Oakridge - Westfield Tenant Coordination
Transcription
Oakridge - Westfield Tenant Coordination
Oakridge Food Court Tenant Criteria August 2012 Table of Contents PURPOSE OF CRITERIA MANUAL 1.0 2.0 3.0 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 5.0 6.0 6.1 6.2 6.3 6.4 7.0 7.1 7.2 7.3 2 Mission Statement Project Introduction Design Philosophy Westfield Design Language Architectural Elements Graphic Design Lighting Design Exhibition Cooking Food Merchandising Kitchen Equipment Materials Selection What’s Inside Technical Criteria Mechanical Design Electrical / Telephone Plumbing Fire & Life Safety General Information Tenant Submission Process Codes and Jurisdiction Project Directory 04-05 06-07 08-09 10-11 12-13 14-19 20-21 22-23 24-25 26-27 28-29 30-37 38 38-41 42-45 46-48 49 51 51-55 66 67 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia This is the Westfield Oakridge Food Court Tenant Criteria Manual, which contains the General Design Criteria for Tenant Improvements. This handbook will assist in familiarizing you and your team with the image, character and objectives that set the tone for the new Food Court. The Tenant’s Architect is encouraged to contact the Landlord’s Tenant Coordinator to discuss any specific design intentions or questions prior to commencing design work. The Landlord’s Tenant Coordinator will strive to resolve all outstanding design issues. However, the Tenant Coordinator may, in the best interests of the mall, reject any aspect of a Tenant’s design. If an acceptable design cannot be agreed upon, the Landlord may, at the Tenant’s expense, provide the storefront design. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 3 1.0 Mission Statement 1.0 Mission Statement At Westfield we strive to distinguish ourselves through superior performance in retail development. The continuous improvements made to our properties are done to meet the changing needs of our customers and the retailers we serve. This commitment is evident to our Tenants who enjoy a retail environment that is well-designed, meticulously maintained and vigorously marketed to maximize traffic and sales. We look to enhance the shopping experience for our customers through the quality of our Tenants and artful Tenant design. We look to become partners with retailers striving for these same goals. Westfield is ready to meet your needs; through shared communication and our expertise, we will create the store that you envision. We wish you great success with the completion of your store and look forward to forming a successful relationship for us both. “Westfie ld looks to en hance the sho p p i n g e x p erience fo r o u r c usto m ers th ro u gh the qu ality of o u r T enants a n d a r tful T enant Desig n.” 4 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 5 2.0 Project Introduction 2.0 Project Introduction Westfield Oakridge In recent years, Westfield Oakridge has taken strides to enhance its merchandise mix, amenities, and overall ambience. This food court setting features bold flavors, enticing design, and the celebrated Westfield Family Dining experience with smaller tables perfectly suited to families with young children. This space is to become a focal point of the entire center, with stylish décor, lighting, and exhibition-style cooking combining to celebrate the art of food preparation and the joy of eating well. 87 82 85 101 N 6 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia Food Court N We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 7 3.0 Design Philosophy 3.0 Design Philosophy food theater THE THEATER OF FOOD Eating is an art we all participate in. Stepping inside a Westfield food experience is like entering a theater. Food Courts are composed of multiple stages made up of food scenery. Great restaurants entertain customers, share new flavors, make statements, express cultures and inspire lifestyles. interaction prep-action Westfield Bondi Junction Harbour Room, Sydney presentation Let the show begin... to allow the audience to enjoy a great experience and be mesmerized. Westfield Bondi Junction Harbour Room, Sydney 8 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 9 4.0 Westfield Design Language 4.0 Westfield Design Language While Westfield outlines specific requirements and prohibitions, there is language in this document that is considered subjective (i.e. “standard”, “typical”, “creative”, “prototypical”etc.) CAFE STYLE FOOD COURT In the hyper-competitive retail industry, Westfield is constantly striving for improvements in order to differentiate our shopping environment from our competitors. The Food Court is part of this equation. It is comprised of mall common areas and individual tenant spaces. Our goal is to transform the environment from a “fast food hall” to a “cafe” style environment by breaking down traditionally large seating areas into small intimate groups, using “softer” materials, and appropriate lighting fixtures to enhance the dining and shopping experience. We are encouraging Tenants to re-think their store design to achieve this vision by treating the entire visual presentation like a well-composed work of art, seamlessly integrating: It will be up to the Westfield Tenant Coordinator’s discretion to determine whether your design meets the requirements outlined in this document. We will be working very closely with Tenants and their Designers to assure a completely integrated and appropriate design specific to their brand and corporate image. While designing your store the following principles must be adhered to: •Architectural elements •Graphic design •Lighting •Exhibition cooking •Food merchandising •Kitchen equipment •Materials selection 10 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia • We are asking the Tenant to re-image their store to fit into the Food Court environment that Westfield envisioned for Westfield Oakridge. • The design must begin to approach the quality of a high-end, sit-down restaurant. Please review the enclosed images and comments which will convey many of the concepts we are trying to achieve and discuss your ideas or concepts with your Tenant Coordinator. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 11 4.1 Architectural Elements 4.1 Architectural Elements Add visual interest through changes in ceiling planes and wall planes. Treat columns and hoods as architectural features. Create service counters more intricately detailed. Prohibitions: Requirements: • • • • • • • • • 12 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia All surfaces must be considered design elements. The elements must work together to create an interesting overall composition. All ceilings will be finished gypsum board ceilings with the exception of the “back of house” area. Acoustic ceiling tiles will not be permitted in the front of house. Return air grilles in the front of house (sales) areas (if used) must be painted to match the adjacent ceiling. Sprinkler heads must be fully recessed and painted to match the adjacent ceiling in the front of house (sales) areas. No exceptions. Exposed hoods and columns need to be treated as architectural features and integrated into the overall design in a comprehensive manner. Toe kick must be used along all store front counter areas. Floor finish transition must occur at center of swing gate at closed position. Tenant must extend mall finish. Tenants must provide a physical sample board and/ or sample of all finishes used in front of house (sales) area. Electronic submittals will not be accepted and no exceptions will be made to this policy. • • No direct view of “back of house.” No swing gates at front counter. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 13 4.2 Graphic Design 4.2 Graphic Design ENVIRONMENTAL GRAPHICS In an era in which consumers are making decisions based on corporate identity we are encouraging companies to bring their marketing strategies into the store design. This is accomplished through environmental graphics. Much like advertising, environmental graphics work to affect the consumer by impressing a mood and lifestyle. Retail shops have been incorporating this type of advertising into their stores for years. It is Westfield’s goal to bring this merchandising strategy into the food court as well. Environmental graphics should not be literal photos of your food offerings. It can be a backdrop for your store. The use of environmental graphics is an important element in getting your message and brand across to your potential customer. Environmental graphics tell the consumer what the product is all about. Name branding, lifestyle photos and environmental graphics are combined to convey information in a fresh modern way. Requirements: • • • • • • • Use a professional graphic designer to work with the architect to come up with an integrated environmental graphic. Digital graphics are recommended to be printed on high quality vinyl and mounted behind glass. Submit MIN. 8”x 8” vinyl sample printed in full scale for Landlord approval. Detail the installation of the graphic in a clean seamless manner. Environmental graphics can be placed in non-traditional areas including columns and hoods. A food stylist must be employed in the production of all food photography. All graphic design elements are to be submitted with architectural drawings. They will be subject to strict review by Westfield’s Tenant Coordinator. Prohibitions: • • • 14 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia No plexiglass. No low resolution digital graphics. No low quality digital output. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 15 4.2 Graphic Design Requirements: MENU BOARDS • The menuing is part of the graphic design of the space. It should be designed by a professional graphic designer and integrated into the overall environmental graphic. Traditional backlit menu boards and backlit transparencies will not be accepted. Non-traditional placement of the menuing information creates visual interest and is strongly encouraged. See examples of menuing on hoods, sidewalls, counter and the like. We understand operational requirements of changing food items and prices. It is up to the graphic designer to devise methods to do so while adhering to these goals. • • • • Use a professional graphic designer to design your menuing. Integrate menuing into the overall graphic design of the space. Use non-illuminated menuing, lit from a remote source. Implement a creative use of alternative fonts. All fonts will be subject to landlord approval. Use food and lifestyle photos. However, all photos must be produced with the involvement of a professional food stylist and is subject to landlord approval. Menuing drawings that completely detail the fabrication and installation methods must be submitted for landlord approval. Electronic menus are encouraged however, they need to be integrated into the architectural design. The digital content should be created by a professional graphic designer. Submit catalogue cuts and monitor digital contents for Landlord approval. Prohibitions: • • • 16 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia No standard prototypical menu boards. No back-lit transparencies unless reviewed and approved by Westfield. No (traditional) back-lit menu boards unless reviewed and approved by Westfield. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 17 4.2 Graphic Design SIGNAGE Signage may be the single most important element of the entire store. This is the area where the Tenant can most effectively brand their storefront. In imaging your store, your signage should not mimic a fast food type operation. You should use the type of signage that would compliment the design of a chic modern restaurant. The signage should be a part of the graphic design as a whole. Requirements: • • • • 18 Signage and environmental graphics must be conceived as an integral part of the design, so they do not appear as an afterthought application. Primary storefront identification shall be limited to Tenant’s trade name, as approved in the lease, or as otherwise approved in writing by Landlord. All signs must fit comfortably into their storefront architecture, leaving sufficient margins and negative space on all sides. Thickness, height, and colors of sign lettering and graphics must be visually balanced and in proportion with other signs within the project. All illuminated signs must be controlled by Tenant’s time clock and illuminated during general operating hours as defined by the Landlord. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia Prohibitions: • • • • • • • • • • All submitted Tenant shop and storefront elevations should show and/or illustrate proposed signage in each phase of the presentation. Sign shop drawings for all signage must be presented to the Landlord for approval prior to commencement of fabrication. Signage shall be mounted only to Landlord designated location. All sign illumination must be concealed. All graphics and signage shall be professionally assembled and displayed in a first-class manner. Check mall specific sign criteria. • • • • • • • • • • No sign, advertisement, notice or other lettering shall be exhibited, inscribed, painted or affixed on any part of the storefront except for the store identification sign. No internally illuminated awnings with or without signage. No internally illuminated channel letters with faced acrylic translucent face panels. No signs fabricated of cloth, paper or cardboard. No signs which are fabricated of vinyl such as the stick-on or decal type. No noise-making signs. No conventional plastic or acrylic faced box or cabinet signs. No formed plastic or injection molded signs. No luminous vacuum formed letters. No temporary wall signs, window signs, pendants, banners, flags, inflatable displays or sandwich boards. No animated signs: signs consisting of anything swinging, rotating, flashing, blinking, scintillating, strobing, including any moving electronic message boards or centers, or temporary lighting, such as, but not limited to search, flood, or fluorescent gel lights. No odor producing signs. No hand-written signage. No exposed lamps, including decorative neon. No exposed fastenings or manufacturer’s /underwriter’s labels. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 19 4.3 Lighting Design 4.3 Lighting Design Lighting design offers the designer the opportunity to satisfy both functional and aesthetic requirements. Care should be used in selecting light sources that compliment the food being served. Using a combination of ambient lighting accents and layering of architectural “jewelry” including decorative pendant lights will help activate the space. Requirements: • • • • • • • • 20 Landlord shall provide lighting in public spaces. Tenant is responsible for all lighting within the entire demised premises. For Tenant identification and signage, see architectural signing criteria. Recessed incandescent quartz halogen luminaries shall be used for counter illumination and shall be of a low brightness and shielded type. Foot-candle levels at counter height shall be 50 foot candle average maintained. Recessed incandescent quartz downlights with specular or semi-specular clear alzak reflectors are acceptable if they have a low brightness and are the shielded type. All fixtures must utilize a clear tempered glass safety lens as per food preparation and local electrical codes. The use of decorative type lighting such as luminous ceilings, chandeliers, pendant or wall units or clear type glitter strips are permitted only if the location is approved by Landlord. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia • • • • • All Tenant lighting shall be controlled separately, and illuminated during mall operation hours. H. I. D. Lighting shall not be used unless approved by Westfield. Incandescent quartz halogen pendant units may be used for general lighting only if the Tenant has established an identity on this theme or motif. Landlord shall have final approval of decorative type and location. Quartz halogen incandescent PAR 16/20/30/38 spots or low voltage MR-16 quartz halogen type lighting, recessed or surface track is recommended for high impact on merchandise or food. These sources must be protected with a clear tempered glass safety lens equipped with the fixture. All display cases must be adequately lit and ventilated. Direct visual exposure of incandescent lamps and/or fluorescent tubes is prohibited. • • • • • • All Tenants must install occupancy sensors in all back of house areas to control lighting. All illuminated signs must be illuminated during the hours the mall is open. These signs shall be controlled by a time clock. Refer to architectural signing criteria. To retain and protect the visual environment of the area and for the benefit of all Tenants, each individual Tenant shall limit the brightness of their lighting fixtures, which shall be subject to the Tenant Coordinator’s approval. Emergency lighting must be fully recessed in the front-of-house (sales) areas. No surface mount type is allowed. Use staggered under-counter lighting if used. Bottom of pendant light must be installed at a minimum of 6’-6” A. F. F. Prohibitions: • • • • • No 2’ x 2’ or 2’ x 4’ fluorescent lighting in the front of house shall be allowed. No recessed flush type acrylic lenses shall be used for general lighting. No strobe, spinner or chase type lighting shall be used. No lighting shall be installed outside the demised premises. No track lighting is permitted in the front of house area unless specifically approved by landlord. It can be used if it is hidden or recessed into ceiling, otherwise tenant should use monopoint type fixtures. Use of high quality fixtures is required. Submit cut sheets of fixtures including manufacturer, model and any photos of specific fixture to Landlord for design approval. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 21 4.4 Exhibition Cooking 4.4 Exhibition Cooking Whether it is grilling, chopping or plating a dish, seeing the art of cooking brings excitement to the customer. Exhibition cooking strikes a higher level of freshness in food served and offers a sophisticated experience that is unique to a Westfield Food Court. Westfield encourages retailers to incorporate exhibition cooking into their design. Requirements: • • • • 22 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia Food preparation such as chopping /mixing can be interpreted as exhibition cooking. Showcasing the food preparation by opening the kitchen is encouraged. Equipment used for exhibition cooking should be an integral part of the store design. Uniforms at the front service area are encouraged as it strengthens brand image. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 23 4.5 Food Merchandising 4.5 Food Merchandising Food display /merchandising should be an integral part of the overall design. Just as successful retail merchants invest a great deal of time and energy in the display of their products, the successful Food Court restaurateur must do the same. It is important for the product to be presented in a fresh, natural and pure way. Requirements: • • • Where appropriate, deli case displays should be incorporated into front counter. All deli / display cases are recommended to be frameless square glass and UV bonded. Curved display cases are discouraged. Steam tables, deli cases and food display presentation are recommended to be much lower than standard height. Packaged food products can be used as part of the display system. Images of food can be used to emphasize the message. Prohibitions: • 24 No plastic food display allowed. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 25 4.6 Kitchen Equipment 4.6 Kitchen Equipment Many traditional Food Court operators tend to look like “food factories”. This is not an acceptable design solution for Food Courts managed by Westfield. As a part of it’s goal of creating a café style environment, Westfield will be closely monitoring the selection and placement of all equipment. As such, whatever equipment deemed essential for the operation must be fully integrated into the overall design. Therefore, all efforts must be made to minimize the amount of equipment visible to the public. All exposed equipment should be minimized and integrated into the overall conceptual design. Requirements: • • • • • • 26 Soda dispensers must be “slimline” with stainless steel finish and can only be accessed by Tenant’s service employees. All storage in “front of house” shall be accounted for in the built-in millwork. UV bonded, frameless sneeze guard is encouraged. Equipment may not merely be placed on the counter, it must be integrated into the overall design, encased in cabinetry, etc.. All equipment should be as compact as possible. If it is on the front counter it should be recessed into the counter to assure maximum sight lines. All hand sink soap, paper towel dispensers and other fixtures must be compact in size with stainless steel finishes. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia • • • • • Hand sink in front of house must be integrated into counter/cabinet. POS system must be recessed into counter or shrouded such that the majority of the POS is hidden from view and what remains visible is pleasing to the eye. This determination will be made solely by Landlord design review. POS configuration must be submitted for Landlord review. No exceptions. All equipment should be placed in the kitchen rather than the storefront. Catalog cuts for all equipment visible to the public must be submitted for review and approval by Westfield. Service items including but not limited to straws, napkins, cups, plastic wares, condiments and other such items must be placed in recessed compartments on the counter. Otherwise, provide a designated place to hide service items from public view and reduce visual clutter. Prohibitions: • • • • • • No self-serve soda towers. No corporate graphics (i.e. Coca Cola, Pepsi, etc.) No free standing equipment at front counter. No kitchen equipment provided by food purveyors will be allowed to display their signage/logo. No exposed storage at the front of the store will be accepted. All storage shall be incorporated in the builtin millwork. No front venting refrigerated display cases will be allowed at the front counter. No full height freezer/refrigerator will be allowed in the front of house. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 27 4.7 Materials Selection 4.7 Materials Selection Recommended counter top materials: Material selection clearly plays a very important role in defining the cafe bistro ambiance. While it is important that the materials work in a functional way, they must also be employed to convey the overall message of your establishment to your customer. Tenants must submit a sample board to Westfield Tenant Coordination for approval. Careful selection of materials is necessary to emphasize the café environment. Solid Surface Zodiaq, CaesarStone or similar Recommended: COUNTER TOP COUNTER FRONT WALLS • • • • • • • • • • Quartz Stone slab High quality solid surface or granite High quality resin Stainless steel • • • • • • Decorative metal Back painted glass High end porcelain / ceramic / mosaic / glass tiles Quartz Stone slab High quality solid surface or granite High quality resin Stainless steel Wood • • Prohibitions: • • • • • 28 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia Back painted glass Graphic mounted to the rear of glass & mounted to the wall High-end porcelain / ceramic / mosaic / glass tiles High quality wallpaper graphics Solid Surface Corian or similar Recommended counter front materials: Wood veneer Glass tiles Rectangular tiles No plastic laminates except for cabinetry on the back wall. No plexiglass. No standard 4” x 4”, 6” x 6”, 12” x 12” tiles unless approved by Westfield. No painted surfaces except areas approved by Westfield i.e. ceiling. No wallpaper. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 29 5.0 What’s Inside Food Court 5.0 What’s Inside THEATER BOX OFFICE CORNER TENANT TYPICAL TENANT EXISTING BRACING TENANT WITH EXTERIOR ENTRANCE, INTERIOR CUSTOMER CIRCULATION AND TRANSPARENCY TO EXTERIOR FLOATING FOOD TENANTS 30 N Food Court Overall Plan - NTS Sample Tenant We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 31 5.0 What’s Inside FC02 - FC 8, FC10 -FC13 5’-0” x 2’-0” x 4” HANGING BLADE SIGN EACH TENANT SHALL FURNISH AND INSTALL A REAR EXIT DOOR. DOOR SHALL NOT SWING INTO SERVICE CORRIDOR TENANT FINISH ON INTERIOR KITCHEN WALLS KITCHEN / PREP AREA (VARIES BY TENANT) EXISTING CORRIDOR WALL TENANT IS ENCOURAGED TO HAVE A SWITCHBACK WITH VESTIBULE TENANT FINISH ON BACK AND DEMISING WALLS SERVICE COUNTER BY TENANT MENU BOARD ZONE / SIGNAGE ZONE REFINISHED NEUTRAL PIER COUNTER FURNISHED AND INSTALLED BY TENANT CORNER TENANT - NO BLADE SIGN BLADE SIGN ABOVE PUBLIC/ SERVICE AREA (VARIES BY TENANT) LEASE LINE TYPICAL TENANT TENANT WITH EXTERIOR ENTRANCE, INTERIOR CUSTOMER CIRCULATION AND TRANSPARENCY TO EXTERIOR - NO BLADE SIGN Tenant Signage Location Plan - NTS 32 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia VARIES N Tenant Typical Plan - NTS We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 33 5.0 What’s Inside 3” clear on all sides 1/2” s/s rods LEASE LINE height varies to ceiling VARIES CEILING BY LL FOR TENANTS FC2, FC3, FC4, AND FC10, BLADE SIGN IS MIRRORED TO OTHER SIDE OF ELEVATION 1’-10” Illuminated blade sign VARIES 0’-4” CEILING REPAINTED BY TENANT ICI PAINTS ‘CRISP WHITE SHIRT’, SATIN FINISH 1/2” S/S ROD 11’-8” AFF SOFFIT LIGHTING INSTALLED BY TENANT Feelux Slimlamp LED TENANT SUPPLIED BLADE SIGN 13’-6” 5’-0” ABOVE SOFFIT LIGHTING Feelux Slimlamp LED TENANT SIGNAGE/ MENU ZONE ON BACK WALL OR SOFFIT BETWEEN 7’-0” AND 10’-0” A.F.F. W/ 14” MAX LETTERS 1’-6” 1’-6” REMOVE BLUE LIGHTS ON BULKHEAD, PATCH DRYWALL AND REPAINT SIGNAGE/MENU ZONE ON BACK WALL BETWEEN 7’-0” AND 10’-0” 7’-0” 13’-6” 3’-0” SIGNAGE SIGNAGE BY TENANT NEUTRAL MODIFIED BY FIRST TENANT TO FIT OUT DETAIL ON PAGE 37 COUNTER BY TENANT 2’-10” AFF PER ADA TENANT FINISH ON INTERIOR OF DEMISING WALLS cap neutral pier with 1” s/s cap with a 1/2” s/s reveal between cap and tenant finish S.S. CAP BY FIRST TENANT TO FIT OUT BRUSHED STAINLESS STEEL 2’-10” AFF TENANT FINISHES N.I.C. SHOWN DASHED EXISTING METAL FRAMING BY L.L. 2’-4” * All tenants are reuired to add a decorative lighting element. approval is at landlords discretion 0’-6” 6” 1” Tenant Typical Elevation - NTS 34 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 1/2” Tenant Typ. Front of the House Section - NTS We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 35 6.1 Mechanical Design General & Technical Critera 6.0 Technical Criteria 6.1 Mechanical Design General and Technical Criteria Tenant shall furnish and install air-conditioning, heating and ventilation equipment that shall serve the Tenant Space at all times during business hours. Tenant shall connect said equipment to the Mechanical service connections or mains provided by Landlord at Landlord’s option. Prior to design, Tenant shall or cause its engineer to field survey existing conditions within the premises. Tenants with grease, odor or smoke producing operations may be required to install pollution control equipment at tenant’s expense. Such systems shall be submitted for Landlord’s approval. Tenants who chose not to install such equipment and is found to, in Landlord’s sole discretion, cause related problems with neighboring tenants or main mall system, shall be required to retrofit their exhaust system to include pollution control at tenant’s sole expense. Other mechanical systems differing from the below system designs shall be reviewed by Landlord on a location basis. Landlord shall reserve the right to deny any variance from this criteria. System Design: Split Systems All tenants are required to utilize a split system design where upon their condensers shall be located on the roof in an approved location. Tenant’s design engineer shall refer to landlord’s designated rooftop equipment plan for their respective location / zone. 1. Tenant shall design and install an air-conditioning and heating system to serve the Demised Premises, based upon the following design conditions. 36 Summer: Inside temperature: 75 degrees F (DB) 50% R.H. Tenant’s mechanical installation to be completed per all governing codes and all materials shall be new and of commercial grade and bare underwriter’s label(s), where such labeling applies. Actual inside lighting load, people load and equipment load. Installation shall be performed by a licensed Mechanical Contractor, in a first-class, workman-like manner. The exact size and outline of all curbs with the actual weight bearing on the roof at each location (including that of equipment, ducts, shafts, etc.). Ventilation load per governing codes. Tenant’s HVAC system shall be designed and installed to include all areas of the Tenant Space. Location of existing Mall structure and additional reinforcement required by Tenant’s equipment weight. Tenant shall furnish complete data indicating system air balance in the Demised Premises and a certified thirdparty balance report no more than thirty (30) days after opening. Details of Landlord-approved curbs and penetration flashing. Summer: Outside temperature: 94 degrees F (DB), 72 degrees F (WB). Minimum outside air quantities shall be based on 0.3 CFM per square foot of floor area and/or as required by governing codes, whichever is greater. Winter: Outside temperature: 30 degrees F (DB). Winter: Inside temperature: 70 degrees F (DB) (minimum throughout the Demised Premises). Provide supplementary heating as required and in compliance with all applicable codes. “U” factor of roof is .05 btuh/square foot degrees F. “U” factor for walls is .189 btuh/square foot F. Tenant’s engineer is to design and Tenant’s contractor is to install the entire Mechanical System. Any and all rooftopequipment must be located within the allotted roof top space provided/designated by landlord Landlord Work At Landlord’s option, a common outside air main duct OSA for Tenant’s system connection located within the Demised Premises, as selected by Landlord. Sizing of duct shall be as required by code for minimum OSA requirements and as determined by Landlord. At Landlord’s option, a mechanical shaft shall be provided for each tenant’s cooking exhaust, M.U.A. and piping. The size of the shaft shall be determined by the Landlord. Tenant Work: General Requirements We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia A. Roof Roof construction is designed for a live load of 100 PSF consisting of a metal deck or poured concrete, lightweight concrete, rigid insulation and a single-ply roof membrane or liquid applied roof membrane mirror drain system between two layers of light weight concrete. Tenant’s roof top equipment shall be located on the roof in areas specifically designated for such equipment. These units shall conform to Landlord’s requirements with respect to weight and size, shall not exceed six feet (6’0”) in height (installed) and shall furnish a minimum twelve inch (12”) clearance from the top of the roof-mounted curb support platforms to the top finished surface of the roof. Any additional reinforcement of the room structure necessary to support equipment shall be at Tenant’s expense. Tenant shall use Landlord’s roofing contractor and/or waterproofing contractor for all re-roofing, flashing and patching procedures. Locations of all roof penetrations shall be reviewed and approved by Landlord in writing. Roof equipment plan submittals shall include: The exact locations dimensioned to Mall column grid lines. The penetration opening size and required reinforcement of roof deck. Dimensioning of all required clearances. Weatherproofing of all Tenants roof installations shall be performed by Landlord’s authorized roofing contractor. All roof-mounted equipment shall be curb mounted on raised support platforms with all conduits, drains and refrigerant lines penetrating the roof inside the curb support. Fabricated support platforms for all roofmounted equipment shall be sized to span from centerline to centerline of the supports within the equipment bay as approved by Landlord. Tenant shall procure and install walkways to and around all rooftop equipment, as shown in detail. This work may be done by Landlord’s roof contractor and paid by Tenant’s general contractor. Tenant’s general contractor shall pay all costs directly to such roofing contractor. units, refrigeration units, fan vents, ducts and other such devices upon a curbed platform or opening in a manner that complies with Landlord’s installation requirements. No roof-mounted refrigerant, electrical or water piping can be installed horizontally over five feet (5’-0”) total length. No exhaust(s) can be located within a minimum of ten feet (10’-0”) of any supply or air intakes or building openings. No equipment or curbs may be installed closer than twentyfour inches (24”) from another roof penetration. Condensate lines for refrigeration and/or air-conditioning shall be copper pipes. Such pipe shall terminate back into Tenant’s space and be connected above the p-trap of the sink in accordance with the requirements of local authorities and Landlord. Or Tenant shall install (in accordance with all governing codes) any condensate drains from air-handling units to an approved receptacle. Conduit may not be run horizontally on roof surface. Site lines of equipment need to be considered from ring road. Access to the Mall roof is restricted to Landlord personnel and Landlord’s designated contractors only. No Tenant contractor or sub-contractor shall be permitted on the roof unless permission has been obtained from Mall Management. No wood sleepers of any kind shall be allowed. B. Structural Tenant’s general contractor shall provide temporary weatherproofing for all roof penetrations until Landlord’s roofing contractor has made the final patch. Tenant, at Tenant’s sole expense, shall engage in the services of a structural engineer. No fan, make-up air units, vents, ducts, other devices or equipment shall be installed on the roof, outside of Tenant’s premises, in any demising partitions or on exterior walls without Landlord approval. Tenant shall locate all Tenant-required grease exhaust Tenant’s structural engineer shall provide plans and specifications showing the device(s) or equipment location(s) and opening(s). Engineering details shall be reviewed by Landlord’s structural engineer. The building’s steel structure is covered with fire proofing spray ¾”thick on beams and 1-1/2” thick on columns. All steel supports required by Tenant to be attached to the steel structure shall be clipped, not welded. Tenant shall return all fire proofing within the premises to the specified thickness providing a 1-hour protective coat. C.Equipment Food Court / Food Service Tenants shall provide and install make-up air and grease exhaust system, as required, including balancing and back-draft dampers, fire dampers, curbs, exhaust and intake air hood(s). Air-handling units, heating equipment, water heaters and other equipment located within the Demised Premises shall be floor- mounted or located over the storage areas on supports provided by Tenant, not to exceed maximum live load.Tenant is responsible for isolation of all equipment so that vibrations and noises are not transmitted. Any noises deemed objectionable by Landlord’s Site Representative shall be corrected at Tenant’s expense. HVAC system shall be in operation whenever Landlord-provided HVAC services are operating. Tenants are required to install a seven-day time clock for controlling their HVAC system and be connected to the fire/smoke alarm system. Tenant’s airconditioning system shall be provided with all necessary controls and devices and be compatible with the enclosed Shoppingtown air-conditioning system and fire alarm system. Low voltage controls shall be in conduit. Tenants that have odor-producing operations shall install a forced-draft ventilation system to maintain a negative pressure within the TenantSpace and discharge into the atmosphere via the roof area. Tenant is responsible for proper diffusion of the exhaust in such a manner as to prevent odors from entering air intakes of other ventilation systems. Installation details, weight specifications, structural reinforcing details and structural opening detail. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 37 6.1 Mechanical Design General & Technical Critera D. Duct Work the Associated Air Balancing council. Fire dampers shall be provided, as required. Hanger-wires, duct-straps, fastening devices, etc. shall be fastened to joists and/or beams above and conform to the National Mechanical Code and all ordinances and regulations having jurisdiction. Do not attach anything directly to the upper-level slab or the roof deck and furnish seismic support per the National Building Code. Tenant, at Tenant’s expense, shall enclose any required duct shafts located outside the Tenant’s space with a two(2) hour fire-rated partition. Landlord shall approve and designate the locations of any Tenant-required duct shaft located outside the demised premises. Tenant shall specify the type of duct and duct insulation used, as per NFPA standards and Landlord’s insurance carrier’s requirements. Supply and return duct work shall be insulated with a minimum of one-inch (1”) thick blanket-type insulation with a vapor barrier. Acoustical liner may be furnished, as required per NFPA standards, Landlord’s insurance carrier’s requirements and be UL rated. Flame spread shall not exceed twenty-five (25) and smoke developed shall not exceed fifty (50). Air distribution supply registers and/or diffusers shall be designed and specified for 50-fpm terminal velocity. Tenant is not allowed to remove exterior insulation from Landlord’s main duct. comply with N.F.P.A. #96 requirements. Access doors are required and are to be on the vertical face of the horizontal run, at the bottom of the vertical riser and/or as required by Code. Automatic and manual devices for shutting down fuel or power supply shall be furnished. A range exhaust hood shall be fabricated in accordance with all codes and shall be at least sixteen- (16) gauge or heavier stainless steel, with all joints welded. Equipment schedules, including air-handling units, condensing units, roof units, exhaust fans, air devices (diffusers, registers and grilles) and any other equipment used, including manufacturers’ name and number. Kitchen range hood exhaust ducts shall be insulated with fire-rated-type insulation or rated chase per NFPA standards, Landlord’s insurance carrier’s requirements and be UL rated, at specified heat temperature design. Please provide complete specification of type of insulation on the submittal drawings. Heating, cooling and ventilation load calculations. Tenant shall not use the plenum space above ceilings for a return air plenum. All return air above the ceilings shall be ducted. Hoods and exhaust systems for food processing shall be protected by a chemical extinguishing system, as required by Code, installed in accordance with all the requirements of the jurisdictional authorities and Landlord’s insurance carrier. All systems shall be integrated with fire/life safety systems and be furnished with access panels, as required or written approval from the Landlord. All duct work shall be fabricated from galvanized sheet metal, stainless steel or black steel in accordance with the standards of American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) and Sheet Metal and Air Conditioning Contractors National Association (SMACNA) for low pressure, low velocity duct work. Flexible metal duct work shall be allowed only in branch ducts, in a length not to exceed five feet (5’-0”). Plastic liner duct work with internal wire reinforcement is not permitted. Food Service: Additional Requirements Mechanical Drawing Requirements The Tenant is responsible for providing their own grease exhaust units(s) and all necessary duct work in accordance with the current BOCA / NMC and all local jurisdictions having authority. Tenant shall submit HVAC plans, prepared by a licensed mechanical engineer, for Landlord’s review and approval. Contractor and/or equipment supplier drawings shall not be permitted. All roof top equipment locations must have prior written approval from Landlord. Tenant’s HVAC drawings shall consist of, but not be limited to, the following: All distribution ducts are to be per SMACNA low velocity standards and details, including insulated supply air distribution to all supply diffusers. (Maximum 1,200 FPM duct velocity.) Flexible ducts are to be used only for termination of duct run to ceiling device and shall not exceed six feet (6’-0”) in length. All roof-mounted kitchen exhaust fans that handle a grease discharge shall have a grease catch pan and gutter. Ducts shall be welded sixteen- (16) gauge metal wrapped with grease duct wrap. A rated shaft will not be provided. Floor plan and/or reflected ceiling plan at one-quarter inch (¼”) scale or larger, including all duct work, exhaust systems, hoods, piping and equipment. All air conditioning duct work systems shall be designed as low velocity (under 1500 fpm) and low pressure (under 2” water gauge). Grease exhaust duct shall be designed with velocity between 1500 fpm to 2500 fpm. Branches from main low-velocity trunk duct work shall be furnished with splitters, dampers or similar balancing devices in accordance with the standards of SMACNA and 38 No combustible materials of any type can be allowed above suspended ceilings. Tenants who specify the use of a rooftop centrifugal exhaust fan for their cooking facilities shall provide proper clearance between the exhauster and the roof. All cooking-exhaust ducts shall be seamlessly welded and We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia Complete details sufficient for construction. Material and equipment specifications. Partial roof plan, if applicable, including location of roofmounted installations and roof penetration details. Schematic diagram of the HVAC system controls, including all fire/smoke detection and alarm devices with all manufactures’ model numbers indicated. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 39 6.2 Electric/Telephone Design General & Technical Critera 6.2 Electrical/Telephone Design General and Technical Criteria Tenant shall extend Landlord’s conduit, as needed, within the Tenant Space to Tenant’s main disconnect switch, System Design transformer and/or panel board. rack shall be provided 3/4” conduit from the rear of tenant’s premises to the service corridor. Landlord shall furnish a main electrical switch at a central distribution point located within Landlord’s main electrical room. Tenant shall design and install an electrical/telephone system to serve the Tenant Space, based on 277/480 volt, 3-phase, 4-wire system. Tenant Work: General Requirements Landlord Work: A. Tenants shall provide the following Landlord shall provide, for Tenant electrical service connection, a service entrance equipment area, located outside the Tenant Space, with main distribution and/or modular metering equipment. Landlord shall provide 100amp, 200amp and 400amp fuse disconnects for Tenants use at Landlord’s main metering sections at Tenant’s expense. Landlord shall furnish either 1-1/2”, 2-1/2” or 4” service conduit from Landlord’s service area to a location within Tenant’s Demised Premises as determined by Landlord. If Tenant requires a different size main electrical switch or service conduits, Landlord may furnish same, if available, at Tenant’s expense. Tenant’s electrical engineer shall notify Landlord in writing of any switch or conduit size requirements of Tenant that are larger than those existing prior to plan submittal. Landlord shall provide main telephone terminal board at a location outside the Tenant Space, selected by Landlord, for Tenant connection to telephone service. Apply for a meter to the local utility company and as directed by Landlord. Extend, as required within the Demised Premises, the electrical service conduit to Tenant’s main disconnect switch or main circuit breaker equipped panel board. Four (4) properly sized copper conductors from Landlord meter section, through the Landlord conduit to the Tenant’s main disconnect device within the Tenant Space. Tenant’s electrical system shall be designed in accordance with Landlord’s criteria as outlined in this manual, the latest adopted editions of the NEC and the requirements of all local authorities having jurisdiction. Materials, electrical products and equipment, including all components shall be new and appear on the Underwriters Laboratories list of approved items. Tenant shall install all electrical work necessary for a complete electrical distribution system within the premises, including, without limitation, transformers, electrical panels, and disconnect switches. Landlord shall furnish a common communications line rack in the service corridor behind Tenant’s Demised Premises for telephone system lines and data lines. Tenants that do not have direct access to the communications 40 B. Conduit & Wires We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia Tenant shall install feeder wires through the main electrical service conduit and make the final connections to the main electrical breaker located at the meter section distribution point. Tenant shall coordinate with Landlord’s electrical contractor. All main feeder wires from the main electrical meter section breaker shall be sized to meet the minimum capacity of Tenant’s main electrical switch with the minimum main feeder size to be #3 copper wire. Main service feeders, as a minimum, shall be treated for the sum of all loads, plus twenty-five percent (25%) spare capacity. Branch circuits connected loads shall not exceed eighty percent (80%) of rated capacity. tubing. Water tight fittings shall be used where required by code. Conduit hangers, clamps, light fixture supports, etc shall be fastened to bar joists or beams. No attachment or support from any roof deck is allowed. Exposed conduits shall be in straight lines parallel with or at right angles to column lines or beams and separated at least six inches (6”) form water or gas lines, wherever they run alongside or across such lines. Flexible metal conduit shall be used only for connections inside casework and as the final connection. Four feet (4’-0”) maximum length and minimum one-half inch (½”) electrical trade size to recessed fixtures or motors and electrical equipment that may generate vibration through the conduit system. No BX, AC, or Romex type wiring can be allowed. Furnish liquid-tight flexible conduits for outdoor installations and floor boxes shall be water tight with cast threaded conduit hubs. Minimum circuit wire size shall be #12 AWG, excluding control wiring. All main and branch circuitry wiring shall be copper. All wiring is to have 600-volt insulation, Type TW, THW, THWN or THHN for main feeders. All wiring shall be color coded per NEC. Same color shall identify same phase Pull boxes or junction boxes are required to be of minimum twelve-(12) gauge galvanized steel. Boxes in walls shall be galvanized pressed steel or cast metal. Caulk around boxes to eliminate noise transmission. through out the system. The electrical system serving the Tenant Space shall be grounded in accordance with the latest requirements of the NEC. System shall be grounded to the main cold water pipe Panel connected loads within the Tenant Space and main feeder conductors (from Landlord meter section to panel) shall be balanced within plus or minus ten percent (10%) across all phases. All conduits shall be concealed in finished areas. Minimum conduit shall be one-half inch (½”) trade size. Conduit concealed in slab that shall be three-quarter inch (¾”) trade size. No conduit shall allowed to be installed in the slab unless absolutely necessary. All wiring shall be installed in conduit. Conduit shall be galvanized steel, rigid heavy wall or electrical metallic in the Demised Premises. Ground fault circuit interrupters shall be installed in branch circuits, where required by code. Prior to making any conduit, pipe or duct-roof penetration and/or positioning any equipment on the roof, all the proposed locations and/or penetrations shall match locations, as indicated on the Landlord-approved plans and be approved by Landlord’s on-site representative. All roof penetrations made by Tenant’s general contractor shall be subject to Landlord’s approval as to location and construction details. Weatherproofing, of any Installation, shall be performed by Landlord’s authorized roofing contractor. Tenant’s general contractor shall pay all costs directly to such roofing contractor. C. Electrical Panels As required, provide lock-on devices on panel circuit breakers for exit and emergency light and fire/smoke alarm system. Panel connected loads within the demised premises and main feeder conductors from Landlord’s meter section to panel must be balanced within plus or minus 10% across all phases. Lighting panel boards shall be of the three-phase, four-wire circuit breaker type. Cabinets shall be constructed of codegauge steel, having not less than four-inch (4”) gutter space on all sides. Doors shall be hinged with keyed cylinder locks and all locks shall be keyed alike. Circuit breakers shall be the thermal magnetic type with molded case with all two (2) and three (3) pole breakers of the common handle type. Distribution panels shall be of the convertible type utilizing automatic circuit breakers or fusible disconnect switches that shall be furnished with current limiting fuses. Tenant shall be required to install a main circuit breaker or manual disconnects. Lighting panels shall have quick-lag molded case breakers bolted to buss. Half-size or tandem breakers or plug-ins shall not be allowed. Distribution panels shall be either fusibletype (with quick-make, quick-break interrupter switches) or molded case breaker-type. Furnish a complete typewritten identification directory card for all main and branch circuits in the panel door. D. Misc. Items Transformers may not be suspended from the structure and are to be floor mounted. Dry type transformers shall be class H rated, 480 volt primary to 120/208 volt, three-phase, four-wire secondary capacity adequate to service Tenant’s requirements. Noise level is limited to a maximum of fifty (50) DB average, measured at a distance of one foot (1’0”) form the case, per NEMA Publication No. TR-1-1960 or latest revision thereof. The electrical system serving the Premises shall be grounded in accordance with the latest requirements of the NEC. System shall be grounded to the main cold water pipe in the Demised Premises. As required by governing codes, furnish Self-contained, battery pack emergency lighting and exit signs throughout the demised Premises. Motors ½ HP or less shall be 120 volts, single phase. Motors ¾ HP or more shall be 208 volts or 480 volts, 3 phase or 277 volt 1 phase. Manual or magnetic starters, switches, contacts, relays, time switches, safety devices and other controls shall be commercial-type with heavy-duty ratings and shall be installed in strict conformance with the manufacturer’s recommendations and applicable codes. Manual switches used as equipment disconnects shall have over-load protection. Tenants are required to utilize electric hot water heaters for domestic hot water and electric heaters for space heating. Engraved phenolic nameplates are required on distribution panels, motor starters, lighting panels and push button stations, etc. Provide weatherproof disconnect switch and 120 volt duplex service outlet on the roof-mounted HVAC unit. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 41 6.2 Electric/Telephone Design General & Technical Criteria All devices and equipment in finished areas shall be flush mounted, where possible. No lighting can be installed outside the Tenant Space, in the common area and/or ceiling for storefront lighting or sign illumination. Tenant’s general contractor shall be required to provide temporary weatherproofing for all roof penetrations until Landlord’s roofing contractor has made the final patch. Tenant’s electrical contractor shall furnish an identification nameplate on Tenant’s main disconnect switch in Landlord’s meter section. Nameplates shall be one-eighth inch (1/8”) thick plastic, black on white and etched letters. The minimum size shall be one inch (1”) with only the Tenant’s space number engraved on such, permanently affixed. Tenant shall make application to the local utility for meter and metered electrical service. Tenant shall comply with all the local utility’s guidelines. Tenant shall provide and install complete telephone service support facilities as required by the serving Telephone Company. All Tenant telephone equipment is to be contained within the Tenant’s space. Tenant shall furnish a telephone backboard, a 120-volt, 20 amp duplex outlet on a separate circuit. Tenant shall make application to the serving Telephone Company for service and shall comply with their requirements. Tenant’s telephone equipment is not permitted in Landlord’s telephone equipment room. Tenant shall install a local audible smoke alarm in their storage, preparation and sales area hard wired to Tenant’s electrical system and shall furnish any other alarm system as may be required by any local governmental authority. Tenant’s HVAC system shall be powered off Tenant’s electrical distribution system. Tenant shall provide all power and control wiring, including final connection. System shall be connected to Landlord’s Central Fire Alarm System. 42 Tenant shall connect to Mall Fire Alarm System for complete monitoring. Tenant shall provide all necessary parts and labor as required. Tenant shall engage in the services of Landlord’s required Fire Alarm contractor to make all final connects to Landlord’s Fire Alarm System. Drawing Requirements Tenant’s electrical drawings shall consist of, but not limited to, the following: Electrical floor plan at one-quarter inch (¼”) scale or larger (for power). Reflected ceiling plan at one-quarter inch (¼”) scale or larger (for lighting). Electrical riser diagram, including type and size of feeders, fuses, disconnect switches and main breakers. Electrical panel(s) schedule, including circuit breaker sizes and all connected load calculations. Lighting fixture schedule, including type, lamps, mounting, wattage’s, quantities and manufacturers catalog number. Fire/smoke alarm system controls and inter-connections. HVAC control schematic details. Electrical load summary, including all connected and demand load calculations. Voltage drop, based on actual loads, shall be indicated on the one line riser diagram for all feeders, sub-feeders, per NEC. Equipment and materials specifications. Smoke exhaust fan control and connection details. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia Working Drawing Design and Coordination The following items shall be noted on Tenant’s plan, for clarification: appropriate coats of pre-treatment primer prior to the final coat. Final coat of the roof matching color shall be approved by Landlord. Prior to making any pipe or duct roof penetration and/or positioning of any equipment on the roof, all the proposed locations and/or penetrations shall match locations as indicated on Landlord-approved plans and approved by Landlord’s construction field coordinator. No roof work of any kind can be performed prior to an on-site meeting with the Tenant Construction Coordinator. Any required roof penetrations shall be performed in coordinator with Landlord’s roofing contractor, as outlined in HVAC Design and Construction Criteria. Tenant’s general contractor shall be required to furnish temporary weatherproofing for all roof penetrations, until Landlord’s roofing contractor has made the final patch. Tenant’s general contractor shall provide a fire watch whenever any welding is done within the Tenant Space. The person performing the fire watch shall remain in the Demised Premises for at lest one (1) hour after the completion of any welding. All roof and slab penetrations made by Tenant’s general contractor shall conform to Landlord’s standard criteria and shall be subject to Landlord’s approval as to location and construction details. Weatherproofing of any roof penetrations required by Tenant shall be performed by Landlord’s authorized roofing contractor. Tenant’s general contractor shall pay all such costs, therefore, directly to such roofing contractor upon their demand. Any failure to follow this procedure, and any damages resulting therefrom, shall be at the Tenant’s sole cost and expense. All pipes penetrating and/or located on the roof shall be painted to match the color of the existing roof. Use the We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 43 6.3 Plumbing Design General & Technical Criteria 6.3 Plumbing Design General and Technical Criteria SYSTEM DESIGN Tenant shall design and develop a complete plumbing system with all the necessary facilities to serve the Demised Premises. Landlord Work At Landlord’s option, a cold water service distribution system and valved outlet connection shall be provided for Tenant’s Space. The outlet shall be valved, sized and placed at a location determined by Landlord. At Landlord’s option, a sanitary sewer service main line and four-inch (4”) plugged (Y) connection shall be provided for the Demised Premised, at a location and invert elevation selected by Landlord. At Landlord’s option, a sanitary vent service main line and two-inch (2”) plugged (T) connection shall be installed at a location and elevation selected by Landlord. Tenant shall extend its service from tenant’s premises to the connection location. At Landlord’s option for food court tenants, a gas manifold shall be installed at a remote location as determined by Landlord for Food Court Tenants connection. Landlord shall provide a predetermined route for which tenant shall install its gas piping and gas meter. Landlord shall reserve the right to install Tenant’s gas piping for Tenant at Tenant’s sole cost; such cost shall be reimbursed to Landlord prior to the start of Tenant’s construction. 44 Tenant Work: General Requirements shall be at Tenant’s sole risk and expense. accordance with all given requirements. Tenant shall connect to and extend all piping from the existing location, all-sanitary sewer, domestic water and sanitary vent piping to the necessary location within the Leased Premises. All work shall comply with the latest edition of the Uniform Plumbing Code with San Jose County Amendments and all other codes as may be applicable within this jurisdiction. All roof and slab penetrations made by Tenant are subject to Landlord’s approval as to location and construction details. Weatherproofing of any roof penetrations shall be performed by Landlord’s authorized roofing contractor and/ or water-proofing contractor. Tenant’s contractor shall pay for all costs therefore, directly to such roofing contractor. The water meter and assembly shall be located at the rear portion of the Tenant Space in a readily accessible and readable location, at a maximum forty-eight inches (48”) above the finished floor. Tenants shall saw cut all slab penetrations and ensure that they are properly sealed and remain watertight. Provide penetrations as small as possible to minimize effect on structural systems and/or components. Penetrations greater than 12” in diameter shall be engineered by Tenant’s Structural Engineering, including steel supports as necessary and as detailed in Landlord’s Base Building Structural Drawings. Tenant Work: General Requirements Tenant shall connect to and extend all piping from the existing location, all-sanitary sewer, domestic water and sanitary vent piping to the necessary location within the Leased Premises. All work shall comply with the latest edition of the Uniform Plumbing Code with San Jose County Amendments and all other codes as may be applicable within this jurisdiction. All piping, clamps, supports, etc. shall be fastened to joists or beams. Do not attach anything directly to the deck, ceiling system or duct work above. Furnish seismic support in compliance with all applicable codes. Shutoff valves shall be provided at all connections to fixtures. Tenant shall provide steel sleeves when passing pipe through concrete slabs or wall sections. All materials shall be new and of commercial grade and bare underwriter’s label(s), where such labeling applies. All penetrations in roof and ceiling to be fire caulked. The entire installation shall be performed by a licensed plumbing contractor in a first-class, workman-like manner. A. Domestic Water Tenants shall saw cut all slab penetrations and ensure that they are properly sealed and remain watertight. Provide penetrations as small as possible to minimize effect on structural systems and/or components. Penetrations greater than 12” in diameter shall be engineered by Tenant’s Structural Engineering, including steel supports as necessary and as detailed in Landlord’s Base Building Structural Drawings. All cold and hot water piping shall be-type “L” seamless hard-drawn copper tubing above ground and type “K” below ground and be in conformance with ASTM B88-48. Fittings are required to be wrought, suitable for 200 psi. Connections to dissimilar materials shall be made with dielectric unions. Tenant shall ensure that all slab penetrations within the Tenant Space (and through the roof) are properly sealed and remain water tight to prevent possible water leakage and/or damage. Any damages caused from failure to do so Connect to the existing valved outlet, as provided by Landlord, extend piping as required and furnish a water meter (registering in gallons), pressure regulator, ground jumper wire and all further installations and connections, in We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia For cold water service Tenant shall: Tenant shall provide and install an electric domestic hotwater heater supported from the floor or on a platform with an ASME-approved temperature and pressure relief valve. Discharge from said hot-water heater temperature and pressure relief valve shall be piped to a floor drain. At Tenant’s option, instantaneous water heaters may be used. Tenant shall furnish drip pans under all water heaters (located above the floor) with a drain piped to the floor drain. Hot water Temperature and Pressure Relief (T&P) Valve options: T & P valve drain line can terminate into mop sink, floor sink or other approved Building Department locations. But not into a floor drain. Hot water heater can set and discharge into, a sealed sheet metal pan. Pan shall have drain line to a “Y” tail section of lavatory waste pipe, as approved by the Plumbing Inspections Department. Hot water heater shall be installed inside a water tight sheet metal pan and T&P drain shall run into the sealed sheet metal pan. Pan shall have drain line into a tailpiece section of lavatory or sink waste pipe or as approved by the Plumbing Inspections Department. B. Sanitary Lines and Vent Piping The design shall comply with all governing codes. Low flow water closets, urinals, lavatories and sinks, etc, as approved by the Plumbing Inspections Department, are to be used. Tenant shall provide floor or wall clean-outs at every fifty foot (50’-0”) (minimum) length of sanitary piping, at the most remote end of each sanitary sewer branch and at each change of direction of the waste line that is greater than forty-five (45) degrees. Ready access to the clean out shall be furnished. No clean-out access shall be located within the Tenant below’s space. Natural gas service may be available for restaurant Tenants for gas-fired cooking, as directed and approved by Landlord. Tenant shall notify Landlord of such requirement(s) during or prior to the Preliminary Plan submission. If available and approved, Tenant shall indicate (on Tenant’s final drawings) the complete design, including the load calculations of the gas system in the Demised Premises. Three-inch (3”) floor drains are required in high water prone areas. The entire piping system and equipment or fixtures shall be furnished with automatic and manual shut-off devices/ controls and color-coded or identified as such, as required. Deep Seal Traps shall be on all fixtures, except those with integral traps. Trap primer shall be provided. Cast iron grease traps, hair interceptors, and /or chemically treated grease traps as required by code and Landlord for use in Tenant’s food processing, product processing, hair styling or pet stores, shall be procured and installed by Tenant in accordance with code within Tenant’s Premises. All underground sanitary and vent piping shall be serviceweight cast-iron, with fittings of the same weight as pipe. All above ground sanitary piping shall be service-weight castiron, with fittings of the same weight as the pipe. C. Gas Piping Landlord reserves the right to deny gas service. Tenant shall provide and install all gas piping from Landlord’s gas manifold to Tenant’s space in a routing as determined by Landlord. Tenant shall submit load requirements to the local Gas Company for approval. Tenant shall, at Tenant’s sole expense, arrange with the utility company for service to Tenant’s premises from the gas service meter area designed on drawings. All gas regulating and metering facilities and all gas piping from the service meter to the gas fired equipment within the premises is a Tenant’s sole cost and expense. Tenant shall arrange with the local utility company for gas service to the Tenant Space, comply with their requirements for metering and service and extend main pipe (properly sized) from the multi-meter manifold area (if available) located outside the Demised Premises. The complete routing and installation of the piping shall be at Tenant’s sole cost and expense All gas piping shall be by Tenant and shall be schedule 40 black steel, ASTM A120 with 150 lb. banded Malleable iron screwed fittings and in compliance with all governing codes and requirements of the utility company, as it relates to piping and equipment installation and testing methods and procedures. D. Food Court / Food Service Additional Requirements Landlord shall provide for tenant’s use a grease interception common to all landlord and the cost amortized to the tenants as cam. A four-inches(4”) waste line shall be provided to the space by landlord. The interceptors shall be maintained and cleaned regularly by the food court tenants. The Tenants serving soft drinks, juices, alcoholic beverages or any corrosive liquid shall use “Durion” piping for all below-floor waste lines. Soft drink chases shall be installed within Tenant’s premises only. Soda line chase installation within other Tenant’s area We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 45 6.4 Fire and Life Safety General & Technical Criteria or within demising walls will not be allowed. Working Drawing Design and Coordination 6.4 Fire & Life Safety Requirements Condensate lines for refrigeration units may not run horizontally across roof. They shall terminate at Tenant’s mop sink or approved receptor. Tenant shall be required to furnish copper condensate line. The following items shall be noted on Tenant’s plan, for clarification: System Design Tenant Work: General Requirements All piping shall be designed in accordance with NFPA #13 and installed per Landlord’s insurance carrier’s requirements. All piping shall be threaded schedule 40 black steel meeting ASTM A135. All pipefitting are required to be pressure class 175. Prior to making any pipe or duct roof penetration and/or positioning of any equipment on the roof, all the proposed locations and/or penetrations shall match locations, as indicated on the Landlord-approved plans and approved by Landlord’s construction field coordinator. Tenant shall connect a fire protection system, to either Landlord’s sprinkler main or a branch line connection to the Demised Premises, using approved mechanical fittings. Tenant shall furnish all branch piping and sprinklers required to complete the sprinkler system within the Tenant Space. Tenant shall engage in the services of a Landlord approved sprinkler contractor. A contact may be obtained from the Mall Management Office. All hangers are to be of an approved type and spaced in accordance with NFPA #13. Seismic bracing to be installed per U.B.C. Tenant sprinkler system may be valved at the connection to the Mall mains. Tenant shall attach a tamper switch and interface with the Mall’s fire alarm system. Tenant shall furnish and install a vane-type water flow detector in the main sprinkler line immediately after connection to Landlord’s main. A flow detector shall be installed, per the manufacturer’s instructions and shall be designed to detect any water flow that equals or exceeds 10 g.p.m. Detector switch mechanism shall incorporate an instantly recycling mechanical retard element with an adjustable range of 0-60 seconds. The Detector Enclosure shall be dust tight, the Switch Enclosure shall be tamper proof and the Flow Switch shall be connected to Mall fire alarm system. Plumbing Drawing Requirements Tenant’s plumbing drawings shall be submitted for Landlord approval with the Final Working Drawing submittal and shall consist of, but not be limited to, the following: Plumbing floor plan at one-quarter inch (¼”) scale or larger, including all plumbing fixtures, piping sizes, equipment locations and plumbing to Landlord’s existing system. Isometric diagram of water system’s (hot and cold) within the Tenant Space. Isometric diagram of sanitary system and venting system within the Demised Premises. All applicable details for floor drains, cleanouts, slab and roof penetrations, etc., sufficient for construction. Specifications including all materials and equipment with also the manufacturer’s name and model number. Plumbing fixture unit calculations. Schedules of all fixtures and equipment including, but not necessarily limited to, water heater, lavatory, water closet, urinals, water meter and floor drains. Isometric diagram of gas system, including all equipment locations within the Tenant Space and at the gas header and meter location placed outside the Demised Premises. All equipment is to be supported from structural members. No weight can be placed on the roofing materials or insulation. Tenant’s general contractor shall be required to furnish temporary weatherproofing of all roof penetrations, until Landlord’s roofing contractor has made the final patch. Tenant’s general contractor shall provide a fire watch and portable fire extinguisher (minimum size 2A:20BC), wherever any welding is done within the Tenant Space. The person performing the fire watch shall remain in the Demised Premises for at least one (1) hour after the completion of any welding. No roof work of any kind can be allowed prior to an on-site meeting with Westfield’s Tenant Construction Coordinator. Any required roof penetrations shall be performed in coordination with Landlord’s roofing contractor and as outlined in HVAC Design and Construction Criteria. All equipment, pipes and ducts penetrating and/or located on roof shall be painted to match color of the existing roof. Use the appropriate coats of primer pre-treatment, prior to the final coat. The final coat of the roof matching color shall be approved by Landlord. Tenant’s store space number shall be permanently stenciled on one side of the roof-mounted equipment with minimum three-inch (3”) high letters. Gas load calculations, as applicable. 46 General and Technical Criteria Tenant’s sprinkler system design shall be based upon a single source of supply, ordinary hazard pipe schedule system as outlined in NFPA pamphlet #13 and Landlord’s insurance carrier’s requirements. Hydraulically calculated sprinkler systems are required. Schedule 10 with mechanical cut grove type pipe couplings and fittings Group II Occupancy with a sprinkler density of 0.16/3000 square feet in the retail area and 0.18/3000 square feet in stock areas. All systems shall be designed to high protection risk (H.P.R.) Requirements. Landlord Work Sizing of the service main or capped branch connection is based on one sprinkler head per one hundred (100) square feet of floor area of the Demised Premises. Tenant shall modify and upgrade the system as required by the store design. Landlord shall provide either a service main or a capped branch line connection to the Demised Premises, at a location selected by Landlord. Landlord may furnish, as deemed necessary and at Tenant’s expense, a sprinkler system for the Tenant space that is in compliance with all local codes and Landlord’s insurance carrier. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia All sprinkler heads shall be quick response type, semiconcealed or fully concealed (the same brand and type as installed by Landlord in the mall common areas), ULlisted, Factory Mutual approved. Sprinklers at the Tenant demising wall must be concealed type, spaced six (6’) feet on center. Tenants sprinkler system must include a water curtain within Tenants Demised Premises along the Mall lease line and/or Tenant shall provide appropriate-type fire extinguishers storefront. in stock room areas and elsewhere throughout the Demised Premises, as required by all local authorities Tenant shall furnish an inspector’s test connection. The having jurisdiction and Landlord’s insurance carrier. Fire test connection shall be installed off the most remote extinguishers shall be furnished, as directed by the Fire sprinkler, as physically possible, from the sprinkler supply Marshal and be easily accessible. As a matter of routine main or capped outlet connection located in the Demised practice, fire extinguishers shall be serviced and inspected Premises. Inspector’s test connection shall be equipped monthly. with a one inch (1”) corrosion-resistant shut-off valve and minimum three-quarter inch (¾”) hose bib connection All materials and equipment under this section shall be with five feet (5’-0”) length of hose piped to discharge to a new and listed by Underwriters Laboratories, Inc. and suitable sanitary sewer receptor within the Tenant Space. Factory Mutual for fire protection system installation All sprinkler system tests shall be witnessed by Landlord’s and approved by all authorities having jurisdiction and Tenant Construction Coordinator and local jurisdictional governing codes. authorities, as required. All piping shall be supported from beams/joists only. Do not attach anything directly to the upper lever slab or roof deck. Fastening and/or suspension devices shall be attached to the building structure only. Final connection to Landlord’s sprinkler main shall not be made until the entire system within the Demised Premises is pressure-tested and ready for service. Tenant shall not be allowed to stock the Tenant Space until the entire sprinkler system has been inspected, approved and put in to operation. All sprinkler system tests shall be We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 47 witnessed by Landlord’s on-site representative and local jurisdictional authorities, as required. The entire installation shall be performed by a licensed sprinkler contractor in a first-class, workman-like manner. Food Court / Service: Additional Requirements All walk in coolers / freezers shall be supplied with nonfreezing sprinklers of the same brand and type as installed by Landlord in mall common areas. Tenant demised Premises with exhaust hoods, grilles, and/or cooking facilities must provide a fire extinguishing system, including an alarm system. Provide specific details of this installation on the sprinkler plans or as required of the Fire Department Regulations. Upon activation of this system all cooking equipment must shut down automatically. Drawing Requirements Tenant’s sprinkler drawings shall include, but not be limited to, the following: With final plan submission, a reflected ceiling plan at onequarter inch (¼”) scale or larger, including all sprinkler locations, pipe size and locations. Coordinator for review and approval. Sprinkler system shop drawings must be approved by the local authorities having the proper jurisdiction prior to the installation. Sprinkler system must comply with all applicable sections of the NFPA #96 pamphlet. Landlord’s Tenant Coordinator shall distribute Landlordapproved sprinkler shop drawings to the following: Sprinkler Contractor (3 copies); Landlord’s insurance carrier (2 copies); Mall Manager (1 copy) and; Tenant Construction Coordinator (2 copies). Landlord’s insurance carrier shall review the plans and forward their comments to Landlord’s Tenant Coordinator, who shall then forward the comments to the sprinkler contractor. Tenant’s sprinkler contractor shall implement any modifications as part of Tenant work. Sprinkler shop drawings must be submitted to both the city of San Jose Building Division and San Jose Fire Department for review and permit issuance. Specifications, including all details, materials and equipment. Sprinkler shop drawings, as prepared by Tenant’s sprinkler contractor, sealed by a San Jose Professional Engineer. Sprinkler Shop Drawing Submittal The Tenant’s sprinkler contractor shall submit one PDF of the sprinkler shop drawings to the Tenant Design 48 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 7.0 General Information 7.1 Tenant Submission Process Architect & Engineer Notification Within five (5) calendar days of the Tenant signature date of the Lease or earlier if required to make Tenant’s commencement date, Tenant shall notify Landlord of the identity of the licensed architect engaged by Tenant for the preparation of the drawings for Tenant’s work. Tenant or Tenant’s Architect shall immediately engage mechanical, electrical and sprinkler system engineers (and structural, if required) and notify Landlord of such, as soon as possible. All architects and engineers shall be licensed, as required by the State of California. L a n d l o r d ’s R e v i e w & Approval Landlord shall not be responsible for proper engineering, safety and design of facilities or compliance with any applicable governing codes and regulations. Said responsibility is not implied and/or inferred on the part of Landlord when drawing(s) are approved. Landlord’s drawing review and approval is only to ensure Tenant complies with Landlord’s criteria. This approval does not relieve Tenant of responsibility for: Compliance with lease documents; Field verification of dimensions and existing conditions; Discrepancies between final drawings and as-built conditions of Tenant’s space; Coordination with other trades and job conditions and/or; Compliance with any and all governing codes and regulations applicable to the Tenant’s work On-Site Inspection During all phases of drawing development and prior to bidding document and/or commencing construction, Tenant is urged to make a physical, on-site inspection of the Tenant Space or facilitate Tenant’s Architect and Engineers to do so. This shall allow the Tenant to verify the as-built location conditions and physical dimensions of the Demised Premises and the Final Working Drawings conformance to such. Failure to do so shall be at the risk and sole expense of the Tenant. Tenant’s Architect or Tenant’s Engineers shall contact the Tenant Coordination Department or Mall Management Office prior to visiting the site. Hard hats, proper footwear and dress may be required for new Mall construction. Changes After Final CD Approval Once Landlord has approved your Working Drawings, no changes shall be made to the “Final Construction Drawings” except with the prior written approval of Landlord. Landlord reserves the right to make changes in, on or about the building as may be required. In that situation, the Tenant shall be notified and shall be asked to adjust the “Final Construction Drawings” to accommodate such changes. Tenant Architect shall issue a set of the Approved Working Drawings shall be issued to the Tenant’s General Contractor for onsite reference. Submittal Procedure All sample boards and related documentation shall be submitted for review and approval to: Tenant Coordination Westfield Corporation, Inc. 11601 Wilshire Boulevard 9th Floor Los Angeles, California 90025 (310) 478-4456 Main Telephone (310) 478-1267 Main Facsimile Check with the Tenant Coordination department for submittal requirements for electronic documentation. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 49 7.1 Tenant Submission Process Concept Development – “Concept Design Submittal” Within twenty one (21) calendar days after the receipt of this design package (or less as required to meet Tenant’s commencement date), the date of the lease or in accordance with Exhibit B of the lease or earlier to make commencement date, Tenant (at Tenant’s sole cost and expense) shall cause Tenant’s Architect to coordinate, prepare and deliver the following to Landlord’s Tenant Coordinator, for approval: 1. Equipment Layout (within 7 days) A set of equipment plans shall be submitted. • One (1) complete set of PDF files. • One (1) set of equipment cut-sheets Equipment layout shall be to scale and clearly notes sizes and locations of all equipment specified by Tenant. 2. Concept Design Submittal (within 21 days) A set of concept design drawings shall be submitted and shall contain architectural plans based on the information in this Tenant Criteria Manual. Said drawings shall be submitted on the following mediums. • One (1) complete set of PDF files. • One (1) color digital rendering of Tenant proposed design. • One (1) sample bag containing all finish materials and specifications. • One (1) set of lighting cut-sheets Design drawings shall be to scale and clearly express Tenant’s design intent and include but not limited to the following: • Floor plan including equipment • Ceiling plan • Rendered front counter elevations • Tenant space section • 3-d rendering (preferred) • Signage, graphic and menu design “Sample Bag” shall include the following: • Front counter materials • Interior wall materials • Casework finish materials • Graphic/Menu materials • Signage materials 50 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia NOTE: Landlord shall notify Tenant’s Architect of the matters, if any, in that the concept development requires corrections to meet with Landlord’s approval. Within fourteen (14) calendar days upon receipt of such notice from Landlord (or less as required to meet Tenant’s commencement date), Tenant or Tenant’s Architect agrees to cause the concept design drawings to be revised in such a manner as shall obtain Landlord’s approval and shall submit revised concept design drawings to Landlord before preliminary drawings are submitted. When Landlord determines that the concept design drawings are in compliance with the design criteria and design standard, Landlord shall return one (1) set of electronicall y stamped, PDF or TIFF formatted computer file drawings, with comments, showing Westfield’s approval. The stamped Landlord-approved concept design drawings or the revised concept design drawings shall be referred to as the “Concept Design”. Design Development – “Preliminary Drawing Sumbittal” Within fourteen (14) calendar days after the receipt of Final Concept Development Approval from Landlord’s Tenant Coordinator, Tenant (at Tenant’s sole cost and expense) shall cause Tenant’s Architect to coordinate, prepare and deliver the following to Landlord’s Tenant Coordinator, for approval: 1. Sample Board One (1) sample board of all storefront and interior materials and colorings. Actual samples shall be included (photos shall not be accepted). Sample Boards shall include but not be limited to the following: • Front counter materials • Interior wall materials • Casework finish materials • Graphic/Menu material • Signage material • Ceiling treatment For expediency, it is asked that the Sample Board is identified with the Mall name, store’s name and space number, as well as each individual sample clearly identified. 2. NOTE: Tenant covenants and agrees that such preliminary drawings shall be prepared in strict accordance with this Exhibit B-1 Tenant Criteria Manual and/or any addendum. Landlord shall notify Tenant’s Architect of the matters, if any, in that the preliminary plans require corrections to meet with Landlord’s approval. Immediately upon receipt of such notice from Landlord, Tenant or Tenant’s Architect agrees to cause the preliminary drawings to be revised in such a manner as shall obtain Landlord’s approval and shall submit revised preliminary drawings to Landlord before final drawings are submitted. When Landlord determines that the preliminary drawings are in compliance with the design criteria, Landlord shall return one (1) set of electronically stamped, PDF or TIFF formatted computer file drawings, with comments, showing Westfield’s approval. The stamped Landlord-approved preliminary drawings or the revised preliminary drawings shall be referred to as the “Preliminary Plans.” Preliminary Plan Submittal A set of preliminary drawings shall be submitted and shall contain architectural plans based on the information in this Tenant Criteria Manual. Said drawings shall be submitted on the following mediums. • One (1) complete set of PDF files at full print size. • One (1) color digital rendering of Tenant proposed storefront design. Design drawings shall clearly express Tenant’s design intent and include the following: • Floor plan at ¼” = 1’- 0”; • Ceiling plan at ¼” = 1’- 0”; • Front counter elevations at 1” = 1’- 0”; • Section at 1” = 1’- 0”; • Interior elevations at ¼” = 1’- 0”; • Equipment plan at ¼” = 1’- 0”. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 51 7.1 Tenant Submission Process Construction Documents – “Final Drawing Submittal” Within twenty-one (21) calendar days after the return of the Landlord reviewed Preliminary Plans (or less as required to meet Tenant’s commencement date) Tenant (at Tenant’s sole cost and expense) shall cause Tenant’s Architect to coordinate, prepare and deliver to Westfield’s Tenant Coordinator • • • • • • • • • • • • • • • • • • • • • • • • • 52 One (1) complete set of PDF files at full size. Architectural, electrical, mechanical, plumbing, signage and sprinkler system drawings and specifications shall be included. Such plans shall be prepared in conformity with the Preliminary Plans and in strict accordance with this Tenant Criteria Manual and Tenant’s design and construction requirements. Working Drawings shall consist of, but not be limited to, the following (at minimum scales indicated): Completed “Tenant Improvement Checklist” Site Plan Vicinity Map Key Plan with location of Tenant’s Demised premises within the Mall, incl. space number Responsibility Schedule Floor Plan at ¼” = 1’- 0” Longitudinal and cross sections at ¼” = 1’- 0” Reflected ceiling plan at ¼” = 1’- 0” Front counter elevations at 1” = 1’- 0” Sections at 1” = 1’- 0” Details 1½” = 1’- 0” Interior finish and door schedule Interior Elevations at 3/8” = 1’-0” or larger. Shop drawings for signs and menu boards, including a section through the signs at ½” = 1’- 0” or larger. Equipment Plan Restroom Plan & Details confirming ADA compliance Construction Shop Drawings or catalogue cut sheets for equipment at ½” = 1’0” or larger. Plumbing Plans (see Plumbing Section) Electrical Plans (see Electrical Section). Mechanical Plans (see Mechanical Section) Code Analysis Egress Plan Wall Schedule We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia Signage Shop Drawing Submittal NOTE: Landlord shall notify Tenant’s Architect of corrections, if any, regarding construction drawings and specifications which require corrections to conform to the preliminary drawings, construction requirements, this Tenant Criteria Manual and/or other items as may be deemed relevant by Westfield’s Tenant Coordinator. Within ten (10) days after receipt of such notice from Landlord, Tenant or Tenant’s Architect shall revise final drawings in such a manner, as required, to obtain Landlord’s approval. At that time, one (1) complete set of PDF files at full size. When Landlord determines that the construction drawings and specifications conform to all relevant criteria, Landlord shall electronically stamp one (1) copy of said plans, thereby evidencing the approval of Landlord. One (1) copy of said Electronically Stamped Final Drawings shall then be returned to Tenant and/or Tenant’s Architect by Landlord. This approval is contingent upon Tenant’s requirement to follow all Landlord comments noted within the final drawings. The construction drawings and specifications or the revised final drawings and specifications shall be referred to as the “Final Construction Drawings”. Tenant shall submit: A. One (1) set of PDF formatted copy of the proposed signage during the preliminary phase, showing location, color, materials and attachment devices. Upon approval, Tenant shall furnish Landlord with one (1) set of PDF formatted copy of shop drawings, including color and materials samples prior to fabrication. Shop drawings for signage and / or menu boards shall include the following criteria: Elevation of signage at ½” = 1’ – 0” or larger Plan of signage at ½” = 1’ - 0” or larger Section through signage at ½” = 1’ – 0” or larger Detail of all attachments Resubmittals Default If Tenant fails to adequately perform any of the following items, Landlord may, at any time thereafter, give Tenant notice that Tenant is in default of its lease. Such notice will describe the nature of the Tenant’s default and will specify a date after the giving of such notice by which such default must be cured. Unless prior to such date Tenant makes the required submissions, Tenant will be deemed incur-ably in default of this lease and Landlord will be entitled to all remedies specified in the lease: • Submit to Landlord preliminary plans and final working drawings and specifications. • Submit to Landlord final approved sprinkler shop and fire alarm drawings and specifications. • Present a full set of final working drawings approved by the Landlord and endorsed with the approval stamp and permit number of the Building Department to Landlord’s Tenant Construction Superintendent, before commencement of construction. • Cause Tenant’s space to be built strictly in accordance with the final set of Landlord’s approved plans. In event that any drawing submittal requires revisions and a resubmittal, Tenant shall, within ten (10) calendar days (or less as required to meet Tenant’s commencement date), revise and resubmit to Landlord. Once Tenant drawings are approved, no changes shall be made unless approved by Landlord in writing. A set of the Landlord Approved drawings or Final Construction Drawings reflecting all Landlord comments must be onsite at all times. The tenant shall be responsible for bidding & building to the Landlord comments. We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 53 7.2 Codes & Jurisdiction Applicable Codes The following is provided as a general guide only and does not release the Tenant from complying with all applicable codes and regulations, as required by jurisdictional authorities. It shall be the Tenant’s responsibility to determine the edition of the above code or codes which are applicable (including supplements and state amendments) as codes are frequently revised and updated. Construction permit applications submitted on or after January 1, 2013, will have to comply with the new State building standards as well as approved local amendments published in the Municipal Code. Construction permit applications that are closed when a permit is not issued within one year of the initial application file date must be resubmitted as required. CALIFORNIA BUILDING CODE CALIFORNIA ELECTRICAL CODE CALIFORNIA MECHANICAL CODE CALIFORNIA PLUMBING CODE CALIFORNIA ENERGY CODE CALIFORNIA ELEVATOR SAFETY CODE CALIFORNIA HISTORICAL BUILDING CODE CALIFORNIA FIRE CODE CALIFORNIA EXISTING BUILDING CODE CALIFORNIA REFERENCED STANDARDS CODE American Disabilities Act California Title 24 All Local Ordinances Having Jurisdiction. Base Building Information 7.3 Project Directory WESTFIELD OAKRIDGE Management Office 925 “A” Blossom Hil Rd. San Jose, CA 95123-1294 Santa Clara County (408) 578-2912 Telephone (408) 578-1148 Facsimile TENANT COORDINATION Westfield Corporation, Inc. 11601 Wilshire Blvd., 12th Floor Los Angeles, CA 90025 (310) 478-4456 Telephone (310) 575-5991 Facsimile BUILDING DEPARTMENT City of San Jose 200 East Santa Clara Street San Jose, CA 95113 (408) 535-3555 Telephone FIRE DEPARTMENT Bureau of Fire Protection 200 East Santa Clara Street San Jose, CA 95113 (408) 535-3555 Telephone HEALTH DEPARTMENT Department of Public health 1555 Bear Street Suite 300 San Jose, CA 95128 (408) 299-6060 Telephone GAS & ELECTRIC SERVICE Pacific Gas & Electric Co. 111 Almaden Boulevard San Jose, CA 95191 (800) 743-5000 Telephone TELEPHONE SERVICE Pacific Bell Telephone & Telegraph 66 Willow Place Menlo Park, CA 94025 (800) 750-2355 Telephone WATER & SEWER SERVICE San Jose Water Company 374 West Santa Clara Street San Jose, CA 95196 (408) 279-7900 Telephone 8AM - 5:30PM M-F Construction Type: Existing Mall Building: V-N Fully Sprinklered New Expansion Building: II F.R. And II-N Fully Sprinklered Occupancy Type: Primary Occupancy: Group M (Merchantile) Food Court: Group A2.1 (Assembly 50 - <300 persons, without storage) Restaurant: Group A3 (Assembly >300 persons, without a stage) Kitchen: Group F-1 Office: Group B Storage:Group S-1 54 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia 55 Westfield LLC 11601 Wilshire Blvd 11th floor Los Angeles, CA 90025 T (310) 478-4456 F (310) 478-1267 www.westfield.com 56 We s t f i e l d O a k r i d g e Fo o d C o u r t C r i te r ia