Master Plan for Northern Conomo Point, April 15, 2015
Northern Conomo Point Essex, MA Phase I Master Plan 04.15.2015 PRESENT PHASE I MASTER PLAN PROGRAM PRESENT PHASE I MASTER PLAN COSTS 2 Northern Conomo Point Essex, MA Phase I Master Plan Program Goals INCREASE PUBLIC ACCESS TO WATERFRONT BY CAR, BIKE, BOAT AND FOOT INCREASE PUBLIC ACCESSIBLE OPEN SPACE PROVIDE PUBLIC SERVICE AREAS PROVIDE PUBLIC ACCESSIBLE PARKING AREAS 3 4 Copley Wolff Design Group Northern Conomo Point, Essex, MA Site A – Essex River Park Phase I Improvement Area 5 Copley Wolff Design Group Northern Conomo Point, Essex, MA $1,362,559 Site A – Essex River Park Phase I Primary Improvements Rebuild Seawall and Water Access Ramp for Kayaks/Canoes Provide Overlook and Event Area for Community Events Provide Public Facilities Building (Storage & Bathrooms) Expand Conomo Point Association Building, and Provide Parking Copley Wolff Design Group 6 Northern Conomo Point, Essex, MA Site B – The Narrows Park Phase I Improvement Area 7 Copley Wolff Design Group Northern Conomo Point, Essex, MA $815,870 Site B – The Narrows Park Phase I Primary Improvements Rebuild and Raise Seawall Provide Accessible Surface at Overlook Enhance Public Space Between Road and Seawall Provide Parking, Rebuild Boat Access Ramp and Rebuild Beach Copley Wolff Design Group 8 Northern Conomo Point, Essex, MA Site C – Front Beach Phase I Improvement Area 9 Copley Wolff Design Group Northern Conomo Point, Essex, MA $789,203 Site C – Front Beach Phase I Primary Improvements Rebuild & Relocate Seawall; Rebuild and Expand Beach Improve Piers with Accessible Docks Widen and Enhance Public Space Between Road and Seawall Copley Wolff Design Group 10 Northern Conomo Point, Essex, MA Site D – Clammer’s Beach Phase I Improvement Area 11 Copley Wolff Design Group Northern Conomo Point, Essex, MA $1,739,003 Site D – Clammer’s Beach Phase I Primary Improvements Rebuild Boat Access Ramp and Seawalls Rebuild Enlarge and Define Beach Provide Public Facilities Building and Public Overlook Provide Accessible Public Parking; Create Green Park Copley Wolff Design Group 12 Northern Conomo Point, Essex, MA $1,362,559 Site A – Essex River Park $815,870 Site B – The Narrows Park $789,203 $1,739,003 Site C – Front Beach Site D – Clammer’s Beach Total Phase I Improvements = $4,706,634 Copley Wolff Design Group 13 Northern Conomo Point, Essex, MA NORTHERN CONOMO POINT MASTER PLAN PHASE I Phase I 2015 Master Plan Existing Conditions Inventory 15 Copley Wolff Design Group Northern Conomo Point, Essex, MA Northern Conomo Existing Open Space Inventory Copley Wolff Design Group 16 Northern Conomo Point, Essex, MA 2015 Phase I Master Plan Northern Conomo Point Proposed Open Space Copley Wolff Design Group 17 Northern Conomo Point, Essex, MA STONE SEAWALL STONE SEAWALL STONE SEAWALL CONCRETE SEAWALL STONE SEAWALL STONE SEAWALL Existing Seawall Inventory Copley Wolff Design Group 18 Northern Conomo Point, Essex, MA OVERLOOK AREA BUILDINGS BOAT RAMP STONE PIER & BEACHES INACCESSIBLE PIER PROMENADE CPA BUILDING REBUILD BOAT RAMP STORAGE BUILDINGS PARKING BEACH AREA ENTRANCE ROAD Copley Wolff Design Group Existing Conditions Inventory 19 Northern Conomo Point, Essex, MA NORTHERN CONOMO POINT MASTER PLAN PHASE I Phase I 2015 Master Plan Program Improvements COMMUNITY LAWN Copley Wolff Design Group DECK OVERLOOK SEAWALL REPAIR RIP-RAP REPAIR BOAT RAMP BOULDER EDGE PUBLIC FACILITY 20 Northern Conomo Point, Essex, MA Northern Conomo Point Proposed Master Plan Program Copley Wolff Design Group 21 Northern Conomo Point, Essex, MA Site A – Essex River Park Proposed Program Copley Wolff Design Group 22 Northern Conomo Point, Essex, MA Copley Wolff Design Group Site B – The Narrows Park Proposed Program 23 Northern Conomo Point, Essex, MA Copley Wolff Design Group Site C – Front Beach Proposed Program 24 Northern Conomo Point, Essex, MA Copley Wolff Design Group Site D – Clammer’s Beach Proposed Program 25 Northern Conomo Point, Essex, MA NORTHERN CONOMO POINT NEAR TERM IMPROVEMENTS PLAN Phase I 2015 Master Plan – Cost Estimate 26 Copley Wolff Design Group Northern Conomo Point, Essex, MA PHASE I MASTER PLAN – COST ESTIMATE – AREA A – ESSEX RIVER PARK Site A - ESSEX RIVER PARK ITEM General Site Demolition Remove Existing Structures (6) Deck overlook Concrete Paving Sloped Granite Curb Seawall - Repair Concrete Wall Seawall - Repair Stone Wall Public Facilities Building* Conomo Point Association Structured Lawn - Event Parking Permeable Paved Parking Area* Rebuild Boat (Kayak) Ramp New Lawn QUANTITY UNIT 38,290 5,118 1,300 3,500 920 400 500 1 1 7,200 9,275 500 5,000 SF SF SF SF LF LF LF EA EA SF SF SF SF UNIT PRICE ITEM TOTAL $1.00 $5.00 $27.00 $8.00 $35.00 $225.00 $275.00 $75,000.00 $100,000.00 $13.00 $18.00 $25.00 $5.00 $38,290.00 $25,590.00 $35,100.00 $28,000.00 $32,200.00 $90,000.00 $137,500.00 $75,000.00 $100,000.00 $93,600.00 $166,950.00 $12,500.00 $25,000.00 *Does not include survey, drainage substructures or utility hookups Sub Total 15% Contingency **Permitting 10% Design Site A Essex River Park - Total $859,730 $128,960 $250,000 $123,869 $1,362,559 27 Copley Wolff Design Group Northern Conomo Point, Essex, MA PHASE I MASTER PLAN – COST ESTIMATE – SITE B – THE NARROWS PARK SITE B - THE NARROWS PARK ITEM General Site Demolition Concrete Paving Sloped Granite Curb Seawall - Rebuild and Raise Stone Wall Seawall - Rebuild Stone Wall Replenish Beach Permeable Paved Parking Area* Rebuild Seasonal Boat Ramp New Lawn QUANTITY UNIT 37,020 5,250 405 175 388 330 5,980 950 4,200 SF SF LF LF LF CY SF SF SF UNIT PRICE ITEM TOTAL $1.00 $8.00 $35.00 $400.00 $275.00 $16.00 $18.00 $25.00 $5.00 $37,020.00 $42,000.00 $14,175.00 $70,000.00 $106,700.00 $5,280.00 $107,640.00 $23,750.00 $21,000.00 *Does not include survey, drainage substructures, or utility hookups Sub Total 15% Contingency **Permitting 10% Design Site B The Narrows Park - Total Sites A-B Sub-Total 15% Contingency Sites A-B Phase I Improvements - Total $427,565 $64,135 $250,000 $74,170 $815,870 $1,287,295 $193,094 $1,480,389 28 Copley Wolff Design Group Northern Conomo Point, Essex, MA PHASE I MASTER PLAN – COST ESTIMATE – SITE C – FRONT BEACH SITE C - FRONT BEACH ITEM General Site Demolition Deck overlook Concrete Paving Sloped Granite Curb Seawall - Widen and Rebuild Stone Wall Seawall - Repair Stone Wall Rebuild Stone Pier Replace Stone (Farnsworth) Pier with Wood Pier Re-seed Lawn - Between Lots 130 & 134 New Lawn Replenish Beach QUANTITY UNIT UNIT PRICE ITEM TOTAL 23,719 1,200 350 480 230 250 950 SF SF SF LF LF LF SF $1.00 $27.00 $8.00 $35.00 $425.00 $275.00 $95.00 $23,719.00 $32,400.00 $2,800.00 $16,800.00 $97,750.00 $68,750.00 $90,250.00 1,245 4,800 7,200 425 SF SF SF CY $27.00 $1.00 $4.00 $16.00 $33,615.00 $4,800.00 $28,800.00 $6,800.00 *Does not include survey, drainage substructures or utility hookups Sub Total 15% Contingency **Permitting 10% Design $406,484 $60,973 $250,000 $71,746 $789,203 Site A-C Subtotal 15% Contingency $1,693,779 $254,067 $1,947,846 Site C Front Beach - Total Sites A-C Phase I Improvements - Total 29 Copley Wolff Design Group Northern Conomo Point, Essex, MA PHASE I MASTER PLAN – COST ESTIMATE – SITE D – CLAMMER’S BEACH SITE D - CLAMMER'S BEACH ITEM General Site Demolition Remove Existing Structures (3) Concrete Paving - Exposed Aggregate Sloped Granite Curb Seawall - Rebuild Stone Wall Seawall - New Stone Wall New Stone Seat Walls Public Facilities Building* New Lawn Bituminous Concrete Parking Area Rebuild Boat Ramp Replenish & Expand Beach Permeable Paving at Conomo Point Road* Green Park at Beach Circle Public Pier and Ramp Screen Buffer Cedar Fence QUANTITY UNIT 56,300 2,825 8,800 920 270 110 270 1 1,200 1,650 5,425 13,150 6,530 6,050 850 115 SF SF SF LF LF LF LF EA SF SF SF CY SF SF SF LF UNIT PRICE $1.00 $5.00 $12.00 $35.00 $275.00 $500.00 $225.00 $100,000.00 $10.00 $15.00 $25.00 $16.00 $18.00 $18.00 $35.00 $175.00 ITEM TOTAL $56,300.00 $14,125.00 $105,600.00 $32,200.00 $74,250.00 $55,000.00 $60,750.00 $100,000.00 $12,000.00 $24,750.00 $135,625.00 $210,400.00 $117,540.00 $108,900.00 $29,750.00 $20,125.00 *Does not include survey, drainage substructures or utility hookups Sub Total 15% Contingency **Permitting 10% Design $1,157,315 $173,597 $250,000 $158,091 $1,739,003 Sites A-D Sub-Total 15% Contingency **Permitting 10% Design $2,851,094 $427,664 $1,000,000 $427,876 $4,706,634 Site D Clammer's Beach - Total Sites A-D Phase I Improvements - Total **Permitting costs are shown as a place holder and will likely be less Copley Wolff Design Group 30 Northern Conomo Point, Essex, MA