profile - Lập dự án

Transcription

profile - Lập dự án
THAO NGUYEN XANH
CONSULTING INVESTMENT CORPORATION
ADDRESS: 158 NGUYEN VAN THU, DAKAO WARD, DISTRICT 1, HO CHI MINH CITY
TEL: 0918755356 – 0839118552 FAX: 0839118579
PROFILE


over



Consult engineering regarding environmental, water supply drainage technology
Prepare report on environmental impact, environmental impact assessment, check and take
Collect, treat waste water, rubbish
Design and build industrial and civil works
Set up invested project
INTRODUCTION
Being one of leading companies specializing in project preparation consulting and one
of very few companies having enough ability to perform formalities relating to
environmental consulting such as apply for waste discharge license issue, set up report
on environmental impact assessment “ĐTM” departmental based on decree 18, 2015,
we are proud of our consultancy for small large groups such as becamex, City land,
SCG, Ha Do,… would like to cooperate with investor “real-estate companies, hospitals,
schools, enterprises, factories,….” to support and consult the entire sequence of setting
up and performing project and environment right since preparation for investment plan
application, we shall help investors complete dossier of money flow estimation, internal
rate of return IRR, Net present value NPV, survey and assess project’s feasibility,
prepare report on environmental impact assessment “ĐTM”…. for investors to get a
comprehensive view and decide for investment exactly, create foundation for investor to
apply for investment plan, call for investment, borrow for investment, and perform
project.
In 2015 Thao Nguyen Xanh is the first company establishing five-star personnel
model to provide for clients the best, fastest, and most professional services. We commit
to serve for client by the best staffs, almost staff team of Thao Nguyen Xanh are
excellent students of Architecture University, Polytechnic College, Natural Science
University, Economics University….
In the past, successful enterprises always hire famous and professional consultants who
are the only ones having ability to help them become successful. High effective project
cannot be done by normal consultants. In practical, a normal company cannot perform
well and also cannot communicate well to ensure proper progress, and they also have no
enough funds to hire good staff. In 2015, 1/4 customer of Thao Nguyen Xanh is booting
rather well; we shall stand by Enterprises to consult and perform all procedure regarding
project and environment.
BUSINESS LINES
1. INVESTED PROJECT ESTABLISHING
 Consult regulation, procedures related to investment in Viet Nam.
 Consult feasibility of investment incentive procedures.
 Set up invested project, apply for investment certificate issue.
 Set up business plan, capital borrowing plan.
 Set up
2. ENVIRONMENTAL CONSULTING
 Set up environmental impact assessment departmental/ ministerial level
 Set up environmental protection project departmental/ ministerial level
 Set up commitment to environmental protection
 Set up environmental supervision periodically
 Discharge permits
 Ground water extraction licenses
 Book all emissions sources of hazardous waste
 Design, construct, install treatment system for waste water, supply water, exhaust
fumes
3. DESIGNING, SUPPERVISING, CONSTRUCTING WORK
 Design consulting
 Construction supervision consulting
 Work quality checking
4. DESIGN, CONSTRUCT, INSTALL TREATMENT SYSTEM FOR WASTE
WATER, SUPPLY WATER, EXHAUST FUMES…
 Clean water supply system – supply water treatment system
 Waste water treatment system
 Technical pipe and equipment system
 Hygiene and drainage system
 Ventilation and air condition system – Compressed air machine
 Boiler system and thermal equipment
 Other utilized systems –Prevent and fight fire system…
System of waste water - supply water treatment of brick factory
HEAD OFFICE AND COMPANY OFFICE
HEAD OFFICE
THAO NGUYEN XANH CONSULTING INVESTMENT CORPORATION
Address: 158 Nguyen Van Thu, Dakao ward, District 1, HCMC
Tel: (08) 39118552 - 0918755356
Fax: (08) 39118579
Tax code: 0 3 0 5 5 9 1 8 6 1
Charter capital: 10.000.000.000 VND
Ha Noi Office: No. B3/D6, Cau Giay New City Area, Dich Vong, Ha Noi
Hotline: 0433526997-0918755356
Branch at Vung Tau: E35 Ong Ich Khiem, Ward 6, Vung Tau City
Website: www.lapduan.com.vn - www.xaydungduan.com
www.thamdinhduan.com - www.ketoanclub.com
Thao Nguyen Xanh – Smart choice of enterprise
Team of environmental engineers, experts of Thao Nguyen Xanh Consulting
Investment Corporation
Proud of being trusted and cooperated such as: SJC Saigon Company, Mai Linh Group, Dong Tam
Long An, Mrs. Nguyen Thi Phan of FATACO Ben Tre Company, Becamex Binh Duong Group
and domestic and foreign companies such as Tam Chau Tea Company, Taiwan Fotai, Samco, Quang
Nam Industrial Park-Prime Dai Loc, Nhon Trach Industrial Park and many other companies trusted
and signed environmental, supervising contracts.
Company leaders participated in the National Congress "YOUNG
ENTREPRENEURS ASSOCIATION VIETNAM" in Hanoi Capital
BUSINESS LICENSE
NGÀNH NGHỀ KINH DOANH
NGÀNH NGHỀ KINH DOANH
CÔNG TY CP TƯ VẤN ĐẦU TƯ
THẢO NGUYÊN XANH
www.lapduan.com.vn
ĐẠI HỘI ĐỒNG CỔ ĐÔNG
HỘI ĐỒNG QUẢN TRỊ
TỔNG GIÁM ĐỐC
TRỢ LÝ
BAN KIỂM SOÁT
THƯ KÝ
PHIÊN
DỊCH
PGĐ ĐIỀU HÀNH
TRỢ
LÝ
P.
MARK
ETING
P.TƯ
VẤN
DN
P. KẾ
TOÁN
K.TOÁ
N
TRỢ
LÝ
TRỢ
LÝ
P. DỰ ÁN
P.
HÀNH
CHÍNH
TRỢ
LÝ
THẨM
ĐỊNH
P. ĐĂNG
KÝ SHTT
P.KT TC
P.KỸ THUẬT
P. MÔI TRƯỜNG
KẾ TOÁN
TRƯỞNG
PGĐ ĐIỀU HÀNH
PGĐ ĐIỀU HÀNH
PGĐ ĐIỀU HÀNH
CHĂM SÓC KH
KT
TỔNG
HỢP
KT
CÔNG
NỢ
THỦ
QUỸ
KINH
DOANH
THÍ
NGHIỆM
TƯ
VẤN
MT
THIẾT
KẾ
XD
GIÁM
SÁT
THI
CÔNG
HUMAN RESOURCES STRUCTURE
OFFICE
STAFF
EXPERIENCE
SPECIALTY
1
Nguyen Thai Son
15 years
Construction
2
Truong Van Trung
5 years
Construction
3
Pham Tan Đuc
5 years
Engineer
3
Nguyen Dinh Hieu
10 years
Construction
4
Tran Trong Thai
5 years
Construction
5
Nguyen Anh Toan
30 years
Constructive economy
6
Nguyen Van Chinh
15 years
Mechanical engineer
7
Nguyen Hong Trung
20 years
Civil and industrial electricity
8
Nguyen Thi Ngoc Nhung
5 years
Accountant
9
Nguyen Anh Tuan
8 years
Constructive engineer
10
Dang Thi Cam Duy
3 years
Accountant
11
Nguyen Thuy Tram
5 years
Accountant-Auditor
12
Dang Ngoc Dong Thu
3 years
Accountant-Auditor
13
Tran Thi Bich Lien
7 years
Industrial engineering
14
Huynh Thi Yen Thinh
5 years
Environmental engineering
15
Nguyen Thi Ry
2 years
Technology designer
16
Duong Van Trinh
3 years
Water supply and drainage
17
Nguyen Phu Lam
2 years
Environmental science
18
Nguyen Viet Thuy
4 years
Environmental science
19
Phan Trong Tan
4 years
20
Hoang Nguyen My Linh
3 years
Environmental science
Environmental and technology
engineer
21
Thieu Viet Cuong
3 years
Environmental engineering
22
Nguyen Thi Thuy Linh
4 years
Environmental technology
23
Le Van Tuan
5 years
Water supply and drainage
24
Pham Thi Anh Thu
15 years
Environmental and technology
engineer
25
Le Mai Thao
5 years
Water supply and drainage
26
Tran Anh Tho
3 years
Water supply and drainage
27
Tran Thi Ut Thuy
8 years
Economy
28
Pham Thi Thu Hien
5 years
Plan economy and investment
29
Ha Nguyen Thuy Doan
2 years
Map - GIS
30
Tran Cao Thanh Toan
4 years
Economy - Law
31
Do Thi Thanh Thao
4 years
32
Le Huyen Chi (IT)
3 years
Management information system
33
Đoan Thi Huong Thuyet
4 years
Information technology
34
Tran Huu Thai
5 years
Electricity - Electronic
Plan economy and investment
DON’T WORK HARD – WORK SMART
With more than 60 environmental engineers and experts, we combine and perform
many successful contracts with partners, agencies such as Environmental Police Department,
Ministry of Natural Resources and Environment, General Department of Environment…..
TYPICAL PROJECTS - CONSTRUCTIONS
Project; Design, Construct Waste Water Treatment System of Cai Nuoc
General Hospital
-
Image of acceptance of Cai Nuoc Hospital
Project: Design, Construct, Provide, Install Waste Water Treatment System Equipment of
Obstetric – Pediatric Hospital at Ca Mau Province Capacity 350m3/ day
Investor: Board of project management social – cultural of Ca Mau
Location: Ly Thuong Kiet, w.6, Ca Mau City
The construction is invested by Board of project management social – cultural of Ca
Mau and completed in 12/2011. Construction stated Thao Nguyen Xanh is not only
successful in project, but also successful in environment.
ENGINEERING DRAWING OF HOSPITAL WASTE WATER TREATMENT
SYSTEM
Drawing:
+ Air condition tank
+ Air condition tank
+ Reflection
+ Chemical
+ Bump bunch...
Project: Purchase, Install, Construct Waste Water Treatment System Belonging to
Project of Constructing Dam Doi General Hospital, Ca Mau
Project: Purchase, Install, Construct Waste Water Treatment System Belonging to
Project of Constructing General Hospital, Ca Mau
PROJECT, CONSTRUCTION OF DESIGNING CONSTRUCTING INDUSTRIAL
WASTE WATER TREATMENT SYSTEM FOR FACTORY, INDUSTRIAL
PARK, APARTMENT…
With the purpose of speeding up domestic industrial development and attract
foreign investor to national development under industrialize, modernize, therefore industrial
zones and export processing zones are built and developed with larger and larger scale.
The main cause is industrial zones, factories are lack of waste water treatment
system due to not having attention of investor and due to weak policy of the government.
Waste water treatment at Khanh Hoa, Nha Trang
Each kind of waste water will be treated in different way. Many waste water treatment
systems are designed based on low cost, lack
of measure equipment, supervision.
Through practical process of building many
waste water treatment systems for industrial
zones, factories, Thao Nguyen Xanh is
proud of being leader a
Project: Design Engineering and Provide,
Install Domestic Waste Water Treatment
System at 22-Floor-Thuy Van-Apartment – Ba Ria Vung Tau
Waste water from different activities of human
being such as (domestic, industrial, agricultural) is
not allowed to pull out to the environment, but
must be treated via waste water treatment system.
Treatment process includes physical, chemical,
and biological processes. This is to improve waste
water quality after treatment.
INDUSTRIAL WASTE WATER TREATMENT – INDUSTRIAL PARK – DYE
TEXTILE
 Dyed waste water is generated mainly during washing, sizing, bleaching, dyeing ...
 Textile Dyeing Wastewater often have high pH is toxic to aquatic kind, corrosive
 The color of textile wastewater in the process due to use dye color volume fraction
just stick to fabric was largely discharged with sewage water causing color when released into
the environment
 In addition to the two elements on other toxins such as supplied, metal heavy
speakers, the halogenated organic compounds can accumulate in organisms can populate and
went on up the food chain causing chronic diseases for humans and animals .
Construction of dye-textile waste water treatment
 With a team of environmental engineers long experience, we constantly study uses
the most advanced technology today, by combining chemical and physical methods proposed
bio suit the characteristics and properties of water bring high efficiency waste;
 The concentration of pollutants after processing achieve current regulations;
 Land use minimum.
 Process simple, easy to operate
We've done a lot of construction works textile wastewater treatment capacity of
1000m3 / day to 1.500m3 / day as sewage treatment works dyeing of textile companies
of South Korea in Hai Duong, textile Dyeing company in Nhon Trach ...
In 2013, with the economy still remains difficult, however with environmental company
Thao Nguyen Xanh had a great success in projects large and small across the country. We
have been implementing the system of sewage and water in IP Dai Quang Dai Loc, Quang
Nam by Prime Dai Loc Corporation investor.
Project: Design Engineering, Construction, Install Waste Water Treatment System
(Capacity 400m3/ day) and Construction, Install Water Treatment System (Capacity
600m3/ day))
Construction: Prime Dai Quang, Dai Loc, Quang Nam, Da Nang
Swimming sewage wastewater treatment works built crude Danang
With advanced technology, using imported equipment, Thao Nguyen Xanh has executed
many works projects large and small wastewater treatment systems throughout the country from
the South to the North, specialized in the design and construction of treatment systems wastewater
industrial parks, factories, hospitals ... With innovative technology, modern machinery and a team
of engineers, experienced professionals will bring to our customers the confidence and satisfaction
With the goal of promoting industrial development in the country and attract foreign
investment to develop the country in the direction of industrialization and modernization,
hence the industrial zones and export processing zones are built and developed with scale
growing. However, in parallel with the positive developments, the process of industrial
development and industrial zones systems in Vietnam is creating many challenges of
environmental pollution caused by solid waste, wastewater and industrial emissions. The
main reason is the industrial zones, factories lack of sewage system mainly because
investors are not really interested and so mechanisms, policies and sanctions are not strong
enough. Wastewater from industrial parks, factories, enterprises are diverse examples:
textile wastewater, plating wastewater ...
Each different type of wastewater will have separate process technology for
processing. Many wastewater treatment system is designed, the construction with the spirit
of "minimal cost", lacks many important items such as laboratory and measuring
equipment, monitoring, control, pump , sludge dewatering and generator backup ...
Through the process of actually constructing the wastewater treatment system of
industrial zones, different plants, Thao Nguyen Xanh proud forefront of technology and
build waste water treatment system.
System of sewage treatment tank
System of steel treatment tank
System sewage treatment basin in Quang Nam Industrial Park – Danang
Construction unit: THAO NGUYEN XANH CONSULTING INVESTMENT
CORPORATION
Project: Construct Yokowo Manufacturing Waste Water Treatment (Japan) 1000m3
Location: Ha Nam
Works
by
JSC
CENTEC specialized electrical
construction as an investor with
a total construction cost 7.6
billion was completed in 2011.
It is one of the big ones which
have partnered Thao Nguyen
Xanh success in the North and
the results of testing showed
that the parameters were
achieved by QCVN 24-2009.
Project title: Design and construction of Sewage Treatment Systems BUILDING
ORIENT SAIGON capacity of 100 m3 / day
Investor: SAI GON PHUONG DONG LIMITED COMPANY
Location: No 12, Phan Ke Binh, Da Kao ward, District 1, HCMC
In 2014, there are several outstanding events and notable for the business community
and the economy of Vietnam.
Most significantly, the business screening actually have quality and potential, not
only flexible to survive the most difficult period, but also seek new business opportunities
in order to expand the scale of operations. Trends strong selection took place, to review the
economic activities of enterprises. Many small businesses have to stop the game, forced to
dissolve or suspend registration of a term. Thao Nguyen Xanh strong to overcome the
economic storms that demonstrate potential and deserves to be honored.
Photos: Leader of Thao Nguyen Xanh and test engineering team, guiding the workers
about workplace safety at work Danang
For example in particular in the environmental field as JSC Consulting Thao Nguyen
Xanh - based in District 1 (HCMC). In times of crisis, to reach up and improve market
competitiveness, business leaders have promoted separate strategy with finding foreign
partners, research technologies, wastewater treatment, advanced emissions, technology
transfer from developed countries like Norway and Sweden to apply in Vietnam. The
results of this business have been successful and achieved many accomplishments as
becoming the environment since 2014. As consumer companies operating in the technology
sector, designing, constructing and operating treatment systems wastewater. Supply of
equipment, machinery and chemical processing environments. Maintenance, repair and
upgrade the sewage system. The wastewater treatment facilities, but Thao Nguyen Xanh
emissions apply new technologies have brought significant benefits, clearly reduced
operating costs textile treatment systems. Voted the enterprise is one of the top 10
environmental consulting unit in Vietnam. And especially consulting firms and make the
records and procedures related to the environmental sector on reporting environmental
impact assessment (EIA), environmental protection schemes with fastest time present day
Design technology projects - construction and installation of wastewater treatment
systems activities in Ba Ria Vung Tau
Capacity: 350 m3 / day
System of domestic waste water treatment
PROJECT DESIGN, CONSTRUCTION LIVESTOCK WASTE WATER
TREATMENT
The model-scale livestock farms contribute to promoting economic development and
solve local employment for many workers in place.
However, the discharge of animal waste into the environment through treatment not
causing environmental pollution and affect other industries. Finding the right solution for
handling livestock waste water before discharging it into the environment is essential for the
sustainable development of this model.
Model of waste water treatment for pig livestock
Thao Nguyen Xanh livestock wastewater treatment successful projects, large and small
farms in the provinces of Binh Duong, Dong Nai, Tay Ninh ....
Tank of livestock waste concentration
GROUND ENGINEERING DRAWINGS PIPES SYSTEM HOSPITAL
WASTEWATER TREATMENT
Surface for placing pump equipment
Surface for water pipe
Surface for chemical pipe
Surface for mud pipe
Surface for gas blowing pipe
Apply advanced technology and engineering
Surface for placing foundation of condition tank – container support
CONSULTING FOR PROJECT ESTABLISHMENT
Thao Nguyen Xanh, specialized consultants to formulate investment projects on
how areas: environmental project planning, project wastewater treatment plant,
construction of apartments, built hospitals, amusement parks - entertainment, hotels and
restaurants, business investment projects, investment in construction projects on
schools, farm projects, etc.
With a team of engineers and consultants are enthusiastic, experienced,
customers will be directed to complete the procedures for setting up projects quickly as
possible. Depending on the size of the business operations, the engineer of prairie Green
will offer customers alternatives to complete the procedures for setting up their projects
efficiently, feasible and fastest.
TYPICAL PROJECTS
PROJECT OF CITYLAND RESIDENTIAL ZONE
Investor: Real Estate Investment City Co. (Cityland)
- Forms Management: Investors direct project management through management
established by investors.
- Investment Purpose: Creating a new urban space modern, synchronous technical
infrastructure, architecture, environment and social infrastructure, coupling with
neighboring projects are deployed, upgrade and renewal urban development contributes
to the cultural, economic, socio - ward area Me Tri, Tu Liem district Nam, Hanoi.
- Scope of analysis: Analyze segments: low-rise houses (villas, townhouses) for high
income earners and utilities such as kindergartens, trees, traffic to the scale of 6
hectares.
Architectural layout space
Construction of a new modern residential architecture has its own characteristics, with
comfortable living environment, high ecological nature. Exploited these landscape
elements in the region, organized harmonious overall architectural landscape of the city.
Space height in units in harmonious organization covers the entire low-rise buildings
(around 4 floors) include garden cottages, garden cottages adjacent incorporate green
space interspersed.
In the center of the entire core area of greenery combined service, underground parking
to meet demand for the entire stay. There is also a system of uninterrupted greenery
organizations, including the flower garden green areas focused, street trees, the bands
and clusters of trees scattered in groups in order to provide maximum efficiency in use
and its significant contributions to landscape architecture urban areas, contributing to
improved environmental conditions microclimate
The transport axis arranged easily coherent link between the buildings and outside areas
at. Also yet to make a compelling change varies spatially and points of view.
Architectural forms of housing projects, public harmonious design style and have
unified Vietnam architectural identity, in accordance with the conditions of tropical
climate.
Perspective of low-rise housing
PROJECT OF CONSTRUCTION INVESTMENT FOR RESIDENTIAL ZONE
PRIMARY DEMONSTRATION
Buildings are built on land with an area of 3347.8 m2, including 12 villas with land use
coefficient is 0.74; construction density 37% as planned. Part outdoor garden layout,
internal roads, shade trees, building fences and gates.
INVESTMENT TARGET
Toward city:
The project will form a high-end villa modern national standard scale of District 2. 3347.8
m2 villas that exploit a complex of works includes the sale and rental apartments utility
services comes closed. Project when being exploited to meet the increasing demand for
housing, demand for rented apartments are deficient in HCMC with complete technical
infrastructure and modern society, sync.
Villas suitable for landscape and city planning contributed to improving habitat security
and public order in District 2.
Mobilizing been idle funds from customers in need of housing and banks, credit
institutions wishing commercial loans, or participation in projects aimed at creating value
for the society material .
To create more resources for housing fund to help solve the housing shortage at present
area project also creates many jobs are to society in the process of building, contributing to
the state budget and bring profit corresponding to the Investor
Toward local people:
Restoration of technical infrastructure and modern society and in sync.
Gradually improve literacy levels in the community living with the equipment and
technical infrastructure and modern society.
Model of single villa
Model of detached villa
PROJECT CONSTRUCTION INVESTMENT HOUSE AND APARTMENT
The objective of the plan
 Distribute functions in accordance with nature of activity, ensure to
closely coordinate between these areas in the whole surrounding region.
 Determine scale, location of land plot for public work
 Connect urban technical infrastructure house groups and residential parks
with surrounding area.
 Harmonious architecture space disposition closely attaches to green piece
and water surface area.
Project: Investment in building housing complexes and condominiums
PROJECT OF RESORT TOURIST PARK
Nature area planned nature of the planning area is construction of tourist service
luxury resort catering demand, rest, recreation and nursing for domestic and
foreign tourists with works hotel and villa gardens to long stay and
convalescence
Zoning 1/2000, and also meet the needs satisfied utilization parts management
function in the operating area of the resort.










Accommodation area.
Hotel area.
Villas, Bungalow serving for short term and long term staying demand.
Supermarket area.
Restaurant, club.
Sport area, football yard, multipurpose hall.
Entertaining and camping area, outdoor hall.
Interior way, car parking of tourist.
Rubbish gathering area.
Park, green tree, sightseeing.
Water lake, sightseeing lake
INVESTMENT PROJECTS WASTE TREATMENT PLANT
Real environmental pollution
A burning issue, upset public opinion in the country today is the pollution of the
ecological environment by the production and life of human caused. This problem is
increasingly serious, direct threat of economic development - a sustainable society, the
existence and development of the current generation and the future.
+ The status of the urban environment, industrial parks
The types of pollutants commonly found in urban areas in Vietnam is surface water
pollution, dust pollution, pollution of sulfur, carbon dioxide, nitric, pollution, lead, solid
waste (in hospitals, birth operation).
In Vietnam, the concentration of pollutants in surface water is often very high as the
suspended solids, chemical oxygen demand, nitrite, nitrate .... fold from 2-5 times, even
up to 10 to 20 times the standard values for surface water type B, the index reached the
standard ecoli allows hundreds of times. In addition to organic pollutants on the
environment of urban surface water in some places are polluted by heavy metals and
toxic substances such as lead, mercury, arsenic, chlorine, phenol, ...
In most urban dust pollution, much of the serious pollution, the most polluted places are
residential areas near the cement plants, industrial parks, manufacturing materials and
plants coal ... In residential areas near industrial areas, the concentration of sulfur
exceeding the allowed number several times. In Vietnam, the percentage of solid waste
collection is still very low compared to the requirements set out, in many places the
percentage of solid waste collection by 20% - 40%. Measures to collect solid waste
currently land filled (currently no landfills that meet the technical standards of
environmental hygiene).
According to statistics, Vietnam has over 800 industrial establishments with 70 export
processing zones (industrial parks). The contribution of industry to GDP is very large.
However we have to suffer environmental damage caused by industrial sector caused.
+ The status of the rural environment
Water pollution in the rural and agricultural sector is also very serious. Nearly 75% of
our country's population live in rural areas, where infrastructure is outdated, the
majority of human waste and untreated cattle, infiltration into the ground or washed
away, making the condition water contamination in organic and biological constantly
rising.
Many places by massive aquaculture, lack of planning, not following the technical
process has caused many negative impacts to the aquatic environment. The amount of
waste water processing enterprises Frozen seafood is also very large, exceeding allowed
a few dozen to hundreds of times. Rural water environment is also polluted by improper
use and improper agricultural chemicals (pesticides, herbicides, ....) The lack of sanitary
facilities, infrastructure support facilities works made for household use only clean
water to reach about 30% - 40%, and only 20% - 305 works of households use hygienic
standards.
+ Technology plan:
MBT-CD.08 technology: waste processing
Garbage stage approach
Quantitative phases, separating primary filter
Cutters tear stages and intermediate recruitment
Secondary separation stage
Multilayer tear from cutting and artisanal nylon
Downstream crushing stages
Stage composted in composting biological tower
Stage crushing and blending additives (production of pellets)
Annealing step for stabilizing natural materials
Stage curing and shaping the fuel pressure members
Stage crushing and blending additives (sx adobe bricks)
Technology industrial waste hazardous: Technology FBE incinerator ...
Pictures: Model systems tunnel kiln incineration of hazardous industrial (carousel
format)
HOSPITAL PROJECTS COMBINED COMMUNICATION
Project construction combined
hospital communication: As the
first hospital in Vietnam to use
all the equipment and machinery
of Japanese, doctors each
department head is in Japanese.
Specialized hospital care and free
counseling for all patients,
especially patients with HIV /
AIDS; and free HIV testing to
patients.
Duration of the project:
25 years, the project is under
construction from month to
month
06/2014
02/2013;
operational
from
January
07/2014, ending in 2038;
liquidation of assets in 2039
The purpose of the
assessment of environmental
impact
"project
combines
Hospital communication" is
considered assessment of the
factors positively and negatively
affect the environment in the
hospital and surrounding areas,
thereby
making
recovery
solution, reduce pollution to
improve
the
environmental
quality impacts limiting risks for
the environment and for the
hospital when the project is
implemented,
meet
the
requirements
environmental
standards.
ENVIRONMENT
 Prepare report on environmental impact assessment DTM
 Prepare report on environmental supervision periodically
 Prepare environmental protection plan
 Prepare environmental protection commitment
 Prepare book of emission sources for hazardous waste matter
 Prepare report on hazardous waste matter controlling
Thao Nguyen Xanh established environmental commitments apply to businesses
manufacturing, trading and services with environmental impact, but not on the list of
projects that need to EIA. Often the projects of small and medium scale capacity below
1 million pieces / year. Environmental protection commitments made before the
business goes into operation
active basis but have carried out the renovation and expansion, enhance production
capacity scale but not on the list of projects that need to EIA.
- The production, business and services not subject to the investment project but
production waste generation.
- For the project, the proposed production, sales, service has been registered
environmental protection commitments but not yet in operation and re-registration must
make a commitment to protecting the environment in the following cases:
+ Relocation of implementation;
+ No implemented within twenty-four (24) months from the date of commitment to
environmental protection is registered;
+ Increase the size, capacity or technological change increases the scope of impact or
increase the negative impact on the environment due to waste not cause or increase the
total amount of waste generated or the new types of waste, waste polluting components
higher than forecast in the environmental protection commitment has been registered
but not serious enough to require reports on environmental impact assessment.
Along with the quality of each project, we trained with specialized skills for overseeing
the construction of civil and industrial, such as: The headquarters office buildings, highrise apartment buildings, houses investment, hotels, industrial parks, processing plants,
warehouses ... Construction Supervisor leveling and construction supervision of
infrastructure and urban residential areas, industrial zones: Construction Supervisor
foundations, bored piles, basement, water supply systems, internal transport system of
urban residential areas, industrial zones and parks ... Construction Supervisor water
supply, waste water treatment ...
We had many large and small contract construction supervision consultant works from
the South to the North. Professional engineering team combined with practical
experience many, who commanded many large projects, stature.
The environmental services of Thao Nguyen Xanh get appreciation and trust
from customers and partners. According to the partners, the Agency departments and
service quality of Thao Nguyen Xanh good, ensure the completion of work on time and
commitment between the parties and put the interests of customers above all else . The
working principle of objectivity Thao Nguyen Xanh tied to reality. Our team of
engineers with high qualifications, friendly, professional and ensure the implementation
of the commitment, service style and enthusiastic consultants.
Image: Meeting at Binh Phuoc
TYPICAL WASTE WATER TREATMENT SYSTEM
Nam of Project
Design and construct waste water treatment
system (Capacity 400m3/ day – supply
water capacity 600m3/ day.
Investor
Place
Prime Dai Loc
Corporation
Dai Quang Industrial
Park, Dai Quang
Commune, Dai Loc
District, Quang Nam,
Da Nang
Design and construct waste water treatment Restaurant 13
system of Restaurant 13, capacity 5m3/ day.
night
Expand waste water treatment system of Ca
Mau Province General Hospital (Capacity
200m3/ day)
Cultural – Social
Project Controlling
Committee of Ca
Mau Province
23 Nguyen U Di, Dist
2, Ho Chi Minh City
Hai Thuong Lan Ong,
W.6, Ca Mau City
Construct waste water treatment system of
Cai Nuoc General Hospital in Ca Mau
Province (Capacity 250m3/ day. night)
Cultural – Social
Project Controlling
Committee of Ca
Mau Province
Provide, install equipment for waste water
treatment system of Dam Doi Hospital, Ca
Mau
XDCB Project
Controlling
Committee of Dam
Doi Province
Dam Doi, Ca Mau
Cultural – Social
Ly Thuong Kiet, W.6,
Lac Long Quan, W.7,
Ca Mau City
Design, construct, provide, install waste
water treatment system of obstetrical –
Pediatrics Hospital in Ca Mau Province
Project Controlling
Committee of Ca
Mau Province
Ca Mau City
Build manufacturing and domestic waste
water treatment system capacity 150m3
Fotai Co., Ltd
Binh Duong
CenTec Corporation
constructing
electromechanical
work
Ha Nam
Design engineering – construct install
domestic waste water treatment system
Son Thinh Office
Building
Vung Tau City
Design construct building’s waste water
treatment system
Trung Nam Co.,
Binh Duong
Build manufacturing and domestic waste
water treatment system capacity 1000m3,
Project Yokowo (Japanese capital)
DTM Establishment Contract
Set up DTM “Widening Wine Production
Factory – capacity 7,000,000 liters/ year”
International Wine
Corporation
Binh Duong
Set up DTM Project of Commercial Service
Complex at 02 Hong Ha, Ward 2, Tan Binh
District
HA DO GROUP
CORPORATION
Ho Chi Minh City
HA DO GROUP
CORPORATION 756 Sai Gon
Ho Chi Minh City
Le Phan Chemical
Co., Ltd
Ho Chi Minh City
Viet Nam Acecook
Co., Ltd
Ho Chi Minh City
Set up DTM Project of Ha Do Complex
Center – Project 756 Sai Gon, 3/2 Street,
Ward 12, District 10
Set up DTM Project “working office,
warehouse, factory of ink production,
producing and packing chemical”
Set up DTM Viet Nam Acecook
Set up DTM project “ Increase factory
capacity from 2,000 crates/ day up to
5,0002,000 crates/ day”
Namviet Oil Refinery
and Petrochemicals
Ho Chi Minh City
JSC - NVO
Set up DTM project “Eden Saigon Hotel”
Sai Gon Eden Hotel
Co., Ltd
Branch of An Long
Set up DTM project “Factory of fertilizer
Ho Chi Minh City
Long An
production”
Construct waste water treatment system for
plated cement production 600m3.
Set up DTM Ha Tien urban and sea resort
Kid Set up DTM project of Kid Cooking oil
production factory
Set up DTM Biti’s Plaza Complex
Apply for license of waste water into water
source
(approved by MNRE)
Apply for license of discharge of waste
water into water sources capacity >5000m3
(approved by MNRE)
Build manufacturing and domestic waste
water treatment system capacity 250m3
Build textile dye production waste water
treatment system 800m3 project washaki
(Japan’s capital)
Register for groundwater usage exploitation
Set up CKBVMT Center of Jewelry trading
and working office
Set up CKBVMT Sofit Hotel
Set up DTM Anpha shipping and repair
project
Set up DTM project of high building
apartment zone 2.4ha
Song Soc Industrial Park
Set up DTM Minh Hung Industrial Park
Build manufacturing waste water treatment
system for ViKa Rubber Recycling Factory
1500m3
Set up environmental supervision report
An My Viet Fertilizer
Corporation
Italisa Co., Ltd
Lien Thanh
Investment
Construction
Corporation
TF Cooking oil C.,
Ltd
Biti’s Corporation
(Binh Tien)
La Nga Sugar Cane
Corporation
Bac Giang
Kien Giang
Vinh Long
Buon Me Thuoc
Dong Nai
Vitasa Manufacturing
Long An
Co., Ltd
Nam Ha Co., Ltd
Thua Thien Hue
Witalisit Co., Ltd
Ninh Binh
Ngoc Tram Co., Ltd
SJC Sai Gon Jewelry
Corporation
Sao Mai Co., Ltd
Anpha Technical
Service Corporation
Golden Land Da
River Corporation
Ca Mau Industrial
Park Infrastructure
Development Co.
Minh Hung Industrial
Park Infrastructure
Development Co.
ViKa Rubber Plastic
Commercial
Corporation
Viet Nam Interwood
Ngoc Tram Co., Ltd
District 3, Ho Chi
Minh City
Can Tho
Ben Tre
Bien Hoa City, Dong
Nai
Ca Mau
Tay Ninh
Bac Giang
Binh Duong
Set up environmental supervision report
Set up environmental supervision report
Register for book mission sources of
hazardous waste matter
Register for book mission sources of
hazardous waste
Register for hazardous waste export
Domestic waste water treatment system
Set up DTM of project “Sai Gon Paradise
Hotel”
Consult, provide equipment of exhaust
fumes treatment
Provide chemical for waste water treatment
Analyze air environment quality
Design & construct waste water treatment
system of wood processing with capacity
1000m3/ day. night
Set up DTM project “build My Quynh zoo,
hotel, and entertainment park”
Design & construct domestic waste water
and wood processing factory’s waste water
treatment system with capacity 2500m3/
day. night
Design, construct & transfer technology
Domestic waste water treatment station for
high-ranking apartment QSK Capacity Q =
600m3/day
Design, construct & transfer technology
Domestic waste water treatment system
300m3.
Design, construct & transfer technology
plated waste water treatment system 300m3.
Set up DTM project “ Saigon River
Co., Ltd
Tae Kwang MTC VN
Dong Nai
Co., Ltd
Oil & Gas Sai Gon
Ho Chi Minh City
Corporation
Asia Pacific Co., Ltd
Viet Nam R&T Lock
& Security Co., Ltd
Viet Duc Co.
New Décor Wood
Industrial Co.
Sai Gon Paradise
Hotel Co., Ltd
Kim Phong
Investment –
Commerce – Service
Corporation
SEPZONE Co., Ltd Linh Trung (Viet
Nam)
Shimada Shoji Co.,
Ltd
Ho Chi Minh City
Tien Giang
Viet Nam to German
Long Thanh
Ho Chi Minh City
Dong Nai
Tay Ninh
Binh Duong
Wooden Industrial
Group Corporation
Can Tho
My Quynh Zoo
Corporation
Long An
B.H Trading and
Manufacturing Co.,
Ltd
Binh Duong
Nam Viet Investment
Joint Stock Company
Nha Trang
Green Real Group
Gia Lai
Viet Duc Joint
Venture Co., Ltd
Ho Chi Minh City
Viet Nam Land SSG
Ho Chi Minh City
Residential Complex (Sai Gon Pearl) – step
2
Improve, install, and instruct for waste
water treatment station operation
Set up environmental supervision report
Co., Ltd
Nam Hai Seafood
Co., Ltd
Binh Dinh
Hung Lam Co., Ltd
Ho Chi Minh City
Set up environmental supervision report
Saigon Commercial
Bank
Ho Chi Minh City
Set up environmental supervision report
Nhat Minh Avila Co., Ho Chi Minh City
Ltd
DEVELOPMENT ORIENTATION
We continuously study, cooperate, trade with foreign partners for knowledge
improvement as well as import high-tech modern machines and equipment, state success
through each construction. That proves that Thao Nguyen Xanh its stronger and stronger
development.
Thao Nguyen Xanh always strives continuously to become a leading environmental
company in Viet Nam.
Thao Nguyen Xanh’s considers principle “ Contributing for environment protection” as a
mission to contribute for environment protection, enhance community awareness in nature
environment construction and protection, contributes to build a happy and civilized society
for human life, for living environment, for human culture, for future life, and also for
ourselves.
THANK YOU
We are proud of owning an abundant team of staffs with active creative
thought, high responsible spirit and willing to face to all challenges for a general aim
is to strive for Thao Nguyen Xanh to become a strong and developed group in order
to provide for The Clients with the most optimal service.
One more time, sincerely thank all Clients and hope to receive more interest,
support, and coordination of Clients for same benefit, same development of two sides.
Wish Clients “Health – Happiness - Success
Respectfully!
“