ArrowBio Brochure
Transcription
ArrowBio Brochure
ArrowBio ® The Cutting Edge Technology for Municipal Solid Waste Treatment. HEADQUARTERS: 2 Hacarmel St., P.O.B. 676 Yoqneam 20692, ISRAEL Tel: +972-4-8411100 Fax: +972-4-8422200 [email protected] www.arrowbio.com ARROWECOLOGY T H E W AY T O Z E R O W A S T E WORLDWIDE AGENCIES: USA: Melvin S. Finstein, Ph.D. 105 Carmel Road Wheeling, WV 26003 Tel: +1 (304) 2420341 [email protected] SPAIN: Arrow Initiative S.L. Avda. Marià Fortuny, 83 4t 43203 Reus Tel: 977 128 414 Fax: 977 344 081 [email protected] www.arrowinitiative.com UK: Oaktech Environmental The Flint Glass Works 64 Jersey Street Ancoats Urban Village Manchester M4 6JW Tel: 0161 605 0802 Fax: 0161 605 0808 [email protected] www.oaktech-environmental.com MEXICO: BENLIMEX S.A. DE C.V. Carlos Levy E. [email protected] [email protected] ARROWECOLOGY T H E W AY T O Z E R O W A S T E ArrowBio ® The Cutting Edge Technology for Municipal Solid Waste Treatment. Watery Separation, Preparation and Biological Process. Stones Sand Textile Recovers Raw Materials. Landfill Produces Rich Biogas. A Green Energy Source for Combined Heat and Power (CHP) Plants. Formulates Contamination Free Soil Amendment with Excellent Properties for Agricultural Purposes. MSW Input Bulk Removal mixed or pre-sorted Plastic bags opening & cardboard collection Recyclables Plastics Metals (Fe, Non-Fe) Glass Watery Separation/ Preparation Market Bio-Degradables Food Paper Anaerobic Digestion Biogas MAIN ADVANTAGES: Proven performance with mixed municipal waste. A most cost-effective process. Recovers over 75% of MSW input. Water independent. A most adoptable and modular system. Relatively small footprint. Environmentally friendly process. Totally safe. No odor or noise nuisance. Kyoto Protocol compliant. No greenhouse gases emissions. Absolute hazardous free and inert residues. Can be located proximate to the city. Water Soil Amendment Heat Electric Power TECHNICAL FEATURES TWO LINE ArrowBio® PLANT Plant Capacity ~270 t/d (2 working shifts) Footprint 15,000 m2 including ramps and roads Estimated Manpower About 15 workers per shift (Including Manager, Engineer, and a few sorters) Bio-Gas Production ~30,000 m3 daily with ~70% Methane content Electric Power Produced ~2.5 MW by gas generators (38% efficiency) Average Power Consumed 1.0 MW Soil Amendment Produced ~60 tpd *All figures depend on the amount of biodegradable organic input.