Workshop
Transcription
Workshop
“we create quality with the pioneering technology.” www.cemreshipyard.com Company History Established in 1996 as paint and blasting company. Got up to date as a shipyard in 2005. Delivered 10 vessels in Pendik Navy Shipyard. (2005-2008) Established own shipyard at Altınova,Yalova in 2008. Total 24 vessels has delivered until 2013. 1000+ employees. Well balanced mix of hull manfacture and turn-key projects. Beside ship construction; all sort of steel construction such as bridges. Speciliazed Production Facilities; Offshore Support Vessels Fishing Vessels Container Vessel , Bulk Carriers and Tanker Piers of bridge steel construction www.cemreshipyard.com Specialized Production Districts Main Production WORKSHOP Workshop www.cemreshipyard.com Production Facilities and Standards Main Production Area Total Production Area Closed Production Area Open Production Area Assembling Painting : 55.000 m2 : 2.750 m2 : 8.250 m2 : 7.900 m2 : 1.200 m2 Lifting Equipment 1 x Gantry Crane 1 x Gantry Crane 2 x GantryCrane 17 x Gantry Crane 2 x Gantry Crane 3 x Gantry Crane 1 x Transporter WORKSHOP : 250 tonnes : 160 tonnes : 80 tonnes : 15 tonnes : 10 tonnes : 5 tonnes : 450 tonnes www.cemreshipyard.com 3 Production Facilities and Standards Workshop Prefabrication Hall : 2 x Gantry Crane 960 m2 : 10 tonnes Cutting and Bending : 1.730 m2 2 x Gantry Crane : 15 tonnes 1 x Gantry Crane : 10 tonnes 1 x Press : 450 tonnes 1 x Bending Machine : 600 tonnes 1 x Pro. Bending Machine : 450 tonnes 1 x 16mm. Mech. Cutting Machine 2 x CNC Cut Machines WORKSHOP Unit Production Area : 3.900 m2 2 x Gantry Crane : 15 tonnes 1 x Gantry Crane : 80 tonnes www.cemreshipyard.com 3 Production Facilities and Standards Closed Multi Purposed Hangar WORKSHOP www.cemreshipyard.com Production Facilities and Standards Painting Halls WORKSHOP www.cemreshipyard.com Production Facilities and Standards These two big cranes especially are using for slipways. 250 tonnes G.Cranes has been built for Slipway 1 and 2 , 80x2 tonnes G.Crane has been built for Slipway 3,4. 250 tonnes Gantry Crane WORKSHOP 80 x 2 tonnes Gantry Crane www.cemreshipyard.com Production Facilities and Standards Main Production Area CLOSED CONSTRUCTION AREA WORKSHOP www.cemreshipyard.com Production Facilities and Standards Slipways SLIPWAY 1 Length = 104 m. Breadth = 20 m. Sea part of slipway = 70 m. SLIPWAY 2 Length = 141 m. Breadth = 26 m. Sea part of slipway = 70 m. SLIPWAY 3 WORKSHOP Length = 100 m. Breadth = 18,5 m. Seapart of slipway = 50 m. SLIPWAY 4 Length = 70 m. Breadth = 12,5 m. Seapart of slipway = 50 m. www.cemreshipyard.com Shipyard Capacity After successfully period of construction brand new shipyard in Altınova , Cemre has been developing its attitude with increasing standards and steel processing capacity every year. Steel Structures , Thousands of tonnes per year 2013(planned) 5000 2012/6 6500 2011 10100 2010 9700 2009 9200 2008 9000 0 2000 4000 6000 8000 10000 12000 www.cemreshipyard.com Investments and Future Plans Development process never ends in Cemre and continues still growing with its young and dynamic prospect. Two new slipways has been already build at the end of 2012. 2000 DWT Bulk Carriers launched from these slipways. New building contains concept of store rooms, offices and dining hall will be finished until March 2013. www.cemreshipyard.com Quality Certificates www.cemreshipyard.com Completed and Planned Projects Havila Mars – 2006 Havila Mercury – 2007 Havila Saturn – 2007 86 meter 86 meter 74,5 meter Havila Neptune – 2007 Sea Lion– 2008 Stril Commander– 2008 74,5 meter 74,5 meter 74,5 meter www.cemreshipyard.com Completed and Planned Projects Stril Challanger– 2008 Eldborg– 2008 Havila Venus– 2008 74,5 meter 74,5 meter 92 meter Sjoborg– 2009 Havila Jupiter– 2009 Stril Commander– 2008 78,6 meter 92 meter 74,5 meter www.cemreshipyard.com Completed and Planned Projects Beaucephalus– 2010 Havila Subsea – 2010 Artus– 2010 84 meter 98 meter 49,8 meter Seaborg– 2011 Ocean Pride– 2011 Sjoborg– 2011 86 meter 86 meter 86 meter www.cemreshipyard.com Completed and Planned Projects Torsborg– 2011 Vestland Mira– 2012 Havila Charisma – 2012 86 meter 86 meter 92,8 meter Ben Nevis– 2012 Martin H– 2012 NB111– 2012 79,6 meter 68 meter 74,5 meter www.cemreshipyard.com Completed and Planned Projects Helene H– 1Q 2013 NB113-1Q 2013 NB114– 1Q 2013 68 meter 79,6 meter 110 meter NB117–Q3 2013 Osterbris– Q1 2014 84,6 meter 74,2 meter www.cemreshipyard.com Other Facilities Beside qualified and well-known ship construction and naval industry buildings. Cemre has proved its quality in any kind of steel process such as bridge pier construction for famous Golder Horn Bridge in Istanbul. We manufactured 12000 tonnes steels totally for bridge piers. www.cemreshipyard.com
Similar documents
DS HEAVY INDUSTRIES Co., Ltd.
2. CLIENT : SAMSUNG ENGINEERING & CONSTRUCTION CO., LTD 3. DELIVERY : 2002.07 ~ 2003.05
More information