Project PDF (short)
Transcription
Project PDF (short)
Debris Flow & Shallow Landslide Protection ANA CHOSICA - 22 BARRIERS FOR NINE VALLEYS, PE ANA CHOSICA - 22 BARRIERS FOR NINE VALLEYS Debris Flow & Shallow Landslide Protection Project Place Country/Region ANA Chosica - 22 barriers for nine valleys Chosica Peru Year of installation 2016 Customer Engineering Contractor ANA Chosica TDM S.A. TDM S.A. Situation In the area east of Lima, Peru, annually recurring rains due to the El Niño phenomenon caused mudslides and landslides in the past. At the end of February 2016, Geobrugg installed 22 debris flow barriers that today protect people and infrastructure in the nine valleys of the Chosica Region. Description 22 barriers were installed between mid-November 2015 and end of February 2016. Noteworthy are the means of transportation: By air from Switzerland to Lima and by muscle power over the final kilometers. The light weight of the systems was advantageous for both types of transport. Local authorities show details of the lagest installation of this kind of Latin America in a film (in Spanish). Protected object Systems Road, Building VX140-H4, UX100-H4, UX120-H6, UX180-H6 Corrosion protection GEOBRUGG SUPERCOATING System height System length 4.0 m, 6.0 m 6 m - 60 m Number of barriers 22 ® For questions please contact our Geobrugg specialist at your side: Alexander Bittendorfer Project Manager Bavaria Phone +41 71 466 84 29 Mobile +41 78 601 06 14 [email protected] Geobrugg AG Aachstrasse 11 | 8590 Romanshorn | Switzerland [email protected] | www.geobrugg.com A company of the BRUGG Group | Certified to ISO 9001 Debris Flow & Shallow Landslide Protection | ANA Chosica - 22 barriers for nine valleys, PE 2/2