the implementation within PG&E's security framework. An in-depth review would involve reviewing firewall rules, system configurations, user permissions, training, background checks, etc. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. ,. 62 Page 17 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnACHMENT~1 Page t 1- o~ 0447 A.07-12-009 COM/MP1/jt2 &Z Structure™ PG&E Advanced Metering Assessment Report Commissioned by the Caliornia Public Utiities Commission D. Detailed Summary of Observations and Findings The following summary of Structure's findings reflects the results of The Assessment's testing and analysis. Structure found the summarized results to be representative of the overall PG&E AMI program; however, due to the accelerated nature of the engagement, Structure's Assessment was limited its ability to express an opinion on all of the AMI processes and procedures used at PG&E. Accordingly, the results should be taken in the context of the data reviewed. D.1 Laboratory Meter Testing D.1.1 Laboratory Meter Testing Findings Summary Structure utilized a laboratory testing facility that was independent from PG&E to conduct tests for meter accuracy, environmental stresses, and end-to-end system functionality. Structure selected 174 Smart Meters from PG&E's warehouses using a randomized selection process based on representative vendor and meter type criteria, and then tested the meters for accuracy in the independent laboratory. All of the tested Smart Meters passed the accuracy testing. Structure then utilized a portion of the selected Smart Meters for environmental stress testing, and found all of the meters to fall within the American National Standards Institute (ANSI) standards when tested in a controlled temperature chamber at reference, high, and low temperatures. D.1.2 Laboratory Meter Testing Findings Details Structure set aside 18 of the 174 meters selected from the warehouses as "spares", and conducted laboratory- based accuracy tests on the remaining 156 stock PG&E Smart Meters selected from the five randomly selected PG&E warehouses. The sample set consisted of a range of meter types and meter manufacturers representing a representative sample of meters available in the PG&E in-stock inventory, which were procured using a random meter selection methodology. The Results of the Laboratory Accuracy Tests were: . 100% of the 156 PG&E stock Smart Meters tested were within an accuracy range of 99.81 % to 100.15%, with an average accuracy of 100.01 % and a standard deviation of 0.0408%. . The meters passed the :to.2% acceptable accuracy standard established by the meter manufacturer, which also satisfied the CPUC accuracy requirement of :t2.0%. load, light load, and with a 50% power factor Following an initial test to verify the accuracy of the meters at full in accordance with ANSI standards, a subset of these meters were used in Structure's laboratory and field test scenarios. Environmental testing consisted of subjecting six of the PG&E Smart Meters to extreme hot and cold conditions in a controlled environmental chamber designed to accurately replicate these conditions in accordance with ANSI C12.20 specifications. The meters were placed into the environmental chamber for 24 hours and allowed to reach "equilibrium". The temperature was then adjusted, and the test performed. The summary findings from the Environmental Laboratory Meter Tests were: . When subjected to +50 degrees Celsius (+122 degrees Fahrenheit) for 24 hours, all of the meters tested within the :t2% CPUC standard; however, one out of the six meters did not conform to the ANSI C12.20 maximum deviation of :to.5% from reference test temperature standard used by the meter Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 18 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATIACHMENT-., Page~o~ i~ 0448 A.07-12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiliies Commission manufacturer. The non-conforming meter exceeded the allowed 0.5% deviation by 0.07% during the full load test. The non-conforming meter's deviation was slightly out of tolerance on the Full Load and Light Load test, but the meter passed the CPUC standard for accuracy when adjusted for Average Meter Registration Accuracy (Full Load Test + Light Load Test)/2. · When subjected to -20 degrees Celsius (-4 degrees Fahrenheit) for 24 hours, all of the meters tested within the PG&E and CPUC criteria of :10.5% and :12%, respectively. All of the meters passed the ANSI C12.20 maximum deviation of :10.5% from the reference test temperature standard used by the meter manufacturer. 0.2 Field Meter Testing 0.2.1 Field Meter Testing Findings Summary Structure conducted field tests on 797 meters using defined procedures and protocols for each of the following six scenarios: · Scenario 3: Electromechanical Meter Test and Smart Meter Field Replacement · Scenario 4: Non-High Bill Complaint Smart Meter Field Test · Scenario 5: High Bill Complaint Smart Meter Field Test · Scenario 6: High Bill Complaint Shadow Meter Field Test · Scenario 7: Non-High Bill Complaint Electromechanical Meter Field Test . Scenario 8: High Bill Complaint PG&E-Installed Shadow Meter Test Verification load, light load, and with an applied power factor. Structure's field tests measured accuracy of the meters at full The results were tracked to acceptance levels for the CPUC (:12% for both Smart Meters and electromechanical meters), PG&E (:10.5% for Smart Meters, :12% for electromechanical meters), and the manufacturer (:10.2% for Smart Meters, :12% for electromechanical meters). Structure's Pass/Fail criterion used in this report was based upon the CPUC standard of :12.0% for electromechanical meters and Smart Meters. Structure attempted 897 field meter tests and completed 797 field meter tests, including both Smart Meters and electromechanical meters. Structure was unable to complete the remaining 100 meters due to normal reasons, such as meter banks on apartment buildings preventing the installation of the dual socket required for testing and meters locations that required extension ladders for access. Overall, a statistically valid, randomized sample of Smart Meters representing the entire installed base of Smart Meters in the P&GE territory was found to pass accuracy reading. Using the CPUC pass/fail criterion of :12.0%, 611 of the 613 Smart Meter field tests were completed, with 100% passing CPUC registration accuracy readings. Two Smart Meters were found to have serious errors and be malfunctioning. One meter was found to have serious errors and be malfunctioning on arrival, and one was found to have serious event errors upon installation; these meters were therefore excluded from testing. The Average Registration Accuracy of the 611 meters tested was 100.067%, with a Standard Deviation of 0.271%. Of the 147 completed electromechanical meter field tests, 141 meters, or 95.92%, passed and 6, or 4.08%, failed accuracy readings. Structure identified one meter that was registering a zero read during the field meter testing. After further examination of PG&E's issue logs, the error was identified as a "data storage" issue. These data storage issues had been identified by PG&E in 12,735 meters as of May 2010, potentially resulting in a subset of Customers receiving zero usage or lower estimated bills. Data storage issues are one type of exception disclosed by PG&E, and may include: · Negative intervals Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. ! 62 Page 19 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATIACHMENT-., Page (1 of 3 t. 0449 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilties Commission ~ Structure™ · Large intervals · Zero table · Negative register readings · Table resets Str.ucture noted that these data storage issues were identified in early October 2009, with replacements starting in May 2010. These errors were disclosed to the public and to the CPUC in May 2010. PG&E subsequently initiated processes to address these issues in a timely and effective manner. As of July 2010, the outstanding data storage issues had been reduced to 1,526 meters. The following Figure illustrates the number of meters that passed and failed the accuracy test for all of the Structure Field Meter Testing Scenarios, delineated by electromechanical meter tests in blue, and Smart Meter tests in yellow. The field testing scenarios were referred to as "High Bill Complaint" and "Non-High Bil Complaint" populations. The High Bil Complaint population was derived from complaints received directly by the CPUC or PG&E and those received at the town hall meetings organized by state senators. Non-High Bill Complaint refers to Customers who had not filed a high bill complaint through one of these channels. . .... Figure 5: Structure's Field Meter Testing Pass/Fail Accuracy Results by Field Test Scenario N/A-S: Not Applicable-Shadow Meter Of the 613 completed Smart Meter field tests, 611 meters were successfully tested and 100% passed Average Registration Accuracy. One meter was found to have serious errors and be malfunctioning on arrival, and one was found to have serious event errors upon installation; these meters were therefore excluded from testing. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 20 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AITACHMENT-L. Page ~ of ~ 62 0450 A.07-12-009 COM/MP1/jt2 Structure™ PG&E Advanced Metering Assessment Report Commissioned by the Caliornia Public Utiities Commission 0.2.2 Field Meter Testing Findings Details A description of Structure's field testing scenarios and summary of the scenario-based testing results are presented in the following Figure. The field testing scenarios were referred to as "High Bill Complaint" and "Non-High Bill Complaint" populations. The High Bill Complaint population was derived from complaints received directly by the CPUC or PG&E and those received at the town hall meetings organized by state senators. Non-High Bill Complaint refers to Customers who had not filed a high bil complaint through one of these channels. Average registration accuracy is calculated using the equation (Light Load Test + Full Load Test)/2 and refers to the average accuracy of a "register," which maintains a measure of the total power consumption that passed through the meter over time. Each of the following scenarios was performed independently of each other, and involved a unique Customer premise. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. 62 Page 21 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATIACHMENTl-, Paged-f of3ý 0451 A.07-12-009 COM/MP1/jt2 &Z Structure™ Electromechanical Meter Test & Smart Meter Field Replacement PG&E Advanced Metering Assessment Report Commissioned by the Caliornia Public Utilties Commission Structure used a representative sample of 50 Customers that were scheduled to have their electromechanical meter replaced . One Smart Meter was found to have a serious event error and be malfunctioning upon installation, and was therefore excluded from testing. by PG&E. The electromechanical meters were removed and . 100% of the 44 tested Smart Meters used for accuracy tested in the field at full load, light load, and 50% power factor. A laboratory-tested Smart Meter was then accuracy-tested in the field before being installed in the Customer's premise. The results of each of these tests were recorded by the Structure . Field test results of 44 of the previously contractor. 47 successful this scenario passed CPUC's accuracy testing acceptance standard of :\2.0% in the field test. laboratory-tested Smart Meters indicated an Average Registration Accuracy of 100.27% during the field tests with a standard deviation of 0.112%. electromechanical meter tests and 44 successful Smart Meter tests were conducted for this Scenario. The difference in number of electromechanical tests and Smart Meter tests was due to 6 electromechanical meters that failed. These meters subsequently did not receive a Smart Meter installation at the time of the test; therefore, Structure did not conduct a Smart Meter test at that premise. . One electromechanical meter was not found to be functional, registering zero on all tests; and was therefore excluded from testing. . 41 of 47 tested electromechanical meters passed the CPUC's accuracy testing standard of :\2.0% in the field test. . Six of the 47 tested electromechanical meters failed the CPUC Accuracy Standard of :\2.0%, with one failing the Full Load and Power Factor tests, one failing the Light Load test, one failing the Power Factor test, and three meters failing the Light Load and Power Factor standard tests. . Two of the six electromechanical meter failures failed the Average Registration Accuracy standard. All field-tested electromechanical meters that were replaced with Smart Meters were returned to PG&E with an indication of whether or not they passed the field test. . The 47 tested electromechanical meters had an Average Registration Accuracy of 99.556%, with a Standard Deviation of 1.343% for the successful tests. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 22 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATIACHMENT-L1 Page ~ o~ 62 0452 A.07-12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilties Commission A representative sample of 532 Smart Meters was chosen from the population of PG&E Customers where a Smart Meter had previously been installed by PG&E and the Customers were not in the High Bill Complaint list. These meters were removed from the Customer's meter socket and placed in a calibrated field test set on-site at the Customer's premise, where the meters were then accuracy-tested at full load, light load and a 50% power factor. In addition, the existing internal meter program was verified to . One Smart Meter (of the 532) was found to have a serious event error and was malfunctioning, and was thus excluded from testing. The communication module on this device was functional and had been reporting zero usage for almost six months. . 100% of the 531 tested meters tested within the CPUC accuracy standard of :t2.0%.Average Registration Accuracy ranged from 98.345 % to 100.78% with an average of 100.075% and a standard deviation of 0.275%. confirm ro er functionalit . Scenario 5 High Bill Complaint Smart Meter Field Test Structure selected 50 Smart Meter installations from the High Bill Complaint population to verify that the meter was properly installed and to field test the registration accuracy of the . All 36 Smart Meters tested passed the CPUC acceptance standard of :t2.0%. . The Average Registration Accuracy for the Scenario 5 meters was 100.004%, with a Standard Deviation of 0.351%. installed Smart Meter. 36 Smart Meter tests were conducted for this Scenario. At each location, the Smar Meter was removed and installed in a calibrated field test set, where the meter was accuracy tested at full load, light load and a 50% power factor. In addition, the existing internal meter program was verified as functionin ro erl . Scenario 6 High Bill Complaint Shadow Meter Field Test Structure selected 20 locations . The results of the 19 shadow meter tests from the High Bill Complaint population to install a Field consisted of the existing installed PG&E Smart Meter and an Elster showed that the shadow meter reads were in concert with the Smart Meter reads. . The bills from both the lab-tested shadow meters and the field-tested shadow meters matched the expected results from manual bill calculations. digital Shadow meter installed . Structure encountered four unauthorized Shadow Meter setup, and completed tests at 19 locations. The Field Shadow meter setup side-by-side to measure the Customer's usage simultaneously through both meters. These meters were used to establish the accuracy of the Customer meters already installed by performing a weekly accuracy check and comparing the readings from the two meters. In addition to verifying Smart Meter accuracy, these installations were also used to PG&E meter swaps/meter tests during the execution of this scenario, as noted in the "Unauthorized PG&E Meter Swaps" section of this report, and in Appendix F: Unauthorized Scenario 6 Meter Swaps Exhibitions. These meters were subsequently not tested by Structure in the field, but were retrieved from PG&E and evaluated in the laboratory with no noted verify the end-to-end accuracy issues. Structure selected additional thru the PG&E AMI system to the accounts to test in lieu of the meters excluded from test sample due to the unauthorized customer bilL. meter swap. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. 52 Page 23 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnACHMENT~1 Page ,;-3 olj 0453 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiities Commission ~ Structure™ Non-High Bill Complaint Electromechanical Meter Field Test Structure used a representative sample of 100 installed PG&E electromechanical meters to verify the accuracy of these meters in the field. The meters were removed from the customer installation and placed in a calibrated field test set to verify their accuracy at full load, light load, and at a 50% power factor. Scenario 8 High Bill Complaint PG&E Installed Shadow Meter Test Verification Structure accompanied PG&E Meter personnel during the installation of 18 shadow meter tests performed by PG&E. These installations consisted of the installation of a side-by-side electromechanical meter and Smart Meter at the site of Structure-selected High Bill Complaint Customer's premises. Structure reviewed PG&E's installation practices to determine if they were in line with documented installation, testing and meter reading procedures and to determine if PG&E followed their documented . Scenario 7's test included 100 installed PG&E electromechanical meters, with no failures on the CPUC Standard of :t 2.0%. . The 100 meters had an Average Meter Registration Accuracy of 99.798% with a Standard Deviation of 0.528%. . The minimum Registration across all tests (Full Load, Power Factor, and Light Load) was 98.1%, and the maximum registration across all tests was 101.95%. . Of the 27 meters selected for Scenario 8, 18 were successfully completed with no identified deviations, and nine were unable to be completed due to premise restrictions and meter installation routing schedules. . In all test cases, PG&E complied with internally documented practices and procedures for the shadow test verification. ractices and rocedures. Figure 6: Structure's Field Meter Testing Summary of Results D.3 End-to-End System Testing D.3.1 End-to-End System Testing Findings Summary End-to-end system testing was used to verify the accuracy of the PG&E Smart Meters, data communications and associated systems, estimation routines, and the customer biling system, including bill printing. A laboratory end-to-end test scenario was used to simulate system exception handling in a controlled environment, including the addition of a meter access point that served as the collection point for the meter information that was sent back to PG&E. End-to-End laboratory testing was performed on five PG&E Smart Meters, with five Elster digital meters used as parallel, side-by-side measurement, referred to in this Assessment as "shadow" meters. These end-to-end laboratory tests involved creating a proxy Customer account, installng a Smart Meter for this account and an electronic meter side-by-side to shadow the account's usage, and conducting tests from the time of installation through to receiving a bilL. Structure established shadow meter test boards and conditions in the independent laboratory for use in the end-to-end system testing, to determine whether the Smart Meters were accurately Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 24 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnACHMENT~1 Page d-4 oè! 62 0454 A.O? -12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiities Commission measuring energy consumption as compared to an independent electronic Meter. A field end-to-end test scenario, Scenario 6, was used to test the actual performance at Customer-installed facilties. Structure did not identify issues during the testing of the meter billing system accuracy. Structure encountered an issue with PG&E's set-up of the proxy accounts, wherein Structure specified a specific billing address and PG&E sent all of the proxy account bills to the wrong address. PG&E indicated that this occurred because they did not follow their standard practices. 0.3.2 End-to-End System Testing Findings Details Twenty-six Elster digital meters procured from the Elster meter manufacturer were laboratory-tested for accuracy and utiized as an auxiliary/additional meter to record energy consumption on the secondary meters, hereby referred to as a "shadow" meters in both the laboratory end-to-end testing and the field end-to-end testing scenarios. End-to-end laboratory testing was performed on five PG&E Smart Meters, with five Elster digital meters used as shadow meters. Each of these meter pairs was subjected to a different amount of load, reflecting measurement at various rate tiers over the test period. In addition, the meters were also subjected to common exceptions to normal conditions often found in the field, including power outages, voltage swells, voltage sags, and loss of Radio Frequency reception. Inclusion of the common exceptions facilitated testing PG&E's capability to perform validation, editing, and estimation (VEE) processes in compliance with CPUC rules, and without introducing errors into Customer bils. The referenced VEE standard was California Interval Data VEE Rules Revision 2.0. "Proxy" Structure Customer accounts were created within PG&E's billing system for each of the laboratorybased end-to-end meters, giving Structure the ability to determine PG&E's application of billng determinants and rate assignments accuracy and the timeliness of physical bil issuance to residential electric Customers. The end-to-end test process was designed for completion over the course of one PG&E biling cycle. Structure encountered an issue with PG&E's set-up of the proxy accounts, wherein Structure specified a specific biling address to be used instead of the premise address and PG&E sent all of the proxy account bills to the wrong address. Structure specifically requested use of the billng address instead of the premise address in order to accommodate a specific route and satisfy the specified bill cycle. The proxy bils were sent to the "premise address" that was created for the proxy accounts, which was a fictitious address created by PG&E for internal use for a premise that does not exist. Structure contacted PG&E when the bills were not received, and subsequently received the bils. PG&E indicated that the bills were sent to the incorrect address because they did not follow their standard practices for account setup. PG&E failed to note on the account that bills were to be sent to the billng address, instead of the premise address, and told Structure that the billng system defaulted to the premise address for bill delivery. End-to-end field testing utilized four Scenario 6 field test shadow meter installations on selected High Bill Complaint Customers. The field test shadow meter setup used the existing installed PG&E Smart Meter and an Elster electronic shadow meter installed side-by-side to measure the Customer's usage simultaneously through both meters. The meter comparison results are discussed in the Field Meter Testing section. Structure also utilized these installations to verify the flow of meter usage and event data from the Customer premise, through the PG&E AMI and Billing systems, to the Customer's receipt of the printed bilL. Structure experienced initial laboratory testing setup challenges that were resolved within the first days of testing. The challenges identified during setup did not impact the overall scope or development of testing conclusions. The results of the end-to-end tests included: Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. 10 12 Page 25 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATIACHMENT-., Page c)fõoil 0455 A.07-12-009 COM/MP1/jt2 ~ Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiliies Commission · End-to-End laboratory system testing verified that the representative sample of five Smart Meters being billed through the PG&E systems had average accuracies compared to the reference Elster meters of 0.06% with a standard deviation of 0.001 %. Meter Data Management System (MOMS) validation routines were verified to be working accurately under the tested conditions, and billing matched the expected results. · Meter readings were verified as accurate between the Advanced Metering Infrastructure (AMI) head-end, the Meter Data Management System (MOMS), and the Customer Care and Billing (CC&B) systems. · Application of biling determinants were verified as accurate, including the assignment of baseline allocations, transition of billng through seasons, and transition of biling through new tariffs. 0.4 High Bill Complaint Analysis 0.4.1 High Bill Complaint Analysis Findings Summary Structure obtained the complaint register associated with the electric Smart Meter High Bil Complaints from both PG&E and the CPUC since the implementation of Smart Meters through June 10, 2010, for inclusion in our analysis which included usage history for 1,378 records. A detailed analysis was performed on 1,066 of these records. The records were analyzed for usage sensitivity to weather, unusual spikes, meter problems, manual or system based issues, meter reading issues, rate impacts, and service issues. Structure further analyzed a targeted sample of 73 complaints that were identified as having multiple issues and would likely provide the greatest insight into potential PG&E system or process issues. Structure contacted 100 High Bill Complaint including the 73 researched complaints, and conducted interviews with 20 Customers that had filed complaints during the period and exhibited excessively high bill periods, cancel/re-bills, or complaint resolution codes that reflected a potential problem. The 73 complaint accounts were also included in the field meter tests. As a result of the high bill complaint analysis, Structure did not identify problems with the Smart Meter data utilized for billing. Structure identified the following factors that contributed to high bill complaints during late 2009 and early 2010: · Customer Usage: a Meter deployment schedules coincided with increased energy usage caused by a heat wave. a Some Customers experienced load changes that were reflective of changes in personal circumstances. Examples included room additions, pool additions, and equipment malfunctions. a Electromechanical meter degradation that was also identified as part of Structure's field meter testing. · Rates: a Rate increases compounded the financial impact of the additional weather-related usage, resulting in higher bils that occurred as Smart Meters were being installed. a Incorrectly applied rates that were based upon historical premise assumptions. o Rate-based inquires that increased as Customer bills escalated. Requests for new or renewed financial assistance through California Alternate Rates for Energy (CARE) were identified as potential reductions of financial impacts related to higher bils. · Customer Service: Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 26 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnACHMENT~, Page ~ oil to'12 0456 A.07-12-009 COM/MP1/jt2 &g Structure™ PG&E Advanced Metering Assessment Report Commissioned by the Caliornia Public Utilties Commission o PG&E processes did not address the Customer concerns associated with the new equipment and usage changes. o Customer skepticism regarding the new advanced meter technology was not effectively addressed by PG&E on a timely basis. o Customers interviewed during this assessment did not consider their complaint resolved, despite indications from PG&E and CPUC that the Customer agreed with the resolution o PG&E Customer complaint resolution did not provide of interval read information available with Smart Meters, which may have assisted Customers' understanding of hourly usage patterns. · Process Issues: o Customers indicated that communications/notifications surrounding physical meter installation were lacking, or that the Customer had issues with the installation personnel. o PG&E utilized field meter readers for an average of 131 days after Smart Meters were installed, resulting in similar meter reading errors as electromechanical meters. The transition to automate the Smart Meter data for use in billng was not clearly addressed with Customers. o PG&E's system tolerances related to biling quality control were not stringent enough, resulting in multiple bil cancelations and re-bilings, which were confusing to Customers. Additionally, Structure determined that the PG&E complaint resolution process was ineffcient and ineffective in providing Customers with resolution details and education related to Smart Meters. Recent process changes adopted by PG&E created Customer Relations resources that were focused on Smart Meters, along with a group focused on resolving escalated complaints. Structure performed a complaint walkthrough with both the PG&E groups and was satisfied that additional focus was being placed on resolving Customer complaints. 0.4.2 High Bill Complaint Analysis Findings Details 0.4.2.1 Customer Complaint Process The Customer complaint process followed multiple paths, including contacting the CPUC Consumer Affairs Branch (CAB) to file a complaint and filing directly with PG&E's Customer Relations Department. In some cases, Customers registered complaints with both the CPUC and PG&E. Typically, Customers had filed more than one complaint with PG&E. Included in the CPUC complaint list were complaints received during town halls hosted by Senators Dean Florez (D-Shafter) in October 2009. The complaint process is illustrated in the Findings section of this document. All complaints filed with the CPUC were provided to PG&E for resolution and expected to either be resolved in 10 days or to provide a required $30 credit to the Customer. CPUC was responsible for communicating results back to the Customer. Complaints filed with PG&E were handled through the Customer Relations call center and logged into the Customer's account profile. The following Figure ilustrates the number of Smart Meter high bil complaints received by PG&E on a monthly basis. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. ..&~ Page 27 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATIACHMENTL. Page eJl- oé1 0457 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiities Commission ~ Structure™ Smart Meter Bil Complaint File Date 350 300 250 200 150 100 50 ... cell ~ -"._~_. .... .....................i..............I...........I................................................. o ~ ~ ~ ~ 00 00 00 00 00 00 ro 00 00 00 00 00 ~ ~ ~ m m m rn m m rn rn m a a a 0 a a 99 99 ~ 9 99 9 9 9 999999 99 9 9999 9 9 99 ~~~ ~ ~ ~ ~ ~ ~~ ~ ~~§~ ~~ ~~otzo~~~~~~ ~ ~ ~~ æ ~~§~~~ ~gotzo~~~~~~ ~ ~ ~~ ~ ~~§ ~gotzo~~~~~~ II Complaints Analyzed II Complaints Post Analysis Figure 7: PG&E-Provided Smart Meter Electric Customer Account Complaints Structure noted a disproportionate number of complaints filed with the CPUC than with PG&E, as indicated in the Figure below. Structure was told by PG&E that a complaint was not marked as a Smart Meter complaint if the Customer did not mention that they had a Smart Meter. This approach may result in complaints not being accurately coded 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Copyright Page 28 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. .. AnACHMENT~, Paged-~ of3t. 12 0458 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the ~ Structure™ Caliornia Public Utilties Commission and reported as Smart Meter complaints. Some Customers interviewed indicated that complaints were registered with both the CPUC and PG&E, although only the CPUC record was identified. Structure also performed a historical usage analysis utilizing an aggregated Smart Meter complaint inventory file provided by PG&E. The file included identification of the complaint source, relevant complaints, and related account detaiL. Structure conducted an analysis of the Smart Meter Complaint inventory to remove duplicate and non-Smart Meter billng data, and concluded that of the 2,915 Smart Meter complaints that were filed by PG&E Customers from September 2007 through April 2010, there were 1,378 distinct Customers that filed complaints related to residential electric accounts. Structure's evaluation included a further detailed review that evidenced 1,066 represented electric residential Smart Meter Customer accounts. Subsequent to the conclusion of our analysis, Structure received additional high complaints from both PG&E and the CPUC. Structure reconciled the lists and determined that an additional 117 CPUC CAB Customer complaints had been excluded from the PG&E-provided consolidated list. Structure utilized the complaint lists and supplemental complaints as the basis for our testing selection, but did not include a complete analysis on these accounts. As part of a follow-up to the Town Hall meeting complaint process, Structure reviewed the detailed Customer analysis performed by PG&E and the associated complaint resolutions. The PG&E analysis included a comparison of the Customer's average daily usage in kWh vs. the monthly average temperature for the region to demonstrate the trend in usage pre- and post- Smart Meter installation. Structure reviewed the Town Hall Meeting historical usage profile for each complaint to determine accounts that were impacted by weather. Structure included the Town Hall complaints within the potential selection group for the Customer Interviews and in the Smart Meter High Bil meter tests for further validation. Structure also performed an independent analysis on the high bill complaint Customer accounts by reviewing the historical usage for 1,378 accounts, and performing detailed analysis on 1,066 accounts. The analysis performed included: · Weather impacts on average daily usage · Average Daily Usage prior month prior year · Extended biling cycles · Unresolved complaints · Cancel/re-bill review Structure compared the historic average daily kilowatt hours (kWh) usage for each of the 1,066 Customer accounts with the objective of determining if the high bill complaint Customers experienced increased kilowatt hour (kWh) usage after installation of Smart Meters due to weather. The comparison utilized the 2006 and 2009 years with similar summer profiles and determined that in 86% of the 2009 complaints, the average daily usage was less than the 2006 summer although the 2006 summer months were hotter. Structure verified that the weather in the same July/August period for 2007 and 2008 was 2 to 3 degrees cooler than in 2009. The remaining 14% of accounts required additional analysis to determine the potential cause for the increased usage. Structure also reviewed the average daily usage for the same period of the prior year for each Customer Complaint account history, and identified less than 6% of the records for the complaint Customers that exceeded 150% of the same period prior year. Structure utilized the 150% value to reflect the differential in weather between 2008 and 2009 and focus on identifying unusual spikes in energy usage. õ~ Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 29 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnACHMENT~1 Page d-C of3L 0459 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the California Public Utiities Commission ~ Structure™ Additional complaint analysis focused on the extent to which bills were included in an extended billing cycle, or delayed bills, outside of the typical (27-32 day) billing cycle. Structure's evaluation discovered that in 2009 and 2010, approximately 9% of the bils reflected a billng period beyond the standard cycle, although less than 0.4% extended past a 45 day window. Extended billing cycles that resulted in higher overall bills were identified as contributing to high bil complaints. Structure recalculated several bills and determined that the appropriate baseline adjustments were included in the bills and that the bills were accurately calculated. Structure also noted that during late 2009 and early 2010, a significant portion of complaints were not resolved within the CPUC-required 10 day complaint resolution period. PG&E indicated that the resolution time period extended well beyond the 10-day timeframe due to the influx of complaints during the second half of 2009 and early 2010. Structure calculated that PG&E took more than 10 days to resolve complaints for more than 67% of the Customer accounts during this time period. Structure did not review all accounts to identify whether the CPUC credit for account resolution was provided, but did identify that in several cases where detailed review was performed, the adjustment was properly applied after Structure's additional review and discussion with PG&E. The cancel/re-bils documented by PG&E represented 1 % of the total high bil complaints. A portion of the cancel/re-bills related to overbiling from estimated meter reads identified by Customers subsequently required adjustments by PG&E. Billng adjustments were also made to compensate for meter installation issues. 0.4.2.2 Customer Interviews Structure contacted 100 high-bill complaint Customers for potential in-depth interview participation related to their high bill complaint. Of the 100 Customers contacted, 20 Customers agreed to be interviewed. Some Customers permitted inclusion of their information in The Assessment, and permitted Structure to follow up with PG&E on their behalf. The Customer interviews focused on the nature of the complaint described to PG&E, PG&E's approach to resolving the Customer's complaint, and the current status of the complaint. The 20 Customers participating in interviews were also included in the field meter testing population. Based upon Customer interviews, Structure identified gaps in PG&E's approach taken to resolve Customer complaints, including but not limited to: · Some Customer complaints were not logged into the service history on Customer accounts. · Follow-up with Customer was not performed on a timely basis. . PG&E indicated that account was resolved did not align with Customer perception. · Lack of resolution communication back to Customer. . Customer lacked clear understanding of complaint resolution process. . Customer consistently treated by PG&E as wrong, until the Customer proved to PG&E that they were right. · Customer perception of Smart Meter functionality resulted in complaint escalation. . PG&E front-line customer call representatives lacked professionalism while dealing with Customer complaints. . Underlying cause of billing issue not discovered in most cases, even when monetary resolution was reached. Recent process changes adapted by PG&E allocated Customer Relations resources focused on Smart Meters, along with a group focused on resolving escalated complaints. Structure performed a complaint walkthrough 2010. Confidential and Proprietary Copyright to Structure Consulting Group, LLC. Page 30 of 34 9/1/10 Report is considered Final by St.""",, C~"';"g G,,"P, LlC'Õ ~ ATIACHMENl..L, ¡-age 30 of! 0460 A.07-12-009 COM/MP1/jt2 &: Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilities Commission with both of the PG&E groups and was satisfied that additional focus was being placed on effectively resolving Customer complaints. In regards to the CPUC complaint resolution process, Structure noted that the Complaint closure letter Customers received from the CPUC provided no further information than had been provided by PG&E, and both were considered to be ineffective. Structure followed-up on the Customer interviews by reviewing the Customer Complaints with PG&E. As an outcome of Structure's review with PG&E, two accounts were adjusted based upon the Customer's satisfaction of certain criteria, including low income CARE eligibility and major customer equipment malfunctions, which were subsequently repaired by the Customer. During the interview process, Structure identified discrepancies in the retroactive application of the CARE eligibility for two Customers. These discrepancies were later resolved by PG&E, following Structure's inquiries, in favor of the Customer. Of the 20 Customer interviews completed, Structure identified the following non-unique account issues: · 9 Customers experienced unusually high bils in the initial months after the Smart Meter was installed o Explanations identified: · Estimated meter reads · Cancellre-bill adjustments · Weather related · Usage pattern adjustments · 9 Customers do not have an explanation, personally or from PG&E, for the spike in electricity usage. o Potential explanation identified: · Electromechanical degradation (similar to those found in field testing) · 5 Customers were on the wrong rate structure, or PG&E changed their rate structure as a result of their complaint. o Explanations included: · Historical premise classified incorrectly, affecting the baseline applied to the premise · Lapse in CARE qualification, or not registered for lower income-based programs · 1 Customer experienced a 500% increase in kWhs used after Smart Meter installation o Explanation included: · Correction of estimated meter reads. · Note: The lack of adequate PG&E exception and validation controls resulted in the bill being processed. . 2 Customers interviewed experienced electrical problems due to Smart Meters causing "surges" or interruptions in timed electrical services such as security lights and hot tub pumps. o Explanations included: · There is a possibility for a meter in close proximity to FCC Part 15 Unlicensed Radio Frequency (RF) devices and transmitting data via a 1 watt radio transmitter to create operational interference (e.g., static, trip, or outage) when the RF signal passes though these devices. This is an issue that is prevalent with any RF device, such as walkie-talkies, garage door openers, etc. Electrical issues may be due to a matter of proximity to the transmitter, strength of the transmitter, frequency of the transmitter, and the impact on the neighboring device. · FCC Part 15 Unlicensed RF devices include: Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. 81 Page 31 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATTACHMEN'l~1 r~agt:~ot 3Lf 0461 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the &Z Structure™ California Public Utilties Commission o Motion sensors o Garage door openers o Baby monitors o Wireless telephones o Wireless speakers · PG&E has determined that certain models of Ground Fault Interrupter (GFI) breakers (such as those used on hot tubs) may be impacted if they are in close proximity to the meter. PG&E has also engaged Smart Meter manufacturers to develop low power transmitter solutions to the GFI interference issue, and has trained the installation contractors to listen for GFI tripping upon installation of a new meter. On average, Customers indicated a 4.5 month delay between complaint submission and ultimate resolution. The quickest resolution was reached in four days; however, the longest resolution took 12 months and significant effort on the part of the Customer. While the Customer interviews and related detail account reviews provided significant insight into potential issues within the Smart Meter program, Structure did not identify recurrent issues that impacted the overall population of High Bill Complaints analyzed. D.5 Best Practices Associated with Smart Meters D.5.1 Best Practices Associated with Smart Meters Findings Summary Structure found PG&E to have been either historically in compliance, or to have recently come into compliance, with the majority of industry best practices associated with Smart Meters. Recognizing that some of these practices have matured over PG&E's three year AMI deployment period, it is reasonable that they have recently come into compliance with standards associated with best practices. Some concerns were noted around PG&E's practices related to Meter Deployment, Meter Data Management Interfaces, and VEE. The following Figure presents a pictorial representation of Structure's evaluation of PG&E's historical and current adherence to industry best practices. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 32 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. ATIACHMENT--, Page 3á otl õ.a 0462 A.07-12-009 COM/MP1/jt2 PG&E Advanced Metering Assessment Report Commissioned by the ~ Structure™ Caliornia Public Utilties Commission Structure's Summary of PG&E Best Practice Compliance . Current li Historical 10 8 6 4 2 0 Ol Ol +- "'; = ii i: i: 0 .- 0 ~0..c lJ E~ 0.0 ü :J0 .. f- i: E:J 0U U c: i: lJ :Q ult 'tQ) 0 '~ ei :: lt 1i 0 Q) .. :: 0 :: .E E Q) E ~ 0 a. 0~ Q) Q) ãí :: E Q) E i: lJ .2 "E .. lt 0. ~ ,g "0 'S ãí ëi g 0"LU lt ~ en Q) ãí :: lt i: .E en Ol i: ~ '§ U= lt lt - :J êa lt :: Figure 9: Structure's Summary of PG&E Best Practice Compliance The Findings section of this report addresses the specific areas in which PG&E is historically and/or currently not compliant with best practices. D.5.2 Best Practices Associated with Smart Meters Findings Details Although PG&E was not in compliance with the recommendation to utilize IEC 61968-9 interoperability standards, PG&E provided documentation that it was employing a set of interoperability standards for MDM Interfaces. Of some concern is the lack of documentation verifying compliance with the Meter Deployment best practice to deploy WAN/LAN collectors prior to meter deployment. By not deploying the communication backbone prior to meter deployment, the time to transition meter reading from manual to AMI system readings is exacerbated, extending to an average of 131 days over the implementation period. This allows a continuation of the higher error rate associated with meter reading and may contribute to the perception that the Smart Meters are inaccurate. Additionally, the inability to verify compliance around the Meter Data Management Interface best practice to "Correlate AMI meter events and alarms with VEE and CiS audits and checks for automated exception handling" and the VEE Best Practice of "MDMS must provide an on-line method, with workflow, resolving validation errors rather than reports" has created a situation where there is manual editing of data causing numerous cancel/re-bills and delayed processing of Customer data. This, coupled with extensive manual, instead of automated, exception handling of issues has allowed many metering and biling errors to occur on a repetitive basis, over time, furthering the perception that the Smart Meters are not accurate. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. 52 Page 33 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnAcHMENT-Li Page 33 o~ 0463 A.07-12-009 COM/MP1/jt2 &Z Structure™ PG&E Advanced Metering Assessment Report Commissioned by the California Public Utilites Commission PG&E has recognized, through the presentation of information, their shortcomings on these issues and has been actively pursuing remedies such as process improvements and the recent consolidation of the Billing, VEE, Smart Meter Engineering, and Troubleshooting operations into one Operation Center. 0.6 Security Assessment 0.6.1 Security Assessment Findings Summary Structure concluded that PG&E has developed a cyber security framework that meets the objectives of the Smart Grid industry's OpenSG AMI-SEC Task Force "AMI System Security Requirements" that were reviewed as part of this evaluation. 0.6.2 Security Assessment Findings Details Structure independently reviewed PG&E's cyber security framework as it applies to their Smart Meter system. Structure also evaluated PG&E's cyber security framework against industry best practice standards to identify deviations in current and historical business practices. Structure concluded that PG&E had developed a cyber security framework that met the objectives of the OpenSG AMI-SEC Task Force "AMI System Security Requirements" that were reviewed as part of this evaluation. An assessment of the implementation of the cyber security framework was not within Structure's agreed-upon scope of work 0.7 Other Observations Structure submitted data requests, using PG&E's standard request procedures as agreed to with PG&E and CPUC to obtain information used as the basis for this report. At PG&E's request, Structure assigned priorities to the data requests to facilitate response focus and expedition. While PG&E accommodated the requests, 28% of the requests were substantially delayed due to PG&E's internal processing and legal review. The delayed resulted in Structure requiring additional time and resources to process, integrate and reconcile information in an effective manner once received. While Structure does not feel that the delayed information impacted the results of the Assessment, the receipt of limited data and the differences in data presentation in the received data impacted the amount of time required to complete the planned analysis, and led to scope modifications and a revised project completion date of September 2, 2010. Copyright 2010. Confidential and Proprietary to Structure Consulting Group, LLC. Page 34 of 34 9/1/10 Report is considered Final by Structure Consulting Group, LLC. AnACHMENT~1 PageYt of"5cj 12 Readers: SmartMeters interfere with baby monitors, other household gad£ - San Jose Mer... Page 1 of 3 0464 Ilt .Arcurg News MercuryNews.com Readers: SmartMeters interfere with baby detectors and remotely controlled garage doors. This equipment operates largely on the 900- to 928-megahert radio spectrum. monitors, other "Right about the time that SmartMeters were installed, our phone went insane," wrote Jane Meckman of San Jose household gadgets This is something PG&E is loath to talk about even though the company promised transparency when it By Dennis Rockstroh [email protected] brought SmartMeters to our homes. Posted: 09i06i2010 09:15:39 PM PDT When Action Line asked PG&E about the complaints, the utilty said little and put up a bureaucratic Updated: 09/08/201008:54:55 AM PDT You've read about problems with PG&E's SmartMeter, especially the folks who claim it's causing huge increases in their electrical bils. But that's not the only issue with the vaunted high-tech device. As Pacific Gas & Electric's SmartMeter installation has rolled across Northern California, dozens of readers have contacted Action Line complaining about newly found erratic behavior with their household electronic gadgets. A conflict occurs, apparently, when the SmartMeter electronically transmits information back to the utility. Cordless phones and crib monitors, patio speakers and wireless headsets are spitting out static and startling pops and crackles. they complained. Also affected, they said, are hurdle to get responses to readers' concerns, going so far as to require notarized waivers of confidentiality . That's the definition of stonewallng. PG&E knew it had a problem as far back as early 2009. "During the second quarter of 2009, PG&E discovered a limited number of cases of SmartMeter radio interference with customer electronics," the company wrote in a report to the California Public Utilities Commission. The report indicates that PG&E was working on a solution, but offcially it is mum. Of course, it is unlikely that all of the problems with household electronics are the fault of the SmartMeter. Radio spectrum pollution is all around us. But the SmartMeter makes a major - and for wireless microphones, security systems, motion many people, unexpected -- contribution: When it communicates with PG&E, it is sending data from a house to local data-gathering points and back to PG&E central. Many folks, of course, don't realize that's happening - until the buzzing starts. Advertisement drsí NETWORK* Print Powered By ATIACHMENTL, Page~of 3 12 http://ww.mercurynews.com/cL16007725?IADID=Search-ww. mercurynews.com-ww. mercu... 9/8/2010 Readers: SmartMeters interfere with uaby monitors, other household gad~ ,- San Jose Mer... Page 2 of 3 0465 Ilt J1tttt News MercuryNews.com Meanwhile the complaints keep flowing in to Action Line, about 60 so far. Action Line became aware of the interference when members of a mothers' group in the Palo Alto-Menlo Park area started reporting that they were suddenly awakened in the middle of the night by loud crackles and pops on their baby monitors. They suspected their recently installed SmartMeters were "Your article concerning the PG&E SmartMeter was exactly what i needed to see," wrote Mario after one of my earlier columns. "Ever since PG&E has installed that stupid device, our DirecTV has been having massive signal issues." the cause. i asked PG&E about it. Nothing, at first. I asked again. Then a month after I asked about this, PG&E spokesman Paul Moreno said that the families needed to update their two-year-old baby monitors Violeta Perez of San Jose wrote that, "Ever since my SmartMeter was installed, my home alarm system has been going off randomly." with improved shielding. (Action Line tip: Make sure any new equipment you buy is "shielded." Ask to make sure.) In one case, PG&E paid for a new monitor. "A mystery has been solved for us," wrote Veronica Wong, complaining that her baby monitor has suddenly picked up static. Moreno finally responded in an e-mail: "We are sorry the customer encountered this inconvenience. The SmartMeter device meets all Federal Communications Commission standards, so in cases like this, the baby monitor wasn't built to a standard where it would not receive interference from legally transmitted equipment like a SmartMeter meter. It is likely that the replacement monitor was designed so it would not receive interference from legally transmitting equipment, which is why it is no longer experiencing interference. This reader might want to seek a refund from the store or maker of the first monitor she purchased." Then PG&E started to take a different approach to my inquiries: stonewallng. PG&E -- which was dinged by the Public Utilities Commission last week for its customer service -has handled this poorly. Radio interference from the SmartMeter and other electronic devices is an irritating fact of life. But when the company brought this device into homes without giving us a choice about whether we wanted it, PG&E owed its customers an honest discussion of what we could expect. Failing to do so has turned an annoyance into a major pain. Contact Action Line at actionline@mercurynews. com or 408-920-5796. · Move your equipment around to see if you can find an interference.free spot around The company decided that written complaints to Action Line could be responded to only if the customer signed a waiver of confidentially. "These either need to be notarized or signed in front of a PG&E employee at one of our service centers," said spokesman Matt Nauman. the house. . Reorient or relocate the receiving antenna of the device experiencing the interference. . Try plugging in to different electric outlets. . Connect the equipment base to an outlet on Advertisement Help people in need. Donate your car, boat or RV Free Towing -Tax Deductible C"ll ìoH"Frim ,. l'h..riti\~(" 1-877-225-9384 . hii IlwBlhid Print Powered By ATIACHMENT ;¿ J Page~o~ L 12 http://ww.mercurynews.com/cL16007725?IADID=Search-ww. mercurynews.com-ww. mercu... 9/8/2010 Readers: SmartMeters intenere with uaby monitors, other household gadt ~ - San Jose Mer... Page 3 of 3 IItJlur News MeruryNews.com 0466 a different household circuit. . Consult the dealer or an experienced radiolT/wave spectrum technician for help. . If all else fails, you may have to replace the equipment with "shielded" equipment that is designed to withstand interference. Source: FCC Advertisement 5 9 AnACHMENT~, Page~~ http:/Mw.mercurynews.com/cL 16007725?IADID=Search-ww.mercurynews.com-ww.mercu... 9/8/2010 PG&E SmarMeter Answer Centers and 1 ..&E Open House in Your Community Page 1 of 1 Terry Dorsey From: Irma Marquez on behalf of Tony Campos Sent: Thursday, September 09,20108:24 AM To: Terry Dorsey Subject: FW: PG&E SmarMeter Answer Centers and PG&E Open House in Your Community -----Original Message----From: Lomax, Karla (mailto:[email protected]) sent: Wednesday, September 08, 2010 5:08 PM To: Lomax, Karla Subject: PG&E SmarMeter Answer Centers and PG&E Open House in Your Community Dear Elected and Community LeadersPG&E is committed to educating and increasing our transparency and response to our customers. One way we are doing this is by increasing the number of SmartMeter Answer Centers throughout our entire service territory so customers can have one-on-one service to address their questions and concerns. We are also hosting Open Houses where customers can come in and get information on various PG&E services including billing and rates, SmartMeter, rebates and CARE programs. PG&E wil be in your community on the following dates: . 9/13/10, Scotts Valley Senior Center, SmartMeter Answer Center, 5:30pm-9pm . 9/22/10 Capitola, SmartMeter Answer Center, PG&E Payment Center (Across from Ross and Kohl's), 1-4pm . 9/30/10 Watsonvile, SmartMeter Answer Center, Ramsey Park Family Center, 4:00-7:00 pm . 10/13/10, Santa Cruz County, PG&E Open House, Santa Cruz, 6:00- 9:00 p.m. We have attached a flyer you can share with your constituents and partners. If you would like to visit the Answer Center or if you have any questions, please contact Wendy Sarsfield at [email protected] or 831-784-3584 or Karla Lomax at [email protected] or 408-282-7450. Thank you in advance for your help! Regards, Wendy Sarsfield and Karla Lomax -:-:Sa ntaC ruzCou nty An swerCenters. pdf:::: ***** **** *** *********** Karla Rodriguez Lomax Government Relations PG&E Direct: 408-282-7450 Cell: 408-206-8744 Email: [email protected] 6;) 9/9/2010 Page 1 of 1 Terry Dorsey From: Irma Marquez on behalf of Tony Campos Sent: Thursday, September 09, 2010 8: 18 AM To: Terry Dorsey Subject: FW: BaS Agenda 9/14/10 -----Original Message----From: Sandy O'Leary (mailto:[email protected]) Sent: Thursday, September 09, 2010 8:07 AM To: Mark Stone; John Leopold; Ellen Pirie; Neal Coonert; Tony Campos Subject: BOS Agenda 9/14/10 I live in Felton. I wanted to send this email to all of the BOS. The PG&E put a smart meter on my electrical meter. Then I found out more about the possible health risks the smart meter may impose. I called PG&E and asked that they not put a smart meter on my gas meter and locked my gate so they did not have access. The meters can still be read over the gate. I am wondering if a moritorium will be put in placed. Also, more importantly I would like the smart meter PG&E put on my electric1 meter removed if there is a moritorium. Please address removing smart meters that people don't want and replacing the other meter. Thank you. 5Y 9/912010 Page i of 5 Terry Dorsey From: Irma Marquez on behalf of Tony Campos Sent: Thursday, September 09, 20108:25 AM To: Terry Dorsey Subject: FW: Correction: Smart Meter health alert -----Original Message----- From: [email protected] (mailto:[email protected] Sent: Wednesday, September 08, 20104:59 PM To: John Leopold; Ellen Pirie; Neal Coonert; Tony Campos; Mark Stone Subject: Correction: Smart Meter health alert My apologies. There was a typo in the fourth paragraph of the letter to Dr. Horton. September 8,2010 Dr. Mark Horton, Director California Department of Public Health Dear Dr. Horton: i urgently request that you research and take immediate emergency action, issuing a state health alert and whatever other means are at your disposat to stop Smart Meters. Wireless Smart Meters are being deployed by utility companies throughout the state of California. The meters have many substantial problems and issues. However, the most critical issue is the health impact from the microwave rf radiation they emit. Utilizing microwave radio frequency radiation, these meters transmit energy usage data from utility meters (water meters are also planned) directly to the utility company, eliminating the meter reader. They emit brief, very large pulses as often as every few seconds, 24 hours a day, 7 days a week. As part of a mesh network, they will relay off each other, so meters will also emit with relayed signals. Southern California Edison gives the power of their peak pulses as 229,000 microwatts per cm2; PG&E will not disclose theirs (they will only give a time-averaged figure). Our public exposure standards set by the FCC are 1000 microwatts per cm2, and these standards are very high by other countries' standards, and extremely high in terms of what is known about the biological impacts from microwave radiation (see attached charts - the first entry on the biological effects chart is at 1 ten-trillionth of a microwatt). Our FCC standards are not protective against cumulative or long-term exposure, nor are they protective against biological impacts. They are only "considered" protective against short-term exposure and thermal (heating) impacts.(lJ The frequencies which the electric meters are broadcasting at are ~Q2~9L8 MHz, with the Home Area Network antenna and gas meters broadcasting at 2.45 GHz. This is pulsed microwave rf. A study published in 1974 (see below) showed that the most lethal frequencies of continuous wave (CWL not pulsed (which is more toxicL microwave radiation are 950 MHz (.095 GHz) and L4~ GHz. The power densities they tested started at .2 W/cm2 = 200,QOO microwatts per cm2. 200,000 microwatts per cm2 kills rats; the higher power densities just killed them a little faster. "The cause of death has been established as congestion, hemorrhage, and obstruction of nasal passages and/or congestion, hemorrhage, and often edema of the 9/9/2010 5;) Page 2 of 5 lungs." (2) The above mentioned study has this first line: "Despite the vastliterature that exists on the biological effects (1, 2*) of microwave radiation,. .." Footnote #2 is Zorach Glaser's "Bibliography of reported biological phenomena ('effects') and clinical manifestations attributed to microwave and radio-frequency radiation" done for the Naval Medical Research Institute in 1972, with over 2000 documents showing biological effects from microwave and radiofreq u e ncy rad iatio n (http://WWW .m agdahavas, cqniI201Q/Q7/05/pick-of~the-week -1-more~ tha n -2000~dQcurn e nts- priqr-to-1972-on~bioeffects-of-radio-frequency-radiation/). This was research prior to 1972. And the research has grown considerably since then. The Bioinitiative Report (www.bioinitiative.org) is a recent review of over 2000 peerreviewed studies on biological impacts from EMF and RF. Why are we the public and the medical authorities so in the dark about all this "vast" research about something that has become a fixture of society affecting millions of people - the use of microwave rf in wireless devices? PG&E (and perhaps the other power companies) makes preposterously false statements on their website regarding RF (radio frequency). Either they are lying or they are utterly ignorant about this biologically potent, biologically toxic medium. People are already getting sick from these meters. I have talked with some of them myself. Symptoms include: heart palpitations and irregular heartbeat, dizziness, weakness, inability to fall asleep, memory problems and cognitive disturbances, flu-like symptoms, worsening of existing health problems, emotional distress, agitation, headaches, hyper-arousal! ADHD leading to inability to focus or relax, nausea, tinnitus/hearing buzzing. Even a PG&E rep, Michael Herz, has said he gets calls from people who are not feeling well after meters are installed. I wonder how many have died. This is an urgent health crisis. If you have been following the international independent research on cell phones, you will have heard over and over about latency periods for cancers to develop, which don't give us any immediate feedback. Vulnerable populations such as babies and children, pregnant women, the elderly, and those whose immune systems are already compromised or are electrosensitive will be the first to react. What will these meters do in the long term to those who are more resilient? The Russian National Committee for Non-Ionizing Radiation Protection issued an international alert in 2008 (attached) regarding cell phones and the long-term health problems for our young people due to their cell phone use. Lennart Hardells study in 2008 showed over a 5 times risk of brain tumor in those who used a cell phone before age 20 (over 4 times for cordless phone use). He said he feared the hazards are even greater because it takes decades for most cancers to develop. Researcher Magda Havas has been publicizing the toxicity issues around Wi-Fi (which Germany warned their citizens about several years ago) including cardiac rhythm impacts (attached). Wi-Fi, digital cordless phones and microwave ovens also operate at 2.40-2.45 GHz. Please take action now. Please issue an advisory and use your authority to stop the Smart Meter program. There are other actions that this state needs to take regarding this situation, but Smart Meters are the first step. EMF Safety Network (www.emfsafetynetwQrk.org) has a great deal of information on all the issues around Smart Meters including the health issues. WWIi.electricalpollution.com has additional information on this and EMFs. I would be happy to answer questions or supply additional information. Sincerely, Nina Beety 277 Mar Vista Dr. 9/9/2010 6r Page 3 of 5 Monterey, CA 93940 IJIJ~netzero. net 831-655-9902 Attached: Chart: Biological Effects of Microwave Below U.S. & Canada's Regulatory Limit Chart: International Radiofrequency / Microwave Exposure Standards Russian National Committee for Non-Ionizing Radiation Protection Warning Dr. Magda Havas: Wi-Fi and Heart Problems INTERNATIONAL Radiofrequency / Microwave EXPOSURE STANDARDS New South Wales, Australia Exposure Level (microW/cm2) 0.001 Salzburg, Austria (pulsed transmissions) 0.1 Russia / Bulgaria / Hungary / Switzerland 2 -10 Belgium 3 China 7 -10 Italy / Toronto 10 Auckland, New Zealand 50 Australia 200 New Zealand / Japan / Germany / U.S. / Canada 200 - 1000 United Kingdom 1,000 -10,000 BIOLOGICAL EFFECTS OF MICROWAVES BELOW U.S. & CANADA'S REGULATORY LIMIT (microW/cm2) Reported Biological Effects References · 0.0000000000001 Altered genetic structure in E. Coli Belyaev 1996 9/9/2010 5Y Page 4 of 5 · 0.0000000001 Threshold of human sensitivity Kositsky 2001 · 0.000000001 Altered EEG in human subjects Bise 1978 · 0.0000000027 Growth stimulation in Viciusfabus Brauer 1950 · 0.00000001 Effects on immune system in mice Bundyuk 1994 · 0.00000002 Stimulation of ovulation in chickens Kondra 1970 · 0.000005 Effect on cell growth in yeast Grundler 1992 · 0.00001 Conditioned "avoidance" reflex in rats Kositsky 2001 · 0.000027 Premature aging of pine needles Selga 1996 0.001100 Yards / metres from Cell Phone · 0.002 Sleep disorders, abnormal blood pressure, nervousness, weakness, fatigue, limb and joint pain, digestive problems, fewer schoolchildren promoted Altpeter 1995, 1997 · 0.0027 Growth inhibition in Vic ius fabus Brauer 1950 · 0.0027 to 0.065 Smaller tree growth rings Balodis 1996 0.007 50 Feet from a Cordless Phone · 0.01 Human sensation Kolbun 1987 0.0161 Mile (L.6Km) from a Cellular Tower · 0.06 Altered EEG, disturbed carbohydrate metabolism, enlarged adrenals, altered adrenal hormone levels, structural changes in liver, spleen, testes, and brain in white rats and rabbits Dumanskij 1974 · 0.06 Slowing of the heart, change in EEG in rabbits Serkyuk, reported in McRee 1980 0.05 10 Feet /3 meters from a Wireless Computer · 0.1 Increase in melatonin in cows Stark 1997 · 0.1 to 1.8 Decreased life span, impaired reproduction, structural and developmental abnormalities in duckweed plants Magone 1996 · 0.13 Decreased cell growth (human epithelial amnion cells) K wee 1997 · 0.168 Irreversible sterility in mice Magras 1997 · 0.2 to 8.0 Childhood leukemia near transmitters Hocking 1996 · 0.3 Impaired motor function, reaction time, memory and attention of school children, and altered sex ratio of children (fewer boys) Kolodynski 1996 · 0.6 Change in calcium ion effux from brain tissue Dutta 1986 · 0.6 Cardiac arrhythmias and sometimes cardiac arrest (frogs) Frey 1968 · 0-4 Altered white blood cell activity in schoolchildren Chiang 1989 · 1.0 Headache, dizziness, irritability, fatigue, weakness, insomnia, chest pain, difficulty breathing, indigestion (humans-occupational exposure) Simonenko 1998 · 1.0 Stimulation of white cells in guinea pigs Shandala 1978 · 2.5 Breakdown of blood-brain barrier (used a digital cell phone to radiate) Salford 1997 · 5.0 Leukemia, skin melanoma and bladder cancer near TV and FM transmitter Dolk 1997 · 2.0 (lower "Microwave hearing" - clicking, buzzing, chirping, hissing, or high-pitched threshold note tones known) Frey 1963, 1969, 1971, 1973, 1988, Justeson 1979, Olsen 1980, Wieske 1963, Lin 1978 · 5.0 Biochemical and histological changes in liver, heart, kidney, and brain tissue Be10krinitskiy 1982 · 10.0 Damaged mitochondria, nucleus of cells in hippocampus of brain Belokrinitskiy 1982a · 10.0 Impaired memory and visual reaction time in people living near transmitters Chiang 1989 · 10.0 Decreased size of litter, increased number of stillborns in mice II 'Chevich (reported in McRee 1980) · 10.0 Redistribution of metals in the lungs, brain, heart, liver, kidney, muscles, spleen, bones, skin, blood Shutenko 1981 9/9/2010 5;) Page 5 of 5 · 1,000.0 United States FCC Exposure Limit, Safety Code 6 Canada limit Meg Sears, Medical Perspective on Environmental Sensitivities, Canadian Human Rights Commission, 2007. Cited in Report: Impaçts of Radiofrequency Radiation from Mobile Phone Antennas Lyn McLean, EMR Australia, 2008 liThe FCC's current exposure guidelines, as well as those of the Institute of Electrical and Electronics Engineers il (IEEE) and the International Commission on Non-ionizing Radiation Protection (ICNIRP), are thermally based, and do not apply to chronic, nonthermal exposure situations. They are believed to protect against injury that. . . result(s) in tissue heating or electric shock and burn. . . The FCC's exposure guideline is considered protective of effects arising any from a thermal mechanism. . . the generalization by many that the guidelines protect human beings from harm by and all mechanisms is not justified." (my emphasis) Norbert Hankin, U.S. Environmental Protection Agency, 2002 http://wWW. emrpo I icy. 0 rg/litigati 0 n/case_1 aw/dgcs/noi_ePL resp9Dse.pdf (2J http://www.magdahavas.com/2010/09/Q6/p ick~of- th e-week-9-0~95-anq~2A5-ghz-most -letha I-niicrowave- frequenci~M Polson, P, DCl Jones, A Karp, and JS Krebs. 1974. Mortality in rats exposed to CW microwave radiation at 0.95, 2.45, 4.54, and 7.44 GHz. Final Technical Report Prepared for U.S. Army Mobility Equipment Research and Development Center, Fort Belvoir, Virginia, Contract DAAK02-73-C-0453. 105 pp. 9/9/2010 5Y To: From: Re: Date: County Board of Supervisors, Santa Cruz County Todd Glassey CISM CIFI, CTO Certichron Inc Key issues with SMAR TGRID and SMART METER Operating Models 9/9/2010 This letter constitutes a formal motion to the Board as an ex-parte community-based submission. It pertains to the adoption of policy within the County and setting of ordinances for the roll-out and operation of SmarGrid and Time Of Use billing systems. The SmartGrid The SmarGrid is a hodge-podge of next generation systems which are penetrating the existing power and infrastructure service markets in America and globally. The SmartGrid is then a next-generation use of an upgraded power distribution grid to allow more intellgence and automated management practices to be used in operating the electric, gas and water utility systems (and interestingly enough as well as steam where it also is sold by the thermpsi model). It is expected also that the new technologies wil create more options and better use telemetry for the end users as well as reduce the physical account-support costs associated with provisioning and management of the meters and their information collection. As such they wil make power company's significantly more profitable which is one of the driving factors for deploying them. The SmartMeter is a mini-ATM functionally What the SmartGrid is in fact is an automated transaction gateway and infrastructure for delivering utility-services as consumable-content just like any other network which connects the end-user to the local 'grid'. In fact the Meters themselves already connect to appliance type computer systems or in the case of the really "smart" SmartMeters already have these capabilities integrated into them. In doing so we must ensure that the consumer's rights and the integrity of the operating model is properly vetted and to date that is not happening. What that means is that power company's are discovering that how they install and how they calibrate their meters is now a key factor in whether they are believable and whether the public confidence is there or not for the program. SmartMeters benefit the power company's much more than the consumer As we noted above, in the county of Santa Cruz the deployment of the new SmartGrid Meter Infrastructure (called AMI - Automatic Metering Infrastructure in the utility world) will save the power company's milions of dollars in maintenance and provisioning overhead (this is what it costs the power company to send a human to your site and to provide those human based services directly). While it is true that the SmartMeters wil allow paries to better judge their usage they do not really provide any *5J ./ mechanism to allow a choice of electrical providers since Direct Access programs don't serve the public only commercial or incorporated entities who can qualify as a commercial power user are allowed to participate in the program so the argument that the meters give the consumers choices is in fact very misleading. Most SmartMeter systems fail basic digital evidence rules The SmartMeter systems are easily spoofed and can be jamed such that the collector radio's are useless. Further they can be made to send bad collection data regularly because the meters use poorly designed security. One meter we looked at had so many security holes it could be reset from a radio through a supervisor session which had no password or any controls. This mode would never be used in production but stil functioned so it created a security hole in the deployment of about 20M meters already in use. Bad testing and no standards for deployment are the issue here. That said most existing SmartMeter devices and their infrastructure fail any semblance of the network security models already mandated for all other financial transaction controls in the US and at State levels meaning that they are unreliable and untrustworthy based on California Digital Evidence standards like those created in California v Khaled and the 4th Appellate Districts appeal which now enforces integrity requirements for any digital information which would be used as evidence in a court proceeding". What that means is that the CPUC is formally aware of the short fallings of the existing SmartMeters per the Khaled ruling and are taking commentary on it under Proceeding PI 007015 fied last month. . Meters are commercial devices and probably need to also be regulated under County Weights and Measures certifications as well. So it is our assertion that the deployment of these systems must meet the minimum security standards for basic network models. That means the design of the SmartMeters themselves is what must be proven and to date there is no such qualitative review of their operations. For instance can a SmartMeter be reset or its collector radio spoofed? If so how easily is this accomplished and are plans or commercial devices which would spoof these available like GPS and Cellular Jamers have become? The issues of privacy of data as well becomes critical since these are in fact purchases of commodities which are the content-energy units delivered to the consumer. Santa Cruz County's response We believe that the easiest way for the County to end the questions and push-back on SmartMeters is to simply inform any and all parties that per Khaled and other evidence standards that any system which is deployed must produce evidence which is competent and trustworthy under mandates set in the California Appellate Cour already. The adoption of this mandate wil functionally stop all roll out of SmarMeter operations until such time that the CPUC has formally ruled that these systems meet the minimum evidence competence necessary to facilitate the use of their evidence in a commercial dispute or criminal prosecution for the theft of energy or frauds relating to the delivery of energy and mis-reporting therein. Our belief is that most Utilities and most SmarMeter providers haven't really thought through the issues of evidence and trustworthiness of their systems and that they stil live in the "Because I said so" world that was in fact debuned when the Wizard of Oz was released and something they stil strive to hide from. We therefore propose the adoption of a resolution "to enforce strong digital evidence standards on any systems which provide financially impacted services to an end-user as par of any use or delivery transaction". We also propose that these include a Khaled review for the use which the Utilities would then file with the County assuring the Board of Supervisor's of the Evidence Competence of their new Energy-Use Billing and Metering Systems in properly serving the public interest. And finally we propose that the County formally enact an ordinance that SmartGrid devices which provide measured delivery of services at specific time do constitute a resource which can be regulated as a weights and measures certification requirement in the County of Santa Cruz itself and that the effect of these two resolutions wil answer all of the public's concerns for SmartGrid as well as put in place a framework for controlling and regulating the SmarGrid in Santa Cruz County. il ~~laSSey CISM ClF CTO Certichron Inc. 800-511-2301 50 W. San Fernando St Suite 320 San Jose CA 95113 [email protected] PG&E's history of blowups I San Francisco Ba, PG&E's history of iardian http://www.sfbf i/poli ti cs120 1 0/0911 O/pges- his tory- blowups blowups 09.10.10 - 8:28 pm I Guardian Staff Writers (lca'egory/author/guardian-staff-writers) J (3) 14 _(nll"~lj~:..i:g,e22.9!1._Ç2,rr.!s,b,~!£_nP'?MY,::,IiJ:p_o~.3.A,~,f..%!~,E~:"ê,!I.9,:,9:m'M,:?,Ep'QEtigs,~~E491Qr~~fQ.e,~,ff1~,*ffpg~.1d:i,i,st.Qry,:. l:!.c:,\'l,p,s,~,t:lG,,%.fß"E~1~~i~.Q"tiLstQ,I'y°6i"?9Q.f.~,~QI;)Q~yps%lQ%LQ%,~Q"S~D_%f_QfEi:D.2j,Sgc:"4.4QEI~y,~4.~QGJ::i,~gti¡i.I*"Sig=Sp) By Noah Arroyo We don't yet know if the San Bruno fire is a b.rrificjlCcide." or an equally horrific mistake ihtto:!JW\V'Nh3yc1tlzen,Ol'c;!stlti..bl'UI:" ej;T,:lo~,,,lon¡st()r\i)eX')e;ns \\li,:IC.jh-oossit)!tH::ausesF¡ . But Pacific Gas and Electric Company, which owns and operates the gas line that ruptured, has a history of incidents that look a lot like this one. Some of these incidents have caused power outages. Others have blown things up, or injured people. The company also has a history taking money that ought to go to maintenance and diverting it into fat corporate profis. In December of 2003, a cable fire at the Mission Substation of the Golden Gate Control Center caused a more than 100,000 people to lose power. The California Public Utilities Commission inspected the incident and found that PG&E suffered from general procedural laziness, and that "PG&E failed to follow three recommendations made in its 1996 Root Cause Analysis Report following (a) 1996 fire." At the time, San Francisco City Attorney Dennis Herrera noted: "The evidence is clear that PG&E knew about problems that endangered public safety and threatened to cost San Francisco businesses millions-and yet did nothing to fix them." Then, in August 2005, sornethinq exploded underqround the intersection of Kearnv and Po s t (http:! íwww.sfqate.com/cqi..b1nh:-rticle.co¡.ìfi le:;/ c/ a¡;;~QO,5iQJ)t! SHEtAsf 2/0 los iOo.:t;lJ. A manhole cover shot into the air and the escaping fire severely burned a passer by. The event's catalyst was a failed transfor¡ner ovlnecJs1iiçQIJi?@!egJ2YlG_I;L ¡ 1-: ltD: JlWV/V,i poe. com! about/news/Il ed iarela lion Sin~;\;vsreleases!a:3 2Q05/OS0Ü 19, s I,tm I) . In June last year, a fire peeked and then roared from a nim:ihole Lt1t~"~y,', foq(~\~il~Q'§.L comhN9rdpressÛ:p09'¿Q!~l?ge-v al.l.e:s'?~:t2QQ,~,Y0,tl_y L£~:pq,YYi~FD,with enoug h force to resemble an explosion to onlookers. The electrical fire, at O'Farrell and Polk, was coming from a PG&E vault. The impact? 8.6DO cus(Q.rels !OSU!(jwt?C fhtt¡\/hN\fvV/,kt'ju,comínewstI9670705/de!aiLhtniiì. This, like Th.ursç@l~s flI~,at,SanJ2ßL:iQ ¡: ri ttD: l/www,LlC:ycítlzcn.o¡-9Isan-bruno-exp los lon/stcrv/huqe-eXF.lío sion-res ¡(.lent ;;:.1 :':::)1, 'fJn:no!) , was a fi re bigger and more resilient than what emergency responders at first assumed. At least in 2009, nobody died. Another difference: In 2009, leading up to the explosion, t§.~EÆ¡lJtL~Q.\!ab(jIJt the pro ble m beta reh a nd. (r-)t tp .llw'NV'¡, baVCilízeri. cHq/san-bruIlO-(j,¡;:iiO;:;!OIìisli)ri/re;;:;:jf'riis-:-eooitE:C! leak....d;,ws-explosjoo! ) Why hadn't PG&E replaced this natural gas pipe (the San Bruno fire's origin) ~ installation in 1948? (htto:l/ww\v t::ôvciuzcn.(¡((J!S8n..bruno,.t:xciOê;; ìnistcivhes.¡dent "¡'¡C,'Dorti,:;d,j,,c:akdays ,"xDlos!"n/) Was the problem one of cost? If so, would replacing such a pipe cost more than the $46 million the company spent trying to p.\I.~Lr~U¿PQsitionJ_§. 2 of 3 fj 91131101:53 PM ios Angele,S Uti L.A. NOW o ERN IFOR staffa! HI J IN LosAi KT Crime I Government I Medical marijuana I Education I Prop 8 I Trallic I Westside L.A. NOW Southern California -- this just in " Previous Post I I ,.A. NOW Home i Next Post" PG&E did poor job inspecting gas pipes, advocacy group says September 10,2010 I 4:08 pm PG&E has had extensive problems with a program to inspect leaks in a massive distribution system that stretches from the California-Oregon border to Bakersfield, according to a ratepayer advocacy group. Distribution pipes, which deliver natural gas to neighborhoods and individual homes, are smaller in diameter and operate at less pressure than the giant transmission pipes such as the one that exploded in San Bruno. "Gas Leaks, Gas Leaks Everywhere" was the subheading in written testimony submitted June 11 to the California Public Utilities Commission by William Marcus, an expert witness who commented on PG&E's current rate increase proposal on behalf of the Utility Reform Network, a ratepayer advocacy group. The utility, he said, has not been forthcoming about its poor inspection record because it "is afraid of negligence lawsuits in the event of explosions due to previously undetected leaks," he said. PG&E do not immediately reply to a request for comment. Marcus said he was able to get some insight into the program's difficulties -- including poor training of inspectors and falsification of records -- because the PUC's Utilities Safety and Reliability Branch released a PG& E PowerPoint presentation that noted that a 2007 re-survey of leaks in the North Coast Division "found deficiencies" including "record falsification" in earlier surveys performed in 2004-07. NI At one point, the survey had to be "suspended" and all personnel retrained. Surveys made using special optical equipment showed that operators were not qualified and had to be retrained. Results of a "statistical sample survey" revealed that all eight out of eight samples in the Yosemite area "did not meet criteria." Four our of four were subpar in the Peninsula; four of eight in the Sierra; eight of eight in the North Valley; and four of four in Fresno, the presentation said. A 2008 leak survey showed better results, PG&E said. The report concluded that "system-wide improvements needed in leak survey" in the areas of "leak grading process, standards, controls training and operator qualification." As a result, the company had to resurvey "all facilities previously surveyed in 2004, 2005, 2006 and 2007." The extra work will cost $103 million in unexpected resurveys by the end of 2010, Marcus said. PG&E is working on a response to the information. PG&E's lackluster distribution inspection record could be indicative of the kinds of problems that led to a fatal gas explosion Dec. 24, 2008, in a residential neighborhood of Rancho Cordova, a Sacramento suburb, Marcus said. The gas leak in a distribution line killed one person and injured five. The National Transportation Safety Board concluded that the probable cause of the explosion was the use of substandard pipe. The line included "a section of unmarked and out-of-specification polyethylene pipe with inadequate wall thickness that allowed gas to leak from the mechanical coupling installed on Sept. 21,2006," the NTSB reported. A contributing factor was the two-hour-plus delay in the arrival of the scene of a PG&E crew that "was properly trained and equipped to identify and classify outdoor leaks and to begin response activities to ensure the safety of the residents and public," states the NTSB report adopted on May 18,2010. "There were several mistakes made," Marcus said. An earlier 2006 repair of the same line was faulty. "Instead of poly pipe, they installed the sleeve it was packaged in. Of course, it leaked," he said. Marcus also faulted a PG&E employees for making an initial inspection of the scene but not ordering people to evacuate their homes. -- Marc Lifsher !S - http:/ N.mantecabulletin.com/news/article/ 16917/ By Dennis Wyatt Managing Editor 209-249-3532 POSTED Sept. 11, 20103:39 a.m. d [email protected] 209-249-3532 CPUC can't be trusted to investigate PG&E explosion in San Bruno The California Public Utilities Commission should not investigate PG&E for the killing of four people, maiming countless others and destroying 37 homes in San Bruno. They ca n't be trusted. If you doubt that, reference the scathing National Transportation Safety Board report in an eerily similar natural gas line explosion on Christmas Eve 2008 that killed a Rancho Cordova man. The NTSB ripped PG&E apart for its lackluster maintenance and protocols that essentially gave the hardworking front-line PG&E employees a next to impossible task to stay on top of system needs. There wasn't so much as a whimper out of the CPUC after that. True, there was the usual chest beating from the CPUC media office about how they were going to keep PG&E on their toes. But as San Bruno has now tragically proven PG&E apparently doesn't put much stock in customer concerns about maintenance issues nor does the CPUC want to use its regulatory teeth except for show. It's convenient, in a way, that the CPUC's general counsel Frank R. Lindh labored just a few years ago as general counsel for - surprise, surprise, - PG&E. The CPUC also routinely approves massive rate increases for PG&E that are often based on the San Francisco-based utility's claim they will use the money to do routine maintenance and then siphon the funds collected from ratepayers for other purposes. One recent rate increase application the CPUC approved included money to replace 40,000 aging power poles. An audit done several years later showed that PG&E only replaced 4,000 poles. How it came up was PG&E had the gal to ask for another rate increase to replace the poles that weren't replaced with the first rate increase. Is there a pattern here? The corporate honchos cannot place this at the feet of PG&E line workers who 1 of 3 9/13/101:59 PM ;):; http:/ v.mantecabulletin.com/news/article/ 16917/ they keep squeezing so they can improve short-term profits. And it isn't the case of asking PG&E to "overfund" work crews. Consider what happened during the boom days earlier in this decade. It would take upwards of a year to get PG&E work crews to various projects because corporate PG&E had cut staffing so thin. If you doubt that ask Jerry DeGroot who was delayed for almost a year trying to open his retail complex in the 200 block of North Main Street or cities such as Manteca that often have seen projects delayed for months because PG&E couldn't meet promised deadlines to relocate power poles. This work, by the way, is not funded by ratepayers but by those requesting the work. PG&E has a history of responding to legitimate concerns about safety by doing what it does best - threatening to sue. South San Joaquin Irrigation District found this out when PG&E tried to push a 24-inch natural gas pipeline through district easements earlier this year without going through the same environmental review process that everyone has to go through. PG&E's initial response on the corporate level wasn't to cooperate or address concerns but it was to threaten to sue if they weren't allowed to proceed immediately. SSJID did not back down and got the assurances - and specifications - they needed to make sure district water was save from being polluted and that their constituents would be safe. San Bruno is a classic case as to why some argue we don't have enough regulations on certain types of businesses in California. Of course, PG&E is not a true "free market" business. They are protected and propped up by guaranteed rates of return by the CPUc. It is not like Wal-Mart, Kmart, and Target going after business head-to-head. PG&E operates as a quasi-government agency that is able to funnel big bonus checks to its top corporate leadership even within months of teetering on the edge of bankruptcy and sending rates sky high while rank-and-file workers see their paychecks shrink. In other words, they were even ahead of Wall Street in the audacity game of almost driving a company into ruins and then rewarding the executives who were at the helm. San Bruno, unfortunately, is the end result of the game PG&E is playing and the lapdog known at the CPUC that serves them and not the ratepayers who are at 20f35~ 9/13/10 1:59 PM http:/ N.mantecabulletin.com/news/article/ 16917/ PG&E's mercy. http://www.mantecabulletin.com/news/article/169 17/ 3 of 3 9/13/101:59 PM CBD BOSMAIL from: [email protected] Sent: Monday, September 13, 2010 3:00 PM To: CBO BOSMAIL Subject: Agenda Comments Meeting Date: 9/14/2010 Item Number: 52 Name : Marilyn Garrett Email: Not Supplied Address: Not Supplied Phone: Not Supplied Comments: Please add my following comments to the 9/14/10 Agenda Item 52: 1) Urgency ordinances have been successfully implemented in the town of Fairfax (8/4/10) and the City of Watsonville (8/24/10). These urgency ordinances have proven to be extremely effective in immediately halting PG&E from installing "Smart" Meters. For instance, a Sept. 9th, 2010, memorandum from the Watsonville's City Attorney Office, Alan J. Smith, to the City Manager, Carlos Palacios, states that "a P.G.&E. representative reportedly said that P.G.&E. has administratively decided to defer its replacement program in Watsonville and the few other cities that have adopted such an ordinance for the time being." I am voicing my strong support that the Santa Cruz Board of Supervisors immediately implement a similar urgency ordinance. 2) i also urge the Santa Cruz Board of Supervisors to extend the ending date on the proposed urgency ordinance from Dec. 31, 2010, to at least one year from the date of enactment (as done by the City of Watsonville). I believe that a period of at least one year is necessary to adequately investigate the health dangers and accuracy problems of these microwave radiofrequency devices. 3) In addition, as a resident of this county, I formally request a list of the locations of all P.G.&E. "Smart" meter infrastructure and antennas, along with the emission levels and purpose of each location. Furthermore, I demand the immediate removal of all non-permitted devices that have already been installed in the County of Santa Cruz. 4) Furthermore, the horrific deadly gas explosion in San Bruno 9/9/10 is only the most recent in a tragic P.G.&E. history. According to the San Jose Mercury front page article on 9/11/10 called "PG&E safety and training record called into question" by Paul Rogers and Steve Johnson, P.G.&E. has a proven track record consistently destructive to our health and environment. Reports exist of "Smart" Meter gas and electric explosions. Therefore, P.G.&E. cannot be trusted, criminal investigation is in order, and their "Smart" Meter program must be halted now before significant harm can be done to our community. 9/13/2010 5)- CBD BOSMAIL "'~~~~~'"~-~~-~-""~-..-"'- From: [email protected] Sent: Monday, September 13, 2010 3:41 PM To: CBO BOSMAIL Subject: Agenda Comments Meeting Date: 9/14/2010 Item Number: 52 Name: Mahlon Aldridge Email: [email protected] Address: PO Box 1188 Phone : 831-426-5925 Santa Cruz, CA 95061 Comments: September 13, 2010 Dear Supervisors, I'm writing to express Ecology Action's support for the deployment of smart meter technology as quickly as possible, to articulate some of the key benefits of the technology, and to emphasize the need to appropriately address public concerns about health and accuracy. Smart meters are a centerpiece in realizing a market-driven sustainable energy system in California. They allow energy consumers to make strategic consumption choices, save money and reduce carbon emissions by better understanding when and how to use energy. While necessary regulations and technology continue to be phased in, smart meters are essential to our transition to a clean energy economy. Smart meters are also a central technology to the widespread adoption of electric vehicles. The meters will allow a customer to buy nighttime off-peak electricity at lower prices and potentially to sell excess electricity from the vehicle's battery back to the grid during peak hours when prices are higher. By making a profit on the transaction, the economics of owning an electric vehicle become much more compelling. Smart meters are an enabling technology for reducing the carbon emissions of California's vehicle fleet. California's wind power is most abundant at night. However, there is little market for night-time power, thus the low carbon benefits of wind power can go unrealized. As a related example, in Las Vegas it is estimated there is the capacity to power 300,000 electric vehicles with nighttime electricity that is currently not being utilized. By making it possible for consumers to buy cheap, clean power at night rather than dirty daytime power, smart meters are key to drastically reducing the carbon-per-mile output of our transportation system. Smart meters also allow for accurate measurement the time and quantity of energy that a customer delivers back into the grid from on-site renewables (e.g. PV, wind, and micro-hydro); thereby assigning that energy input the highest possible value. 9/13/2010 i7 A sustainable energy future depends on deployment of smart meters in a way that successfully accommodates the need for technical accuracy and an understanding of any potential human health 5-'1 _ impacts. Ecology Action believes d Dyment must not wait and should L lone concurrently with the continuing work on safety and accuracy. Sincerely, Mahlon Aldridge Vice President Ecology Action 3d 9/1312010 caD BOSMAIL From: [email protected] Sent: Monday, September 13, 2010 2:39 PM To: CBO BOSMAIL Subject: Agenda Comments Meeting Date: 9/14/2010 Item Number: 52 Name : Reba Nielsen Email: Not Supplied Address: Not Supplied Phone: Not Supplied Comments: The health-damaging effects of electromagnetic radiation have been known for 75 years. The article which I have included below is from the IRCHET International Research Centre of Healthy and Ecological Technology (Berlin-Germany) and gives a chronological history of scientific research studies on the subject of microwave radiation. Therefore, in light of all of this scientific evidence, I am voicing my opposition to the installation of "Smart" Meters in Santa Cruz County and urge you pass the proposed urgency ordinance. (Article from ww. hese-pro ject. org/hese-uk/ en/niemr/hechtvortrag070 724eng lisch. pdf): Overloading of Towns and Cities with Radio Transmitters (Cellular Transmitter): a hazard for the human health and a disturbance of eco-ethics Karl Hecht, Elena N. Savoley IRCHET International Research Centre of Healthy and Ecological Technology Berlin - Germany 1. A Very Serious Warning 36 Years Ago "The electromagnetic radiations emanating for radar, television, communications systems, microwave ovens, industrial heat-treatment systems, medical diathermy units, and many other sources permeate the modern environment, both civilan and military." "Unless adequate monitoring and control based on a fundamental understanding of biological effects are instituted in the near future, in the decades ahead, man may enter an era of energy pollution of the environment comparable to the chemical pollution of today." "The consequences of undervaluing or misjudging the biological effects of long-term, low level exposure could become a critical problem for the public health, especially if genetic effects are involved." These quotations are excerpts from the US government report "Program for Control of Electromagnetic Pollution of the Environment", which was published in December 1971. The government report was drafted starting in December 1968 by an expert group made up of nine people, "The Electromagnetic Radiation Management Advisory Council". "The President's Office of Telecommunications Policy" issued the order. This report was an urgent warning for the future. 9/13/2010 5)- 2. Today (2007): Ignoring This Wariiiiig and Irresponsible Deception About 36 years have passed since the publishing of this report. Unfortunately, this urgent warning, which is scientifically well-founded, is currently not taken seriously. The beauty of landscapes and cities are spoiled with "forests of radiant radio antennas" in order to serve a new addiction of people: telecommunication. From this unethical, environment-disfiguring antenna forest, people are continuously bombarded by invisible, imperceptible, healthdamaging, stressing, high-frequency, electromagnetic radiations. As predicted 36 years ago in the US government report, our planet today is more "contaminated" by "electronic smog" than with the chemistry that already heavily strains people. Those responsible have unfortunately still not considered a possible double strain of these two harmful factors. The telecommunications and microwave industry even contends that these high-frequency electromagnetic radiations are not harmful for people's health. That is irresponsible deception. Facts support the opposite. 3. Radio Wave or Microwave Sickness Known for 75 Years Seventy-five years ago in August 1932, the German doctor Erwin Schliephake published scientific data in the German Medical Weekly about radio transmitter-induced "microwave" or "radio wave sickness" with the following symptoms: severe tiredness and fatigue during the day, fitful sleep in the night, headaches to the point of intolerability, and high susceptibility to infection. These symptoms, which are also observed in neurasthenia (enervation), were not to be traced back to the thermal effects, but rather to the athermal effects of high-frequency electromagnetic radiation, according to Schliephake's view. The health-damaging effect of high-frequency electromagnetic and electric radiation was reproduced in thousands of investigations. This microwave sickness, induced by athermal high-frequency EMF radiation, was verified by the scientific work of the Russian author Zinaida Gordon from the Moscow Institute for Industrial Hygiene und Occupational Diseases, in 1966 in the Russian language and in 1970 in the English language, among many others. She examined more than 1,000 workers who worked at radio installations, electric utilities, radar stations, etc., over the duration of 10 years. She established the following symptoms: ? daytime tiredness? neurovegetative disorders ? loss of productiveness? neurosis ? sleeplessness? depressions ? headaches? hyperactivity and inner agitation ? cardiovascular regulation changes of various types According to Prof. Gordon (1966), the symptoms strengthened with increasing duration of exposure, and sensitivity to the microwave radiations increased. Reports from Poland were presented by Baranski (1971, 1967, 1966) and Czereski et al. (1972,1964) about: ? microwave syndrome and ? chromosome damage, and by Minecki (1967,1965,1964,1963, 1961) about: neurovegetative disorders? chromosome damage ? psycho ? neurasthenia? embryonic development disorders after the chronic influence of weak high-frequency fields. Karel Marha, from the Institute for Industrial Hygiene and Occupational Diseases Prague (1968-1971), reported about analogous symptoms, like they had already been described by the others. He stressed, though, that the brain functions are especially sensitive to high-frequency electromagnetic radiation. the title 1969, eleven large conferences took place under In the USA from 1955 until 9/13/2010 !5r "Microwaves - Their Biologic Effects dnd Damages to Health". The so-cai. _J Richmond Conference in 1969 presented such overwhelming facts that the above-mentioned government report had to be compiled. Besides the microwave symptoms mentioned, gastric bleeding, leukemia, chromosome breakages, cancer, and clouding of the eye lenses were also observed by doctors in the USA. Already in November 1958, the "Security Measures for Persons in the Range of Microwave Generators" was instituted by order of the Minister of the Soviet Public Health Service. 4. Eastern Threshold Value Around Three Orders of Magnitude Lower than Western Threshold Value The threshold value was established at the value of 0.01 mW/cm2 for full-time contacts with high-frequency electromagnetic radiation, based on research results in Russia (the former Soviet Union). The threshold value was bindingly stipulated at 10.0 mW/cm2 in the USA at the 1955 conference at the Mayo Clinic in Minnesota. With the establishment of NATO, this threshold value became binding also for Western Europe. This difference of three orders of magnitude between the threshold value in the East and the threshold value in the West still exists today. In the East, electrical smog is taken more seriously. The annual report of the national Committee of Russia for non-ionizing radiation of the year 2002 addressed the following themes among others: ? "Emotional stress and EMFs" (electromagnetic fields), ? "Electromagnetic Fields and Cancer", ? "The State of Health and Work Conditions of Workers in Civil Aviation Who Operate Radar, Navigation, and Communication Equipment", ? "The Functional Brain Hemisphere Asymmetry Under the Influence of Magnetic Fields". They adopted the following recommendations for the protection and safety from mobile telephone use: mobile telephones should not be used by children under 18 years old, pregnant women, patients with neurologic diseases, neurathenia, psychopathy, neurosis, sleep disorders, memory loss, or epilepsy syndrome. Basically, it is recommended to keep mobile phone conversations as short as possible and in no case to have a conversation longer than 15 minutes. 5. Research into the Findings in the Russian-Language Scientific Literature Shocked German Authorities Prof. Dr. Karl Hecht and his associate Hans-Ullrich Balzer were commissioned in 1996 by the Institute for Telecommunication to carry out research on the Russian technical literature about the health-damaging and biological effect of high-frequency German Federal electromagnetic radiations from the years 1960-1996. In 1997, the authors turned over the report, which was based on 878 scientific works, to the sponsor. The data was so overwhelming for the German conditions that the report immediately disappeared into the archive. 6. The Duration of the Effect of High-Frequency Electromagnetic Radiation - Decisive for Health Damage Next we would like to mention a few important facts of this report. The duration of the effects proved to be a very decisive factor for the health-damaging effect of the EMF. A three-phase progression in the development of the microwave syndrome was proved. First: Initial Phase In the first 1-3 years, predominantly a sympathicotonic deflected initial phase was predominantly demonstrated, which proceeded in three sub-phases: First Subphase = Pronounced sympathicotonia (hypertonia) activation phase. This phase is comparable with the alarm phase of the general adaptation syndrome of Selye and with the 9/13/2010 5r unspecific activation according to Lii iusley (1951), Lacey (1967), and othb.... Second Subphase: Performance-promoting, increased sympathicotonic reaction phase in the sense of a eustress reaction or an emotional activation (Lindsley 1951). According to Selye (1953), it is to be interpreted as a resistance phase. Third Subphase: Adaptive, balancing phase with less sympathicotonic deflection. The body functions are still located in the range of homeostasis, so normal values are measured, although latent, intermittently appearing ailments may already express themselves. This phase, too, is still to be assigned to the resistance phase, according to Selye (1953). Second: Pre-Morbid or Early Phase of a Chronic Disease After 3-5 years of influence duration, weakly visible and/or strengthening pathologic developments of neurasthenic basic symptoms with vagotonic reaction tendencies, sleep disorders, and daytime tiredness appear. Third: Exhaustion Syndrome Pronounced neurasthenic symptoms with increasing pathologic lapses of the regulation system, neurotic and neurasthenic symptoms, sleep disorders, daytime tiredness, and general exhaustion are dominating appearances. Effect duration ~ 5 years. Figure 1. Schema of the stages of illness development after long-term influence of EMF radiation in comparison with the stages (1,2, and 3) of the General Adaptation Syndrome according to Hans Selye (1953). I = activation phase, A = activation (excitement), B = positive stimulation, C = adaptive phase; II = latent, weak pathologic development; ILL = strong pathologic development. Based of the findings of a literature review (Hecht und Balzer 1997). 7. Essential Findings after Long-Term EMF-(EF-)Effect Objectively gathered findings: ? neurasthenia, neurotic symptoms ? EEG changes (decay of the alpha rhythm into the theta rhythm and isolated delta rhythm) ? sleep disorders ? deformation of the biologic rhythm hierarchy ? disorder in the hypothalamohypophyseal adrenal cortex system ? arterial hypotonia, more rarely arterial hypertonia, bradycardia, or tachycardia ? vagotonic displacement of the cardiovascular system ? hyperfunction of the thyroid? resting tremor of the finger ? potency disorders? hair loss ? digestive function disorders? tinnitus ? slowing down of the sensory motor system ? increased susceptibility to infection Subjective Complaints: ? exhaustion, lack of energy? weakness of concentration ? daytime tiredness? headaches ? quick tiring under stress? lightheadedness ? constriction of physical and mental ability ? concentration and memory decline ? night sweats ? spontaneously occurring excitability from hypotonic reaction situation, especially in the case of external pressures ? cardiac pain, heart racing (Rubzowa 1983; Rakitin 1977; Drogitschina et al. 1966; Gordon 1966; Drogitschina und Sadtschikowa 1965,1964; Piskunova und Abramowitsch-Poljakow 1961). 9/13/20105r 8. Factors That Can Influence the Development of an Illness through Athermal/Biologic, Non-Ionizing EMF Radiation Duration of Influence: At the earliest, pathological appearances appear after ca. 3 years; duration of influence;: 20 min. daily, 5x per week has no pathological consequences. Age: Younger organisms show greater electromagnetic sensitivity than older ones; children especially must be protected. Individual State of Health Electromagnetic Sensitivity: decreasing healthiness increasingly raises electromagnetic sensitivity Status of the Elektrolyte/Mineral Balance: lack of minerals and toxic stress increases electromagnetic sensitivity. Additional stressor effects, e.g. noise, other radiations, conflicts, and stress, increase the risk to come down with microwave syndrome. Active Ingredients and Medications: stimulants, e.g. caffeine, can increase electromagnetic sensitivity. 9. What Good Are Short-Term Research Projects? The research projects of today's cell phone, microwave, and telecommunication industry run for at most one year, very rarely two years. According to the state of knowledge shown, no harmful effect of the high-frequency electromagnetic radiation can be established at alL. How the factor of the duration of influence is handled in these research projects should be explained with an example of a BUWAL study (BUWAL = Switzerland's Department of the Environment). The findings of a table of scientific works regarding the investigation of the duration of effect of high-frequency microwave radiations on various function systems or states of health, which one of us extracted and compiled from the tables of the BUWAL document, shows that among 129 analyzed scientific works or studies, an immediate effect (up to 1 h) was investigated in 44% of them. The duration of effect was tested for the short-term (up to three days) in 22.5% of them and for the middle-term (3-30 days) in 11 % of them. Only 22.5% investigated the duration of effect of high-frequency microwaves longer than a month. It must be added that cardiovascular, hormone system, and immune system symptoms of radio-wave or microwave sickness are cited in the BUWAL documentation in the form of headaches, sleep disorders, general condition, EEG changes, and information processing, which the authors could not explain with their one-sided conceptions of the thermal effects of high-frequency electromagnetic radiation. With such erroneous research approaches, of course no health-damaging effect can be found. Such research projects are also completely unnecessary, because the athermal, healthdamaging effect of high-frequency electromagnetic radiation has been known for 75 years and has been confirmed again and again during this time in more than a thousand investigations, whenever serious principles of research were guaranteed. 10. The Following Definitions Are Cited For Better Understanding of the Effect of High-Frequency Electromagnetic Radiation on People and Corresponding Interpretations 10.1 Health Definitions Various views have existed about the term "health" for 60 years. Conventional medicine defines health as the exemption from organic, verifiable sicknesses. Such a definition does not correspond to the realities. The so-called "functional syndrome" or somatoform disorders (ICD 10F) are not accounted for in it. In the founding preamble of WHO, health is defined as follows: "Health is the condition of the complete physical, mental, and social well-being and not the exemption from 9/13/2010 .5~ sicknesses and ailments." In the O. ia Charter of 1986, this definition \i extended as follows: Health is to be understood "as a satisfactory measure of functional capability in physical, mental, social, and economic regards and the ability to take care of oneself until an old age" (WHO 1987). 10.2 Bioactive Effect and Health Damage The terms health damage, bioactive effect, or bioactive reaction are frequently used without being sharply delimited from one another, thus leading to confusion. Therefore, a short definition for clarification: A bioactive effect is mostly an unspecific reaction of the organism to outside influences of various natures (physical, chemical, social, bacterial, viral). It must be differentiated: ? if this reaction is temporary and the homeostasis (norm) recuperates through a reversible transient effect; that is an individual's normal adaptation reaction, or ? if the changed reaction remained temporarily (e.g. several days) and then "normalized" again through a reversible transient effect. That would be equivalent to a health disorder in which the foreign influence was effective as a trigger, or ? if the triggered changed reaction involves problems, losses of abilities to do things, and quality of life for the long-term and is not reversible. That is damage to one's health. Under health damage, we thus understand enduring or intermittent irreversible changes of the physical, mental, and social functional capability of the person, which can arise from noxious influence developed over the short-term or long-term, or also from intense, short-term. influences (e.g. shock). (Noxa = pollutants, harmful agents, pathogenic causes) 11 . Animals and Plants are Also in Danger Animals and plants are also very negatively influenced by this high-frequency electromagnetic radiation. In the case of cows, reduction of the milk yield and malformed offspring have been proven. Graver for humankind could be the death of bees observed everyhere due to the electro-smog contaminated environment. When the bees are dead, people not only have no more honey, but also no more fruit, because pollination of the flowers is impossible without bees. Humankind stands today before an important decision: further development of the technogenic pollution of the environment or finding our way back to Nature. Let us remember the report of the Club of Rome (1983) in which there is the following statement: "The pressure of the facts is so great that we must either change our way-of-life or disappear from the face of the Earth." Literature The literature can be requested from the author or from the internet: ww.hese-projekt.org 5~ 9/1312010 Page 1 of 1 Terry Dorsey From: Ellen Pirie Sent: Monday, September 13, 20102:51 PM To: Terry Dorsey Subject: FW: Smart Meters -----Original Message----From: leonard (mailto:[email protected]) sent: Monday, September 13, 2010 2:39 PM To: John Leopold; Ellen Pirie; Neal Coonert; Tony Campos; Mark Stone Subject: Smart Meters Greetings County Board of Supervisors, I would like to express my opposition to installing wireless Smart meters on our gas and electric meters. These wireless mesh networks are proven to be unhealthy due to radiation exposure. There is much evidence showing that exposure to high frequency radio waves is harmful, but it seems PGand E and the CPUC and other authorities have chosen to ignore or downplay these facts. I would like to point out that Smar meters can and have been implemented using the existing power lines as carriers of data. This is called PLC or power line carrier transmission and has been implemented in Europe extensively. A San Jose CA company known as Echelon has implemented this technology that serves up to 26 milion European customers. (Please see smart meters at Wikipedia for more details). It doesn't use radio waves and thus is safer. Gas meters are not connected to the power lines of course, but they could be read manually as they are now. There is no capacity concern with our gas system that I know of, (the San Bruno disaster notwithstanding) so why do we need smart meters on gas meters anyway? The entire issue of the smart grid has to do with our aging infrastructure in this country, why not fix that instead of trying to put a band-aid on the problem? The contractor that is doing the installations locally is called Wellington, and their website claims they are experts in PLC technology as well as wireless. So there is a choice. In summary Smart meters can be implemented on our electric lines using the existing lines as carriers and not using radio waves. I ask you to do all you can to block this implementation of radio frequency radiation in our county. Thank you, Leonard Rimicci, Santa Cruz CA. 6d9/14/2010 LIST OF CALLERS REGARDING ITEM 52 SEPTEMBER 14, 2010, BOARD OF SUPERVISORS AGENDA Name: Rhonda Hoefs P.O. Box 2744 Aptos, CA 95001 Comment: Pass an injunction on installation of Smart Meters. Name: Jean Pirano P.O. Box 856 Freedom, CA 95019 Comment: I am against PG&E Smart Meters. Name: Teri Tickle 612 Frederick Street Santa Cruz, CA 95062 Comment: The negative healths effects caused by dirty radiation are bad for human beings. The installation of PG&E Smart Meters adds to the radiation pollution. Name: Judi Grunstra 220 McMillan Santa Cruz, CA 95060 Comment: I am against Smart Meters. Please stop PG&E from installing any more of them in our county. Name: Michele Anderson 612 14th Avenue Santa Cruz, CA 95062 Comment: Please- -no Smart Meters. Name: Laura Tucker 930 Rosedale Avenue, #39 Capitola, CA 95010 Comment: Hope you can extend the time period to halt Smart Meters. Name: Elizabeth A. Walker-Goldkuhl 13334 Highway 9 Boulder Creek, CA 95006 Comment: Thank you for considering action. I urge you to expand the time period to a full year like the cities of Fairfax and Watsonville. ~ ~ ~ Page 2 Name: Nicolas Whi tehead 2627 Mattison Lane, Space 1 Santa Cruz, CA 95062 Comment: I am against Smart Meters. A 3 month ban is insufficient time. A longer ban period should be put in place. There are efficiency and medical issues that need to be studied. Name: Richard Buckingham 265 Brown Gables Road Ben Lomond, CA 95005 Comment: Against Smart Meters. PG&E has not given the public any choice or voice regarding the installation of these devices. Name: Davina Baker 750 47th Avenue Capitola, CA 95010 Comment: Pass an ordinance to expand the ending date from December to 1 year from date of enactment. Name: Jennifer Walker 2081 Chanticleer Avenue Santa Cruz, CA 95062 Comment: Take action to immediately halt the installation of Smart Meters. Name: Sherry Jackson lives in La Selva Beach, CA 95076 Comment: More information needs to be gathered re: Smart Meters. Stop and rethink these Smart Meters. Look into optic wiring like in Europe. She posted a do not install sign on her house and no Smart Meter was installed. Name: Don Pountain no address given Comment: Evidence by PG&E is not correct. Electromagnetic smog is harmful to human beings. Name: Gerald Fehr 95 Lily Way La Selva Beach, CA 95076 Comment: Halt the Smart Meters. Page 3 Name: Cherie Gronnel 435 13th Avenue Santa Cruz i CA 95062 Comment: Pass the Smart Meter ordinance to stop installation of the meters. Name: Susan Ferrel 217 Claus Court Aptos i CA 95003 Comment: Moratorium please. I am sensitive to electrical waves. I don i t want one on my house. 5171C6 F..eedol. Fo..uln PRESENTS ARE PG&E fMARTMfTfRf REALLY SMART? The city councils of Santa Cruz, Scotts Valley, Capitola and Soquel, and the SC Co. Supervisors have declared a moratorium on the installation of PG&E /tSmart Meters". Why is PG&E ignoring these explicit demands and going ahead with the 2+ billion dollar /troll out"? The SmartMeter system collects electric and gas usage from homes and transmits the data via pulsed microwave to a wireless network (=no meter readers!). FIND OUT if these microwave meters are the future for GREEN energy or DANGEROUS and INA CCURA TE and reveal "private details of daily life," ie.: when people wake up, come home, take a hot bath and go on vacation! Speakers include: *Karl Maret, M.D., M.Eng., president Dove Health Alliance, electrical engineer, biomedical engineer, and MD specializing in Energy and Nutritional Medicine. He has carried out physiological research near the summit of Mt. Everest, and built instruments measurements under the Antarctic ice. He knows the science!! *Dennis Norton, Vice Mayor, Capitola, city council member for 10 years, UCSC grad, for physiologic business owner - dennisnortondesigns.com. He has taken a bold stance! *Joshua Hart, journalist, spearheads campaign to stop PG&E smart meters, see stopsmartmeters.wordpress.com. 15 year advocate for sensible transportation and public policy. His Master's thesis- Driven to Excess- on the neighborhood impact of motor traffic- was covered by over 100 media outlets worldwide. Eloquent and informed! Wednesday, Sep.15, 2010, 7 pm Live Oak Grange, 1900 17th Ave, Santa Cruz Guest Speakers - Local Announcements - Open Mic - Free, donations welcome! Where Ideas Tum Into Acton Every:t Wednesday "He that 'would make his own liberty secure, must guard even his enemy from oppression; fòr if he violates this duty, he establishes a precedent that will reach to himself" Thomas Paine, 1791 Program subject to change See events posted: www.meetup.com/santacruz-freedom forum Freedom Forum is not endorsed by the Live Oak Grange ýhl-M-d +n ',+. V" 61q ( I L-! (CJ . CBD BOSMAIL ~,,~ ~.~ From: [email protected] Sent: Monday, September 13, 20109:14 PM To: CBD BOSMAIL 1 ~, Subject: Agenda Comments \ )1 Meeting Date: 9/14/2010 Item Number: 52 Name: Barbara Roettger Email: [email protected] Address: 329 Rigg ST Phone: Not Supplied Santa Cruz, CA 95060 Comments: The electromagnetic radiation being put out by the smart meters has got to be considered. I urge you to put a moratorium on smart meters until PG & E settles it's problems. 9/14/2010 52 CBD BOSMAIL From: [email protected] Sent: Tuesday, September 14, 2010 3:39 AM To: CBD BOSMAIL Subject: Agenda Comments Meeting Date: 9/14/2010 Item Number: 52 Name: Professor Glen Chase Email: [email protected] Address: Santa Cruz County Phone: Not Supplied Comments: From: Professor Glen Chase To: Santa Cruz County Board of Supervisors Date: September 14, 2010 Re: So called "Smart Meter" Moratorium Ordinance Dear Santa Cruz County Supervisors, i encourage you to pass an ordinance with teeth putting a moratorium on the PG&E so-called "Smart Meter" Program. I encourage you to make the moratorium a full year, similar to Watsonville. A few-monthsonly moratorium is a blip of time that PG&E is planning on to simply adjust their installation schedule around Santa Cruz, not handle any of the material objections you've raised, and resume installation in Santa Cruz County after three months. PG&E has already installed the infrastructure of their "Smart" program, knowing of a possible short-term ordinance moratorium. A full year ordinance could have a rescind clause if your concerns are dealt with, so it could end up less than a year if PG&E finally handled your concerns. Establishing a full year ordinance (even with rescind clause) makes a serious statement, whereas a 3-month ordinance implies weakness to many. You Supervisors go to such significant extent to be fair, accurate, reasonable and cost effective all at the same time while serving the people of Santa Cruz County. PG&E is not like you. PG&E Corporate does not deal in good faith as you do. You cannot make effective agreements with another party when the other party violates good faith and integrity. It is like trying to come to agreement with a crack addict, or teach a pig to sing. It simply can't be done no matter how sincere one party is and how many chances are given to the other party (PG&E.) 1. The "Independent" investigation of "Smart meter" accuracy is an obvious fraud. The results were set prior to the investigation. The investigation did NOT sincerely address the claims of tens of thousands of complaints. It did not follow down the path of those tens of thousands of complaints to identify their true origin. Rather, it tested in lab conditions not representing the environment or conditions within which the complaints were made. It was similar to the example of the new owner of a "Lemon" automobile towing his new car to the dealership, having the dealership push the vehicle onto the diagnostic analyzer that does not identify that particular vehicle's problems, and telling the customer that his vehicle checks out fine. 9/14/2010 ~i. Structure, the company doing the "Independent" investigation is in bed with PG&E. PG&E is a major client of Structure. 2. The energy-saving advantages of "Smart Meters" that PG&E claims have been disproved by Economists. 3. PG&E falsely projects the advantages of energy delivery of a Smart Grid as though those advantages are due to or related to their so-called "Smart Meters." None of the advantages of energy delivery of a smart Grid come from PG&E WiÎeless "Smart Meters. Wireless meters create health risks. Wireless meters transmit, receive and repeat 1000's of other's meters signals. PG&E Wireless meters are deployed to create a three-dimensional mesh network that is attached to each home and business at its foundation. 4. PG&E Corporate has in the implementation of this program demonstrated their arrogance and nonresponsiveness to the public, to the city councils and boards of supervisors and other elected officials representing the people. Only after ordinances are about to be passed does PG&E Corporate finally send representatives. Yet these representatives have little information, no authority and are only serving PG&E's desires to stall and slow down any action against PG&E. This devious management strategy allows PG&E to secure a greater foothold with these meters and their infrastructure. PG&E corporate knows that it wil be more difficult to have meters and infrastructure removed than to stop their installation. 5. PG&E has been cutting service to ratepayers for some time now to improve their bottom line and increase the $ multi-million dollar bonuses to PG&E corporate execs. 6. PG&E has been using funds from ratepayers designated for service and maintenance to instead improve salaries and bonuses for Corporate Executives. 7. Please don't forget that PG&E's lack of customer response has lead to disaster with people dying in San Bruno from explosion and fire. 8. Please don't forget that PG&E is responsible for parents, children and entire families taking ill and dying, as documented in the Erin Brockovich Movie. 9. Please don't forget that PG&E colluded with Enron during a recent energy crisis. 10. Please don't forget that PG&E placed their Money and assets in a holding company and then went broke, leaving California Tax Payers to foot the bill for PG&E's bankruptcy and irresponsible behavior. Please pass an ordinance with at least a one-year term and strong measures of enforcement. Thank you, Professor Glen Chase, [email protected] 91l41.!). CBD BOSMAIL From: [email protected] Sent: Tuesday, September 14,20105:30 AM To: CBO BOSMAIL Subject: Agenda Comments Meeting Date: 9/14/2010 Item Number: 52 Name: Randy S. Baker MD Email: [email protected] Address: 2955 Park Ave. Phone: 831 476-1886 Soquel, CA 95073 Comments: Dear County Supervisors, I am a Family Physician who lives in Soquel, where I have practiced for over 22 years. I am extremely concerned about the serious potential health hazards associated with the installation of PG & E "Smart Meters" and strongly urge you to vote YES on the proposed moratorium for installation of such meters in Santa Cruz county. PG & E's assertion that these meters pose no health hazard is not supported by a very large body of scientific research on the effects of RF radiation. There are absolutely no studies specifically demonstrating that these meters are safe, and there are many people who are reporting serious adverse consequences from exposure to meters already installed (you can read some of these reports here: http:// emfsafetynetwork. 0 rg/?page _id=2292). While some of the symptoms may be related to anxiety caused by fears of adverse effects from these meters, many people developed symptoms before they were aware that the meters had been installed. It is far too risky to expose our entire population to the potential hazards such as increased risk of cancer from "Smart Meters" until there is solid research demonstrating their safety. An excellent summary of the scientific case for the potential for serious health hazards can be found here: http://ww.electricalpollution.com/smartmeters.html (some of this is an addendum at the end of this letter in case you receive this in a written form that does not allow you to click the link) Another reason to oppose these meters is elucidated by Lawrence Bragman, Vice Mayor of Fairfax, a Marin town which has banned the meters, "This is not a democratically deployed system. It is being forced upon us by a series of undemocratic decision-makers. And the trustees of the information collected will be a series of corporations." The following local governments have demanded a halt to the smart meter program: City and County of San Francisco, Santa Cruz and Marin Counties, and the cities of Sebastopol, Berkeley, Cotati, Fairfax, Santa Cruz, Piedmont, Scotts Valley, Capitola, Watsonvile, Sausalito, Belvedere, Monte Sereno, Novato, Richmond, Ross, Bolinas, and Camp Meeker. 9/14/2010 ,; I hope that the Santa Cruz County Board of Supervisors will continue to be part of this coalition of communities in their efforts to protect the health of their citizens. .5 ~ Sincerely, Randy S. Baker MD Attached excerpt from http://ww.electricalpollution.com/smartmeters.html: Transmitting smart meters are being installed nationwide on gas, water, and electrical services, driven in part by funding for the Smart Grid Program approved as part of the American Recovery and Reinvestment Act of 2009. This is of great concern because the exposure to microwave and radiowave radiation from these meters is involuntary and continuous. The transmitting meters do comply with Federal Communications Commission (FCC) "safety" standards. However, those standards were initially designed to protect an average male from tissue heating (cooking) during a brief exposure. These standards were not designed to protect a diverse population from the non-thermal effects of continuous exposure to microwave and radiowave radiation. Therefore, these "safety" standards were not designed to protect the public from health problems under the circumstances which the meters are being used. The transmitting meters most often being used transmit continuously, every few seconds. This is picked up by a receiver and logged by the utility. You are exposed to the transmissions from all the meters within transmitting range. The meters often have a range of over 2 miles. Thus, the exposure is continuous and the "safety" standards the meters comply with are irrelevant to the situation. Please read this letter from the Radiation Protection Division of the Environmental Protection Agency (EPA) regarding the limitations of the FCC standards. Some transmitting meters transmit at less frequent intervals, however, they still seem to be causing health problems. This could be due to the still elevated levels of radiowaves and microwaves in the neighborhood because of all the neighbors transmitters. Remember, many, many meters are transmitting at these intervals. (One person with a meter transmitting hourly reports waking at the time it transmits.) The transmitting meters can also put high frequencies directly on home and building wiring. This can happen deliberately through signaling to electrical loads or inadvertently through poor engineering. Poorly engineered meters can cause electrical pollution by putting the transmitted signal directly on home wiring or by the way they draw power to operate. Whether deliberate or inadvertent, studies are finding high frequencies on building wiring is related to a host of health problems. Milham and Morgan found a doseresponse relationship between high frequencies present on building wiring and cancer. Removing high frequencies on building wiring has improved MS symptoms, blood sugar levels, asthma, sleep quality, teacher health, headaches, ADD, and numerous other health problems. (Visit Research page to see papers.) Technical papers provide a solid electrical and biomolecular basis for these effects. A recent paper by Ozen, showed that transients induce much stronger current density levels in the human body than does the powerline 60Hz signaL. A technical paper by Vignati and Giuliani discusses the authors' findings that high frequency communication signals on power lines also induce much stronger electrical currents in the human body than a low frequency signal of the same strength. The induced currents disturb normal intercellular communications. This causes harmful short-term and long-term effects. Please see the Technical page for information about properly measuring the high frequencies on building wiring that are causing health problems. There is also a simple meter that lay people can use to easily measure most high frequencies on building wiring. The objectives of the Smart Grid Program can be accomplished without transmitting meters and without using other technology such as high frequency communication over power lines, which are also harmful to human health. It simply requires that meters be selected that are properly engineered to meet the needs of the program without using dangerous technology. Multi-rate billing and other sophisticated metering options do not require that the meter transmit. Models are available that download periodically on phone lines, dedicated communication lines, or are read by a reader the meter reader carries. Dedicated communication cables can be used to shut off or allow on certain power consuming electronics such as air conditioners. It is essential that only meters that do not transmit or put high frequency signals on building wiring are 9/14/2010 5:: approved for the Smart Grid Progn. Tlie un-safeness of the "safety" standards for the continuously transmitting smart meters is apparent from the reports of health problems ranging from headaches to poor sleep to heart palpitations that begin after their installation. Transmitted microwave and radiowave radiation also have the potential for causing serious long-term health consequences, even for those who do not notice overt symptoms. The majority of independent studies report similar results: impairment of cellular communication, DNA breakages, increased stress proteins, etc. Studies targeting cell phone and cordless phone usage are finding increased risk of brain tumors. Children seem to be particularly vulnerable. A review of studies performed prior to 2007 is available at http://ww.bioinitiative.org. A recent public health study provides particularly strong evidence that we should be concerned about continuous exposure to transmitted microwave radiation. It can be found in a paper published in Pathophysiology (Volume 16, Issue 1, June 2009, Pages 43-46) Apparent decreases in Swedish public health indicators after 1997-Are they due to improved diagnostics or to environmental factors? The authors looked at trend lines in data collected by the Swedish government and found that the introduction of cellphone technology nationwide in 1997 coincided with the beginning of an accelerating deterioration of several health indicators. Specifically, the rates of prostate cancer, brain tumors, melanomas and lung cancers in the elderly all increased dramatically. So did deaths from Alzheimer's disease, traffic accident injuries, sick leave rates, and percentage of infants born with heart problems. This paper is short and well worth reading. We should resolve the public health questions before introducing further public exposure to microwave radiation, particularly involuntary continuous exposure. Radiowave and microwave radiation are not just a problem for people, they are causing serious problems for animals of all types. Please visit http://ww.hese-project.org/hese-uk/en/issues/emr.php?id=bees and http://ww.hese-project.org/hese-uk/enlissues/ for more information. 9/14/2010 5'1