New Jersey Department of Transportation Director, Division of

Transcription

New Jersey Department of Transportation Director, Division of
New Jersey Department of Transportation
Director, Division of Project Management
State Transportation Engineer, PE
Transportation:
Means of Conveyance of Travel from One Place to Another
New Jersey Department of Transportation Mission Statement
"Improving Lives by Improving Transportation."
We Strive to Build Projects that Improve the Economy and the Quality of Life in Our State
Organizational Overview
Project
ManagementGeographic
Assignments
Procurement – Doing Business
Professional Services Procurement
Manager: Karen Abbott
Phone: (609)530-2452
Email: [email protected]
http://www.state.nj.us/transportation/business/procurement/ProfServ/
Construction Services Procurement
Manager: Keith Daniels
Phone: (609)530-2103
E-mail: [email protected]
http://www.state.nj.us/transportation/business/procurement/ConstrServ/
Proposed Program for Fiscal Year 2016
$1.9 Billion – Total
2016
$1.1 Million State
$0.8 Million Federal
2015
FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF
GGGGGGGGGGGGGGGGGGGGGG
75% of Bridge Inspections - $28 Million/Annually
50% of Construction Inspections - $50 Million/Annually
85% of Design Work - $120 Million/Annually (All phases)
Fiscal Year 2012 – Fiscal Year 2014
Average of 97 Consultant Selections

Planning

Design

Structural Evaluation

Construction Inspection

Maintenance Engineering
Fiscal Year 2015
To Date…..
133 Consultant
Selections…..
And Counting
Group Selections
ADA – 14 Consultants Selected – 14 Assignments Granted
Bridge Decks – New Selections – Spring 2015
Pavement Resurfacing – New Selections - Spring 2015
Pavement Reconstruction – One Year Extension: Spring 2015
New Solicitation Spring 2016
Term Agreements
20 General Engineering Services Contracts – Spring 2015
Keep An Eye Out
I-76 Bridges over the Rt. 130 Bridge, Camden County
$20 Million Deck / Superstructure Replacement
Early Summer 2015
I-80 / Rt. 15 Interchange, Morris County
$40 Million Missing Move
Early Summer 2015
Fiscal Year 2016
Route 4 Hackensack River Bridge - $30 Million Major Rehabilitation
I-80 WB Pavement Reconstruction - $200 Million Pavement Reconstruction
I-76/676 Bridge Deck Replacements - $40 Million Deck/Superstructure Replacements
Rt. 1&9 Interchange at I-278 - $150-$200 Million Interchange Completion
FY 2015 CAPITAL PROGRAM
New Jersey Department of Transportation
More than
$300 Million
in Roadway Assets
More that
$650 Million
for State and Local Bridges
Funding for Local System Support is almost $450
(Of which almost
$160 Million
Million
is through Municipal and County Aid)
Current Active Construction Projects
Over 180
Valued @ Almost $2.0 Billion
Route 3/46 Valley Notch Road – Contract A
Little Falls Twp., Borough of Woodland Park
City of Clifton, Passaic County
Award Summer 2015
Operational Improvement
Newark City, Essex County
Harrison Town, East Newark Boro, Hudson County
Award Summer 2015
Bridge / Operational / Safety
$100+ Million
Major Bridge Rehabilitation
North Bergen Township, Hudson County
$50+ Million
Award:
Late Calendar 2015
Replacement of Movable Bridge with Fixed Bridge
Logan Township
Gloucester County
$80+ Million
Award: Late Fall 2015
$30 Million
Bridgewater Twp.
Bedminster Twp.
Somerset County
Award: Spring 2016
Operational and Safety Improvements
I-295/42/I-76 Direct Connect Contract
Contract 1: Rt. 42 I-76 Leaf Avenue to North of Browning Street
I-76 vic Market Street / Bell Road Bridge Replace
Contract 2: Rt. 168 Interchange / Aljo’s Curve to Bell Road
Contract 3: I-295 Bridge over I-76 / Route 42
Award Summer 2016 $200+ Million
Contract 4: Complete Work on I-76 / Route 42
Award Early 2019 $175+ Million
I-295 / 42 Missing Moves
Award Summer 2017 $175+ Million
Approximately $1+ Billion
Route 7 Wittpenn Bridge Replacement
Jersey City, Kearny Town
Hudson County
Contract 4: The project includes improvements
to the interchange of Route 7 and Fish House
Road. A pump station is proposed to alleviate
flooding problems.
Award: Summer 2016
$250+ Million
Start: Late Summer 2011
Finish: 2020
Total Dollar Amount:
$600 Million +
•Replacement of the Route 7 Movable Bridge over
the Hackensack River (Wittpenn Bridge) with a
mid-level vertical lift bridge.
•Sidewalk will be provided on the northbound
side continuity with the East Coast Greenway.
For A
Better
Any ?????????????’s