Bored Pile
Transcription
Bored Pile
The Typical Mega Foundation Bored Pile HEAD OFFICE 1033-2 Guseo 2-dong, Guemjeongu, Busan,Korea Tel. 82-051-580-5500 Fax.82-051-580-5678 SEOUL REGIONAL HEADQUARTERS 16th Floor, Seongwon Bldg, 141 Samseong-dong, Gangnam-gu Seoul Tel. 82-02-553-3527 Fax.82-02-555-1763 INDIA CORPORATION #329, 3rd Floor, Tower-B, Spazedge, Sector-47, Gurgaon-Sohna Road, Gurgaon, Haryana-122002, India Tel.91-124-473-8604~8 Fax.91-124-473-8610 VIETNAM CORPORATION A1/43 Building, 130 Doc Ngu, Ba Dinh District, HaNoi, Viet Nam Tel.84-4-726-3620 ABU DHABI BRANCH OFFICE P.O.Box 126607, Abu Dhabi, UAE Tel.971-2-658-4060 Fax.971-2-658-4061 KUWAIT BRANCH OFFICE P.O.Box 28621 Safat 13147 Kuwait city-Kuwait Tel.965-22437717 FAX.965-22437718 BAHRAIN BRANCH OFFICE Office22, Entrance 892, Road3316, Manama/Ummal Hassam 0333,Capital Governorate,Bahrain Tel.973-3400-2871 SINGAPORE BRANCH OFFICE 192 Waterloo Street #04-07 Skyline Bldg Singapore 187966 Tel.65-6745-6530 Fax.65-6745-3059 CAMBODIA BRANCH OFFICE IOC Center F4 R2, No. 254, Monivong Blvd, Sangkat Beong Raing, Khan Daun Penh, Phnom Penh City Tel.070-7735-7399 QATAR BRANCH OFFICE P.O. Box 75362 Doha, Qatar Tel.974-4490-1565 Fax.974-4490-1284 Table of Contents 04 Introduction 06 Construction Sequence 09 Projects Description (Overseas) 11 Projects Description (Korea) 12 Equipment Owned 15 Track Record The Typical Mega Foundation Bored Pile Introduction Bored Pile Introduction Maintain stable shaft This method is able to excavate into soft/hard rock , and also under ground obstacles. Ease to identify strata type Casing tub is oscillated and installed by the main body of earth drill and Vibrator Machine until upper rock level. Upper soil from ground to rock is removed by Hammer Grab or Earth Drill Auger (BG Machine). The Specialties Below the rock excavation is used generally by main BG machine with rock drilling tool or RCD Machine. This method can be used for foundation of large bridge in river, foundation of super structure building , foundation of marine structure, and so on. Indeed, this is a more effective method in removing Less any disturbance and subsidence to the surrounding areas Less noise & vibration undergrounsd reinforced-concrete structures for redevelopment works. Efficiency in QA/QC 4 5 DONGAH GEOLOGICAL ENGINEERING CO.,LTD DONGAH GEOLOGICAL ENGINEERING CO.,LTD Deep Foundation; Bored pile application in construction Since1991, In KOREA Since 2006, at overseas (Singapore, Vietnam, Cambodia, etc) Foundation of tank Foundation of buildings Foundation of Bridge abutment, pier Bored Pile Removal of underground structure (Concrete block, etc) Foundation penetrated to hard ground www.dage.co.kr Bored Pile Construction Sequence Construction Sequence Survey Bored Pile Construction Sequence (Oscillator + Earth Drilling) Drilling 1.Carry in and set up equipment (株 東 亞 地 質 3.Set up the drilling machine 2.Install casing to the top of weathered rock and excavatton 4.Drilling (株 ) 東 亞 地 質 ) Casing Socket rock Casing Re-bar fabrication work Install casing 지하수위 Water level N Remove slime 6 Disposal Setting up oscillator in planed position Re-bar cage 5.Move to the next position Inserting of casing with hammer garb 6.Install rebar cage Setting up earth drilling equipment 7.Concreting and withdraw casing Drilling for men casing area 7 DONGAH GEOLOGICAL ENGINEERING CO.,LTD DONGAH GEOLOGICAL ENGINEERING CO.,LTD Inspect Excavated material/ slime 8.Backfill after concreting Y Install rebar cage Remove slime(2nd) 東 亞 地 質 (株) (株 東 亞 地 質 ) Install tremie pipe CON'C Concreting Withdraw tremie pipe Move to next position Insertion of steel cage Placing concrete with tremie pope and Pulling out of casing Backfilling wuth soil or gravel after placing concrete Earth work Toe grouting/ Cutting off Withdraw casing Machine Set Up Casing Installing Boring Works Install rebar cage Concreting Completion www.dage.co.kr Bored Pile Construction Sequence Projects Description (Overseas) Bored Pile Construction Sequence (Vibrator+Earth drill ) Location: Balmoral Rd Singapore PJ name: Pilling Works for Balmoral Condominium Project 1) Point survey 2-1) Casing Installation (Vibrator) 2-2) Casing Installation (BG Machhine) Application ■Construction period: 2012.7 ~ 2012.11 ■Bored pile Diameter:D600, D700, D800, D900, D1000 ■Depth : 32 ~ 36m ■CBP Diameter :D800, D900, D1000, D1200 ■Depth : 14 ~ 24M Location: Upper Changi Rd Singapore PJ name: Down Town Line Stage 3 Contract 923 DONGAH GEOLOGICAL ENGINEERING CO.,LTD Application ■Construction period: 2011.11 ~ 2013.08 ■Bored pile Diameter:D1600, D1200,D1100, D1000, D800, D600 ■Depth : 15 ~ 58m 3) Excavation (Drilling) 4) Rebar Installation 5) Con'c Casting 9 Location: Collyer Quay Rd, Singapore PJ name: Redevelopment of overseas Union House & Change Alley Plaza Collyer Quay 6) Casing Extraction www.dage.co.kr Application ■Construction period : 2007.12~2008.07 ■Bored pile : D1100, D1500 ■Depth : 40m Bored Pile DONGAH GEOLOGICAL ENGINEERING CO.,LTD 8 Projects Description (Overseas) Location: Kimseng Rd, Singapore PJ name: Kimseng Condo Application ■Construction period : 2006.07~2007.11 ■Bored pile : D1500 ■Depth : 43~63m Location: Phnom Penh, CAMBODIA 10 PJ name: CAMBODIA ACLEDA Bank Plc. Headquarters Building Extension Location: Hanoi, Vietnam PJ name: Hanoi City Complex Application ■Construction period : 2007.10~2008.07 ■Bored Pile : D1500,D2000 ■Depth : 43~63m www.dage.co.kr Location: Palau Island, USA PJ name: Palau Compact Road Const. Application ■Construction period : 1999.09~2002.11 ■Bored pile : D1500 ■Depth : 43~63m Location: Busan, Korea 11 PJ name: Doosan We’v Condo DONGAH GEOLOGICAL ENGINEERING CO.,LTD DONGAH GEOLOGICAL ENGINEERING CO.,LTD Application ■Construction period : 2013.01~2013.08 ■Bored pile Diameter : D1000, D1200 ■Depth : Approx.43m Projects Description (Korea) Application ■Construction period : 2007.12~2008.08 ■Bored pile : D2500 ■Depth : 60m ■Highligths : Building foundation Location: Incheon, Korea PJ name: Incheon Bridge (Pier Foundation) Application ■Construction period : 2006.05~2008.05 ■Bored pile : D1000~D2000 ■Depth : 35~40m ■Highligths : Offshore foundation Bored Pile Equipment Owned Drilling Machine Oscillator Model BM-C150 MGN2000HD BM-C200 BM-C200S BM-C300 Casing Out Diameter Max. 1,500mm Max. 2,000mm Max. 2,000mm Max. 2,000mm Max. 3,000mm Lifting Stroke 600 mm 700 mm 600 mm 600 mm 650 mm Lifting Force 243 ton at 320bar 3940kN (402 ton) 314 ton at 320bar 581 ton at 320bar 726 ton Clamping Force 197 ton at 320bar 2895kN (295 ton) 257 ton at 275bar 402 ton at 320bar 509 ton 721 ton-m at 320bar 1014 ton 25˚ 25˚ 21˚ Item Torque BG28 12 www.dage.co.kr Diameter (mm) Depth (m) BG40 Crowd System Crane Weight (ton) DMB 18S Rotary Speed BG-40BC Main Winch Aux. Winch (tf) (tf) Kelly Bar Torque (tf.m) BG28 2,000 63 Winch Type 96 35U/MIN 25.51 8.16 27.5 BG36 2,000 71 Winch Type 120 23/48U/MIN 30.61 10.2 36 BG40 2,500 53 Cylinder Type 142.5 21/43U/MIN 30.61 13.27 30 DMB18S 1,500 45 Winch Type 70 "Low 8.3 High 52.9U/ MIN" 18.3 6 18 BG40BC 2,500 71 Winch Type 142 8~60U/MIN 40 14 39 Rotation Angle 25˚ 26˚ Retaining Force 98 ton 129 ton 145 ton 163 ton Travel of casing 327 mm 436 mm 436 mm 550 mm Operating Pressure 320 bar 320 bar 320 bar 320 bar 320 bar Size 6,815(L) × 2,780(W) × 2,210(H) 8,225(L) × 3,540(W) × 2,280(H) 7,775(L) × 3,310(W) × 2,230(H) Whole weight 26 ton 32 ton 31 ton 13 DONGAH GEOLOGICAL ENGINEERING CO.,LTD DONGAH GEOLOGICAL ENGINEERING CO.,LTD Item BG36 286 ton-m at 320bar 6345kNm (647 ton-m) 481 ton-m at 320bar 8,995(L) × 3,780(W) 10,455(L) × 4,700(W) × 2,525(H) × 2,655(H) 42 ton 57 ton Bored Pile Equipment owned Track Record Overseas RCD Machine ItemModel Model BM-C150 Base frame Max.drill bit out diameter : 2,000mm Power swivel (model) Rexross A6VM 250HD2 Max.350bar (2 Planetary gearing) 2 Planetary gearing (G22) (Lower speed) 0~5.9 rpm / 0~18.4 Ton.m (High speed) 0~28.69 rpm / 0~3.8 Ton.m Mast tilt Max. 3.5m stroke (Thrust) 88tons at 320bar (Pull-up) 129tons at 320bar Working platform tilt Max. 20deg.(option) Retaining device NW 300 drill pipe Drill pipe rack tilt Max. 41.5deg. Jib crane Max. 1ton swivel boom (2 Hyd. motors) BM-R3030/NW300 MGN2000HD BM-C200 2 Planetary Gearing (G25) Rexross A6VM 250HD2 Max.350bar 0~10.0 rpm / 0~30.0 Ton.m (High speed) 0~27.2 rpm / 0~11.0 Ton.m 32deg. 122tons at 320bar (Pull-up) 201tons at 320bar Max. 12.5deg.(option) Retaining device NW 300 drill pipe Drill pipe rack tilt Max. 37.6deg. Water inlet Weight Diaphragm wall, Bored pile, Earth work UIC Mixed Development Singapore UIC Investments Samsung C&T 2013.03 2013.12 Diaphragm wall, Bored pile, Balmoral Condominium Development Singapore Hong Leng Holding Limited Daewoo E&C 2012.07 2012.11 Bored Pile & CBP Downtown Line Stage 3 Contract 923 Singapore Land Transport Authority (LTA) Samsung C&T 2011.12 2013.02 Diaphragm Wall , Bored Pile , Secant Piling The # Star River Project Cambodia Daesan Cambodia Co Posco E&C 2009.11 2010.11 Bored Pile & SCW Monivong Office Project Cambodia CKiD Hyundai AMCO 2009.01 2009.07 Diaphragm wall, Bored pile, Earth work Gold Tower 42 Project Cambodia Yon Woo Cambodia Co Hanil E&C 2008.04 2009.12 Diaphragm wall, Bored pile, Earth work New Construction of The HaNoi City Complex of 65 Stories Tower Vietnam Coralis Vietnam Co Daewoo Motor Sales 2007.10 2008.12 Diaphragm Wall, Bored Pile Proposed Redevelopment of OUH & CAPP at Collyer Quay Singapore HILLSTATE Hyundai E&C 2007.09 2008.11 Diaphragm Wall, Bored Pile Palau Compact Road Project USA (Palau) U.S. Army Corps of Engineers Daewoo E&C 1999.09 2004.02 Bored Pile HVS Shipyard Predrilling Project Vietnam Hyundai Vinashin Hyundai E&C 1997.01 1997.07 Bored Pile Singapore Guan Realty Pte. Ltd Tiong-seng 2006.07 2007.11 Diaphragm Wall Max. 3.5m stroke (Thrust) Jib crane 2013. 01 2013. 08 15 Max.drill bit out diameter :3,000mm (Lower speed) Working platform tilt www.dage.co.kr Model BM-C150 2 Planetary Gearing (G25) Thrust cylinders Hyundai amco Approx. 25 tons(incl. casing clamp) (2 Planetary gearing) Mast tilt ACLEDA Bank Plc. Headquarters Cambodia ACLEDA Bank Plc Building Extension Project DONGAH GEOLOGICAL ENGINEERING CO.,LTD DONGAH GEOLOGICAL ENGINEERING CO.,LTD 10K - NW200*2lines Weight Power swivel (model) Description of Work Client wire rope diameter 6mm×length 25m Water inlet Base frame Contract Period Country 26 deg. Thrust cylinders ItemModel Main Contractor Project Name PS22 / 113.88 /18 (2 Hyd. motors) 14 BM-R1820/NW300 MGN2000HD BM-C200 The Phros Condominium Development Max. 1ton swivel boom wire rope diameter 6mm×length 25m 10K - NW200*2lines Approx. 38 tons Bored Pile Track Record Korea Client Main Contractor Contract Period OK Center Development Daewoo E&C 2012.02 2013.08 Yeosu National Industrial Complex Entry Ramp Madong IC Project Jeollanamdo Posco E&C Songdo The # Green Square (RC3BL) Residence Apartment Project Posco E&C Posco E&C Lotte Shopping Lotte E&C 2011.05 2011.12 2011.05 2011.10 2011.04 2011.07 Samsung Electronics Samsung C&T 2010.10 2011.02 Project Name Songdo OK center Project Jamsil Lotte World RCD Project G1-Project Daewoo E&C Daewoo E&C Samsung Electronics Samsung C&T 2010.08 2011.12 2010.06 2010.06 Samsung Heavy Industries Co. 2010.05 2010.07 Honam Railway Section 1-2 Gumkang River RCD Ministry of Land, Infrastructure and Transport Korea Rail Network Authority Samsung C&T Cheongra A28 block Residence Apartment RCD Jung Heung Construction Posco E&C 2010.04 2010.06 2010.01 2010.04 Songdo Rm1 block New Building Project Cheun An LCD 6Line extension work Youngsan River restoration Project Section 2 Bored-Pile 16 Ulsan~Pohang Expressway Section5 Bored-Pile Chojeong~Hwamyeong Connection Road Pusan Film Center Deveopment Heung Hwa Industry Busan Metropolitan City Busan Metropolitan City Dongbu Construction 2010.04 2011.03 Daewoo E&C 2009.12 2011.03 Hyundai E&C 2009.02 2009.07 Hanjin Heavy Industies & Construction 2009.02 2009.06 Daewoo E&C Do-Gae~Chojeong Road Extension Work Gimhae City Samho Semyeon Multi-Purposed Building Project Semyeon Develop Co Posco E&C 2008.08 2008.12 2007.12 2008.08 2007.04 2009.04 2007.04 2007.09 Korea Expressway Corporation Hyundai E&C 2006.04 2008.04 Song-do International Business Building Development Haeundae Doosan We've The Jeniss Residence Apartment Development Incheon Bridge Connection Road Section 3 Tangjeong T-8 Project NSC-NEATT & BOAT, BLOCK 36 RCD Work Kimhea Bridge RCD Work www.dage.co.kr NSIC Daewon Plus Construction Doosan E&C Samsung Electronics Samsung C&T 2006.04 2006.08 NSC & GALE INTL Daewoo E&C 2006.04 2007.03 Gimhae City Joong Ang Development 2006.02 2006.04 Project Name Client Main Contractor Contract Period Daewoo E&C Daewoo E&C 2006.01 2006.02 Φ2,000mm 30 48m Φ1,500mm 189 49m Φ2,500mm 28 24m Φ1,500mm 176 50m Φ1,500mm 29 37m Φ1,000mm 31 14m Φ1,500mm 27 15m Φ2,000mm 29 16m Φ2,000mm 106 50m Φ2,000mm 20 24m Expressway Donghea Expressway Section 8, Namcheon Bridge Foundation Work Korea Corporation Φ1,500mm 4 17m Hopo Bridge Piling Work Φ2,500mm 8 17m Φ2,000mm 36 24m Φ1,500mm 198 31m Φ1,000mm 15 48m Φ1,200mm 56 48m Φ1,500mm 124 50m Φ2,000mm Φ1,500mm Φ2,000mm 22 40 129 52m 36m 33m Φ1,500mm 4 33m Φ2,000mm 20 44m Φ2,500mm 8 39m Φ1,200mm 4 27m Φ2,000mm 20 56m Φ2,000mm 76 50m Φ2,500mm 101 60m Φ1,200mm 80 58m Φ2,000mm 108 50m Φ1,200mm 39 35m Φ2,000mm 193 40m Φ1,200mm 74 17m Φ2,000mm 98 18m Φ2,000mm 155 60m Φ1,500mm 38 50m Φ1,500mm 20 35m Daejeon EXPO PF Construction -RCD Work Geoga Bridge Access Road Extension Work Section JangsungpoJanmok Gyeongsangnamdo Samsung C&T Φ1,500mm 45 27m Φ2,000mm 106 26m Φ1,500mm 48 20m Φ1,500mm 75 8m Φ2,000mm 130 10m Φ1,500mm 242 28m Φ1,500mm 87 33m Φ1,500mm 16 14m Φ1,500mm 56 35m Φ1,500mm 180 22m Φ1,500mm 60 20m Φ1,200mm 30 20m Samsung C&T 2005.05 2006.06 Samho International Daewoo E&C Dongah Construction Hyosan Construction 2004.04 2007.03 2003.01 2003.06 2001.11 2002.12 2001.11 2002.04 Ministry of Land, Infrastructure and Transport Gumgwang 2001.02 2002.12 Pohang City Dongah Construction 2000.06 2000.07 Youngdeok Songcheon Bridge Piling Work Ministry of Land, Infrastructure and Transport Gumgwang 1999.01 2000.04 Φ1,500mm 150 60m Naksan Bridge Piling Work and Connection Road Construction Yangyang County Dongbu Construction 1999.04 1999.12 Φ1,500mm 45 67m Korea Expressway Corporation Daewoo E&C 1998.08 2003.12 Φ1,200mm Daegu~Pohang Expressway Section 9 24 18m Φ1,500mm 135 18m Korea Rail Network Authority Shinhwa Construction 1997.07 1997.12 Φ1,500mm 414 20m Φ1,200mm 452 24m Kumho E&C Kumho E&C 1997.02 1997.06 Φ1,500mm 225 17m Korea Korea Development Development Corporation Corporation 1997.01 1997.05 Φ1,500mm 135 10m Deungcheon-Dong Grand Department Building RCD Foundation Work Grand Department Daewoo E&C Φ2,000mm 104 50m Φ1,500mm 111 15m Φ1,500mm 66 25m Φ2,000mm 24 27m Φ1,500mm 66 44m Φ1,500mm 56 30m Φ1,500mm 23 40m Φ2,000mm 10 40m Samsung Electronics New R&D Centre Construction Trumpworld Marine Building Ilsan Brownstone Apartment RCD Foundation Work Woegwan Bridge Piling Work Pohang Yeonil Bridge Piling Work Gyeongbu High Speed Railway Section 9-2 Pilling Work Ulsan Dal-Dong Geumho Apartment Piling Work Eumgung-Dong Daelim Apartment Piling Work Eumgung-Dong Daedong Apartment Piling Work Deokchon-dong Multi-purposed Building RCD Foundation Gyungbu Railway Section Mulkeum-Gupo Piling Work Gayang Bridge Piling Work Jeil Life Insurance Building Foundation Samsung Electronics 2005.06 2007.06 Description of Work G/W hick Depth Length ness ISU E&C Korail Busan Isu Construction Daedong Daedong 1996.08 1997.04 1996.04 1996.07 Buguk Redevelopment Union Anam Construction 1995.02 1997.12 Halla E&C Korea Rail Network Authority Seoul Metropolitan City Dongah Construction 1996.05 1996.12 1995.08 1997.06 Jeil Insurance Jeil Apartment 1995.08 1997.06 17 DONGAH GEOLOGICAL ENGINEERING CO.,LTD DONGAH GEOLOGICAL ENGINEERING CO.,LTD Cheongra Prugio Residence Apartment A8 Block Korea Expressway Corporation Description of Work G/W hick Depth Length ness Bored Pile
Similar documents
Pressure valves GROUP ENGLISH var May 2016.cdr
the load at any position without drift and protect of overloading and thermal expansion by open center control valves.
More information