STAGE I-Draft0909
Transcription
STAGE I-Draft0909
Sheet Index Layout ID Layout Name 01 Sheet Index 02 Site Plan 03 Furniture Layouts 04 Layout - Ground Floor 05 Layout - First Floor 06 Layout - Roof 07 Framing Plans - Gro... 08 Foundation Plan 09 Sections, 1 10 Sections, 2 11 Sections, 3 12 Elevations 13 Details, Cladding 1 14 Details: Cladding, 2 15 Details: Cladding, 3 16 Details, Bathrooms - ... 17 Balustrades Job Title STAGE I Extensions For Shirley Riddle At Published Remark N Drawing Title Drawn Checked Creation Date Plot Date 142 Campbell Rd Greenlane 9/09/2008 4:36 p.m. PC PC Drawing Number 02/05/06 01 9/09/2008 ALL DIMENSIONS TO BE VERIFIED ON SITE ORGANON Sheet Index Scale 1:1, 1:269.1553 ARCHITECTURE PO Box 108054, Symonds St. Auckland, New Zealand www.organonarchitecture.co.nz Phone: +64 9 631 0034 Fax: +64 9 631 0034 email: [email protected] Existing soil stack New kitchen sink FIRST FLOOR New A.A.V. in discharge DW Relocated pipe vanity Relocated shower New bath Existing WC and connection New F.W.G New bar sink Relocated vanity Ex'g. kitchen sink GROUND FLOOR New WC New F.W.G replacing ex'g. G.T. Ex'g. G.T. Ex'g. WM Existing WC and connection Existing private SS lines to existing connection to council SS line Site & Drainage Plan 1:50 LOT 52 DP 16295 T O T A L S I T E A R E A : 8 5 7 m2 = 162m2 EXISTING PAVING Removed = 22m2 Additions = 93m2 TOTAL PAVED AREA = 139m2 13 m2 Ex'g Soil Stack 89.61 Ex'g. WC Ex'g. WM Rel. van. New kitchen sink Floor Waste EXISTING D.P. EXISTING GT New bar sink ROOF AREA, STAGE I 37 m2 12,571 ct new Constru ( . m te s SS sy mbined d separate.) o c te a priv tem, an Existing SW sys 5,600 1,000 89.32 Build up to 89.6 Existing sink EXISTING DWELLING 162 m2 EXISTING D.P. NEW D.P. New Deep-Bored Soakpit Dished drainage channel to new parking bay, IL= 89.35 Settling Chamber 89.75 EXISTING POHUTUKAWA TREE 12m HIGH NE LI F O AY W E V RI .D C N O .C 'G EX EXISTING D.P. PROPOSED NEW TERRACE 27 m2 NEW ENTRANCE 5m 2 EXISTING D.P. NEW RAIN-HEAD 89.76 New 100 dia. private SW line to new on-site disposal 89.58 NEW PARKING BAY 50 m2 FALL NEW C.P. with Enviropod 89.71 E X I S T I N G C O N C2 . D R I V E W A Y 117 m 3,583 89.93 4,128 8,913 NEW DINING AREA New WC 89.82 3,587 EXISTING D.P. FALL 16 m2 89.19 Floor Waste PROPOSED NEW PROPOSED NEW NEW A.A.V. PERMEABLE T E R R A C E DW in new DECK AREA discharge pipe 2 = 210m2 = 24.5% [ok] CAMPBELL ROAD BATHROOM EXTENSION 3 m2 89.63 = 205m2 = 24% [ok] Proposed Stage II garage and sleep out shown dotted. (Not part of this contract.) New 100 dia. private SW line to new on-site disposal 6,168 42 m EXISTING DWELLING Additions = 43m2 TOTAL BLDG. COVERAGE Ex'g. 150dia. public SS line, plotted from council records 2,983 NB: New floor waste replaces ex'g. gulley trap, and feeds into existing GT connection to private SS line 89.78 2,985 CORNWALL PARK N Revision A Issued for consent DATE 10 Sept., 2008 O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Drawing Title Site Plan 2 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Site & Drainage Plan 1:100 142Campbell-STAGEI.pln; 02 Site Plan; 100%; 9/09/2008 4:36 p.m. Drawing Number 02 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln shower WC WC vanity UP 8 R. @ 178 mm 7 T. @ 280 mm Prefab Cabinets Prefab Cabinets Objectsink - 002 Prefab Cabinets 1 2 3 4 x 178 = 0.712 m 12 11 10 9 8 Prefab Cabinets 7 Object - 002 6 5 4 1. 3 Ground Floor 1:50 2 1 UP FB20M Gangnail flitch beam over Object - 005 Object - 002 Object - 005 Sill 810 WC bath Object - 002 Object - 002 shower 8 R. @ 178 mm DN 7 T. @ 280 mm Prefab Cabinets Object - 002 vanity Prefab Linen Cabinets 3 R. @ 180 mm 2 T. @ 290 mm 12 11 10 9 8 7 Revision A Issued for consent DATE 10 Sept., 2008 6 Prefab Cabinets 5 4 3 2 1 UP O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Drawing Title Furniture Layouts 2. 3 First Floor 1:50 142Campbell-STAGEI.pln; 03 Furniture Layouts; 100%; 9/09/2008 4:36 p.m. Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 03 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln 142Campbell-STAGEI.pln; 04 Layout - Ground Floor; 100%; 9/09/2008 4:36 p.m. KEY: EXISTING WALLS TO BE REMOVED GUIDANCE NOTES: ■ Demolish existing walls where shown only to a height of 2170 above FFL --- retain the upper portion. ■ Install Posistrut bulkhead trusses between new and existing walls with timber supports under extended top chords. ■ Replace all remaining windows to concrte block base with new aluminium windows to NZS4211, installed in accordance with the WANZ Window Installation System: July 2005. Retain existing lintel, and construct new bay opening under. Close in 270mm of wall at east end of opening. Y4 Y3 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> 7,257 2,695 Y2 Y1 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> Move door Remove existing wall and install new new Gangnail Flitch Beam to new ceiling soffit height NB: Demolish walls shown to height of 2170 above FFL, and install new Posistrut 'bulkhead trusses' as per Framing Plans 8,700 1,685 2,786 90 3,720 2,270 Remove existing lintel and portion of of flanking wall, and install new Gangnail Flitch beam over 2,710 Retain existing stairs Remove portion of existing floor above, shown dashed shower WC <MARKERSHEETNUMBER_R> Prefab Cabinets 2,790 WET BAR 12 11 10 9 8 Prefab Cabinets X2 1,907 250 GARDEN 7 Object - 002 1,340 800 ROOM 240 X1 <MARKERSHEETNUMBER_R> B2, GS2, 2000 X2 6 5 70 lowered ceiling over 1,060 <MARKERSHEETNUMBER_R> P. 20 50 1,618 1,635 Ground Floor Demolition Plan 1:100 200x100 beam over Prefab Cabinets 1. 04, GS2, 4200 340 20 Objectsink - 002 20 M1, Masonry, 2700 20 New windows in existing garage openings X4 Prefab Cabinets <MARKERSHEETNUMBER_R> 3,410 vanity Shelving N1, GS2, 3300 <MARKERSHEETNUMBER_R> 760 Re-use existing entrance door and frame in new entrance EX'G. LAUNDRY W.C. 810 X1 ENSUITE B1, GS2, 2800 90 1,657 1 2 3 4 x 178 = 0.712 m (not part of this contract) 90x70 diagonal timber brace UP 114 SPA POOL 8 R. @ 178 mm 7 T. @ 280 mm 90x70 diagonal timber brace 5,200 BED 2 WC O3, BLG,1000 90x70 diagonal timber brace N2, 910 CS Cavity Slider BraceWall FUTURE PORTABLE SPA Remove existing brick veneer, and install new interior door under existing window lintel N4, GS2, 2200 N3, GS2, 2200 90x70 diagonal timber brace 90x70 diagonal timber brace 1,100 A1, VB7, 2300 B4, GS2, 2000 4 3 B3, GS2, 2200 2 1 X3 <MARKERSHEETNUMBER_R> D3, BLP, 600 D1, BLP, 600 D2, GS1a, 2000 Q1, GS1a, 1900 New 760 doorway under existing window lintel P1, GS2, 2500 O2, BL1, 900 C1, GS2, 2900 O1, BL1, 900 X3 <MARKERSHEETNUMBER_R> NEW ENTRANCE 2,043 LOGGIA N5, BLP, 2200 LOGGIA 2,043 1,950 DETAIL:4 W-board wall/Masonry wall 95 2,399 590 1,902 UP Revision A Issued for consent DATE 10 Sept., 2008 O R G A N O N ARCHITECTURE 1,851 1,931 3,092 3,232 2,408 90 6,050 PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz 460 Job Title 2,450 STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Drawing Title Layout - Ground Floor Y4 Y3 Y2 Y1 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> Drawing Status 4 Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 04 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln Y3 <MARKERSHEETNUMBER_R> Y2 Y1 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> Retain existing lintel, and construct new bay opening under. Close in 270mm of wall at east end of opening. Remove portion of ceiling shown for new skylight above Retain existing stairs Install new Gangnail Flitch Beam between new posts Remove existing floor in area shwon shaded NB: Demolish walls shown only to height of 2170 above FFL, and install new Posistrut 'bulkhead trusses' as per Framing Plans Y4 Y3 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> Y1 <MARKERSHEETNUMBER_R> 90 2,330 70 2,990 370 3,130 70 530 70 1,840 2,600 Hinged flap to storage cavity 1,100 90 1,010 3,393 20 901 New partition to underside of of new ceiling deck 9,200 Ceiling Decks - Soffit 1:50 X1 <MARKERSHEETNUMBER_R> 7 6 Prefab Cabinets X2 5 <MARKERSHEETNUMBER_R> 4 Non-structural 70x70 post for door-closer 3 D2, BL1, 4,6 470 55 2 1100Wx1000H timber shutters 1 UP 66290 Remove window and sill and create new bay extension in existing window opening 8 Non-structural 70x70 post at stair head E1, GS1a, 3100 70 732 N1, BL1,1200 1,171 D1, BL1, 750 Existing walls demolished to 2100 above FFL only 3. 1,977 70 9 P2, BL1, 400 700 1100x300x2000 high prefab book shelves 2,209 3,200 90 10 Remove window and sill and create new bay extension in existing window opening 90 70 11 <MARKERSHEETNUMBER_R> X3 12 20 20 1,460 New 14x90 ceiling beams at 650cc.at ceiling deck level below skylight enclosure, Skylight shown dashed. X3 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> Revision A Issued for consent DATE 10 Sept., 2008 732 70 354 698 Velux 1140x1180 VS660 skylight over skylight opening Rinnai Timberflame Radius gas fire. Cut-out dimensions H:730 W:790 D:435 20 70 880780 750 872 718 700 NB: Screw-fix all existing particle board flooring to all joists with self-drilling particle board screws fixed at 150cc at sheet edges and 200cc elsewhere. Ensure support surface and the under side of sheets are in contact at time of fixing. B4, GS2, 1550 B2, BLG, 900 O1, BLG, 800 X2 Prefab Cabinets Built-in shelves C1, BL1, 1200 B1, GS2, 1470 1100x300x1000 high prefab book shelves 90 <MARKERSHEETNUMBER_R> Ceiling open to roof over vanity Re-use ex'g 710 doors 50 X1 +2,680 Prefab Cabinets Object - 002 910 M1, BL1, 400 3,320 3,250 Coved ceiling over FB15L Gangnail flitch beam over 3,130 FB15L Gangnail flitch beam over 70 8 R. @ 178 mm DN 7 T. @ 280 mm X4 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> shower 42 Object - 002 70 +1,900 1,038 Object - 002 O3, BL1, 990 +2,580 bath 4,500 N2, GS2, 3570 2,500 2,410 4,607 WC 1,622 Object - 002 Object - 005 400 Object - 005 FB20M Gangnail flitch beam over P1, BL1, 900 90 UP Line of bulkheads over shown dashed O2, GS1a, 2900 3,690 Build up ex'g. 810 sill to 950 X4 New partition to underside of of new ceiling deck 1,150 373 1,010 Sill FFL plus 950 3 R. @ 180 mm 2 T. @ 290 mm 1,100 A1, BL1, 900 Existing walls demolished to 2100 above FFL only PS30-30x07 Gangnail Posistrut fixed beneath existing ceiling framing to form new bulkheads 880 2,990 PS30-30x07 Gangnail Posistrut fixed beneath existing ceiling framing to form new bulkheads First Floor Demolition Plan 1:100 3,210 GUIDANCE NOTES: ■ Posistrut ceiling trusses are not intended to take roof loads, but to easily form bulkheads, in which new wiring and new downlights are installed. Demolish existing walls where shown only to a height of 2170 above FFL --retain the upper portion. ■ Install Posistrut bulkhead trusses between new and existing walls with timber supports under extended top chords. ■ Screw-fix to all ceiling joists under which Posistrut bulkhead trusses pass, and studs to which they are contiguous. Install 70x35 ceiling battens @600cc under Posistrut bulkhead trusses to form 'ceiling decks' as shown, with soffit at 2100 above FFL, and 100x50 Kwila edge trim to perimeter of formed bulkhead edges. Existing walls New window in existing wall 90 2. Y2 <MARKERSHEETNUMBER_R> 70 Fill in existing window in existing wall Retain existing lintel, and construct new bay opening under. 3,580 Retain existing lintel, install post at north end, and construct new bay opening under. New partition to underside of of new ceiling deck PS30-30x07 Gangnail Posistrut fixed beneath existing ceiling framing to form new bulkheads Retain existing lintel, install post at south end, and construct new bay opening under. New window in existing wall PS30-30x07 Gangnail Posistrut fixed beneath existing ceiling framing to form new bulkheads Sill 810 PS30-30x07 Gangnail Posistrut fixed beneath existing ceiling framing to form new bulkheads GUIDANCE NOTES: ■ Demolish existing walls where shown only to a height of 2170 above FFL --- retain the upper portion. ■ Install Posistrut bulkhead trusses between new and existing walls with timber supports under extended top chords. ■ Replace all remaining windows with new aluminium windows to NZS4211, installed in accordance with the WANZ Window Installation System: July 2005. PS30-30x07 Gangnail Posistrut fixed beneath existing ceiling framing to form new bulkheads EXISTING WALLS TO BE REMOVED Y4 <MARKERSHEETNUMBER_R> PS30-30x07 Gangnail Posistrut fixed beneath existing ceiling framing to form new bulkheads KEY: O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 2. 142 Campbell Rd Greenlane AUCKLAND First Floor 1:50 142Campbell-STAGEI.pln; 05 Layout - First Floor; 100%; 9/09/2008 4:36 p.m. 70 1,123 70 3,000 70 Drawing Title Layout - First Floor 3,300 90 3,210 5 8,700 90 4,665 70 3,785 90 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number Y4 Y3 Y2 Y1 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> 05 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln New concrete tile roof extension to match existing New pressed steel tile roof addition, with profile to emulate existing New pressed steel tile roof addition, with profile to emulate existing X4 New ridge addition to 39 degrees pitch, using existing and new pressed steel roof tiles. 127 Fall Fall New pressed steel tile roof addition, with profile to emulate existing New ridge addition to 39 degrees pitch, using existing and new pressed steel roof tiles. 1,496 Fall Fall <MARKERSHEETNUMBER_R> New pressed steel tile roof addition, with profile to emulate existing X1 <MARKERSHEETNUMBER_R> X2 5,473 X2 <MARKERSHEETNUMBER_R> Fall <MARKERSHEETNUMBER_R> Existing pressed steel tile roof, to17.5 degrees pitch (confirm pitch on site before commencing roof work) Fall New pressed steel tile roof addition, with profile to emulate existing New 140x45 pergola rafters Existing roof on storey below to, be replaced (not part of this contract) 2,104 Fall Existing concrete tile roof, to17.5 degrees pitch (confirm pitch on site before commencing roof work) X3 X3 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> New 140x45 rafters FIXINGS: UNDERPURLINS: 2/100X3.75 SKEWED NAILS + 2 WIRE DOGS RIDGE BEAM: 2/100X3.75 SKEWED NAILS + ROOF STRAP NEW RAFTERS: 2/100X3.75 SKEWED NAILS + 1 WIRE DOG FB20M Gangnail flitch beam over 190x90 pergola beam 4. New 'dummy' trusses on existing trusses @ 900cc to lift pitch of roof. See diagram below for shape. NB: Shape is intended to match proposed Stage 2 extension (not part of this contract) New 190x90 underpurlin under new 'dummy' roof trusses, propped to walls below as shown 90x45 rafters@600cc max. 140x45 rafters@ 600cc max. 248 39D (C.o.S) 1,207 174 422 FB 25L Gangnail flitch beam FB 25L Gangnail flitch beam New 190x90 underpurlin under new 'dummy' roof trusses, propped to walls below as shown 3 R. @ 180 mm 2 T. @ 290 mm 150x90 Hy90 lintel 150x90 Hy90 cantilevered lintel 190x90 ridge beam Roof 1:50 17.5D (C.o.S) 785 215 1,490 Revision A Issued for consent DATE 10 Sept., 2008 2,490 150x90 Hy90 continuous lintel O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 2. First Floor (1) 1:50 142Campbell-STAGEI.pln; 06 Layout - Roof; 100%; 9/09/2008 4:36 p.m. Existing type 'a' gangnail truss @900cc, REF 1:Auckland City consent drawing 2638, July 1975, REF 2: abc drawing no. 117/1 REF 3: Reg. Plant Design No. 103, Truss DEsign No. B8/1, D.C. Moore 142 Campbell Rd Greenlane AUCKLAND Drawing Title Layout - Roof 6 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 06 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln Y4 Y3 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> Y2 Y1 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> 190x45 H3.2 joists @ 400cc. max Existing 190x50@500cc DETAIL:1 Bulkheads, 4 190x90 beam on line of existing wall X4 <MARKERSHEETNUMBER_R> Existing 240x90 200x90 Hy90 roof beam X2 DETAIL: Bulkheads, 1 <MARKERSHEETNUMBER_R> 140x70 underpurlin 140x70 underpurlin 1,450 Existing 190x50@500cc X1 <MARKERSHEETNUMBER_R> X3 <MARKERSHEETNUMBER_R> 200x90 Hy90 roof beam 602 140x45 roof/pergola beams @ 600cc max. Existing 190x50@500cc PS30-30x07 Gangnail Posistrut fixed beneath existing floor framing to form new bulkheads PS30-30x07 Gangnail Posistrut fixed beneath existing floor framing to form new bulkheads 140x70 strongback 200x90 Hy90 roof beam 200x90 Hy90 roof beam 900 250 250 900 250 900 X3 <MARKERSHEETNUMBER_R> FB25L Gangnail Flitch Beam DETAIL: Bulkheads, 2 190x45 floor joists@450cc max DETAIL: Bulkheads, 1 PS30-30x07 Gangnail Posistrut fixed beneath existing floor framing to form new bulkheads X1 X2 PS30-30x07 Gangnail Posistrut fixed beneath existing floor framing to form new bulkheads DETAIL: Bulkheads, 3 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> FB20M Gangnail Flitch Beam set to soffit height of 2093 190x70 H3.2 bearer, notched and fixed to posts with 2/M12 galv. bolts 190x70 H3.2 bearer, notched and fixed to posts with 2/M12 galv. bolts X4 <MARKERSHEETNUMBER_R> 190x70 H3.2 bearer, notched and fixed to posts with 2/M12 galv. bolts 1,650 max. 140x45 H3.2 joists @400cc. max Revision A Issued for consent DATE 10 Sept., 2008 140x45 pergola/roof beams 1,455 O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Y4 Y3 Y2 Y1 <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> <MARKERSHEETNUMBER_R> Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Ground Floor Ceiling Framing 1:50 142Campbell-STAGEI.pln; 07 Framing Plans - Ground Flooor; 100%; 9/09/2008 4:36 p.m. Drawing Title Framing Plans - Ground Flooor 7 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 07 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln Hand-selected No. 190x90 H3.2 timber post, fixed with 2/M12 bolts Notch capping around post, and cut slot for bracket 1,650 1,740 300x300 footing with 2/D12 long'y, D12 starters@600cc bent into slab 869 D12 rods @ 150cc both ways D12 bars 300 long @ 600cc epoxy fixed into existing slab 868 1,657 192 600x600x300 thicknesser, with 6/D12 @150cc. 1,907 5,017 Cut 50mm wide chase for wiring to new wet bar DETAIL:Piers 1:10 Existing conc. slab 1,453 300x700x300 deep conc. footing 665 mesh 1,381 550 3,642 6,060 Foundations 1:50 142Campbell-STAGEI.pln; 08 Foundation Plan; 100%; 9/09/2008 4:36 p.m. 300x300 footing with 2/D12 long'y, D12 starters@600cc bent into slab 140x300 reinforced masonry footing footing with 2/D12 longitudinally; D12 starters bent into slab @600cc, on existing brick veneer strip footing 356 1,595 2,033 449 D12 bars 300 long @ 600cc epoxy fixed into existing slab DETAIL: Piers 3,232 2,876 0. D12 rods @200 cc 1,090 reinf mesh 1,657 490 958 9,200 150 thick conc. slab with 665 mesh on HD polythene DPM on 40 HD polystyren on sand blinding on hardcore. Allow for selected tiles, and fall to drain Hand-selected No. 190x90 H3.2 timber post in 200 series solid-poured open-end blocks 1,657 995 1,566 300x300x450 deep conc. footing to all 90x90 H3.2 braced posts. All other 90x90 H3.2 posts in 300x300x300 conc. footing unless shown 1,055 960 Bowmac B197 post bracket 6,627 2,560 100 thick conc. slab with 665 mesh on HD polythene DPM on 40 HD polystyren on sand blinding on hardcore. Allow for selected tiles, and fall to drain Existing timber sub-floor with perimeter strip footing for brick veneer. No change. Revision A Issued for consent DATE 10 Sept., 2008 O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Drawing Title Foundation Plan 8 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 08 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln Corner soaker over mitred pre-primed bevel-backed weatherboards Existing lightweight pressed steel tile roofing Tyvek building wrap 9mm Villiboard sheet with recessed edge and flush joint stopped New soffit extension, fixed to existiing truss top chord with 2/M12 galv. coach bolts Waterproof membrane to manufacturer's specifications 6mm 50x50 corner flashing over building wrap New lightweight pressed steel tile roofing to 17.5 D pitch Tyvek building wrap Selected tiles NOTE: Lay new conc. slab with fall to waste. Perimeter edge of waste to be a minimum of 50mm from edge of sheet or wall. New 150x20 PP timber fascia Compressible grout 6 35x35 galvanised steel corner angle 0.6mm thick Flexible silicon sealant Fibreglass mesh at corners 150 slab on grade laid to fall New soffit framing New 4.5 Hardisoffit P New 75x20 PP frieze board DETAIL:Villaboard Wall to Floor Junctn 1:5 Piano hinge to 20mm enamel painted MDF hinged lid 9mm Villiboard sheet with recessed edge and flush joint stopped +7,630 5 DETAILS: Weatherboard New jack truss on existing trusses at 900cc. 190x90 underpurlin on 90x45 struts New Tyvek building wrap over existing cladding New 135x19 PP weatherboards Waterproof membrane to manufacturer's specifications Existing 17.5 pitch roof trusses (C.o.S.) at 900cc. +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit 950 above FFL Flexible silicon sealant BEDHEAD STORAGE Selected tiles Demolish existing wall and floor as shown STUDY DETAIL:Roof Extension, Master Bed 1:10 D12 bars 300 long @600cc epoxy fixed into existing slab edge BATHROOM New mobile bar unit SLAB: 150 thick conc slab with 665 mesh on HD polythene DPM on 40 polystyrene on sand blinding on hardcore. Fall to drain. FOOTING: 300x300 footing with 2/D12 longitudinally; D12 starters bent into slab @600cc. Existing stairs (unchanged) EXISTING CUPBD. NEW ENTRANCE Existing 190x45 floor framing (unchanged) +2,680 2 First Floor 2056 170 Compressible grout DETAIL:2Villliboard Wall To Wall Junction 1:2 STAIR-HALL LAUNDRY ±0 1 Ground Floor PATIO New sound insulation installed between joists Y1 Screw fix to all existing joists Section AA 1:50 +7,630 5 DETAILS: Weatherboards Extent of original roof shown greyed New PS30-30x07 Posistrut Install new recessed lighting in bulkhead. NOTE: install all new wiring within bulkhead EXISTING TRUSS FRAMING EXISTING TRUSS FRAMING Line of existing outside wall, and existing lintel. Remove existing window and wall under sill only, add new extension and make good. 2093 Revision A +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit New 140x90lintel MASTER BED . GALLERY +2,680 2 First Floor DETAIL:2 Villliboard Wall To Wall Junction Job Title Existing 190x90 @450cc Selected tiles on adhesive on waterproof membrane on Hardies Villiboard on H 3.2 90x50 stud wall New mobile bar unit 142Campbell-STAGEI.pln; 09 Sections, 1; 100%; 9/09/2008 4:36 p.m. O R G A N O N PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz DETAIL: Roof Extension, Master Bed DETAIL:Bulkheads, 1 1:5 DATE 10 Sept., 2008 ARCHITECTURE Existing wall (unchanged) FFL Issued for consent TERRACE (not part of this contract) NEW GARDEN ROOM D12 bars 300 long @600cc epoxy fixed into existing slab edge WET BAR BATHROOM SLAB: 150 thick conc slab with 665 mesh on HD polythene DPM on 40 polystyrene on sand blinding on hardcore. Fall to drain. FOOTING: 300x300 footing with 2/D12 longitudinally; D12 starters bent into slab @600cc. ±0 1 Ground Floor Y2 Section AA 1:50 STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Drawing Title Sections, 1 9 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 09 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln +7,630 5 DETAILS: Weatherboards +7,630 5 DETAILS: Weatherboards New jack truss on existing trusses at 900cc. 190x90 underpurlin on 90x45 struts m 0m 25 Existing 17.5 pitch roof trusses (C.o.S.) at 900cc. New bay window area in existing opening Extent of original roof shown greyed +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit n. m mi m 0 5 1 New range-hood at level of of new bulkheads LOUNGE +2,680 2 First Floor KITCHEN n. mi +2,680 2 First Floor Lead flashing dressedinto pan DETAIL: New window head in block base DETAIL:1 Bulkheads, 4 New mobile bar unit Tile batten Hem along top of flashing DETAIL New window sill in block base ±0 1 Ground Floor NEW GARDEN TERRACE ROOM BEDROOM ±0 1 Ground Floor Upper roof underlay lapped over flashing New pressed metal tiles New Aluminium Bifold Doors in extended window opening Y3 Section AA (1) HEETNUMBER_R><DUMMY><,> 1:50 140x45 H3 PP pergola beams Existing concrete tiles +7,630 5 DETAILS: Weatherboards New Aluminium Bifold Doors in existing rebated opening New cavity slider 190x90 ridge beam Pressed metal tiles on battens on 190x45@600cc max. 39° 39° DETAIL: Apron change 1:2 1,653 Pressed metal tiles on HW underlay on battens on Hardigroove soffit on140x45 rafters @cc. shown. 190x45 joists@450cc +2,680 2 First Floor . 100 170 50 207 170 50 850 1 680 Y4 Section AA HEETNUMBER_R><DUMMY><,> 1:50 200 170 50 2,285 Expol polystyrene insulation between joists. Hardigroove soffit lining under. 3,249 +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit ±0 1 Ground Floor Install new R3.6 ceiling batts over existing ceiling insulation, taking care not to place around new or existing downlights. +7,630 5 DETAILS: Weatherboards +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit +7,630 5 DETAILS: Weatherboards 1 DETAIL: Roof Apron Flashing - Parallel +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit FB25L Gangnail flitch beam 1 Revision DETAIL: Apron Flashing - Transverse A Issued for consent DATE 10 Sept., 2008 O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND +2,680 2 First Floor +2,680 2 First Floor Drawing Title Sections, 2 FB20M Gangnail flitch beam set to soffit height of 2093, ±0 1 Ground Floor X4 Section AA 1:50 142Campbell-STAGEI.pln; 10 Sections, 2; 100%; 9/09/2008 4:36 p.m. EXISTING LAUNDRY EX'G. W.C. EXTENDED BATHROOM 10 Drawing Status Building Consent EXISTING BEDROOM Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales ±0 1 Ground Floor Drawing Number 10 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln EXISTING TRUSS FRAMING (no change) X2 Section AA ETNUMBER_R><DUMMY><,> 1:50 New pressed steel tiles on battens on 7.5mm grooved Hardisoffit on rafters as indicated belwo Install new R3.6 ceiling batts over existing ceiling insulation, taking care not to place around new or existing downlights. +5,080+5,080 4 Roof+4,850 4 Roof +4,850 3 Ceiling Decks 3 Ceiling - Soffit Decks - Soffit +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit STUDY Remove portion of existing masonry wall, and install new FB25L Gangnail Flitch Beam in new opening LOUNGE 140x70 underpurlin, fixed with 2/M12 galv bolts DETAIL: Steel Tile Abutment DETAIL: Bulkheads, 2 DETAIL: Bulkheads, 1 140x45 H3.2 timber rafters/pergola beams at centres shown on Framing Plan +2,680+2,680 22First FirstFloor Floor +2,680 2 First Floor Remove existing brick veneer cladding inside new entrance area Existing beam unchanged 2/200x90 H3.2 Hy90 verandah beam, with blocking at all posts Relocate existing front door unit Line of demolished brick veneer shown dashed STAIR-HALL NEW ENTRANCE NEW GARDEN ROOM Selected tiles on new conc. slab laid at FFL minus 20 TERRACE (n o t p a r t o f t h i s c o n t r a c t ) ±0 ±0 1 Ground 1 Ground Floor Floor TERRACE Selected 90x90 No. 1 H3.2 timber posts in 250x600x300 deep conc. footing Selected 90x90 No. 1 H3.2 timber posts in 900x250x600 conc. footings X3 Section AA <BACKREFSHEETNUMBER_R><DUMMY><,> 1:50 Remove existing gutter over new roof, and cut back overhand to 150mm total ±0 1 Ground Floor D12 bars 300 long @600cc epoxy fixed into existing slab edge New 190x90 PP fascia SLAB: 150 thick conc slab with 665 mesh on HD polythene DPM on 40 polystyrene on sand blinding on hardcore. Fall to drain. FOOTING: 300x300 footing with 2/D12 longitudinally; D12 starters bent into slab @600cc. Remove exiting brick veneer in new entrance area only 140x300 reinforced masonry footing footing with 2/D12 longitudinally; D12 starters bent into slab @ 600cc, on existing brick veneer strip footing New pressed steel tile Underlay carried down over gutter lining 12mm H3 ply anti-ponding board laid to fall Nog for upstand VS EDW Continue butyl gutter lining 250 past new abutment Concrete Tiles EDW Head Flashing A EDW Tile Support B BASIS OF DESIGN: VELUX Manual Venting Skylight (VS) A B Butyl gutter lining carried over anti-ponding board and up abutment frame on nog to suit 100 1 60 50 mm mm 140x45 stringer DETAIL:Steel Tile Abutment ETNUMBER_R><DUMMY><,> 1:5 Insect screen (removable) Existing exterior timber frame EDW Sill Flashing ELEVATION Lining Trimmer/Header Operating hook Tile Batten 3060 mm BASIS OF DESIGN: VELUX Manual Venting Skylight (VS) Revision A Issued for consent DATE 10 Sept., 2008 3060 mm Lining SECTION BB EDWflashing gutter Mounting bracket Roof Underlayment O R G A N O N ARCHITECTURE Tight joint between finish groove and finish material PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Ventilation Lining Job Title Rafter SECTION AA STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Insulation 130 Insulation Drawing Title Hardigroove soffit NEW ZEALAND LTD. Finish material DETAIL: Velux Fixed Skylight Installation <BACKREFSHEETNUMBER_R><DUMMY><,> Vapor Barrier SkyProduct Management 0800 650 445 VSManual Venting Skylight with EDW flashing installed in a tile roof with a cathedral ceiling Name Drawn by Checked by Drawing No. Date Jan. 08 Jan. 08 11 NZ011073004 Drawing Status This drawing is an instrument of service and is provided for informational use only. © 2006 VELUX GROUP Sections, 3 ® VELUX is a registered trademark Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 1 DETAIL New Eaves & Barge - Pressed Metal Tiles 1:5 142Campbell-STAGEI.pln; 11 Sections, 3; 100%; 9/09/2008 4:36 p.m. 11 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln +7,630 5 DETAILS: Weatherboards New Dimond Tile pressed steel tile on new roofs, and on new portions of existing roofs 190x19 PP direct-fixed weatherboard on new elevations, to match existing James Hardie Shingleside Staggered Edge Panel fixed over cavity battens to new and existing gable ends, and all walls above second-storey BUILDING ENVELOPE RISK MATRIX North Elevation Risk Factor Wind zone (per NZS 3604) Number of storeys Roof/wall intersection design Eaves width Envelope complexity Deck design Risk Severity Risk Score Low risk 0 Medium risk 1 Low risk 0 High risk 2 Medium risk 1 Medium risk 2 Total Risk Score: 6 +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit New Architectural series aluminium windows in new & existing openings (see Window Schedule for more information) +2,680 2 First Floor ±0 1 Ground Floor James Hardie Shingleside Staggered Edge Panel fixed over cavity battens to new and existing gable ends EXISTING DWELLING -NO CHANGE RENOVATED PORTION OF EXISTING DWELLING 9,190 Paint-finish H3 pergola and decking timbers EXTENSION TO EXISTING DWELLING 8,628 New Dimond Tile pressed steel tile on new roofs, New Architectural series aluminium windows in new & existing openings (see Window Schedule for more information) BUILDING ENVELOPE RISK MATRIX West Elevation Risk Factor Wind zone (per NZS 3604) Number of storeys Roof/wall intersection design Eaves width Envelope complexity Deck design +7,630 Risk Severity Risk Score 5 DETAILS: Low risk 0 Medium risk 1 Medium risk 1 Very high risk 5 Medium risk 1 Medium risk 2 Total Risk Score: Weatherb 10 3,292 +5,080 4 Roof +4,850 3 Ceiling Decks - Soff E-01 North Elevation +2,680 2 First Floor BUILDING ENVELOPE RISK MATRIX South Elevation New Velux skylight Risk Factor Wind zone (per NZS 3604) Number of storeys Roof/wall intersection design Eaves width Envelope complexity Deck design New log burner and flue New Dimond Tile pressed steel tile on new roofs, and on new portions of existing roofs Total Risk Score: Risk Severity Risk Score Low risk 0 Medium risk 1 Low risk 0 High risk 2 Medium risk 1 Medium risk 2 +7,630 5 DETAILS: Weatherboards 6 ±0 1 Ground Floor 190x19 PP direct-fixed weatherboard on new elevations, to match existing New Architectural series aluminium windows in new & existing openings (see Window Schedule for more information) +5,080 4 Roof +4,850 3 Ceiling Decks - Soffit E-04 1,000 1,680 1,340 1,000 Relocate existing front door assembly 142Campbell-STAGEI.pln; 12 Elevations; 100%; 9/09/2008 4:36 p.m. +2,680 2 First Floor Revision A Issued for consent DATE 10 Sept., 2008 O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND ±0 1 Ground Floor Drawing Title Elevations 12 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales EXTENSION TO EXISTING DWELLING 3,272 RENOVATED PORTION OF EXISTING DWELLING 8,525 EXISTING DWELLING -NO CHANGE 9,165 Drawing Number 12 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln Bevelback weatherboard Bevelback weatherboard s Tyvek wall wrap Wall plate to overhang slab edge by 6mm min DPC Tyvek wall wrap DPC Weatherboard to finish 50mm min below floor level (and 175mm above finished ground level or 100mm above paving) Concrete floor slab Wall plate to overhang slab edge by 6mm min Soffit bearer Hardigroove soffits Internal linings 42 x 18 eaves mould with weathergroove - fit tight to soffit lining Foundation wall Cladding to finish 50mm min below top of foundation (and 175mm above finished ground level or 100mm above paving) 1. Bevelback weatherboards - direct fixed - base of wall - concrete floor Scale 1:5 Internal linings Tyvek wall wrap Hardigroove soffit lining Bevelback weatherboards Wall underlay Jenkin A-lign eaves mould 42 x 18 with weathergroove - fit tight to soffit lining ® 3. Jenkin A-lign bevelback weatherboard - direct fixed - eaves with angled soffit ® Scale 1:5 2. Bevelback weatherboard - direct fixed - base of wall - timber floor Roofing underlay draining into spouting Min overhang of roofing beyond fascia Eaves flashing by roofer Ensure that weatherboard project above top of fascia Eaves flashing by roofer Wall underlay flap, lapped over head flashing upstand Isolating layer under flashing as required Tyvek wall wrap Packing to be H3.1 treated, cut to suit and isolated from metal flashing Metal cap flashing with 5º min fall, fix through downturn Spouting Air seal over backing rod 70mm mincover 70mm mincover Out-turn to flashing to form dip (see right side for birds beak option) Bevelback weatherboards Tyvek wall wrap Take wrap under eaves to provide an air barrier Meter box or similar 190x19 fascia of width to suit spouting brackets and falls Internal linings Flashing with drip edge and 75mm cover to top weatherboard 5mm gap H3 packer Solid blocking Scale 1:5 Seal gap between head flashing and weatherboard for 50mm each end of flashing Quickflash modified Code 24B head flashing with 15º slope and 10mm cover to angle Packing to suit 4. Bevelback weatherboards - direct fixed - eaves with flat soffit ex40x40H3 weatherhead fixed over sealant to weatherboard and extending 30mm beyond jamb sections each side 50mm min 150mm Bevelback weatherboard Scale 1:5 Air seal over backing rod Eaves mould 42 X 18 Birds beak drip edge (see left hand downturn for out-turn drip edge) Wall underlay turned into framing reveal, flexible flashing tape to trimmer and turn up 100mm at ends 5. Bevelback weatherboards - direct fixed - eaves with 150 soffit Scale 1:5 Jenkin A-lign eaves mould 42 x 18 ® Seal and rivet 30 x 30mm angle to meter box all round - seal and fix to weatherboard Tyvek wall wrap continuous over top of wall frame Bevelback weatherboards Soffit lining with end setback 6mm to provide an anti-capillary space 5mm clearance Nog Jenkin A-lign bevelback weatherboard ® Framing Bevelback weatherboards Note: Fit pre-cut 18mm scriber to each jamb angle Note: Install flexible flashing tape and saddle flashing at junction with full height wall Wall underlay 6. Bevelback weatherboards - direct fixed - balustrade parapets (Use same detail for sloping balustrades to ends of deck) Scale 1:5 7. Bevelback weatherboards - direct fixed - meter box and similar 8. Bevelback weatherboards - direct fixed - reversed raked soffit Scale 1:5 Scale 1:5 Wall underlay Wall underlay Wall framing Bevelback weatherboards Framing Bevelback weatherboards Wall underlay Line of saddle flashing behind. Seal to wall underlay with flashing tape Wall underlay 20 0 Apron flashing Apron flashing upstand behind cladding and building wrap Lower edge of cladding Flexible flashing tape dressed down 50mm min down face of balustrade/parapet underlay Capping flashing 90 x 90 corner flashing behind saddle flashing Two lines of sealant Rivet through sealant Tapered stop-end to divert apron flashing water into gutter 142Campbell-STAGEI.pln; 13 Details, Cladding 1; 100%; 9/09/2008 4:36 p.m. Two lines of sealant to capping and flashing Fa ll 50 x 50 transition tray behind fascia or seal between fascia and coated cladding alternative position behind fascia 10 0 mm 50 Revision n mi A Issued for consent DATE 10 Sept., 2008 Framing Sloped packer Framing Wall underlay continuous around corner O R G A N O N Wall underlay continuous around corner 9. Bevelback weatherboards - direct fix - parapet - balustrade saddle flashing Roofing 5° Spouting to stop 10mm min from finished wall cladding 50mm min Flexible flashing tape dressed up and securely adhered to the building underlay Scale 1:10 ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz 11. Bevelback weatherboards - direct fix - parapet - balustrade saddle install Job Title Scale 1:10 Parapet or balustrade building wrap lapped around corner STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Drawing Title Details, Cladding 1 Gutter 13 Wall underlay Wall framing Jenkin A-lign bevelback weatherboard scribed to each other ® Note: Cover for apron flashing cover over roofing to be 130min. 9. Bevelback weatherboards - direct fix - apron flashing - stop end 150mm min to face of window or door jamb stud Quickflash Code 03 corner back flashing, 65mm cladding cover to flashing Line of sloping H3.1 treated packer above Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Wall underlay Drawing Number Scale 1:10 Parapet or balustrade wall framing 10. Bevelback weatherboards - direct fixed - balustrade to wall - plan detail ® Scale 1:5 13 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln New exterior concrete paint system to existing masonry 50 Existing masonry wall 50 1 New window head in block base 1:2 12 Quickflash Code 05 metal flashing Quickflash Code 03 modified metal flashing 35x35 timber 'stop' Pre-cut 18mm scriber Tyvek building wrap Bevelback weatherboards 1 New exterior concrete paint system to existing masonry DETAIL:4 W-board wall/Masonry wall 1:5 Packers Existing cladding 1 Tyvek building wrap dressed into opening with Dow Corning flashing tape installed over wrap DETAIL New window sill in block base 1:2 H3 PP Scriber cut to weatherboard profile Line of head flashing over 1 20 min. New exterior concrete paint system to existing masonry 10 min. W-board: Window Jamb 1:5 Building wrap dressed into opening with flaxible flashing tape installed over wrap to corners at head 1 Additional building wrap lapped over flashing DETAIL New work to ex'g. rebated sill 1:2 New exterior concrete paint system to existing masonry Packer Air seal Head flashing with 15 degree fall Packers Sill flashing to line with back of window frame 1 DETAIL: New window jamb in block base 1:2 1 DETAIL: New window head under Shingleside gable cladding 1:5 Line of 20mm min. upstand at both ends of sill flashing Sill flashing with 5 degree min. fall and hem to back edge Air seal 1 New exterior concrete paint system to existing masonry DETAIL: Parapet Flashing Joints 10 5 Timber fillet backing to suit, fixed over sealant Solid backing around pipe penetration Flange to protect sealant from exposure to sunlight Air seal all around Sealant with backing rod Flexible flashing tape adhering around pipe and onto wall underlay (100mm lap to underlay and 25mm to pipe) Chamfer trimmer plate to suit flashing Existing cladding Issued for consent DATE 10 Sept., 2008 35 H3 batten under window Bevel back weatherboards Flexible flashing tape Ensure 5degree fall to pipework for water run-off Revision A Tyvek building wrap O R G A N O N 1 DETAIL Rebated sill 1:2 ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Drawing Title Air seal all around Details: Cladding, 2 1 14 DETAIL: W-board: Window Head & Sill 1:5 Drawing Status Building Consent 190x19 PP weatherboard on Tyvek bulding wrap Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number Pipe penetration 142Campbell-STAGEI.pln; 14 Details: Cladding, 2; 100%; 9/09/2008 4:40 p.m. 14 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln 12mm min. gap 1 DETAIL: W-Board: External Corner 1:5 Existing wall framing & cladding 12mm H3 ply. Seal and plant with external paint system before fixing deck Deck joistrs to Framing Plan M12 dyna bolt into existing concrete masonry base. See Framing Plan for spacings 50x3 EPDM washer 1 1 DETAIL: Flue penetration to roof Extend Tyvek wrap down below fastening DETAIL: W-Board: Internal Corner 1:5 1 1 DETAIL: Flue penetration Tyvek wall wrap DPC Concrete floor slab 1 DETAIL: Deck Stringer 1:5 Bevelback weatherboard Wall plate to overhang slab edge by 6mm min Weatherboard to finish 50mm min below floor level (and 175mm above finished ground level or 100mm above paving) DETAIL: W-board: base of wall, conc. floor 1:5 142Campbell-STAGEI.pln; 15 Details: Cladding, 3; 100%; 9/09/2008 4:40 p.m. Revision A Issued for consent DATE 10 Sept., 2008 O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND Drawing Title Details: Cladding, 3 15 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 15 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln R Gib Aqualine Gib Aqualine R R Gib Aqualine Type 1 Organic Based Wall Tile Adhesive Over Waterproof Membrane Wall Tiles (to a minimum height of 300mm) R Type 1 Organic Based Wall Tile Adhesive Over Waterproof Membrane Minimum Gap Between Bath and The Back of The Gib Aqualine 10mm Acrylic Sealant 2mm 5-10mm 6mm Silicone Sealant Relief Joint Clearance Between Shower base and The Gib Aqualine 6mm R 6mm Silicone Sealant Relief Joint R 6mm Basin Type 1 Organic Based Wall Tile Adhesive Over Waterproof Membrane Gib Aqualine Acrylic Sealant 2mm 6mm 10mm Acrylic Sealant Silicone Sealant 5-10mm Tap Body Silicone Sealant Relief Joint Wall Tiles Clearance Between Shower base and The Back of The Gib Aqualine Splashback Impervious Membrane 6mm 6mm Sideand Upstand 300mm Minimum Wall Tiles Relief Joint Preformed Shower Base Bench Top NOTE Where Impact Noise From Pipes an Bath Clearance Between The Bath and The Timber Frame Nogging Clearance Between Shower base and The Timber Frame Nogging Issue Fix All Pipes on Resilient Brackets TYPICAL PLUMBING PENETRATION TUB, SINK AND BASIN PREFORMED SHOWER BASE WALL JUNCTION D1 BATH TO WALL JUNCTION D2 D4 D3 32x32x0.55mm Vertical Fixed Galvinsed Steel Angle R Gib Aqualine Wall Tiles R Gib Aqualine R Gib Aqualine 6mm Gib Aqualine Wall Tiles Flat or Contious Fall to The Floor Waste Reinforcing Mat Embedded in Waterproof Membrane 10mm Acrylic Sealant 6mm Flexible Sheet Vinyl Fully Bonded To The Floor and Wall With all Seams Hot Welded 10mm 75mm MINIMUM 10mm Type 1 Organic Based Wall Tile Adhesive Over Waterproof Membrane Type 1 Organic Based Wall Tile Adhesive Over Waterproof Membrane Silicone Relief Joint 150 Minimum R Wall Tiles Reinforcing Mat Embeded into Waterproof Membrane Membrane Applied Prioe to The Floor Screed Type 1 Organic Based Wall Tile Adhesive Over Waterproof Membrane VINYL FLOOR COVERING CERAMIC FLOOR TILES WALL TO FLOOR JUNCTIONS WALL TO FLOOR JUNCTIONS Foam Plastic Bond Breaker Rod TILED SHOWER INTERNAL CORNER DETAIL D5 D6 CERAMIC TILED INSITU SHOWER D7 Reinforceing Mat Returned 50mm Around The Internal Corner Both Ways 50mm 6mm Silicone Sealant Relief Joint Ceramic Floor Tiles Morter Bed Floor Screed Formed to Fall to The Floor Waste Silicone Sealant Relief Joint Coved Moulding For Continious Support Reinforced Corner Returned 150mm Minimum up The Wall D8 Revision A Issued for consent DATE 10 Sept., 2008 50mm O R G A N O N ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz Job Title STAGE I Extensions 142 Campbell Rd Greenlane AUCKLAND 32mm X 32mm X0.55mm Galvanised Angle Fixed at 600mm centres to Each Stud Drawing Title Reinforceing Mat Returned Details, Bathrooms - general 16 150mm Both Along The Floor and 150mm Up The Wall Drawing Status Building Consent REINFORCING MEMBRANE AND MAT CORNER REINFORCING : GALVANISED ANGLE 142Campbell-STAGEI.pln; 16 Details, Bathrooms - general; 100%; 9/09/2008 4:40 p.m. MAT TO INTERNAL CORNER D9 D10 NOTE: Use details shown here for all bathrooms unless specifically shown otherwise. Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 16 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln PLAN 1,308 75 1,158 75 1,008 35 98 35 59 35 98 35 60 35 98 35 59 35 98 35 79 150 150 140x45 HW rail, to 5D pitch inwards 240 45 195 45 79 25 NOTE: FIXINGS: Use M12 galv. bolts with 50x50x3 galv. washers, with 63mm double-sided circular toothed connectors 70x45 H3 pine D4S 1,195 2,010 35x35 H3 Pine D4S 75x75 hardwood posts 35x35 H3 Pine D4S 50 70x45 H3 pine D4S Revision A Issued for consent DATE 10 Sept., 2008 275 O R G A N O N 45 45 100 230 45 75 Square cut ends ARCHITECTURE PO Box 108054, Symonds St, Auckland, New Zealand E-mail: [email protected] Tel/Fax: (09) 631 0034 www.organonarchitecture.co.nz ELEVATION NOTE: Instal uprights so as to ensure no more than 90mm gap between uprights Job Title STAGE I Extensions DETAIL: Open Balustrade 1:10 142Campbell-STAGEI.pln; 17 Balustrades; 100%; 9/09/2008 4:40 p.m. 1 DETAIL: Baluster Fixings 1:5 142 Campbell Rd Greenlane AUCKLAND Drawing Title Balustrades 17 Drawing Status Building Consent Drawn by Date Checked by Date PC 7/03/08 PC 7/03/08 Scales Drawing Number 17 of 17 Status Revision Consent A D:\_Projects\07003 - Campbell Road 142\142Campbell-STAGEI.pln
Similar documents
Android Development for Beginners
* Private- Accessible only within the class * Public- Accessible within the class and to other classes * Protected- Accessible within the class and to children of the class (subclassess)
More informationspan tables - Thora Wholesale Timbers
– Maximum Floor Load Width 1800 mm Bearers Supporting Single Storey Loadbearing Walls – Maximum Floor Load Width 2400 mm Bearers Supporting Single Storey Loadbearing Walls – Maximum Floor Load Widt...
More information