Kaohsiung LRT Project (Phase I) Project Brief
Transcription
Kaohsiung LRT Project (Phase I) Project Brief
Kaohsiung LRT Project (Phase I) Project Brief Content Project Description Bid Strategies and Qualifications of Tender Milestones, Payment and Evaluation Criteria Brief of Preliminary Design of Civil & Track Work Brief of E&M System Specification Policy for Public Transport- 6 Transfer Hubs High Efficiency Transfer hubs 30minutes for daily life One Harbour, 2 Stations and 3 Mountains (Shan) Shortage the distance, improve the development Transfer Hubs 30 min from HSR Zuoying to Chishan transfer hub Main Center Service Inter-city Character Metropolitan 永安 內門 湖內 茄萣 阿蓮 路竹 (高科) Transfer Kaohsiung Stn. HSR Zuoying Transportation Tool TRA、MRT、 Highway Express、Bus HSR、TRA、 MRT、Highway Express、Bus 旗山站 岡山站 仁武 左營高鐵站 大樹 三民 Service 鼓山 Character Transfer Transportation Tool 3 前金 Rural Connection 旗山站 Highway Express 、Bus 鳳山 站 新興 塩埕 鳥松 鳳山站 高雄車站 Metropolitan 燕巢 大社 楠梓 左營 Secondary Center 屏東 苓雅 鳳山 前鎮 岡山站 大寮 小港站 TRA、MRT、Highway Express、Bus 美濃 10 橋頭 梓官 桃源 六龜 田寮 岡山 彌陀 那瑪夏 甲仙 杉林 旗津 小港 3 大發 工業區 小港站 林園 3 3 Project Description 內惟 Whole route length of LRT is about 22.1km, with 36 stations and 1 depot, 1 stabling yard. Phase I: From C1 to C14, about 8.7km, with 14 stations and 1 depot. Budget : About 6.8Billion NTD (For reference only) Completion Deadline : NTP+24(months) 天 內惟站 九 祥 一 鼓 z z z z z z 速 鼎金 (覆鼎金) 中 三莊 力 N 如 山 華 內惟 路 一 四 三 zR13 z z C24zz 路 C23 C22 C21 路 C25 鼎 C26 金 C27 路 大 路 民 盟 同 路 博 中 族 z z z z z z 華 熱 如 全 鼓山站 路 路 C18 二 街 路 九 如 高雄站 中 國 路 三塊厝站 中 六 國七 狗山 z z z z z 四 河 二 福 O1 四 路 愛 C11 三 路 一 生 z z z z z 路 二 路 三 路 青 維 路 C33 四 三 二 多 中 山 路 華 三 多 四 旋 z z z z z 權 二 鴨母寮 聖 二 二 路 一 路 路 三 C35 獅甲 崗山仔 心 路 洲 一 路 廟 中 z z z z z C7 三 路 C1 瑞 功 凱 路 山 C6 北汕尾 旋 二 三 烏松 C2 四 路 前 R6zzzzz 路 第一階段已通車路段 第二階段通車目標 洲 C5 中 路 C3 C4 多 凱 三 民 C8 成 多 路 三 中 路 一 多 四 維 四 三 四 C34 路 三 路 路 z z z z z 路 一 三 山 路 一 二 權 路 維 z z z z z 旋 一 二 五塊厝 正 C32 凱 平 民 四 二 路 三 青 年 路 中 路 年 一 C31 路 路 和 一 路 華 一 路 中 z z z z z 一 光 福 二 路 中 五 福 三路 C9 正 五 華 中 C10功 路 福 二 成 路中 路 z z z z z 一 寶獅 順 一 二 路 五 苓雅寮 C12 族 一 正 C30 大 大順站 旋 一 路 民 路 河 凱 一 正 三 仁 五 路 中 民 z z z z z z C13 如 路 民族站 建 國 一 合 中 路 生 路 六 z z z z z z z z z z z 路 四 三 C14 山 華 合 賢 z z z z z z 路 路 七 路 民 賢 C16 路 路 二 賢 二 愛 義 九 建 七 建 C29 街 一 z z z z z 路 C17 路 一 路 二 國 路 一 河 路 如 三 路 全 熱 仁 建 二 路 十 二 路 九 山 一 愛 二 一 河 三 鼓 功 C28 建 立 十 二 九 山 順 灣仔內 自 C19 公 路 一 C20 鼓 C15 本館 凹底子 美術館站 中 4 林內山 鼎 路 路 山 隆 Kaohsiung LRT (1st Phase) Length 8.7km, 14 stations, 1 depot, 6 TSSs. 中山路 路 中華 Kaisyuan Rd.→Chenggon Rd.→Sin-Guang 中正路 Rd.→Sanduo 5th Rd.→Haibian Rd.→ over Love river→Gongyuan 2nd Rd.→Refute two special and 路regional→Penglai Rd. 五福 →Linhaixin Rd. C16 C15 捷運西子灣 C13 駁二/七賢 大義 街 TSS6 O1 路 光華 C14 七賢 路 臨 海 二 路 C11 碼頭 真愛 海 邊 路 C12 駁二/大義 三多 TSS5 C10 路 四維 路 光榮碼頭 二聖路 路 新光 C9 三多/苓南 C8 成功/新光 TSS4 C7 一心 路 三路 復興 機廠 TSS1 成功/復興 TSS3 5 路 凱旋/瑞田 R6 /凱 旋 路 鎮興 成功/時代大道 中華 旋 C2 大道 時代 C4 凱 街 田 瑞 路 成功 C5 路 中華 C6 路 山 中 路 正勤 成功/正勤 瑞隆路 C1 TSS2 C3 中 山 /凱 旋 凱旋/一心 Project Description E&M System : ¾ Rolling Stock - 100% low floor Car Body, more than 250 passengers for each Tram ¾ Power Supply – Catenary free ¾ Signaling – Tram in priority Embedded track with grass for main line (Not including road junctions and special sections) Land Acquisition: Completed before October 2012 Bidding plan : Tender announce: End of June 2012 Preparation for tender : At least 40 days based on government procurement laws; However, if contract award date is not approved by Execution Yuan, the bid will be reserved till approval is granted. 6 Bid Strategies 1. Bid Type It is a Design- Build bid which includes civil work, trackwork and E&M system. The contract is awarded to the most advantageous tender. 2. Tenders Tender alone, or joint venture of four or less. Companies from GPA members countries will be allowed. 3. Project Management Delivery (Client’s duties) Engage with a Project Management Consultant (including verification, validation and certification for E&M system) and a Construction Supervision Consultant. 7 Qualifications in general A. Tender subject related : (For each member of Joint Venture) 1. Certificate of Company Registration 2. Certificate of Tax Payment Invoice 3. Domestic Tenders and their owner shall provide original stamp form and waiver. B. Capability of contract performance : ─Proof of Credit : 1. Certificate of “No dishonored” 2. Certificate or supporting documents issued by bank or financial institution of “no refund in the last three years” 8 Qualifications in particular, 1 of 4 Joint venture tender with considerable experience in: 1. Class A construction company. 2. Rolling Stock manufacture company : Having at least one completed project in rolling stock manufacture for tram or metro system in the past 15 years 3. Track-work : Having at least one completed track work project in the past 15 year 4. E&M Integration : Having at least one completed core E & M system (rolling stock, power supply and signaling system) of the Tram or metro system In the past 15 years The leading firm of the tender should have the largest portion of contract value and has to be more than 30% of that Input of any member of the joint venture shall not be less than 10% of the contract value. 9 Qualifications in particular, 2 of 4 Tender alone: The tender can be submitted by Class A construction company only and its portion can not be less than 50% of contract value Tender’s shortage of particular qualifications can be provided by professional sub-contractors. Those professional sub-contract shall submit a joint statement or an agreement for tender. Members of joint venture or professional subcontractors can not be changed after contract is awarded, unless agreed by the Client. 10 Qualifications in particular, 3 of 4 Considerable experience/track record: (applicable for tender alone or joint venture tender) In the past 15 years, the tender has to achieve one of the following conditions : 1) Having a single contract with contract value not less than 2/5 of the budget of this project. 2) Having accumulated contract value not less than the budget of this project. 11 Qualifications in particular, 4 of 4 With considerable financial resources : 1.Single tender has to achieve one of the follows conditions: (1) Paid-up capital is not less than /10 of the budget of the project. (2) Accountants certificate or audit by auditing body of a fiscal year or the most recent annual financial report, and its content fulfill the follows︰ A. Net value not less than 1/12 of this budget. B. Current assets not less than current liabilities. C. Total indebtedness not more than four times of the net value. But not for the privatization of public enterprises. 2.For joint venture tender : Each member’s paid-up capital is not less than 1/3 of those above. or Net value in financial report is not less than 1/3 of those above. And each one should fulfill requirements stated in 1.(2).B and C as above. 12 For Foreign company Foreign firms’ qualification : Documents should be translated into Chinese and be notarized by Taiwanese government representative office overseas. • Company’s registration certificate: Should be issued/validated by Taiwanese government before tender submission •Requirements given by Taiwanese law for certain expertise of professional and technical personnel, except through the mutual recognition, should be complied. •Credit proof: Should be provided. •In the country having difficulty in providing documents stated above, please kindly describe the reason and provide equivalent qualifications. 13 Milestone NTP+19 months, 1st tram test run on main line NTP+22 months, System E&M substantial completion NTP+24 months, MOTC Test completion, ready for revenue operation 14 14 Payment 1. No advance payment 2. Valuation : Civil Work, Track work and Building Service : a. By design stages for design b. By time for construction c. For Building Service - By Milestone E&M System : Milestone are defined by detail design , equipment delivery, installation and testing. 15 15 Evaluation Criteria • Team members and Experiences/Track Record • Understanding of Project, Solution and Delivery Plan • Design concepts and Construction planning • System characteristics and requirements • Cost quotation and analysis • Other creative and feasible solutions • Presentation and Q&A (Shall be confirmed by the Selection Committee) 16 16 Brief of Civil work and Track Route, Station, and TSS Track and Platform Depot preliminary layout Station design requirement Bridge KMCPMC Interface Track type and grass 17 17 Kaohsiung LRT (Phase I) The Route , Station and TSS 中山路 中華 一.顧問團隊與實績 二.對本計畫了解與對策 三.設計構想與規劃 四.工作計畫與執行策略 五.結語 街 真愛 路 大義 C11 凱旋 路 五福 C13 駁二/七賢 路 光華 C15 路 TSS6 O1 C3 7 七賢 C14 臨 海 二 捷運西子灣 路 中正路 路 C16 碼頭 C12 海 駁二/大義 邊 TSS5 C10 三多 C3 6 路 四維 路 路 光榮碼頭 二聖路 路 新光 C9 C35 三多/苓南 C8 成功/新光 TSS4 C7 一心 路 三路 復興 機場 TSS1 成功/復興 C1 路 正勤 C4 /凱 中華 旋 凱旋/一心 路 凱旋/瑞田 街 田 瑞 18 大道 時代 旋 C2 R6 路 鎮興 TSS3 路 路 成功/時代大道 中華 成功 C5 凱 路 山 中 C6 成功/正勤 瑞隆路 TSS2 C 3 山/ 凱 旋 中 Kaisyuan Rd.→Chenggon Rd.→Sin-Guang Rd.→Sanduo 5th Rd.→Haibian Rd.→ over Love river→Gongyuan 2nd Rd.→Refute two special and regional→Penglai Rd. 18 →Linhaixin Rd. Track and Station (Platform) of Phase I Platform type: Station C1-C14 is side platform Station type: Except C11 is a elevated station, rest are surface stations。 TSS: TSS1-TSS6, 6 TSS in total。 Special track work layout: TSS3 TSS1 C1 C2 TSS2 C3 TSS4 C4 C5 C6 C7 C8 TSS6 C9 19 C10 TSS5 C11 C12 C13 C14 Kaisyuan Rd.→Chenggon Rd.→Sin-Guang Rd.→Sanduo 5th Rd.→Haibian Rd.→ over Love river→Gongyuan 2nd Rd.→Refute two special and regional→Penglai Rd. →Linhaixin Rd. 19 Base area:about 33000 ㎡ Depot first step layout Kaisyuan Rd. 一.顧問團隊與實績 二.對本計畫了解與對策 三.設計構想與規劃 Kaisyuan Rd. 四.工作計畫與執行策略 凱旋路 五.結語 LING STAB Traction Deprot/ Sub-Station/ Engine room Intervention vehicles Daily Inspection/ Washing Machine Inspection pits & roof platforms Tramway lifting Open workshops WORKSHO P & OFFICES External storage Waste collection area Peripheral road RESERVE FOR TRA Stabling Entrance Main store cars PIT WHEEL LATHE & PAINTING BOOTH RESERVE FOR TRA 20 20 Standard Stations- Concerns 21 Tropical Climate and Urban Landscape As a shelter from the rain and sun- shine Material durability and corrosion Overall design including stations, pavement and bikeway 21 Station Standard stations : 10 Special station : C3、C9、C11、C14 Delivery of two among four Special station needs wellknown international architect to get involved. 22 22 Requirement- C14 Station: 1. The Side platform uses original TRA station。 Track: 1. It shall keep current TRA track (gauge 1067mm) together with light rail track (standard gauge 1435mm), it combines the old and new cultures together. 2. The old TRA tracks has to be moved and saved during construction stage. After installing new rail, the old TRA track will be put back to new trackbed with the soil and grass, 3. During detailed design stage, said detailed design has to be sent to culture property committee for review and approval. 23 23 Viaduct & landscape bridge 七賢 C14 捷運西子灣 路 C13 街 駁二/七賢 大義 C11 碼頭 真愛 C12 駁二/大義 海 邊 路 Viaduct: Between C10 & C12 around 910M Has to concern Kaohsiung Maritime Cultural & Popular Music Center (KMCPC) entrances and exits & road location Viaduct & pier type should consider global metropolitan landscape. C10 光榮碼頭 路 新光 C9 三多/苓南 C8 成功/新光 C7 成功/復興 路 路 24 成功 Landscape bridge: cross Love River, main span is 115m. 中華 C6 成功/正勤 C5 成功/時代大 道 Other bridge: between C5 & C6,cross by the 5th ship crossing 5th channel, about 80m. 24 Landscape bridge An old TRA structure ,crossing Love River and completed in 46 years ago , span about 96m, deck width 4m,superstructure is steel U- shape girder, substructure is RC, now is used for a pedestrian bridges. Remove existing bridge (including superstructure & substructure) , reserves the TRA substructure. New LRT bridge should consider global metropolitan landscape , Consist with KMCPMC pedestrian bridges. Consider & set up sound barrier (noise walls), construction safety, noise prevention 25 海音中心路段 愛河 Landscape bridge location 25 LRT Landscape bridge simulation (Better idea can be provided in the proposal) LRT Landscape bridge simulation ( 60M + 115M + 60M ) 26 26 KMCPMC. Interface (middle section) View of the sea Building 英 雄 路 8M P ar k i ng viaduct About 98M Love River Emba nkme nt (Abou t 82M) l ot Pa rkin g lo Ha t 2M ibia nR d. 8M K.M.C.P.M.C. M 7.2 27 27 KMCPMC. Interface (west side) 公園 路 LRT ROUTE Clearence maintain4.6M Pier should not conflict with main entrances and exits Clearence maintain3.5M, Pier should not conflict with entrances and exits Embankme Viaduct about nt 98M (About 82M) 28 海 音 C11 中 心 西 站 Warehouse Clearence maintain4.6M K.M.C.P.M. C. Performance Hall viaduct Kaohsiung Harbor 28 Track work Track work 1.Standard Gauge 1,435mm, Continuous welding rail 2.Horizontal alignment min. Radius 25m. 3.The max. gradient 5%. Track Layout 1.The Embedded track (Grass Track ) at grade section. 2.The Depot track was Ballasted track, and the Embedded track and maintenance pit at building. 3. The turnout use the Radius 50m (Main line) and 25m(Depot). 4. It uses the Noise and Vibration prevent Track at section of C10-C12 for the environmental protection consideration. 29 29 Brief of E&M Spec E&M System In General Rolling Stock Specification Power Supply Configuration Signaling System Configuration Communications Configuration Automatic Fare Collection Framework 30 30 30 E&M System Position E&M System includes: • Rolling Stock • Communications System • Electrification System • Automatic Fare Collection • Signaling System • Maintenance Facilities • Operation Control Center 31 31 31 Rolling Stock Catenary free 100% low floor Car Body Appearance on Kaohsiung sea image, approved by Owner Dual track, operating at right Manual drive on signal, 1 driver per train 32 32 32 Rolling Stock Specifications -1 33 33 系統型式 Type 鋼輪鋼軌, 標準軌距 Steel wheel-rail, gauge 1,435mm 載客量 Capacity 座位坐滿+立位5人/m2時 載客量 250人 Capacity is 250 for full seated and stand in 5 passengers/m² 車身高度 Height 3.80 公尺以下 Less than 3.80m 軸重 Axle load 小於 13噸 Less than 13 tons 車身材質 金屬 Material of car Metal body 車身寬度 Width 2.65 公尺 2.65 m 急衝度 Jerk 1.3 m/sec3 加速度 Acceleration 1.3 m/sec2 正常/緊急減速 度 Normal/ Emergency Deceleration 0.8~1.5 /2.70 m/sec2 車門入口處地板高 Floor height at entrance 350 公厘(距軌道頂面) 350 mm(To TOR) 33 Rolling Stock specifications -2 輪椅上下車處 Wheelchairs entrance 34 34 兩處 Two entrances 車上驗票機 Ticket verify on board 設於中央握把 Located on central column 雙扇1.3公尺 門寬 Double leaf, 1.3m Width of door 單扇0.8公尺 Single leaf, 0.8m 車廂月台高度差 Difference in height between cabin door ±25 mm threshold and platform 駕駛室 Driving cab 車間通道 Gangway 無車間通道門 Pass, without door 電力,無架空線/架 空線(機廠) 動力供應方式 By electricity, dual Power supply for catenary free and OCS in depot 車廂內裝特別需求 Special needs of interior 1.無障礙環境 For disable 2.腳踏車固定架 For bike 推進最大坡度 Max. slope 最小轉彎半徑 Min. curvature 25公尺 25 m 前後兩端均設 Two ends of tram 60 0/00 34 TRACTION POWER SYSTEM • • • • • • • Traction Power System Voltage Level AC 22.8kV TSS 6A 35 35 TSS 6B DC DC 750V AC 750V 380V/220V AC 22.8kV AC 22.8kV TSS5 TSS4 DC 750V AC DC 750V AC 380V/220V 380V/220V AC 22.8kV TSS3 DC 750V AC 380V/220V 6 traction substations, including DTSS(TSS1) and TSS2~TSS6 TPC AC 22.8kV DualLoop Any one TSS failure will not affect operation DTSS and TSS1 backup each other TSS6 should be designed backup TSS interior(land limited) Typical TSS:15m(L)*7m(W)*4m(H) DTSS+TSS1: 17m(L)*10m(W)*4m(H) TSS2: 13m(L)*9m(W)*4m(H) TSS6: 15m(L)*10m(W)*4m(H) TSS2 should rebuild from exist building under elevated road TSS5 should consider half under ground design AC 22.8kV TSS2 DC 750V AC 380V/220V AC 22.8kV TSS1 DTSS DC DC 750V AC 750V 380V/220V 35 SIGNALLING SYSTEM (Configuration) • • • • • • • OCC can execute depot shunting but not main line Modify/Replace road traffic controller to perform priority. Bidder should coordinate in design phase. Train detectors provide vehicle locations to controller Controller send road traffic light and LRT signalling to ITS center, but send LRT signalling to OCC only Without ATP,ATS and auto train recognized function Non-motorized switch installed at route crossing, but motorized switch installed at terminal and depot. Interlocking system installed on the wayside Only 1 signalling room located in DTSS Terminal signalling zone Depot signalling zone 36 36 Terminal signalling zone 36 Communication System 37 37 37 Communication System -1 • The design and operation of LRT Communication system should be based on whole-line. The design must consider the future expandability. The system will cover all regions (trainset, stations, tracks, depot / maintenance workshop / OCC, etc.). • Telephone system : OCC should install an electronic digital PBX. Voice transmission by Internet Protocol(the Voice over IP). • Passenger Information Display Systems: Stations Dot matrix information display should be provided. OCC edit console select the monitor to insert the real-time and prerecorded message (such as: delays, commercial advertising, passenger information, emergency messages, train messages and the government propaganda etc.). 38 38 38 Communication System -2 39 39 • Digital Radio System: use TDMA protocol digital radio system (Standard definition by European Telecommunications Standards Institute (ETSI)). Based on IP network technology. • Clock System: To provide LRT standard clock signal generated by master clock located in OCC equipment room, transmitted to LRT system clock device through the transmission network . • Fiber Optic Communication Transform System : Transmit voice, data, video and control/monitor signal between OCC, workshop, station and ancillary buildings (eg, TSS). Include fiber optic cable and Gigabit (GbE) Ethernet System. • CCTV system: Video signals transmitted via a Gigabit (GbE) Ethernet, and provide the IP (Internet Protocol) network camera. 39 Automatic Fare Collection System Operation Company O utside E‐ticketin g Co. A Single trip ticket TVM Station Validators Handheld ticket‐checking machine On‐Board Validators Passenger OR Clearing Host By single trip By e‐ticketing ticket Payment method E‐ticketing C o . B Workstation Wireless access point Ethernet Internet or VPN Station Switch Hub ClearIing Host E‐ticketin g C o . C Single trip ticket TVM Station validator Get on the tarin DPS Clearing Host Ethernet Single trip ticket E ‐ticketin g C o. D Get on the tarin On‐Board Validator CPS ‧ F are p aram eters s y s tem ‧ Black lis t m an ag em en t s y s tem ‧ Data m an ag em en t s ys tem ‧ A s y s tem o p eratio n m an ag em en t s y s tem ‧ Data tran s m is s io n s y s tem 40 40 Firewall Clearing Host Get on the tarin 40 THANK YOU FOR YOUR ATTENTION