Prezentacja programu PowerPoint

Transcription

Prezentacja programu PowerPoint
Construction of precast concrete multi-flat building
using Tekla software tools
Katarzyna Wozniak-Zaborny
Mariusz Wdzieczny
Poznan, 10.11.2015
Schedule
1.
2.
3.
4.
5.
Introduction
Working methods
Our projects
Conclusions and considerations
Question and Answer
Constravia’s information flowchart
ARCHITECT
DESIGN PROCES REPORT
MEP
ARCHITECT
INDUSTRY
MEP
INDUSTRY
PRELIMINARY
DESIGN
FINAL DESIGN
archi
ASSEMBLY DRAWINGS
DETAILS
STRUCTURAL ELEMENTS DRAWINGS
MATERIAL
SOFTWARE PREPARED
BY OUR ENGINEERS
USING C SHARP
SPECIFICATION
BUILDING 3D MODEL
OTHERS
CONTRACTOR
CONTRACTOR
OTHERS
RULES FOR NUMERICALLY
CONTROLLED MACHINES
Architecture, Structure and MEP coordination
MEP
ARCHITECTURE
STRUCTURAL ELEMENTS
DETECTION AND SOLVING OF CLASHES
ANALYSIS OF TOPOGRAPHY
IN NEIGHBOURHOOD OF BUILDING
OPTIMAL UTILISATION
OF BUILDING DEVELOPMENT AREA
AFTER-BUILD STOCKTAKING OF RETAINING WALL
AND ADJUSTMENT OF STRUCTURE GEOMETRY
Excel – not only calculation sheet
•
•
•
•
Robot Structural Analysis results management
Tekla Structures reports management
Calculation model geometry revision
Link between calculation model and executive project
Excel – not only calculation sheet
•
•
•
Calculations software prepared by Constravia engineeers
Tools optimal for our needs – fast and precise work
Consciousness
Tekla Structures Components
•
We create own Tekla Structures components, which automate repetitive tasks.
FLIGHT OF STAIRS AND LANDING REINFORCEMENT
Map of projects
MCDONALD’S
(MOLDE)
NORDRE JARLSBERG BRYGGE
EIKREM PANORAMA
(MOLDE)
BAMA NYLAND SYD
(OSLO)
GAND VIDEREGÅENDE SKOLE
(HOVEVEIEN)
TOLLARE TORG
(NACKA NEAR STOCKHOLM)
Tekla BIM Awards Poland
winner 2015
Tollare Torg
Tollare Torg
MAIN 8-STOREYS
BUILDING
4-STOREYS BUILDING
4-STOREYS BUILDING
Tollare Torg
•
MEP installations introduced into model
Tollare Torg
•
•
Comparison between Tekla Structures
model and reality.
Possible collisions detection
PLUMBING TUBES
Tollare Torg
ELECTRIC CABLES
Tollare Torg
Tollare Torg
•
Two buildings are in progress, rest of them are designed and waiting to be manufactured
Tekla BIM Awards Poland
winner 2014
Eikrem Panorama
BUILDING B
BUILDING A
BUILDING B
BUILDING A
STAGE 1 – 84 APARTMENTS (15 000 M2)
BUILDING C
WHOLE – 250 APARTMENTS (~50 000 M2)
BUILDING C
BUILDING C
Eikrem Panorama
•
Seismic impact zone
BUILDING A
BUILDING B
Eikrem Panorama
ORGANIZER
PHASE
MANAGER
Eikrem Panorama – workshop drawings
BUILDING A
BUILDING B
BUILDING C
Eikrem Panorama
BUILDING B
BUILDING A
Eikrem Panorama
BUILDING A
BUILDING B
THE VIEW FROM THE TOP FLOOR APARTMENTS
BUILDING C
Tekla BIM Awards Poland
winner 2013
Gand Videregående Skole
Gand Videregående Skole
Gand Videregående Skole
Nordre Jarlsberg Brygge
REVIT 3D MODEL
ROBOT STRUCTURAL ANALYSIS PROFESSIONAL
Nordre Jarlsberg Brygge
Nordre Jarlsberg Brygge
Bama Nyland Syd - models
Bama Nyland Syd
•
Excel sheets fully compatible
with calculation model
Bama Nyland Syd
McDonald’s Molde
TEKLA – ARCHITECTURAL MODEL
TEKLA – STRUCTURAL MODEL
ROBOT STRUCTURAL ANALYSIS MODEL
McDonald’s Molde
McDonald’s Molde
Constravia – Tekla BIM Awards winner in Poland since 2013
2013
GAND VIDEREGÅENDE SKOLE
2014
EIKREM PANORAMA
2015
TOLLARE TORG
Conclusions & Considerations
Question and Answer
Thank you for your attention.
Contact details:
[email protected]
+48 508 901 957

Similar documents