PRESENT PHASE I MASTER PLAN PROGRAM

PRESENT PHASE I MASTER PLAN COSTS
2
Northern Conomo Point Essex, MA
Phase I Master Plan Program Goals

INCREASE PUBLIC ACCESS TO WATERFRONT
BY CAR, BIKE, BOAT AND FOOT

INCREASE PUBLIC ACCESSIBLE OPEN SPACE

PROVIDE PUBLIC SERVICE AREAS

PROVIDE PUBLIC ACCESSIBLE PARKING AREAS
3
4
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
Site A – Essex River Park Phase I Improvement Area
5
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
$1,362,559
Site A – Essex River Park Phase I Primary Improvements
 Rebuild Seawall and Water Access Ramp for Kayaks/Canoes
 Provide Overlook and Event Area for Community Events
 Provide Public Facilities Building (Storage & Bathrooms)
 Expand Conomo Point Association Building, and Provide Parking
Copley Wolff Design Group
6
Northern Conomo Point, Essex, MA
Site B – The Narrows Park Phase I Improvement Area
7
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
$815,870
Site B – The Narrows Park Phase I Primary Improvements
 Rebuild and Raise Seawall
 Provide Accessible Surface at Overlook
 Enhance Public Space Between Road and Seawall
 Provide Parking, Rebuild Boat Access Ramp and Rebuild Beach
Copley Wolff Design Group
8
Northern Conomo Point, Essex, MA
Site C – Front Beach Phase I Improvement Area
9
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
$789,203
Site C – Front Beach Phase I Primary Improvements
 Rebuild & Relocate Seawall; Rebuild and Expand Beach
 Improve Piers with Accessible Docks
 Widen and Enhance Public Space Between Road and Seawall
Copley Wolff Design Group
10
Northern Conomo Point, Essex, MA
Site D – Clammer’s Beach Phase I Improvement Area
11
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
$1,739,003
Site D – Clammer’s Beach Phase I Primary Improvements
 Rebuild Boat Access Ramp and Seawalls
 Rebuild Enlarge and Define Beach
 Provide Public Facilities Building and Public Overlook
 Provide Accessible Public Parking; Create Green Park
Copley Wolff Design Group
12
Northern Conomo Point, Essex, MA
$1,362,559
Site A – Essex River Park
$815,870
Site B – The Narrows Park
$789,203
$1,739,003
Site C – Front Beach
Site D – Clammer’s Beach
Total Phase I Improvements = $4,706,634
Copley Wolff Design Group
13
Northern Conomo Point, Essex, MA
NORTHERN CONOMO POINT MASTER PLAN PHASE I
Phase I 2015 Master Plan Existing Conditions Inventory
15
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
Northern Conomo Existing Open Space Inventory
Copley Wolff Design Group
16
Northern Conomo Point, Essex, MA
2015 Phase I Master Plan Northern Conomo Point Proposed Open Space
Copley Wolff Design Group
17
Northern Conomo Point, Essex, MA
STONE SEAWALL
STONE SEAWALL
STONE SEAWALL
CONCRETE SEAWALL
STONE SEAWALL
STONE SEAWALL
Existing Seawall Inventory
Copley Wolff Design Group
18
Northern Conomo Point, Essex, MA
OVERLOOK AREA BUILDINGS
BOAT RAMP
STONE PIER & BEACHES
INACCESSIBLE PIER
PROMENADE
CPA BUILDING
REBUILD BOAT RAMP
STORAGE BUILDINGS
PARKING
BEACH AREA
ENTRANCE ROAD
Copley Wolff Design Group
Existing Conditions Inventory
19
Northern Conomo Point, Essex, MA
NORTHERN CONOMO POINT MASTER PLAN PHASE I
Phase I 2015 Master Plan Program Improvements
COMMUNITY LAWN
Copley Wolff Design Group
DECK OVERLOOK
SEAWALL REPAIR
RIP-RAP REPAIR
BOAT RAMP
BOULDER EDGE
PUBLIC FACILITY
20
Northern Conomo Point, Essex, MA
Northern Conomo Point Proposed Master Plan Program
Copley Wolff Design Group
21
Northern Conomo Point, Essex, MA
Site A – Essex River Park Proposed Program
Copley Wolff Design Group
22
Northern Conomo Point, Essex, MA
Copley Wolff Design Group
Site B – The Narrows Park Proposed Program
23
Northern Conomo Point, Essex, MA
Copley Wolff Design Group
Site C – Front Beach Proposed Program
24
Northern Conomo Point, Essex, MA
Copley Wolff Design Group
Site D – Clammer’s Beach Proposed Program
25
Northern Conomo Point, Essex, MA
NORTHERN CONOMO POINT NEAR TERM IMPROVEMENTS PLAN
Phase I 2015 Master Plan – Cost Estimate
26
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
PHASE I MASTER PLAN – COST ESTIMATE – AREA A – ESSEX RIVER PARK
Site A - ESSEX RIVER PARK
ITEM
General Site Demolition
Remove Existing Structures (6)
Deck overlook
Concrete Paving
Sloped Granite Curb
Seawall - Repair Concrete Wall
Seawall - Repair Stone Wall
Public Facilities Building*
Conomo Point Association
Structured Lawn - Event Parking
Permeable Paved Parking Area*
Rebuild Boat (Kayak) Ramp
New Lawn
QUANTITY
UNIT
38,290
5,118
1,300
3,500
920
400
500
1
1
7,200
9,275
500
5,000
SF
SF
SF
SF
LF
LF
LF
EA
EA
SF
SF
SF
SF
UNIT PRICE
ITEM TOTAL
$1.00
$5.00
$27.00
$8.00
$35.00
$225.00
$275.00
$75,000.00
$100,000.00
$13.00
$18.00
$25.00
$5.00
$38,290.00
$25,590.00
$35,100.00
$28,000.00
$32,200.00
$90,000.00
$137,500.00
$75,000.00
$100,000.00
$93,600.00
$166,950.00
$12,500.00
$25,000.00
*Does not include survey, drainage substructures or utility hookups
Sub Total
15% Contingency
**Permitting
10% Design
Site A Essex River Park - Total
$859,730
$128,960
$250,000
$123,869
$1,362,559
27
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
PHASE I MASTER PLAN – COST ESTIMATE – SITE B – THE NARROWS PARK
SITE B - THE NARROWS PARK
ITEM
General Site Demolition
Concrete Paving
Sloped Granite Curb
Seawall - Rebuild and Raise Stone Wall
Seawall - Rebuild Stone Wall
Replenish Beach
Permeable Paved Parking Area*
Rebuild Seasonal Boat Ramp
New Lawn
QUANTITY
UNIT
37,020
5,250
405
175
388
330
5,980
950
4,200
SF
SF
LF
LF
LF
CY
SF
SF
SF
UNIT PRICE
ITEM TOTAL
$1.00
$8.00
$35.00
$400.00
$275.00
$16.00
$18.00
$25.00
$5.00
$37,020.00
$42,000.00
$14,175.00
$70,000.00
$106,700.00
$5,280.00
$107,640.00
$23,750.00
$21,000.00
*Does not include survey, drainage substructures, or utility hookups
Sub Total
15% Contingency
**Permitting
10% Design
Site B The Narrows Park - Total
Sites A-B Sub-Total
15% Contingency
Sites A-B Phase I Improvements - Total
$427,565
$64,135
$250,000
$74,170
$815,870
$1,287,295
$193,094
$1,480,389
28
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
PHASE I MASTER PLAN – COST ESTIMATE – SITE C – FRONT BEACH
SITE C - FRONT BEACH
ITEM
General Site Demolition
Deck overlook
Concrete Paving
Sloped Granite Curb
Seawall - Widen and Rebuild Stone Wall
Seawall - Repair Stone Wall
Rebuild Stone Pier
Replace Stone (Farnsworth) Pier with Wood
Pier
Re-seed Lawn - Between Lots 130 & 134
New Lawn
Replenish Beach
QUANTITY
UNIT
UNIT PRICE
ITEM TOTAL
23,719
1,200
350
480
230
250
950
SF
SF
SF
LF
LF
LF
SF
$1.00
$27.00
$8.00
$35.00
$425.00
$275.00
$95.00
$23,719.00
$32,400.00
$2,800.00
$16,800.00
$97,750.00
$68,750.00
$90,250.00
1,245
4,800
7,200
425
SF
SF
SF
CY
$27.00
$1.00
$4.00
$16.00
$33,615.00
$4,800.00
$28,800.00
$6,800.00
*Does not include survey, drainage substructures or utility hookups
Sub Total
15% Contingency
**Permitting
10% Design
$406,484
$60,973
$250,000
$71,746
$789,203
Site A-C Subtotal
15% Contingency
$1,693,779
$254,067
$1,947,846
Site C Front Beach - Total
Sites A-C Phase I Improvements - Total
29
Copley Wolff Design Group
Northern Conomo Point, Essex, MA
PHASE I MASTER PLAN – COST ESTIMATE – SITE D – CLAMMER’S BEACH
SITE D - CLAMMER'S BEACH
ITEM
General Site Demolition
Remove Existing Structures (3)
Concrete Paving - Exposed Aggregate
Sloped Granite Curb
Seawall - Rebuild Stone Wall
Seawall - New Stone Wall
New Stone Seat Walls
Public Facilities Building*
New Lawn
Bituminous Concrete Parking Area
Rebuild Boat Ramp
Replenish & Expand Beach
Permeable Paving at Conomo Point Road*
Green Park at Beach Circle
Public Pier and Ramp
Screen Buffer Cedar Fence
QUANTITY
UNIT
56,300
2,825
8,800
920
270
110
270
1
1,200
1,650
5,425
13,150
6,530
6,050
850
115
SF
SF
SF
LF
LF
LF
LF
EA
SF
SF
SF
CY
SF
SF
SF
LF
UNIT PRICE
$1.00
$5.00
$12.00
$35.00
$275.00
$500.00
$225.00
$100,000.00
$10.00
$15.00
$25.00
$16.00
$18.00
$18.00
$35.00
$175.00
ITEM TOTAL
$56,300.00
$14,125.00
$105,600.00
$32,200.00
$74,250.00
$55,000.00
$60,750.00
$100,000.00
$12,000.00
$24,750.00
$135,625.00
$210,400.00
$117,540.00
$108,900.00
$29,750.00
$20,125.00
*Does not include survey, drainage substructures or utility hookups
Sub Total
15% Contingency
**Permitting
10% Design
$1,157,315
$173,597
$250,000
$158,091
$1,739,003
Sites A-D Sub-Total
15% Contingency
**Permitting
10% Design
$2,851,094
$427,664
$1,000,000
$427,876
$4,706,634
Site D Clammer's Beach - Total
Sites A-D Phase I Improvements - Total
**Permitting costs are shown as a place holder and will likely be less
Copley Wolff Design Group
30
Northern Conomo Point, Essex, MA

Similar documents