VALHALLA RESIDENTIAL UNITS
Transcription
VALHALLA RESIDENTIAL UNITS
MICHAEL REX ASSOCIATES THE VALHALLA 201 BRIDGEWAY & 206 SECOND STREET SAUSALITO, CALIFORNIA APN 065-242-06 & 65-242-17 THE VALHALLA ARCHITECTURE & DESIGN 1 7 5 0 BRIDGEWAY S U I T E B 2 1 1 S A U S A L I T O CALIFORNIA 94965 TEL.4 1 5.3 3 1.1 4 0 0 FAX.4 1 5.3 3 1.5 4 6 3 WWW.R E X A S S O C.C O M DATE AND DESCRIPTION: DESIGN REVIEW 22 MAY 2013 DES. REV. RESUBMIT PROJECT TEAM teamwork://Etta/Valhalla_Residential_TW / Tuesday, July 29, 2014 / 9:27 AM Civil Engineer: Land Surveyor: John Yadegar Associates 90 New Montgomery St., Ste. 412 San Francisco, CA 94105 PH 415-243-0858 ext. 303 FX 415-243-0486 Project Engineer: John Yadegar [email protected] Traffic Engineer: Carlile-Macy 15 Third Street Santa Rosa, CA 95401 PH 707-535-1542 FX 707-542-5212 Project Engineer: Dave Hanson [email protected] Preservation Architect: ADA Consultant: Nersi Hemati Consulting Soil Engineer 3030 Bridgeway Blvd., Ste. 131 Sausalito, CA 94945 PH 415-331-3061 FX 415-331-3062 Project Engineer: Nersi Hemati [email protected] Margen + Associates 925 Ygnacio Valley Road, Suite 103A Walnut Creek, CA 94996 PH 925-934-3440 FX 925-934-3440 Contact: Peter Margen [email protected] 37 NOVATO POINT REYES STATION OLEMA Archaeological Consultant: Geotechnical Engineer: Carlile-Macy 15 Third Street Santa Rosa, CA 95401 PH 707-535-1553 FX 707-542-5212 Project Architect: Bill Rinehart [email protected] Coastal Engineering Consultant: William Schroeder & Associates 643 Del Ganado Road San Rafael, CA 94903 PH 415-472-4759 FX 415-472-7819 Project Surveyor: William Schroeder [email protected] Robert L. Harrison Transportation Planning and Project Management 26 Ned's Way Tiburon, CA 94920 PH 415-435-2871 Contact: Robert Harrison [email protected] .1 TE R Structural Engineer: Michael Rex Associates 1750 Bridgeway, Suite B211 Sausalito, CA 94965 PH 415-331-1400 FX 415-331-5463 Project Architect: Michael Rex Project Manager: Rea Ashley [email protected] Landscape Architect: FAIRFAX SAN RAFAEL 580 MILL VALLEY STINSON BEACH PACIFIC OCEAN 101 Architect: Alexander Kashef, DDS, MD 770 Tamalpais Drive #408 Corte Madera, CA 94925 PH 415-924-6936 FX 415-924-6937 [email protected] 101 Owner: SHEET INDEX VICINITY MAP TIBURON TAMALPAIS VALLEY SAUSALITO SITE N MOLLIE STONES, Bridgeway, Sausalito, CA - Google Maps 101 To see all the details that are visible on the screen, use the "Print" link next to the map. Preservation Architecture 446 17th Street, #302 Oakland, CA 94612 PH 510-418-0285 Contact: Mark Hulbert [email protected] AREA MAP Archaeological Resource Service 122 American Alley, Suite A Petaluma, CA 94952 PH 707-762-1791 Contact: Sally Evans PROJECT SITE 201 BRIDGEWAY & 206 SECOND ST. Noble Consultants, Inc. 359 Bel Marin Keys Blvd., Suite 9 Novato, CA 94949-5637 PH 415-884-0727 FX 415-884-0735 Contact: Ron Noble, P.E. [email protected] BCDC RESUBMITTAL 30 SEPTEMBER 2013 Architectural A0.1 Title Sheet A0.2 Project Data A0.3 Site Plan: Zoning Data A0.4 Building Coverage Summary A0.5 First Floor Area Summary A0.6 Second and Third Floor Area Summaries A0.7 Impervious Surfaces Summaries A0.8 Model Views--Existing, Previous, Current A0.9 Rendering--View from Bay A0.10 Rendering--View from Main and Second Street w/o Landscaping A0.11 Rendering--View from Main and Second Street w/ Landscaping Civil C1 C2 A1.1 A1.2 A1.3 Surveyor T1 Topographic Map Record of Survey T2 T3 Parcel Map Page 1 of 1 A2.1 SAN FRANCISCO 26 JULY 2013 Neighborhood Site Plan Site Plan / Roof Plan Story Pole Plan A2.2 A2.3 A2.4 A2.5 A2.6 A2.7 First Floor Plan Second Floor Plan Third Floor and Clerestory Plan Foundation Demolition Plan Site / Roof Demolition Plan First Floor Demolition Plan Second Floor Demolition Plan A3.1 A3.2 A3.3 A3.4 A3.5 A3.6 A3.7 Exterior Elevations: South and East Exterior Elevations: North and West Exterior Elevations: East, West & North Courtyard Exterior Elevations: Street and Garage Elevations Exterior Elevations: 206 Second Street Proposed Boardwalk Entry Conceptual Beach Access Plan & Section A4.1 Site / Building Section ME2.1 ME2.2 ME2.3 Exterior Lighting: Site and First Floor & Fixture Schedule Exterior Lighting: Second Floor Exterior Lighting: Third Floor Grading Plan Utility Plan Landscape Preliminary Landscape Plan--Ground Floor/Site Plan L1.1 Preliminary Landscape Plan--Second Floor Roof Garden L1.2 Landscape Plant Materials L2.1 Tentative Map Site Boundary, Lots, and Topography TM1 Air Space Ownership and Easements TM2 Existing Conditions Existing Conditions Photos EC0.1 Existing Site / Roof Plan EC1.1 Existing Foundation Plan: 201 Bridgeway EC2.0 Existing First Floor Plan: 201 Bridgeway EC2.1 EC2.2 Existing Second Floor Plan: 201 Bridgeway Existing Floor Plans: 206 Second Street EC2.3 EC3.1 Existing North & East Elevations: 201 Bridgeway Existing South & West Elevations: 201 Bridgeway EC3.2 Existing Elevations: 206 Second Street EC3.3 Existing Building Sections: 201 Bridgeway EC4.1 RESPONSE TO BCDC 21 OCTOBER 2013 DES. REV. RESUBMIT #2 15 NOVEMBER 2013 1 RE-BUILT BOARDWALK 19 MARCH 2014 2 NAVD DATUM 27 MARCH 2014 3 SMCSD COMMENTS RESP. 29 APRIL 2014 4 UNIT #5 & GARAGE MODIF. 11 JUNE 2014 5 REVS 207 BRIDGEWAY 18 JUNE 2014 6 REVS--25 JUNE 2014 7 REVS--1 JULY 2014 8 REVS--7 JULY 2014 9 REVS--23 JULY 2014 THESE DRAWINGS CONSTITUTE THE ORIGINAL WORK OF THE ARCHITECT AND MAY NOT BE USED WITHOUT HIS WRITTEN CONSENT © 2013 MICHAEL REX ASSOCIATES BTC DRAWN BY: MRA CHECKED BY: SCALE: NOT TO SCALE FIRE-SPRINKLER NOTES 1. Provide an approved automatic residential fire sprinkler system conforming to the provisions of the Southern Marin Fire Department and N.F.P.A. Standard13. TITLE SHEET 2. The fire-sprinkler system is design/build by fire-sprinkler subcontractor. 3. Fire-sprinkler plans and calculations shall be prepared and submitted to reviewing agencies by the fire-sprinkler subcontractor/engineer at least 3 weeks prior to rough inspection. Submit 3 sets of plans and calculations to the Building Department for review by the Fire Department. Obtain Fire Department's and Architect's approval of plans prior to installing system. N 4. Fire sprinkler coverage shall be provided through the entire structure as per the UFC 1001.9. Map data ©2012 Google - SHEET A0.1