CDR Industrial Park - Gral English (OCT 2014)
Transcription
CDR Industrial Park - Gral English (OCT 2014)
Irapuato, Guanajuato - Mexico Our Group holding Industrial & Residential Developments Engineering Projects Founded by Jose Maria Pascual Our Group holding Developer established in 1998 with projects in: Latin America Mexico Chile Europe Spain On going projects holding Valencia, Spain Project: Mercat Investment: € 30 million Urbanization and Underground Parking Building 3 underground levels with 2.20 m height per floor and 427 parking spaces in a 4,200.00 m2 lot On going projects holding Alicante, Spain Project: Lugano Benidorm Tower 42 Floors 204 Apartments On going projects holding Puerto Santiago, Tenerife Vigilia Park Hotel 111 apartments On going projects holding Project: Santiago del Mar La Ligua, Chile Investment: € 18.00 million Urbanization of 335 has. Residential Project On going projects holding Irapuato, Mexico Project: Castro del Rio Techno industrial Park Current Investment: $45.00 US Mill. Projected Investment: 32 US Mill. 444 has. Industrial Development / 53 companies / robust industrial infrastructure Offers the best site for your new facility due to its: Strategic location in Central Mexico Stable labor environment with a low payroll cost Strong word-class infrastructure and utilities Safety and Irapuato’s lifestyle Strategic Central Location and Logistic Advantages Castro del Rio offers easy acces to the main cities, borders and ports in Mexico, by train and truck, as well as worldwide connectivity through the Bajio International Airport. • Public transportation Distances from IRAPUATO to: Detroit, MI 2,858 Km. – Greenville, SC 2,412 Km. – Birmingham, AL 1,928 Km. – Laredo, TX 943 Km. – El Paso,TX 1,339 Km. Hermosillo, Son. 1,350 Km. – Mazatlan, Sin. 780 Km. – Saltillo, Coah. 743 Km. – Altamira, Tamps. 623 Km. – Manzanillo,Col. 556 Km. – L. Cardenas, Mich. 488 Km. Veracruz, Ver. 715 Km. – Ixtapa 512 km. Puerto Vallarta 626 km. - 1,775 Miles 1,498 Miles 1,098 Miles 585 Miles 832 Miles 835 Miles 484 Miles 461 Miles 387 Miles 359 Miles 303 Miles 444 Miles 318 Miles 389 Miles Trucking time to: • U. S. border (Laredo): 9 hours • Both Pacific Ocean & Gulf of Mexico: 6 hours International Connectivity At 30 mins. from CDR Bajio International Airport Irapuato Queretaro At 60 mins. from CDR INTERNATIONAL AIRPORTS Silao /Bajío Daily flights 国際便 Dallas/Fort Worth, Texas 2d Houston, Texas 5d Chicago, Illinois 2w Los Angeles, California 2d Atlanta, Georgia 1d Tijuana – San Diego 1d Cancun 4w Mexico City 6d San Francisco 3w Monterrey Queretaro 2d Houston, Texas 3d Dallas/Forth Worth, Texas 3d Cancun 3w Tijuana – San Diego 2w Access to a railroad spur in specific lots Rail shipping services provided by: 1. Border Service 2. Transborder Service 3. Passport Service Automotive OEM’s Location TOYOTA (PICK UP) FORD (MOTORES) SONORA CHIHUAHUA G.M. (AUTOS & UV) COAHUILA NUEVO LEON CHRYSLER (AUTOBUSES) DURANGO FORD (AUTOS) TAMPS. G.M. (AUTOS) ZACATECAS CHRYSLER (MOTORES & UV) S.L.P. AGS. NISSAN (AUTOS & MOTORES) HONDA GTO. MEX. COLIMA YUCATAN QRO. FORD (AUTOS& UV) HIDALGO JALISCO MICHOACAN TLAX. MOR. CAMPECHE PUEBLA VW (Engines), GM (UV), Mazda (Cars), HONDA (Cars) TABASCO GUERRERO GM (PRUEBAS) G.M. (MOTORES) OAXACA CHIAPAS CHRYSLER (AUTOS & UV) CHRYSLER (CAMIONES) BMW (AUTOS) NISSAN (AUTOS & UV) V.W. (AUTOS & MOTORES) Qualified workforce Competitive payroll cost Stable labor environment Young, well-trained and abundant labor force: World class education in Irapuato: 20 private and public superior education centers in Irapuato Growing labor pool: +200,000 people (50% have no formal jobs) Average age: 21 year-old 526,000 56 companies from 6 countries. +US$1,500 Mill of Investment. + 7,000 new jobs. 1.8% of Guanajuato’s GDP Companies in Castro del Rio 2004 Groundbreaking 11 23 8 12 1 1 Germany Japan USA Mexico Taiwan Holland 2006 2007 2008 2009 2010 ECC 2011 Sankyo Kogyo 2012 NAPS 2013 Transportes Aliados Mexicanos NHK -Topura Okawa Tstech SUMINOE PROASA GUGAR GTK NSSC (…) ISS VERFRUCO Strong autoparts supplier presence in Marabis Group Some of our clients… Autoparts produced in Castro del Rio and Marabis Abasolo Industrial Parks Manufacturing Processes: Stamping Plastic Injection Aluminum Die Casting Alloys Precision Machining Parts Assembling Plating Spinning weave and sewing Guanajuato Silao Population at 15 km. radius N Romita 15km Sta Cruz de Juventin Irapuato Salamanca ueramaro Distance Radius 15 km Total Communities 341Abasolo Total Population Male Population Female Population 502,342 242,100 259,457 Economic Active Economic Active Population Population (Male) 198,379 130,383 Economic Active Population (Female) 67,996 Leon Dolores Hidalgo Guanajuato Population at 20 km. radius Silao N rancisco del Rincon 20km Romita o Sta Cruz de Juventino Rosas Irapuato Salamanca Cueramaro Abasolo Distance Radius Total Communities Total Population 20 km 703 583,396 Pueblo Nuevo Villagran Male Population Female Population Economic Active Population (Male) Economic Active Population (Female) Población Economicamente Activa Femenino 281,035 300,773 226,062 151,073 74,989 Location Largest communities Irapuato - Human Resources Molino de Santa Ana San Antonio el Rico San Vicente San Agustín de los Tordos El Márquez Serrano Gdpe. Paso Blanco Valencianita El Copalillo El Copal Carriz. El Grande La Caja El Carrizalito Malvas Cuchicuato Sn. Javier San Antonio de Chico Cuarta Brigada Tomelópez San Roque El Carmen Sta. Elena de la Cruz Guadalupe de Rivera San Nicolas Temascatío La Soledad Col. Morelos de Gpe. de Rivera Vista Hermosa Peñuelas La Trinidad Temascatio Location of Irapuato’s largest communities in a 25 km radius Irapuato - Human Resources Comunity Community La Calera San Roque Villas de Irapuato Arandas Lo de Juarez Aldama San Cirstobal Tomelopitos El Carrizal El Grande Cuchicuato Cuarta Brigada Valencianita Santa Elena de la Cruz San Antonio El Rico Hacienda del Marquez El Carrizalito San Antonio El Chico San Nicolas Temascatio Ex-Hacienda El Copal Inhabitants Population 5818 5057 4774 3973 3949 3705 3525 2946 2832 2755 2459 2327 2213 1753 1903 1858 1753 1574 1439 Largest Communities Comunity2 Community El Copalillo La Caja Tomelopez El Carmen San Javier Guadalupe de Rivera San Vicente La Soliedad San Agustín de los Tordos Guadalupe El Paso Blanco Serrano Peñuelas La Trinidad de Temascatio Molino de Santa Anta Colonia Emiliano Zapata Vista Hermosa Col. Morelos de Guadalupe de Ejido Malvas Inhabitants3 Population 1413 1369 1343 1285 1278 1252 1232 1217 1210 1108 1099 1094 1077 1075 1056 1038 1022 1000 Castro del Rio Campus Dual Education Program (DEP) A Unique and Revolutionary Education System in Irapuato Based on the German Model to train skilled technicians . DEP: Program is jointly designed Education at School 40% of time Training at Company 60% of time Low cost training program Fulfills specific labor needs Young & skilled technicians CONALEP Castro del Rio Campus Project Project Total Investment: $ 5 Mill USD Enrollment Projection 2014 - 2018 Program Mechatronics Maintenance of Automatic Systems Machine & Tools Plastic Injection Total Enrollment: 2014 283 227 253 0 763 2015 349 290 253 80 972 2016 347 347 261 195 1150 2017 385 385 310 310 1390 2018 392 392 360 360 1504 Projection Graduates 2014 - 2018 Program Mechatronics Maintenance of Automatic Systems Machine & Tools Plastic Injection Total Graduates 2014 40 30 70 0 140 2015 44 46 65 0 155 2016 114 55 103 0 272 2017 112 112 66 0 290 2018 110 110 75 75 370 Other Local Institutions related to DEP Current Academic ITESI Technical University: Industrial Engineering Electromechanical Engineering Total Enrollement: Electronic Engineering + 6,000 students CECYTEG Technical School: Total Enrollement: 800 students. Projected:1,500 students Current Academic Instrumentation Manteinance Mechatronics Local Training Institution: IECA Training Programs CAD/CAM Programmer Machining and Lathing Centers Programmer CNC Operator Machining and Tooling Operator CNC Line Adjuster Tool and Die Maker Plastic Injection Programs: Materials Engineering Mechatronics Engineering Computer Engineering Programs: Manufacturing Electromechanics Electronics Universities in Irapuato with Technical Programs Tec de Monterrey Industrial Engineering Mechatronic Engineering Universidad de León Industrial Engineering Universidad Quetzalcoatl Electrical Engineering Computer Systmes Engineering Universidad San Angel del Sur Computer Engineering Computer Systems Engineering Universities in the zone with Technical Programs FIMEE - UGTO Communication and Electronic Engineering Electrical Engineering Mechatronics Engineering Mechanical Engineering Computer Systmes Engineering Instituto Politécnico Nacional Automotive Systems Engineering Aeronautic Engineering AVERAGE 2014 SALARY BENCHMARK SILAO $ IRAPUATO $ (Entry Level- Operator) COMPANY PRODUCTION PROCESS LOCATION PER MONTH (PESOS) BENEFITS PER HR. (USD) 4,603.68 $ 4,236.74 1.46 $ 1.34 2013 Salary Information Projection of Salary increase 4.5% (Market) SALARY GROSS (PESOS) SALARY GROSS (PESOS) WEEKLY MONTHLY WEEKLY MONTHLY GERMAN METAL MECHANIC IRAPUATO $ 1,132.00 $ 4,905.33 $ 1,182.94 $ 5,126.07 JAPANESE AUTOMOTIVE SILAO $ 1,129.40 $ 4,904.82 $ 1,182.82 $ 5,125.54 AUSTRALIA AUTOMOTIVE SILAO $ 1,129.40 $ 4,894.07 $ 1,180.22 $ 5,114.30 ITALIA AUTOMOTIVE SILAO $ 1,105.43 $ 4,790.20 $ 1,155.18 $ 5,005.76 BRAZIL MECHANIC SILAO $ 1,034.62 $ 4,483.33 $ 1,081.17 $ 4,685.08 GERMAN AUTOMOTIVE IRAPUATO $ 1,021.00 $ 4,215.52 $ 1,016.59 $ 4,405.22 GERMAN AUTOMOTIVE SILAO $ 999.48 $ 4,331.07 $ 1,044.45 $ 4,525.97 GERMAN AUTOMOTIVE IRAPUATO $ 972.81 $ 4,215.52 $ 1,016.59 $ 4,405.22 GERMAN AUTOMOTIVE SILAO $ 950.00 $ 4,116.67 $ 992.75 $ 4,301.92 JAPANESE PLASTIC MOLDING IRAPUATO $ 938.46 $ 4,066.67 $ 980.69 $ 4,249.67 JAPANESE AUTOMOTIVE IRAPUATO $ 898.00 $ 3,891.33 $ 938.41 $ 4,066.44 JAPANESE AUTOMOTIVE SILAO $ 892.31 $ 3,866.67 $ 932.46 $ 4,040.67 JAPANESE AUTOMOTIVE SILAO $ 890.00 $ 3,856.67 $ 930.05 $ 4,030.22 731.03 1,026.10 $ $ 3,167.81 4,446.42 BENEFITS TAIWAN HYGENE IRAPUATO $ 800.00 $ 3,031.40 $ - Transportation Service AVERAGE WEEKLY GROSS INDUSTRIAL ZONE $ 992.35 $ 4,254.95 $ - Cafeteria Service - Food Coupon BENEFITS USD$1.00 = MXP$13.00 - Transportation Service - Saving Fund (% Base Salary) - Cafeteria Service - Productivity Bonus - Food Coupon - Saving Fund (% Base Salary) - Productivity Bonus POSITION NAME/ OCCUPATION AVERAGE WAGE (USD/YEAR) EXPERIENCE LEVEL Production teams Logistic planner $ 27,559.38 Sr. Industrial engineer $ 27,692.31 Sr. Supervisors $ 21,230.77 3+ similar position Quality Quality manager $ 52,615.38 5+ similar position Quality engineer $ 30,069.23 Sr. POSITION NAME/ AVERAGE WAGE Technical Functions EXPERIENCE LEVEL OCCUPATION (USD/HR) Maintenance manager $ 50,769.23 5+ similar position Technical specialist $ Welding $ 3.70 3+ similar position 14,769.23 5+ similar position Maintenance $ 20,307.69 Sr. Security $ 7.21 Jr.engineer Tool Shop Tool POSITION crib (warehouse NAME/ AVERAGE WAGE POSITION NAME/ AVERAGE WAGE EXPERIENCE LEVEL EXPERIENCE LEVEL maintenance) $ (USD/YEAR) 15,692.31 Sr. OCCUPATION OCCUPATION (USD/YEAR) Logistics Production teams Production teams Logistic manager $ 50,769.23 Logistic planner $ 27,559.38 Sr. Logistic planner $ 27,559.38 5+ Sr. similar position Logistic clerk $ 16,615.38 3+ Industrial engineer $ 27,692.31 Sr. Industrial engineer $ 27,692.31 Sr. similar position Forklift drivers (Material Supervisors $ 21,230.77 3+ similar position Supervisors $ 21,230.77 3+ similar position handler) $ Quality 8,395.38 3+ similar position Quality Logistic/material $ 27,559.38 Quality manager $ 52,615.38 5+ similar position Quality manager planner 52,615.38 Sr. 5+ similar position Staff and Quality engineer $ 30,069.23 Sr. Quality engineer $ Management 30,069.23 Sr. General plant manager Technical $ 66,461.54 5+ similar position Technical Functions Functions Driver $ 8,424.65 3+ Maintenance manager $ 50,769.23 5+ similar position Maintenance manager 50,769.23 5+ similar position Clerk HR/Finance $ 9,230.77 Technical specialist $ 14,769.23 5+ similar position Technical specialist 14,769.23 3+ 5+ similar position Manager - finance $ 50,769.23 Maintenance engineer $ 20,307.69 Sr. Maintenance engineer 20,307.69 5+ Sr. similar position Manager controling $ 50,769.23 5+ similar position Tool Shop Tool Shop Manager - IT $ 50,769.23 5+ similar position Tool crib (warehouse Tool crib (warehouse Manager - HR $ 50,769.23 maintenance) maintenance) $ 15,692.31 Sr. 15,692.31 5+ Sr. similar position Logistics Logistics Logistic manager $ 50,769.23 5+ similar position LogisticNAPS manager $ 50,769.23 5+ position Source: – 2014 Data. USD$1.00 = similar MXP$13.00 Logistic clerk $ 16,615.38 3+ similar position Logistic clerk $ 16,615.38 3+ similar position Forklift drivers (Material Forklift drivers (Material handler) handler) $ 8,395.38 3+ similar position $ 8,395.38 3+ similar position Competitive Payroll Cost at Irapuato (2014) STAFF LEVEL TO MANAGEMENT Gross Salary (includes only food coupons) Best Labor Environment Source: *1 Labor Relation Statistics of Local Jurisdiction,2010-INEGI Construction: • Built to suit projects • Facility design • Industrial infrastructure Management of governmental procedures and permissions Industrial land for sale Industrial facilities for rent and for sale Offices for sale and for rent We are the only Industrial Park in Guanajuato certificated by the Mexican standard for Industrial Parks (NMX-R-046-SCFI-2011) and the first to be certified by the standard 2011. CDR INFRASTRUCTURE SITE Location CASTRO DEL RIO TECHNOINDUSTRIAL PARK Irapuato (Between Aldama and La Garrida) Zoning Industrial area, at a low natural disaster location. (Seismic Clasified as B: low seismic risk area) Soil Characterisitcs Sandy gravels soils Soil Bearing Capacity: from 1.0 up to 1.2 Kg/cm2 Utilities Natural Gas Power Potable Water Sanitary Sewer System Storm System Fiber Optics Telephone Public Lighting Internal Roads 18,080 GCal / 71,741 MMBTU available per day Dual feed: 300 MVA @ 115 kV, 90 MVA @ 34.5 kV Currently installed 60 MVA @ 34.5 kV 4 wells 25 l/s sanitary capacity at WWTP Available storm drainage system Available infrastructure to receive TELMEX services Available Available in main and secondary access and roads Available 15mts wide roads Accessibility Highways Federal Highway #45 (Panamericana)- 6 lanes (close to entrance) Railroad Spur Available only in west side of Guanajuato River in specific lots. CDR Infrastructure CONNECTIVITY SCHEME OF CASTRO DEL RIO SUBSTATION IRP IRAPUATO I SUBSTATION 115 kV 115 kV ACSR-397.5 9.0 KM 11.5 KM ACSR-795 ACSR-397.5 29.0 KM 0.03 KM ACSR-477 115 kV GTO GUANAJUATO SUBSTATION LAS FRESAS HIGH-POWER SUBSTATION (200 MVA) CASTRO DEL RIO SUBSTATION 0.03 KM ACSR-477 115 kV LOCATION Direct access to Federal Highway 45 Total: 444 has. Currently developed: 270 has. 5th Phase - under development: 100 has 6th Phase – expansion area: 70 has. ECC 6th Phase TAMX 連ハイウェイ45号線への メインアクセス MARABIS PLAZA Okawa Federal Hihgway 45 “Castro del Rio Technoindustrial Park, in Guanajuato, has become the MECCA of automotive sector in México” José Luis Valls, Director of Nissan Mexicana says: “The Castro del Rio Technoindustrial Park, in Guanajuato, has become the Mecca of automotive sector in Mexico. The concentration of several automotive manufacturers in one place has reduced foreign currency paid by carmakers installed in Mexico to import auto parts.” (…) Source: http://www.cnnexpansion.com/especiales/2012/06/21/mexico-la-meca-del-automotor (9th of July, 2012.) Schaeffler Group Rolling Bearings Plant Germany GETRAG – FORD Transmission Plant Germany Mr. Norbert Buechelmaier Executive Vice President of Manufacturing “We expected labor rates to increase over the next five years, but the turnover and absenteeism rates are very favorable. Basically, we considered the area to be quite stable as a union situation” Source: Representatives of Schaeffler Group opinion: “The availability of suitable property to build the factory, a pool of qualified workers, strong infrastructure and access to public transportation as factors in the site decision” Article: THE MAGAZINE OF CORPORATE REAL ESTATE STRATEGY & AREA ECONOMIC DEVELOPMENT January of 2009
Similar documents
Annual Report 2010
• Our Board approved the construction of a new Welcome Center for the Camp. Capital funding for the project included the following gifts: The Martin Andersen-Gracia Andersen Foundation pledged a le...
More information