SIMPAC G
Transcription
SIMPAC G
SIMPAC G SEPAC S. A. de C.V. (Electronic Systems for Power Automation and Control ), is Automation of the Hydroelectric Power Plants of Guatemala In the month of December 1998, the Empresa de Generación de Energía Eléctica (EGEE), dependent of the carrying out the automation for 95% of the hydroelectric capacity installed in Guatemala, as well as the Instituto Nacional de Electrificación (INDE) of Guatemala, carried out the bid for the “Design, Manufacturing, Supply, Assembly, Tests, Commissioning and Training” of the Automation of the Hydroelectrical supply of a Control Center to be installed in the city of Power Plants : Chixoy, Aguacapa, Marinalá, and Los Esclavos, as well as Guatemala in the installations of Instituto de Electrificación a Control Center and Chixoy Hydroelectrical Central the Communication Canals. The EGEE Tecnologías e Informática, S.A (TTI).- TTI included for the assigned Automation project the bid to the local and the Control Center, equipments designed and manufactured by the Mexican Company Sistemas telecommunications company, Nacional (INDE). Electrónicos de Potencia Automatización y Contol S.A de C.V (Sepac). The main characteristics of the hydro electrical power plants are: ? Chixoy H.C.: Design flow 75.0 m3/sec; maximum brute fall 517.00 m; rough fall average 488.00 m; net fall average 430.00 m; Type of turbines Pelton; annual energy average 1,330 GWH; Plant Factor 0.764; Generator Power 47,000 kW’s; Curtain of the Chixoy Hydroelectical Center Velocity 360 rpm; Nominal power of the turbines 5 x 60 MW’s; Generators power 5 x 55.3 MVA’s. Φ Aguacapa H.C.: Design flow 2.0 m3/sec; Design Fall 554.10 m; Installed power 90 MW’s; Reliable power 80 MW’s; Number of units three; Type of turbines Pelton ; Speed 400 rpm; Power factor 0.85; Output voltage 13.9 kV’s; 112,500 Nominal Capacity kVA’s; Date of commissioning Oct 20, 81. WORKING TOGETHER Control Room of Aguacapa Hydroelectrical Center Hydro electrical Capacity installed in Guatemala: Chixoy: 5 x 60 = 300 MW Sn. Luis: 2 x 1,25 = 2.5 MW Aguacapa: 3 x 30 = 90 MW Chichaic: 2 x .35 = 0.7 MW Jurún Marinalá Hydroelectrical Center Marinalá:3 x 20.4=61.2 MW Φ Jurún Marinalá H.C.: Installed power 61.2 MW’s; Reliable power 60.0 MW’s; Design flowl 12.0 m3/sec;Design Fall 660 m; Number of units three; Type of turbines Pelton Vevey brand; Speed 600 rpm; Generators brand Brown Boveri; Capacity 75,000 kVA'’ ; Power Factor 0.85; Output voltage 13.8 kV'’; Date of commissiong 1st Palín: 1 x 1.6 = 1.6 MW Esclavos: 2 x 6.5 = 13 MW Río Hondo:1 x 2.4 = 2.4 MW unit Dec 01, 69 last unit Feb 12, 71. Sta María: 2.1 x 3 = 6.3 MW Φ Los Esclavos H.C.: Installed Power 13 MW’s; Reliable power 6.5 MW’s; Design Porvenir: 1 x 2.8 = 2.8 MW El Salto: 2 x 2.25 = 5.5 MW 3 flow 15.4 m /sec; Design Fall 108 Total: 486.10 MW m; Number of units two; Type of turbines Francis: Speed 600 rpm; Brand of generators Siemens; Hydro electrical Capacity installed for the automation Capacity 16,250 kVA’s ; Power factor 0.85; Output voltage 6.9 kV’s; Date of commissioning of the first unit Ago 23, 66. Los Esclavos Hydroelectrical Central project : Chixoy: 5 x 60 = 300 MW Aguacapa: 3 x 30 = 90 MW El Salto 5.5 Marinalá:3 x 20.4=61.2 MW El Porvenir 2.8 Santa María 6.4 The capacity of the installed Río Hondo 2.4 Los Esclavos Marinalá Palín 1.6 13 hydroelectrical generation in 61.2 Esclavos: 2 x 6.5 = 13 MW Total: 464.20 MW = 95 % Guatemala. is : Chichaic 0.7 Φ 90 486.10 MW’s 300 Aguacapa Chixoy 2.5 San Luis Graph of the hydroelectic capacity installed in Guatemala 4 .5 The hydroelectric capacity installed in Guatemala for automation with Sepac equipment, is of: Φ 464.20 MW’s 9 5.5 Graph of the hydorlectric capacity installed to automation WORKING TOGETHER Location Φ Location: Central America bordering between the Caribe, Honduras and Belize, bordering the North Pacific Ocean, between El Salvador and México. Φ Geographical Coordinates: 15 30 N, 90 15 West.. Φ Area: total 108,890 km 2, terrestrial 108,430 km 2, water 60 km 2. Chixoy Chixoy Φ Electrical Production: 3,085 TWh Φ Electric Production: Fossilized Fuels 26.42 %; Hydroelectric 66.61 %; Marinalá Marinalá Nuclear 0 %; Others 9.97 %. Aguacapa Aguacapa Φ Electrical Consumption: 2,914 TWh. Φ Exported Electricity: 6 GWh. Φ Imported Electricity: 51 GWh. Guatemala WORKING TOGETHER Esclavos Esclavos Architecture Centro de Despacho Automatizaciòn de: Chixoy; Aguacapa; Marinalà; Los Esclavos Arquitectura del Proyecto of the Project: The Architecture of the project is based on a Dispatch Center: With two servers SCADAPAC XAR4 –D; Two X –Terminals; Servidores SCADAPAC XAR4 -D An Engineering Station; An Intelligent Monitor 21" Communication Controller SCADAPAC Monitor 21" CIC XAR2/6; Two Inkjet printers; and a WS B - 2000 dot matrix printer. WS B - 2000 Teclado Mouse Teclado Mouse For the Hydroelectric Power Plants , the X -Terminal Architecture is based on : Estaciòn de Ingenierìa An Operation Station SIMPAC XAR2 – D; Impresora Stylus 800 Impresora LQ 2180 X - Terminal Kayac XM600 Mouse An Engineering Station; PLC’s SIMPAC G X - Terminal Kayac XM600 Mouse Teclado Impresora Stylus 800 X - Terminal Kayac XM600 Teclado Mouse UCAD – MX; Remote Unit Terminals SCADAPAC Teclado XAR1 Communication –M; controller Intelligent SIMPAC CIC XAR2/4; Two Inkjet printers; and dot matrix printer .. Micrond as CIC XAR2/6 Micro ndas SIMPAC CIC XAR2/4 SIMPAC CIC XAR2/4 Monitor 21" Monitor 21" Kayac XU Kayac XU Teclado Monitor 21" Mouse Teclado Kayac XU Estación Operación Los Esclavos Mouse Teclado SIMPAC CIC XAR2/4 SIMPAC CIC XAR2/4 Monitor 21" Monitor 21" Kayac XU Kayac XU Mouse Teclado Estación Operación Jurún Marinalá Estación Operación Chixoy Monitor 21" Monitor 21" Teclado Kayac XU Mouse Teclado Kayac XU Mouse Mouse Teclado Mouse Estación Operación Aguacapa WORKING TOGETHER