Building Condition Report Building Condition

Transcription

Building Condition Report Building Condition
Building Condition Report
Price Memorial
Building #0001
Present Building Use:
The Administration building currently houses offices for the President, and Senior Administration.
Building History:
Overall Size:
Built in 1879
24,922 Square Feet
Replacement Value: $4,984,400.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Wood Frame / Brick Veneer
Wood Frame / Drywall
Carpet
Asphalt Shingle / Mod Bit.
Condition
Good
Good
Good
Good
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Campus Chilled Water Loop
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Price Memorial
Building #0001
ADA Accessibility
 ADA Entrance
 Partial
Building Upgrades










1999 —75% Interior Renovation
2004—Boiler Replacement
2005—VCT Replacement 1st Floor
2006—Carpet Replacement 3rd Floor
2007—Elevator Repairs and Carpet Replacement
2009—Fire Pump Replacement
2010– Replace AC Compressor
2012—Carpet Replacement 2nd Floor
2012—AC Compressor Replacement
2013—Tied onto Campus Chill Water Loop
Recommendation on Future Repair and Renovation
Building Condition Report
Will D. Young Hall
Building #0002
Present Building Use:
The building currently houses lecture classrooms, conference rooms, and collaborative classrooms.
Building History:
Overall Size:
Built in 1938
15,837 Square Feet
Replacement Value: $3,167,400.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick and Wood Veneer
Metal Frame / Drywall
Carpet / Tile
Asphalt Shingle / Mod Bit.
Condition
Good
Good
Good
Good
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Campus Chilled Water Loop
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Will D. Young Hall
Building #0002
ADA Accessibility
 ADA Compliant
Building Upgrades

2012—Complete Renovation of the building completed.
Recommendation on Future Repair and Renovation
Building Condition Report
Hoag Student Center
Building #0003
Present Building Use:
The building currently houses an auditorium, student services offices, computer labs, eateries,
study space., and the post office.
Building History:
Overall Size:
Built in 1969
48,077 Square Feet
Replacement Value: $12,019,250.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Stone/Block w/ Brick Veneer
Metal Frame / Drywall
Carpet / Tile
Modified Bit
Condition
Good
Good
Good
Poor
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Campus Chilled Water Loop
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Hoag Student Center
Building #0003
ADA Accessibility
 ADA Compliant
Building Upgrades

2012—90% Renovation of the buildings interior completed.
Recommendation on Future Repair and Renovation

Fall of 2013 a roof replacement project is planned.
Building Condition Report
Nix Fine Arts
Building #0005
Present Building Use:
The building currently houses Shott auditorium, faculty offices, classrooms, music rehearsal
rooms, wood work shop, and a photo lab.
Building History:
Overall Size:
Built in 1936
27,075 Square Feet
Replacement Value: $5,415,000.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Brick
Metal Frame / Drywall
Carpet / Tile
Asphalt Shingle
Condition
Good
Good
Fair
Fair / Poor
Mechanical
HVAC
Fire Alarm System
Electrical
Type
60 Ton
Fire Light
120/208V 3 Phase
Condition
Poor
Good
Fair
Building Condition Report
Nix Fine Arts
Building #0005
ADA Accessibility
 ADA Partial Compliance
Building Upgrades



1987—Renovation
2002—Hood and Exhaust Fan Installation
2001—ADA Renovation
Recommendation on Future Repair and Renovation

Summer of 2013 will be tied to the campuses chill water loop.
Building Condition Report
Barnes Hall
Building #0006
Present Building Use:
The building currently houses Faculty offices.
Building History:
Overall Size:
Built in 1935
19,701 Square Feet
Replacement Value: $3,940,200.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Brick
Metal Frame / Drywall
Carpet / Tile
Asphalt Shingle
Condition
Good
Good
Good
Good
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Campus Chill Water Loop
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Barnes Hall
Building #0006
ADA Accessibility
 ADA Compliant
Building Upgrades

2012—Complete Renovation
Recommendation on Future Repair and Renovation
Building Condition Report
Stewart Success Center
Building #0007
Present Building Use:
The building currently houses Residence Life, Counseling Center, Career Services, Financial
Aid, &Testing.
Building History:
Overall Size:
Built in 1971
34,085 Square Feet
Replacement Value: $6,817,000.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile
3 Ply Mod. Bit.
Condition
Good
Good
Good
Good
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Campus Chill Water Loop
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Stewart Success Center
Building #0007
ADA Accessibility
 ADA Compliant
Building Upgrades

2012—Complete Renovation
Recommendation on Future Repair and Renovation
Building Condition Report
Dunlap Hall
Building #0008a
Present Building Use:
The building currently houses faculty & staff offices, classrooms, and meeting spaces.
Building History:
Overall Size:
Built in 1965
43,158 Square Feet
Replacement Value: $8,818,400.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile / Terrazo
Built-up with Aggregate
Condition
Good
Fair
Fair
Fair
Mechanical
HVAC
Fire Alarm System
Electrical
Type
90 Ton Water Cooled Chiller
Fire Light
120/208V 3 Phase
Condition
Poor / Fair
Good
Fair
Building Condition Report
Dunlap Hall
Building #0008a
ADA Accessibility
 ADA Partially Compliant
Building Upgrades










1994—Chiller Replacement
1985—Exterior Concrete Rehabilitation
1994—50% Renovation
2002—HVAC Repairs
2003—Fire Alarm Upgrades
2004—Carpet Replaced 2nd Floor
2005—Electrical Upgrade
2006—Third Floor Carpet
2006—Repair 3rd Floor Air Handler
2008—HVAC & Electrical Renovations
Recommendation on Future Repair and Renovation

Potential candidate for a full renovation.
Building Condition Report
Newton Oakes Center
Building #0008b
Present Building Use:
The building currently houses faculty & staff offices, classrooms, and meeting spaces.
Building History:
Overall Size:
Built in 1994
44,092 Square Feet
Replacement Value: $8,818,400.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile / Terrazo
Built-up with Aggregate
Condition
Fair
Fair
Poor
Fair
Mechanical
HVAC
Fire Alarm System
Electrical
Type
120 Ton Air Cooled Chiller
Fire Light
120/208V 3 Phase
Condition
Fair
Good
Fair
Building Condition Report
Newton Oakes Center
Building #0008b
ADA Accessibility
 ADA Partially Compliant
Building Upgrades




2003—Fire Alarm Upgrade
2003—Chiller Replacement
2010—Repair Chiller Compressor
2012—Roof Repairs
Recommendation on Future Repair and Renovation
Building Condition Report
Memorial Hall
Building #0011
Present Building Use:
The building currently houses a pool, gymnasium, faculty and Staff offices, classrooms, and
athletic locker rooms.
Building History:
Overall Size:
Built in 1960
77,127 Square Feet
Replacement Value: $15,425,400.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile / Hardwood
Built-up with Aggregate
Condition
Fair
Fair
Fair
Fair
Mechanical
HVAC
Type
Condition
Multiple Systems 100 Ton Conden- Fair
ser, 2ea 10 Ton Condensers, window
units.
Fire Alarm System
Electrical
Fire Light
120/208V 3 Phase
Good
Fair
Building Condition Report
Memorial Hall
Building #0011
ADA Accessibility
 ADA Partially Compliant
Building Upgrades
Gym A/C Installation – 04/01/96-Ostrom Boiler Services, Inc.
Gym Seating Replacement – 08/15/95-H.E. Hodge Company
Gym Flooring Renovation- 05/18/95-Tri-Star Builders, Inc.
Boiler Repairs – 12/10/93 – Ostrom Boiler Services, Inc.
Wellness Center Addition – 06/02/93- Tipton Construction Company
Electrical Upgrade – 05/29/93 – Bob Carman Electric
Renovation/Addition – 04/27/88 Charles Black Construction
Wellness Center/Locker Rooms Heat & AC Installation – 03/19/86 – Fortner Heating & Cooling
Pool Overhead Painting – 08/23/85 – Phil Boleman & Associates, Inc.
Design Exit Doors & Stairs – 5/2003 - Millard
Pool Renovations – 9/2002 – In House
Exit doors – 11/2003 – Swofford Construction
Fire Alarm Upgrades – 8/2004 – Fire Protection Associations
Renovations – 9/2004 – In House
Accoustical Design – 3/2006 – Millard, Inc.
Sprinkler Systems – 2006/2007 – ML Warwick
Pool Repairs – Plumbing, Rerouting, Main Pump Replacement – 6/2005 – Heller Pools
Gym Air Handler – 6/2006 – RepCo
Chlorine System for Pool – 8/2006 – Heller Pool Services
Pool Motor – 8/2006 – Heller Pool Services
Gym Stage Microphone – 2006
Replace carpet second floor – NE GA Carpet – 3/2007
Window Treatment Second Floor – Millie’s Drapery – 5/2007
Stage Curtains – Georgia Stage, Inc – 4/2007
Classroom Cooling – Blue Mtn and Repco - 7/2006
Air Handler Replacement – Repco – 7/2006
Floor Abatement – Armory – NEGa Carpet – 7/6/2007
Outdoor Pool Heaters – 1/2008 – John Q. Bullard
Replace Furnace at Wellness Ctr. – 2/2008 – Blue Mtn.
Replace Compressor on Trane Unit – Condition Air – 7/5/08
Replace Compressor on Trane – Carrier – 8/08
Mechanical & Electrical Assessment for Gym-Spencer Bristol – 3/09
Install mini split system heat pump-Armory-REP – 12/08
Fire Suppression System @ Armory – Fire Protection – 11/08
Decorative lightning @ Armory– in house – 11/08
Floor Abatement @ Armory – NE Ga Carpet – 11/08
Chiller Replacement – Carrier – 11/08
Repair Pool Heater – John Q. Bullard – 1/10
Replace 10 ton compressor-Conditioned Air-6/2010
Recommendation on Future Repair and Renovation
Building Condition Report
Military Leadership Center
Building #0017
Present Building Use:
The building currently houses the military science department.
Building History:
Overall Size:
Built in 1971
28,653 Square Feet
Replacement Value: $5,730,600.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile / Concrete
EPDM
Condition
Good
Good
Good
Fair
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Trane Air Cooled Chiller
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Military Leadership Center
Building #0017
ADA Accessibility
 ADA Partially Compliant
Building Upgrades





2004 – 75% renovations – Hogan Construction
6/13/05 Additional Change – Flynn-Finderup Architects
Carpet Placement in classrooms – 5/07 – Northeast Ga Carpet
Rifle Range – In House – Lighting Improvements
Cabling for Room 152 – 3/2008 –Net Paramount
Recommendation on Future Repair and Renovation
Building Condition Report
Hansford Hall
Building #0032
Present Building Use:
The building currently houses Faculty and Staff offices, classrooms, and the IT Department.
Building History:
Overall Size:
Built in 1895
26,626 Square Feet
Replacement Value: $5,325,200.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile
Asphalt Shingle
Condition
Good
Good
Good
Good
Mechanical
HVAC
Fire Alarm System
Electrical
Type
80 Ton Chiller
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Hansford Hall
Building #0032
ADA Accessibility
 ADA Partially Compliant
Building Upgrades











A/C Unit Installation – Distance Learning Lab – 07/96 – Vaporis Heating & Air
Carpet Installation – Distance Learning Lab – 07/96 – Northeast Ga Carpet
Window Replacement – 04/17/95 – American Window & Door Co, Inc.
Carpet Project – Room 114 – 01/95 – Northeast GA Carpet
Electrical Upgrade in Server Room – 8/2003 – Dockmaster Electrical
Ramp – 4/2004 – Chapman Construction
Replace Air Handler – 8/2004 – Blue Mtn Heat & Air
Topo Survey – 1/2007 – Rochester & Associates
Renovation – 2007 - Millard Architect
Demo – 3/2007 - North Ridge Restoration
ReBuild (Interior)– FY 08 – Swofford Co. COMPLETED 8/2008
Recommendation on Future Repair and Renovation
Building Condition Report
Health & Natural Science
Building #0102
Present Building Use:
The building currently houses Faculty and Staff offices, classrooms, labs, lecture hall and a
planetarium.
Building History:
Overall Size:
Built in 2000
94,000 Square Feet
Replacement Value: $28,200,000
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile
Builtup
Condition
Good
Good
Flair
Fair
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Water Cooled Chillers
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Health & Natural Science
Building #0102
ADA Accessibility
 ADA Partially Compliant
Building Upgrades
Boiler Study – 7/2004 – Schweitzer Group, Inc.
Repair Boilers – 1/2005 – Aircond
Replacement of Transducer on Chillers – 1/2005 – Carrier
Install Louvers, Ductwork, etc. – 2/2005 – Aircond
Reroute existing flue venting – 3/2005-Aircond
Chiller Repairs – 3/2005 – Johnson Controls
Clean Tube Bundles – 3/2005 – Carrier
Retaining Wall – 6/2003 – In house
ADA Door Openers – 5/2005 – Automatic Doors by Morgan-Wright
Upgrade Fire Alarm Panel – 2006
Auditorium Ceiling Replacement – 5/2007 – Chapman
Chiller Repairs – Carrier – 10/2007
Door Closers-Automated Doorways- 5/09
Corkboard replacement – DMK – 6/09
Cable Infrastructure – Paramount Network – 11/08
Pre wire cubicles – Caldwell Electric – 11/08
Revocation Room 147-In House-5/10
Boiler Design-Kler, Bryan-Timberhood Consulting-5/10
Built Biology Greenhouse-5/2010
2012—Repaced Boiler (1 of 3).
Recommendation on Future Repair and Renovation
Building Condition Report
Physical Plant
Building #0104
Present Building Use:
The building currently houses plant operations, materials management, and procurement.
Building History:
Overall Size:
Built in 2004
31,541 Square Feet
Replacement Value: $6,308,200.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile
Metal
Condition
Good
Good
Good
Fair
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Heat Pumps /
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Physical Plant
Building #0104
ADA Accessibility
 ADA Partially Compliant
Building Upgrades



Materials Mgmt HVAC Warehouse – 8/2006 – John Pennebaker
MM – Install Fence – Precision – 3/2007
MM – Driveway Improvements – Chapman – 3/2007
Recommendation on Future Repair and Renovation
Building Condition Report
Library Technology Center
Building #0109
Present Building Use:
The building contains the library, associated services, and IT support.
Building History:
Overall Size:
Built in 2008
88,873 Square Feet
Replacement Value: $23,284,726.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile
Modified
Condition
Good
Good
Good
Good
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Air Cooled Chiller
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Library Technology Center
Building #0109
ADA Accessibility
 ADA Partially Compliant
Building Upgrades


Rear Door Design – Architecture Group – 5/10
Rear Door –Gay-6/10
Recommendation on Future Repair and Renovation
Building Condition Report
Recreation Center
Building #0114
Present Building Use:
The building contains 3 basketball courts, a walking track, cardio & weight workout areas, as
well as faculty and staff offices.
Building History:
Overall Size:
Built in 2008
57,000 Square Feet
Replacement Value: $15,000,000.00
Building Condition
Architectural
Exterior Walls
Interior Walls
Floor
Roof
Type
Block / Brick Veneer
Metal Frame / Drywall
Carpet / Tile / Hardwood
Asphalt Shingles
Condition
Good
Good
Good
Good
Mechanical
HVAC
Fire Alarm System
Electrical
Type
Air Cooled Chiller
Fire Light
120/208V 3 Phase
Condition
Good
Good
Good
Building Condition Report
Recreation Center
Building #0114
ADA Accessibility
 ADA
Building Upgrades

Roof Repairs @ Lobby—2008—2012
Recommendation on Future Repair and Renovation