Marko Hardeman
Transcription
Marko Hardeman
Scheduler Marko Hardeman LAMA © 2014 IBM Corporation Plannen, waarom? Inzichtelijk maken van de (toekomstige) werkvoorraad Inzichtelijk maken van de benodigde capaciteit van – Mensen – Materialen – Gereedschappen Inzichtelijk maken van benodigde down time Koppelen werkzaamheden aan personen 1 Niveau`s van plannen Jaarplanning MJOP Meerjaren Onderhoud Planning Jaren Maandplanning Maanden Output Inzicht In werkaanbod en budgetten komende jaren PO-schema’s voorzien van plandata op basis van o.a. beschikbare capaciteit MAXIMO basis applicaties PO-schema’s Taakplannen verrekeneenheden PO-schema’s Taakplannen Vakgroepen Kalenders Routes MAXIMO planning applicaties Scheduler Weken Werkorders voorzien van plandata op basis van o.a. beschikbare capaciteit Werkorders + structuur Vakgroepen Kalenders Manplanning Dagen Aan medewerkers toegewezen werkorders met plandata Werkorders Vakgroepen Medewerkers Kalenders AssignmentManager 2 Doel van Scheduler Ondersteuning bieden bij het planningsproces d.m.v. grafisch overzicht en ondersteuning bij koppelen werkvoorraad aan capaciteit. Grafisch maken van de (toekomstige) werkvoorraad Grafisch maken van de benodigde capaciteit van – Mensen – Materialen – Gereedschappen Grafisch maken van benodigde down time (automatisch) plannen van werk Koppelen werkzaamheden aan personen 3 Scheduler ontwikkeling 7.5.X Functies - Work orders in Gantt-view - PM forecast - Labor load 7.5.1 7.5.2 - Work orders in Gantt-view - PM forecast - Labor load - Work orders in Gantt-view - PM forecast - Labor load - Asset, location, tool, item availability - Graphical assignment dispachting - Schedule compliance - Asset, location, tool, item availability - Graphical assignment dispachting - Schedule compliance - Crew assignment optimalization - Scenario management Type planning Long term planning Mid & short term planning Long. Mid & short term planning 4 Scheduler 7.5.1 v.s. 7.5.2 Planner uses Scheduler to manually create an optimal schedule Foreman manually performs assignments for all work orders and tasks within the schedule Manually leverage the benefits of Scheduler 7.5.1 Manually leverages the benefits of Graphical Assignments appl. in Scheduler 7.5.1 Current Approach Schedule automatically created Capacity planning and resource leveling models based on asset/location availability, resource constraints Resources and/or Crews automatically assigned to schedules Assignment optimization model uses Craft, Skill and Crew Type and vacation data to optimally assign Resources or Crews Dispatcher monitors current and incoming work & assigns based on many org specific criteria. Manually adjusts resource schedules affected by new assignments Manually manages a dynamic Resource and Crew schedule in the Dispatching appl. in Scheduler 7.5.1 Incoming work automatically assigned to Resources or Crews based on organizational priorities Uses Dynamic Scheduling optimization model to accommodate incoming work respecting organizational priorities to optimize routes, assignments, and productivity Scheduler 7.5.2 Benefits •Quicker schedule creation •Greater schedule accuracy and compliance •Reduction in Services required to supplement resources •Huge efficiency gains by eliminating routine repetitive assignment action •Allows Foreman to adjust the assignments rather than make them •Major efficiency gain by freeing the Dispatcher from having to shuffle resource routes to accommodate incoming work •Optimizes routes to maximize productivity Streamlines the entire work management process! 5 5 Nieuwe features in 7.5.2 Gebruiksvriendelijkheid Automatisch Schedule – Prioriteit – Resources Scenario management Vergelijken van scenario`s 6 Look en feel Scheduler 7 Scheduler van PO naar WO 8 Gebruiksvriendelijkheid Tabbladen Overzichten Werkorder opties Afhankelijkheden 9 Scenario management Scenario 1 Scenario 2 Schedule Scenario 3 10 Vergelijken van scenario`s 11 Graphical Assignments 12 Bedankt voor uw aandacht Marko Hardeman Managing Consultant [email protected] mobiel: +31 (0)6-21264259 LAMA groep B.V. Oude Apeldoornseweg 41 7333 NR Apeldoorn 13