AVANGARD

Transcription

AVANGARD
AVANGARD
INDUSTRIAL PARK
2015
PROJECT DESCRIPTION
We introduce you the project of
Industrial Park “Avangard”. It is the
first pilot project of “greenfield”
type not only in Khabarovsk region
but also in Far Eastern Federal
District in general.
FAR EASTERN
FEDERAL DISTRICT
Khabarovsk city,
the capital of Far Eastern
Federal District
Well-developed
transport infrastructure:
Railway station - 2.6 km
International Airport - 7 km
KHABAROVSK
River port - 14 km
Seaport - 750 km
CHINA
Geographical closeness
to the Asian Pacific
region.
JAPAN
SOUTH
KOREA
PROJECT DESCRIPTION
Eco-Wood
46,9
land
plot
hectares area
Energo-Impulse
production
of electrical equipment
production of plastic wood
and foamed PVC
1,1 ha
2,3 ha
Vacant
land plots
Residents of the park:
JGC Evergreen
Avangard Logistic
Eco-Wood
Energo-Impulse
Complex Logistic Systems
Cogeneration center
and infrastructural objects
Vacant land plots
JGC Evegreen
greenhouses
17 ha
Complex
Logistic
Systems
Cogeneration
center
and infrastructural
objects
container depot
5,8 ha
1,2 ha
Avangard Logistic
logistic center
10,0 ha
PROJECT IMPLEMENTATION
46,9
land
plot
hectares area
Residents of the park:
JGC Evergreen
Avangard Logistic
Eco-Wood
Energo-Impulse
Complex Logistic Systems
Cogeneration center
and infrastructural objects
+ + +
+ +
+ + +
Embodied projects
Projects
under implementation
Projects with possible
joint investment
Vacant land plots
+ + + + + +
+ + + + + + +
+ + + + + +
+ + + + + + +
+ + + + + +
+ + + + + + +
+ + + + + + +
+ + + + + + +
+ + + + +
+ + + + + +
+ + + + + + +
+ + + + + + +
+ + + + + + + +
+ + + + + + +
+ + + + + + +
+ + + + + + +
+ + + + + +
+ + + + + + +
+ + + + + + +
+ + + + + + + +
+ + + + + + + +
+ + + + + + + + +
+ + + + + + + + +
+ + + + + + + + +
+ + + + + + + +
+ + + + + + + + +
+ + + + + + + +
+ + + + + + + +
+ + + + + + +
+ + + + + + + + +
+ + + + + +
+ + + + +
+ + + + + +
+ + + + +
+ + + + + +
RESOURCES AND INFRASTRUCTURE
Industrial Park “Avangard” is supplied with
all necessary infrastructure and resources.
Labor resources
in 50 km zone
440 000 p.
employable population of Khabarovsk city
Natural gas
pressure - 0,6 MPa
Water supply
artesian wells
Electricity
Sewer system
11.5
MW
voltage – 6KV
local sewage-purification facilities
PREFERENCES FOR THE RESIDENTS
The territory of Industrial
Park “Avangard” is included
in the Territory of advanced
development “Amur”
TAX PREFERENCES
Profit tax (general rule – 20%):
 0% - 1st-5th years;
 10% - 6th–10th years.
Property tax (general rule – 2.2%):
 0,5% - 1st–5th years;
 1,1% - 6th–10th years.
Labor tax (general rule – 43%):
 20,6 %
There are several groups of preferences for
the residents prescribed by Russian Federal
Law of 29/12/2014 № 479-FZ.
SIMPLIFICATION OF ADMINISTRATIVE
PROCEDURES
Authorization of Russian Federal Ministry for
Development of Far East to facilitate some public
services (construction permit, commissioning
permit, territory planning design confirmation etc.)
Suspension of quotas and permit on attraction of
foreign labor force.
The possibility of free custom zone establishment.
RESIDENT POLICY
EXPECTED PROFILE OF THE RESIDENT
moderate land plot size (within 5 hectares)
ecological friendly production (IV-V classes of danger)
energy-intensive production
INTERACTION BETWEEN RESIDENT AND INDUSTRIAL PARK MANAGEMENT COMPANY
Conclusion of the admission
agreement and 49-years land lease
agreement
Construction and commissioning of
the resident’s production facilities
The resident's production activity
Acquiring the right of purchasing the
leased land plot
Fulfillment of the resident’s technical requirements,
granting of the engineering facilities, road and
railroad connections
Opportunity of factories construction utilizing
«built-to-suit» scheme
Providing of services by Management Company
(logistic, recruiting, engineering, security, cleaning,
and basic office services)
JOINT VENTURE SCHEME
INVESTOR
Foreign or Russian company
Status of the resident
of Industrial Park
and of the Territory of
Advanced Development
INVESTOR
SPECIAL
PROJECT
COMPANY
Admission
agreement
Construction
and
commissioning
Production
Russian company
INDUSTRIAL PARK
MANAGEMENT
COMPANY
CONTACTS
Industrial Park “Avangard”, LLC
2a, Donskaya str., Khabarovsk city, 680000, Russian Federation
Denis A. Gros
Chief Executive Officer
+ 7 962 501 44 01
[email protected]
Andrey V. Bezverkhov
Chief Development Officer
+ 7 962 501 22 06
[email protected]
WISH YOU WERE HERE