New Jersey Department of Transportation Director, Division of
Transcription
New Jersey Department of Transportation Director, Division of
New Jersey Department of Transportation Director, Division of Project Management State Transportation Engineer, PE Transportation: Means of Conveyance of Travel from One Place to Another New Jersey Department of Transportation Mission Statement "Improving Lives by Improving Transportation." We Strive to Build Projects that Improve the Economy and the Quality of Life in Our State Organizational Overview Project ManagementGeographic Assignments Procurement – Doing Business Professional Services Procurement Manager: Karen Abbott Phone: (609)530-2452 Email: [email protected] http://www.state.nj.us/transportation/business/procurement/ProfServ/ Construction Services Procurement Manager: Keith Daniels Phone: (609)530-2103 E-mail: [email protected] http://www.state.nj.us/transportation/business/procurement/ConstrServ/ Proposed Program for Fiscal Year 2016 $1.9 Billion – Total 2016 $1.1 Million State $0.8 Million Federal 2015 FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF GGGGGGGGGGGGGGGGGGGGGG 75% of Bridge Inspections - $28 Million/Annually 50% of Construction Inspections - $50 Million/Annually 85% of Design Work - $120 Million/Annually (All phases) Fiscal Year 2012 – Fiscal Year 2014 Average of 97 Consultant Selections Planning Design Structural Evaluation Construction Inspection Maintenance Engineering Fiscal Year 2015 To Date….. 133 Consultant Selections….. And Counting Group Selections ADA – 14 Consultants Selected – 14 Assignments Granted Bridge Decks – New Selections – Spring 2015 Pavement Resurfacing – New Selections - Spring 2015 Pavement Reconstruction – One Year Extension: Spring 2015 New Solicitation Spring 2016 Term Agreements 20 General Engineering Services Contracts – Spring 2015 Keep An Eye Out I-76 Bridges over the Rt. 130 Bridge, Camden County $20 Million Deck / Superstructure Replacement Early Summer 2015 I-80 / Rt. 15 Interchange, Morris County $40 Million Missing Move Early Summer 2015 Fiscal Year 2016 Route 4 Hackensack River Bridge - $30 Million Major Rehabilitation I-80 WB Pavement Reconstruction - $200 Million Pavement Reconstruction I-76/676 Bridge Deck Replacements - $40 Million Deck/Superstructure Replacements Rt. 1&9 Interchange at I-278 - $150-$200 Million Interchange Completion FY 2015 CAPITAL PROGRAM New Jersey Department of Transportation More than $300 Million in Roadway Assets More that $650 Million for State and Local Bridges Funding for Local System Support is almost $450 (Of which almost $160 Million Million is through Municipal and County Aid) Current Active Construction Projects Over 180 Valued @ Almost $2.0 Billion Route 3/46 Valley Notch Road – Contract A Little Falls Twp., Borough of Woodland Park City of Clifton, Passaic County Award Summer 2015 Operational Improvement Newark City, Essex County Harrison Town, East Newark Boro, Hudson County Award Summer 2015 Bridge / Operational / Safety $100+ Million Major Bridge Rehabilitation North Bergen Township, Hudson County $50+ Million Award: Late Calendar 2015 Replacement of Movable Bridge with Fixed Bridge Logan Township Gloucester County $80+ Million Award: Late Fall 2015 $30 Million Bridgewater Twp. Bedminster Twp. Somerset County Award: Spring 2016 Operational and Safety Improvements I-295/42/I-76 Direct Connect Contract Contract 1: Rt. 42 I-76 Leaf Avenue to North of Browning Street I-76 vic Market Street / Bell Road Bridge Replace Contract 2: Rt. 168 Interchange / Aljo’s Curve to Bell Road Contract 3: I-295 Bridge over I-76 / Route 42 Award Summer 2016 $200+ Million Contract 4: Complete Work on I-76 / Route 42 Award Early 2019 $175+ Million I-295 / 42 Missing Moves Award Summer 2017 $175+ Million Approximately $1+ Billion Route 7 Wittpenn Bridge Replacement Jersey City, Kearny Town Hudson County Contract 4: The project includes improvements to the interchange of Route 7 and Fish House Road. A pump station is proposed to alleviate flooding problems. Award: Summer 2016 $250+ Million Start: Late Summer 2011 Finish: 2020 Total Dollar Amount: $600 Million + •Replacement of the Route 7 Movable Bridge over the Hackensack River (Wittpenn Bridge) with a mid-level vertical lift bridge. •Sidewalk will be provided on the northbound side continuity with the East Coast Greenway. For A Better Any ?????????????’s