profile - Lập dự án
Transcription
profile - Lập dự án
THAO NGUYEN XANH CONSULTING INVESTMENT CORPORATION ADDRESS: 158 NGUYEN VAN THU, DAKAO WARD, DISTRICT 1, HO CHI MINH CITY TEL: 0918755356 – 0839118552 FAX: 0839118579 PROFILE over Consult engineering regarding environmental, water supply drainage technology Prepare report on environmental impact, environmental impact assessment, check and take Collect, treat waste water, rubbish Design and build industrial and civil works Set up invested project INTRODUCTION Being one of leading companies specializing in project preparation consulting and one of very few companies having enough ability to perform formalities relating to environmental consulting such as apply for waste discharge license issue, set up report on environmental impact assessment “ĐTM” departmental based on decree 18, 2015, we are proud of our consultancy for small large groups such as becamex, City land, SCG, Ha Do,… would like to cooperate with investor “real-estate companies, hospitals, schools, enterprises, factories,….” to support and consult the entire sequence of setting up and performing project and environment right since preparation for investment plan application, we shall help investors complete dossier of money flow estimation, internal rate of return IRR, Net present value NPV, survey and assess project’s feasibility, prepare report on environmental impact assessment “ĐTM”…. for investors to get a comprehensive view and decide for investment exactly, create foundation for investor to apply for investment plan, call for investment, borrow for investment, and perform project. In 2015 Thao Nguyen Xanh is the first company establishing five-star personnel model to provide for clients the best, fastest, and most professional services. We commit to serve for client by the best staffs, almost staff team of Thao Nguyen Xanh are excellent students of Architecture University, Polytechnic College, Natural Science University, Economics University…. In the past, successful enterprises always hire famous and professional consultants who are the only ones having ability to help them become successful. High effective project cannot be done by normal consultants. In practical, a normal company cannot perform well and also cannot communicate well to ensure proper progress, and they also have no enough funds to hire good staff. In 2015, 1/4 customer of Thao Nguyen Xanh is booting rather well; we shall stand by Enterprises to consult and perform all procedure regarding project and environment. BUSINESS LINES 1. INVESTED PROJECT ESTABLISHING Consult regulation, procedures related to investment in Viet Nam. Consult feasibility of investment incentive procedures. Set up invested project, apply for investment certificate issue. Set up business plan, capital borrowing plan. Set up 2. ENVIRONMENTAL CONSULTING Set up environmental impact assessment departmental/ ministerial level Set up environmental protection project departmental/ ministerial level Set up commitment to environmental protection Set up environmental supervision periodically Discharge permits Ground water extraction licenses Book all emissions sources of hazardous waste Design, construct, install treatment system for waste water, supply water, exhaust fumes 3. DESIGNING, SUPPERVISING, CONSTRUCTING WORK Design consulting Construction supervision consulting Work quality checking 4. DESIGN, CONSTRUCT, INSTALL TREATMENT SYSTEM FOR WASTE WATER, SUPPLY WATER, EXHAUST FUMES… Clean water supply system – supply water treatment system Waste water treatment system Technical pipe and equipment system Hygiene and drainage system Ventilation and air condition system – Compressed air machine Boiler system and thermal equipment Other utilized systems –Prevent and fight fire system… System of waste water - supply water treatment of brick factory HEAD OFFICE AND COMPANY OFFICE HEAD OFFICE THAO NGUYEN XANH CONSULTING INVESTMENT CORPORATION Address: 158 Nguyen Van Thu, Dakao ward, District 1, HCMC Tel: (08) 39118552 - 0918755356 Fax: (08) 39118579 Tax code: 0 3 0 5 5 9 1 8 6 1 Charter capital: 10.000.000.000 VND Ha Noi Office: No. B3/D6, Cau Giay New City Area, Dich Vong, Ha Noi Hotline: 0433526997-0918755356 Branch at Vung Tau: E35 Ong Ich Khiem, Ward 6, Vung Tau City Website: www.lapduan.com.vn - www.xaydungduan.com www.thamdinhduan.com - www.ketoanclub.com Thao Nguyen Xanh – Smart choice of enterprise Team of environmental engineers, experts of Thao Nguyen Xanh Consulting Investment Corporation Proud of being trusted and cooperated such as: SJC Saigon Company, Mai Linh Group, Dong Tam Long An, Mrs. Nguyen Thi Phan of FATACO Ben Tre Company, Becamex Binh Duong Group and domestic and foreign companies such as Tam Chau Tea Company, Taiwan Fotai, Samco, Quang Nam Industrial Park-Prime Dai Loc, Nhon Trach Industrial Park and many other companies trusted and signed environmental, supervising contracts. Company leaders participated in the National Congress "YOUNG ENTREPRENEURS ASSOCIATION VIETNAM" in Hanoi Capital BUSINESS LICENSE NGÀNH NGHỀ KINH DOANH NGÀNH NGHỀ KINH DOANH CÔNG TY CP TƯ VẤN ĐẦU TƯ THẢO NGUYÊN XANH www.lapduan.com.vn ĐẠI HỘI ĐỒNG CỔ ĐÔNG HỘI ĐỒNG QUẢN TRỊ TỔNG GIÁM ĐỐC TRỢ LÝ BAN KIỂM SOÁT THƯ KÝ PHIÊN DỊCH PGĐ ĐIỀU HÀNH TRỢ LÝ P. MARK ETING P.TƯ VẤN DN P. KẾ TOÁN K.TOÁ N TRỢ LÝ TRỢ LÝ P. DỰ ÁN P. HÀNH CHÍNH TRỢ LÝ THẨM ĐỊNH P. ĐĂNG KÝ SHTT P.KT TC P.KỸ THUẬT P. MÔI TRƯỜNG KẾ TOÁN TRƯỞNG PGĐ ĐIỀU HÀNH PGĐ ĐIỀU HÀNH PGĐ ĐIỀU HÀNH CHĂM SÓC KH KT TỔNG HỢP KT CÔNG NỢ THỦ QUỸ KINH DOANH THÍ NGHIỆM TƯ VẤN MT THIẾT KẾ XD GIÁM SÁT THI CÔNG HUMAN RESOURCES STRUCTURE OFFICE STAFF EXPERIENCE SPECIALTY 1 Nguyen Thai Son 15 years Construction 2 Truong Van Trung 5 years Construction 3 Pham Tan Đuc 5 years Engineer 3 Nguyen Dinh Hieu 10 years Construction 4 Tran Trong Thai 5 years Construction 5 Nguyen Anh Toan 30 years Constructive economy 6 Nguyen Van Chinh 15 years Mechanical engineer 7 Nguyen Hong Trung 20 years Civil and industrial electricity 8 Nguyen Thi Ngoc Nhung 5 years Accountant 9 Nguyen Anh Tuan 8 years Constructive engineer 10 Dang Thi Cam Duy 3 years Accountant 11 Nguyen Thuy Tram 5 years Accountant-Auditor 12 Dang Ngoc Dong Thu 3 years Accountant-Auditor 13 Tran Thi Bich Lien 7 years Industrial engineering 14 Huynh Thi Yen Thinh 5 years Environmental engineering 15 Nguyen Thi Ry 2 years Technology designer 16 Duong Van Trinh 3 years Water supply and drainage 17 Nguyen Phu Lam 2 years Environmental science 18 Nguyen Viet Thuy 4 years Environmental science 19 Phan Trong Tan 4 years 20 Hoang Nguyen My Linh 3 years Environmental science Environmental and technology engineer 21 Thieu Viet Cuong 3 years Environmental engineering 22 Nguyen Thi Thuy Linh 4 years Environmental technology 23 Le Van Tuan 5 years Water supply and drainage 24 Pham Thi Anh Thu 15 years Environmental and technology engineer 25 Le Mai Thao 5 years Water supply and drainage 26 Tran Anh Tho 3 years Water supply and drainage 27 Tran Thi Ut Thuy 8 years Economy 28 Pham Thi Thu Hien 5 years Plan economy and investment 29 Ha Nguyen Thuy Doan 2 years Map - GIS 30 Tran Cao Thanh Toan 4 years Economy - Law 31 Do Thi Thanh Thao 4 years 32 Le Huyen Chi (IT) 3 years Management information system 33 Đoan Thi Huong Thuyet 4 years Information technology 34 Tran Huu Thai 5 years Electricity - Electronic Plan economy and investment DON’T WORK HARD – WORK SMART With more than 60 environmental engineers and experts, we combine and perform many successful contracts with partners, agencies such as Environmental Police Department, Ministry of Natural Resources and Environment, General Department of Environment….. TYPICAL PROJECTS - CONSTRUCTIONS Project; Design, Construct Waste Water Treatment System of Cai Nuoc General Hospital - Image of acceptance of Cai Nuoc Hospital Project: Design, Construct, Provide, Install Waste Water Treatment System Equipment of Obstetric – Pediatric Hospital at Ca Mau Province Capacity 350m3/ day Investor: Board of project management social – cultural of Ca Mau Location: Ly Thuong Kiet, w.6, Ca Mau City The construction is invested by Board of project management social – cultural of Ca Mau and completed in 12/2011. Construction stated Thao Nguyen Xanh is not only successful in project, but also successful in environment. ENGINEERING DRAWING OF HOSPITAL WASTE WATER TREATMENT SYSTEM Drawing: + Air condition tank + Air condition tank + Reflection + Chemical + Bump bunch... Project: Purchase, Install, Construct Waste Water Treatment System Belonging to Project of Constructing Dam Doi General Hospital, Ca Mau Project: Purchase, Install, Construct Waste Water Treatment System Belonging to Project of Constructing General Hospital, Ca Mau PROJECT, CONSTRUCTION OF DESIGNING CONSTRUCTING INDUSTRIAL WASTE WATER TREATMENT SYSTEM FOR FACTORY, INDUSTRIAL PARK, APARTMENT… With the purpose of speeding up domestic industrial development and attract foreign investor to national development under industrialize, modernize, therefore industrial zones and export processing zones are built and developed with larger and larger scale. The main cause is industrial zones, factories are lack of waste water treatment system due to not having attention of investor and due to weak policy of the government. Waste water treatment at Khanh Hoa, Nha Trang Each kind of waste water will be treated in different way. Many waste water treatment systems are designed based on low cost, lack of measure equipment, supervision. Through practical process of building many waste water treatment systems for industrial zones, factories, Thao Nguyen Xanh is proud of being leader a Project: Design Engineering and Provide, Install Domestic Waste Water Treatment System at 22-Floor-Thuy Van-Apartment – Ba Ria Vung Tau Waste water from different activities of human being such as (domestic, industrial, agricultural) is not allowed to pull out to the environment, but must be treated via waste water treatment system. Treatment process includes physical, chemical, and biological processes. This is to improve waste water quality after treatment. INDUSTRIAL WASTE WATER TREATMENT – INDUSTRIAL PARK – DYE TEXTILE Dyed waste water is generated mainly during washing, sizing, bleaching, dyeing ... Textile Dyeing Wastewater often have high pH is toxic to aquatic kind, corrosive The color of textile wastewater in the process due to use dye color volume fraction just stick to fabric was largely discharged with sewage water causing color when released into the environment In addition to the two elements on other toxins such as supplied, metal heavy speakers, the halogenated organic compounds can accumulate in organisms can populate and went on up the food chain causing chronic diseases for humans and animals . Construction of dye-textile waste water treatment With a team of environmental engineers long experience, we constantly study uses the most advanced technology today, by combining chemical and physical methods proposed bio suit the characteristics and properties of water bring high efficiency waste; The concentration of pollutants after processing achieve current regulations; Land use minimum. Process simple, easy to operate We've done a lot of construction works textile wastewater treatment capacity of 1000m3 / day to 1.500m3 / day as sewage treatment works dyeing of textile companies of South Korea in Hai Duong, textile Dyeing company in Nhon Trach ... In 2013, with the economy still remains difficult, however with environmental company Thao Nguyen Xanh had a great success in projects large and small across the country. We have been implementing the system of sewage and water in IP Dai Quang Dai Loc, Quang Nam by Prime Dai Loc Corporation investor. Project: Design Engineering, Construction, Install Waste Water Treatment System (Capacity 400m3/ day) and Construction, Install Water Treatment System (Capacity 600m3/ day)) Construction: Prime Dai Quang, Dai Loc, Quang Nam, Da Nang Swimming sewage wastewater treatment works built crude Danang With advanced technology, using imported equipment, Thao Nguyen Xanh has executed many works projects large and small wastewater treatment systems throughout the country from the South to the North, specialized in the design and construction of treatment systems wastewater industrial parks, factories, hospitals ... With innovative technology, modern machinery and a team of engineers, experienced professionals will bring to our customers the confidence and satisfaction With the goal of promoting industrial development in the country and attract foreign investment to develop the country in the direction of industrialization and modernization, hence the industrial zones and export processing zones are built and developed with scale growing. However, in parallel with the positive developments, the process of industrial development and industrial zones systems in Vietnam is creating many challenges of environmental pollution caused by solid waste, wastewater and industrial emissions. The main reason is the industrial zones, factories lack of sewage system mainly because investors are not really interested and so mechanisms, policies and sanctions are not strong enough. Wastewater from industrial parks, factories, enterprises are diverse examples: textile wastewater, plating wastewater ... Each different type of wastewater will have separate process technology for processing. Many wastewater treatment system is designed, the construction with the spirit of "minimal cost", lacks many important items such as laboratory and measuring equipment, monitoring, control, pump , sludge dewatering and generator backup ... Through the process of actually constructing the wastewater treatment system of industrial zones, different plants, Thao Nguyen Xanh proud forefront of technology and build waste water treatment system. System of sewage treatment tank System of steel treatment tank System sewage treatment basin in Quang Nam Industrial Park – Danang Construction unit: THAO NGUYEN XANH CONSULTING INVESTMENT CORPORATION Project: Construct Yokowo Manufacturing Waste Water Treatment (Japan) 1000m3 Location: Ha Nam Works by JSC CENTEC specialized electrical construction as an investor with a total construction cost 7.6 billion was completed in 2011. It is one of the big ones which have partnered Thao Nguyen Xanh success in the North and the results of testing showed that the parameters were achieved by QCVN 24-2009. Project title: Design and construction of Sewage Treatment Systems BUILDING ORIENT SAIGON capacity of 100 m3 / day Investor: SAI GON PHUONG DONG LIMITED COMPANY Location: No 12, Phan Ke Binh, Da Kao ward, District 1, HCMC In 2014, there are several outstanding events and notable for the business community and the economy of Vietnam. Most significantly, the business screening actually have quality and potential, not only flexible to survive the most difficult period, but also seek new business opportunities in order to expand the scale of operations. Trends strong selection took place, to review the economic activities of enterprises. Many small businesses have to stop the game, forced to dissolve or suspend registration of a term. Thao Nguyen Xanh strong to overcome the economic storms that demonstrate potential and deserves to be honored. Photos: Leader of Thao Nguyen Xanh and test engineering team, guiding the workers about workplace safety at work Danang For example in particular in the environmental field as JSC Consulting Thao Nguyen Xanh - based in District 1 (HCMC). In times of crisis, to reach up and improve market competitiveness, business leaders have promoted separate strategy with finding foreign partners, research technologies, wastewater treatment, advanced emissions, technology transfer from developed countries like Norway and Sweden to apply in Vietnam. The results of this business have been successful and achieved many accomplishments as becoming the environment since 2014. As consumer companies operating in the technology sector, designing, constructing and operating treatment systems wastewater. Supply of equipment, machinery and chemical processing environments. Maintenance, repair and upgrade the sewage system. The wastewater treatment facilities, but Thao Nguyen Xanh emissions apply new technologies have brought significant benefits, clearly reduced operating costs textile treatment systems. Voted the enterprise is one of the top 10 environmental consulting unit in Vietnam. And especially consulting firms and make the records and procedures related to the environmental sector on reporting environmental impact assessment (EIA), environmental protection schemes with fastest time present day Design technology projects - construction and installation of wastewater treatment systems activities in Ba Ria Vung Tau Capacity: 350 m3 / day System of domestic waste water treatment PROJECT DESIGN, CONSTRUCTION LIVESTOCK WASTE WATER TREATMENT The model-scale livestock farms contribute to promoting economic development and solve local employment for many workers in place. However, the discharge of animal waste into the environment through treatment not causing environmental pollution and affect other industries. Finding the right solution for handling livestock waste water before discharging it into the environment is essential for the sustainable development of this model. Model of waste water treatment for pig livestock Thao Nguyen Xanh livestock wastewater treatment successful projects, large and small farms in the provinces of Binh Duong, Dong Nai, Tay Ninh .... Tank of livestock waste concentration GROUND ENGINEERING DRAWINGS PIPES SYSTEM HOSPITAL WASTEWATER TREATMENT Surface for placing pump equipment Surface for water pipe Surface for chemical pipe Surface for mud pipe Surface for gas blowing pipe Apply advanced technology and engineering Surface for placing foundation of condition tank – container support CONSULTING FOR PROJECT ESTABLISHMENT Thao Nguyen Xanh, specialized consultants to formulate investment projects on how areas: environmental project planning, project wastewater treatment plant, construction of apartments, built hospitals, amusement parks - entertainment, hotels and restaurants, business investment projects, investment in construction projects on schools, farm projects, etc. With a team of engineers and consultants are enthusiastic, experienced, customers will be directed to complete the procedures for setting up projects quickly as possible. Depending on the size of the business operations, the engineer of prairie Green will offer customers alternatives to complete the procedures for setting up their projects efficiently, feasible and fastest. TYPICAL PROJECTS PROJECT OF CITYLAND RESIDENTIAL ZONE Investor: Real Estate Investment City Co. (Cityland) - Forms Management: Investors direct project management through management established by investors. - Investment Purpose: Creating a new urban space modern, synchronous technical infrastructure, architecture, environment and social infrastructure, coupling with neighboring projects are deployed, upgrade and renewal urban development contributes to the cultural, economic, socio - ward area Me Tri, Tu Liem district Nam, Hanoi. - Scope of analysis: Analyze segments: low-rise houses (villas, townhouses) for high income earners and utilities such as kindergartens, trees, traffic to the scale of 6 hectares. Architectural layout space Construction of a new modern residential architecture has its own characteristics, with comfortable living environment, high ecological nature. Exploited these landscape elements in the region, organized harmonious overall architectural landscape of the city. Space height in units in harmonious organization covers the entire low-rise buildings (around 4 floors) include garden cottages, garden cottages adjacent incorporate green space interspersed. In the center of the entire core area of greenery combined service, underground parking to meet demand for the entire stay. There is also a system of uninterrupted greenery organizations, including the flower garden green areas focused, street trees, the bands and clusters of trees scattered in groups in order to provide maximum efficiency in use and its significant contributions to landscape architecture urban areas, contributing to improved environmental conditions microclimate The transport axis arranged easily coherent link between the buildings and outside areas at. Also yet to make a compelling change varies spatially and points of view. Architectural forms of housing projects, public harmonious design style and have unified Vietnam architectural identity, in accordance with the conditions of tropical climate. Perspective of low-rise housing PROJECT OF CONSTRUCTION INVESTMENT FOR RESIDENTIAL ZONE PRIMARY DEMONSTRATION Buildings are built on land with an area of 3347.8 m2, including 12 villas with land use coefficient is 0.74; construction density 37% as planned. Part outdoor garden layout, internal roads, shade trees, building fences and gates. INVESTMENT TARGET Toward city: The project will form a high-end villa modern national standard scale of District 2. 3347.8 m2 villas that exploit a complex of works includes the sale and rental apartments utility services comes closed. Project when being exploited to meet the increasing demand for housing, demand for rented apartments are deficient in HCMC with complete technical infrastructure and modern society, sync. Villas suitable for landscape and city planning contributed to improving habitat security and public order in District 2. Mobilizing been idle funds from customers in need of housing and banks, credit institutions wishing commercial loans, or participation in projects aimed at creating value for the society material . To create more resources for housing fund to help solve the housing shortage at present area project also creates many jobs are to society in the process of building, contributing to the state budget and bring profit corresponding to the Investor Toward local people: Restoration of technical infrastructure and modern society and in sync. Gradually improve literacy levels in the community living with the equipment and technical infrastructure and modern society. Model of single villa Model of detached villa PROJECT CONSTRUCTION INVESTMENT HOUSE AND APARTMENT The objective of the plan Distribute functions in accordance with nature of activity, ensure to closely coordinate between these areas in the whole surrounding region. Determine scale, location of land plot for public work Connect urban technical infrastructure house groups and residential parks with surrounding area. Harmonious architecture space disposition closely attaches to green piece and water surface area. Project: Investment in building housing complexes and condominiums PROJECT OF RESORT TOURIST PARK Nature area planned nature of the planning area is construction of tourist service luxury resort catering demand, rest, recreation and nursing for domestic and foreign tourists with works hotel and villa gardens to long stay and convalescence Zoning 1/2000, and also meet the needs satisfied utilization parts management function in the operating area of the resort. Accommodation area. Hotel area. Villas, Bungalow serving for short term and long term staying demand. Supermarket area. Restaurant, club. Sport area, football yard, multipurpose hall. Entertaining and camping area, outdoor hall. Interior way, car parking of tourist. Rubbish gathering area. Park, green tree, sightseeing. Water lake, sightseeing lake INVESTMENT PROJECTS WASTE TREATMENT PLANT Real environmental pollution A burning issue, upset public opinion in the country today is the pollution of the ecological environment by the production and life of human caused. This problem is increasingly serious, direct threat of economic development - a sustainable society, the existence and development of the current generation and the future. + The status of the urban environment, industrial parks The types of pollutants commonly found in urban areas in Vietnam is surface water pollution, dust pollution, pollution of sulfur, carbon dioxide, nitric, pollution, lead, solid waste (in hospitals, birth operation). In Vietnam, the concentration of pollutants in surface water is often very high as the suspended solids, chemical oxygen demand, nitrite, nitrate .... fold from 2-5 times, even up to 10 to 20 times the standard values for surface water type B, the index reached the standard ecoli allows hundreds of times. In addition to organic pollutants on the environment of urban surface water in some places are polluted by heavy metals and toxic substances such as lead, mercury, arsenic, chlorine, phenol, ... In most urban dust pollution, much of the serious pollution, the most polluted places are residential areas near the cement plants, industrial parks, manufacturing materials and plants coal ... In residential areas near industrial areas, the concentration of sulfur exceeding the allowed number several times. In Vietnam, the percentage of solid waste collection is still very low compared to the requirements set out, in many places the percentage of solid waste collection by 20% - 40%. Measures to collect solid waste currently land filled (currently no landfills that meet the technical standards of environmental hygiene). According to statistics, Vietnam has over 800 industrial establishments with 70 export processing zones (industrial parks). The contribution of industry to GDP is very large. However we have to suffer environmental damage caused by industrial sector caused. + The status of the rural environment Water pollution in the rural and agricultural sector is also very serious. Nearly 75% of our country's population live in rural areas, where infrastructure is outdated, the majority of human waste and untreated cattle, infiltration into the ground or washed away, making the condition water contamination in organic and biological constantly rising. Many places by massive aquaculture, lack of planning, not following the technical process has caused many negative impacts to the aquatic environment. The amount of waste water processing enterprises Frozen seafood is also very large, exceeding allowed a few dozen to hundreds of times. Rural water environment is also polluted by improper use and improper agricultural chemicals (pesticides, herbicides, ....) The lack of sanitary facilities, infrastructure support facilities works made for household use only clean water to reach about 30% - 40%, and only 20% - 305 works of households use hygienic standards. + Technology plan: MBT-CD.08 technology: waste processing Garbage stage approach Quantitative phases, separating primary filter Cutters tear stages and intermediate recruitment Secondary separation stage Multilayer tear from cutting and artisanal nylon Downstream crushing stages Stage composted in composting biological tower Stage crushing and blending additives (production of pellets) Annealing step for stabilizing natural materials Stage curing and shaping the fuel pressure members Stage crushing and blending additives (sx adobe bricks) Technology industrial waste hazardous: Technology FBE incinerator ... Pictures: Model systems tunnel kiln incineration of hazardous industrial (carousel format) HOSPITAL PROJECTS COMBINED COMMUNICATION Project construction combined hospital communication: As the first hospital in Vietnam to use all the equipment and machinery of Japanese, doctors each department head is in Japanese. Specialized hospital care and free counseling for all patients, especially patients with HIV / AIDS; and free HIV testing to patients. Duration of the project: 25 years, the project is under construction from month to month 06/2014 02/2013; operational from January 07/2014, ending in 2038; liquidation of assets in 2039 The purpose of the assessment of environmental impact "project combines Hospital communication" is considered assessment of the factors positively and negatively affect the environment in the hospital and surrounding areas, thereby making recovery solution, reduce pollution to improve the environmental quality impacts limiting risks for the environment and for the hospital when the project is implemented, meet the requirements environmental standards. ENVIRONMENT Prepare report on environmental impact assessment DTM Prepare report on environmental supervision periodically Prepare environmental protection plan Prepare environmental protection commitment Prepare book of emission sources for hazardous waste matter Prepare report on hazardous waste matter controlling Thao Nguyen Xanh established environmental commitments apply to businesses manufacturing, trading and services with environmental impact, but not on the list of projects that need to EIA. Often the projects of small and medium scale capacity below 1 million pieces / year. Environmental protection commitments made before the business goes into operation active basis but have carried out the renovation and expansion, enhance production capacity scale but not on the list of projects that need to EIA. - The production, business and services not subject to the investment project but production waste generation. - For the project, the proposed production, sales, service has been registered environmental protection commitments but not yet in operation and re-registration must make a commitment to protecting the environment in the following cases: + Relocation of implementation; + No implemented within twenty-four (24) months from the date of commitment to environmental protection is registered; + Increase the size, capacity or technological change increases the scope of impact or increase the negative impact on the environment due to waste not cause or increase the total amount of waste generated or the new types of waste, waste polluting components higher than forecast in the environmental protection commitment has been registered but not serious enough to require reports on environmental impact assessment. Along with the quality of each project, we trained with specialized skills for overseeing the construction of civil and industrial, such as: The headquarters office buildings, highrise apartment buildings, houses investment, hotels, industrial parks, processing plants, warehouses ... Construction Supervisor leveling and construction supervision of infrastructure and urban residential areas, industrial zones: Construction Supervisor foundations, bored piles, basement, water supply systems, internal transport system of urban residential areas, industrial zones and parks ... Construction Supervisor water supply, waste water treatment ... We had many large and small contract construction supervision consultant works from the South to the North. Professional engineering team combined with practical experience many, who commanded many large projects, stature. The environmental services of Thao Nguyen Xanh get appreciation and trust from customers and partners. According to the partners, the Agency departments and service quality of Thao Nguyen Xanh good, ensure the completion of work on time and commitment between the parties and put the interests of customers above all else . The working principle of objectivity Thao Nguyen Xanh tied to reality. Our team of engineers with high qualifications, friendly, professional and ensure the implementation of the commitment, service style and enthusiastic consultants. Image: Meeting at Binh Phuoc TYPICAL WASTE WATER TREATMENT SYSTEM Nam of Project Design and construct waste water treatment system (Capacity 400m3/ day – supply water capacity 600m3/ day. Investor Place Prime Dai Loc Corporation Dai Quang Industrial Park, Dai Quang Commune, Dai Loc District, Quang Nam, Da Nang Design and construct waste water treatment Restaurant 13 system of Restaurant 13, capacity 5m3/ day. night Expand waste water treatment system of Ca Mau Province General Hospital (Capacity 200m3/ day) Cultural – Social Project Controlling Committee of Ca Mau Province 23 Nguyen U Di, Dist 2, Ho Chi Minh City Hai Thuong Lan Ong, W.6, Ca Mau City Construct waste water treatment system of Cai Nuoc General Hospital in Ca Mau Province (Capacity 250m3/ day. night) Cultural – Social Project Controlling Committee of Ca Mau Province Provide, install equipment for waste water treatment system of Dam Doi Hospital, Ca Mau XDCB Project Controlling Committee of Dam Doi Province Dam Doi, Ca Mau Cultural – Social Ly Thuong Kiet, W.6, Lac Long Quan, W.7, Ca Mau City Design, construct, provide, install waste water treatment system of obstetrical – Pediatrics Hospital in Ca Mau Province Project Controlling Committee of Ca Mau Province Ca Mau City Build manufacturing and domestic waste water treatment system capacity 150m3 Fotai Co., Ltd Binh Duong CenTec Corporation constructing electromechanical work Ha Nam Design engineering – construct install domestic waste water treatment system Son Thinh Office Building Vung Tau City Design construct building’s waste water treatment system Trung Nam Co., Binh Duong Build manufacturing and domestic waste water treatment system capacity 1000m3, Project Yokowo (Japanese capital) DTM Establishment Contract Set up DTM “Widening Wine Production Factory – capacity 7,000,000 liters/ year” International Wine Corporation Binh Duong Set up DTM Project of Commercial Service Complex at 02 Hong Ha, Ward 2, Tan Binh District HA DO GROUP CORPORATION Ho Chi Minh City HA DO GROUP CORPORATION 756 Sai Gon Ho Chi Minh City Le Phan Chemical Co., Ltd Ho Chi Minh City Viet Nam Acecook Co., Ltd Ho Chi Minh City Set up DTM Project of Ha Do Complex Center – Project 756 Sai Gon, 3/2 Street, Ward 12, District 10 Set up DTM Project “working office, warehouse, factory of ink production, producing and packing chemical” Set up DTM Viet Nam Acecook Set up DTM project “ Increase factory capacity from 2,000 crates/ day up to 5,0002,000 crates/ day” Namviet Oil Refinery and Petrochemicals Ho Chi Minh City JSC - NVO Set up DTM project “Eden Saigon Hotel” Sai Gon Eden Hotel Co., Ltd Branch of An Long Set up DTM project “Factory of fertilizer Ho Chi Minh City Long An production” Construct waste water treatment system for plated cement production 600m3. Set up DTM Ha Tien urban and sea resort Kid Set up DTM project of Kid Cooking oil production factory Set up DTM Biti’s Plaza Complex Apply for license of waste water into water source (approved by MNRE) Apply for license of discharge of waste water into water sources capacity >5000m3 (approved by MNRE) Build manufacturing and domestic waste water treatment system capacity 250m3 Build textile dye production waste water treatment system 800m3 project washaki (Japan’s capital) Register for groundwater usage exploitation Set up CKBVMT Center of Jewelry trading and working office Set up CKBVMT Sofit Hotel Set up DTM Anpha shipping and repair project Set up DTM project of high building apartment zone 2.4ha Song Soc Industrial Park Set up DTM Minh Hung Industrial Park Build manufacturing waste water treatment system for ViKa Rubber Recycling Factory 1500m3 Set up environmental supervision report An My Viet Fertilizer Corporation Italisa Co., Ltd Lien Thanh Investment Construction Corporation TF Cooking oil C., Ltd Biti’s Corporation (Binh Tien) La Nga Sugar Cane Corporation Bac Giang Kien Giang Vinh Long Buon Me Thuoc Dong Nai Vitasa Manufacturing Long An Co., Ltd Nam Ha Co., Ltd Thua Thien Hue Witalisit Co., Ltd Ninh Binh Ngoc Tram Co., Ltd SJC Sai Gon Jewelry Corporation Sao Mai Co., Ltd Anpha Technical Service Corporation Golden Land Da River Corporation Ca Mau Industrial Park Infrastructure Development Co. Minh Hung Industrial Park Infrastructure Development Co. ViKa Rubber Plastic Commercial Corporation Viet Nam Interwood Ngoc Tram Co., Ltd District 3, Ho Chi Minh City Can Tho Ben Tre Bien Hoa City, Dong Nai Ca Mau Tay Ninh Bac Giang Binh Duong Set up environmental supervision report Set up environmental supervision report Register for book mission sources of hazardous waste matter Register for book mission sources of hazardous waste Register for hazardous waste export Domestic waste water treatment system Set up DTM of project “Sai Gon Paradise Hotel” Consult, provide equipment of exhaust fumes treatment Provide chemical for waste water treatment Analyze air environment quality Design & construct waste water treatment system of wood processing with capacity 1000m3/ day. night Set up DTM project “build My Quynh zoo, hotel, and entertainment park” Design & construct domestic waste water and wood processing factory’s waste water treatment system with capacity 2500m3/ day. night Design, construct & transfer technology Domestic waste water treatment station for high-ranking apartment QSK Capacity Q = 600m3/day Design, construct & transfer technology Domestic waste water treatment system 300m3. Design, construct & transfer technology plated waste water treatment system 300m3. Set up DTM project “ Saigon River Co., Ltd Tae Kwang MTC VN Dong Nai Co., Ltd Oil & Gas Sai Gon Ho Chi Minh City Corporation Asia Pacific Co., Ltd Viet Nam R&T Lock & Security Co., Ltd Viet Duc Co. New Décor Wood Industrial Co. Sai Gon Paradise Hotel Co., Ltd Kim Phong Investment – Commerce – Service Corporation SEPZONE Co., Ltd Linh Trung (Viet Nam) Shimada Shoji Co., Ltd Ho Chi Minh City Tien Giang Viet Nam to German Long Thanh Ho Chi Minh City Dong Nai Tay Ninh Binh Duong Wooden Industrial Group Corporation Can Tho My Quynh Zoo Corporation Long An B.H Trading and Manufacturing Co., Ltd Binh Duong Nam Viet Investment Joint Stock Company Nha Trang Green Real Group Gia Lai Viet Duc Joint Venture Co., Ltd Ho Chi Minh City Viet Nam Land SSG Ho Chi Minh City Residential Complex (Sai Gon Pearl) – step 2 Improve, install, and instruct for waste water treatment station operation Set up environmental supervision report Co., Ltd Nam Hai Seafood Co., Ltd Binh Dinh Hung Lam Co., Ltd Ho Chi Minh City Set up environmental supervision report Saigon Commercial Bank Ho Chi Minh City Set up environmental supervision report Nhat Minh Avila Co., Ho Chi Minh City Ltd DEVELOPMENT ORIENTATION We continuously study, cooperate, trade with foreign partners for knowledge improvement as well as import high-tech modern machines and equipment, state success through each construction. That proves that Thao Nguyen Xanh its stronger and stronger development. Thao Nguyen Xanh always strives continuously to become a leading environmental company in Viet Nam. Thao Nguyen Xanh’s considers principle “ Contributing for environment protection” as a mission to contribute for environment protection, enhance community awareness in nature environment construction and protection, contributes to build a happy and civilized society for human life, for living environment, for human culture, for future life, and also for ourselves. THANK YOU We are proud of owning an abundant team of staffs with active creative thought, high responsible spirit and willing to face to all challenges for a general aim is to strive for Thao Nguyen Xanh to become a strong and developed group in order to provide for The Clients with the most optimal service. One more time, sincerely thank all Clients and hope to receive more interest, support, and coordination of Clients for same benefit, same development of two sides. Wish Clients “Health – Happiness - Success Respectfully! “