S5.1
Transcription
S5.1
BACKFILLED TRENCH BOTTOM OF TRENCH PIPE SHALL NOT EXTEND BELOW THIS LINE NOT LESS THAN 18" NOTE: PIPES MAY PENETRATE THRU CONT FOOTING, NOT THRU SPREAD FOOTINGS jh lawder, inc. structural engineers 717 16th Street, Ste. 4, Modesto, CA 95354 (209) 521-1143 Fax: (209) 521-1581 THRU CONT FTG WHERE PIPE SLEEVE IS ‰ 6" ABV BOTT OF CONT FTG 6" MIN TYP NO FORMS * TRENCH 12d FOR #6, #7, #8 STANDARD 6d FOR #3, #4, #5 STANDARD N/A SEISMIC 5 1/2" PROVIDE 40 LAPS TYP 24' - 0" D d BELOW CONT FTG WHERE PIPE SLEEVE IS ‰ 4" BELOW BOTT OF CONT FTG +16' - 5" TOF d 90° TYP REINF 6d 6d w/ ST 3" A N M D IN A SE RD IS M IC D These documents are property of LDA Partners, LLP, and are not to be reproduced, changed or copied without the expressed written consent of LDA Partners, LLP. DATE: DRAWN: CHECKED: REVISIONS: 135° MIN * 2 1/2" * WHERE BOTT REINF IS INTERRUPTED ADD SAME SIZE BAR x 10'-0" MIN REINF TO RUN THRU WHERE POSSIBLE COVER PER GENERAL NOTES 2 D 4d w/ 2å" 4'-0" MIN 180° HOOK PER PLAN TOF THRU CONT FTG WHERE PIPE SLEEVE IS BETWEEN 6" ABV & 4" BELOW BOTT OF CONT FTG 15 TY P 90° HOOK BAR BEND DIAMETER: D = 6d FOR #8 & SMALLER D = 8d FOR #9, #10, & 11 D=10d FOR #14 & #18 NOTE: PIPES PENTRATING SLAB, SLAB EDGES, FTG, ETC., SHALL BE SEALED AS REQ'D IN ACCORDANCE w/ THE SOIL VAPOR MIGRATION MEASURES SYSTEM. SPAN PER PLAN ROOF JOIST DESIGNATION PER PLAN 12 d 2' - 0" MIN 4'-0" MIN BY STIRRUP/TIE HOOKS 8" MIN OF CONT FTG 12/21/09 gk/09-040 / 12d UON BOTT NI OF CA L I FOR FOUNDATION PERMIT BAR BEND DIAMETER: D = 4d FOR #3, #4, & #5 D = 12d FOR #6, #7, & #8 JOIST GIRDER DESIGNATION PER PLAN UCT UR A ISSUED 12/21/09 NOTE: CONCRETE FILL @ PIPE SHALL BE SAME WIDTH AS CONT FTG, FULL WIDTH OF TRENCH, & SHALL BE PLACED BEFORE CONT FTG IS POURED * TE R NEE S TA No. 2310 Exp. 3-31-11 TR S BOTT OF CONT FTG UNREINFORCED CONC FILL ER REG I S TE R JO FESS I ONA PRO L E H LAWD N H I NG ED L PROVIDE SLEEVE 1" CLR AROUND PIPE - TYP 1 A 6" MIN PER PLAN 2 BOTT OF CONT FTG 11 PIPES & TRENCHES TYP BAR BENDS 3/4" = 1'-0" 1/2" = 1'-0" NOTES: 1. DESIGN LOAD COMBINATION IN ACCORDANCE w/ CBC SECTION 1605.3. 2. DESIGN LOADS: MAIN ROOF: DL=17psf, LL=20psf. DL INCLUDES 2.0 psf ALLOWANCE FOR OWJ. ADJUST AS REQ IF OWJ DL IS GREATER THAN 2.0psf. SEE PLANS FOR MECH UNIT LOADS. SC-2 PER PLAN REINF CONT THRU SC STANDARD HK 5. DESIGN FOR 1500# POINT ADD LOAD APPLIED AT ANY TOP CHORD PANEL PT ALONG TRUSS FOR FUTURE LOADING. 6. STANDARD SJI DESIGNATIONS SHOWN INDICATE THE EQUIVALENT LOADING FOR THE LOADING DIAGRAMS SHOWN. MANUFACTUER'S DESIGN MAY BE BASED ON THE EQUIVALENT LOADING OR LOADING DIAGRAMS. OTHER DEPTHS MAY BE USED PROVIDED THAT MINIUMUM CLEARANCE TO THE BOTTOM CHORD IS MET. FOR JOISTS w/ "SP" SUFFIX, JOIST SUPPLIER TO DESIGN JOISTS TO SUPPORT LOADS AS SHOWN ABOVE. SEE 8. "E/1.4=5.0k" DENOTES TOP CHORD AXIAL LATERAL DESIGN LOADS. DESIGN FOR E/1.4=5.0k UON. CLIENT CALIFORNIA GREEN STRATEGIES 1'-0" BEND TYP UON NOTE: 7. WEB CONFIGUARATION PER MUANUFACTERER. WEB CONFIGURATIONS FOR ADJACENT JOISTS TO BE CONSISTENT (AS ECONOMICALLY AS POSSIBLE) TO ALLOW FOR MECHANICAL, PLUMBING, AND ELECTRICAL RUNS. 0" TYP 0" TYP 4. DL INCLUDES AN ALLOWANCE FOR SPRINKLERS 3å"ø AND LESS. VERIFY w/ SPRINKLER SUBCONTRACTOR FOR LOADS & LOCATIONS SHOULD SPRINKLERS GREATER THAN 3å"ø BE REQUIRED. 3" CLR TYP SEE PLAN 3. DEFLECTION CRITERIA: LL-SPAN/240, DL+LL-SPAN/180. 13 S0.1 UON CORNER INTERSECTION END 702 MARSHAL ST, STE 420 SACRAMENTO, CA 958160 (916) 769−1138 FTGS w/ (2) BARS IN HORIZONTAL PLANE SHOWN, CONDITIONS w/ (3) BARS SIMILAR. 1/8" = 1'-0" 14 SOFF-CUT JT: SC-2 3/4" = 1'-0" TOOL w/ á" RADIUS EA SIDE 10 TYP FTG REINF -PLAN VIEW PROJECT 1/2" = 1'-0" 586−01−08 STATE OF CALIFORNIA DEPT. OF MOTOR VEHICLES − STOCKTON TOOLED JT OPTION å" PUDDLE WELDS @ 12" OC LINCOLN STREET STOCKTON, CA SC-1 PER PLAN SLAB PER PLAN REINFORCING PER PLAN CONT CLOSURE ƒ MATCH DECK GA 18 GA MIN BM PER PLAN å" x 2'-0" SMOOTH GREASED DOWEL w/ SAWCUT ENDS @ MID-DEPTH @ 24" OC 17 3/4" = 1'-0" EQ 2" 2" 1 ß" MIN DEPTH SAW-CUT SHEET INFO #4 CONT EA SIDE OF JT GENERAL NOTES & TYPICAL DETAILS SOIL VAPOR MIGRATION MEASURES SYSTEM 1'-0" BEND TYP PREPARED BUILDING PAD SOFF-CUT OPTION PROVIDE WHERE DOWN FLUTE MISSES BEAM FLUTE/BM CLOSURE EQ 13 SLAB ON GRADE JT: SC-1 3/4" = 1'-0" CORNER 9 SHEET NO -- INTERSECTION TYP FTG REINF -PLAN VIEW 1/2" = 1'-0" 5 GENERAL NOTES 12" = 1'-0" S0.1 OF -- SHEETS 12/21/2009 10:55:32 AM 22 STEEL ROOF JOIST DESIGN CRITERIA 6.1 6 5 4 3 2.2 2 1.5 1 120' - 0" HS S5 X5 X 1' - 0" 3/ 1 6 6 structural engineers D 717 16th Street, Ste. 4, Modesto, CA 95354 (209) 521-1143 Fax: (209) 521-1581 B ED DU6 S 5. FASTENERS ALONG THE EDGES IN SHEAR PANELS SHALL BE PLACED NOT LESS THAN ã" IN FROM PANEL EDGES. 1' - 0" WIDE CONT FTG TYP 1' - 0" 15' - 6" 6' - 6" 1' - 0" 6' - 0" 1' - 6" 17' - 2" S/H TYP @ 12" WALL 12" = 1'-0" DATE: DRAWN: CHECKED: REVISIONS: SC-2 C 3" A -1' - 0" TOC C 6 3/ 1 E -1' - 0" FTG TYP UON HS S5 X5 X E CO L SI BLO ZE C AS KO RE UT Q ST 'D Y P 9 DU 5" EOC @ CMU VENEER TYP HS S5 X5 X1 /4 HS S5 X5 X1 /4 E 24" WIDE x 24" DP GRADE BM -1' - 6" TOC 6 S5.1 16" WIDE x 24" DP GRADE BM TYP B S/H SC-1 BY E DU6 S/H 120' - 0" 29' - 8 1/2" CC . 17 S5.1 TYP HS S5 X5 X1 /4 6 3/ 1 HS S5 X5 X DD -0' - 8" TOC 4' - 0" HS S5 X5 X 3/ 1 4 S/H 9 DU 6 C HS S6 X6 X1 / -1' - 6" FTG . 12/21/09 gk/09-040 / DU6 S/H HS S5 X5 X1 /4 5 S5.1 3' - 0" 4' - 0" NI OF CA L I FOR These documents are property of LDA Partners, LLP, and are not to be reproduced, changed or copied without the expressed written consent of LDA Partners, LLP. DU6 S/H 7 UCT UR A FOUNDATION PERMIT A 24 SC-1 3 S5.1 SHEAR WALL SCHEDULE DU6 48' - 0" 7. STRUCTURAL PANELS ARE PERMITTED TO BE APPLIED EITHER PARALLEL OR PERPENDICULAR TO FRAMING. TE ISSUED 12/21/09 10" 6. PANELS LESS THAN 12" WIDE SHALL NOT BE USED. No. 2310 Exp. 3-31-11 TR S TA R NEE S/H FESS I ONA PRO L E H LAWD N H L 3/ 16 -1' - 0" TOC @ GB jh lawder, inc. 3/ 1 S5 X5 X 6 6" 1' - 6" . SC-2 4. PLYWOOD SCREWS SHALL BE A MIN OF 1" LONG, SELF-DRILLING, SELFTAPPING, w/ FLAT HEAD & MIN HEAD DIAMETER OF 0.285". 8' - 0" S/ HD U6 S/ HD U9 3/ 1 C C A 3/ 16 HS -1' - 0" TOC @ GB -1' - 0" TOC @ GB B E ER 3. SEE PLAN FOR HOLDOWNS. C S5 X5 X B -1' - 6" FTG S/H DU 9 REG I S TE R JO TYP -1' - 6" FTG S/H C DU9 . 1' - 0" A /1 6 C 11' - 6" +0' - 0" TOC S/ HD U9 1' - 0" S/ HD U9 S/ HD U9 11' - 0" -1' - 6" FTG 16 S4.1 +0' - 0" TOC B HS 12' - 6" HS S5 X5 X C S5 X5 C X3 2' - 6" 2' - 0" X3 /1 /1 6 HS 15' - 0" 1' - 6" I NG 2. BLOCK ALL PANEL EDGES. HORIZONTAL BLOCKING MAY BE 1å" WIDE x 20 GA CONT STRAP. 12' - 6" HS S5 X5 S5 X B 5 X3 6 HS C 9' - 0" D 10 S5.1 12" x 24" GRADE BM TYP TOC @ GB TO MATCH FTG ELEV @ ENDS UON S/ HD U9 2' - 6" WIDE x 16" DP NOTES: INSTALL WALL SHTG PRIOR TO CONSTRUCTION OF POP-OUTS AND ADJACENT WALLS. +0' - 0" TOC -1' - 6" FTG 6' - 10" -1' - 6" FTG 6' - 0" E 17' - 2" 24' - 0" 6 2' - 2" 24' - 0" 3/ 1 -1' - 6" FTG 24' - 0" S/ HD U9 24' - 0" HS S5 X5 X 24' - 0" 1' - 8" 1' - 6" 4" CLR FSTNR FSTNR SPACING - SPACING BASE SHTG EDGES (EN) FIELD ANCHOR FSTNR MARK SHTG A ä" OSB APA å"ø TITEN HD #8 SCREWS 6" OC 12" OC SHTG, EXP 1 @ 32" OC B ä" OSB APA å"ø TITEN HD #8 SCREWS 4" OC 12" OC SHTG, EXP 1 @ 24" OC C ä" OSB APA å"ø TITEN HD #8 SCREWS 3" OC 12" OC SHTG, EXP 1 @ 16" OC HS S5 X5 X SHEAR WALL SCHEDULE 1. 2.8 SC-2 1' - 0" WIDE CONT FTG TYP S/H DU6 2 7 1/4" = 1'-0" T 17 FOUNDATION PLAN 1/8" = 1'-0" 72' - 0" SC-2 SC-1 SC-2 SC-2 A 6.1 1' - 0" 6 +0' - 0" TOC DD 6" 1' - 0" 7' - 0" 24' - 0" 6' - 6" 5 17' - 6" 1' - 8" 23 S5.1 -1' - 6" FTG 3 2.9 B TYP +0' - 0" 17 TOC S5.1 -1' - 6" FTG 6" 1' - 8" 1' - 0" 7' - 0" 6 3/ 1 1' - 0" 14' - 6" B -1' - 6" FTG +0' - 0" TOC FOUNDATION PLAN & DETAILS 17' - 0" 2 1.8 SHEET NO -- 1' - 0" 24' - 0" 2.1 SHEET INFO A 24' - 0" 3.2 12" x 24" GRADE BM TYP TOC @ GB TO MATCH FTG ELEV @ ENDS UON LINCOLN STREET STOCKTON, CA 6 S5 X5 DD X3/ 16 BB 3/ 1 HS TYP -1' - 0" FTG -1' - 0" TOC @ GB STATE OF CALIFORNIA DEPT. OF MOTOR VEHICLES − STOCKTON B . S/ HD U6 B 23 S2.3 4 S5.1 23' - 0" 3/ 16 HS S5 X5 X 6 HS S5 X5 X -1' - 6" FTG 24' - 0" 4 24" WIDE x 24" DP GRADE BM S7 X5 X3 /1 6 17 S5.1 S5 X5 X HS S5 X5 X HS S2.3 D 16 11 S5.1 HS 3/ 1 6 HS S5 X5 X . S/ HD U6 . S/ HD U6 D -1' - 6" FTG TYP 1' - 0" B -1' - 0" TOC @ GB 4 TT1 S/H T14 3/ 1 6 3/ 1 . B S/ HD U6 D A S/ HD U6 . . S/ HD U6 SC-2 HT T14 SC-1 22 HS S7 X5 X3 / 2' - 0" 50' - 0" 7. SEE ARCH FOR EXTERIOR FLATWORK & WALKWAYS. 21 D 31' - 6" 6. SEE SHEET S4.1 FOR LIGHT GAGE FRAMING DETAILS. FOUNDATION NOTES S/ . S/H HS S5 X5 X 6 HS S5 X5 X 3/ 1 6 HS S5 X5 X 3/ 1 B B 14' - 6" 14' - 6" B SC-1 TYP @ DOORS U6 HD S/ U9 7 S5.1 586−01−08 2' - 6" N 1 0.8 S2.1 OF -- SHEETS 12/21/2009 10:55:47 AM 3/ 1 C 2. DIMENSIONS ARE TO FACE OF STUD (FOS) UON. A PROJECT SC-2 2' - 6" D S/H 3. EDGE OF CONCRETE (EOC) @ FOS UON. *'-*" 4. DENOTES TOP OF FOOTING ELEVATION BELOW FLOOR SLAB. FTG DATUM 0'-0" IS 1st FLOOR SLAB ON GRADE. *'-*" 5. DENOTES TOP OF CONCRETE ELEVATION. DATUM 0'-0" IS 1st TOC FLOOR SLAB ON GRADE. SC-1 SLOPE TO DRAIN TYP SEE PLUMBING DWGS . NOTES: 702 MARSHAL ST, STE 420 SACRAMENTO, CA 958160 (916) 769−1138 DU6 . 6 -0' - 8" TOC CALIFORNIA GREEN STRATEGIES A 4 9 DU B EXTERIOR WALLS NOT NOTED AS SHEARWALLS SHALL HAVE í" SHEATHING. FASTEN w/ #10-24 x 1" TEKS/3 @ 6" OC EDGES, 12" OC FIELD. BLKG NOT REQ'D. SC-1 3' - 0" S/H DD SIM 12' - 7" SHEARWALL MARK SEE SHEARWALL SCHEDULE 24/S2.1 TERMINATE SHEARWALL @ OPENING & PROVIDE EDGE NAILING @ KING STUD DU6 S/H SC-2 HS S5 X5 X 4" CMU VENEER PER ARCH 13 S0.1 S/H 16' - 9" 11 S5.1 B.2 TYP @ SC-1 CLIENT SIM HS S6 X6 X1 / 600S162-43 @ 16" OC TYP @ SC-2 DU6 SC-1 6 S5.1 -1' - 6" FTG 1200S162-54@ 16" OC 1. S/H SC-2 22 A B -1' - 6" TOC 9 DU SC-2 TOC C . 14 S0.1 4" SLAB ON GRADE w/ #4 @ 24" OC EA WAY @ 1" CLR OF TOC o/ SOIL VAPOR MIGRATION MEASURES SYSTEM o/ PAD PREPARED IN ACCORDANCE w/ SOILS REPORT. TOC = 0'-0" 6 3/ 1 -0' - 8" LEGEND: * S/H 1' - 0" 4 HS S6 X6 X1 / EE S5.1 SC-2 SC-2 (2) #4 x 1'-6" EA WAY (4) #5 x 2'-6" EA WAY (4) #5 x 4'-6" & (6) #5 x 2'-6" (5) #5 x 3'-6" EA WAY (5) #5 x 3'-6" & (8) #5 x 6'-6" (6) #5 x 4'-6" EA WAY (6) #5 x 4'-6" EA WAY (7) #5 x 5'-6" EA WAY (6) #5 x 5'-6" EA WAY HS S5 X5 X 2'-0" SQ x 12" DP 3'-0" SQ x 24" DP 3'-0" x 5'-0" x 24" DP 4'-0" SQ x 24" DP 4'-0" x 7'-0" x 24" DP 5'-0" SQ x 24" DP 5'-0" SQ x 30" DP 6'-0" SQ x 24" DP 6'-0" SQ x 30" DP . 10' - 0" A B BB C CC D DD E EE 15' - 6 1/2" MARK B.5 29' - 8 1/2" FOOTING SCHEDULE SIZE REINFORCING 59' - 5" -1' - 6" FTG TYP @ S5.1 CMU 9 VENEER DU H / S * HSS PER PLAN a-a COURSE 2 #4 @ 24" OC IN BOND BM UNIT 20' - 8" LEVELING NUTS +23' - 4" TOC 0' - 0" #5 VERT @ EA CORNER NO SPLICES jh lawder, inc. structural engineers HSS PER PLAN 717 16th Street, Ste. 4, Modesto, CA 95354 (209) 521-1143 Fax: (209) 521-1581 HSS3X3X3/16 DEPRESSED SLAB 4 24" (NOM) 3/4" = 1'-0" S TA SEC a-a NOTES: 1. COL PER PLAN TYP TOC 0' - 0" 6" OC 10' - 8" 12" OC #4 NI OF CA L I FOR These documents are property of LDA Partners, LLP, and are not to be reproduced, changed or copied without the expressed written consent of LDA Partners, LLP. * 6" 3/4" = 1'-0" * BREAKFORM 1200T125-54 TOC 0' - 0" TOC 0' - 0" DATE: DRAWN: CHECKED: REVISIONS: 12/21/09 gk/09-040 / BY 6" OC SPACING +6' - 2" TO CMU 1/8" = 1'-0" B.2 NOTE: 29' - 8 1/2" 2' - 2" 29' - 8 1/2" SEE 3 S5.1 NOTE: UON. SEE #4 EQ 6" OC 15' - 0" 12" OC EQ 6" OC 12" (2) #6 TOP & BOTT w/ STD HKS EA END 6" OC 1' - 4" #4 * 2" 2" ð éx10x1'-3" w/ (4) 1"ø F1554 THRD RODS w/ HEAVY HEX NUTS UON 2" @ 24" OC 12" @ EA VERT, ALT HKS PER PLAN 5 1/2" PER PLAN 2" 2" 3" 3" 6 â @ HSS7x5 @ HSS6x6 SHEATHING PER PLAN COL PER PLAN EN JAMB LEVELING NUTS BREAKFORM 600T125-43 #4 (ALT CAP BARS) SPACING PER ELEV 2" NON-SHRINK GROUT PER PLAN TOC FTG #4 SPACING PER ELEV SPACING PER ELEV 1/2 SPACE 1/2" = 1'-0" @ 12" OC GRADE BEAM (GB) TYP PERIMETER FTG 2 3/4" = 1'-0" 3/4" = 1'-0" 6" 3" BREAKFORM 600T125-43 COL PER PLAN PER PLAN TOC 1å" NON-SHRINK GROUT 3" 1. LEVELING NUTS EQ 1. 2. PROVIDE (2) ANCHORS MIN @ EA PIECE OF TRACK. 13 TITEN HD ANCHOR 1" = 1'-0" AB PER SCHD w/ STD HK REINF PER FTG SCHD HILTI PAF PER ICC ESR-1663. PER SCHED 3. PROVIDE PAF 6" MAX & 1" MIN FROM ENDS OF TRACK & @ SPLICES. 9 HILTI PAF ANCHOR 1" = 1'-0" * 5 TYP COLUMN FTG 1/2" = 1'-0" 702 MARSHAL ST, STE 420 SACRAMENTO, CA 958160 (916) 769−1138 PROJECT LINCOLN STREET STOCKTON, CA SHEET INFO WIDTH PER SCHED FOUNDATION DETAILS SECTION a-a COL 2. PROVIDE (2) PAF MIN @ EA PIECE OF TRACK. 3. PROVIDE ANCHORS 12" MAX & 3" MIN FROM ENDS OF TRACK & @ SPLICES. 1/2 SPACE GRADE BM NOTES: TOC 0' - 0" PER PLAN FTG FTG PER PLAN TITEN HD PER ICC ESR-1056. 1 1/2" TYP BASE ƒPER SCHD CALIFORNIA GREEN STRATEGIES STATE OF CALIFORNIA DEPT. OF MOTOR VEHICLES − STOCKTON 1" CLR 9 1/2" * NOTES: SPACING PER ELEV 1/2" = 1'-0" 0.138ø HILTI X-C PAF @ 16" OC (1å" EMBED) FTG PER PLAN 2' - 0" 17 å"ø TITEN HD @ 32" OC MAX UON PER SHEAR WALL SCHED CLIENT 586−01−08 * * a-a 3" CLR TYP EQ COLUMN FTG WALL FRAMING PER PLAN PER PLAN TOC PER PLAN 2' - 0" PER PLAN TOC WALL FRAMING PER PLAN 3 1/2" EMBED * a-a TOP OF DBL NUTS DBL HEAVY HEX NUTS CLENCHED TIGHT NOTES: 1. PROVIDE (2) TITEN HDs MIN @ EA PIECE OF TRACK. 2. PROVIDE TITEN HDs 12" MAX & 3" MIN FROM ENDS OF TRACK & @ SPLICES. â SEC a-a C PER PLAN 3/4" = 1'-0" A 7 #4 #4 @ 24" OC (2) #6 CONT TOP & BOTT (2) #6 TOP & BOTT w/ FTG DETAIL 10 18" 1' - 0" 5" 5" 2" 2" 2" ð éx10x1'-2" w/ (4) 1"ø F1554 THRD RODS w/ HEAVY HEX NUTS UON TOC 0' - 0" LENGTH PER SCHD * TOC 0' - 0" PER PLAN FTG 1/8" = 1'-0" å"ø TITEN HD @ 48" OC UON PER SHEARWALL SCHEDULE BREAKFORM 600T125-43 EN PER PLAN TOC SPACING FRAME @ GL 7 22 TOC 0' - 0" WALL FRAMING PER PLAN 1' - 0" EQ 6" OC 13 S5.1 C PER SCHED 6" OC 15' - 0" 12" OC SHEAR PER PLAN PER PLAN EQ 6" OC #4 @ 24" OC 2' - 0" LAP 20'-0" * 2' - 0" MIN PER PLAN FTG 3/4" = 1'-0" 24" PER ARCH (2) #6 x 35'-0" TOP & BOTT CENTERED @ B.5 3 3/4" = 1'-0" #4 VERT @ 24" OC @ ñ OF WALL (LAP ONLY AS SHOWN) 12" 17 S5.1 24" OC BOND BM SPACING 21 S5.1 7 UON. PERIMETER FTG @ 12" WALL #4 HORIZ @ 24" OC PERIM FTG @ DOOR OPNGS 2 S5.1 1 1/2" TYP 2' - 2" 8" NOM ƒ t WIDTH LENGTH AB HSS3x3 å 9 0'-9" (4) é"ø HSS5x5 é 12 1'-0" (4) é"ø HSS5x5 16 1'-4" (4) é"ø 1 SHEET NO -- S5.1 OF -- SHEETS 12/21/2009 10:55:59 AM B.5 18" MIN C 21 UCT UR A FOUNDATION PERMIT 2. ALTERNATE COURSES 1 & 2. FRAME @ GL A 23 GROUT ALL CELLS SOLID. DO NOT GROUT CAVITY w/ HSS, (2) #6 TOP & BOTT EA END w/ STD HKS LAP 36" 5' - 0" 6" OC TE ISSUED 12/21/09 FTG @ CANOPY COL 11 PER PLAN FTG 5' - 0" 6" OC PER PLAN REINF PER PLAN 21 S5.1 No. 2310 Exp. 3-31-11 TR S PER PLAN COURSE 1 R NEE HSS4X4X3/16 FESS I ONA PRO L E H LAWD N H ER +19' - 0" ED I NG PER PLAN FTG REG I S TE R JO HSS3X3X3/16 TYP BM PER PLAN TYP (4) #4 12" w/ #4 @12" OC w/ (2) TIES @ TOP 5" PER PLAN TOC L 2.1 24" (NOM) 2.9 A 1å" DRYPACK PER ARCH 2' - 0" LAP à ðåx11x0'-11" w/ (4) é"ø AB @ 8"x8" GA (4" PROJ, 8" EMBED, 3" HK)
Similar documents
The Strength of Stiffened CFS Floor Joist Assemblies with Offset
The Strength of Stiffened CFS Floor Joist Assemblies with Offset Loading Prepared for American Iron and Steel Institute Committee on Framing Standards and Steel Framing Alliance
More information