McAlvain Construction - Greater Boise Auditorium District
Transcription
McAlvain Construction - Greater Boise Auditorium District
RFQ 2015-1 | NOVEMBER 6, 2015 BOISE CENTRE EXPANSION CONSTRUCTION MANAGEMENT | GENERAL CONTRACTOR SERVICES Table of Contents Letter of Introduction Project Approach Firm Qualifications|Experience Team Personnel Work Examples|References Letter of Introduction Project Approach PROJECT APPROACH CM|GC PROJECT APPROACH Preconstruction Phase Table of Contents A successful project starts in preconstruction and carries throughout the project life-cycle, past commissioning and warranty periods. McAlvain Construction, Inc., (MCI) will work closely with the District and its design team to assist in finalizing a project program and scope that will fit within project needs and budget. Our proposed team has the requisite experience in the CM/GC delivery and relevant projects to make the Boise Centre Expansion Project a success. With effective management of the design in concert with budget requirements, meeting established milestones and maximizing the program within project constraints is our specialty. McAlvain Construction Inc, was recently awarded the CM/GC delivery of the adjacent Grove Plaza Renovation Project by CCDC and our preconstruction and construction services associated with this adjacent project make our team uniquely qualified to execute the Boise Centre Preconstruction Phase Opportunities & Constraints Define Stakeholder Values Constructability Reviews Site Logistics Project Master Schedule Preconstruction Estimating Value Engineering Procurement Process Subcontracting Procedures KEY PRECONSTRUCTION ACTIVITIES INCLUDE (but not limited to): • Assist with program finalization & master planning effort – identifying the needs within the associated budget. • Review draft drawings & specifications and provide input regarding constructability, alternative materials, and availability of materials and equipment. • Strive for simplicity, constructability, repeatability, within the budget constraints while maintaining construction quality. • Provide decisions regarding construction materials, equipment, methods, systems, phasing and costs including life-cycle cost analysis to assist in engineering and life safety systems selection. • Assist the designers in clarity, accuracy and completeness of the documents and resolve each deficiency and omission that would allow contract changes or schedule impacts. • Provide input on current construction market conditions for materials, labor and equipment. B O I S E C E N T R E E X PA N S I O N P R O J E C T • Prepare preconstruction cost estimates as design progresses. • Work with the District to derive and negotiate project Guaranteed Maximum Price. • Ensure the project stays within the budget and provide recommendations should the project exceed the established budget. • Create, update and maintain the project master schedule. • Creation of the project logistics plan. • Develop and obtain trade contract scopes and other contract documents. • Obtain competitive bids for all the work, materials, and equipment. • Perform pre-bid meetings and jobsite walkthroughs with prospective bidders. • Assist the District in answering questions, issuing of addenda and opening bids. • Work with the District and design team to value engineer the design and reconcile budget overruns as needed. 6 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH Expansion Project in the most expeditious manner possible, to the greatest advantage to all stakeholders and with the most cost effective utilization of the public funds associated with these projects. and what the preliminary budget is, are all key factors to understanding the book ends within each project to be successfully executed. For the Boise Centre Expansion, we’ve already identified what other construction activities are on-going and their specific schedule Specific to the Boise Centre project, MCI has already milestones, what special events are already planned initiated its due diligence process to understand the at CenturyLink Area and the Boise Centre during the scope of work and associated constraints. From this anticipated construction period, and what limiting factors are involved with both construction accessibility process we have prepared a preliminary conceptual schedule, site logistics plans, design integration conas well as public welfare. MCI has also identified pocepts and detailed project delivery and procurements tential savings opportunities to The District in conjunction with its preconstruction program with CCDC on the plans, detailing what we believe is an integrated work plan between the Boise Centre Project and the Grove Plaza, by pre-planning work phases that create Grove Plaza Renovation which identifies key variables predictable outcomes for all stakeholders. Significant and avoids constraints leading to a successful execusavings for construction activities including avoiding delays, shared general conditions, avoiding wasted tion of both projects. Based upon our research and public funds on rework and maximizing value in bid investigation, the MCI approach to the Boise Centre project will focus on four specific areas – Supply Chain packages will benefit all of the stake holders. Management, Disruption Avoidance, Phase Integration, and a Comprehensive Procurement Plan (Bid Understanding project constraints means meeting Package Phasing/Sequencing). All phases of preconwith and understanding all stakeholder interests. struction will be focus on these pillars of planning. Whether it’s the Owner, a sports arena, local vendor or city agency, there are multiple parties who can be impacted by a new construction project such as this. Opportunities & Constraints All of these enterprises will affect and be affected by The first step MCI takes in the preconstruction cycle the planning which occurs in preconstruction. MCI is to understand specific project constraints and poconsiders these affects in this highly congested area, tential opportunities. Knowing where a project is because they will define how we look at this project located, what it’s present and planned uses are, when and will allow us to avoid disruption as much as possithe Owner needs to start or complete construction by, B O I S E C E N T R E E X PA N S I O N P R O J E C T 7 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH ble to ongoing operations for adjacent facilities in creating a scheduling and sequencing plan for the new construction activities. These activities have already been evaluated by our team and have preliminarily been integrated in our current phases of preconstruction for the Grove Rehabilitation project, whether it’s scheduling, logistics or estimating. As example, our preliminary conceptual schedule for the Boise Centre identifies the dates and times of the fourteen sporting events (Hockey, Basketball and Gymnastics) at CenturyLink Arena and fourteen known scheduled events at Boise Centre, during the month of March 2016. Our preconstruction planning allows us to overlay these events with anticipated construction activities, to either change our workflow plan or create special conditions within our bid packages and design plans to manage risk and avoid disruption. Knowing project constraints is one of the pillars for future planning efforts. Early identification of these factors will result in a more cost efficient construction process. MCI has already started this process for the District. Define Stakeholder Values MCI believes you sometimes need to go slow in preconstruction in order to go fast during the construction phase of the project. This means that in order to work efficiently, we need to understand what stakeholders value most in the delivery of a project. Whether its speed of delivery, life cycle cost, principles of aesthetics, quality, budget, public safety or disruption avoidance, our key driving focus of preconstruction planning will be delivering those values. If we can establish that these key elements are speed of delivery and budget, but other public and private stakeholders most value disruption avoidance and aesthetics, our preconstruction planning will seek out opportunities to maximize the delivery of these target values in concert with the District’s wishes. Defining these stakeholder values on the front end during preconstruction, allows all team members to focus their efforts on what matters most. We have already initiated this process as part of the Grove Rehabilitation Project. Efficiency of time and resources is the name of the game, and defining targets we all B O I S E C E N T R E E X PA N S I O N P R O J E C T understand up front will reduce waste and allows those resources to be put back into the project for the District’s benefit. As example of this, MCI is presently working with CCDC on a series of value propositions specific to the Grove Plaza Renovation. Through a process of interviews, meetings and work sessions, MCI has prepared an Alternative Delivery Plan Options for CCDC which recognizes those values which CCDC considers most important, so informed decision making can occur. MCI will provide this same level of understanding and commitment to The District during the preconstruction phase of the Boise Centre Expansion, while bringing together the interests of other stakeholders on concurrent pathways. Constructability Reviews Constructability reviews are integral to MCI’s management control system. MCI will work with the District and its Design Team to review the program for: Cost Effectiveness, Materials Selection, Functional Ability, Constructability, Design Schedule Support and Safety Considerations. During design, MCI will provide value analysis studies to optimize the value in project design. Materials, equipment, and accessories will be analyzed with MCI’s formalized process for conducting constructability reviews that includes drawing reviews for accuracy, interference and adequacy of components. Additionally, evaluation of designed systems and construction approaches may be required to confirm that the most economical methods and systems are being proposed. These studies will take into account capital, operating and maintenance costs to verify the most cost effective design. Key to providing high value constructability review is the understanding of the scope of work, design intent, and potential pathways for construction delivery. As the design develops through the schematic and development phases, our experience and understanding of how to build, along with our processes of defining project values and constraints, allow MCI to provide constructive constructability reviews which add value to the design process. We dig into the details and filter out those elements which are wasteful and unnecessary. We assist in focusing design ef- 8 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH forts where they will be most useful and productive, adding the most value to future phases of preconstruction and construction. Our constructability review is about delivering attention to what is needed and valued most, freeing up resources to maximize the investment of the Boise Centre project. Site Logistics rial deliveries are tracked through our integrated project management, cost control and accounting software Viewpoint. Critical items including key equipment and material deliveries are integrated into our overall master schedule to insure a productive process that integrates into the flow of work to meet our construction schedule timelines and milestone completion dates. This integrated Construction Logistics Plan, once finalized, will be incorporated into our bid packages to insure that all of our subcontracting partners understand how and where to stage all construction materials, phasing associated with deliveries and material handling over the course of construction, including interface with other potential subcontractors associated with the Grove Rehab project. This will include the area limits and constraints (just in time delivery, lean construction principles) that may be associated with material handling and associated division of work for each project. These areas are continuously monitored by our field staff. Items such as material and equipment delivery are discussed during weekly coordination meeting to insure a seamless flow onto the job site and into workers hands for construction activities. Mate- To facilitate this process, we have included preliminary site logistic and phasing plans that highlight fencing limits, work zone areas with specific task assignments and durations, public access/egress pathways, and scheduled events during each work phase. Specific to the Districts and the Boise Centre Expansion, MCI has already conceptualized an integrated logistics plan which integrates and coordinates work planned by CCDC within the Grove Plaza. This plan recognizes physical and logistic constrains specific to the environment, and is tailored to the demands and impacts of each on public and private spaces, as well as upon each project. Two of the greatest constraints upon both projects are the scheduled events during construction (CenturyLink and Boise Centre) and site accessibility. MCI has identified the West Spoke of the Grove Plaza as being the best alternative for project accessibility, due to the least impact on pedestrian travel, other construction and access/egress to other venues. This approach does have limitations and risks which need to managed, and as part of the preconstruction will be collectively discussed and considered with key stakeholders involved. Logistics Plans will evolve with the design and as ideas are vetted, but they are critical to any type of construction scheduling. Logistic constraints for the Grove and Boise Centre such as the 9th Street access point, limit productivity and add risk, which must be accounted for in both budgeting and scheduling. If The District does not yet have a comprehensive logistics and phasing plan already, its budget and schedule are at risk of being inaccurate and incomplete. Our initial preliminary phasing and logistic plans for the Boise Centre Expansion Project as follows: As part of our standard CM/GC services, MCI provides a detailed Construction Logistics Plan in the form of sequential drawings reflecting construction phases. Our Director of Preconstruction, with the participation of the Project Management Staff will create a site logistics plan involving the interaction of local governing jurisdictions as necessary. Within these plans, we identify the limits of the site/fencing, job trailer location, construction traffic/haul routes, crane and hoisting paths, utility locations or easement constraints, construction staging and parking areas and integrated safety features to insure the safety of workers and the general public. MCI will also detail any potential conflicts with normal operations of the surrounding businesses and how access and service to these businesses will be maintained during the course of construction. It is our priority to minimize any possible disturbances to those surrounding our job sites. B O I S E C E N T R E E X PA N S I O N P R O J E C T 9 M C A LV A I N C O N S T R U C T I O N , I N C . Conceptual Phasing Plan - Work Zone 1 South Spoke Construction Fencing & Public Access Potential 10yd Dumpster Location - Curbside Pull-in along Front St. Primary Construction Access Point Restrooms for Construction Use Only These Doors remain accessible for duration of construction Secured Construction Access Gates Posted Sign "Please Walk Bicycles - No Through Access" Front street Sidewalk & Crosswalk Unobstructed During Construction Accessible All Directions Phase I - BCE Fenced Work Zone Pedestrian Access CenturyLink Arena 10' Clear Unrestricted Egress from CenturyLink Arena Doors 5 & 6 BCE Phase I Construction Fencing - Drilled Post, 6' Height with Fabric Screening, Lockable Access Gates on Ends. PROJECT APPROACH Project Master Schedule MCI will collaborate with the District and its design team to develop various alternative approaches for sequencing of entitlements, design, permitting, procurement, and construction. The optimal project approach will be expanded into the preliminary project master schedule, and continue to evolve with design development and the vetting of logistic assumptions. The project schedule will be coordinated with Owner tasks and appropriate CSI coding structure and communicated to all project participants. Along with defining entitlement and permitting durations, the project master schedule will identify design milestone dates, critical bid and award dates, long lead materials and equipment procurement dates, contract and construction milestones, Owner commissioning and occupancy deadlines, substantial and final completion dates, and other key task items requiring identification within the project delivery supply chain. The project schedule will be coordinated with the appropriate task and CSI coding structure and will be communicated to all project participants. The project master schedule will be cost, resource, and material loaded by craft and trade, will establish entitlement to progress payments, and serve as a measurable indicator of productivity. During preconstruction the conceptual master schedule will undergo a series of evolutions. As previously noted it is key to not only capture the full scope of work but the potential constraints as well. As each successive phase of design unfolds more information becomes available and initial procurement strategies develop. Material alternatives and selections open discussions and investigation into lead times which must be captured in the master schedule. Changing market conditions, the sudden departure of materials or human resources, and the start of new construction projects can affect a delivery strategy, significantly altering a project approach and the focus of design development. B O I S E C E N T R E E X PA N S I O N P R O J E C T As part of this qualification statement to the District, MCI has prepared an integrated work-plan which combines conceptual preconstruction and construction activities for the Boise Centre expansion. Some of the milestone dates identified within this schedule include: ■■ Early Material Release (Elevators & Escalators) – December 11, 2015 ■■ Executed GMP Agreement – January 25, 2016 ■■ Temporary Construction Walls & Wayfinding – February 9, 2016 ■■ Micropiles & Column Footings – March 28, 2016 ■■ Structural Framing Erection – April 21, 2016 ■■ 2nd Floor Concrete Topping Slab Placement – May 13, 2016 ■■ Concourse Bridge Framing – June 3, 2016 ■■ Roofing Insulation & Membrane – June 17, 2016 ■■ Composite Metal Soffit Panels – July 18, 2016 ■■ Escalator Delivery – August 1, 2016 ■■ Acoustical Ceiling Tile Drop – September 15, 2016 ■■ Contractor Punchlist Detailing – October 4, 2016 ■■ Certificate of Completion – October 18, 2016 ■■ Notice of Final Completion – October 27, 2016 10 M C A LV A I N C O N S T R U C T I O N , I N C . The Boise Centre Expansion - Conceptual Integrated Workplan Activity ID Activity Name The Grove Plaza Renovation & Boise Centre Expansion The Grove & CCDC Preconstruction Services The Grove & CCDC Construction Services Boise Centre & GBAD Preconstruction Services Design-2 BCPreD -1000 BCPreD -1050 BCPreD -1100 BCPreD -1150 BCPreD -1200 BCPreD -1250 Design Construction Document - 50% Construction Documents - Permit Set Submission Design Construction Documents - 100% Demolition Permit Procurement Building Permit Procurement Pre-Bid RFI Response Window Construction Management BCPreCM -1000 BCPreCM -1050 BCPreCM -1075 BCPreCM -1100 BCPreCM -1125 BCPreCM -1135 BCPreCM -1150 BCPreCM -1175 BCPreCM -1200 BCPreCM -1225 BCPreCM -1250 BCPreCM -1275 BCPreCM -1300 BCPreCM -1350 BCPreCM -1400 Preconstruction Services Agreement - MCI & GBAD CMGC & Project Team Kick-Off Meeting GBAD & CCDC Coordination Meeting-1 100% Design Development Estimate Field Verifications - Measurements & Investigations Project Procurement Plan - MCI Bidder Prequalification & Bid Packaging GBAD & CCDC Coordination Meeting-2 Bid Advertisement Project Management Plan - MCI Bid Opening & Qualification GBAD & CCDC Coordination Meeting-3 GMP Proposal - MCI Subcontractor Letters of Intent Subcontract Awards Stakeholders BCPreSt -1000 BCPreSt -1050 BCPreSt -1100 BCPreSt -1150 BCPreSt -1200 BCPreSt -1250 BCPreSt -1300 BCPreSt -1325 BCPreSt -1350 BCPreSt -1400 Receive RFQ Response - MCI Interview CMGC Candidate - MCI Negotiate CMGC Award - MCI Execute CMGC Precon Agreement - MCI Review MCI Design Development Estimate Early Material Procurement - Escalators & Elevators Approval of MCI Bid Packaging & Project Management Plan Emergency Egress Plan Review & Approval - City of Boise Project Bid Review Execute GMP with MCI Boise Centre & GBAD Construction Services Boise Centre Phase I - Mobilization BCCSMo -1000 BCCSMo -1050 BCCSMo -1100 BCCSMo -1150 BCCSMo -1200 BCCSMo -1250 BCCSMo -1300 Advance Notification Signage Construction Office Set-Up Temp Construction Walls & Wayfinding Project Fencing & Signage Remote Yard Set-Up Subcontractor Precon Kick-Off Meeting GBAD & CCDC Coordination Meeting -4 Boise Centre Phase II - Construction Core & Shell BCCS CS -1000 BCCS CS -1050 BCCS CS -1100 BCCS CS -1150 BCCS CS -1200 BCCS CS -1250 BCCS CS -1300 Localized Barricades Remove Pavers - Front Plaza Radius Work Zone Install 6" Storm Drainage Piping & Cleanouts - Plaza Radius Drill & Cap Micropiles - Grid 18 Excavate & Place Column Footings - Grid PL4 Electrical Conduit - Inground Up Lighting Install 6" Storm Drainage - East Spoke (CenturyLink Arena) Actual Work Critical Remaining Work Remaining Work Milestone Summary Original Start Duration 283 01-Oct-15 A 86 01-Oct-15 A Finish 01-Nov-16 20-Sep-16 72 06-Nov-15 15-Feb-16 27 10 3 5 3 10 0 0 182 121 3 15 15 6 10 10 3 16-Nov-15 16-Nov-15* 23-Nov-15 16-Nov-15 28-Dec-15 11-Jan-16 28-Dec-15 20-Nov-15 20-Nov-15* 25-Nov-15 27-Nov-15 20-Nov-15 02-Dec-15 04-Dec-15 11-Dec-15 11-Dec-15 28-Dec-15 24-Dec-15 18-Jan-16 28-Dec-15 21-Jan-16 21-Jan-16 26-Jan-16 06-Nov-15 06-Nov-15* 13-Nov-15 20-Nov-15 27-Nov-15 11-Dec-15 11-Dec-15* 23-Dec-15 07-Jan-16* 18-Jan-16 21-Jan-16 12-Jan-16 12-Jan-16 12-Jan-16 26-Jan-16 09-Feb-16 29-Jan-16 26-Jan-16 16-Feb-16 18-Feb-16 19-Feb-16 29-Feb-16 29-Feb-16* 03-Mar-16 07-Mar-16 28-Mar-16 05-Apr-16 07-Apr-16 28-Mar-16 28-Jan-16, The Grove & CCDC Preconstruction Services 28-Jan-16 236 26-Oct-15 45 0 0 15 0 0 15 62 0 0 0 15 5 10 8 0 15 10 0 0 0 5 15 57 0 5 5 0 5 0 3 3 3 3 210 O N D J F M A M J J A S O N D J F M 20 11 20 012 30 122 01 120 01 220 12 201 12 001 23 012 20 112 00 122 01 12 011 23 012 20 112 00 123 01 220 12 01-Nov-16, The Grove Plaza Renovation & Boise C 15-Jan-16 04-Dec-15 15-Jan-16 15-Feb-16 10-Dec-15 08-Dec-15 17-Dec-15 22-Dec-15 15-Jan-16 06-Jan-16 27-Jan-16 15-Feb-16 25-Jan-16 19-Nov-15 26-Nov-15 17-Dec-15 25-Dec-15 11-Jan-16 20-Jan-16 25-Jan-16 01-Nov-16 18-Feb-16 25-Jan-16 28-Jan-16 15-Feb-16 02-Feb-16 08-Feb-16 20-Sep-16, The Grove & CCDC Construction Services 15-Feb-16, Boise Centre & GBAD Preconstruction Services 15-Jan-16, Design-2 16-Nov-15* Design Construction Document - 50% 23-Nov-15 Construction Documents - Permit Set Submission 16-Nov-15 Design Construction Documents - 100% 28-Dec-15 Demolition Permit Procurement 11-Jan-16 Building Permit Procurement 28-Dec-15 Pre-Bid RFI Response Window 15-Feb-16, Construction Management 20-Nov-15* Preconstruction Services Agreement - MCI & GBAD 25-Nov-15 CMGC & Project Team Kick-Off Meeting 27-Nov-15 GBAD & CCDC Coordination Meeting-1 20-Nov-15 100% Design Development Estimate 02-Dec-15 Field Verifications - Measurements & Investigations 04-Dec-15 Project Procurement Plan - MCI 11-Dec-15 Bidder Prequalification & Bid Packaging 11-Dec-15 GBAD & CCDC Coordination Meeting-2 28-Dec-15 Bid Advertisement 24-Dec-15 Project Management Plan - MCI 18-Jan-16 Bid Opening & Qualification 28-Dec-15 GBAD & CCDC Coordination Meeting-3 21-Jan-16 GMP Proposal - MCI 21-Jan-16 Subcontractor Letters of Intent 26-Jan-16 Subcontract Awards 25-Jan-16, Stakeholders 06-Nov-15* Receive RFQ Response - MCI 13-Nov-15 Interview CMGC Candidate - MCI 20-Nov-15 Negotiate CMGC Award - MCI 27-Nov-15 Execute CMGC Precon Agreement - MCI 11-Dec-15 Review MCI Design Development Estimate 11-Dec-15* Early Material Procurement - Escalators & Elevators 23-Dec-15 Approval of MCI Bid Packaging & Project Management Plan 07-Jan-16* Emergency Egress Plan Review & Approval - City of Boise 18-Jan-16 Project Bid Review 21-Jan-16 Execute GMP with MCI 01-Nov-16, Boise Centre & GBAD Construction Serv 18-Feb-16, Boise Centre Phase I - Mobilization 12-Jan-16 Advance Notification Signage 26-Jan-16 Construction Office Set-Up 09-Feb-16 Temp Construction Walls & Wayfinding 29-Jan-16 Project Fencing & Signage 26-Jan-16 Remote Yard Set-Up 16-Feb-16 Subcontractor Precon Kick-Off Meeting 18-Feb-16 GBAD & CCDC Coordination Meeting -4 01-Nov-16, Boise Centre Phase II - Construction 15-Aug-16, Core & Shell 01-Nov-16 15-Aug-16 02-Mar-16 23-Mar-16 25-Mar-16 04-Apr-16 18-Apr-16 20-Apr-16 30-Mar-16 29-Feb-16* Localized Barricades 03-Mar-16 Remove Pavers - Front Plaza Radius Work Zone 07-Mar-16 Install 6" Storm Drainage Piping & Cleanouts - Plaza Radius 28-Mar-16 Drill & Cap Micropiles - Grid 18 05-Apr-16 Excavate & Place Column Footings - Grid PL4 07-Apr-16 Electrical Conduit - Inground Up Lighting 28-Mar-16 Install 6" Storm Drainage - East Spoke (CenturyLink Arena) Page 1 of 4 Information is Proprietary & Confidential - Redistribution or use without prior written authorization of The McAlvain Group is prohibited and will result in prosecution to the fullest extent of the law. The Boise Centre Expansion - Conceptual Integrated Workplan Activity ID Activity Name BCCS CS -1350 BCCS CS -1400 BCCS CS -1500 BCCS CS -1525 BCCS CS -1550 BCCS CS -1600 BCCS CS -1650 BCCS CS -1675 BCCS CS -1700 BCCS CS -1750 BCCS CS -1800 BCCS CS -1850 BCCS CS -1900 BCCS CS -1950 BCCS CS -2000 BCCS CS -2050 BCCS CS -2100 BCCS CS -2150 BCCS CS -2200 BCCS CS -2250 BCCS CS -2275 BCCS CS -2300 BCCS CS -2350 BCCS CS -2375 BCCS CS -2400 BCCS CS -2450 BCCS CS -2500 BCCS CS -2550 BCCS CS -2600 BCCS CS -2650 BCCS CS -2700 BCCS CS -2750 BCCS CS -2775 BCCS CS -2800 BCCS CS -2850 Interior BCCSInt -1000 BCCSInt -1050 BCCSInt -1100 BCCSInt -1150 BCCSInt -1175 BCCSInt -1200 BCCSInt -1250 BCCSInt -1300 BCCSInt -1350 BCCSInt -1400 BCCSInt -1450 BCCSInt -1500 BCCSInt -1550 BCCSInt -1600 BCCSInt -1650 BCCSInt -1700 BCCSInt -1750 BCCSInt -1800 BCCSInt -1850 BCCSInt -1900 BCCSInt -1950 BCCSInt -2000 Original Duration Exterior Wall Framing & Sheathing - NE Corner 12 Fluid Applied Air Barrier 3 EIFS To Match - NE Elevation 10 Storefront Windows & Doors - East Elevation 0 Storefront Sill Wall Framing - Sports Zone 4 Storefront Sill Wall Glas-Mat, Rigid & Batt Insulation - Sports Zone 2 Storefront Sill Pony Wall - Sports Zone 3 Storefront Sill Metal Cap - Sports Zone (Field Measure & Fab) 5 Storefront Head & Parapet Wall - Sports Zone 6 Storefront Header Wall Sheathing & Insulation 3 Bridge Lower Component Wall Framing 6 Bridge Lower Wall Insulation & Glas-Mat 4 Bridge Lower Wall Fluid Air Barrier & Rigid Insulation 3 Bridge Upper Component Wall Framing 6 Bridge Upper Wall Insulation, Glas-Mat & Plywood Sheet 4 Bridge Upper Wall Fluid Air Barrier & Rigid Insulation 3 Storefront Window Frames - Bridge & Sports Zone 0 Storefront Glazing & Spandrel Panels - Bridge & Sports Zone 0 Steel Awning Columns - Sports Zone 0 Steel Awning Wall Anchors - Sports Zone Upper 0 Steel Awning Beams - Columns to Wall - Sports Zone 5 Composite Metal Panels - Sports Zone & Bridge (Field Measure & Fab) 15 Composite Metal Soffit Panels - Bridge (Field Measure & Fab) 15 7 Parapet Coping Cap - Bridge, Zone & Elevated Walkway (Field measure & fab) Main Entry Elevated Walkway Steel Column Footings 0 Main Entry Elevated Walkway Columns 4 Roofing Demo - Main Entry Radius Column Bearing 2 Main Entry Elevated Walkway Roof Columns 3 Main Entry Elevated Walkway Beams & Decking 5 Main Entry Elevated Walkway Infill Framing 10 Main Entry Radius Roof Repairs 3 Composite Metal Soffit Panels - Elevated Walkway (Field Measure & Fab) 15 10 Composite Metal Facade Panels - Elevated Walkway (Field Measure & Fab) Main Entry Elevated Walkway - Boise Centre Signage 5 Main Entry Elevated Walkway - Lighting 5 122 Decommission Work Zone Fire Alarm (L1-L2) 5 Decommission Work Zone Electrical (L1-L2) 5 Remove & Salvage Vestibule Doors - Entry Lobby (L1) 3 Remove Ceiling & Floor Finishes - Concession Area (L1) 3 Temporary Fire Sprinkler Modifications (L1-L2) 3 Remove & Salvage Storefront - Office Area (L1) 3 Remove Interior Walls (L1-L2) 5 Remove Integral Planters - Sports Zone (L2) 3 Safe-Off Balcony Egress - Sports Zone (L2) 2 Remove & Salvage Awnings & Signage - Sports Zone (L2) 4 Remove Glass Railings - Sports Zone (L2) 4 Remove Electrical Devices - Sports Zone (L2) 4 Remove Exterior Storefront, Walls & Finish - East Elevation 7 Remove Roofing, Deck & Structural Steel - East Elevation 4 Temporary Roofing & Leading Edge Safety Barrier 2 Reroute (E) water and RDL lines - Lobby (L1) 7 Modify Existing AHU & Duct System 7 Sawcut Concrete - Reroute Existing 4" Waste Line 4 Sawcut Concrete - Elevator Pit 2 Elevator Pit Excavation 3 Elevator & Sump Pit Concrete Floor 3 Elevator Pit Concrete Walls & Sill Angle 5 Actual Work Critical Remaining Work Remaining Work Milestone Summary Start Finish 10-May-16 26-May-16 31-May-16 14-Jun-16 13-May-16 19-May-16 23-May-16 09-Jun-16 26-May-16 03-Jun-16 26-May-16 03-Jun-16 09-Jun-16 03-Jun-16 13-Jun-16 17-Jun-16 22-Jun-16 06-Jul-16 26-May-16 03-Jun-16 17-Jun-16 06-Jul-16 14-Jun-16 05-Aug-16 19-Apr-16 19-Apr-16 19-Apr-16 21-Apr-16 26-Apr-16 14-Jun-16 03-May-16 28-Jun-16 12-Jul-16 19-Jul-16 26-Jul-16 19-Feb-16 19-Feb-16 19-Feb-16 26-Feb-16 02-Mar-16 07-Mar-16 07-Mar-16 07-Mar-16 23-Feb-16* 26-Feb-16 01-Mar-16 01-Mar-16 01-Mar-16 07-Mar-16 16-Mar-16 22-Mar-16 07-Mar-16 07-Mar-16 16-Mar-16 16-Mar-16 18-Mar-16 23-Mar-16 28-Mar-16 25-May-16 30-May-16 13-Jun-16 18-May-16 20-May-16 25-May-16 15-Jun-16 02-Jun-16 07-Jun-16 02-Jun-16 08-Jun-16 13-Jun-16 10-Jun-16 16-Jun-16 21-Jun-16 23-Jun-16 26-Jul-16 04-Jul-16 15-Aug-16 22-Apr-16 20-Apr-16 25-Apr-16 02-May-16 27-Jun-16 05-May-16 18-Jul-16 21-Jul-16 25-Jul-16 01-Aug-16 08-Aug-16 25-Feb-16 25-Feb-16 01-Mar-16 04-Mar-16 09-Mar-16 09-Mar-16 11-Mar-16 25-Feb-16 29-Feb-16 04-Mar-16 04-Mar-16 04-Mar-16 15-Mar-16 21-Mar-16 23-Mar-16 15-Mar-16 15-Mar-16 21-Mar-16 17-Mar-16 22-Mar-16 25-Mar-16 01-Apr-16 O N D J F M A M J J A S O N D J F M 20 11 20 012 30 122 01 120 01 220 12 201 12 001 23 012 20 112 00 122 01 12 011 23 012 20 112 00 123 01 220 12 10-May-16 Exterior Wall Framing & Sheathing - NE Corner 26-May-16 Fluid Applied Air Barrier 31-May-16 EIFS To Match - NE Elevation 14-Jun-16 Storefront Windows & Doors - East Elevation 13-May-16 Storefront Sill Wall Framing - Sports Zone 19-May-16 Storefront Sill Wall Glas-Mat, Rigid & Batt Insulation - Sports Zone 23-May-16 Storefront Sill Pony Wall - Sports Zone 09-Jun-16 Storefront Sill Metal Cap - Sports Zone (Field Measure & Fab) 26-May-16 Storefront Head & Parapet Wall - Sports Zone 03-Jun-16 Storefront Header Wall Sheathing & Insulation 26-May-16 Bridge Lower Component Wall Framing 03-Jun-16 Bridge Lower Wall Insulation & Glas-Mat 09-Jun-16 Bridge Lower Wall Fluid Air Barrier & Rigid Insulation 03-Jun-16 Bridge Upper Component Wall Framing 13-Jun-16 Bridge Upper Wall Insulation, Glas-Mat & Plywood Sheet 17-Jun-16 Bridge Upper Wall Fluid Air Barrier & Rigid Insulation 22-Jun-16 Storefront Window Frames - Bridge & Sports Zone 06-Jul-16 Storefront Glazing & Spandrel Panels - Bridge & Sports Zone 26-May-16 Steel Awning Columns - Sports Zone 03-Jun-16 Steel Awning Wall Anchors - Sports Zone Upper 17-Jun-16 Steel Awning Beams - Columns to Wall - Sports Zone 06-Jul-16 Composite Metal Panels - Sports Zone & Bridge (Field Measure & Fab) 14-Jun-16 Composite Metal Soffit Panels - Bridge (Field Measure & Fab) 05-Aug-16 Parapet Coping Cap - Bridge, Zone & Elevated Walkway (Field measure 19-Apr-16 Main Entry Elevated Walkway Steel Column Footings 19-Apr-16 Main Entry Elevated Walkway Columns 19-Apr-16 Roofing Demo - Main Entry Radius Column Bearing 21-Apr-16 Main Entry Elevated Walkway Roof Columns 26-Apr-16 Main Entry Elevated Walkway Beams & Decking 14-Jun-16 Main Entry Elevated Walkway Infill Framing 03-May-16 Main Entry Radius Roof Repairs 28-Jun-16 Composite Metal Soffit Panels - Elevated Walkway (Field Measure & Fab) 12-Jul-16 Composite Metal Facade Panels - Elevated Walkway (Field Measure & Fab) 19-Jul-16 Main Entry Elevated Walkway - Boise Centre Signage 26-Jul-16 Main Entry Elevated Walkway - Lighting 08-Aug-16, Interior 19-Feb-16 Decommission Work Zone Fire Alarm (L1-L2) 19-Feb-16 Decommission Work Zone Electrical (L1-L2) 26-Feb-16 Remove & Salvage Vestibule Doors - Entry Lobby (L1) 02-Mar-16 Remove Ceiling & Floor Finishes - Concession Area (L1) 07-Mar-16 Temporary Fire Sprinkler Modifications (L1-L2) 07-Mar-16 Remove & Salvage Storefront - Office Area (L1) 07-Mar-16 Remove Interior Walls (L1-L2) 23-Feb-16* Remove Integral Planters - Sports Zone (L2) 26-Feb-16 Safe-Off Balcony Egress - Sports Zone (L2) 01-Mar-16 Remove & Salvage Awnings & Signage - Sports Zone (L2) 01-Mar-16 Remove Glass Railings - Sports Zone (L2) 01-Mar-16 Remove Electrical Devices - Sports Zone (L2) 07-Mar-16 Remove Exterior Storefront, Walls & Finish - East Elevation 16-Mar-16 Remove Roofing, Deck & Structural Steel - East Elevation 22-Mar-16 Temporary Roofing & Leading Edge Safety Barrier 07-Mar-16 Reroute (E) water and RDL lines - Lobby (L1) 07-Mar-16 Modify Existing AHU & Duct System 16-Mar-16 Sawcut Concrete - Reroute Existing 4" Waste Line 16-Mar-16 Sawcut Concrete - Elevator Pit 18-Mar-16 Elevator Pit Excavation 23-Mar-16 Elevator & Sump Pit Concrete Floor 28-Mar-16 Elevator Pit Concrete Walls & Sill Angle Page 2 of 4 Information is Proprietary & Confidential - Redistribution or use without prior written authorization of The McAlvain Group is prohibited and will result in prosecution to the fullest extent of the law. The Boise Centre Expansion - Conceptual Integrated Workplan Activity ID Activity Name BCCSInt -2050 BCCSInt -2100 BCCSInt -2150 BCCSInt -2200 BCCSInt -2250 BCCSInt -2300 BCCSInt -2350 BCCSInt -2400 BCCSInt -2450 BCCSInt -2500 BCCSInt -2550 BCCSInt -2600 BCCSInt -2650 BCCSInt -2700 BCCSInt -2750 BCCSInt -2800 BCCSInt -2850 BCCSInt -2900 BCCSInt -2950 BCCSInt -3000 BCCSInt -3050 BCCSInt -3100 BCCSInt -3125 BCCSInt -3150 BCCSInt -3175 BCCSInt -3200 BCCSInt -3225 BCCSInt -3250 BCCSInt -3300 BCCSInt -3350 BCCSInt -3375 BCCSInt -3400 BCCSInt -3425 BCCSInt -3450 BCCSInt -3500 BCCSInt -3550 BCCSInt -3575 BCCSInt -3585 BCCSInt -3600 BCCSInt -3700 BCCSInt -3750 Elevator Pit Safety Cover Sawcut Concrete - Stairwell Continuous Footings Excavation Continuous Footing Placement - Stairwell Sawcut Concrete - Offfice/Lobby Spread & Cont. Footings Spread & Cont. Footing Placement - Office/Lobby area Sawcut Concrete - Escalator Pit Escalator Pit Excavation Sawcut Concrete - Existing Spread Footing @ Escalator Escalator Pit Concrete Floor Escalator Pit Concrete Walls Escalator Pit Safety Cover CMU Wall In-fill (Solid Grouted) - Office area Expose Existing Structure - Wild Connections Erect HSS Columns Erect Structural Framing - 2nd Floor Slab Edge Bent Plate - 2nd Floor Composite Decking - 2nd Floor Welded Studs, DBA's & Reinforcement - 2nd Floor Erect Structural Roof Framing 20ga Roof Decking Roof Deck Penetrations & Supports Concrete Pourback - Spread & Continuous Footings Concrete Topping Slab - 2nd Floor Stairwell Stringers & Landings Concrete Placement - Stair Pans & Landings Roof Structural Steel In-fill & Hoist Beam - Stairwell & Elevator Roofing Insulation & TPO Membrane - Building, Bridge & Concourse Elevator shaft Wall Framing Stairwell Framing & Sheathing Stairwell Railings Stairwell Roof Access Hatch & Ladder Interior Wall Framing (L1-L2) Masonry Walls - Won Door Pocket (L2) MEP Overhead Rough-In (L1-L2) Interior Walls - MEP Rough-In (L1-L2) Soffit Ceiling Framing (L1-L2) Stairwell & Landing Standpipe & Sprinkler Piping Stairwell & Landing Underside Framing & Sheathing Drywall Sheathing (L1-L2) Hard-Lid Ceiling Framing (L1) Lighting Fixtures & Mechanical Run-out (L1) BCCSInt -3800 BCCSInt -3850 BCCSInt -3950 BCCSInt -4000 BCCSInt -4025 BCCSInt -4050 BCCSInt -4100 BCCSInt -4150 BCCSInt -4200 BCCSInt -4250 BCCSInt -4300 BCCSInt -4350 BCCSInt -4400 BCCSInt -4450 Fire Sprinkler Head Drops (L1) Hard Lid Sheathing & Taping (L1) Hard Lid Ceiling Framing (L2) Lighting Fixtures & Mechanical Run-out (L2) Hard Lid Sheathing & Taping (L2) Mechanical Piping - Bridge & Concourse Ceiling Framing - Bridge & Concourse Ceiling Recessed Lighting Fixtures - Bridge & Concourse Drywall Sheathing - Bridge & Concourse Drywall Tape & Finish - Bridge & Concourse Acoustical Ceiling Grid - Office (L1) Acoustical Ceiling Grid (L2) Ceiling Grid Lighting & Diffusers Ceiling Grid Sprinkler Head Cut-In Finishes & Activation BCCSFin -0900 Condensing Unit Set Actual Work Critical Remaining Work Remaining Work Milestone Summary Original Duration 0 3 3 2 3 3 4 2 3 5 0 10 3 3 5 3 2 3 5 3 2 3 0 8 5 2 0 5 5 4 4 15 5 15 10 10 3 10 8 5 4 4 8 5 4 8 4 5 3 4 7 5 5 10 10 87 5 Start 04-Apr-16 18-Mar-16 23-Mar-16 23-Mar-16 25-Mar-16 25-Mar-16 30-Mar-16 05-Apr-16 07-Apr-16 12-Apr-16 19-Apr-16 30-Mar-16 13-Apr-16 18-Apr-16 21-Apr-16 28-Apr-16 03-May-16 05-May-16 28-Apr-16 05-May-16 10-May-16 10-May-16 13-May-16 03-May-16 13-May-16 20-May-16 17-Jun-16 24-May-16 20-May-16 27-May-16 27-May-16 13-May-16 20-May-16 13-May-16 25-May-16 03-Jun-16 02-Jun-16 07-Jun-16 17-Jun-16 17-Jun-16 24-Jun-16 24-Jun-16 30-Jun-16 24-Jun-16 01-Jul-16 07-Jul-16 07-Jul-16 13-Jul-16 20-Jul-16 25-Jul-16 29-Jul-16 12-Jul-16 19-Jul-16 19-Jul-16 19-Jul-16 01-Jul-16 01-Jul-16* Finish 22-Mar-16 25-Mar-16 24-Mar-16 29-Mar-16 29-Mar-16 04-Apr-16 06-Apr-16 11-Apr-16 18-Apr-16 12-Apr-16 15-Apr-16 20-Apr-16 27-Apr-16 02-May-16 04-May-16 09-May-16 04-May-16 09-May-16 11-May-16 12-May-16 12-May-16 19-May-16 23-May-16 30-May-16 26-May-16 01-Jun-16 01-Jun-16 02-Jun-16 26-May-16 02-Jun-16 07-Jun-16 16-Jun-16 06-Jun-16 20-Jun-16 28-Jun-16 23-Jun-16 29-Jun-16 O N D J F M A M J J A S O N D J F M 20 11 20 012 30 122 01 120 01 220 12 201 12 001 23 012 20 112 00 122 01 12 011 23 012 20 112 00 123 01 220 12 04-Apr-16 Elevator Pit Safety Cover 18-Mar-16 Sawcut Concrete - Stairwell Continuous Footings Excavation 23-Mar-16 Continuous Footing Placement - Stairwell 23-Mar-16 Sawcut Concrete - Offfice/Lobby Spread & Cont. Footings 25-Mar-16 Spread & Cont. Footing Placement - Office/Lobby area 25-Mar-16 Sawcut Concrete - Escalator Pit 30-Mar-16 Escalator Pit Excavation 05-Apr-16 Sawcut Concrete - Existing Spread Footing @ Escalator 07-Apr-16 Escalator Pit Concrete Floor 12-Apr-16 Escalator Pit Concrete Walls 19-Apr-16 Escalator Pit Safety Cover 30-Mar-16 CMU Wall In-fill (Solid Grouted) - Office area 13-Apr-16 Expose Existing Structure - Wild Connections 18-Apr-16 Erect HSS Columns 21-Apr-16 Erect Structural Framing - 2nd Floor 28-Apr-16 Slab Edge Bent Plate - 2nd Floor 03-May-16 Composite Decking - 2nd Floor 05-May-16 Welded Studs, DBA's & Reinforcement - 2nd Floor 28-Apr-16 Erect Structural Roof Framing 05-May-16 20ga Roof Decking 10-May-16 Roof Deck Penetrations & Supports 10-May-16 Concrete Pourback - Spread & Continuous Footings 13-May-16 Concrete Topping Slab - 2nd Floor 03-May-16 Stairwell Stringers & Landings 13-May-16 Concrete Placement - Stair Pans & Landings 20-May-16 Roof Structural Steel In-fill & Hoist Beam - Stairwell & Elevator 17-Jun-16 Roofing Insulation & TPO Membrane - Building, Bridge & Concourse 24-May-16 Elevator shaft Wall Framing 20-May-16 Stairwell Framing & Sheathing 27-May-16 Stairwell Railings 27-May-16 Stairwell Roof Access Hatch & Ladder 13-May-16 Interior Wall Framing (L1-L2) 20-May-16 Masonry Walls - Won Door Pocket (L2) 13-May-16 MEP Overhead Rough-In (L1-L2) 25-May-16 Interior Walls - MEP Rough-In (L1-L2) 03-Jun-16 Soffit Ceiling Framing (L1-L2) 02-Jun-16 Stairwell & Landing Standpipe & Sprinkler Piping 07-Jun-16 Stairwell & Landing Underside Framing & Sheathing 17-Jun-16 Drywall Sheathing (L1-L2) 17-Jun-16 Hard-Lid Ceiling Framing (L1) 24-Jun-16 Lighting Fixtures & Mechanical Run-out (L1) 24-Jun-16 Fire Sprinkler Head Drops (L1) 30-Jun-16 Hard Lid Sheathing & Taping (L1) 24-Jun-16 Hard Lid Ceiling Framing (L2) 01-Jul-16 Lighting Fixtures & Mechanical Run-out (L2) 07-Jul-16 Hard Lid Sheathing & Taping (L2) 07-Jul-16 Mechanical Piping - Bridge & Concourse 13-Jul-16 Ceiling Framing - Bridge & Concourse 20-Jul-16 Ceiling Recessed Lighting Fixtures - Bridge & Concourse 25-Jul-16 Drywall Sheathing - Bridge & Concourse 29-Jul-16 Drywall Tape & Finish - Bridge & Concourse 12-Jul-16 Acoustical Ceiling Grid - Office (L1) 19-Jul-16 Acoustical Ceiling Grid (L2) 19-Jul-16 Ceiling Grid Lighting & Diffusers 19-Jul-16 Ceiling Grid Sprinkler Head Cut-In 01-Nov-16, Finishes & Activation 01-Jul-16* Condensing Unit Set 29-Jun-16 11-Jul-16 30-Jun-16 06-Jul-16 18-Jul-16 12-Jul-16 19-Jul-16 22-Jul-16 28-Jul-16 08-Aug-16 18-Jul-16 25-Jul-16 01-Aug-16 01-Aug-16 01-Nov-16 07-Jul-16 Page 3 of 4 Information is Proprietary & Confidential - Redistribution or use without prior written authorization of The McAlvain Group is prohibited and will result in prosecution to the fullest extent of the law. The Boise Centre Expansion - Conceptual Integrated Workplan Activity ID Activity Name BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin BCCSFin -0950 -1000 -1050 -1075 -1100 -1150 -1200 -1250 -1300 -1325 -1350 -1365 -1375 -1400 -1450 -1550 -1600 -1625 -1650 -1700 -1750 -1850 -1900 -1950 -2000 -2050 -2100 -2150 -2200 -2250 -2300 Sealed Concrete (l1-L2) Machine Room-less Electric Traction Elevator Delivery Traction Elevator Install Drywall Infill - Elevator Door Frames Top of Shaft Electrical, Fire & Mechanical Escalator Delivery Escalator Assembly & Install Escalator Power & Lighting Connection Escalator Start-up & Tuning Miscellaneous Finish Detailing Around Escalator Landings Interior Wall & Ceiling Painting Electrical Wall Trim Out Won Fire Door Installation Fire Alarm Devices Mechanical Trim & Split System (Bridge & Concourse) Carpet & Rubber Base (L1-L2) Rubber Floor Tile - Stairwell Final Overhead Inspections - OK to Cover Acoustical Ceiling Tile Drop Fire Alarm Trim Out & Functional Testing Lighting & Mechanical Trim Out Punch List Detailing Owner & AHJ Final Inspections Structural Conformance Letter Certificate of Completion - Occupancy Notice of Substantial Completion Final Cleaning and Punch List Completion Warranties and O&M's - Owner Submission Notice of Final Completion Final Owner Billing Full Owner Occupancy - Phase II Grand Opening Actual Work Critical Remaining Work Remaining Work Milestone Summary Original Duration 5 0 10 3 4 0 20 3 5 5 10 10 0 5 4 7 7 0 5 8 8 5 5 0 5 0 5 0 3 2 0 Start Finish 19-Jul-16 19-Jul-16* 19-Jul-16 28-Jul-16 02-Aug-16 01-Aug-16* 01-Aug-16 29-Aug-16 01-Sep-16 08-Sep-16 09-Aug-16 23-Aug-16 29-Jul-16 23-Aug-16 23-Aug-16 23-Aug-16 01-Sep-16 15-Sep-16 15-Sep-16 22-Sep-16 22-Sep-16 04-Oct-16 11-Oct-16 11-Oct-16 18-Oct-16 25-Oct-16 18-Oct-16 25-Oct-16 25-Oct-16 28-Oct-16 01-Nov-16 25-Jul-16 01-Aug-16 01-Aug-16 05-Aug-16 26-Aug-16 31-Aug-16 07-Sep-16 14-Sep-16 22-Aug-16 05-Sep-16 29-Aug-16 26-Aug-16 31-Aug-16 09-Sep-16 21-Sep-16 03-Oct-16 03-Oct-16 10-Oct-16 17-Oct-16 24-Oct-16 24-Oct-16 27-Oct-16 31-Oct-16 O N D J F M A M J J A S O N D J F M 20 11 20 012 30 122 01 120 01 220 12 201 12 001 23 012 20 112 00 122 01 12 011 23 012 20 112 00 123 01 220 12 19-Jul-16 Sealed Concrete (l1-L2) 19-Jul-16* Machine Room-less Electric Traction Elevator Delivery 19-Jul-16 Traction Elevator Install 28-Jul-16 Drywall Infill - Elevator Door Frames 02-Aug-16 Top of Shaft Electrical, Fire & Mechanical 01-Aug-16* Escalator Delivery Escalator Assembly & Install Escalator Power & Lighting Connection Escalator Start-up & Tuning Miscellaneous Finish Detailing Around Escalator Landings 09-Aug-16 Interior Wall & Ceiling Painting 23-Aug-16 Electrical Wall Trim Out 29-Jul-16 Won Fire Door Installation 23-Aug-16 Fire Alarm Devices 23-Aug-16 Mechanical Trim & Split System (Bridge & Concourse) 23-Aug-16 Carpet & Rubber Base (L1-L2) 01-Sep-16 Rubber Floor Tile - Stairwell 15-Sep-16 Final Overhead Inspections - OK to Cover Acoustical Ceiling Tile Drop Fire Alarm Trim Out & Functional Testing Lighting & Mechanical Trim Out Punch List Detailing Owner & AHJ Final Inspections 11-Oct-16 Structural Conformance Letter 18-Oct-16 Certificate of Completion - Occupancy 25-Oct-16 Notice of Substantial Completion Final Cleaning and Punch List Completion 25-Oct-16 Warranties and O&M's - Owner Submission Notice of Final Completion Final Owner Billing 01-Nov-16 Full Owner Occupancy - Phase II Grand Opening Page 4 of 4 Information is Proprietary & Confidential - Redistribution or use without prior written authorization of The McAlvain Group is prohibited and will result in prosecution to the fullest extent of the law. PROJECT APPROACH The Grove Plaza and Boise Centre Expansion projects are excellent examples of why a coordinated and collaborative approach to scheduling is so important. If either is executed independent of each other, the final construction by product for both will result in project coordination conflicts leading to delays and added costs to both projects. In preparation of the conceptual master schedule for the Boise Centre, MCI was limited to a review of the Design Development Drawings and Specifications, and initial site investigation of existing conditions. MCI has however, completed a thorough site assessment of the Grove Plaza and Boise Centre through its Schematic Design review phase for CCDC, which conveniently provides a template overlay of constraints and opportunities for the District. With this scheduling exercise, MCI has prepared for CCDC and can provide to the District, a series of construction options which either integrate or segregate their respective projects. Starting in preconstruction, MCI prefers to utilize Primavera Scheduling Software to monitor, control, and report the overall progress of the project. This software is utilized through the construction delivery phase in order to expedite weekly Owner and subcontractor progress updates. We may require that at a minimum each subcontractor provides schedule updates in Primavera Contractor with their progress billings. In conjunction with the assignment of block activity identification numbers, this requirement will ensure a seamless integration and pay application review process. During the construction phase, the MCI Project Team will monitor each subcontractor and vendor to ensure compliance with project milestones and established plans. A key duty of the Project Engineer is to help manage change by reviewing change order requests for time. The Project Engineer in cooperation with the Field Superintendents will quantify the time impact of any critical delays encountered during the project through the employment of time impact analysis methodologies. What-if schedules will be developed as required to analyze and measure the effects of change, define potential impacts to the overall project master sched- B O I S E C E N T R E E X PA N S I O N P R O J E C T ule and associated milestones, and identify potential alternatives to maintain the critical path. Schedule updates will provide the basis for discussion in weekly project scheduling and coordination meetings, exception reporting, schedule status reporting and progress reporting. The overall master schedule and three week look-a-head schedules are utilized in weekly on-site coordination meetings with our subcontracting teams to assist in the monitoring and controlling of the completion of construction activities to insure our scheduled timelines are achieved. Preconstruction Estimating This estimating effort will be led by our Director of Preconstruction Services in close coordination with our Project Manager and Estimating personnel. Our team of estimators will be responsible for preparing conceptual and detail estimates as required during the preconstruction phase of the project. To maintain consistency across lines of business and Client bases our Director of Preconstruction Services will coordinate with the project team to assist in establishing the project controls system utilizing the Work Breakdown Structure (WBS) established for the specific project. Input from all team members including Project Superintendent occurs as design packages are developed and constructability reviews and VE analysis are developed throughout the preconstruction services phase. MCI utilizes a state of the art computer software system to assist our estimators and incorporates an estimating database derived from our cost control system. Actual costs associated with previous relevant projects can be updated based on projected quantities and input into the estimate. Our work breakdown structure for these estimates is consistent and integrated with our other project management tools and allows for the evaluation of variances as the design progresses. MCI produces hundreds of millions of dollars of cost estimates each year and maintains an extensive database of costs to draw upon. These estimates vary as required for different needs. This provides the ability to check our early conceptual and budgetary esti- 11 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH estimate of project costs and provide the District with all the supporting data. The estimate will continue to be refined as the Construction Documents progress and delivered at predetermined milestone dates identified by the Team and identified within our baseline Project Master Schedule. For the Boise Center Expansion Project we expect three major estimating deliverables culminating in a GMP at approximately 90% design completion. mates against actual cost performance. Most importantly, we utilize in-house data libraries created from a multitude of historical facility projects to ensure accurate pricing that reflects current market conditions. At the beginning of Preconstruction activities, an initial Estimate will be established, based on the available design documents. This initial estimate will provide the baseline upon which all future estimates are based, updated and modified as the design information develops. Concurrent with this estimate, MCI will conduct a local market survey to determine the current costs and availability of labor, materials and equipment, current and future bidding climates and other related factors that have a direct effect on pricing for the project. This includes bringing in our subcontracting partners as necessary to provide preliminary budgets early in the process to insure that our estimating model is consistent with the local market conditions. This information is then leveraged against our project cost database to insure that the early estimates are as accurate as possible. MCI has a history of being able to accurately determine at the very earliest phases of design reliable budgets which in turn can be managed throughout the preconstruction process. At the completion of the next design phase, MCI will prepare a more detailed B O I S E C E N T R E E X PA N S I O N P R O J E C T MCI will work closely with the District to ascertain that all project costs (such as third party costs, Owner released purchase orders, Owner furnished materials, systems, furniture, and equipment, site surveys, site investigations, and contingencies, as necessary) and ensure that estimated final costs are complete and accurate. Our preconstruction process allows us to go beyond the two dimensions of drawings or three dimensions of BIM, and into 4D level of presentation of potential investment strategies tied to logistics, constraints and opportunities, schedule and stakeholder values. Our preconstruction estimating takes a real world holistic approach to the build, to offer the District an unequaled level of confidence in investment decision making. Estimating services will continue into the Construction Phase and will include the development of an “Owner’s Estimate”. Estimates to support bid package addenda will also continue throughout the early stages of the Construction phase. The project estimator will play a critical role throughout the entire Construction phase. Conceptual and detail estimates will generally be required as Construction commences to account for constructability and process challenges and to manage change. Value Engineering Based on historical cost data and extensive similar experience, MCI will provide value engineering; life cycle cost analysis and recommendations on the feasibility of construction methods, availability of materials and labor and time requirements for procurement and installation of materials, systems and equipment, and other factors related to the overall project costs. We will work closely with the District and its design team to 12 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH explore alternative designs or materials where appropriate in order to attain the goal of providing a quality project at the lowest possible cost. One of our most recent CM/GC projects for the City of Boise - The Dixie Drain Phosphorus Removal Facility, required a massive amount of earthwork to develop ponds that are a mandatory part of the treatment process. Due to the remote location of the project, improving earth movement around the site and avoiding exporting dirt off of the site was critical to optimizing the budget. In working closely with the Engineering team and City of Boise, we provided numerous cost analysis scenarios which helped maintain a balanced site and avoided transporting dirt long distances. This in turn was a realized savings of over $1.2 Million dollars to the program. But value engineering to MCI is more than just cutting costs, it’s about delivering maximum owner defined value. We will seek out opportunities that improve efficiency, accelerate construction, have lower life cycle costs, or improve the overall quality of the project. This effort is tied to our initial preconstruction process of defining stakeholder values – establishing those deliverable qualities which the District most desires. Knowing these upfront allow MCI to focus value engineering efforts towards those items which deliver the most owner satisfaction and return on investment. Procurement Process The procurement process begins with the identification of long lead materials and equipment for prepurchasing. MCI will lead the effort to determine the pre-purchased material and equipment strategy and provide detailed what-if scenarios to determine the most feasible and cost effective delivery schedules. Lead-times will be evaluated and incorporated into the project master schedule and bid packages to determine the procurement sequence and strategy for long lead items. Concurrent with the initial effort, the project team will begin preparing the necessary procurement and expediting documentation. B O I S E C E N T R E E X PA N S I O N P R O J E C T Subcontracting Procedures MCI will define bid package activities within the project schedule that depicts the overall sequence and timing of the events from completion of design through award and closeout. Our bid package status report will summarize this information for the benefit and planning of the entire team. The result is a CPM network that is replicated for each bid package and reflected in the project master schedule. This ensures that deviations from the overall contracting strategy are identified on a bid package and construction document basis and are corrected in a timely manner. i. Solicitation of Subcontractors Under the direction of the Project Manager, the project team will be responsible for preparation of bid packages, pre-qualification of subcontractors and the recommendation of successful bidders. Initially, the Project Manager will work with the Project Team to establish the work breakdown structure (WBS) and define the scope of work for the individual bid packages. Bid packages for early work will be expedited to permit the earliest possible start. ii. Subcontracting Procedures The subcontracting procedures to be used on this project will follow formal package preparation, bidder evaluation and selection methods. We will use local subcontractors when possible and will ensure proper competitive participation of small and disadvantaged businesses if necessary. MCI will define bid package activities within the project schedule that depicts the overall sequence and timing of the events from completion of design through award and closeout. The result is a CPM network that is replicated for each bid package and reflected in the project master schedule. This ensures that deviations from the overall contracting strategy are identified on a bid package and construction document basis and are corrected in a timely manner. 13 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH iii. Source List Development The bidders’ list for each scope of work will be carefully developed and analyzed to ensure the selection of knowledgeable subcontractors capable of performing quality and safe work at a competitive price. For all major contract work packages, and smaller packages as required, the Project Engineer will develop a list of bidders who are properly matched to the task, financially stable and provide proven quality craftsmanship. MCI has started a dialogue with numerous potential bidders and can assure a qualified group with adequate coverage. Research sources for developing a bidders list include the following: ■■ The District/Design Team recommendations (if desired) ■■ List and evaluation of the pre-qualified subcontractors that MCI has utilized on current and previous work ■■ Recommendations from other sources, e.g., contractors with whom MCI has done business, affiliated company contractor files and comments In reviewing potential subcontractors, we will utilize reference information, standardized pre-qualification questionnaires, financial and credit reports, Dun & Bradstreet reports, workers compensation modification rates, bank references, etc. Each subcontractor’s reliability and competence will be checked through client references, face-to-face interviews and meetings as required. iv. Bid Package Definition MCI, in conjunction with the District, will prepare a definition of all contract packages and a Bid Package Status Report. This report will establish target dates for each activity leading to the award of each subcontract and will be integrated into the project master schedule. The Bid Package Status Report will be issued on a weekly basis showing the current status of each activity. B O I S E C E N T R E E X PA N S I O N P R O J E C T v. Bid Package Assembly Prior to bid package assembly, MCI will work to establish bid package formatting along with general, special and supplemental conditions. The project Estimator and Project Team will collaborate to develop subcontractor pricing schedules and milestone schedules for inclusion in each bid package. Our Project Team will assemble bid packages containing a description of the scope of work to be performed. Included will be the MCI General Conditions, Owner Special and Supplemental Conditions, applicable drawings and specifications, all specific requirements of the District and any other documents necessary for a complete contract. MCI will start with previously approved documents from other similar projects. These documents include bid package material and subcontract language that conforms to the District’s requirements including flow down requirements for subcontractors. This is another example of how MCI will save the District money by avoiding the process of re-inventing the wheel. Once the package has been assembled, it will be reviewed by the project team, revised as necessary, and approved by MCI’s Project Manager. 14 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH vi. Bid Package Issuance bid documents may be resolved through telephone The Project Manager will select an appropriate clarification and subsequent confirmation. number of qualified bidders from the source list and recommend them as bidders for the specific subTypically and as deemed necessary, a bid clarificacontract package. This bidders list will be presented tion meeting will be held with the low bidder prior to to the District for approval. When the MCI Team submission of a recommendation to the District. If has received approval of the contract package and several bidders are closely grouped, it may be rebidders list, proposals will be solicited with a date quired to conduct interviews with each of the bidders and time set for the pre-bid conference and receipt to determine the best proposal. Bid review meetings of proposals. Bidders will be specifically directed to will be held in the MCI project offices. The bid reprepare and submit proposals on project forms and view meeting will be attended by the Bidder, Project in compliance with the specified format. The bidders Manager, Cost and Schedule Manager, Estimator and/ will be advised that MCI and the District reserves the or their designated representative and other approright to award to other than the lowest bidder or to priate project personnel. The District will be invited reject all bids. All bidders are responsible for submit- to bid review meetings. The meetings will ensure ting bids by the designated date and time. that the bidder completely understands the work to be performed and has priced the bid accordingly. vii. Bid Clarifications and Addenda The contract documents, insurance, EEO (as may be The MCI Project Team will maintain contact with the applicable) and OSHA requirements will be reviewed. bidders during the bidding period to answer questions Schedules and estimated manpower, negotiation regarding drawings and specifications, terms and condi- of exceptions, unit price rates, change order pricing tions, insurance, payment and performance bonds structures, etc. will be included in the discussion. The schedule, etc. We will transcribe the minutes of the key members of the bidder’s project team may be Pre-bid meeting and forward the meeting minutes to called in for interview. After the bid review meeting(s) all bidders as an addendum. Any changes to the bidand receipt of written revised proposals, if required, a ding requirements will also be forwarded to all bidders. final recommendation will be made to the District. viii. Bid Evaluation MCI will receive bids. The Project Manager will open the bids after the appointed time for submittal. The District will be invited to all bid openings. All exceptions, bid items and summary of unit pricing information (when applicable) will be recorded on a tabulation form. All bids received are handled as confidential information. After the bid tabulation is completed, the bids will be analyzed for overall pricing differentials including relative value of bid exceptions, comparison with job estimates, relative balance of the price breakdowns, relationship of sales tax to material cost, relationship of bond cost to total contract value, and adequacy of bid range. The relative capability of each subcontractor and acceptance of contract terms and conditions will also be evaluated. Minor exceptions to B O I S E C E N T R E E X PA N S I O N P R O J E C T ix. Subcontract Award After the District’s approval of the negotiated GMP, final recommendation and receipt of a letter of authorization, the subcontract will be prepared by the Contract Administrator and approved by MCI’s Project Manager. A transmittal letter accompanying the Subcontract Agreement will state that no fieldwork may commence until MCI is in receipt of the fully executed Agreement including the appropriate Insurance Certificates and any other required documentation. The subcontractor will be required to name their on-site Superintendent and Site Safety Representative. Prior to mobilization, all subcontractors will be required to attend a mandatory Pre Construction meeting at the project site to review the administrative requirements of the contract documents. 15 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH Construction Phase Table of Contents MCI has completed similar services for numerous projects similar in scope and complexity and has developed the following project approach to assure a quality product, in a timely manner, within the performance criteria established by the project team. Based on this approach, preconstruction activities will continue into the construction phase. Estimating, scheduling, contract administration, procurement, document control and other preconstruction activities will continue uninterrupted. General conditions and staffing plan to support the construction sequence will be identified during the pre-construction phase of this project. Construction Phase Safety Scheduling Cost Control Management Project Meetings Self-Perform Capabilities Subcontracting Execution Inspection and Testing Commissioning Project Closeout Safety Our project team recognizes the value of a viable safety program and takes great pride in making sure all our employees, and our subcontractors employees, work in a safe environment every day. Our motto is, “SAFETY COMES FIRST”. Our project team has partnered with OSHA since 1998. Scheduling MCI believes that centralized control of the project master schedule and weekly face-to-face communications between the project manager and the project team provides the highest level of control. During the pre-construction and construction phases, we ensure that every aspect of the project is planned and that the plan is adequately and clearly communicated to the participating subcontractors, consultants and engineers. We achieve this goal by using contractual milestone schedules and baseline schedules tied to subcontractor payments. Secondly, we perform a series of rigorous performance measurement reviews to ensure that the various participants are achieving their plan. Critical trends are communicated to the entire project team as deviations are identified. In this proactive manner, the MCI management team provides clear and concise solutions. Construction progress will be monitored on a daily basis by our field staff. KEY CONSTRUCTION ACTIVITIES INCLUDE (but not limited to): • • • • • Manage the construction process including coordination, planning, trade contractor management, manage submittals, and requests for information Review and negotiate change orders, coordinate safety programs, resolve issues and claims Conduct and coordinate inspections, review and pay trade invoices, update construction schedules Conduct coordination meetings Maintain records, record documents and manuals, punch list, coordinate and assist with warranty corrections B O I S E C E N T R E E X PA N S I O N P R O J E C T • Provide all necessary supervisory, and clerical staff • • Cost control management • • • • 16 for proper management of the construction Manage project schedule (bimonthly basis) Prepare and deliver construction progress reports (prepared daily, weekly, and monthly basis) Hold regular project meetings (weekly basis) Provide quality control/quality assurance (QA/QC) throughout the construction phase Coordinate and assist in warranty corrections M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH Cost Control Management The project manager will continually analyze performance data. Cost control will be facilitated at the project level and implemented at the project office. Our project manager will establish communications protocols as required to facilitate change control and progress billings for the project. All cost reporting, cash flow reporting, forecasting, monthly reporting, change management, progress billing, invoicing and related functions will be handled by our management staff and transparently conveyed to the District utilizing our ‘Open Book Policy’. The MCI cost control process is coordinated with project scheduling and estimating functions and will be used to monitor and control the entire project budget and cost performance. All project costs will be input into the cost control system including CM management costs and fees, design costs and fees, contingencies, construction costs, pre-purchased materials and equipment, site investigations, as well as all insurance and other costs as defined by the District. During the course of the project, the cost control system will be updated to reflect changes in scope, contingencies and other District and design team directives as required. The actual cost of work will be collected from the project team, vendors, material suppliers and subcontractors on a realtime basis. Open commitments such as changes in work requests, requests for quotes, pending change orders and claims/issues will also be monitored and tracked continually for a clear and concise reflection of the project budget. Project Meetings Our primary method for formal communication and coordination will be weekly scheduled meetings that include all subcontractors, the District, design team, and our project staff. At this meeting, a three-week schedule will be distributed and a work plan implemented for the week ahead. The work areas will be coordinated and other relevant issues discussed. These will include such items as safety, potential interferences, up-coming detail changes or design holds, etc. B O I S E C E N T R E E X PA N S I O N P R O J E C T Self-Performing Capabilities MCI employs a seasoned team of craftsmen, carpenters, finishers, laborers and equipment operators and routinely self-performs more than 30% of the work on our projects. The ability to self-perform these early activities sets the tone for the rest of the project. As one of the largest self-performing construction services companies in our region of work and the largest structural concrete contractor in our area, our ability to successfully complete even the most complex of projects with great accuracy, on a schedule of our choosing, allows each subsequent division of work to be completed faster, more efficiently and without compromise. Subcontracting Execution During the subcontract execution phase, MCI will administrate the contract to maintain open lines of communication and emphasize the necessity for completion as scheduled. All major subcontracts will include a reporting and invoicing specification, which requires the subcontractor to submit information necessary for proper progress reporting. Day-to-day supervision and management of the contract by MCI will emphasize the minimization of changes and proper coordination of subcontractor activities with other project activities. Should changes or interferences occur, the conditions would be processed and resolved as quickly as possible to minimize cost and schedule impacts. All changes in work requests will be properly documented, reviewed, 17 M C A LV A I N C O N S T R U C T I O N , I N C . PROJECT APPROACH validated and forwarded to the District for approval. Changes will only be issued after receiving approval from the District. When the subcontractor has completed their work, they will be required to request, in writing, a completion inspection that will then be scheduled by the project manager. During this inspection, a preliminary punch list will be prepared, signed by all inspecting parties and sent to the subcontractor for completion. When the subcontractor has completed all items on the punch list, he will request another inspection of the items. When all items have been corrected, the project team will prepare a punch list acceptance letter that will be forwarded to the project manager for signature and then to the subcontractor for record. (Note: outstanding submittals or operating and maintenance manuals will be included as punch list items). Upon receipt of the punch list acceptance letter, the subcontractor will prepare and submit the following items as required by the subcontract: Subcontractor Guarantees, Warranties (from Suppliers), Asbuilt Drawings, All required Certifications, Inspection Reports, Final Billings, Final Lien Waivers for the Total Contract Amount, Lower-Tier Final Lien Waivers, Final Affidavit Showing all Subcontractors are Paid in Full and Final Payroll Reports as required. Inspection and Testing MCI will conduct, organize or schedule all inspections required at the project sites. We have full construction inspection and supervision capabilities and will perform construction surveillance activities on all portions of the work. We will fully cooperate with all Owner inspections, and inspections conducted by third parties, as may be designated by the District. During commissioning, we will provide the necessary support to the design team. Commissioning The project commissioning (post-construction) phase is often the most neglected phase of the projects. MCI’s processes and procedures ensure that each contract is closed out immediately after acceptance and not simply “left to the end.” B O I S E C E N T R E E X PA N S I O N P R O J E C T Applicable scope specific commissioning agents will be brought on early to assist in program development and provide input to the design team for critical systems. In conjunction with MCI, a project specific commissioning plan will be developed early to facilitate a comprehensive understanding and sequencing plan for operable systems. Before systems are brought on-line the commissioning agents will be fully engaged and begin the process of rigorous quality and performance checks. In addition to a detailed start-up and commissioning plan, a detailed commissioning schedule will be developed at about the 20% project completion phase and will include established milestones, system start-up procedures including lock out tag out protocols and sign-off sheets, life-safety issues and occupancy constraints. Project Closeout Our closeout process begins at the preconstruction meeting, well in advance of mobilization: ■■ ■■ ■■ ■■ ■■ ■■ As-Built/Record Documents O&M Manuals Warranties Subcontractor and vendor provided training Punchlist and Punchlist Completion Verification Final Payments and Unconditional Lien Waivers We strive to complete preliminary closeout documents well in advance of the Substantial Completion milestone. Throughout the project we are collecting closeout documents and internally reviewing them for completeness, accuracy and relevant information. In addition to paper and electronic documents as part of our training protocol, we record all owner trainings and include the DVD’s in the final operation & maintenance manuals. During the warranty period, MCI has an extensive warranty correction procedure that resolves items as quickly as possible to the satisfaction of our clients. 18 M C A LV A I N C O N S T R U C T I O N , I N C . Firm Qualifications|Experience FIRM QUALIFICATIONS | EXPERIENCE FIRM QUALIFICATIONS | EXPERIENCE REGIONAL LEADER McAlvain Construction, Inc (MCI) is a regional leader in the CM|GC project delivery with extensive experience in relevant multi-phased projects completed on high-profile and active high-use pedestrian areas under tight site logistics. Our company has proven to be the contractor of choice where quality, demanding schedule deadlines and budgetary goals have been established. With these capabilities, McAlvain has not only built remarkable structures and many of Boise’s landmark features, but has built long lasting, quality relationships as well. Over our 35 year history, McAlvain has provided these services to a diverse set of clients including public, institutional, commercial and industrial sectors. McAlvain has contracted for nearly $1Billion worth of work with the local sub-contracting community. This combined with our vast experience provides for a one-of-a-kind team oriented company with unique talents and insight into the western United States construction market that will prove advantageous to the Greater Boise Auditorium District. MCI understands McAlvain was also instrumental in the recent adoption of the CM|GC delivery method into local State Legislation. More than 70% of our work is delivered under the CM|GC model with our integrated preconstruction service processes and procedures. Within the last 3 years alone, MCI has contracted for well over $100M worth of work under the CM|GC delivery for both public and private institutions. As with each of our CM|GC projects, MCI will work closely with the District to ensure an efficient, collaborative climate within the project team. One of our keys to success is the effective communication of all project elements within the entire project team during each stage of preconstruction and throughout the duration of the project. Complete understanding of project goals, defined roles and responsibilities and clearly defined RECENT EXPERIENCE PROVIDING CM|GC SERVICES The Grove Plaza Renovation - CCDC Limelight Hotel, Ketchum Shoshone-Bannock Phase 2 Casino Addition City of Boise Dixie Drain Phosphorus Removal City of Boise TMSF Office and Maintenance Kendall Ford of Meridian Phase 1 Kendall Ford of Meridian Phase 2 B O I S E C E N T R E E X PA N S I O N P R O J E C T construction management processes are extremely important to the success of the project. MCI has been extremely successful in exceeding project goals with our clients with respect to budget, schedule and quality. We will work closely with the District throughout the CM|GC process exploring alternative were appropriate in order to attain the goal of providing a quality project at the lowest possible cost. BUDGET|VALUE ENGINEERING One of our most recent CM/GC projects for the City of Boise - The Dixie Drain Phosphorus Removal Facility required a massive amount of earthwork to develop ponds that are a mandatory part of the treatment process. Due to the remote location of the project, improving earth movement around the site and avoiding exporting dirt off of the site was critical to optimizing the budget. In working closely with the Engineering team and the City of Boise, we provided numerous cost analysis scenarios which helped maintain a balanced site and avoided transporting dirt long distances. This in turn was a realized savings of over $1.2 Million dollars to the program. Boise Whitewater River Park, Phase 1 (A-D) Western States Pocatello Idaho Water Center Grove Hotel and Events Center Les Bois Turf Club Remodel River Edge Apartments/Student Housing UofI Kibbie Activity Center Pressbox & Luxury Suites Boondocks Family Fun Center, Kaysville Micron NanoFAB1 Royal Plaza Gooding Valley Country Store 20 M C A LV A I N C O N S T R U C T I O N , I N C . FIRM QUALIFICATIONS | EXPERIENCE MCI is currently providing CM/GC services for CCDC on the Grove Plaza Renovation Project. Through this experience we have gained valuable insight into the coordinated effort and interface required to successfully complete this project in tandem with the Boise Centre Expansion Project. Significant savings to your project will result from shared preconstruction services, shared general conditions, efficiencies associated with gains in productivity and minimized rework as well as competitive coordinated subcontractor bid packages. This will result in the most efficient use of the available funds associated with both of these public projects resulting in the highest probability of success and significant project savings. These items have been discussed in detail within our Project Approach section of this statement of qualifications. SCHEDULE|VALUE ENGINEERING McAlvain has built a reputation of exceeding expectations in regards to schedule. While performing CM|GC services for the City of Boise’s Boise River Whitewater Park Phase 1 A-C, initial plans to only close the river in sections to complete the new diversion dam and water features were re-evaluated due to schedule concerns. McAlvain worked closely with the City of Boise and Army Corps of Engineers to develop and maintain a new plan to divert the river through Quinn’s Pond which proved successful allowing the project to be completed on schedule and under budget allowing freed funds to be used elsewhere on the project. MULTI PHASE | ACTIVE SITE MCI is experienced in multi-phase projects completed using the CM|GC delivery as demonstrated throughout this statement of qualifications. Many of these projects were successfully constructed within active facilities without incident for both public and private entities. As always, the safety of all parties involved is top priority. COORDINATION & COLLABORATION WITH OTHER PRIME CONTRACTORS MCI has experience working concurrent and in close coordination with other contractors on high-profile projects and will coordinate closely with the Districts Phase 1 contractor. Recent examples include: Capital Wings Expansion & Renovation (Design|Build) To facilitate the enormous task of renovating and expansion of the Idaho State Capital the State of Idaho entered into design/build contracts with two separate contracting firms to complete the Capital Core Renovation and new Underground Wings Expansion. MCI was contracted to provide design|build services for the core and shell of the new east and west underground wings. After the core and shell was completed the core contractor took over to complete the interior of the wings. McAlvain worked heavily with the Capital Core contractor and architect/ engineering team to coordinate our scope of work in completion of the Capital Wings project. McAlvain was able to complete the West Wing 7 weeks and the East Wing 3 weeks ahead of the initial substantial completion date. U of Idaho Kibbie Activity Center Expansion (CM|GC) During the University of Idaho’s Kibbie Activity Center McAlvain provided CM|GC services for the University to complete the construction of the new press box and luxury suites. At the same time, the University contracted with another contractor to complete life-safety and replace the east and west walls with translucent panels. Close coordination between both parties at all times to make both projects successful included: use of stadium floor for staging and cranes, equipment and material access to facility through the east and west ends and electrical/data/AV wiring from one side to the other through the east and west walls constructed by the other contractor. SIZE McAlvain Group of Companies, Inc, consistently employs approximately 150+ full time employees consisting of highly trained and skilled, certified craftsman, superintendents and foreman, project managers, project engineers, field engineers, safety personnel, estimators, cost control engineers, accounting personnel and home office support. SELF-PERFORM ABILITIES McAlvain routinely self-performs over 30% of the work on our projects. The ability to successfully complete critical early stages of our projects with great accuracy, on a schedule of our choosing, allows each subsequent division of work to be completed faster, more efficiently and without compromise. Activities include: Earthwork, Utilities, Rough Carpentry, Foundation, Structural & Architectural Concrete, Finish Carpentry. Within the last 5 years, MCI has placed over 350,000 CY of concrete. B O I S E C E N T R E E X PA N S I O N P R O J E C T 21 M C A LV A I N C O N S T R U C T I O N , I N C . Team Personnel TEAM PERSONNEL TEAM PERSONNEL McAlvain Construction Inc., (MCI) is a regional leader in the CM/GC project delivery mechanism and has completed many successful projects relevant to the Greater Boise Auditorium Districts Boise Centre Expansion Project. We have carefully selected our team with requisite experience in the CM/GC delivery, renovations/expansions and working on active sites for public and private entities. Torry McAlvain, Chuck Graves, Walt McBrier Torry, Chuck and Walt will serve as corporate sponsors and hold overall responsibility for the successful completion of the project. All three have extensive experience working with public entities under the CM|GC delivery. Jamal Nelson, Director of Preconstruction Jamal will lead preconstruction phase activities. As demonstrated throughout his resume included within this section, Jamal has managed some of Boise’s largest high-profile structures. Jamal is currently providing CM|GC preconstruction services for the Grove Plaza Renovation Project which has provided great insight into the Boise Centre Expansion Project. Tyler Resnick, Project Manager Tyler is an experienced team leader and has spent a large portion of his career providing CM|GC services on large developments for both public and private entities completed in multiple phases on active sites. Tyler is currently providing CM|GC services for the City of Boise’s Dixie Drain Phosphorus Removal Project which is the first CM|GC contract released by the City of Boise. Tom Crowell, Superintendent Tom has spent a major of his career devoted to renovations and expansions. Tom is currently superintendent for the CM|GC Grove Plaza Renovation Project and has been involved in early planning stages which has provided great insight into the Boise Centre Expansion Project. Tom has extensive experience working on active sites providing close coordination and collaboration with Owners, stakeholders, public as well as other Prime Contractors working in close association to adjacent projects. Jamal Nelson THE DISTRICT Tyler Resnick Director of Preconstruction Owner Project Manager Torry McAlvain CEO Chuck Graves President Construction Manager Licence #157 Walt McBrier VP PE, LEED GA Corporate Sponsors Design Team Ruth Fritts Safety Director Ferd Smith Tom Crowell Name Subcontractors Chief Estimator Project Engineer Project Controls/Scheduler COLOR KEY: MCI Accounting/Cost Contract Administration Superintendent McAlvain Self-Perform Home Office Support B O I S E C E N T R E E X PA N S I O N P R O J E C T Field Supervision 23 Contractors Design M C A LV A I N C O N S T R U C T I O N , I N C . TEAM PERSONNEL ROLES & RESPONSIBILITIES Torry McAlvain, CEO | Chuck Graves, President CM -157 | Walt McBrier, PE, LEED GA, VP/Project Director Preconstruction: 10% Construction: 10% ■■ Overall authority & responsibility for a timely, quality, in budget project ■■ Provide resources to the Project Manager to execute successfully ■■ Interface with the District and design team regarding our performance Jamal Nelson - DIR. of PRECONSTRUCTION Tyler Resnick - PROJECT MANAGER Preconstruction: 100% Construction: 10% Preconstruction: 40% Construction: 100% ■■ Manage the preconstruction program ■■ Open communications with design team ■■ Assist in establishing partnering standards for the CM/GC project team ■■ Conduct formal and informal design reviews, constructability reviews & VE analysis etc. ■■ Work with design team to ensure quality ■■ Respond and correct design review comments through design team ■■ Assist in providing a design that is safe to build ■■ Provide Input availability of material selected ■■ Compile pre-construction deliverables ■■ Coordinate all pre-construction estimates and establish GMP ■■ ■■ ■■ ■■ ■■ ■■ ■■ Manage the construction program Maintain project staffing levels Change Management Track schedule and budget/cost control Track and monitor RFI’s, submittals, etc. Create monthly progress reports Conduct formal and informal design reviews, constructability reviews & VE Analysis etc. ■■ Respond and correct design review comments through design team ■■ Develop site logistics & project phasing plans ■■ Facilitate other preconstruction and construction services as defined within this RFQ PROJECT ENGINEER | Preconstruction: 100% Construction: 100% ■■ ■■ ■■ ■■ ■■ ■■ Assist in overall cost control and reporting Prepare monthly reports of project indicators Pre-qualify subcontractors/vendors Assist in preparing bid packages Manages document control functions and logs Assists in RFI, submittal and change control Tom Crowell - SUPERINTENDENT | Preconstruction: 20% ■■ ■■ ■■ ■■ Participate in design reviews Overall responsibility for field activities of all subs Assist in scope development for bid packages Create construction schedule/update progress/ drive successful completion ■■ Provide a clean & safe jobsite ■■ On site agent responsible for quality ■■ Coordinate with District and other Contractors and plan work-arounds for potential job impacts Ferd Smith - CHIEF ESTIMATOR | ■■ Preparation of application for payment ■■ Develop, monitor and update overall project master schedule and track long-lead items ■■ Define key milestone dates including pre ordered equipment/materials ■■ Overall cost control reporting ■■ Monthly reporting of project indicators Construction: 100% ■■ Develop site logistics & project phasing ■■ Coordinate with site facility manager for day to day operations and reducing construction impact to operations and events. ■■ Develop and implement QA/QC plan ■■ Ensure compliance with inspection/test programs ■■ Empower field management to ensure quality of all subcontractors and suppliers ■■ Schedules and coordinates preparatory meetings for all subcontractors and vendor Preconstruction: 25% Construction: 25% ■■ Assist in pre-qualifying subcontractors/vendors ■■ Prepare detailed estimates ■■ Assist in preparing bid packages ■■ Prepare GMP estimate ■■ Prepare conceptual estimates ■■ Assist in reconciliation of any change orders B O I S E C E N T R E E X PA N S I O N P R O J E C T 24 M C A LV A I N C O N S T R U C T I O N , I N C . TEAM PERSONNEL TORRY M C ALVAIN CEO WORK HISTORY: 2008 - Present CEO of McAlvain Group of Companies, Inc. 2002 - 2008 President of McAlvain Construction, Inc. 2000 - 2003 Safety Director, McAlvain Construction, Inc. 1996 - 2002 Vice President Head of Operations, McAlvain Construction, Inc. 1992 - 2001 Vice President of McAlvain Construction, Inc. 1989 - 1992 Chief Estimator/Project Mgr – Projects above $10,000,000, McAlvain Construction, Inc. 1987 - 1989 Project Manager, McAlvain Construction, Inc. 1986 - 1987 Q/C Inspector MHAFB Control Tower $1,800,000 McAlvain Construction, Inc. 1984 - 1986 McAlvain Construction of California; Project Manager/ Project Superintendent, Multiple Alpha Beta Store remodels; COE Child Care Center – Monterey, California 1983 - 1984 1983 Employed within Industry Since Griffin Developers, California Idaho Public Works Contractors Licensing Board Chairman, 2006 – 2014 AGC of Idaho Secretary/Treasurer/Vice President, 2001 – 2004 AGC of Idaho Chapter President, 2005 AGC of Idaho Board of Directors, 1996 BSU Construction Management Advisory Board, 2001 – 2008 Humanitarian Bowl Advisory Board of Directors, 2000 – 2010 Humanitarian Sports Hall of Fame Board of Directors, 1999 – 2004 Bronco Athletic Association Board of Directors, 2000 – Present AGC Presidents Award, 2003 B O I S E C E N T R E E X PA N S I O N P R O J E C T Torry has over 30 years experience in the construction industry and has earned his way through the ranks in the family owned business as a laborer, journeyman carpenter foreman, project coordinator, superintendent, quality control inspector, estimator and project manager. Torry currently holds the position of CEO and President of McAlvain Group of Companies, and provides strategic direction for the company while building upon the vision and values maintained within the family business since 1980. 25 1984 Employed with McAlvain Since EDUCATION Idaho Construction Leadership Academy; Carpenter Apprenticeship Training 1980-83; Boise State University 1981-82; Industry Related Courses: Finance, Project Management, Estimating, Design Build, Construction Management; Graduate, Capital High School, 1981. M C A LV A I N C O N S T R U C T I O N , I N C . TEAM PERSONNEL JAMAL NELSON DIRECTOR OF PRECONSTRUCTION PROJECT EXPERIENCE GROVE PLAZA RENOVATION - CMGC Boise, Idaho - Director of Preconstruction. McAlvain is currently providing CM|GC services to the Capital City Development Corporation (CCDC) for the Grove Plaza Renovation. The renovation is a total reconstruction to modernize the high-use pedestrian plaza with the installation of a 2nd Generation of personalized bricks, new fountain, performance audio and lighting, shade structures, unique site furnishings and new landscaping. SHOSHONE/BANNOCK CASINO EXPANSION - CM/GC Fort Hall Idaho - Director of Preconstruction. Approx. 73,616 sf of new construction using a structural steel frame resting on concrete foundations. The building is separated into two parts, Casino (approx.. 29,733sf) and Administration (approx. 44,239sf) areas; additional new surface parking and driveways. 8th & MAIN ZIONS TOWER Boise, Idaho - General Superintendent/Preconstruction Manager/On-site Project Manager. Multi-story, urban development, Class ‘A’ office and retail high rise in Boise, Idaho. Managed field staff of Superintendents, Engineers and Carpenters, serving as General Contractor on 18 month duration, $50M project completed January 2014. 9th & RIVER (THE AFTONS) - CM/GC Boise, Idaho - Project Executive/ Preconstruction Manager. Two phase condominium project located adjacent to the Boise River near the heart of downtown Boise. Forty eight living units from 900 2,200sf with private balconies, roof top garden area, brownstone live-work units, two story private parking and approximately 9ksf of retail space. $20M project valuation with phase I GMP delivered at 50% CD’s. 5th & IDAHO - CM/GC Boise, Idaho - Project Executive/Preconstruction Manager. HUD financed $12M apartment and live-work space in the heart of downtown Boise. Scheduled to complete Spring 2017, this LEED certified 5-story mixed-use complex is located in the historic North-end district and includes private balconies, roof top garden patios, underground parking structure with major streetscape improvements. TWIN FALLS MIDDLE SCHOOL - CM/GC Twin Falls, Idaho - Project Executive/Preconstruction Manager. New 120ksf middle school scheduled to complete in Spring 2017. Two story education building with indoor gymnasium, classrooms and science labs, cafeteria and library. Outdoor track, football and soccer fields, tennis courts and concessions facilities. Contract GMP of $25.8M delivered at 50% CD’s. BOISE STATE ENVIRONMENTAL SCIENCE & RESEARCH BUILDING Boise, Idaho - Superintendent/On-site Project Manager. Five floors of laboratory, classroom and office space for geosciences and civil engineering - approximately 97ksf. The building layout promotes collaboration between scientists, engineers, researchers and faculty on environmental issues. Facility was designed and constructed to perform 35% more energy efficient than traditional methods through HVAC system, wall and roof insulation, window systems and building envelope. Completed in 19 months with a value of approximately $34M. BOISE STATE LINCOLN PARKING GARAGE EXPANSION Boise, Idaho - Superintendent/On-site Project Manager. Completed in 12 months, this 5 story addition to an existing parking structure added 702 stalls and approximately 7ksf of office space. Completed summer 2011, value of approximately $7M. BOISE STATE MICRON COLLEGE OF BUSINESS & ECONOMICS Boise, Idaho - Superintendent/On-site Project Manager. Four story , 120ksf building designed and constructed to emphasize student learning, research and community collaboration. Included state-of-the art classrooms, 250 seat lecture auditorium, student commons area, financial trading room, living roof areas, multiple water features and outdoor amphitheater. Designed for high energy efficiency utilizing geothermal heat and active chilled beam technology. 18 month construction duration completed Fall 2012, value of approximately $31M. B O I S E C E N T R E E X PA N S I O N P R O J E C T 26 Jamal manages all of McAlvain’s project management resources associated with our preconstruction services to ensure that all project team goals with respect to quality, schedule and budget are achieved. This provides a seamless transition into the construction phase of the work. 2000 Employed within Industry Since 2015 Employed with McAlvain Since EDUCATION B.A. Economics / Psychology Minor University of California, Davis Secondary Teaching Credential Chapman University CERTIFICATIONS ASHE Certified Walmart SWPPP Certified Professional Paradigm Certified SWPPP Inspector First Aid and CPR Certified 10-Hour OSHA Certified M C A LV A I N C O N S T R U C T I O N , I N C . TEAM PERSONNEL TYLER RESNICK PROJECT MANAGER LEED® Green Associate™ PROJECT EXPERIENCE CITY OF BOISE DIXIE DRAIN PHOSPHORUS REMOVAL - CM/GC Parma Idaho - Project Manager. CM/GC services to construct a Phosphorus Removal facility diverting 200cfs of untreated irrigation water from the Dixie Drain Slough .25 miles upstream from the Boise River convergence. Plant will include a concrete diversion structure with air actuated bladders, pump station, pre-sedimentation basin, chemical treatment building, rapid mix basin, settling pond, concrete fixed weir, box culvert and flocculation settling pond. ASUI KIBBIE ACTIVITY CENTER EXPANSION/REMODEL - CM/GC Moscow, Idaho - RFI’s and Submittals. $4.2 million Construction Management project. The University of Idaho Kibbie Dome project consists of the remodel, retrofit and upgrade to the historic 15,750 occupant athletic facility including updating the entire dome A/V system, addition of 2 elevators, construction of cantilevered club level/banquet area, 9 suites, and cantilevered press box. KENDALL FORD OF MERIDIAN PHASE 1 - QUICKLANE, SERVICE GARAGE EXPANSION & FACILITY REMODEL - CM/GC Meridian, Idaho. Project Engineer - This project consists of a three phased 34,000 s.f. building remodel and a 7,800 s.f. addition to Kendall Ford of Meridian. The project includes a complete customer area remodel, a new quick lube service drive, service garage expansion and Parking Modifications. KENDALL FORD OF MERIDIAN PHASE 2 - NEW SALES AND SERVICE BUILDING, CAR WASH - CM/GC Meridian, Idaho Project Engineer. This project consists of (3) separate properties with (5) separate projects and improve site circulation. The new 10,000 s.f. facility consists of sales office, automotive service area and Parking Lot. The new automatic car wash is 3,500 s.f. and is state of the art. U OF I INTEGRATED RESEARCH AND INNOVATION CENTER Moscow, Idaho - Project Manager. McAlvain Concrete, Inc provided concrete services for the University of Idaho’s 70,000 sf ft, 4-story Integrated Research and Innovation Center as a concrete subcontractor for Structural and Site concrete which includes 2,009 CY of Slabs, 484 CY of Footings and 552 CY of Walls. ONE CAPITAL HARDSCAPE REVITALIZATION Boise, Idaho. - Project Manager. Completed in CCDC’s Westside District, the One Capital Center project included concrete and structure replacement on the south entry/bridge area of the One Capital Center in Downtown Boise. Details include bridge repairs, entry stairway replacements, sidewalks, pavers and decorative colored concrete. BOISE AIRPORT LOTS 20 & 30 MODIFICATIONS Boise, Idaho Project Manager - The Boise Airport Parking Lot 20/30 project consists of the expansion and rehabilitation of two separate existing parking lots at the Boise Airport. IDAHO STATE CAPITOL EXPANSION AND RENOVATION - DESIGN/BUILD (Design/Build) Boise, Idaho - Millwork controlling experience including, cost controls, material ordering, subcontractor management, project engineering for Boswell-Olsen Enterprises during the Idaho State Capitol Expansion and Renovation. BOISE STATE EAST CAMPUS GREEN FIELD - DESIGN/BUILD Boise, Idaho - Assistant Project Manager. The BSU East Campus Green Field project includes the demolition of the Applied Technology Building (with hazardous materials abatement); construct a high performance natural grass athletic field, donor recognition monument/structure, concrete/pavers plaza, landscaping and perimeter privacy security/screening fence. BOISE STATE DONA LARSEN PARK FACILITY - DESIGN/BUILD Boise, Idaho. Tyler served as Project Engineer for the new Track & Field Facility. Details include: 8-lane NCAA track, Football/Soccer/Lacrosse Field, 8,000 seats, public restrooms, concession stands, pressbox, scoreboards, PA system, field lights, etc. BOISE AIRPORT TERMINAL PARKING GARAGE EXPANSION City of Boise - Project Engineer. 325,780 SF 1015 car, 4 tier, post tensioned parking garage with a pre-engineered metal building roof structure. Includes 3 stair towers, 2 elevators, signage, landscaping, structural steel, extensive site work and utilities. 11 month construction duration. MICRON SOUTH PARKING LOT EXPANSION - DESIGN/BUILD Boise, Idaho - Project Manager. Construction of a 750 space parking lot with asphalt paving, curb gutter, pedestrian walkways, storm drainage systems, site lighting and landscape. B O I S E C E N T R E E X PA N S I O N P R O J E C T 27 Tyler’s strengths include project management, scheduling, directing, coordinating and supervising project related field operations to successful completion on time and within budget. 2002 Employed within Industry Since 2011 Employed with McAlvain Since EDUCATION Bachelor of Science, Construction Management, Boise State University CERTIFICATIONS LEED® Green Associate; Walmart Stormwater Compliance, Remodel Construction; 10 hr OSHA M C A LV A I N C O N S T R U C T I O N , I N C . TEAM PERSONNEL TOM CROWELL SUPERINTENDENT RELATIVE PROJECT EXPERIENCE GROVE PLAZA RENOVATION - CMGC Boise, Idaho - Superintendent. McAlvain is currently providing CM|GC services to the Capital City Development Corporation (CCDC) for the Grove Plaza Renovation. The renovation is a total reconstruction to modernize the high-use pedestrian plaza with the installation of a 2nd Generation of personalized bricks, new fountain, performance audio and lighting, shade structures, unique site furnishings and new landscaping. ASUI KIBBIE ACTIVITY CENTER EXPANSION/REMODEL - CM/GC Moscow, Idaho - Superintendent. McAlvain served as the CM/GC for the University of Idaho Kibbie Activity Center remodel, retrofit and upgrade. This remodel to the historic 15,750 occupant athletic facility including updating the entire dome A/V system, addition of 2 elevators, construction of cantilevered club level/banquet area, 9 suites, and cantilevered press box. BOISE SPECTRUM FACADE AND PLAZA REVITALIZATION Boise, Idaho - Superintendent. The revitalization project replaces existing facades with a stacked stone and re-purposed hardwood look while the plaza is reconstructed with a stone creek bed, benches, fire pit and re-faced fountain. VERIZON BOISE MSC EXPANSION/REMODEL Boise Idaho - Superintendent. Expansion of the original MSC building from 5,319 sq ft to 12,180 sq ft. The expansion included; CMU Walls, an expanded battery room, new AC power room and emergency generator replacement, expanded switch space, a new larger control room, new administration area, a new break room/conference room, new rest rooms, a new reception area and a new mechanical room. Method of Procedures were followed throughout construction. SHORE LODGE GUEST ROOMS REMODEL McCall, Idaho - Superintendent. The Shore Lodge Guest Rooms Renovation included the remodel of 75 guest rooms and associated corridors within the 56,700 sq ft three-story Shore Lodge in McCall, Idaho. The project was completed in 2 and a-half months with crews working 7 days a week and required carefully planned and successfully executed room phasing to allow the hotel to remain open for business throughout the duration of the renovation. Details included: high-end interior wood finishes, carpet, paint, doors, hardware, fixtures, tile, vanities, specialties, etc. Finishes within the Shore Lodge reflect the standards of a luxury 4 star hotel. IIB SIXTH FLOOR REMODEL - DESIGN/BUILD Boise, Idaho - Superintendent. Microsoft occupies the sixth floor of the IIB Plaza office building. Details of the Microsoft Remodel project includes a remodel of existing 6,755 sq ft tenant space on the 6th floor: Demolition of existing walls, ceilings, HVAC, electrical; New plumbing; reconfiguration of presentation and sales floor with new reception, multi-purpose conference room space, and IT department. Daily operations for Microsoft continued on the sixth floor throughout the duration of the remodel. IIB FOURTH FLOOR REMODEL Boise, Idaho - Superintendent. 7,000 sq ft remodel of the existing fourth floor of the IIB building for three new tenants. Work included new HVAC and electrical, phone and data systems, upgraded wall coverings and entry design. IDAHO POWER DATA CENTER - DESIGN/BUILD Boise, Idaho - Superintendent. (Design/Build) 5,000 square foot Tier II data center within an existing building for Idaho Power Company. Tom has served more than 35 years experience in full on-site construction management and supervision. His responsibilities and strengths include: project supervision, safety, scheduling, procurement, and quality control for McAlvain. 1978 Employed within Industry Since 2006 Employed with McAlvain Since CERTIFICATIONS Walmart Stormwater Professional; Walmart Remodel Construction; 10 hr OSHA; AGC Superintendent Training Project 1995 AT&T BOISE 3RD FLOOR HVAC & ELECTRICAL REMODEL Boise, Idaho - Superintendent. McAlvain served as a Construction Manager under Caliente Construction for the AT&T 3rd Floor HVAC & Electrical Modification Project. Project included a 3rd floor lighting upgrade, HVAC unit upgrade, ductwork removal/replacement and controls upgrade. Method of Procedures were followed throughout construction. LITHIA LINCOLN REMODEL Boise, Idaho - Superintendent. Modify exterior masonry and glass wall, construction of a stucco and ACM entry portal along with showroom, ceiling and office modification. FEDERAL EXPRESS OFFICE/WAREHOUSE Portland, Oregon - Superintendent. 45,000 sq ft tilt-up warehouse with 5,000 sq ft of office space. THE HOME DEPOT Vancouver,Washington - Superintendent. 122,000 sq ft, single story concrete tilt-up retail facility for home improvement with a garden center. RIVERSHORE PLACE Eagle, Idaho - Superintendent. 17,000 sq ft of wood framed office and retail space with extensive landscaping, tenant improvements including Pioneer Title, Horizon Home Loans and a Design-Build Franco Latino Restaurant. MAJESTIC MARKET PLACE Meridian, Idaho - Superintendent. 17,000 sq ft wood framed retail building. B O I S E C E N T R E E X PA N S I O N P R O J E C T 28 M C A LV A I N C O N S T R U C T I O N , I N C . Work Examples|References WORK EXAMPLES | REFERENCES WORK EXAMPLES|REFERENCES PERFORMANCE IN RELATIVE PROJECTS 1) 2) 3) 4) 5) 6) 7) 8) The Grove Plaza Renovation The Grove Hotel Idaho Water Center PA2/PA3 The Royal Plaza BOI Elevated Roadway IIB Plaza Kendall Ford Phase 1 &2 Remodel/Expansion 9) University of Idaho Kibbie Activity Center Expansion RECENT EXPERIENCE PROVIDING CM|GC SERVICES The Grove Plaza Renovation - CCDC Limelight Hotel, Ketchum Shoshone-Bannock Phase 2 Casino Addition City of Boise Dixie Drain Phosphorus Removal Project City of Boise TMSF Office and Maintenance Facility Kendall Ford of Meridian Phase 1 Kendall Ford of Meridian Phase 2 Boise Whitewater River Park Phase 1 (A-D) Idaho Water Center Grove Hotel and Events Center Les Bois Turf Club Remodel River Edge Apartments UofI Kibbie Activity Center Expansion Boondocks Family Fun Center, Kaysville Micron NanoFAB1 Royal Plaza Gooding Valley Country Store 1 THE GROVE PLAZA RENOVATION SIMILARITIES: CM|GC Services , Public Entity, High Profile, High Traffic, Coordination with the District and other Prime Contractors McAlvain is currently providing CM|GC services to the Capital City Development Corporation (CCDC) for the Grove Plaza Renovation. The renovation is a total reconstruction to modernize the high-use pedestrian plaza with the installation of a 2nd Generation of personalized bricks, new fountain, performance audio and lighting, shade structures, unique site furnishings and new landscaping. This work will be in progress during the completion of the Centre Building and Clearwater Building which will require close coordination with the District and contractor of the buildings. MCI is currently providing CM/GC services for CCDC on the Grove Plaza Renovation Project. Through this experience we have gained valuable insight into the coordinated effort and interface required to successfully complete this project in tandem with the Boise Centre Expansion Project. Significant savings to your project will result from shared preconstruction services, shared general conditions, efficiencies associated with gains in productivity and minimized rework as well as competitive coordinated subcontractor bid packages. This will result in the most efficient use of the available funds associated with both of these public projects resulting in the highest probability of success and significant project savings. These items have been discussed in detail within our Project Approach section of this statement of qualifications. COST: Approximately $3.5M REFERENCE: Doug Woodruff, CCDC Project Manager (208) 319-1229 B O I S E C E N T R E E X PA N S I O N P R O J E C T 30 M C A LV A I N C O N S T R U C T I O N , I N C . WORK EXAMPLES | REFERENCES 2 3 THE GROVE HOTEL & EVENTS CENTER SIMILARITIES: CM|GC Services, High Profile, High Traffic, Grove Plaza remained active The Grove Hotel & Events Center A high profile, multiuse 425,000 square foot project. It has two major structural components connected for creative functional continuity. The north half of the structure is a four story public space that includes an ice hockey rink/convention floor, retail area, a fine dining restaurant and a sports bar. The south half of the structure is an 18 story residential tower with a parking garage underneath. The top four floors of the tower are reserved for condominium living, and the hotel uses the lower floors. The hotel area includes all of the standard operational spaces in addition to a health club on the fifth floor with an Olympic-size lap pool, a fourth floor conference center and terrace, a second floor ballroom located above the lobby and porte cochere. The entire structure is predominantly post-tensioned cast in place concrete, with a structural steel component utilized for the long-span roof framing at the arena. IDAHO WATER CENTER SIMILARITIES: CM|GC Services, High Profile, High Traffic, Working with ZGA, Coordinating with surrounding active facilities The Idaho Water Center is a 220,000 sq ft multi-use professional office, educational and retail facility. It is the primary base of the University of Idaho, Boise. The facility is a cast-in-place concrete structure and was constructed with a sustainable and energy saving design, and construction techniques. This Building was designed utilizing geothermal heat pumps as part of the Boise Downtown geothermal loop. Scope includes civil, structural, architectural, mechanical, electrical and plumbing work. This class A office building includes hydraulic and combustion labs; shell and core constructed on the garage podium; landscaped and hardscape plaza on garage podium and adjacent sitework. Work also included a 60,000 square foot below grade parking structure. COST: $28M FIRMS RESPONSIBILITY: CM|GC Services, Joint REFERENCE: Wayne Meuleman - Idaho State Building Venture with PCL REFERENCE: Kurt Boyd, PCL (206) 719-5477 B O I S E C E N T R E E X PA N S I O N P R O J E C T COST: $38M FIRMS RESPONSIBILITY: CM|GC Services, Joint Venture with Turner Construction. Authority (208) 345-6057 WORKING WITH TEAM: ZGA 31 M C A LV A I N C O N S T R U C T I O N , I N C . WORK EXAMPLES | REFERENCES 4 CIVIC PLAZA PA2|PA3 SIMILARITIES: CM|GC Services, High-Profile, High Traffic, PA3 completed while existing parking structure remained operational (*see below). Civic Plaza PA-2 is a six-story building with a 77,000 sq ft cast in place below grade parking garage, one level (33,000 sq ft) of retail, and five levels (160,000 sq ft) with 144 wood framed residential units. Civic Plaza PA-3 is a six-story 168,000 sq ft four level structural steel building with 155 steel framed residential units. Challenges to the project included the construction of the residential units on top of an existing concrete parking structure. COST: $30M REFERENCE: Jeff Pomeroy (949) 254-6064 - Jeff is no longer with Civic Plaza but remains a strong reference. * McAlvain also constructed the existing Ada County Courts Complex Parking Structure on which the PA3 structure was constructed. The parking garage daily operations remained uninterrupted. ADA COUNTY COURTS PARKING GARAGE The Ada County Courts Parking Garage is a posttension parking structure that includes underground long-term parking, ground floor level retail and three levels of short-term parking above the ground. Underground tunnels were constructed for future pedestrian access to other developments on building pads to the south. $4.3M B O I S E C E N T R E E X PA N S I O N P R O J E C T 5 THE ROYAL PLAZA SIMILARITIES: CM|GC Services, TI work completed while building was operational, Working with Nathan Charlton The Royal Plaza is a six-story, 103,700 sq ft luxury urban residential building. The first floor is designated for retail space, second floor for parking, third through sixth floors luxury residential suites, with a seventh floor roof top garden. The Royal Plaza features 26 condominiums with all the high-end finishes ranging in size from 1,200-3,000 sq ft, an exercise facility, large storage, and large balconies. Brick, Stucco, Stone, and Granite make up the outer skin of the building. McAlvain also completed TI work on units 301, 302, 303, 308, 401, 402, 405, 408, 501, 601 and 603. COST: $16M REFERENCE: Bob Hosac, Owner (208) 322-5410 WORKING WITH TEAM: Nathan Charlton 32 M C A LV A I N C O N S T R U C T I O N , I N C . WORK EXAMPLES | REFERENCES 6 BOISE AIRPORT ELEVATED ROADWAY SIMILARITIES: Similar project details for public agency, Services provided while Airport remained operational, coordinating with other Prime Contractors in connection to the Airport Terminal Expansion. The Boise Airport Elevated Roadway project consisted of approximately 3,770 linear feet of at-grade roadway construction including 790 linear feet of MSE approach ramp adjacent to the new passenger terminal building; approximately 990 feet x 70 feet of roadway bridge and 120 feet x 25 feet of pedestrian bridge, including railings, lighting, canopies, and pavement markings.; construction of a reinforced concrete box bridge supported on drilled shafts to accommodate 4 lanes of roadway traffic at the upper level of the proposed new passenger terminal building. The work involved construction of temporary pedestrian and vehicle traffic facilities, demolition, excavation, asphalt paving, concrete curb and sidewalks, signing, pavement marking, lighting, storm drainage, and sanitary sewer installation. COST: $8.2M REFERENCE: Matt Petaja, City of Boise Department of Aviation and Transportation (208) 383-3100 McAlvain has completed addition projects for the Boise Airport while the daily operations of the facility remained uninterrupted including: BOISE AIRPORT COVERED WALKWAYS The Boise Airport Covered walkway is an indoor passenger walkway to planes stationed on Boise Airport runway. This structural steel walkway is complete with a concrete base, wall panels, glass windows and a metal standing seam roof. $1.4M B O I S E C E N T R E E X PA N S I O N P R O J E C T 7 IIB PLAZA SIMILARITIES: CM|GC Services, Additional services provided while occupied building remained operational. The IIB Plaza is a six-story 85,000 sq ft structural steel office building. The first two floors are occupied by Idaho Independent Bank for administrative offices as well as a full-service branch, commercial lending offices and drivethru banking. The remaining four floors will be leased as commercial and office space. IIB CORE AND SHELL COST: $6.1M IDAHO INDEPENDENT BANK TI: $1.2M REFERENCE: Peter Oliver - was with Brighton Corpora- tion (Owner) and now with TOK, (208) 947-0816 Within the IIB Plaza Building, McAlvain has performed multiple renovation projects while the daily operations of the existing tenants remained uninterrupted including: IIB SIXTH FLOOR REMODEL Remodel of existing 6,755 sq ft tenant space on the 6th floor: Demolition of existing walls, ceilings, HVAC, electrical; New plumbing; re-configuration of presentation and sales floor with new reception, multi-purpose conference room space, and IT department. $489,199 IIB FOURTH FLOOR REMODEL Remodel of existing 7,000 sq ft for three new tenants on the 4th floor: Demolition, mechanical, plumbing, electrical, fire protection, phone and data systems, framing, drywall, insulation, ceilings, cabinetry, counter tops, wall coverings, flooring, and furnishings. $279,062 33 M C A LV A I N C O N S T R U C T I O N , I N C . WORK EXAMPLES | REFERENCES 8 9 KENDALL FORD RENOVATION|EXPANSION PHASES 1&2 SIMILARITIES: CM|GC Services, Completed in multiple phases while dealership remained fully operational and uninterrupted. U OF IDAHO KIBBIE ACTIVITY CENTER RENOVATION|EXPANSION SIMILARITIES: CM|GC Services, Completed in multiple phases while Kibbie Activity Center Activities remained fully operational and uninterrupted, Close coordination with other Prime Contractors. The Kendall Ford Of Meridian Quicklane, Service Garage Expansion & Facility Remodel (MultiPhase) consisted of a three phased 34,000 sq ft building remodel of existing showroom, administrative offices and service department along with the construction of a new 7,800 sq ft quick lube service drive (Quick Lane) and service garage expansion. The dealership remained open to the public throughout construction without incident. $4.4M The University of Idaho Kibbie Activity Center Renovation|Expansion included: New media and facilities operation box, club and event room, mini-suite seating, loge seating, mechanical/HVAC and electrical systems improvements, audio/visual systems improvements, universal access and ADA improvements. The project was completed on an extremely aggressive schedule due to the many campus activities held in the Kibbie Activity Center including Football, Basketball and special events including the Lionel Hampton International Jazz Festival. A portion of the work began after the football season and the put on hold during the jazz festival before resuming leaving 5 months to complete the rest of the renovation|expansion. Dubbed “The best seats in college football” construction was delivered on schedule and within budget. At the same time, the University contracted with another contractor to complete life-safety and replacing east and west walls with translucent panels. Close coordination between both projects and contractors was necessary and performed making both projects successful. The Kendall Ford Of Meridian New Sales and Service Building & Automatic Car Wash (Multi-Phase) consisted of multi-phased construction including a new 10,800 sq ft sales facility with showroom, sales office, administrative offices and automotive service area. The project was completed with the construction of a new state of the art 3,500 sq ft automatic car wash. The dealership remained open to the public throughout construction without incident. $3.2M REFERENCE: Dean Pape, Kendall Automotive Group (541) 848-8825 REFERENCE: Guy Esser, University of Idaho - A/E Services Project Manager (208) 885-5495 B O I S E C E N T R E E X PA N S I O N P R O J E C T 34 M C A LV A I N C O N S T R U C T I O N , I N C .