Hendon - Democracy Home - London Borough of Barnet
LONDON BOROUGH OF BARNET HENDON AREA PLANNING AND ENVIRONMENT COMMITTEE 30 November 2005 Agenda Item 12 Report of the Head of Planning BACKGROUND PAPERS – GENERAL STATEMENT The background papers to the reports contained in the agenda items which follow comprise the application and relevant planning history files, which may be identified by their reference numbers, and other documents where they are specified as a background paper in individual reports. These files and documents may be inspected at: HENDON AREA OFFICE Barnet House 1255 High Road Whetstone London N20 0EJ Contact Officer: Mrs Vivian Bell, 020 8359 4672 82 HENDON AREA PLANNING AND ENVIRONMENT COMMITTEE DATE:30 November 2005 INDEX TO THE REPORT OF THE HEAD OF PLANNING ______________________________________________________________ W01506H/05 Burnt Oak 86-89 Woodcroft Primary School, Goldbeaters Grove, Edgware, Middlesex, HA8 0QF. Construction of single storey corridor extension and new two-storey lift enclosure. Addition of dormer to roofslope to provide separate lift enclosure. APPROVE SUBJECT TO CONDITIONS ______________________________________________________________ W00198AQ/05 Colindale 90-102 Land at former RAF East Camp Site, Aerodrome Road, Grahame Park Way, London, NW9. Reserved matters application seeking approval for design, external appearance and landscaping in relation to the third phase (Block E) comprising 309 residential units pursuant to Condition 6 of outline planning permission W00198AA/04 for the redevelopment of the site approved 8th April 2005. APPROVE ______________________________________________________________ W13463K/05 Edgware 103-105 Oaktrees B Site, Grendon Lodge, Knightswood Close, Edgware, Middlesex, HA8 8FR. Variation of Condition 2 of planning permission reference W13463A/04 to remove reference to "8 of the car-parking spaces being marked out shall be provided solely for the use of residents of 1-8 Knightswood Close". APPROVE ______________________________________________________________ 83 W14141A/05 Mill Hill 106-111 7 Birkbeck Road, London, NW7 4BP. Two-storey side extension, single storey rear extension, conversion of property into 2 self-contained flats. APPROVE SUBJECT TO CONDITIONS ______________________________________________________________ W00560MF/05 West Hendon 112-116 BRENT CROSS SHOPPING CENTRE MANAGEMENT OFFICES, BRENT CROSS SHOPPING CEN, Prince Charles Drive, London, NW4 3FP. Roof top extension for retail and storage purposes and associated works to unit C1. Relocation of plant room. APPROVE SUBJECT TO CONDITIONS ______________________________________________________________ W00560LZ/05 West Hendon 117–130 Land adjacent to Fenwick, Brent Cross Shopping Centre, Prince Charles Drive, London, NW4 3FP. Variation of Condition 1 of planning permission ref W00560GN for the erection of a multi-storey car park and associated works on the land to the east of Brent Cross Shopping Centre to allow a further 5 years for the consent to be implemented. APPROVE SUBJECT TO CONDITIONS ______________________________________________________________ 84 WA0291/05 Adjoining Borough 131-135 Royal National Orthopaedic Hospital, Brockley Hill, Stanmore, Middlesex, HA7 4LP. Outline: Partial redevelopment for new hospital and facilities, housing (incl. staff) revised road junction. Parking and open space (site with a Tree Preservation Order). NO OBJECTION 85 LOCATION: Woodcroft Primary School, Goldbeaters Grove, Edgware, Middlesex, HA8 0QF. REFERENCE: W01506H/05 WARD: APPLICANT: PROPOSAL: Received: Accepted: Burnt Oak Expiry: Final Revisions: London Borough of Barnet 27 Sep 2005 1 Nov 2005 27 Dec 2005 Construction of single storey corridor extension and new two-storey lift enclosure. Addition of dormer to roofslope to provide separate lift enclosure. RECOMMENDATION: APPROVE SUBJECT TO CONDITIONS 1. This development must be begun within three years from the date of this permission. Reason: To comply with Section 51 of the Planning and Compulsory Purchase Act, 2004. INFORMATIVE(S):1. The plans accompanying this application are:- PD20< DP21, DP22A, PD23, PD24, SO2 2. The reason for this grant of planning permission or other planning related decision is as follows: i) The proposed development accords with strategic planning guidance and policies as set out in the Mayor's London Plan (published 10 February 2004) and the Adopted Unitary Development Plan/Revised Deposit Draft Unitary Development Plan except where material considerations indicate otherwise and the following polices are relevant: Adopted Barnet Unitary Development Plan (1991): G1, T1.1, T3.1 Unitary Development Plan Revised Deposit Draft Modifications, approved 28th June 2005, GBEnv1, GBEnv2, , D1-D2, CS4, HC1 ii) The proposal is acceptable for the following reason(s): The proposed development would not be detrimental to neighbouring residential or visual amenity, would be in keeping with the character of the existing building and accords with all the following policies. 86 1. MATERIAL CONSIDERATIONS (a) Adopted UDP (1991): G1, T1.1, T3.1. Revised Deposit Draft UDP (2001): GBEnv1, GBEnv2, D1-D2, CS4, HC1. (b) Relevant Planning History W01506E - Demountable classroom to give additional teaching space – Approved 1985. W01506F/02 - Replacement of windows. – Approved 29-08-2002 W01506G/05- Construction of two covered walkways – Approved September 2005 (c) Consultation and views expressed: Neighbours Consulted: 2 26 Replies: 0 PLANNING APPRAISAL Subject site and surrounding area description The application site is Woodcroft Primary School, which is located within the Watling Estate Conservation Area, on the western side of Goldbeaters Grove near to the junction with Watling Avenue. The site adjoins the rear gardens of properties on Abbots Road, Wolsey Grove and Watling Avenue. The site consists of the main 2 storey school building, a hall and associated classrooms. The school buildings are set within large grounds with the main access to the site located at Goldbeaters Grove. The application proposes a two storey lift shaft and linking single storey corridor extension and a dormer window to facilitate the installation of a separate internal lift. The corridor extension and lift shaft would be located adjacent to the Junior playground surrounded by school buildings. As such it would not be visible to neighbouring residents. The single storey element would be 2.5m deep with a flat roof. The proposed dormer window would be located at the southern end of the main school building adjacent to the play area with a pitched roof. 87 The size and design of the proposed extensions are in keeping with the appearance of the existing building and are consistent with Council Policy and Design Guidance. CONCLUSION Given the aforementioned this application is recommended for APPROVAL. 88 Woodcroft Primary School, Goldbeaters Grove, Edgware, HA8 0QF - W01506H/05 RO AD HO MEFIELD O SE LIS CL AB B D R OA OTS DBE GOL ATE R OV S GR W OLS E ROVE EY G E W OLS OVE Y GR W Based on the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationary Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. London Borough of Barnet LA086290 2003 89 A IN TL G A VE NU E Scal e 1:1250 LOCATION: Land at former RAF East Camp Site, Aerodrome Road, Grahame Park Way, London, NW9. REFERENCE: W00198AQ/05 WARD: APPLICANT: PROPOSAL: Received: Accepted: Colindale Expiry: Final Revisions: St George Central London Ltd 24 Oct 2005 24 Oct 2005 19 Dec 2005 Reserved matters application seeking approval for design, external appearance and landscaping in relation to the third phase (Block E) comprising 309 residential units pursuant to Condition 6 of outline planning permission W00198AA/04 for the redevelopment of the site approved 8th April 2005. RECOMMENDATION: APPROVE INFORMATIVE(S):1. The plans accompanying Rev 02, 21425/PL05M, E1toE8-03-201 Rev 03, E1toE8-03-204 Rev 03, E1toE8-03-206 Rev 03, E1toE8-04-200 Rev 03, E1toE8-04-201 Rev 03, E1toE8-05-201 Rev 03 this application are: 21425A E1toE8-01-200 21425 E1TOE8-03-200 Rev 03, 21425A 21425A E1toE8-03-202 Rev 03, 21425A 21425A E1toE8-03-205 Rev 03, 21425A 21425A E1toE8-03-20R Rev 02, 21425A 21425A E1toE8-04-200 Rev 03, 21425A 21425A E1toE8-05-200 Rev 03, 21425A 2. The reason for this grant of planning permission or other planning related decision is as follows: i) The proposed development accords with strategic planning guidance and policies as set out in the Mayor's London Plan (published 10 February 2004) and the Adopted Unitary Development Plan/Revised Deposit Draft Unitary Development Plan, in particular the following polices are relevant: Adopted Barnet Unitary Development Plan (1991): G1, G2, G15, G16, G17, G18, G21, G22, G23, T1.1, T1.2, T1.3, EDN1.1, ERG1.1, ERG1.3, EMP2.2, EMP2.3, H1.1, H1.2, H3.1, H3.2, H3.4, H3.5, M2.1, M4.1, M6.1, M6.2. Barnet Revised Deposit Draft Modifications Unitary Development Plan 90 (approved 28 June 2005): GSD, Gmixed Use, Gland, GBEnv1, GBEnv2, Gparking, GCS1, GLOC, GH1, GH3, D1, D2, D3, D5, D6, D8, D9, D10, D11, M1, M4, M7, M10, M11, M14, H0, H4, H16, H17, H20, CS1, CS8, EMP8, TLR21. ii) The proposal is acceptable for the following reason(s): The development would accord with the principles established by the ouline planning permission and assist in delivering new homes and employment on a derelict brownfield site. 1. MATERIAL CONSIDERATIONS National Planning Policies: PPS1 – Creating Sustainable Communities PPG3 – Housing Circular 6/98: Planning and Affordable Housing PPG13 - Transport PPG17 – Open Space, Sport and Recreation PPG15 – Planning and the Historic Environment The London Plan (2004): Policies 2A.3; 3A.5; 3A.3; 3A.60; 3A.8; 4B1; 4B3; 3A.17; 3A.21; 5.3; 3C1. The Colindale Development Framework (Draft 2003) Relevant Planning History: W00198AA/04- Redevelopment of site comprising 2800 residential units (Class C3), approximately 7850sqm of retail (Class A1), financial and professional services (Class A2), food and drink (Class A3), business (Class B1), leisure and community (Class D1 and D2) uses and driving test centre (sui generis) with associated landscaped open space, car parking and access arrangements. (Outline Application) Submission of Environmental Statement. – Approved 8 April 2005 W00198AD/04- Mixed use development comprising 191 residential units and 1693sqm of commercial and non-residential uses with associated car parking, landscaping and vehicular and pedestrian accesses. (Full Application) 91 Submission of Environment Statement. (This application is submitted in duplicate under reference W00198AE/04) – Deemed Refusal 20 April 2005 W00198AG/05- Reserved matters application seeking approval for design, external appearance and landscaping in relation to the first phase of development comprising 191 residential units and 1696sqm of non-residential uses pursuant to Conditions 1 and 6 of outline planning permission W00198AA/04 for the redevelopment of site approved 8 April 2005 – Approved 25 May 2005. W00198AK/05- Reserved matters application seeking approval for design, external appearance and landscaping in relation to the second phase of the development comprisind 458 residential units and 2255sqm of non-residential uses pursuant to Condition 6 of outline planning permission W00198AA/04 for the redevelopment of site approved 8 April 2005 – Approved W01731JS/04- Grahame Park Estate – bounded by Lanacre Avenue to the west, Grahame Park Way to the south and Field Mead to the north, NW9. Redevelopment of site involving the demolition of 1314 existing residential units and construction of 2977 new residential units providing a total of 3440 units on the estate, provision of approximately 9074sqm replacement retail (Class A1), office (Class A2) food and drink (Class A3) and social and community (Class D1) uses and associated public and private open space, car parking and access arrangements. (Outline Application) Submission of Environmental Statement – Resolution to grant permission subject to S106 Agreement 8 September 2004. Consultation and Views Expressed: The application was advertised on site and in the press. Neighbours Consulted: 91 Replies: 1 A letter has been received from a resident in Aerodrome Road making an enquiry into the nature of the proposals. Internal/Other Consultations: Housing – No objection. Satisfied with the affordable housing provision in the third phase (Block E) Traffic and Transportation – No objections 92 Environmental Services – Comments to be reported Metropolitan Police Services (Crime Prevention Design Office) – No objections in principle to the third phase of the development. The police are working closely with St George over the course of the development to ensure all aspects relating to design and community safety are considered. Greater London Authority – No objections Transport For London – No objections English Heritage (Archaeology) – No objections Environment Agency – No comment to make PLANNING APPRAISAL Site Description and Surroundings RAF East Camp is a substantially cleared 10.2 ha brownfield site. There is one key building remaining on site, the watchtower/gatehouse building, which is a Grade II Listed Building. There are a number of mature trees in the east of the site which are covered by a Tree Preservation Order. The southern boundary of the site is formed by Aerodrome Road. Fronting onto this road, on the southern side, is the Metropolitan Police Training Centre. The training centre comprises a range of buildings including 2-3 storey commercial buildings and residential blocks of 12 to 18 storeys. The western boundary of the site abuts the Middlesex University Halls of Residence where building heights are mainly 2-4 storeys. To the north of the site are the Colindale Divisional Police Station and Area Headquarters and the RAF Museum Hendon. The north west boundary is formed by Grahame Park Way, beyond which is the Grahame Park Estate. The Midland Mainline forms the eastern boundary of the site and immediately beyond running parallel is the M1 motorway. Colindale Tube Station is about 10-15 minute walk from the centre of the site. Proposals Background On the 8 April 2005 outline planning permission was granted for a major mixed-use development following completion of a Section 106 Agreement securing substantial local community and infrastructure benefits. The outline planning application has established an overall masterplan for the development of the site. In having sought approval for siting and access including indicative building heights and massing, the outline consent essentially provides a ‘footprint’ upon which the development can take shape. 93 The key details defining this stage, otherwise known as ‘reserved matters’ are required by Condition 6 attached to the outline permission. This states: ‘The development of each phase shall not commence until layouts, plans/sections and elevations for that part of the development, detailing; 1. design of the buildings, including floor areas, height and massing; 2. external appearance; 3. landscaping strategy (referred to as reserved matters) have been submitted to and approved in writing by the Local Planning Authority. The relevant part of the development shall in all aspects be carried out in accordance with the approved plans unless otherwise agreed in writing with the Local Planning Authority’. The outline planning permission is of course subject to a significant number of additional conditions covering matters such as drainage, land contamination, detailed landscaping, archaeology and construction methodology. A number of these items must be addressed prior to any development commencing or during the course of each phase of the development of the site. Several conditions have already been partly discharged in relation to contamination and construction methodology following extensive consultation with the Councils environmental health and highway officers. Current application – Phase 3 ‘Block E’ The current scheme for the approval of reserved matters relates to the third phase of the East Camp development, comprising ‘Block E’ and associated access, parking and amenity space. It covers an area of approximately 1.09 ha. ‘Block E’ would be located in a prominent position on the south eastern edge of the masterplan facing Aerodrome Road and adjacent to the railway embankment. The block would also form the eastern edge of one of the main entrance roads into the proposed residential ‘quarter' of the development. Housing Mix The detailed proposals for Block E contain 309 residential units, representing 11% of the total number (2800) approved under the outline planning consent. The block would consist of residential accommodation on all levels, with a mix of units ranging from studios to 3 bedroom apartments. The make up by tenure of the outline planning permission, detailed proposal for Block E and the combination of Block B (first phase), A (second phase) and E are as follows: 94 Private Sale + DMS RSL Rented Housing Shared ownership EPWS Outline 1870 66.8% 400 14.3% 200 7.1% 330 11.8% Block E Block B, A & E combined 202 65.4% 614 64.1% 52 16.8% 144 15.0% 28 9.1% 94 9.8% 20 8.7% 106 11.1% TOTAL 2800 309 100% 100% 958 100% Note: DMS – Discount Market Sale EPWS – Entry Point Worker Studio Block E brings forward a full range of tenures and with Blocks B and A begins to address the required balance of units types established by the outline permission. Private sale and discount market sale units have been grouped together as it is proposed to spread the discount market sale units throughout the development and not limit these to a single core within a block. The breakdown of units by bedroom size proposed in Block E is as follows: Private (including DMS) Studio 18 1 Bed 2 Bed 3 Bed 72 99 1 Bed S/O 4 2 Bed S/O 21 13 TOTAL 202 Affordable EPWS 27 3 Bed S/O 2 Bed Rent 3 3 Bed Rent 25 27 TOTAL 107 In respect of affordable housing, discussions with Genesis Housing Group have been entered into and are currently progressing in consultation with the Councils housing officers. Design and External Appearance The reserved matters details in relation to these aspects have been prepared in line with principles established by the approved masterplan and an agreed design framework submitted pursuant to the outline consent. This proposals do not seek stage approval of landscaping details which are only indicative at this stage. These will however be brought to committee in due course for condideration. Unlike Blocks B and A, Block E is an entirely residential phase located away from the mixed use part of the site and providing for a mix of private and affordable units around a landscaped amenity space set above a secure parking area, ‘wrapped’ and therefore concealed by residential accommodation at ground floor level. Block E would have a footprint measuring approximately 70 metres x 60 metres. It would effectively comprise of 8 linked buildings consisting in the main of medium rise, five and six storeys with the top floors generally set back to provide terraces. The lower residential floor levels would in certain locations 95 feature balconies and at ground level an area of defensible space would provided for each unit. Buildings E4 and E6 (see appendix) on prominent corners facing Aerodrome Road would rise to seven storeys and feature strong, angular corner bays. These feature blocks would present a modern and appearance to the Aerodrome Road frontage when arriving at the site through the existing road tunnels. Block E has been designed so that each building element of the urban block has an individual character and identity. Consequently, the street frontages created within and around the site would comprise of a series of related buildings, rather than monolithic blocks. The architectural treatment proposed is contemporary using traditional materials and finishes and having regard to the need to create sustainable accommodation. To this end for instance the window to wall ratio would not exceed 40% to reduce heat loss and timber framed construction for the upper residential storeys is being used. The ground floor, including the concealed undercroft parking would be framed in durable reinforced concrete construction and clad in facing brickwork. Facing brickwork would also be used on buildings E2, E5 and E7 with through-coloured render used elsewhere. Lightweight cladding panels would be used in key locations on the facades to visually ‘lighten’ the appearance of the upper storeys or recessive bays between blocks and enhance the articulation of the elevations. A variation in window size, shape and proportion would also be introduced in order to assist in creating greater variety to the facades. Window frames to the residential accommodation would be maintenance free pvcu with powder coated aluminium frames. All glass would be clear, nontinted and double glazed. Balconies and balustrading would be formed in architectural metalwork with a maintenance free galvanised finish. The balustrading to the key corner buildings E4 and E6 would feature clear glazed infill panels providing a light and clean appearance against the cladded background walls. The proposed entrance street leading from Aerodrome Road to the proposed ‘Residential Square’ would comprise of hard landscape paving materials, street furniture, and soft landscaping treatment with suitable urban street trees and planted areas, all provided with good lighting for amenity and security. . Boundary treatments would be designed and installed appropriately relative to their particular visual prominence, for example the street frontage of Aerodrome Road would feature black painted metal railings 1200mm high with landscaping planted behind. 96 Full details of the design, elevational treatment and landscaping of the proposed first phase includes samples of all materials to be used in the external finishes will be displayed at the meeting. Overlooking / Overshadowing Condition 19 of the outline consent states that “a detailed assessment of overlooking and overshadowing will be undertaken as part of the preparation of the reserved matters application”. In accordance with condition 19 the detailed design of Block E has considered the potential for overlooking to ensure that a reasonable degree of privacy is offered to future residents of the development. As illustrated by the floor plan that forms part of the reserved matters application (see appendix) there would be in the region of 30 to 40 metres between facing windows to habitable rooms of the proposed block. This distance provides a balance between ensuring a reasonable degree of privacy to future residents whilst maximising security through natural surveillance and providing valuable residential amenity space in the form of a communal courtyard. To maintain privacy and prevent overlooking consideration has also been given to the potential overlooking of the flats on internal corners of the block and this would be minimised through a combination of carefully positioned windows and the arrangement of the internal layouts. To eliminate the potential overlooking from and onto balconies, screens would be sensibly placed to provide a reasonable degree of privacy to future occupiers. During the design of Block E and in accordance with condition 19, consideration has been given to the overshadowing of the residential amenity space. The dense urban form of the approved development necessarily involves the positioning of reasonably tall buildings in rather close proximity to one another. An inevitable consequence of this is that the light conditions within the development will not be comparable to that of a low rise development in a more traditional suburban context. Car parking Within the masterplan for the development of the site residents car parking would be accommodated either beneath or adjacent to the proposed residential block. The reserved matters application provides 215 car parking spaces of which 144 would be accommodated undercroft below the podium courtyard of the block with additional parking located towards the eastern boundary in a ‘mews style’ street. The remaining car parking provision would be located on street within the site. 97 As agreed at the outline planning stage depending upon the demand for parking space following the findings of the surveys to be carried out in accordance with the Section 106 Agreement, additional parking space would be provided in the next phase, Block F. BRE-Eco Homes/BREEAM Standards The outline consent conditioned that all new development on site meet the “very good” standard in the BRE-Eco Homes and BREEAM assessments. These assessment methods have been used to assess the environmental performance of both new and existing buildings for a number of years and are regarded by the UK’s construction and property sectors as the measure of best practice in environmental design and management. St. George are committed to attaining this standard and specialist consultants have been commissioned who are Licensed BRE Assessors to undertake the formal assessment of the first and second phases of the development. An update on this matter will be provided at the next meeting. COMMENTS ON THE GROUNDS OF OBJECTION No objections have been received to the proposals. CONCLUSION This application represents the fourth phase of a major regeneration project that will bring significant changes and benefits to the Colindale area. The details submitted are considered to be in accordance with the parameters established by the outline consent and your officers are satisfied that the design approach would provide for a high quality residential environment. Approval of this reserved matters submission if therefore recommended. 98 99 100 101 102 LOCATION: Oaktrees B Site, Grendon Lodge, Knightswood Close, Edgware, Middlesex, HA8 8FR. REFERENCE: W13463K/05 WARD: APPLICANT: PROPOSAL: Received: Accepted: Edgware Expiry: Final Revisions: Notting Hill Housing Trust 1 Nov 2005 1 Nov 2005 27 Dec 2005 Variation of Condition 2 of planning permission reference W13463A/04 to remove reference to "8 of the car-parking spaces being marked out shall be provided solely for the use of residents of 1-8 Knightswood Close". RECOMMENDATION: APPROVE INFORMATIVE(S):1. The plans accompanying this application are:- A3228C/3.1/001. 1. MATERIAL CONSIDERATIONS (a) Relevant Unitary Development Plan Policies: Unitary Development Plan (adopted 1991) G21 Unitary Development Plan Revised Deposit Draft Modifications (approved 28 June 2005): M14 (b) Relevant Planning History: W13463A/04- Demolition of existing building and construction of a two storey block containing 9 no supported flats and a 6 bed respite care home. Provisioin of 10 car parking spaces to serve the development, 2 minibus spaces and 8 parking spaces to serve nos 1-8 Knightswood Close and associated landscaping. Approved 28.4.04 (c) Consultations and views Expressed: 100 residents were consulted. No replies have been received. 103 PLANNING APPRAISAL Site Description and Surroundings The Council owned sheltered housing development, known as Grendon Lodge, is currently being demolished to accommodate the 9 supported flats and 6 bed respite care home approved under W13463A/04. The application site includes part of the Council owned highway fronting no’s 1-4 Knightswood Close. Proposal Condition 2 of the above approval required that “before the development hereby permitted is occupied turning space and parking spaces shall be provided and marked out within the site in accordance with the details shown on drawing no. A3228/2.1/101A. Eight of those spaces shall be marked out and provided solely for the use of residents of 1-8 Knightswood Close”. The car parking spaces for the residents of Knightswood Close would be sited on the adopted highway. Whilst car-parking bays may be marked out on an adopted road, they cannot be provided for the sole use of individuals. The applicant is, therefore, unable to comply with this part of condition 2 and has applied to remove the final sentence. Material Planning Considerations Previously, adjoining residents parallel parked approx 5 cars on the adopted highway fronting no’s 1-4 Knightswood Close. No formal provision allowed for this and cars parked could inhibit vehicular movements to and from Grendon Lodge. The approved scheme allows for the marking out of 10 car parking spaces on the adopted road. Whilst 8 of the spaces would not now be for the sole use of individual residents, 10 available spaces would be a marked improvement on the previous unsatisfactory situation and it is recommended that the variation to condition 2 be approved. COMMENTS ON THE GROUNDS OF OBJECTIONS No objections have been received. 104 OAKTREES B SITE, GRENDON LODGE, KNIGHTSWOOD CLOSE HA8 W13463K/05 KNIGHTSWOOD CLOSE Scal Based on the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationary Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. London Borough of Barnet LA086290 2003 105 e 1:1250 LOCATION: 7 Birkbeck Road, London, NW7 4BP. REFERENCE: W14141A/05 WARD: APPLICANT: PROPOSAL: Received: Accepted: Mill Hill Expiry: Final Revisions: Orchard Farm Cattery 5 Sep 2005 5 Sep 2005 31 Oct 2005 Two-storey side extension, single storey rear extension, conversion of property into 2 self-contained flats. RECOMMENDATION: APPROVE SUBJECT TO CONDITIONS 1. This development must be begun within three years from the date of this permission. Reason: To comply with Section 51 of the Planning and Compulsory Purchase Act, 2004. 2. The materials to be used in the construction of the external surfaces of the building(s) shall match those used in the existing building(s). Reason: To safeguard the visual amenities of the building and the surrounding area. 3. Notwithstanding the provisions of the Town and Country Planning (General Permitted development) Order 1995,or any Order revoking and re-enacting that Order with or without modification), no additional windows shall be placed at any time on the side elevations of this property facing towards 5 Birkbeck Road without the prior permission of the Local Planning Authority. Reason: To ensure that the amenities of the occupiers of adjoining properties are not prejudiced by overlooking. 4. Before the development hereby permitted is occupied the parking spaces shown on "Plan of Parking" (received 5.9.2005) shall be provided and shall not be used for any purpose other than the parking 106 of vehicles in connection with the approved development. Reason: To ensure that parking is provided in accordance with the council's standards in the interests of pedestrian and highway safety, the free flow of traffic and in order to protect the amenities of the area. 5. Before the development hereby permitted commences, details of enclosures and screened facilities for the storage of recycling containers and wheeled refuse bins or other refuse storage containers where applicable, together with a satisfactory point of collection shall be submitted to and approved in writing by the Local Planning Authority and shall be provided at the site in accordance with the approved details before the development is occupied. Reason: To ensure a satisfactory appearance for the development and satisfactory accessibility; and to protect the amenities of the area. 6. The development hereby permitted shall not be occupied until space has been provided within the site for bicycles to be parked. This area shall not be used for any purpose other than the parking of bicycles in connection with the approved development. Reason: To ensure that cycle parking is provided in accordance with the council's standards and in the interests of sustainable travel. INFORMATIVE(S):1. The plans accompanying this application are:- Dwg. No's: BR1, BR2, BR3, "Plan of Parking", Site Plan. 2. If the development is carried out it will be necessary for the existing crossover to be widened by the Highway Authority, at the applicant's expense. You may obtain an estimate for this work from Highways, Building 4, North London Business Park, Oakleigh Road South, London, N11 1NP (telephone 020 8359 4336). 3. The reasons for this grant of planning permission or other planning related decision are as follows: i) The proposed development accords with strategic planning guidance and policies as set out in the Mayor's London Plan (published 10 February 2004) and the Adopted Barnet Unitary Development Plan, Unitary Development Plan Revised Deposit Draft Modifications, approved 28 June 2005. In particular the following polices are relevant: Adopted Barnet Unitary Development Plan (1991): G1, G2, G18, T1.1, H1.2, H5.1, H5.3, M2.1. 107 Unitary Development Plan Revised Deposit Draft Modifications, approved 28 June 2005: GBEnv1, GBEnv2, D1, D2, D5, H23, H26, H27. Design Guidance Note 7: residential Conversions. ii) The proposal is acceptable for the following reason(s): The proposed development would not significantly harm the visual and residential amenities of any neighbouring property, being in-keeping with the characteristics of the streetscene and the character of the original dwellinghouse according with all of the aforementioned UDP policies. 1. MATERIAL CONSIDERATIONS This application was deferred from Planning and Committee on 20 October 2005 for Members site visit. Environment Relevant Policies: Adopted UDP (1991): G1, G2, G18, T1.1, H1.2, H5.1, H5.3, M2.1 Unitary Development Plan Revised Deposit Draft Modifications (Approved 28th June 2005): GBEnv1, GBEnv2, D1, D2, D5, H23, H26, H27 Design Guidance Note 5: Extensions to Houses Design Guidance Note 7: Residential Conversions Relevant Planning History: W14141/05, Two-storey side extension. Single storey rear extension. Conversion of property into two self-contained flats, Withdrawn, 5/9/05 Consultations and views Expressed: Neighbours Consulted: 10 Replies: 2 The owner/occupiers of 5 and 9 Birkbeck Road have expressed the following objections 1. Insufficient off street parking and resultant on street problems. 2. Loss of light/outlook 3. Increase in disturbance and noise levels 4. Parking issues within the area 5. The principle of flats within a group of single family dwelling houses Any further representations are to be reported to the committee. Internal/Other Consultation: 108 Traffic and Transportation team comment as follows: • The provision of 2 parking spaces for the proposed 1 two bedroom units and a single 1 bedroom units would be required to meet the Parking Standards. • A minimum visibility along the edge of the footway would be required for the crossover. Please ensure that an unobstructed visibility above the height of 1.05 metres exists for vehicles at least 2.4 metres in both directions along the edge of the footway. This sight line needs to be achieved without the vehicle encroaching onto the footway. Provided the above requirements are satisfied there is no objection to the above application. 2. PLANNING APPRAISAL Site Description and Surroundings The application site is an end of terrace property located on the west side of Birkbeck Road, there have been no previous extensions to the property Proposal Proposed is a two-storey side extension, single storey rear extension, conversion of property into 2 self-contained flats. Material Planning Considerations The proposed two-storey side extension would have a sideways projection of 1m, being set off the boundary of No. 5 Birkbeck Road by 1m as suggested within Design Guidance Note 5: Extensions to Houses. Given that the side extension is minimal it is considered that a set down from the original ridgeline would not be required. The single story rear extension would project part 3.8m part 3m, the extension closer to the boundary of No 5 Birkbeck would extend the further for a width of 3.9m. The 3m projection would be for a width of 2.95m and closest to the boundary of 9 Birkbeck Road. It is considered that there would be no significant loss of amenity to the neighbouring occupiers as a result of the proposed extensions. The Council’s policies with regard to the conversion of single-family dwellings to flats state that conversions will only be acceptable if they don’t have an adverse affect on the amenity of neighbouring properties and the established character of the street scene. Birkbeck Road is of mixed character, comprising a mixture of detached and semi detached houses: There is evidence of a large number of residential conversions within the road, hence the principle of flat conversions has been established. 109 The provision of 2 car-parking spaces would be provided to the front of the property which is currently a garden. Similar hard standings exist to other properties and this part of the development is therefore considered to be acceptable Details for the location of refuse facilities is subject to planning condition. Other issues such as sound insulation, fire regulations, plumbing and drainage would be covered under the building regulations. COMMENTS ON THE GROUNDS OF OBJECTIONS These have been addressed within the body of the report 3. CONCLUSION The proposed development would be consistent with policy and guidance in the Adopted and Revised Deposit Draft Modifications UDP, Design Guidance Note 5: and in Design Guidance Note: 7: Residential Conversions. Given the aforementioned, this application is considered acceptable in planning terms and is recommended for APPROVAL 110 BY RO N RO AD BIRKBE CK ROAD 7 Birkbeck Road, Mill Hill, NW7 4BP - W14141A/05 9 5 DAW S L ANE Based on the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationary Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. London Borough of Barnet LA086290 2003 111 Scal e 1:1250 LOCATION: BRENT CROSS SHOPPING CENTRE MANAGEMENT OFFICES, BRENT CROSS SHOPPING CEN, Prince Charles Drive, London, NW4 3FP. REFERENCE: W00560MF/05 WARD: APPLICANT: PROPOSAL: Received: Accepted: West Hendon Expiry: Final Revisions: Hammerson UK Properties Plc 6 Oct 2005 19 Oct 2005 14 Dec 2005 Roof top extension for retail and storage purposes and associated works to unit C1. Relocation of plant room. RECOMMENDATION: APPROVE SUBJECT TO CONDITIONS 1. This development must be begun not later than one year from the date of this permission. Reason: (i) To comply with Section 91 of the Town and Country Planning Act 1990 (ii) To allow the proposal to be re-assessed for conformity with the Cricklewood and Brent Cross Masterplan. 2. Before the development hereby permitted commences on site details of all additional and relocated extraction and ventilation equipment and roof-top plant shall be submitted to and approved in writing by the Local Planning Authority and implemented in accordance with agreed details before the use is commenced. Reason: To ensure that the proposed development does not prejudice the enjoyment or amenities of occupiers of adjoining residential properties and the appearance of the locality. INFORMATIVE(S):1. The plans accompanying this application are:- AR/TP/01 REV A, BX/TP/01, AR/TP/02, AR/TP/03, AR/TP/04 REVA, AR/TP/05, AR/TP/06, AR/TP/07, AR/TP/08, AR/TP/09, AR/TP/10, AR/TP/11, AR/TP/12, AR/TP/13, AR/TP/14 REVA, AR/TP/15, AR/TP/16, AR/TP/PHOTO1, AR/TP/PHOTO2 and AR/TP/PHOTO3 112 2. The reasons for this grant of planning permission or other planning related decision are as follows: i) The proposed development accords with strategic planning guidance and policies as set out in the Mayor's London Plan (published 10 February 2004) and the Adopted Barnet Unitary Development Plan, Unitary Development Plan Revised Deposit Draft Modifications, approved 28 June 2005. ii) In particular the following polices are relevant: Adopted Barnet Unitary Development Plan (1991): - G1, T1.1, S1.1, M2.1 Unitary Development Plan Revised Deposit Draft Modifications, approved 28 June 2005: GBEnv1, GBEnv2, Gloc, Gparking, Gnon Car, GTCR1, Gcrick, D1, D2, D3, M1, M14, TCR1, TCR4, C1, C2, C5, C6, C8 ii) The proposal is acceptable for the following reason(s): The proposal is acceptable in terms of design, scale and size and is not considered to be detrimental to the character and appearance of the property, streetscene or amenity of neighbouring occupiers. 3. The applicant should be aware that the additional floorspace hereby approved will be considered as part of the additional 55,000 sq.m to be accommodated in the development framework proposals. 4. The following details are required in connection with condition 2: a. Sound pressure levels of refridgeration/ chiller/ air conditioning/ ventilation/ extraction units/ machinery to be installed, predicted in decibels (dBA) at one metre from the nearest noise sensitive premises. b. Details of where the equipment will be placed ie within or outside of the building, marked on to a map. c. The proposed hours of use of the equipment and opening hours. d. Details of any silencers to be fitted, or sound insulation measures to reduce/ minimise any noise impacts on neighbours. e. Details of any anti vibration mountings for the ductwork of the extraction system. f. The height of the flue (must be a minimum 1m above the highest eaves of the building and adjacent buildings). g. Details on how the joints on the ductwork will be sealed. h. Details of plans for the maintenance and cleaning of any filters in the system. i. The ductwork should not be fitted with a cowl or restriction to the final opening. 1. MATERIAL CONSIDERATIONS Relevant Unitary Development Plan Policies: Adopted UDP (1991): - G1, T1.1, S1.1, M2.1 113 Unitary Development Plan Revised Deposit Draft Modifications, approved 28 June 2005: GBEnv1, GBEnv2, Gloc, Gparking, Gnon Car, GTCR1, Gcrick, D1, D2, D3, M1, M14, TCR1, TCR4, C1, C2, C5, C6, C8 SPG – Cricklewood, Brent Cross and West Hendon Regeneration Area Development Framework (April 2004) Relevant Planning History (most recent): W00560GG Fenwicks – Additional floor to retail unit – approved 28.02.96 W00560HD – Installation of storage units on first floor roof – approved 09.04.97 W00560HP/02 Boots – Extension at second floor level – approved 05.06.98 W00560KC/02 Marks and Spencer – Additional lift motor at roof level – approved 10.10.02 W00560KP/03 Waitrose – Additional roof-mounted air condensers – approved 16.03.03 W00560KL/03 – Marks and Spencer – Roof-mounted plant machinery – approved 30.06.03 W00560LY/04 - Erection of an extension on the roof of store C1 to provide additional retail and storage floorspace, with relocation of plant to new roof. Alteration to southern elevation (adjacent to mall 1 entrance) – approved 2601-2005 Consultations and views Expressed: Neighbours Consulted: 2. 239 Replies: 0 PLANNING APPRAISAL Site Description and Surroundings Brent Cross is a regional shopping centre located to the north side of the North Circular Road, to the east of the M1/A5 junction and to the west of the A41 junction. The northern part of the site is surrounded by residential development. A significant area of the site comprises surface car parking areas, some of which are used on a permanent basis, some seasonally. Proposals In January 2005 the Council approved an application ref: W00560LY/04 for the erection of an extension on the roof of store C1 to provide additional retail and storage floorspace, with relocation of plant to new roof and alterations to the southern elevation. The primary alteration between this and the approved scheme is the extension of the external escape stair core on the southern elevation of Brent Cross Shopping Centre. The escape core within the approved scheme provides access to the Shopping Centre at upper ground floor level, at which point an internal stair links the roof top extension. However, due to construction and phasing reasons, it is now proposed that the external stair core be extended by 4.2m to provide direct access in to the proposed extension in order to minimise any impact on the trading of the 114 existing floor space during construction. Furthermore, a new weatherproof walkway is to be constructed to the north east of the extension to form as means of access from the unit. It should be noted that the proposed external escape core would in the same location and be constructed of the same materials as that previously approved. Material Planning Considerations In view of the previous approved application it is considered that the principle of retail or storage extension in this location has been established. Given that the proposal would be the same height as the approved scheme and be screened from the south by the existing parapet wall of the Shopping Centre it is considered not to have a significant impact on the appearance of the Shopping Centre. The proposed extension of the external escape core by 4.2m would result in an increase of 5 square metres in floor area, which is considered to be diminimus. Given that the development would not increase the overall number of units at the centre, but comprises proposals to make the existing units more attractive to occupiers, it is considered that there would be no significant impact on the future regeneration plans for the centre in planning terms. It is however proposed that the permissions should be valid for one year only so that, if they are not implemented, their compatibility with the Masterplan framework can be reconsidered in the future. 3. COMMENTS ON THE GROUNDS OF OBJECTIONS None received at time report was written. 4. CONCLUSION The proposal is considered to be acceptable. 115 W00560MF/05 – Brent Cross Shopping Centre FA IR AV EN UE FI EL D S E RL HA EC INC PR Based on the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationary Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. London Borough of Barnet LA086290 2003 116 E RIV SD Ri ve t re n rB Scal e 1:1250 LOCATION: Land adjacent to Fenwick, Brent Cross Shopping Centre, Prince Charles Drive, London, NW4 3FP. REFERENCE: W00560LZ/05 WARD: APPLICANT: PROPOSAL: Received: Accepted: West Hendon Expiry: Final Revisions: Hammerson UK Properties plc / 17 Jan 2005 17 Jan 2005 14 Mar 2005 Variation of Condition 1 of planning permission ref W00560GN for the erection of a multi-storey car park and associated works on the land to the east of Brent Cross Shopping Centre to allow a further 5 years for the consent to be implemented. RECOMMENDATION I: That the Borough Solicitor and Head of Planning be instructed to invite the applicant and any other person having requisite interest, to enter by way of an agreement into a planning obligation under Section 106 of the Town and Country Planning Act 1990 and other legislation which the Borough Solicitor considers is necessary for the purpose of varying the Section 106 agreement dated 11 March 1998 and the supplemental agreement dated 14 June 1999 to ensure: i) Substitution of area designated as 'brown land' on which the landscaping works will be carried out, as shown on drawing no. (SK)A505RevB. ii) Increase in the 'Works Contribution' in line with inflation, relating to works to improve the pedestrian underpass. iii) Increase in contribution towards supervision of Pedestrian Amenity Works by Council Engineer in line with inflation. iv) Paying the Council's legal and professional costs of drawing up the legal agreement and any other enabling agreements. RECOMMENDATION II: That upon completion of such agreement the Director of Environment or Head of Planning be instructed to approve planning application ref: W00560LZ/05 under delegated powers subject to the following conditions:1. This development must be begun not later than two years from the date of this permission. Reason: (i) To comply with Section 91 of the Town and Country Planning Act 1990. (ii) To allow the proposal to be re-assessed for conformity with the 117 Cricklewood and Brent Cross Masterplan. INFORMATIVE(S):1. The plans accompanying this application are:- Plan Nos. JLE0789-01. 2. The reasons for this grant of planning permission or other planning related decision are as follows: i) The proposed development accords with strategic planning guidance and policies as set out in the Mayor's London Plan (published 10 February 2004) and the Adopted Barnet Unitary Development Plan, Unitary Development Plan Revised Deposit Draft Modifications, approved 28 June 2005. In particular the following polices are relevant: The London Plan (2004):- 2A.2, 2A.5, 3D.1, 3D.2, 3D.3, 5E.1, 5E.2 Adopted Barnet Unitary Development Plan (1991): G1, T1.1, S1.1, M2.1. Unitary Development Plan Revised Deposit Draft Modifications, approved 28 June 2005: GBEnv1, GBEnv2, Gloc, Gparking, Gnon Car, GTCR1, Gcrick, D1, D2, D3, D4, D5, M1, M11, M12, M13, M14, TCR1, TCR4, C1, C2, C5, C6, C7, C8 and: ii) The proposal is acceptable for the following reason(s): The proposal would not adversely affect the amenities of the locality and complies with the framework for the Cricklewood and Brent Cross Area. 1. MATERIAL CONSIDERATIONS Relevant Unitary Development Plan Policies: The London Plan (2004): -2A.2, 2A.5, 3D.1, 3D.2, 3D.3, 5E.1, 5E.2 Adopted UDP (1991): - G1, T1.1, S1.1, M2.1 UDP Revised Deposit Draft Modifications (28 June 2005):- GBEnv1, GBEnv2, Gloc, Gparking, Gnon Car, GTCR1, Gcrick, D1, D2, D3, D4, D5, M1, M11, M12, M13, M14, TCR1, TCR4, C1, C2, C5, C6, C7, C8 SPG – Cricklewood, Brent Cross and West Hendon Regeneration Area Development Framework (April 2004) Relevant Planning History: 118 W00560FC – Alterations to existing surface car park and erection of 2 level multi-storey car park above, alterations to access – Approved 08.06.94 W00560GQ – Construction of extension to Brent Cross Shopping Centre (masterplan application) – Dismissed on appeal by Secretary of State on 03.12.03 W00560GN – Construction of a car park on 5 levels adjoining Fenwick’s store; alterations to existing site roads, exit and entry roads and service yard; alterations to exiting pedestrian route; associated landscaping - Allowed on appeal by Secretary of State on 06.04.00 W00560KD/02 - Erection of car-wash adjacent to existing northern car-park – Approved 29.01.03 W00560LU/04 - Erection of an extension on the roof of the store 1 (option 1) to provide additional retail and storage floorspace, with relocation of plant new roof – Approved 26.01.05 W00560LV/04 - Erection of an extension on the roof of store 1 (option 2) to provide additional retail and storage floorspace, with relocation of plant to new roof – Approved 26.01.05 W00560LX/04 - Erection of an extension on the roof of store R1 to provide additional Class A3 (food and drink) floorspace – Approved 26.01.05 W00560LW/04 - Erection of an extension on the roof of store B8 to provide additional retail and storage floorspace – Approved 26.01.05 W00560LY/04 - Erection of an extension on the roof of store C1 to provide additional retail and storage floorspace, with relocation of plant to new roof. Alteration to southern elevation (adjacent to mall 1 entrance) – Approved 26.01.05 Consultations and views Expressed: Neighbours Consulted: 279 Replies: 5 plus a joint letter with15 signatories The occupiers of properties in Denehurst gardens and Renters Avenue have raised the following objections: i) will devalue their properties ii) will result in additional traffic and traffic jams iii) loss of light iv) unsightly, detrimental to appearance of street scene v) managers of Brent Cross must encourage more people to use public transport vi) current car parking is more than adequate v) area already noisy and polluted every day of the week vi) when other multi-storey car park erected there was supposed to be landscaping to screen it. If this new car park is allowed then it must be screened from Hendon Way. Transport for London: No comments received 2. PLANNING APPRAISAL Site Description and Surroundings 119 The application site comprises the existing surface car park to the north-east of the shopping centre. Access to the car park is via the internal access road around the centre, which is reached via Prince Charles Drive. Traffic leaving Brent Cross may also exit on to the northbound A41 at this point. Proposals Planning permission was granted by the Secretary of State for the Environment, Transport and the Regions in 2000 for the construction of a car park on 5 levels on the site (planning application ref. W00560GN). The permission was granted subject to conditions and legal agreements. The 5 year time limit for implementation of the permission expired in April this year (prior to submission of this application) and the applicant seeks an amendment to the condition to extend the period for implementation. Material Planning Considerations History A planning permission was made in 1996 for an extension to Brent Cross shopping centre (application W00560GQ). A second application (W00560GN) was also made for the erection of a 5 level car park in the eastern part of the site (referred to as the Fenwick’s multi-storey car park). Both applications were called in by the Secretary of State. Following a Public Inquiry, the principal application (W00560GQ) was refused but the Fenwick’s multi-storey car park application was allowed on 06 April 2000. The permission was subject to legal agreements and conditions. Secretary of State’s decision The decision letter of the Secretary of State is attached as an appendix. In granting permission for the Fenwick’s multi-storey car park the Inquiry Inspector ‘had particular regard to the relationship between this application and the planning permission already granted and implemented in respect of application W00560FC to build a car park on the South West Car Park site.’ The Inspector and the Secretary of State considered it ‘reasonable to expect’ that if permission for the Fenwick’s car park was refused then the permission for the South West car park would be completed. The Secretary of State concluded that more car parking spaces would result from implementing the South West car park permission than the Fenwick’s permission and that allowing the Fenwick’s application would accord slightly better with the Government’s transport and sustainability objectives. The Inquiry Inspector found that the extant permission for the South West car park would provide 790 additional spaces. The Fenwick’s car park would provide 1100 spaces but these would be offset by the loss of existing surface parking spaces in this location. In relation to visual amenity, the Inspector found that the site falls markedly from north to south and that the bottom two levels of the car park would be below existing ground level. The top 2 levels only occupy the northern part of the site. He concluded that the elevated A41 would ‘reduce the intrusion that the above ground elements of the multi-storey car park would otherwise have in views from the east’ and he ‘can therefore see no objection to this proposal on urban amenity grounds.’ 120 Current application The period for implementation of the permission expired on 06 April 2005. In January 2005 this application was made to extend the period for implementation of the permission. The first legal agreement attached to the original permission essentially secured the following: i) A commitment that the developer will not complete the development relating to planning permission W00560FC. This relates to a permission granted in 1994 for a south-west multi-storey car park. Although the car park has not been completed, the permission was implemented during the Public Inquiry by means of the installation of subsoil piling. ii) Payment of £80,000 to the Council to undertake works to the underpass under the A41 and associated paths, to improve amenity for pedestrians. Alternatively, if the Council do not undertake the works, then the applicant will spend an equivalent amount on undertaking Pedestrian Amenity Works within the site, under the supervision of the Council’s Engineer. i) Implementation of a landscaping scheme on the ‘brown land’. This was to ensure a degree of screening of the development from the Hendon Way and the residential properties to the north and east. The area specified as the ‘brown land’ in the original agreement has subsequently been developed by means of a carwash. The proposal involves the substitution of another area for the brown land. The area now proposed is situated slightly further south than the original ‘brown land’. It is considered that tree planting in this area would still secure some screening of the development from Hendon Way. ii) Provision of temporary car-parking for staff elsewhere in the Centre during construction of the car park. The Supplementary legal agreement attached to the original permission relates to the removal of the engineering works carried out to commence the development of the south-west multi-storey car park, in the event that this scheme, the Fenwick’s multi-storey is implemented. A Deed of Variation is considered necessary to ensure that an alternative location for the landscaping works can be included and to increase the ‘works contribution’ for improvements to the underpass in line with inflation. In other respects the requirements of the previous agreements are unchanged. Policy considerations The principal material change since grant of the original permission is the policy context. The London Plan has been adopted and the Unitary Development Plan revised. The masterplan for Brent Cross and Cricklewood and the associated policies of the UDP Revised Deposit Draft Modifications refer to an upper limit of 7,600 spaces in the new town centre at Brent Cross. This takes into account consented schemes (ie the Fenwick’s multi-storey or south-west multi-storey consents). It is considered that the renewal of the permission for a limited period will not therefore prejudice the level of parking envisaged for the future development of the area. Renewal of the permission 121 for a limited period is considered to be consistent with previous permissions granted for minor extensions at Brent Cross. Sustainable Development Issues / Safety and Security Measures No additional issues raised. Disability Issues No additional issues raised. Section 106 Items No additional issues raised. 3. COMMENTS ON THE GROUNDS OF OBJECTIONS Addressed in appeal decision. 4. CONCLUSION The renewal of the permission for a further limited period is considered to be consistent with previous decisions and would not compromise the masterplan proposals for Brent Cross. 122 123 124 125 126 127 128 129 Land adjacent to Fenwicks, Brent Cross Shopping Centre, Prince Charles Drive, NW4 3FP - W00560LZ HE ND ON W AY HA LEY R OA RE NTE RS A VEN UE D IV E PR IN C CH E AR LES D RI VE TC RO TC AR RO D EN SS S EN SS FL RO YO V CO EN G ER G BR IN BR AL D PR SP IN CE CH AR LE S DR AD HE EN TC RO SS FL ND YO V ON W A Y ER Un der pass BR G SP ALD IN 9 RO AD 5 I NG TI LL AD RO TI PR I VE DR LES HAR EC IN C Scal Based on the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationary Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. London Borough of Barnet LA086290 2003 130 e 1:2500 I NG LL R OA D O LOCATION: Royal National Orthopaedic Hospital, Brockley Hill, Stanmore, Middlesex, HA7 4LP. REFERENCE: WA0291/05 WARD: Adjoining Borough APPLICANT: PROPOSAL: Received: Accepted: Expiry: 17 Jul 2005 17 Jul 2005 11 Sep 2005 Final Revisions: Harrow Council - Mr D Thompson Outline: Partial redevelopment for new hospital and facilities, housing (incl. staff) revised road junction. Parking and open space (site with a Tree Preservation Order). RECOMMENDATION: NO OBJECTION INFORMATIVE(S):1. That the Head of Planning at the London Borough of Harrow is informed that the London Borourgh of Barnet raises no objection to the means of access for proposed development subject to pedestrian facilities being provided and a condition to discourage U turners in Brockley Hill 1. MATERIAL CONSIDERATIONS Relevant Policies: Strategic Guidance for London Planning Authorities (RPG3) The Mayor of London’s Spatial Development Strategy for Greater London, The London Plan. Relevant Planning History: None Consultations and views Expressed: 131 Highways Group No objections subject to pedestrian facilities being provided and a condition to discourage U turners in Brockley Hill. 2. PLANNING APPRAISAL Site Description and Surroundings The application site occupies an area of 33.7hectares (ha) towards the north eastern borough boundary with LB Barnet. The site is bounded to the east by the A5 at Brockley Hill and Watling Street and to the south by Wood Lane. Brockley Hill Farm and Green Belt land extend northwards. To the west the site is bounded by the former BAE Systems site on Warren Lane, by the higher land of Stanmore Hill and by the farm land and buildings of Stanmore Common, that lie within the Harrow Weald Ridge. The existing site comprises more than a hundred buildings with a total footprint of 38,349sqm, buildings set in woodland and grassland. The buildings are mostly in use as hospital facilities or as uses ancillary to the hospital, e.g. staff accommodation, plant and storage buildings, offices and teaching / research centres. Proposal The proposed development is in outline form for means of access only to be determined at this stage. The scheme comprises: groundworks, partial demolition of existing hospital buildings and redevelopment for new hospital and associated uses (Class C2) educational facilities (Class D1), re-use of Zachary Merton building as the Ronald McDonald parent accommodation hostel (Sui Generis), staff accommodation, private and affordable housing (Class C3) reuse of Spinal Injuries Unit for Trust Offices (Class B1), partial demolition and reuse of Eastgate house for housing (Class C3), relocation of helipad, landscaping , parking and highway works. “Parameter Plans” were submitted, and form part of the application, for three separate “Development Zones”. These plans seek to fix the land use mix, maximum building footprint, maximum building height and maximum parking standards for each zone. They have also been used as a basis for the Environmental Impact Assessment, to enable any likely significant environmental effects to be assessed. Illustrative drawings indicate how the site might be developed in the context of the Parameter Plans, showing three sectors: east (affordable housing), central (hospital use) and west (private housing, including use of the Zachary Merton building as a parents hostel). Material Planning Considerations for Barnet 132 Parking The increased provision of parking on site for the hospital has been justified in terms of the low accessibility of the site to public transport and current parking levels, which exceed the number of formal parking spaces. Traffic impact The proposed residential units and increase in size of the hospital and staff accommodation will necessitate improvements to access to the site as well as highway improvements Access and Highway improvements Currently queues can build up quickly at peak times when southbound through traffic on Brockley Hill is blocked by right turning traffic, both at Wood Lane and at the hospital access. This is because Brockley Hill has a single lane in each direction with no separate right turn lanes. The proposed new roundabout at the junction of Brockley Hill will reduce the potential for queuing and delays to traffic in Brockley Hill at its junction with Wood Lane arising from the increase in traffic generated from the development and will ease the existing situation Discussion with the applicants transport consultant have indicated that major improvements to the access on Brockley Hill are not possible due to the presence of listed buildings within the site close to the access. The applicants transport assessment indicates that access to the site is proposed to be split between the Brockley Hill access and the Wood Lane access with slightly more traffic anticipated to use the Wood Lane access. The change in emphasis of access to the site will be reinforced by the proposed restricted traffic movements at the Brockley Hill access -left in and left out only. Following concerns expressed by London Borough of Barnet officers about the possibility of ‘U’ turning on Brockley Hill, both the applicants and Harrow officers have agreed to impose a condition that a traffic management scheme be prepared to discourage the possibility of users of the site U turning in Brockley Hill (i.e to encourage the use of Wood Lane to access the proposed hospital) The agreed wording of the S278 is as follows Pedestrian access to Public Transport The 107 bus route is an important public transport link to the site and it is necessary for pedestrians to cross Brockley Hill to the southbound bus stop from the hospital. Following concerns expressed by officers, the applicants have submitted a revised plan illustrating improvements to pedestrian facilities in the form of a pedestrian refuge to assist in crossing Brockley Hill. 133 The applicants have also agreed with Harrow to a S106 contribution in the sum of £300,000 towards the improvement of bus services. Wider traffic impact Barnet Officers have also sought a S106 contribution for improvements to the Cannons Corner Roundabout but the applicants have pointed out their considerable financial investment in improving the Brockley Hill/ Wood Lane junction. The development would have a relatively minor impact on Cannons Corner roundabout, and it is considered that such improvements would be difficult to justify. Conclusion On balance given the proposal to implement an improved roundabout at the junction of Brockley Hill and Wood Lane, it is considered that the impact on the highway network will not be significant and it is recommended that London Borough of Barnet raise no objection the application subject to pedestrian facilities being provided and a condition to discourage U turners in Brockley Hill. 134 Royal National Orthopaedic Hospital, Stanmore WA0291/05 Pond BR KL OC EY HI LL W OO D LA NE Scal Based on the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationary Office Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. 135 London Borough of Barnet LA086290 2003 e 1:1250