VALHALLA RESIDENTIAL UNITS

Transcription

VALHALLA RESIDENTIAL UNITS
MICHAEL REX ASSOCIATES
THE VALHALLA
201 BRIDGEWAY & 206 SECOND STREET
SAUSALITO, CALIFORNIA
APN 065-242-06 & 65-242-17
THE VALHALLA
ARCHITECTURE & DESIGN
1 7 5 0
BRIDGEWAY
S U I T E
B 2 1 1
S A U S A L I T O
CALIFORNIA
94965
TEL.4 1 5.3 3 1.1 4 0 0
FAX.4 1 5.3 3 1.5 4 6 3
WWW.R E X A S S O C.C O M
DATE AND DESCRIPTION:
DESIGN REVIEW
22 MAY 2013
DES. REV. RESUBMIT
PROJECT TEAM
teamwork://Etta/Valhalla_Residential_TW / Tuesday, July 29, 2014 / 9:27 AM
Civil Engineer:
Land Surveyor:
John Yadegar Associates
90 New Montgomery St., Ste. 412
San Francisco, CA 94105
PH 415-243-0858 ext. 303
FX 415-243-0486
Project Engineer: John Yadegar
[email protected]
Traffic Engineer:
Carlile-Macy
15 Third Street
Santa Rosa, CA 95401
PH 707-535-1542
FX 707-542-5212
Project Engineer: Dave Hanson
[email protected]
Preservation Architect:
ADA Consultant:
Nersi Hemati Consulting Soil Engineer
3030 Bridgeway Blvd., Ste. 131
Sausalito, CA 94945
PH 415-331-3061
FX 415-331-3062
Project Engineer: Nersi Hemati
[email protected]
Margen + Associates
925 Ygnacio Valley Road, Suite 103A
Walnut Creek, CA 94996
PH 925-934-3440
FX 925-934-3440
Contact: Peter Margen
[email protected]
37
NOVATO
POINT REYES STATION
OLEMA
Archaeological Consultant:
Geotechnical Engineer:
Carlile-Macy
15 Third Street
Santa Rosa, CA 95401
PH 707-535-1553
FX 707-542-5212
Project Architect: Bill Rinehart
[email protected]
Coastal Engineering
Consultant:
William Schroeder & Associates
643 Del Ganado Road
San Rafael, CA 94903
PH 415-472-4759
FX 415-472-7819
Project Surveyor: William Schroeder
[email protected]
Robert L. Harrison Transportation Planning
and Project Management
26 Ned's Way
Tiburon, CA 94920
PH 415-435-2871
Contact: Robert Harrison
[email protected]
.1
TE
R
Structural Engineer:
Michael Rex Associates
1750 Bridgeway, Suite B211
Sausalito, CA 94965
PH 415-331-1400
FX 415-331-5463
Project Architect: Michael Rex
Project Manager: Rea Ashley
[email protected]
Landscape Architect:
FAIRFAX
SAN RAFAEL
580
MILL VALLEY
STINSON BEACH
PACIFIC OCEAN
101
Architect:
Alexander Kashef, DDS, MD
770 Tamalpais Drive #408
Corte Madera, CA 94925
PH 415-924-6936
FX 415-924-6937
[email protected]
101
Owner:
SHEET INDEX
VICINITY MAP
TIBURON
TAMALPAIS
VALLEY
SAUSALITO
SITE
N
MOLLIE STONES, Bridgeway, Sausalito, CA - Google Maps
101
To see all the details that are visible on the
screen, use the "Print" link next to the map.
Preservation Architecture
446 17th Street, #302
Oakland, CA 94612
PH 510-418-0285
Contact: Mark Hulbert
[email protected]
AREA MAP
Archaeological Resource Service
122 American Alley, Suite A
Petaluma, CA 94952
PH 707-762-1791
Contact: Sally Evans
PROJECT SITE
201 BRIDGEWAY &
206 SECOND ST.
Noble Consultants, Inc.
359 Bel Marin Keys Blvd., Suite 9
Novato, CA 94949-5637
PH 415-884-0727
FX 415-884-0735
Contact: Ron Noble, P.E.
[email protected]
BCDC RESUBMITTAL
30 SEPTEMBER 2013
Architectural
A0.1
Title Sheet
A0.2
Project Data
A0.3
Site Plan: Zoning Data
A0.4
Building Coverage Summary
A0.5
First Floor Area Summary
A0.6
Second and Third Floor Area Summaries
A0.7
Impervious Surfaces Summaries
A0.8
Model Views--Existing, Previous, Current
A0.9
Rendering--View from Bay
A0.10
Rendering--View from Main and Second Street w/o Landscaping
A0.11
Rendering--View from Main and Second Street w/ Landscaping
Civil
C1
C2
A1.1
A1.2
A1.3
Surveyor
T1
Topographic Map
Record of Survey
T2
T3
Parcel Map
Page 1 of 1 A2.1
SAN
FRANCISCO
26 JULY 2013
Neighborhood Site Plan
Site Plan / Roof Plan
Story Pole Plan
A2.2
A2.3
A2.4
A2.5
A2.6
A2.7
First Floor Plan
Second Floor Plan
Third Floor and Clerestory Plan
Foundation Demolition Plan
Site / Roof Demolition Plan
First Floor Demolition Plan
Second Floor Demolition Plan
A3.1
A3.2
A3.3
A3.4
A3.5
A3.6
A3.7
Exterior Elevations: South and East
Exterior Elevations: North and West
Exterior Elevations: East, West & North Courtyard
Exterior Elevations: Street and Garage Elevations
Exterior Elevations: 206 Second Street
Proposed Boardwalk Entry
Conceptual Beach Access Plan & Section
A4.1
Site / Building Section
ME2.1
ME2.2
ME2.3
Exterior Lighting: Site and First Floor & Fixture Schedule
Exterior Lighting: Second Floor
Exterior Lighting: Third Floor
Grading Plan
Utility Plan
Landscape
Preliminary Landscape Plan--Ground Floor/Site Plan
L1.1
Preliminary Landscape Plan--Second Floor Roof Garden
L1.2
Landscape Plant Materials
L2.1
Tentative Map
Site Boundary, Lots, and Topography
TM1
Air Space Ownership and Easements
TM2
Existing Conditions
Existing Conditions Photos
EC0.1
Existing Site / Roof Plan
EC1.1
Existing Foundation Plan: 201 Bridgeway
EC2.0
Existing First Floor Plan: 201 Bridgeway
EC2.1
EC2.2
Existing Second Floor Plan: 201 Bridgeway
Existing Floor Plans: 206 Second Street
EC2.3
EC3.1
Existing North & East Elevations: 201 Bridgeway
Existing South & West Elevations: 201 Bridgeway
EC3.2
Existing Elevations: 206 Second Street
EC3.3
Existing Building Sections: 201 Bridgeway
EC4.1
RESPONSE TO BCDC
21 OCTOBER 2013
DES. REV. RESUBMIT #2
15 NOVEMBER 2013
1 RE-BUILT BOARDWALK
19 MARCH 2014
2 NAVD DATUM
27 MARCH 2014
3 SMCSD COMMENTS RESP.
29 APRIL 2014
4 UNIT #5 & GARAGE MODIF.
11 JUNE 2014
5 REVS 207 BRIDGEWAY
18 JUNE 2014
6 REVS--25 JUNE 2014
7 REVS--1 JULY 2014
8 REVS--7 JULY 2014
9 REVS--23 JULY 2014
THESE
DRAWINGS
CONSTITUTE
THE
ORIGINAL
WORK
OF
THE
ARCHITECT AND MAY NOT BE USED
WITHOUT HIS WRITTEN CONSENT
© 2013 MICHAEL REX ASSOCIATES
BTC
DRAWN BY:
MRA
CHECKED BY:
SCALE:
NOT TO SCALE
FIRE-SPRINKLER NOTES
1. Provide an approved automatic residential fire sprinkler system
conforming to the provisions of the Southern Marin Fire
Department and N.F.P.A. Standard13.
TITLE SHEET
2. The fire-sprinkler system is design/build by fire-sprinkler
subcontractor.
3. Fire-sprinkler plans and calculations shall be prepared and
submitted to reviewing agencies by the fire-sprinkler
subcontractor/engineer at least 3 weeks prior to rough
inspection. Submit 3 sets of plans and calculations to the Building
Department for review by the Fire Department. Obtain Fire
Department's and Architect's approval of plans prior to installing
system.
N
4. Fire sprinkler coverage shall be provided through the entire
structure as per the UFC 1001.9.
Map data ©2012 Google -
SHEET
A0.1