Manual

Transcription

Manual
X-ternal
CONDENSING
HANDBOOK AND SERVICE LOG
12/14
15/19
TRADITIONAL
SYSTEM
Your Boiler Serial Number is:
to be found on the Burner Cover.
Householder
Information
Householder
Information
Contents
Page
IMPORTANT!
IMPORTANT!
Your boiler must be commissioned in order to:
Your boiler must be commissioned in order to:
DESCRIPTION
-
PAGE
Validate your warranty
- Validate your
warranty
Householder
Information
Ensure the boiler has been installed correctly and avoid premature failure
Ensure the
boiler has Document
been installed correctly and avoid premature failure
Warranty
Registration
End Of Manual
Warranty
3 site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from
- Extended
Set the boiler
to its optimum efficiency. Operating conditions for the boiler will vary3 from site to site, your
Warranty
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning
engineer has specialised equipment to check the oil pressure and analyse
After
Salessmoke
Service
3 the exhaust gases for
temperature,
and carbon dioxide content.
temperature,
smoke
and
carbon
dioxide
content.
Boiler Controls: X-ternal
4
Systemthe
X-ternal
Your installer will organise
commissioning of your boiler. Should you experience any 4difficulty locating an
Your
installer
will organise the commissioning of your boiler. Should you experience any
Burner
5 difficulty locating an
engineer,
our Lockout
service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
-
Technical Specifications
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark”
Installation, Commissioning and Service Record Log Book
Boiler Dimensions:
X-ternal 15/19
6
X-ternal
12/14
7 of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back
Please ensure that your
installer
has completed all sections of the log book (found at the back
of this manual).
System
X-ternal
8
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The
log
book
will
be
required
in
the
event
of
any
warranty
work.
Ensure
that
the
service
record
is completed.
Technical Specifications
9
Burner Settings
10
Boiler Installation
Warranty
Warranty
Regulations
11
Boiler
Sizing
11
Your HRM boiler is under warranty for 2 years from the date of installation.
Your
HRM boiler An
is under
warranty for 2 years from the date of installation.
Refurbishing
Old System
11
System
Protection
11
Warranty Conditions
Warranty
Boiler Conditions
Location
12
Wall
Construction
12
- The boiler must be installed and commissioned in accordance with our handbook
- Flue
The Terminal
boiler must
be installed
and commissioned in accordance with our handbook
Guard
Installation
13
Flue
Terminating
Positions
- The boiler must not be repaired, modified or tampered with by any person not authorised by 14
HRM
- Fuel
The Supply
boiler must
not be repaired, modified or tampered with by any person not authorised 15
by HRM
System
Oil Supply
15
Extended
Warranty
Extended Warranty
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark”
and warranty registration document at the end of this manual should be completed as
Installation
appropriate
by Procedure
your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
withX-ternal
our recommendations. Return the warranty registration document to HRM in order to qualify
for a further 3 year
16-19
warranty
of the heat exchanger – a total of 5 years.
warranty
the heat exchanger – a total of 5 years.
SystemofX-ternal
20-25
Condensate
26
Extended
WarrantyDrain
Conditions
Extended Warranty Conditions
Diagrams
- Wiring
The boiler
must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced annually and maintained in accordance with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark”
serviceX-ternal
log is located at the back of this manual
X-ternal
and System
27
-
This warranty is in addition to your statutory and other legal rights
- This
warranty is in addition to your statutory and other legal rights
Boiler
Maintenance
After Sales Service
After
Sales
Service
Baffle
Removal
-
28
If your boiler fails during the warranty period contact your installer, who will be able to identify the
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate, your installer will contact us.
Contacts
-
Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
- No:
Under no circumstances
should “in warranty” work be undertaken without authorisation from the HRM
Tel
455400
service01953
department
service
department
Fax No:
01953
454483
or [email protected]
[email protected]
- Email:
If you are
unable to contact your
installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – this can be found on the cover of this manual.
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
Handbook
Standard X-ternal
& System X-ternal
Handbook
Handbook
3 131
Householder Information
Introduction
IMPORTANT!
Householder
Information
Householder Information
Householder
Information
Householder
Information
IMPORTANT!
IMPORTANT!
IMPORTANT!
Your boiler must be commissioned in order to:
Your boiler must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
mustbe
becommissioned
commissionedininorder
orderto:
to:
Your
boiler
must
- Validate your warranty
- Validate your warranty
- Validate your warranty
Validateyour
yourwarranty
warranty
-- Validate
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed
Ensure
correctly
theboiler
boiler
and avoid
hasbeen
been
premature
installed
failure
correctlyand
andavoid
avoidpremature
prematurefailure
failure
-- Ensure
the
has
installed
correctly
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum
efficiency.
Set the
the boiler
boiler
Operating
to its
its conditions
optimum efficiency.
efficiency.
for the boiler
Operating
will vary
conditions
from site
fortothe
the
site,
boiler
your will vary
vary from
from site
site to site,
site, your
your
-- commissioning
Set
to
optimum
Operating
conditions
boiler
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
engineer
has specialised equipment
to check
the oilfor
pressure
and will
analyse the
exhausttogases
for
commissioning engineer has specialised
commissioning
equipment
engineer
to
check
has
the
specialised
oil
pressure
equipment
and
analyse
to
check
the
the
exhaust
oil
pressure
gases
for
and
analyse
the
exhaust
gases
for
commissioning
engineer
has specialised
equipment to check the oil pressure and analyse the exhaust gases for
temperature, smoke and carbon dioxide content.
temperature,
smoke
and carbon
dioxide content.
temperature, smoke and carbon dioxide
temperature,
content.
smoke
and
carbon
dioxide
content.
temperature, smoke and carbon dioxide content.
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise theYour
Your
commissioning
installer will
will
of organise
your boiler.
the Should
commissioning
you experience
of your
your boiler.
any
boiler.
difficulty
Shouldlocating
you experience
experience
an
any difficulty
difficulty locating
locating an
an
installer
the
commissioning
of
Should
you
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer,
our service organise
department
may
be able to provide
you with details
of an
engineer in yourany
area.
engineer,
our
service
department
engineer,
may
be
able
our
to
service
provide
department
you
with
details
may
be
of
able
an
engineer
to
provide
in
you
your
with
area.
details
of
an
engineer
in
your
area.
Dear Householder
engineer, our service department may be able to provide you with details of an engineer in your area.
IMPORTANT!
Thank you, for selecting a boiler from HRM. Your boiler is the culmination of years of experience in the development,
testing, and manufacture
of oil fired
equipment.Commissioning and Service Record Log Book
“Benchmark”
Installation,
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and
andService
ServiceRecord
RecordLog
LogBook
Book
“Benchmark”
Installation,
Commissioning
Our
boilers
are that
independently
tested
and comply
the latest
BoileratEfficiency
Directive.
Our quality
Please
ensure
your installer
has completed
allwith
sections
of the European
log book (found
the back of
this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer Please
has
Please
completed
ensurethat
all
thatsections
yourinstaller
installer
of thehas
has
log completed
book
completed
(foundall
all
atsections
sections
the backof
ofofthe
this
log
manual).
book(found
(foundat
atthe
theback
backof
ofthis
thismanual).
manual).
assurance
procedures
also approved
andofcomply
with thework.
International
Standards,
ISO9001:2000
and ISO14001.
ensure
log
book
The log book
will be are
required
in the event
any warranty
Ensure that
the service
record is completed.
The log book
will be your
required
in the event
of any warranty
work. the
Ensure
that the service
record is
completed.
The log book will be required in the
The
event
log
book
of
any
will
warranty
be
required
work.
in
Ensure
the
event
that
of
the
any
service
warranty
record
work.
is
completed.
Ensure
that
the
service
record
is
completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
Each boiler is assembled and tested with care by a member of our production team.
Your boiler will provide you with a long and trouble free service life providing that a few essential steps are addressed.
Please take time to read the “Householder Information” section of this handbook.
Warranty
Warranty
Warranty
Warranty
Warranty
In the
unlikely
of awarranty
fault, please
yourthe
installer
should be able to identify the cause of the problem, if
Your
HRM
boiler event
is under
for 2 contact
years from
date ofwho
installation.
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for HRM
2HRM
years
boiler
fromisisthe
under
date
warranty
of installation.
for22years
yearsfrom
fromthe
thedate
dateof
ofinstallation.
installation.
appropriate your installer will contact us.
Your
boiler
under
warranty
for
Warranty Conditions
Warranty Conditions
Warranty Conditions
WarrantyConditions
Conditions
Warranty
Eastwell
- Simon
The boiler
must be installed and commissioned in accordance with our handbook
- The boiler must be installed and commissioned in accordance with our handbook
- The boiler must be installed and
commissioned
Theboiler
boilermust
must
inbe
be
accordance
installedand
and
withcommissioned
commissioned
our handbookininaccordance
accordancewith
withour
ourhandbook
handbook
-- The
installed
MD
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
- The boiler must not be repaired,
Theboiler
boiler
ormust
must
tampered
notbe
be
with
repaired,
by anymodified
modified
person not
ortampered
tampered
authorised
with
by by
HRM
byany
anyperson
personnot
notauthorised
authorisedby
byHRM
HRM
-- modified
The
not
repaired,
or
with
Extended Warranty
Extended Warranty
Extended Warranty
ExtendedWarranty
Warranty
Extended
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warranty
The
registration
“Benchmark”
document
andwarranty
warranty
at the end
registration
of this manual
document
should
atbe
the
completed
endof
ofthis
this
as manual
manualshould
shouldbe
becompleted
completedas
as
The
“Benchmark”
and
registration
document
at
the
end
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate
by your installer
/ engineer.
This is your
record that
the
boiler
has been
correctly installed
in accordance
appropriate by your installer / engineer.
appropriate
This
is
by
your
your
record
installer
that
/
engineer.
the
boiler
This
has
been
is
your
correctly
record
that
installed
the
boiler
in
accordance
has
been
correctly
installed
in
accordance
appropriate
by your installer
/ engineer.
This isregistration
your recorddocument
that the boiler
hasinbeen
installed
in accordance
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with
our recommendations.
Return
the warranty
to HRM
ordercorrectly
to qualify
for a further
3 year
with our recommendations. Return
with
theour
our
warranty
recommendations.
registration document
Returnthe
thetowarranty
warranty
HRM in registration
order
registration
to qualify
document
for a further
toHRM
HRM
3 in
year
inorder
orderto
toqualify
qualifyfor
foraafurther
further33year
year
with
recommendations.
Return
document
to
warranty of the heat exchanger – a total of 5 years.
warranty
of
the heat exchanger
– a total
of 5 years.
warranty of the heat exchangerwarranty
warranty
– a total of
of the
5the
years.
heat
exchanger
–
a
total
of
5
years.
heat exchanger – a total of 5 years.
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended
ExtendedWarranty
WarrantyConditions
Conditions
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced
annually
The boiler
boiler
andmust
must
maintained
be serviced
serviced
in accordance
annually and
and
with maintained
this handbook.
in accordance
The
with this handbook. The
-- “Benchmark”
The
“Benchmark” service log is located at the back of this manual
servicebe
log is locatedannually
at the back of maintained
this manual in accordance with this handbook. The
“Benchmark” service log is located
“Benchmark”
at
the
back
of
service
this
manual
log
is
located
at
the
back
of
this
manual
“Benchmark” service log is located at the back of this manual
- This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to--your
This
statutory
warranty
andisisother
addition
legal rights
toyour
yourstatutory
statutoryand
andother
otherlegal
legalrights
rights
This
warranty
ininaddition
to
After Sales Service
After Sales Service
After Sales Service
AfterSales
SalesService
Service
After
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
- If your boiler fails during the-- warranty
yourperiod
boiler fails
contact
fails during
yourthe
the
installer,
warranty
who
period
will be
contact
able to
your
identify
installer,
the who
who will
will be
be able
able to
to identify
identify the
the
IfIf your
boiler
warranty
period
contact
your
installer,
cause of the problem. If appropriate, your installer will contact us.
cause
of the
problem.during
If appropriate,
your installer
will contact
us.
cause of the problem. If appropriate,
cause
your
of
installer
the
problem.
will
contact
If
appropriate,
us.
your
installer
will
contact
us.
cause of the problem and refer to HRM for any warranty work instruction.
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
- Under no circumstances should
“in
Under
warranty”
nocircumstances
circumstances
work be undertaken
should“in
“in
without
warranty”
authorisation
workbe
beundertaken
undertaken
from the HRM
withoutauthorisation
authorisationfrom
fromthe
theHRM
HRM
should
warranty”
work
without
-- service
Under
no
service department
department
service department
service
department
service department
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your
Ifyou
youare
are
please
unable
contact
to contact
contact
our service
your installer
installer
department.
pleaseQuoting
contact our
your
our service
boiler’sdepartment,
department. quoting
Quotingyour
yourboiler’s
boiler’s
-- serial
Ifinstaller
unable
please
serial number when phoning – this can be found on the cover of this manual.
number
when to
phoning
– your
this can be found
oncontact
the cover ofservice
this manual.
serial number when phoning – this
serial
cannumber
be
number
found
when
on the
phoning
cover –of
–this
thiscan
can
manual.
befound
foundon
onthe
thecover
coverof
ofthis
thismanual.
manual.
serial
when
phoning
be
2
2
Standard X-ternal & System X-ternal
Handbook
Standard X-ternal & System X-ternal
Handbook
3
Standard X-ternal & System X-ternal
Handbook
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
Handbook
Standard X-ternal
& System X-ternal
Handbook
Handbook
3
3 33
3
Boiler Controls – Standard X-Ternal and System X-Ternal
Householder Information
IMPORTANT!
Control Panel
Your boiler must be commissioned in order to:
IMPORTANT!
-
Validate your warranty
-
Ensure the boiler has been installed correctly and avoid premature failure
Householder
Information
Householder Information
Householder
Information
Burner
Lockout
IMPORTANT!
IMPORTANT!
Theboiler
burner
is equipped
with a flame
failure
Your
must
be commissioned
in order
to:device. When activated the reset button on the burner control box is
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
illuminated. Refer to the fault finding section of the handbook to identify possible causes.
- Validate your warranty
- Validate your warranty
- Validate your warranty
The test switch is provided for the service engineer, in normal operation the switch should be left in the “PROG”
- position.
Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed
- Ensure
correctly
the boiler
and avoid
has been
premature
installed
failure
correctly and avoid premature failure
Boiler
Onoptimum efficiency. Operating conditions for the boiler will vary from site to site, your
Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Switching
Set the The
boiler
to its
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised
commissioning
equipment
engineer
to check
hasthe
specialised
oil pressure
equipment
and analyse
to check
the the
exhaust
oil pressure
gases for
and analyse the exhaust gases for
- temperature,
Turn on thesmoke
oil supply
temperature, smoke and carbon dioxide content.
and carbon dioxide content.
temperature, smoke and carbon dioxide
temperature,
content.
smoke and carbon dioxide content.
- Switch on the mains supply
- installer
Set the timer
control to the
“on” commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your
will organise
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
- Set our
the service
boiler control
thermostat
to the
setting
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer,
department
may be
ablerequired
to provide
you with details of an engineer in your area.
engineer, our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
-
Switching The Boiler Off For Long Periods
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
- Have the boiler serviced
- Please
Switch
off thethat
mains
(Note:
Without power
the boiler
no frost
protection)
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
ensure
yoursupply
installer
has completed
all sections
of will
the have
log book
(found
at the back of this manual).
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
- The
Turn
the oil
tank in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
logoffbook
willatbethe
required
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service record is completed.
“Benchmark” Installation, Commissioning and Service Record Log Book
Pump Priming
If the burner fails to lift oil, the pump may be dry and require priming. To prime the burner, fill a suitable container, such
as a jar, with heating oil, disconnect the flexible oil line at the isolating valve and place the end into the container.
Warranty
Warranty
Warranty
Hold the container above the height of the burner and press the lockout reset button, once the pump has pulled the oil
from
the container
through
it is primed
and can
bethe
reconnected
to the main supply.
Your
HRM
boiler is under
warranty
for 2 years
from
date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Temperature Control Thermostat
Oil Delivery
Warranty Conditions
Warranty
Conditions
Warranty Conditions
Warranty Conditions
The control thermostat regulates the temperature of the water within the boiler.
the boiler
an and
oil delivery,
wait forina accordance
short period with
before
- The boiler must be installed and commissioned in accordance with our handbook
- Switch
The boiler
mustoff
beduring
installed
commissioned
ourswitching
handbookthe boiler back on to allow sediment
- minimum
The boilerformust be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
The recommended settings, governed by the control knob, are maximum for heating and hot water and
in the bottom of the oil supply tank to settle.
- hot
Thewater
boileronly.
must not be repaired, modified or tampered with by any person not authorised by HRM
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
- The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
Maintenance
Boiler Overheat
Extended
Warranty(Limit) Thermostat
Extended Warranty
Extended Warranty
Extended Warranty
Your boiler should be serviced annually. Failure to have this done will invalidate your warranty and may also lead to
In
the
unlikely
event
the
boiler
overheats
the
reset
button
will
trip
and
cut
the
power
supply
to
the
boiler.
Allow
the
inconvenient
breakdowns.
A “Benchmark”
service
log canatbe
found
of this
manual.
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The
“Benchmark”
and warranty
registration
document
the
end at
ofthe
thisback
manual
should
be completed as
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
shouldatbethe
completed
end of this
as manual should be completed as
boiler to by
cool
then
press the
reset button
the thermostat.
appropriate
your
installer
/ engineer.
This to
is reset
your record
that the boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record that
installed
the boiler
in accordance
has been correctly installed in accordance
If you
difficulty in locating
service
engineer,
please document
contact ourtoservice
who for
may
able to
provide
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with
our have
recommendations.
Returna the
warranty
registration
HRM indepartment
order to qualify
a be
further
3 year
with our recommendations. Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
you withofthe
name
an engineer
your of
area.
warranty of the heat exchanger – a total of 5 years.
warranty
the
heatofexchanger
– aintotal
5 years.
warranty
the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
IMPORTANT - If overheating occurs regularly, consult your installation engineer. There may be a
fault withofthe
central
heating
system
Burner Spares
Extended Warranty Conditions
Extended
Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
-
Power
Neon must
Lamp be serviced annually and maintained in accordance with this handbook. The
contactmust
our sales
department
for further
spares. with this handbook. The
The boiler
- Please
The boiler
be serviced
annually
and information
maintainedoninburner
accordance
- The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located at the back of this manual
“Benchmark”
service
log
is
located
“Benchmark”
at
the
back
of
service
this
manual
log
is
located
at
the
back
of
this
manual
The lamp is illuminated when there is power to the control thermostat and the control system (time clock) is
requesting
heat.
This warranty
is in addition to your statutory and other legal rights
- This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
Limit
Neon
Lamp
After
Sales
Service
After Sales Service
After Sales Service
After Sales Service
-
The
lamp
is illuminated
when
there is power
the controls,
but the who
boilerwill
hasbeoverheated.
Whenthe
the limit reset is
If your
boiler
fails during
the warranty
periodtocontact
your installer,
able to identify
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
- If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able to
your
identify
installer,
the who will be able to identify the
pressed
should
extinguish. your installer will contact us.
cause ofthis
thelamp
problem.
If appropriate,
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installer will contact us.
-
Lockout
Neon
Lamp
Under no
circumstances
should “in warranty” work be undertaken without authorisation from the HRM
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
- Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
service department
service department
service
department
service
department
The remote reset plate supplied with the boiler can be connected to the X-ternal control panel to allow for indoor
resetting
the burner.
Simply
pass
the Molex
connector
through
thedepartment.
cable trunking
already
used
to supply power to
If you areofunable
to contact
your
installer
please
contact our
service
Quoting
your
boiler’s
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- Ifwhen
you are
unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact your
our service
boiler’sdepartment. Quoting your boiler’s
the
boiler
and connect
to the corresponding
Molexonconnector
panel. The lamp is illuminated
there
serial
number
when phoning
– this can be found
the coveron
of the
this control
manual.
serial number when phoning – this can be found on the cover of this manual.
serialshould
number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on the cover of this manual.
is power to the controls, but the burner has not fired correctly. When the lockout reset is pressed this lamp
Standard X-ternal & System X-ternal
extinguish. This lamp is also a reset button which provides an alternative to pressing the reset on the burner itself.
Handbook
-
44
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
3
Standard X-ternal & System X-ternal
Handbook
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
Handbook
Handbook
3
5
3 35
Householder Information
Technical Specifications – Boiler Dimensions – Standard X-ternal (15/19)
IMPORTANT!
Frontal View
Householder Information
Householder
Information
Technical Specifications – Boiler Dimensions
– System
X-ternal Householder Information
IMPORTANT!
IMPORTANT!
Frontal
View be commissioned in order to:
Your boiler must
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
IMPORTANT!
Your boiler must be commissioned in order to:
-
For 12/14 Standard
X-ternal (heat only) wall
plate and external casing
measurements are the
same as System X-ternal
-
Validate your warranty
-
Ensure the boiler has been installed correctly and avoid premature failure
-
Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised
commissioning
equipment
engineer
to check
hasthe
specialised
oil pressure
equipment
and analyse
to check
the the
exhaust
oil pressure
gases for
and analyse the exhaust gases for
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon dioxide
temperature,
content.
smoke and carbon dioxide content.
-
Validate your warranty
Validate your warranty
-
Validate your warranty
-
- Ensure the boiler has been installed correctly and avoid premature failure
Ensure the boiler has been installed
- Ensure
correctly
the boiler
and avoid
has been
premature
installed
failure
correctly and avoid premature failure
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service record is completed.
Warranty
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty Conditions
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
Extended Warranty
Warranty
Warranty
Warranty Conditions
Warranty Conditions
-
- The boiler must be installed and commissioned in accordance with our handbook
The boiler must be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
-
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
Extended Warranty
Extended Warranty
Extended Warranty
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
shouldatbethe
completed
end of this
as manual should be completed as
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record that
installed
the boiler
in accordance
has been correctly installed in accordance
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
Underside
warranty
of theView
heat exchanger – a total of 5 years.
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchangerwarranty
–
a total of View
5the
years.
heat exchanger – a total of 5 years.
Underside
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
-
The boiler must be serviced annually and maintained in accordance with this handbook. The
“Benchmark” service log is located at the back of this manual
- The boiler must be serviced annually and maintained in accordance with this handbook. The
The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
-
This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to your statutory and other legal rights
This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
After Sales Service
-
After Sales Service
After Sales Service
After Sales Service
-
If your boiler fails during the warranty period contact your installer, who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able to
your
identify
installer,
the who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installer will contact us.
-
Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
service department
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
service department
service department
service department
-
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact your
our service
boiler’sdepartment. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on the cover of this manual.
66
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
Handbook
Handbook
3
8
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternalStandard
Standard
X-ternal
& System
X-ternal
X-ternal
& System
X-ternal
Handbook
Handbook
Handbook
Handbook
3
3 37
Householder Information
Technical Specifications
IMPORTANT!
-
IMPORTANT!
IMPORTANT!
IMPORTANT!
Boiler
Model in order to: 12/14 Condensing
Your boiler must be
commissioned
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
Your boiler must be commissioned in order to:
-
Householder
Information
Householder Information
Householder
Information
Technical Specifications – Burner Settings
Validate your warranty
Standard X-ternal
-
Ensure the boiler has been installed correctly and avoid premature failure
Validate your warranty
-
btu/h
Output
Validate your warranty Kw
- Validate your warranty
15/19 Condensing
47,800
64,850
14
19
US/GPH
80° EH
Nozzle
- Ensure
the boiler has beenSize
installed
correctly and0.50
avoid
premature failure 0.55 80° EH
& Type
Ensure the boiler has been installed
- Ensure
correctly
the boiler
and avoid
has been
premature
installed
failure
correctly and avoid premature failure
6.9
8.6
BAR
Electrical
Supply
230V
Single
Phase,
Fused
5amp
Oil the
Pressure
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set
boiler to its optimum efficiency. Operating100
conditions for the boiler125
will vary from site to site, your
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to itsPSI
conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
Max Power Consumption
110W
commissioning
engineer has specialised equipment
to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised
commissioning
equipment
engineer
to check
hasthe
specialised
oil pressure
equipment
and 1.34
analyse
to check
the the
exhaust
oil pressure
gases
for
and analyse the exhaust gases for
1.63
Fuel
temperature,
smoke and carbon dioxide content. Class C2 (28 Sec Kerosene)
temperature,
smoke andKg/hr
carbon dioxide content.
Firing
Rate
temperature,
smoke
and
carbon
dioxide
temperature,
content.
smoke
and
carbon
dioxide
content.
1.7
2.05
Litres/hr
Oil Supply Connection
10mm Compression, Single Pipe
0
Heating Systems
Requirements
Fullyboiler.
Pumped,
Conventional
Open Vented,
or
Scale
Your installer
will organise
the commissioning of your
Should
you experience
any difficulty
locating an
Your Smoke
installer No.
will organiseBacharach
the commissioning
of your0boiler. Should you experience
any difficulty locating an
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
Sealed
System
engineer, our service department may be able to provide
you with
details of an engineer in your area.
engineer,
our
service
department
may
be
able
to
provide
you
with
details
of
an
engineer
in
your
area.
11.5
12
CObe
% with details
2 able
engineer, our service department engineer,
may
our to
service
provide
department
you
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
Max Operating Pressure
3 Bar (43.5psi) Static Head 30.59 Meters
85
85
Less ambiant °C
Flue Gas Temp
(100ft)
A
A
Band
SEDBUK
Operating Temperature Range
60 to 80 Degree’s Centigrade
Resistance To“Benchmark”
Water Flow Between
Return
15/19 - 35mm
- 26mm
Installation,
Commissioning
and12/14
Service
Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Burner
Installation,
Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
Fault Diagnosis
and Flow Connections (10 Deg Temp Rise)
Please
ensure
that your installer has completed all 100
sections
of theCentigrade
log book (found at the back of this manual).
Please
ensure
that
your installer has completed all sections
of the
log book (found at the back of this manual).
Cut Out
Temperature
Degree’s
Burner
fails
to start
-all
lamp
not
illuminated
Please ensure that your installer
has
Please
completed
ensure
thatsections
your installer
of the has
log book
completed
(foundall
atMains
sections
the back
of
ofthe
thislog
manual).
book (found at the back of this manual).
The
log book
will be required in the event of any warranty
work.12/14
Ensure
that the service record is completed.
The log book will be required in the event of any warranty
work. Ensure that the service record is completed.
Weight
Empty
15/19 - 93kg
- 84kg
Blown fuse
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is
completed.
Ensure
that the service record is completed.
Time clock/programmer not calling for heat
Water Capacity
15/19 - 19.25 Litres 12/14 - 17.5 Litres
Room or hot water thermostats not calling for heat
SEDBUK Rating
A
Burner lockout lamp is illuminated -
Warranty
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty
SystemConditions
X-ternal
Your HRM boiler is under
Warranty Conditions
-
Lack of oil
Faulty solenoid coil
Blocked nozzle
Warranty
Warranty
Faulty fire valve
Air in oil supply
Your HRM boiler is under warranty for 2 years from the date
of installation.
warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from theEmpty
dateoiloftank
installation.
Blocked Oil Filter
Warranty Conditions
Warranty Conditions
Flame extinguishes after a short period
Photocell faulty
The boiler must be installed and commissioned in accordance
with
our handbook
control
box
and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in Faulty
accordance
with our handbook
The boiler must be installed and commissioned in accordance with our handbook
- The boiler must be installed
Electrical Supply
230V Single Phase, Fused 5amp
sparkby any person not authorised by HRM
- The
boiler
must
not be repaired, modified or tampered
with by any person not authorised by HRM
- The boiler must not be repaired, modified or tamperedNowith
Max
Power
Consumption
110W
- The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorised
by HRM
bybox
any person not authorised by HRM
Faultywith
control
Fuel
Class C2 (28 Sec Kerosene)
Faulty ignition transformer
Extended
Warranty
Extended Warranty
Incorrect electrode setting
Oil Supply
Connection
10mm Compression, Single Pipe
Extended Warranty
Extended Warranty
Heating Systems Requirements
Sealed Systems Only
does not runand
Seized
oil pump
The “Benchmark”
and
warranty registration document
the end Static
of thisHead
manual
should
be completed as
The Motor
“Benchmark”
warranty registration document
at the
end of this manual should be completed as
Max Operating
Pressure
3 Barat(43.5psi)
30.59
Meters
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
should
bethe
completed
end of this
as manual should be completed as
Motor at
faulty
appropriate by your installer / engineer. This is your record
that
the
boiler
has
been
correctly
installed
in
accordance
appropriate
by
your
installer
/
engineer.
This
is
your
record
that
the
boiler has been correctly installed in accordance
(100ft)
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record
that
installed
boiler
in accordance
has been correctly installed in accordance
Control
boxthe
faulty
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration
document
to HRM in order to qualify for a further 3 year
Capacitor
faulty
with our recommendations. Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to
qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
Operating Temperature Range
60 to 80 Degree’s Centigrade
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchangerwarranty
–Radio/T.V
a total of
5
the
years.
heat
exchanger
–
a
total
of
5
years.
Resistance To Water Flow Between Return
12/14 – 26mm
interference Incorrect electrode setting
and Flow Connections (10 Deg Temp Rise)
Poor earth bonding
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
Faulty ignition transformer
Cut Out Temperature
100 Degree’s Centigrade
Weight
12/14 - 84kg
- The
boilerEmpty
must be serviced annually and maintained
in accordance with this handbook. The
- The
boiler must
be serviced annually and maintained
in
accordance with this handbook. The
Blocked
nozzle
- The boiler must be serviced
- Smokey
annually
The exhaust
boiler
and-must
maintained
be serviced
in accordance
annually and
with maintained
this
handbook.
in accordance
The
with this handbook. The
Water Capacity
12/14
- 17.5 Litres
“Benchmark”
service log is located at the back of this
manual
“Benchmark” service log is located at the back of thisIncorrect
manualburner settings
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
SEDBUK Rating
A
-
This warranty is in addition to your statutory and other legal rights
After Sales Service
-
Burner starts violently Ignition
- This
warranty is in addition to your statutory and otherDelayed
legal rights
Incorrect
electrode
This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other
legal
rights adjustment
After Sales Service
After Sales Service
After Sales Service
Electrode insulation damaged
HT leads faulty
Air in oil supply
Incorrect air adjustment
-
If your boiler fails during the warranty period contact your installer, who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able to
your
identify
installer,
the who will be able to identify the
cause
of the
problem. If appropriate, your installer willIncorrect
contactcombustion
us.
Oil cause
odours
- installer
cause of the problem. If appropriate,
your
of
the problem.
will contact
If appropriate,
us.
your installer will contact
us. settings
-
Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
service department
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
service
department
Unstable
flame
Incorrect head settings
service department
service
department
-
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
- If you are unable to contact your installer please contact
ourairservice department. Quoting your boiler’s
Excess
If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact
your
our service
boiler’sdepartment. Quoting your boiler’s
Faulty
nozzle
serial number when phoning – this can be found on the
cover
of this manual.
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on the cover of this manual.
Oil leak
8
Standard X-ternal & System X-ternal
Standard Handbook
X-ternal & System X-ternal
Handbook
Low oil pressure
3
9
10
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal Standard
Standard
X-ternal
& System
X-ternal
X-ternal
& System
X-ternal
Handbook
Handbook
Handbook
Handbook
3
3 39
Householder Information
Boiler Installation
Boiler Installation - Continued
Householder
Information
Householder Information
Householder
Information
IMPORTANT!
IMPORTANT!
IMPORTANT!
IMPORTANT!
Regulations
Boiler
Your boiler must be commissioned in order to:
Your boiler Location
must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
The Installation of oil fired boilers must comply with the following Standards and Codes of Practice:
Noise
levels
consideration should be given to the following:
- Validate your warranty
- Validate your–warranty
- Validate your warranty
- Validate your warranty
BS 5410-1:1997
Oil installations up to 45kW
Where
flue terminates
near thecorrectly
boundary
of avoid
an adjoining
property,
- Ensure the boiler has been installed correctly and avoid premature failure
- -Ensure
the aboiler
has been installed
and
premature
failureconsideration should be given to
- Ensure the boiler has been installed
- Ensure
correctly
thenoise
boiler
anddisturbance
avoid
has been
premature
installed
failure
correctly
andsensitive
avoid premature
failure
possible
as some
people are
to even low
noise levels.
BS 5449
Forced circulation hot water central heating systems for domestic premises
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum
- Wall
efficiency.
SetConstruction
the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
commissioning
specialised
equipment
to check
the oil
pressure
and analyse the exhaust gases for
commissioning
engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
BS
7593:2006 engineer has
Treatment
of water
in hot water
central
heating
systems
commissioning engineer has specialised
commissioning
equipment
engineer
to check
hasthe
specialised
oil pressure
equipment
and analyse
to check
the the
exhaust
oil pressure
gases for
and analyse the exhaust gases for
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon
dioxide
temperature,
content.
smoke
and
carbon
dioxide
content.
The boiler must be installed on a suitable load bearing external wall.
Building Regulations
Part L1 Part J 2006 England and Wales, Part F Scottish Regulations and Technical
Your installer will organise the
commissioning
of
your
boiler.
Should
you
experience
any
difficulty
locating
an
Your
installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Booklet L Northern Ireland
Your installer will organise the Your
commissioning
installer
will
of organise
yourof boiler.
the Should
commissioning
you
experience
ofmaterial,
your any
boiler.
difficulty
Shouldlocating
you experience
an
any the
difficulty locating an
For walls
timber,
stramit
or
similar
thedetails
structural
material
must
support
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer,
our constructed
service department
may
be able
to provide
you with
of an
engineer
in your
area. weight
engineer, our service department engineer,
may
beboiler
able
our to
service
provide
department
you
details
may
be
ofable
an
engineer
to frame
provide
in
you
yourwith
area.
details of anwhen
engineer
in your area.
of the
when
filled
withwith
water.
A stud
work
should
be
constructed
appropriate.
BS 7671:2001
Electrical Regulations
BS 7074
It is not necessary to construct a heat barrier around the wall plate.
Code of practice for sealed systems
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark”Where
Installation,
Commissioning
“Benchmark”
Service Record
Commissioning
Log Book
and aService
Book
the external
cladding is and
of Installation,
weatherboard
or similar,
construct
“pictureRecord
frame” Log
for the
wall plate to
seat
against.
PleaseSizing
ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Boiler
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service record is completed.
It is important to establish the correct size of boiler required. Boiler output will depend on a number of factors,
including:
- The preferred room temperatures
Warranty
- Location winter temperature
- Structural and ventilation heat losses
Your
boilerhot
is under
for 2 years from the date of installation.
- HRM
Domestic
waterwarranty
requirements
Warranty
Warranty
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Warranty
Warranty Conditions
This is Conditions
a complicated calculation, we recommend you employ the services of a heating engineer, whoWarranty
will determine
Conditions
Warranty Conditions
the correct size of boiler required for your property.
- The boiler must be installed and commissioned in accordance with our handbook
- The boiler must be installed and commissioned in accordance with our handbook
- The boiler must be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
- Refurbishing
The boiler must
repaired, modified or tampered with by any person not authorised by HRM
an not
Oldbe
System
-
Extended
Warranty – Before installing a new boiler:
IMPORTANT
Extended Warranty
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
Extended Warranty
Extended Warranty
The
“Benchmark”
and
registration
at the
of this
manual
should be
completed
as scale that
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The
system should
bewarranty
chemically
cleaned to document
remove debris,
in end
the form
of black
magnetite
sludge
and The
lime
“Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
shouldatbethe
completed
end of this
as manual should be completed as
appropriate
by your
installer and
/ engineer.
ThisFailure
is yourtorecord
that
boiler
been
correctly
accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
accumulates
in radiators
pipe work.
do this
willthe
result
in has
debris
adhering
to installed
the cleaninsurfaces
of
a
new
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record that
installed
the boiler
in accordance
has been correctly installed in accordance
with
our recommendations.
Return
the warranty
document
to HRM
in order
to qualify
for a further
3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
boiler,
causing kettling or
knocking
noises. registration
It also prohibits
efficient
heat
transfer.
A cleanser
such
with as
our Fernox
recommendations. Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
warranty
of should
the heat
– asystem
total of
years.prior to changing the boiler
warranty of the heat exchanger – a total of 5 years.
Superfloc
beexchanger
added to the
485 hours
warranty of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
System Protection
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark”
service log is located at the back of this manual
“Benchmark” service log is located at the back of this manual
After
Installation
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
- Flush
This the
warranty
is with
in addition
to your
statutorytraces
and other
rights grease, metal swarf, solder pieces and oils used
- This warranty is in addition to your statutory and other legal rights
system
a cleanser
to remove
of fluxlegal
residues,
- This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
during component manufacture.
After Sales Service
After Sales Service
After Sales Service
After Sales Service
After Flushing
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
- If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able to
your
identify
installer,
the who will be able to identify the
cause
of
the
problem.
If
appropriate,
your
installer
will
contact
us.
cause of the problem. If appropriate, your installer will contact us.
Add a corrosion inhibitor. This will minimise the chemical action and chemical change that takes place in a systems
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installer will contact us.
primary water and system components.
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
- Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
service
department
service department
Note:
The
manufacturer’s usage instructions for chemical cleaners and inhibitors should always be followed.
service department
service department
Please refer to BS 7593:2006 for a detailed explanation of cleansing procedures.
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact your
our service
boiler’sdepartment. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on the cover of this manual.
10
Standard X-ternal & System X-ternal
Handbook
Standard X-ternal
& System X-ternal
Handbook
3
11
12
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal Standard
Standard
X-ternal
& System
X-ternal
X-ternal
& System
X-ternal
Handbook
Handbook
Handbook
Handbook
3
3 311
Householder Information
Flue Guard Assembly Instructions
IMPORTANT!
Householder
Information
Householder Information
Householder
Information
IMPORTANT!
IMPORTANT!
IMPORTANT!
Your boiler must be commissioned in order to:
-
Flue Terminating Positions
Your boiler must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
Validate your warranty
1. Mark & Drill Holes
-
Validate your warranty
-
-
Validate your warranty
Validate your warranty
-
Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed
- Ensure
correctly
the boiler
and avoid
has been
premature
installed
failure
correctly and avoid premature failure
Place the flue guard onto the front of the casing, mark out
and
drill
the
four
5mm
holes.
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning
engineer
has
specialised
commissioning
equipment
engineer
to
check
has
the
specialised
oil
pressure
equipment
and
analyse
to
check
the
the
exhaust
oil
pressure
gases
for
and analyse the exhaust gases for
Note:
Drill smaller
pilot
holes
first dioxide
to reduce
the risk of the
temperature,
smoke
and
carbon
content.
temperature, smoke and carbon dioxide content.
temperature,
smoke
and
carbon
dioxide
temperature,
content.
smoke
and
carbon
dioxide
content.
fibreglass case cracking.
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service record is completed.
2. Bolts & Washers
Warranty
Position
Pass a stainless steel bolt with a washer through the front
of the guard bracket. Place another washer on the back
Warranty
so it sits between the guard and the casing.
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
Extended Warranty
3. Securing Guard
Description
A
Directly Below An Opening (Air Brick, Window, etc)
Warranty B
Horizontally To An Opening
Warranty
C
Below a Gutter, Eaves or Balcony With Protection (Note 2)
Your HRM boiler
is under warranty forBelow
2 yearsGutter,
from Eaves
the date Balcony
of installation.
D boiler
Without Protection
Your HRM boiler is under warranty
Your
for 2HRM
years
fromisthe
under
datewarranty
of installation.
for 2 ayears
from the or
date of installation.
E
From Vertical Sanitary Pipework
Warranty Conditions
From An Internal or External Corner
Warranty Conditions
WarrantyFConditions
G
Above Ground or Balcony Level
H must be installed and commissioned
From Surfaceinoraccordance
Boundry Facing
- The boiler
withThe
ourTerminal
handbook
- The boiler must be installed and
- commissioned
The boiler
must
inbe
accordance
installed and
withcommissioned
our handbook
in accordance with our handbook
J
From a Terminal Facing a Terminal
K must not be repaired, modified
Vertical
a Terminal
Onany
The person
Same Wall
- The boiler
or From
tampered
with by
not authorised by HRM
- The boiler must not be repaired,
- modified
The boiler
tampered
not be
with
repaired,
by anyHorizontally
modified
person not
orFrom
tampered
authorised
with
by HRM
by The
any Same
person
not authorised by HRM
L or must
A Terminal
On
Wall
M
From
An
Oil
Tank
Extended Warranty
Extended Warranty
Extended Warranty
Dimension
600mm
600mm
75mm
600mm
300mm
300mm
300mm
2500mm
1200mm
1500mm
750mm
1800mm
Information taken from BS 5410-1:1997
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
shouldatbethe
completed
end of this
as manual should be completed as
Secure the
guardinstaller
onto the
case using
washerthat the boiler has been correctly installed in accordance
appropriate
by your
/ engineer.
Thisa isfurther
your record
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record that
installed
the boiler
in accordance
has been correctly installed in accordance
and
nut
on
the
inside.
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
Notes:
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
1 - Terminals should be positioned so as to avoid products of combustion accumulating in stagnant pockets around
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced
-theannually
The
boiler
and
must
maintained
beinto
serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
building
or entering
buildings.
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
-
This warranty is in addition to your statutory and other legal rights
After Sales Service
-
- This warranty is in addition to your statutory and other legal rights
This warranty is in addition to-2
your
This
statutory
warranty
and
in addition
legal rights
to your
other
rights above it and the projection consists of plastics
- Where
a flue
isisother
terminated
less
thanstatutory
600mmand
away
fromlegal
a projection
or has a combustible or painted surface, then a shield of at least 750mm should be fitted to protect these surfaces.
After Sales Service
After Sales Service
After Sales Service
-
If your boiler fails during the warranty period contact your installer, who will be able to identify
the
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
4. Installation
- IfComplete
your boiler fails during the-3warranty
yourlowest
period
boiler part
contact
failsofduring
your
the
installer,
warranty
whoperiod
will 2m
be
contact
able
to
your
identify
installer,
the balcony,
who willflat
be roof
ableortoother
identify
theto which any
- If the
the
terminal
is less
than
above
the
ground,
place
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate,
cause
your
installer
the problem.
will terminal
contact
If appropriate,
us.
your
installerby
willa contact
person
hasofaccess,
the
should be
protected
guard. us.
The installation of the X-ternal flue terminal guard is now
Under no circumstances should “in warranty” work be undertaken
without authorisation from the HRM
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
complete.
- Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
service department
service department
service department
service adepartment
4 - Where
flue terminates near the boundry of an ajoining property, consideration should be given to possible noise
disturbance as some people are sensitive to even low noise levels.
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact your
our service
boiler’sdepartment. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on the cover of this manual.
5 - Boilers can produce sulphur deposits, occasionally these deposits are discharged out of the flue, this should be
taken into consideration when planning to site flue’s over patios etc.
12
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
3
13
14
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
X-ternal
& X-ternal
System X-ternal
StandardStandard
X-ternalHandbook
& System
Handbook
Handbook
Handbook
3
3 313
Householder Information
Fuel Supply System
IMPORTANT!
IMPORTANT!
IMPORTANT!
IMPORTANT!
Your boiler must be commissioned in order to:
Your boiler must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
SIGHT
GAUGE
-
Validate your warranty
-
Ensure the boiler has been installed correctly and avoid premature failure
-
Householder
Information
Householder Information
Householder
Information
Installation Procedure – Standard X-ternal
-
Validate your warranty
-
Validate your warranty
-1. Unpack
ValidateThe
yourBoiler
warranty
- Ensure the boiler has been installed correctly and avoid premature failure
Ensure the boiler has been installed
-Remove
Ensure
correctly
boiler
and
avoid
has
been
premature
installed
failure
correctlysilencer
and avoid
thethe
fibre
glass
cover,
burner
assembly,
boxpremature failure
assembly,
heat
exchanger,
top
baffle
and
control
panel.
Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has Note:
specialised
commissioning
equipment
engineer
to
check
has
the
specialised
oil
pressure
equipment
and
analyse
to
check
the
the
exhaust
oil
pressure
gases
for
and analyse the exhaust gases for
Keys forsmoke
the fibre
glass
cover
are secured
temperature, smoke and carbon dioxide content.
temperature,
and
carbon
dioxide
content.to the burner.
temperature,
smoke
and
carbon
dioxide
temperature,
content.
smoke
and
carbon
dioxide
content.
10mm
-
COPPER
PIPEyou experience any difficulty locating an
Your installer will organise the commissioning of your boiler. Should
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
ISOLATING VALVE
OIL TANK TO BOILER
BASE
“Benchmark”CONCRETE
Installation,
Commissioning and Service
Record Log Book
MAXIMUM 100M
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
The
log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
Oil
Tank
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service
recordWall
is completed.
2. Attach
Plate To Wall
We recommend the use of plastic oil tanks, they require less maintenance than steel tanks and are longer lasting.
4 Rawl bolts are supplied to secure the wall plate to the wall. The
drill size for the Rawl bolts is 14mm.
A bunded oil tank may be required on any environmentally sensitive site where spillage of oil could pollute rivers,
Warranty
Warranty
ponds, or any other water courses. Please refer to the appropriate requirements when locating oil tanks:
“Control of
Warranty
Warranty
Secure the wall plate to the wall and ensure that it is level
Pollution Regulations”, “Building Regulations” and OFTEC Technical Paper T19.
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Oil Supply
Warranty Conditions
Warranty Conditions
Warranty Conditions
Warranty Conditions
Fuel Tank Below the Burner
- The boiler must be installed and commissioned in accordance with our handbook
- The boiler must be installed and commissioned in accordance with our handbook
- The boiler must be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
The fuel pump can lift fuel to a height of 2.5m. A two pipe system or deaerator (Tiger Loop, 3K or similar) is not
- required.
The boiler
must
not be
repaired,
or tampered
with by
any person not authorised by HRM
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
For
heights
above
2.5m,modified
please consult
our service
department.
- The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
Extended
Warranty
Pipework
Extended Warranty
Extended Warranty
Extended
Warranty
3. Drill Holes
For Pipe Work / Power Supply
TheSoldered
“Benchmark”
warranty
at in
thethe
end
of this
should
be completed
as the pump
The “Benchmark” and warranty registration document at the end of this manual should be completed as
fittings and
should
not be registration
used, as the document
joints will fail
event
of amanual
fire. Flux
deposits
may damage
The “Benchmark”
and warrantyThe
registration
“Benchmark”
document
and
warranty
at thedrill
end
registration
of this the
manual
document
should
atbethe
completed
end of this
as manual should be completed as
Once
theby
wall
plate
is secure,
holes
work
and
appropriate
your
installer /the
engineer.
This isthe
yourjoint.
record
that the boiler
correctly
installed
in accordance
appropriate
your
installer
/ engineer.
Thisfor
is yourpipe
record
that
the boiler has been correctly installed in accordance
and fuel by
may
deteriorate
solder within
Galvanised
pipeshas
andbeen
fittings
must not
be used.
The aggressive
appropriate by your installer / engineer.
appropriate
This
isbyyour
yourrecord
installer
that
/ engineer.
the
boiler This
has
been
is your
correctly
record that
installed
the boiler
in accordance
has been correctly installed in accordance
power
supply
connections
with
a
suitably
sized
drill
bit.
withaction
our recommendations.
Return
the warranty
registration
to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
of the fuel will erode
the zinc
and damage
the fuel document
pump.
with our recommendations. Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
Keep the number of pipe joints to a minimum, form bends rather than using compression fittings.
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
Joining Compounds
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark”
serviceshould
log is located
the care.
back of
this manual
“Benchmark” service log is located at the back of this manual
Jointing
compounds
be usedatwith
Excessive
amounts can cause blockages, and fragments “Benchmark”
may cause service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
failure of the fuel pump or the non-return valve. We recommend the use of a non-setting liquid pipe sealant.
- This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
Automatic Isolation of the Fuel Supply in the Event of a Fire
After Sales Service
After Sales Service
After Sales Service
After Sales Service
4. Heat Exchanger
In accordance with Document J of the Building Regulations “a means of automatic isolation of the fuel
- supply”
If your should
boiler fails
during
the warranty
contact
installer,
who inwill
be able towith
identify
the
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
be used.
A remote
acting period
fire valve
beingyour
the most
common
accordance
BS 5410- If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able boiler
to
your
identify
the who
be able
to identify
the
The
isinstaller,
supplied
withwill
22mm
copper
end feed
bends for the
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate, your installer will
contact us.
1:1997
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installerflow
will and
contact
us.connections, and a drain cock.
return
-
Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
Oil
Filtration
service
department
-
If you
are unable
to filter
contact
your installer
please
contact
our service
Quoting
youroilboiler’s
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
The
paper
element
supplied
must be
installed
adjacent
to thedepartment.
boiler. Where
a steel
tank is installed we
- If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact
your
our service
boiler’sdepartment.
Quoting your
boiler’s
IMPORTANT:
The heat exchanger
is heavy,
two people will
recommend
a further
paper element
filterbeis found
also fitted
adjacent
tothis
the manual.
oil tank, replacement elements are available (Pt.
serial number
when phoning
– this can
on the
cover of
serial number when phoning – this can be found on the cover
of this manual.
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on
the
cover to
of lift
this
manual.
be
required
it
into
position.
No. BS076)
14
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work
undertaken
fromheat
the HRM
without authorisation
from
the HRM
Liftbethe
exchanger
into position,
secure
with nuts and
service department
service department
service department
washers provided.
3
15
16
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternalStandard
Standard
X-ternal
& System
X-ternal
X-ternal
& System
X-ternal
Handbook
Handbook
Handbook
Handbook
3
3 315
Householder Information
Installation Procedure Continued – Standard X-ternal
IMPORTANT!
IMPORTANT!
IMPORTANT!
IMPORTANT!
Your boiler must be commissioned in order to:
-
Householder Information
Householder
Installation Procedure Continued –Standard
X-ternal Information Householder Information
Your boiler must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
Validate your warranty
-
Validate your warranty
-
-
Validate your warranty
Validate your warranty
Note: The power supply to the boiler should be fitted with a 5
amp premature
fuse. The electrical
supply to the boiler should be made via
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed correctly and avoid
failure
- Ensure the boiler has been installed
- Ensure
correctly
the boiler
and avoid
has been
premature
installed
failure
correctly anda avoid
premature
failure
switched
and fused
spur located near the boiler, fitted with a 5
amp
fuse.
Topyour
Baffle
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to 5.site,
- Set the boiler to its optimum efficiency. Operating
conditions
for the boiler will vary from site to site, your
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning
engineer
has
specialised
commissioning
equipment
engineer
to
check
has
the
specialised
oil
pressure
equipment
and
analyse
to
check
the
the
exhaust
oil
pressure
gases
for
and analyse the exhaust gases for
Place the top baffle into the heat exchanger as shown.
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon dioxide content. A frost thermostat is fitted as standard to protect the boiler.
temperature, smoke and carbon dioxide
temperature,
content.
smoke and carbon dioxide content.Where appropriate, an additional frost thermostat may be
required
protect the
of the heating
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the commissioning of your
boiler.to Should
yourest
experience
any system.
difficulty locating an
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer
has
Please
completed
ensure
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
9.The
Silencer
Boxwillall
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
log book
be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service record is completed.
Slide the silencer box over the 4 mounting pins located on the heat
6. Control Panel
exchanger. Secure the silencer box to heat exchanger by
Fit the control panel onto the wall plate with and secure screw
tightening the 4 supplied wing nuts and penny washers down onto
provided.
the mounting pins.
Warranty
Warranty
Warranty
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty Conditions
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
-
Warranty Conditions
Warranty Conditions
- The boiler must be installed and commissioned in accordance with our handbook
The boiler must be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
- The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
7.
Thermostats
Extended Warranty
Extended Warranty
Extended Warranty
Extended Warranty
10. Burner
Place
the
thermostat
phials
into
their
pockets
located
at
the
top
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
should
the
completed
end
of this
as manual
should
as As you
of the
Fit that
theatbe
burner
to the
flange
on be
thecompleted
silencer
box.
appropriate by your installer / engineer. This is your record
thatheat
the exchanger.
boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record
the boiler
hasmounting
been correctly
installed
in accordance
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record
that
installed
the
boiler
inpicture
accordance
hasthe
been
correctly
installed
in around
accordance
can
see
in
this
flue
has
been
rotated
into its
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our
recommendations.
Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
forposition.
a further
to HRM
3 year
in order to qualify for a further 3 year
IMPORTANT:
Ensure
the
thermostat
capillary
tubes
are
operational
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchanger – a total of 5 years.
of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
kept clear of any possible electrical contact on thewarranty
control panel
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
-
The boiler must be serviced annually and maintained in accordance with this handbook. The
“Benchmark” service log is located at the back of this manual
- The boiler must be serviced annually and maintained in accordance with this handbook. The
The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
-
This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to your statutory and other legal rights
This warranty is in addition to-11.
yourThis
statutory
warranty
andis
other
in addition
legal rights
to your statutory and other legal rights
Connect
The
Fuel
Line
After Sales Service
-
-
After Sales Service
If your boiler fails during the warranty period contact your installer, who will be able to identify the
8.cause
Electrical
of theConnections
problem. If appropriate, your installer will contact us.
20mmno
hole
is provided in
the wall
for concealed
cable
- AUnder
circumstances
should
“in plate
warranty”
work be undertaken
without authorisation from the HRM
entry.
Use
round
cable
ducting
to
pass
wires
through
the
wall
service department
cavity.
-
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
The
earth
bonding
can– be
to theon5mm
stud of this manual.
serial
number
whencable
phoning
thissecured
can be found
the cover
provided on the wall plate, as shown.
After Sales Service
After
Sales
Connect
theService
fuel line from the burner, to the oil supply.
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
If your boiler fails during the- warranty
IfIMPORTANT:
yourperiod
boiler contact
fails
during
yourthe
installer,
warranty
whoperiod
will
be
contact
ablenon-return
to
your
identify
installer,
the who will be able to identify the
The
comes
a built
cause
of the problem.
If X-ternal
appropriate,
yourwith
installer
willincontact
us.
cause of the problem. If appropriate,
cause
your
of
installer
the problem.
will
Ifreturn
appropriate,
us.
your installer
contact
us.
valve.
No
additional
noncontact
valve must
be used.will
Should
the
be circumstances
used in conjunction
with a work
purpose
designed without authorisation from the HRM
- boiler
Under no
should “in warranty”
be undertaken
Under no circumstances should
-underground
“in
Under
warranty”
no tank,
circumstances
work
befoot
undertaken
should
“in
without
warranty”
authorisation
work
be undertaken
from
without authorisation from the HRM
the
valve
found
inside
such
tanks
mustthe
be HRM
service department
service department
serviceordepartment
removed
at least rendered ineffective. A replaceable element
filter
be fitted
near the
The please
adjacent
images
a department. Quoting your boiler’s
- fuel
If you
aremust
unable
to contact
yourtank.
installer
contact
ourshow
service
If you are unable to contact your
-clear
installer
If you
are
please
unable
contact
to contact
our
service
your
installer
department.
please
Quoting
contact
your
our service
boiler’sdepartment. Quoting your boiler’s
fuel
line
with
built
in
filter
which
are
no
longer
supplied
as
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning –standard,
thisserial
can be
number
found
on the
phoning
cover
of
– this can
manual.
beNumber:
found onBS099A)
the cover of this manual.
they
arewhen
available
separately
(Part
Please refer to page 15 of this manual for oil tank installation
recommendations
16
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
3
17
18
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
Standard
X-ternal
& System
Standard
X-ternal
& System
X-ternalX-ternal
Handbook
Handbook
Handbook
Handbook
3
3 317
Householder Information
Installation Procedure Continued – Standard X-ternal
IMPORTANT!
IMPORTANT!
IMPORTANT!
IMPORTANT!
Your boiler must be commissioned in order to:
Your boiler must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
-
Validate your warranty
-
Ensure the boiler has been installed correctly and avoid premature failure
-
Householder Information
Installation Procedure – System X-ternalHouseholder Information Householder Information
Lead
12-. Burner
Validate
your warranty
-
Validate your warranty
-1. Unpack
ValidateThe
yourBoiler
warranty
- Ensure the boiler has been installed correctly and avoid premature failure
Connect the 3 pin plug
socket.
- and
Ensure
the boiler has been installed
-Remove
Ensure
correctly
boiler
and
avoid
has
been
premature
installed
failure
correctlysilencer
and avoid
thethe
fibre
glass
cover,
burner
assembly,
boxpremature failure
assembly,
heat
exchanger,
expansion
vessel,
pump,
Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum
-pressure
efficiency.
Set the
boiler
Operating
toand
its conditions
optimum
efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
relief
valve
control
panel.
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning
engineer
has specialised
equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised
commissioning
equipment
engineer
to check
hasthe
specialised
oil pressure
equipment
and analyse
to check
the the
exhaust
oil pressure
gases for
and analyse the exhaust gases for
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon dioxide content.
13. Condensate
Drain smoke and carbon
temperature,
dioxide
temperature,
content.
smoke
and
carbon
dioxide
content.
Note: Keys for the fibre glass cover are secured to the burner.
Your installer will organise the commissioning of your boiler.In Should
any difficulty
locating
an
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
order to you
drainexperience
away condensate
produced
in operation
Your
installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with
details
of
an
engineer
in
your
area.
engineer, our service department may be able to provide you with details of an engineer in your area.
there is a stainless steel tube connection onengineer,
the underside
our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
of the flue, which comes pre-connected to a flexible hose.
The flexible hose supplied forms the condensate trap and
is terminated with a rubber fitting which will seal inside
“Benchmark” Installation, Commissioning 22mm
and Service
Logthat
Book
“Benchmark” Installation, Commissioning and Service Record Log Book
plasticRecord
waste pipe
must be connected into a
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
soak-away, the household drains or a vertical stack.
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service
recordWall
is completed.
2. Attach
Plate To Wall
14. Priming The Burner
4 Rawl bolts are supplied to secure the wall plate to the wall. The
Ensure both power and fuel supplies to the boiler are switched on.
drill size for the Rawl bolts is 14mm.
Press the reset button, the burner will start it’s firing sequence. To
Warranty
Warranty
release air from the oil line, slacken the vent plug during this
Warranty
Warranty
Secure the wall plate to the wall and ensure that it is level
sequence. If ignition fails the burner will go to lock out, wait 60
Your
HRM boiler
is under
for 2 years from the date of installation.
Your HRM boiler is under warranty for 2 years from the date of installation.
seconds
and repeat
the warranty
procedure.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Warranty Conditions
15. Test The
Fuel Supply
Warranty
Conditions
Warranty Conditions
Warranty Conditions
-
The boiler must be installed and commissioned in accordance
with our
handbook
- The boiler must be installed and commissioned in accordance with our handbook
With the burner
running,
check the fuel supply for- airThe
leaks.
It ismust be installed
boiler
and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
normal for a static air bubble to remain at the highest point of the
- The boiler must not be repaired, modified or tampered
person not authorised
by HRM through the oil line
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
oil with
line, by
butany
a continuous
stream of bubbles
- The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
indicates that air is being drawn in. This must be cured before
Extended Warranty
Extended Warranty
proceeding.
Extended Warranty
Extended Warranty
Drill Holes For
Pipe
Work / registration
Power Supply
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The3.“Benchmark”
and
warranty
document at the end of this manual should be completed as
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
shouldatbethe
completed
end of this
as manual should be completed as
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer.
appropriate
Thiswall
isbyyour
yourrecord
installer
that/ engineer.
the
boiler
This
has
been
is your
correctly
record
that
installed
the boiler
in accordance
has been correctly installed in accordance
Once
the
plate
is
secure,
drill
holes
for
the
pipe
work
and
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return
with
theour
warranty
recommendations.
registration document
Return
thetowarranty
HRM in drill
order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
power
supply
connections
with
warranty of the heat exchanger – a total of 5 years.
warranty
of the heat
exchanger
–a asuitably
total ofsized
5 years. bit.
warranty of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
Extended
Warranty Conditions
16. Casing
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
- Lift
The
mustposition,
be serviced
and plate
maintained
in lock
accordance with this handbook. The
the boiler
case into
secure annually
it to the wall
using the
“Benchmark”
service log is located at the back of this manual
located
on the underside.
- The boiler must be serviced annually and maintained in accordance with this handbook. The
The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
-
- This warranty is in addition to your statutory and other legal rights
This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
This warranty is in addition to your statutory and other legal rights
After Sales Service
-
After Sales Service
After Sales Service
After Sales Service
4. Heat Exchanger
-
If your boiler fails during the warranty period contact your installer, who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
-
Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
- Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work
undertaken
fromheat
the HRM
without authorisation
from
the HRM
Liftbethe
exchanger
into position,
secure
with nuts and
service department
service department
service department
service department
washers provided.
17. Commissioning the Boiler
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
- If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact
your
our service
boiler’sdepartment.
Quoting your
boiler’s
IMPORTANT:
The heat exchanger
is heavy,
two people will
serial number when phoning – this can be found on Installation
the cover ofisthis
manual.
serial number when phoning – this can be found on the cover
of this manual.
complete. The boiler must now be commissioned
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on
coverto
oflift
this
manual.
be the
required
it into
position.
by a competent engineer. The “Benchmark” log found at the
back of this manual should be completed, and the warranty
documentation returned to HRM Boilers Ltd.
-
18
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able boiler
to
your
identify
the who
be able
to identify
the
The
isinstaller,
supplied
withwill
22mm
copper
end feed
bends for the
cause of the problem. If appropriate, your installer will
contact us.
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installerflow
will and
contact
us.connections, and a drain cock.
return
3
19
20
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
X-ternal
& X-ternal
System X-ternal
StandardStandard
X-ternal Handbook
& System
Handbook
Handbook
Handbook
3
3 319
Householder Information
Installation Procedure Continued – System X-ternal
IMPORTANT!
IMPORTANT!
IMPORTANT!
IMPORTANT!
Your boiler must be commissioned in order to:
-
Householder Information
Householder
Installation Procedure Continued – System
X-ternal Information Householder Information
Your boiler must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
Validate your warranty
-
Validate your warranty
-
-
Validate your warranty
Validate your warranty
Note: The power supply to the boiler should be fitted with a 5
amp premature
fuse. The electrical
supply to the boiler should be made via
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed correctly and avoid
failure
- Ensure the boiler has been installed
- Ensure
correctly
the boiler
and avoid
has been
premature
installed
failure
correctly anda avoid
premature
failure
switched
and fused
spur located near the boiler, fitted with a 5
amp
fuse.
Topyour
Baffle
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to 5.site,
- Set the boiler to its optimum efficiency. Operating
conditions
for the boiler will vary from site to site, your
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning
engineer
has
specialised
commissioning
equipment
engineer
to
check
has
the
specialised
oil
pressure
equipment
and
analyse
to
check
the
the
exhaust
oil
pressure
gases
for
and analyse the exhaust gases for
Place the top baffle into the heat exchanger as shown.
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon dioxide content. A frost thermostat is fitted as standard to protect the boiler.
temperature, smoke and carbon dioxide
temperature,
content.
smoke and carbon dioxide content.Where appropriate, an additional frost thermostat may be
required
protect the
of the heating
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the commissioning of your
boiler.to Should
yourest
experience
any system.
difficulty locating an
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer
has
Please
completed
ensure
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
9.The
Silencer
Boxwillall
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
log book
be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service record is completed.
Slide the silencer box over the 4 mounting pins located on the heat
6. Control Panel
exchanger. Secure the silencer box to heat exchanger by
Fit the control panel onto the wall plate with and secure screw
tightening the 4 supplied wing nuts and penny washers down onto
provided.
the mounting pins.
Warranty
Warranty
Warranty
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty Conditions
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
-
Warranty Conditions
Warranty Conditions
- The boiler must be installed and commissioned in accordance with our handbook
The boiler must be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
- The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
7.
Thermostats
10. Attach Pump
Extended Warranty
Extended Warranty
Extended Warranty
Extended Warranty
Place
the end
thermostat
phials into
theirbe
pockets
located
Attach
tomanual
the heat
exchanger,
ensuring
The “Benchmark” and warranty registration document
at the
of this manual
should
completed
as at the top
The “Benchmark” and warranty registration document
at thethe
endpump
of this
should
be completed
as that the
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
should
atbethe
completed
end is
ofused
this
as manual
should
be completed as
of
the
heat
exchanger.
supplied
washer
between
the
connection.
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record that
installed
the boiler
in accordance
has been correctly installed in accordance
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our
recommendations.
Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
IMPORTANT:
Ensure
the
thermostat
capillary
tubes
are
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchanger – a total of 5 years.
of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
kept clear of any possible electrical contact on thewarranty
control panel
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
-
The boiler must be serviced annually and maintained in accordance with this handbook. The
“Benchmark” service log is located at the back of this manual
- The boiler must be serviced annually and maintained in accordance with this handbook. The
The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
-
This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to your statutory and other legal rights
This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
After Sales Service
-
-
After Sales Service
If your boiler fails during the warranty period contact your installer, who will be able to identify the
8.cause
Electrical
of theConnections
problem. If appropriate, your installer will contact us.
20mmno
hole
is provided in
the wall
for concealed
cable
- AUnder
circumstances
should
“in plate
warranty”
work be undertaken
without authorisation from the HRM
entry.
Use
round
cable
ducting
to
pass
wires
through
the
wall
service department
cavity.
-
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
The
earth
bonding
can– be
to theon5mm
stud of this manual.
serial
number
whencable
phoning
thissecured
can be found
the cover
provided on the wall plate, as shown.
20
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
After Sales Service
After Sales Service
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
If your boiler fails during the-11.
warranty
IfAttach
yourperiod
boiler contact
fails
during
yourthe
installer,
warranty
whoperiod
will be
contact
able to
your
identify
installer,
the who will be able to identify the
(Cont.)
cause
of thePump
problem.
If appropriate, your installer will contact us.
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installer will contact us.
the
3 pin plug from
the pump
to the control
panel.
- Connect
Under no
circumstances
should
“in warranty”
work be
undertaken without authorisation from the HRM
Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
service department
service department
service department
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact your
our service
boiler’sdepartment. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on the cover of this manual.
3
21
22
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
Standard
X-ternal
& System
Standard
X-ternal
& System
X-ternalX-ternal
Handbook
Handbook
Handbook
Handbook
3
3 321
Householder Information
Installation Procedure Continued – System X-ternal
IMPORTANT!
Householder
Information
Householder
Information
Householder
Information
Installation
Procedure
Continued
– System
X-ternal
IMPORTANT!
IMPORTANT!
IMPORTANT!
Your boiler must be commissioned in order to:
Your boiler must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
-
Validate your warranty
-
Ensure the boiler has been installed correctly and avoid premature failure
-
Validate your warranty
-
-
Validate your warranty
Validate your warranty
16. Filling The System
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed
- Ensure
correctly
the boiler
and avoid
has been
premature
installed
failure
correctly and25mm
avoid diameter
prematureholes
failure
are provided in the wall plate allowing a
12. Pressure Relief Valve
connection
to
a
cold
feed.
filling
to the
heat
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler Connect
will varythe
from
siteloop
to site,
your
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will
vary
conditions
from
site
forto
the
site,
boiler
yourOpen
will vary
from
site
to valve
site, your
exchanger
on
the
½”
elbow.
the
filling
loop
and
commissioning engineer has specialised equipmentAttach
to check
oil pressure
and analyse
theinch
exhaust
gases
for at
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
the the
pressure
relief valve
to the half
socket
located
commissioning
engineer has specialised
commissioning
equipment
engineer
to check
hasthe
specialised
oil pressure
equipment
andpressurise
analyse
to check
the
the
exhaust
oil pressure
gases
for
and
analyse
the exhaust
gases
for
the
system
until
1
bar
is
showing
on
the
pressure
temperature, smoke and carbon dioxide content. the back left of the heat exchanger in the orientation shown.
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon dioxide
temperature,
content.
smoke and carbon dioxide content.gauge. It may be necessary, after venting air from the heating
system,
repeat you
this experience
operation in
to filllocating
the system
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the commissioning of your
boiler.toShould
anyorder
difficulty
an
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of correctly.
your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service record is completed.
17. Burner
13. Pressure Relief Valve (Cont.)
Warranty
The flow from the pressure relief valve should be plumbed away
through the bottom of the wall plate using the supplied 15mm
Your
HRMpipe.
boiler is under warranty for 2 years from the date of installation.
copper
Warranty Conditions
Fit the burner to the mounting flange on the silencer box.
Warranty
Warranty
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
Extended Warranty
Warranty Conditions
Warranty Conditions
-
- The boiler must be installed and commissioned in accordance with our handbook
The boiler must be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
-
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised
HRM The Fuel Line
18. by
Connect
Extended Warranty
Extended Warranty
Extended Warranty
Connect the fuel line from the burner, to the oil supply.
The “Benchmark” and warranty registration document at the end of this manual should be completed
as
The “Benchmark” and warranty registration document at the end of this manual should be completed as
14. Expansion
Vessel
The “Benchmark”
and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
should
atbethe
completed
end ofThe
this
as X-ternal
manualcomes
shouldwith
be completed
as
IMPORTANT:
a built in non-return
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record No
that
installed
the boiler
in accordance
has been
installed
in accordance
valve.
additional
non
returncorrectly
valve must
be used.
Should the
with our recommendations. Return the warranty registration
to HRMvessel
in order
qualify
a further
3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
Hookdocument
the expansion
nuttoover
thefor
bracket
located
at the
with
our recommendations.
Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
for
a further
to
3 year
in order towith
qualify
a furtherdesigned
3 year
boiler
be
used
in HRM
conjunction
a for
purpose
warranty of the heat exchanger – a total of 5 years. back of the heat exchanger, as shown.
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
underground tank, the foot valve found inside such tanks must be
removed or at least rendered ineffective. A replaceable element
Extended Warranty Conditions
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
fuel filter must be fitted near the tank.
-
The boiler must be serviced annually and maintained in accordance with this handbook. The
“Benchmark” service log is located at the back of this manual
-
This warranty is in addition to your statutory and other legal rights
After Sales Service
-
-
- The boiler must be serviced annually and maintained in accordance with this handbook. The
The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back ofNote:
this manual
Please refer to page 15 of this manual for oil tank
installation recommendations.
- This warranty is in addition to your statutory and other legal rights
This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
After Sales Service
After Sales Service
After Sales Service
If your boiler fails during the warranty period contact your installer, who will be able to identify the
cause
of the problem.
appropriate, your installer will contact us.
15
. Expansion
VesselIf(Cont.)
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able to
your
identify
installer,
the who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installer will contact us.
- Connect
Under no
circumstances
“in warranty”
betoundertaken
the
other end of should
the expansion
vesselwork
hose
the nipple without authorisation from the HRMservice
department
on the heat exchanger.
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
Under no circumstances should
- “in
Under
warranty”
no
circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
19.
Burner
Lead
service department
service department
service department
Connect the 5 pin plug and socket.
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact your
our service
boiler’sdepartment. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on the cover of this manual.
-
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
22
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
3
23
24
Standard X-ternal & System X-ternal
Standard X-ternal & System X-ternal
Standard&X-ternal
System X-ternal
Standard X-ternal
System &
X-ternal
Handbook
Handbook
HandbookHandbook
3
3 323
Householder Information
Installation Procedure Continued – System X-ternal
IMPORTANT!
IMPORTANT!
20.boiler
Condensate
Your
must be Drain
commissioned in order to:
Householder
Information
Householder Information
Householder
Information
The Condensate Drain
IMPORTANT!
IMPORTANT!
Condensate
Installation in order to:
Your
boiler mustDrain
be commissioned
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
order toyour
drainwarranty
away condensate produced in operation
X-ternal
condensing
- InValidate
- The
Validate
your
warranty range of boilers use a single unit heat exchanger similar to those in the condensing Wallstar.
- Validate your warranty
- Validate
your warranty
there is a stainless steel tube connection on the underside
However,
in order
to drain away condensate produced in operation, there is a stainless steel tube connection on the
of
the
flue,
which
comes
pre-connected
to
a
flexible
hose.
underside
of
the
flue,
pre-connected
a flexible
hose.failure
The flexible hose supplied forms the condensate
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler haswhich
beencomes
installed
correctly andto
avoid
premature
- Ensure the boiler has been installed
- Ensure
the boiler
and avoid
has
premature
installed
failure
correctly
andseal
avoid
premature
The flexible hose supplied forms the condensate trap and
trap
andcorrectly
is terminated
withbeen
a rubber
fitting
which will
inside
22mm failure
plastic waste pipe, it must be connected into a
terminated
withtoa its
rubber
fitting which
will seal
inside 22mm
(fig 1.1),
the optimum
householdefficiency.
drains (figOperating
1.2), or a vertical
stack
1.3).
- isSet
the boiler
optimum
efficiency.
Operating
conditions for the boiler will vary from site to site, your
- soak-away
Set the boiler
to its
conditions
for(fig
the
boiler will vary from site to site, your
- Set the boiler to its optimum
- efficiency.
Set the boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
plastic
waste pipeengineer
that must
be specialised
connected into
a soak-away,
commissioning
has
equipment
to check the oil pressure and analyse the exhaust gases for
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning
engineer
has
specialised
commissioning
equipment
engineer
to
check
has
the
specialised
oil
pressure
equipment
and
analyse
to
check
the
the
exhaust
oil
pressure
gases
for
and analyse the exhaust gases for
the
household smoke
drains or
a vertical
temperature,
and
carbon stack.
dioxide content.
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon dioxide
temperature,
content.
smoke
and
carbon
dioxide
content.
Soak Away
21. Priming The Burner
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer,
our service department engineer,
may be able
our to
service
provide
department
you with details
may be
ofable
an engineer
to provide
in you
yourwith
area.
details of an engineer in your area.
Ensure both power and fuel supplies to the boiler
are switched
on. Press the reset button, the burner will start it’s firing
sequence. To release air from the oil line, slacken the vent plug
during this sequence. If ignition fails the burner will go to lock out,
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning
“Benchmark”
and
Installation,
Service Record
Commissioning
Log Book and Service Record Log Book
wait 60 seconds and repeat the procedure.
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the
The
event
log book
of anywill
warranty
be required
work.inEnsure
the event
thatofthe
any
service
warranty
record
work.
is completed.
Ensure that the service record is completed.
22. Test The Fuel Supply
With the burner running, check the fuel supply for air leaks. It is
normal for a static air bubble to remain at the highest point of the
oil line, but a continuous stream of bubbles through the oil line
Warranty
indicates that air is being drawn in. This must be cured before
proceeding.
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty Conditions
Your HRM boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
from
isthe
under
datewarranty
of installation.
for 2 years from the date of installation.
fig 1.1
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
Household Drains
Warranty
Warranty
Warranty
-
Warranty Conditions
Warranty Conditions
- The boiler must be installed and commissioned in accordance with our handbook
The boiler must be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
23. Casing
Extended Warranty
Extended Warranty
Extended Warranty
Extended Warranty
Lift the case into position, secure it to the wall plate using the
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
shouldatbethe
completed
end of this
as manual should be completed as
lock located on the underside.
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record that
installed
the boiler
in accordance
has been correctly installed in accordance
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return
with
theour
warranty
recommendations.
registration
Return thetowarranty
HRM in order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
Vertical
Stack document
warranty of the heat exchanger – a total of 5 years.
warranty of the
heat exchanger
– a total of 5 years.
warranty of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
Extended Warranty Conditions
-
fig 1.2
Extended Warranty Conditions
Extended Warranty Conditions Extended Warranty Conditions
-
The boiler must be serviced annually and maintained in accordance with this handbook. The
“Benchmark” service log is located at the back of this manual
- The boiler must be serviced annually and maintained in accordance with this handbook. The
The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located
“Benchmark”
at the back of
service
this manual
log is located at the back of this manual
-
This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to your statutory and other legal rights
This warranty is in addition to-yourThis
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
After Sales Service
24. Commissioning The Boiler
-
After Sales Service
-
After Sales Service
After Sales Service
If your boiler fails during the warranty period contact your installer, who will be able to identify the
Installation is complete. The boiler must now be commissioned by
cause of the problem. If appropriate, your installer will contact us.
a competent engineer. The “Benchmark” log found at the back of
this manual should be completed, and the warranty documentation
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
returned to HRM Boilers Ltd.
service department
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able to
your
identify
installer,
the who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installer will contact us.
-
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
If you are unable to contact your
- installer
If you are
please
unable
contact
to contact
our service
your installer
department.
pleaseQuoting
contact your
our service
boiler’sdepartment. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
serial number when phoning – thisserial
can be
number
foundwhen
on the
phoning
cover of
– this can
manual.
be found on the cover of this manual.
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
24
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
service department
fig 1.3
service department
service department
3
25
26
Standard X-ternal & System X-ternal
Handbook
Standard X-ternal & System X-ternal
Standard
X-ternal
System
X-ternal
Standard
X-ternal
&&
System
X-ternal
Handbook
Handbook
Handbook
3
3 325
Householder Information
Control Panel Wiring Diagrams – X-ternal and System X-ternal
IMPORTANT!
Householder
Information
Householder Information
Householder
Information
Boiler Maintenance
IMPORTANT!
IMPORTANT!
IMPORTANT!
Servicing
Your
boiler must be commissioned in order to:
Your boiler must be commissioned
Your
in order
boilerto:
must be commissioned in order to:
Your boiler must be commissioned in order to:
The
boileryour
should
be serviced annually. Should you experience any difficulty in locating an engineer, our service
Validate
warranty
-department
Validate may
your be
warranty
able to provide you with the contact details of an engineer in your area.
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed correctly and avoid premature failure
- Ensure the boiler has been installed
- Ensure
correctly
the boiler
and avoid
has been
premature
correctly
andservicing
avoid premature
failure
IMPORTANT:
Isolate
the installed
powerfailure
supply
before
the boiler.
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
- Set the boiler to its optimum
-Servicing
efficiency.
Set the
boiler
Operating
to its conditions
optimum efficiency.
for the boiler
Operating
will vary
conditions
from siteforto the
site,boiler
your will vary from site to site, your
Steps
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning
engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
commissioning
engineer
has
specialised
commissioning
equipment
engineer
to
check
has
the
specialised
oil
pressure
equipment
and
analyse
to
check
the
the
exhaust
oil
pressure
gases
for
and analyse the exhaust gases for
Standard
X-ternal
and
X-ternal
temperature,
smoke
and
carbon System
dioxide content.
temperature, smoke and carbon dioxide content.
temperature, smoke and carbon
dioxide
temperature,
content.
smoke
and
carbon
dioxide
content.
1. Remove the burner and combustion chamber baffles/insulation, clean the internal heat exchanger surfaces and
components.
Replace the
the combustion
chamber
baffles
andShould
insulation
with
new items.any difficulty locating an
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
Your installer
will organise
commissioning
of your
boiler.
you
experience
Your installer will organise the Your
commissioning
installer will
of organise
your boiler.
the Should
commissioning
you experience
of your any
boiler.
difficulty
Shouldlocating
you experience
an
any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department may be able to provide you with details of an engineer in your area.
engineer, our service department engineer,
may
be
able
our
to
service
provide
department
you
with
details
may
be
of
able
an
engineer
to
provide
in
you
your
with
area.
details
of
an
engineer
in
your
area.
2. Check and replace seals, gaskets and flexible oil lines as appropriate.
-
Validate your warranty
-
Validate your warranty
-
3. Clean or replace filter elements and de-sludge the oil tank.
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark” Installation, Commissioning and Service Record Log Book
“Benchmark”4.Installation,
“Benchmark”
and
Installation,
Service
Record
Commissioning
Lognozzle.
Book For
andinstructions
Service Record
Log
Dismantle Commissioning
the burner
assembly
and
clean,
fit
a new
on how
to Book
carry this out please read
the separate
burner
withallyour
boiler.of the log book (found at the back of this manual).
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
Please
ensure that
your instructions
installer hassupplied
completed
sections
Please ensure that your installer has
Please
completed
ensure all
thatsections
your installer
of the has
log book
completed
(foundall
atsections
the backofofthe
thislog
manual).
book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
The log book will be required5.
in the
The
event
log
book
of
any
will
warranty
be
required
work.
in
Ensure
the
event
that
of
the
any
service
warranty
record
work.
is
completed.
Ensure
that
the service record is completed.
Check the oil pressure and flue gas analysis, adjust the burner settings as
appropriate.
IMPORTANT: Do not use a wire brush to clean flue ways.
Warranty
Warranty
Warranty
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty Conditions
Baffle
Your
HRMReplacement
boiler is under warranty for 2 years from the date of installation.
Your HRM boiler is under warranty
Your
for 2HRM
years
boiler
fromisthe
under
datewarranty
of installation.
for 2 years from the date of installation.
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
Extended Warranty
Warranty Conditions
Warranty Conditions
-
- The boiler must be installed and commissioned in accordance with our handbook
The boiler must be installed and
- commissioned
The boiler must
inbe
accordance
installed and
withcommissioned
our handbook in accordance with our handbook
-
- The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
The boiler must not be repaired,
- modified
The boiler
or must
tampered
not be
with
repaired,
by anymodified
person not
or tampered
authorisedwith
by HRM
by any person not authorised by HRM
Extended Warranty
Extended Warranty
Extended Warranty
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warranty registration document at the end of this manual should be completed as
The “Benchmark” and warrantyThe
registration
“Benchmark”
document
and warranty
at the end
registration
of this manual
document
shouldatbethe
completed
end of this
as manual should be completed as
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
appropriate by your installer / engineer.
appropriate
This isbyyour
yourrecord
installer
that/ engineer.
the boiler This
has been
is your
correctly
record that
installed
the boiler
in accordance
has been correctly installed in accordance
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return the warranty registration document to HRM in order to qualify for a further 3 year
with our recommendations. Return
with
theour
warranty
recommendations.
registration document
Return thetowarranty
HRM in order
registration
to qualify
document
for a further
to HRM
3 year
in order to qualify for a further 3 year
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchanger – a total of 5 years.
warranty of the heat exchangerwarranty
– a total of 5the
years.
heat exchanger – a total of 5 years.
Extended Warranty Conditions
Extended Warranty Conditions
Extended
Conditions Extended Warranty Conditions
Note: The electrical supply to the boiler should be made via a switched and fused spur located near the
boiler, Warranty
fitted
5 amp must
fuse. be serviced annually and maintained in accordance with this handbook. The
- with
Thea boiler
- The boiler must be serviced annually and maintained in accordance with this handbook. The
- The boiler must be serviced
- annually
The boiler
andmust
maintained
be serviced
in accordance
annually and
with maintained
this handbook.
in accordance
The
with this handbook. The
“Benchmark” service log is located at the back of this manual
“Benchmark” service log is located at the back of this manual
“Benchmark”
service
log
is
located
“Benchmark”
at
the
back
of
service
this
manual
log
is
located
at
the
back
of
this
manual
The Pump socket is only utilised on the X-ternal System, it is redundant on the Standard X-ternal.
- This warranty is in addition to your statutory and other legal rights
- This warranty is in addition to your statutory and other legal rights
This warranty
statutory
warranty
andisother
in addition
legal rights
to your statutory and other legal rights
A frost thermostat is fitted as standard to protect the X-ternal and X-ternal System boilers. Where -appropriate
an is in addition to-yourThis
additional
frost thermostat may be required to protect the rest of the heating system.
After
Sales Service
After Sales Service
After Sales Service
After Sales Service
-
If your boiler fails during the warranty period contact your installer, who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
- If your boiler fails during the warranty period contact your installer, who will be able to identify the
If your boiler fails during the- warranty
If yourperiod
boiler contact
fails during
yourthe
installer,
warranty
whoperiod
will be
contact
able to
your
identify
installer,
the who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
cause of the problem. If appropriate,
cause
your
ofinstaller
the problem.
will contact
If appropriate,
us.
your installer will contact us.
-
Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
service department
-
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
- Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
Under no circumstances should
- “in
Under
warranty”
no circumstances
work be undertaken
should “in
without
warranty”
authorisation
work be undertaken
from the HRM
without authorisation from the HRM
service department
service department
service
department
Priming the Burner
- If you are unable to contact your installer please contact our service department. Quoting your boiler’s
If you are unable to contact your
-Ensure
installer
If youboth
are
please
unable
contact
to contact
oursupplies
service
your installer
department.
please
Quoting
contact
your
our service
boiler’s
department.
power
fuel
boiler
on. manual.
Press
the resetQuoting
button,your
the boiler’s
burner will start it’s
serial number
whenand
phoning
– this cantobethe
found
on are
the switched
cover of this
serial number when phoning –firing
thisserial
can
be
number
found
when
on
the
phoning
cover
of
– this
can
manual.
found
on the
thisduring
manual.
sequence.
To
release
air from
the
oilbe
line,
slacken
thecover
vent of
plug
this sequence. If ignition fails the burner
will go to lock out, wait 60 seconds and repeat the procedure.
26
Standard X-ternal & System X-ternal
Standard X-ternal
& System X-ternal
Handbook
Handbook
3
27
28
Standard X-ternal & System X-ternal
Handbook
Standard X-ternal & System X-ternal
StandardX-ternal
X-ternal&&System
SystemX-ternal
X-ternal
Standard
Handbook
Handbook
Handbook
3
3 327
NOTES
The code of practice for the installation,
commissioning & servicing of oil central heating.
Installation,
Commissioning and
Service Record
Log Book
IMPORTANT
1.
Please keep the Log Book in a safe place for future reference.
2.
This Log Book is to be completed in full by the competent person(s)
who commissioned the boiler and associated equipment and then
handed to the customer. When this is done, the Log Book is a
commissioning certificate that can be accepted as evidence of
compliance with the appropriate Building Regulations.
3.
Failure to install and commission this appliance to the manufacturer’s
instructions may invalidate the warranty.
The above does not affect your statutory rights.
The content of this Log Book has been
produced in consultation with
C HEATING AND HOT WATER INFORMATION COUNCIL
APPLIANCE INSTALLATION AND CONTROL DETAILS
APPLIANCE INSTALLATION AND CONTROL DETAILS
CIRCULATION
INSTALLER DETAILS
COMPANY NAME:
HAS THE SYSTEM BEEN FLUSHED IN ACCORDANCE WITH THE INSTALLATION
INSTALLATION DATE:
ADDRESS:
TEL. NO.
INSTRUCTIONS?
YES
HAS AN INHIBITOR BEEN ADDED:
YES
(For the central heating mode, measure and record)
OFTEC REG NO. (if applicable)
COMMISSIONING DETAILS
COMPANY NAME:
CENTRAL HEATING FLOW TEMPERATURE
0
C
CENTRAL HEATING RETURN TEMPERATURE
0
C
COMMISSIONING DATE:
ADDRESS:
BURNER SETTINGS
TEL. NO.
SMOKE NO
OFTEC REG NO. (if applicable)
2
CO
NOZZLE SIZE
% NETT FLUE GAS TEMPERATURE
0
C
OIL PRESSURE
APPLIANCE DETAILS
MODEL:
WALLSTAR
(Please enter model number)
X-TERNAL
COMBINATION BOILERS ONLY
SERIAL NUMBER:
HAS A WATER SCALE REDUCER BEEN FITTED?
FLUE TYPE (Weybourne Only)
TYPE FITTED?
LOW LEVEL
HIGH LEVEL
VERTICAL
CONVENTIONAL FLUE INSTALLATION (Weybourne Only)
YES
IS ADEQUATE COMBUSTION/VENTILATION AIR SUPPLY PROVIDED?
YES
FLUE TERMINATING POSITION
DOES THE FLUE TERMINATE IN ACCORDANCE WITH THE INSTALLATION MANUAL?
MAXIMUM OPERATING WATER PRESSURE
bar
COLD WATER INLET TEMPERATURE
0
C
HOT WATER OUTLET TEMPERATURE
0
C
WATER FLOW RATE AT MAXIMUM SETTING
litres/min
IS THE SYSTEM PRESSURE CORRECT
YES
YES
CONDENSING BOILERS ONLY
OIL SYSTEM
TANK CAPACITY:
NO
(For the domestic hot water mode, measure and record):
CONVENTIONAL
IS THE FLUE INSULATED?
YES
litres.
BUNDED
YES
NO
FIRE VALVE TYPE: FUSEABLE HANDWHEEL, (Supplied Wallstar Only)
YES
NO
REMOTE SENSING (Weybourne or Wallstar on Gravity Oil Supply)
YES
NO
IS THE TANK SUPPORTED ON A SUITABLE BASE?
YES
NO
IS A PAPER ELEMENT OIL FILTER FITTED?
YES
NO
CONTROLS
To comply with the Building Regulations, each section must have a tick in one or other of the boxes.
REQUIREMENTS
MEASURES PROVIDED
1.
TIME AND TEMPERATURE
CONTROL TO HEATING
ROOM STAT AND
PROGRAMMER/TIMER
PROGRAMMABLE
ROOMSTAT
2.
TIME AND TEMPERATURE
CONTROL TO HOT WATER
CYLINDER STAT AND
PROGRAMMER/TIMER
COMBI
BOILER
3.
HEATING ZONE VALVES
FITTED
NOT REQUIRED
4.
THERMOSTATIC RADIATOR VALVES
FITTED
5.
AUTOMATIC BYPASS TO SYSTEM
FITTED
HAS THE CONDENSATE DRAIN BEEN INSTALLED IN ACCORDANCE
WITH THE MANUFACTURER’S INSTRUCTIONS?
YES
FOR ALL INSTALLATIONS
DOES THE HEATING AND HOT WATER SYSTEM COMPLY
WITH THE APPROPRIATE BUILDING REGULATIONS?
YES
HAS THE BOILER AND ASSOCIATED EQUIPMENT BEEN INSTALLED AND
COMMISSIONED IN ACCORDANCE WITH THE INSTALLATION INSTRUCTIONS?
YES
HAVE YOU DEMONSTRATED THE OPERATION OF THE BOILER
AND SYSTEM CONTROLS TO THE CUSTOMER?
YES
HAVE YOU LEFT ALL MANUFACTURER’S LITERATURE WITH THE
CUSTOMER?
YES
HAS WARRANTY DOCUMENTATION BEEN COMPLETED AND RETURNED?
YES
COMPETENT PERSON’S
CUSTOMER’S
SIGNATURE: .............................................
SIGNATURE: .............................................
(To confirm demonstrations of equipment, and receipt of appliance instructions)
NOT REQUIRED
NO
SERVICE LOG
Service engineer’s name: ............................................. Telephone No: .............................................
Date
Parts Replaced
Comments/Parts to be
replaced Next Service
www.hrmboilers.co.uk
Haverscroft Industrial Estate, Attleborough, Norfolk, NR17 1YE. Tel: 01953 455400. Fax: 454483.
E-mail: [email protected] E-mail: [email protected]
HRM Boilers Limited
Registered in England No. 4168704
HRM Boilers Limited Haverscroft Industrial Estate Attleborough Norfolk NR17 1YE
Tel:01953 455400 Fax:01953 454483 e-mail:[email protected] www.hrmboilers.co.uk
Code: LI041
Issue No: 2 (10/13).