VISI DAN MISI UPTD SAMPAH MANGGAR
Transcription
VISI DAN MISI UPTD SAMPAH MANGGAR
SOLID WASTE MANAGEMENT BALIKPAPAN CITY 2014 Introduction Of Balikpapan 2 • THE ENTRANCE GATE OF EAST KALIMANTAN PROVINCE • WIDTH : 83.189 hectare (land : 50.330 hectare, sea : 32.859 hectare) • TOPOGRAPHY : 85% HILLY & 15% FLAT • THE CITY OF MICE (MEETING, INCENTIVE, CONFERENCE, EXHIBITION) • CENTRE OF OIL REFINERY FOR THE EASTERN PART OF INDONESIA • POPULATION IN 2012 : 637.488 PEOPLE • POPULATION IN 2013 : 660.437 PEOPLE • POPULATION GROWTH : 4,89 % Waste Stream Balikpapan City 140000 120000 100000 10% 80000 13% Transported to TPA 7% composted 71% 60000 Recycled Untreated 2011 2012 2013 40000 20000 0 SOLID WASTE MANAGEMENT 203.03 tons/year 163,269 tons/year INORGANIC WASTE NEIGHBOURHOOD WASTE/DOMESTIC WASTE WASTE BANK 11,008 tons/year SOURCE OF WASTE MARKET/SHOP WASTE WASTE SORTING ORGANIC WASTE WASTE RESIDUE ROAD/STREET WASTE 5 COMPOST HOUSE 115,266 tons/year FINAL DISPOSAL AREA Waste Collection System Motto : No Waste Stays in Waste Container There Are 4 shift for collection the waste 1. Shift 1, (00-08.00 am),60 truck, all waste container in the city 2. Shift 2, (03.00-11.00 am), 5 truck, residu from shift 1 3. Shift 3, (07.00 am- 03.00 pm), 5 truck, residu from shift 2 and new waste 4. Shift 4, (07.00 am- 03.00 pm), 8 pick up,sweep the waste on the main street and new waste KEBIJAKAN PEMERINTAH KOTA BALIKPAPAN DALAM MANAJEMEN PENGELOLAAN SAMPAH 3 R 1. REVISION OF LOCAL REGULATION ABOUT SOLID WASTE 2. COMPOSE FEASIBILITY STUDY FOR SOLID WASTE MANAGEMENT IN CITY BALIKPAPAN PADA TAHUN 2013 3. RECOMENDED INTERMEDIATE TREATMENT FACILITY FOR CITY OF BALIKPAPAN (ITF) - STAGE 1 : MATERIAL RECOVERY FACILITY ( MRF ) - STAGE 2 : AN-AEROBIC DIGESTION PLANT ( AD ) - STAGE 3 : ELECTRICITY PRODUCTION 4. DEVELOPMENT CWB ( CENTRAL WASTE BANK ) 5. DEVELOPMENT WASTE WATER TREATMENT PLANT( IPAL) OFF-SITE. 6. 2013-2016 : PROJECT FOR CAPACITY DEVELOPMENT OF CENTRAL AND LOCAL GOVERMENT FOR 3Rs AND DOMESTIC SOLID WASTE MANAGEMENT SYSTEM BY JICA 7 There are 65 units of WASTE BANK WASTE MANAGEMENT Innovation Compost House (There are 38 units) FINAL DISPOSAL AT MANGGAR LANDFILL OVERVIEW OF FINAL DISPOSAL AT MANGGAR LANDFILL 1. Location : Jl. Proklamasi RT 036 Manggar 2. Width : 27,1 Ha 3. Land Status : Property of Balikpapan City Government 4. System : Sanitary Landfill 5. Built in : 1997/1998 6. Fund Resource : KUDP (Kalimantan Urban Development Programme) 7. Operated since : 13 Januari 2002 DATA OF INORGANIC WASTE COLLECTED BY COLLECTORS IN 2013 111,400 109,700 JANUARI FEBRUARI MARET APRIL MEI JUNI 104,200 98,300 97,500 93,500 96,300 96,800 91,300 95,900 181,800 89,700 JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER DATA OF COMPOST MANAGEMENT AND DISTRIBUTION IN 2009 - 2013 915,040 910,300 800,200 SAMPAH ORGANIK 686,100 HASIL KOMPOS 607,800 PENGAMBILAN KOMPOS 42,546 2009 22,752 48,027 2010 31,592 65,883 2011 28,540 57,885 2012 37,210 70,605 2013 34,095 ROUTE OF WASTE PROCESS INTO FINAL WASTE DISPOSAL AREA 1 2 Truck entering TPA 3 Unloading Scaling Washing 6 5 4 TPA HUMAN RESOURCES & OPERATION Currently, TPA Manggar has 65 personnel consisting of: Civil Servants : 10 Person 2.Administrative Staffs : 2 Person 3.Operational Personnel : 51 Person 4.The employees above get the average salary of 1,000,000 IDR to 1,500,000 IDR per month 1. FACILITIES AND INFRASTRUCTURE IN FINAL WASTE DISPOSAL AREA NO 1 2 3 4 QUANTITY NO HEAVY EQUIPMENT 9 UNIT 1 LANDFILL 1 UNIT TRANSPORTATION EQUIPMENT 9 UNIT 2 SCALING 1 UNIT 3 WASTE WATER TREATMENT PLANT 1 UNIT 4 COMPOSTING BUILDING 1 UNIT 5. 3R BUILDING 1 UNIT 6. EDUCATIONAL PARK AND GAZEBO 1 UNIT 7 HEAVY EQUIPMENT GARAGE 1 UNIT 8 METHANE GASS AREA 1 UNIT 9 SECURITY POST 1 UNIT FACILITY 3 R EQUIPMENT METHANE GASS BIO EQUIPMENTS 6 UNIT 6 UNIT 5 OTHER EQUIPMENTS 39 UNIT INFRASTRUCTURE QUANTITY WASTE STACK LOCATION The land arrangement uses Cut and Fill system. The waterproof layer (Geomembrane) with an area of 26,000 m2 in Zone I and 30,000 m2 in Zone II is given a 40 cm-thick layer of red soil. The Leachate and gas pipeline installation has the distance of 20 m (10) lines. The Waste Destroying System is Sanitary Landfill. Final Waste Disposal Area Manggar is located on Jl. Proklamasi RT 036, Manggar subdistrict, East Balikpapan district or ± 23 Km from the city center WASTE IS UNLOADED USING THE EXCAVATOR WASTE IS UNLOADED USING THE EXCAVATOR WASTE IS LEVELED USING THE BULL DOZER AS MAXIMUM AS POSSIBLE TRY TO HAVE NO MORE WASTE AND ODOR COVER THE WASTE USING THE LAND CITY OF BALIKPAPAN CLEANSING, PARKS, AND CEMETERIES MANAGEMENT DEPARTMENT FINAL DISPOSAL AT MANGGAR LANDFILL WASTE STACK AREA OPERATION BASED ON DAILY CELL B37 B29 B28 B27 B26 B34 B25 B24 B33 B23 B32 B22 B31 B21 B20 B2 B30 B4 B6 B9 B19 B18 B17 C2C1 C4 C5 C6 C7 C8 C9 C10 B10 B12 C3 B16 C18 C17 C16 C15 C14 C13 C12 C11 A1 B1 B3 B5 B7 B1B9 B13 1 B14 B15 A13 A1 A12 A11 A10 A2 A4 A5 A6 A33 A32 A31 A30 A29 A28 A27 A6 A23 A5 A22 A20 A3 A15 A2 A14 MASUK A34 A35 A35 A4 A21 A3 WASTE STACK IMAGE DESCRIPTION IN ZONE II B35 B36 A26 BLOK A BLOK B BLOK C A25 A24 A7 DAILY CELL POSITION A19 A8 A18 A17 A9 A16 A10 CELL BOUNDARY OF WEEKLY STACK A11 A9 A8 A12 A7 A13 ACCESS TO THE STACK Leachate Treatment System Compost Production Facilities 1 2 3 4 DESCRIPTION KETERANGAN : 1. Compost Material 2. Material grinding 3. Fermentation 4. Reversal 5. Drying in the sun 6. Grinding 7. Packing 7 6 5 Plastic Cutting Facilities The house to cut up the plastic is still under construction Cutting Machine Waste Recycle Process Methane Gass Production Facilities 1 Description Keterangan : 1. Stacking 2. Methane gass well 3. Separating tool of gass I and II 4. Gauge 5. Pipe transmitting methane gass to the population 6. Methane gass is utilised by the people 2 3 4 6 5 FINAL WASTE DISPOSAL AREA AS THE EDUCATION FACILITY 1. Change the people’s point of view regarding the TPA that it is no longer dirty and smelly Nursery House 2. Nursery house for education 3. Education on inorganic waste / use the waste for handicraft Handicraft resulted from inorganic waste 4. Education on organic waste/use the waste for compost. Compost resulted from organic waste is ready to be distributed to the community free of charge. 5. Education on the methane gass Methane gass utilised by the community Reading park 6. Education on reading park FINAL WASTE DISPOSAL AREA AS THE RECREATION FACILITY The recreation facilities are among others: 1. ATP Car Mobil ATP 2. Suspended bridge and other playing facilities 3. Flying fox 4. Cafe Methane THANK YOU