sept 19, 2014 poa board meeting minutes
Transcription
sept 19, 2014 poa board meeting minutes
Porto Cima Townhome Property Owners Association P.O. Box 482 Lake Ozark, MO. 65049 (573) 216-2380 www.pctpoa.com [email protected] Porto Cima Townhouse Property Owners Association Board Meeting September 19, 2014 Bill Manion called the board meeting to order at 2:05 p.m. Board members present were Bill Manion, Jim Barnett, Jim Butler, Lynn Diggs, Marti Eagan and Lee Eise. Also in attendance were Todd Nelson from Nelson Management Company and Dana Johannesen who recorded the minutes. Residents in attendance were Leslie Gentry, Mr. Sappington from Bello Point and Larry Johannesen from Via Bacino. Bill Manion started the meeting with a brief statement indicating that in addition to the main purpose of the meeting being finalization of the 2015 budget, there were other matters, notably Bello Point resident Leslie Gentry’s concern about continued moisture in her home. Bill Manion stated his concern of potential litigation, receipt of a letter from Leslie Gentry’s attorney and the possible need for an executive session regarding this matter. Bill Manion then asked the board’s consideration in accommodating Leslie Gentry by making her matter the first item on the agenda. The board members agreed. Gentry – Bello Point: Todd Nelson provided a brief description of the history of Leslie Gentry’s moisture problem and a number of actions previously taken by the Association on her behalf. Todd Nelson then discussed the Miller Engineering inspection report Leslie Gentry had prepared. In response to the report, Todd Nelson had Cross Hair Stucco Repair do any repairs indicated to the exterior of her home. Todd Nelson stated that subsequent to that work, Leslie Gentry’s dehumidifier has to be emptied two times per day. Leslie Gentry was then asked to present her request for the Board’s consideration. After describing the amount of money she has spent in remediating the problem. Leslie Gentry then asked the Board to find someone who can determine the main source of the problem. Bill Manion then briefly described the Miller report and its conclusion indicating three areas of recommended action. The areas highlighted were: 1) original construction/property location; 2) attention to maintenance issues and maintenance work; 3) property owner responsibilities. Bill Manion further stated that the Association has done all of the exterior maintenance/work issues outlined in the report. Bill Manion then asked Leslie Gentry if there were any places in her home where there was evidence of standing water. Leslie Gentry did not indicate one way or the other. The Miller report suggested windows installed in Bello Point weren’t compatible with the EIFS (synthetic stucco) system, the Association had the windows used in Bello Point inspected and determined leaking windows appear not to be the source of the problem. A lengthy discussion then followed regarding other possible sources of moisture, including the potential of an underground stream, storm drainage around the home, a blocked storm drain or a leak in the water service to the home. Bill Manion then asked if the water meter reading test suggested to Leslie Gentry a week earlier had been conducted. She answered no. There was further discussion about the process for reading the meter and when it could be done, as well as additional conversation about televising the drain to determine if it is blocked. The board directed Todd Nelson to have that work done. The discussion then turned to the letter Leslie Gentry’s attorney sent to Bill Manion asking the Board to take a much more proactive approach and in-depth review of the situation and, in addition, a suggestion the Board spend more money on work to be performed on the unit and a commitment to pursue Four Seasons Homes for relief and/or the POA’s reimbursement for at least a portion of the damages Leslie Gentry has already sustained. The attorney’s letter ended with a request for a response from the Board within 15 days. The discussion ended with reference to the attorney’s separate letter to Four Seasons Homes demanding relief for Leslie Gentry. At that point Leslie Gentry and Mr. Sappington left the meeting. There was additional discussion regarding the POA’s proactive efforts in this situation, the numerous meetings between Leslie Gentry, Bill Manion, Todd Nelson and other board members from the Bello Point neighborhood. Also discussed was the amount of time and money spent and work done trying to resolve Leslie Gentry’s issue. The Board then held a discussion in Executive Session. Manion then asked Todd Nelson all of the work the association has don Financial - 8/30/14: Todd Nelson started by telling the Board of his separate meeting with Jim Barnett and Fred Miller at which they worked on the budget, revised formats and balance sheet. Todd Nelson then provided a brief description of the balance sheet numbers for budget year 2013 year end, budget year 2014 to date as of August 31st and the status of the individual neighborhoods as well as the overall Association. Todd Nelson stated cash on hand is almost $595,000 which is the total of the operating funds and reserve fund accounts. Receivables are $113,000, almost all of which is the Villa La Cresta special assessment that is just now due. He further stated that liabilities were $17,000 of payables and that owner’s equity was $691,208. Revenue and expenses across all of the neighborhoods were; operations of $65,465; operational reserves of $125,054; and designated reserves of $566,154, all adding up to the owner’s equity of $691,208. Todd Nelson then stated that all neighborhoods had an operational reserve with the exception of the 10th Green due to roof replacement 2 years ago and Villa La Cresta due to the interiors repair work just completed. Jim Barnett then asked about payments for the Villa La Cresta special assessment. Todd Nelson indicated “well”, with the exception of a few where the cost was above $6,000. He further indicated that any payments out-standing after 90 days would be subject to the Association’s collection policy and procedure. Bill Manion then asked if there were any further questions or discussion. Being none, a motion, made by Jim Butler, seconded by Lee Eise, was unanimously approved by the Board. Budgets/Reserve - 2015: Todd Nelson started the discussion by indicating the format for the budget had changed to be the same as the financial statement. He then provided a brief explanation of the proposed budget, changes in operational costs, reserves and changes needed in quarterly assessment amounts for certain neighborhoods.. The members of the Board then discussed excess operating funds, the Board’s decision to fund long term reserves to a level of 50% and creating a new budget line item for funds remaining after attaining the objective for designated reserves. The purpose of the new line item would be to provide funds for special projects requested by individual neighborhoods. After considerable discussion, the Board determined the new line item would be called the Operational Fund. A motion, made by Jim Barnett, seconded by Lee Eise, to approve a new line item for the 2015 budget was passed unanimously by the Board. Jim Barnett then made a motion, seconded by Jim Butler, to approve the budget for 2015. The Board unanimously approved the motion. Operating Reserves Transfer: Todd Nelson started the discussion by referring to the August 31st, 2014 year to date financials Reserves/Owner’s Equity worksheet he prepared showing amounts, by neighborhood, for Designated and Operational Reserves. He stated that as of August 31st, 2014, Operational Reserves had reached $125,000 and that there had been no transfer of funds from this account to Designated Reserves in 2013 or 2014. Jim Barnett noted the checking account has a current balance of $171,000 and the worksheet shows a proposed transfer amount of $85,000 providing an Operational Reserve amount of $40,000 and $46,000 left in the checking account for working capital funds. After a discussion about the way Designated Reserves are calculated, approvals and the use of funds from Designated Reserves, Jim Barnett made a motion to authorize Todd Nelson to transfer $85,000 from the Association’s checking account into the Designated Reserves account. Marti Eagan initiated further discussion regarding the amount proposed for transfer from the Via Bacino portion of the operational funds. She stated that Via Bacino is going to request the Board’s approval for funds to pay for proposed landscaping improvements for their neighborhood and that she is concerned about the amount of money that will be available if too much of the neighborhood’s excess operating funds are transferred into the Designated Reserves account. As a result of the discussion, Jim Barnett amended his motion by reducing the amount to be transferred to $83,188.94. The motion, seconded by Jim Butler, was unanimously approved by the Board. Reserve Study: As directed by the Board at the August meeting, Todd Nelson presented Reserve Advisors’ two proposals, the only ones received, for a professionally prepared Designated Reserves study for the Association. The proposals, the first, a Designated Reserves Study costing $3,900 of which $1,850 would be an up-front, nonrefundable retainer; the second proposal, the Transitional Study, a report of the original builder’s construction defects, costing $4,500 if done separately or $3,500 if done in conjunction with the Reserve Study. After discussing the matter, Jim Barnett made a motion, seconded by Jim Butler, to authorize Todd Nelson to move forward with the Reserve Study. The motion was unanimously approved by the Board. There was further discussion about the Transitional Study and the Board being pro-active in determining the source of the many construction related issues with which the Association has been faced. After further consideration, a motion authorizing Todd Nelson to move forward with the Transitional Study was made by Jim Butler, seconded by Lee Eise, was passed by a vote of 3 to 2 with Jim Barnett and Marti Eagan voting no. Via Bacino Improvements: Bill Manion started the discussion by asking Marti Eagan to present Via Bacino’s request for approval and funding for proposed landscaping and additional maintenance improvements to the neighborhood. Marti Eagan presented a packet of documents prepared by Via Bacino resident Larry Johannesen. (A copy of the packet is attached.) The documents included a spreadsheet analyzing various contractors’ estimates of cost, the contractor’s estimates and a plan of Via Bacino showing 5 separate projects being considered. She then described the following projects: Project 1 – installing plant material and mulch at the entry and in front of the trash enclosures; Project 2 – Remove existing gravel between curb and grass area that is currently in the area of ash trees [mulch to remain]. Add 4" of top soil, fine grade, seed, fertilize and straw. Project 3 - 4 planting bed areas on hillside between drive and golf course. Each bed to consist of aprox.120 sq.ft and includes 2 maiden grass in a #3 container, 3 old gold junipers in a #5 container, weed barrier and brown dyed mulch. All plant holes will be overdug with planting soil backfill, excavated soil to be hauled away. Project 4 – Irrigation - Westside - north end Southshore Ct. Project 5 - Vegetation Control and Maintenance: Area 1 - between rear of units and 18th tee boxes Area 2 - entry, east side Southshore Ct. and center island Marti Eagan stated that Via Bacino is requesting approval and funding for Project 1, part of Project 4 and Project 5. The approximate estimated cost of these projects is $7,311. Bill Manion commented about the work in Project 5 adjacent to the golf course. Bill recommended that, in the future, the vegetation control along the 18th hole be added to the budget for “brush hogging” every year. Bill stated that the head of maintenance for the golf course, Paul Naudett, had agreed in writing to allow the Association to maintain the area in question. After a brief discussion of the funds available for this type of work, a motion, made by Jim Barnett and seconded by Lee Eise to approve funding in the amount of $7,300 for the 3 requested projects was unanimously approved by the Board. A second motion, made by Jim Butler and seconded by Jim Barnett, to approve the 3 requested projects was unanimously approved by the Board. Old Business: Gentry – Bello Point: Moved to the first item discussed in the meeting. New Business: Todd Nelson introduced requests from members of the Association. First - A resident of Punto Pilato is asking the Board to formally request the resident’s neighbor to move the neighbor’s dock to allow the resident to construct a bigger dock. After a brief discussion, the Board determined that the request was not within the Board’s purview and that any Board action regarding the request would be inappropriate. Second – A resident of Villa La Cresta is requesting Board approval of a payment plan for his special assessment amount. After discussing the Board’s policy and procedure for collection of past due payments a motion made by Lee Eise and seconded by Jim Butler, directing Todd Nelson to have the Association’s attorney work with the resident to prepare a promissory note with a 1 year term at a 5% interest rate. The motion was unanimously approved by the Board. Third – Another resident of Villa La Cresta contacted Todd Nelson indicating a death in the family and asking about any relief the Association can provide. After discussing the matter, the Board directed Todd Nelson to have the resident follow the Association’s policy and follow the procedure of contacting the Association’s attorney. Todd Nelson advised the Board that the current administrator of the Association’s web site was going to retire. Todd asked for the Board’s direction to find a replacement for the position. After discussing the matter, the Board asked Todd Nelson to provide proposals from potential web site administrators prior to the next board meeting. Bill Manion then started a discussion about curbs in the Bello Point neighborhood. He pointed out that a number of residents have installed transition strips in the gutter adjacent to their driveways to prevent damage to the under carriage and front end of their cars. Bill Manion stated that a resident has complained and that none of the residents who installed the strips had contacted the association prior to installing the strips. Earlier in the meeting, Bello Point resident Leslie Gentry indicated she had installed a transition strip, was unaware of the requirement for the Board’s approval. She asked who was responsible for the strips and what needed to be done with them during the winter months when snow plowing could happen. The Board briefly discussed the situation and determined for the record that the transition strips were personal property of the residents and that the Association has no responsibility or liability in any way for the transition strips or moving them to avoid damage from snow plowing operations. . Bill Manion then asked if there was any new business. There being none, he then asked about the time and place for the next board meeting. Jim Barnett indicated the next meeting, which will be the Annual Meeting, will be Saturday, November 8, 2014 at 9:00 AM.in the 19th Hole room in The Club at Porto Cima Bill Manion then asked if there was any other matters to discuss. Being none, Jim Butler made a motion to adjourn. After being seconded by Lee Eise and a unanimous vote, Bill Manion called the meeting to a close at 4:37 PM. Respectfully submitted, Dana Johannesen Entryways Via Bacino Punto Piloto Bello Point Villa La Cresta Trash Enclosures Punto Piloto Via Bacino Landscaping Improvements Proposals Analysis Nelson Land Project 1 Landscaping area at front entry & around trash enclosure GreenHorizons ++ Nelson Land entry feature proposal included in Project 3 below 8 Grass Morning Light #2 2 Crape Myrtle Sioux Clump #15 2 Premium Topsoil per Cubic yard 2 Mulch, Forrest Brown Dyed Chips 8 Installation Labor to build up planting box for trees, install plants and mulch ** Adjusted 0.3 4 0 4 4 8 1.5 Topsoil per tandem load Mulch, Forrest Brown Dyed Chips Blue Princess Holly #5 Euonymus Alatus Compatyca 24" Grass Morning Light #3 Installation Labor Mini Skid Steer $2,055.99 ** 3 Purple pride beautyberry #3 4 Adagio grass #3 6 Little henry itea #3 1 Dynamite crape myrtle #5 5 Green velvet boxwood #5 4 Maiden grass #3 * Overdig all holes,haul off spoils and backfill with a top soil planting mix. Vaughn Irrigation 9/17/2014 Club at Porto Cima Maintenance Adjustment to Nelson Estimate 938 Topsoil per tandem load Mulch, Forrest Brown Dyed Chips Blue Princess Holly #5 Euonymus Alatus Compatyca 24" Grass Morning Light #3 Installation Labor Mini Skid Steer 1 250 250 12 49.5 594 3 47.85 143.55 12 70.29 843.48 14 32.89 460.46 24 30 720 6 50 300 Adjust Amounts 0.33 82.5 4 198 0 0 4 281.2 4 131.6 8 240 1.5 75 3311.5 1008 Tax * #3 existing graveled areas to be top dressed with brown dyed mulch $1,813.00 Project 2 Remove existing gravel between curb and grass area that is currently in the area of ash trees [mulch to remain].Add 4" of top soil,fine grade,seed, fertilize and straw. 350 2 16 8 Turf Type Fescue Sod 1 Square Yard Premium Topsoil per tandem load Installation Labor Mini Skid Steer 2915.50 ** $2,626.00 Project 3 Work to include 4 bed areas on hillside between drive and golf course. Each bed to consist of aprox.120 sq.ft and includes 2 maiden grass in a #3 container, 3 old gold junipers in a #5 container,weed barrier and brown dyed mulch.All plant holes will be overdug with planting soil backfill, excavated soil to be hauled away. 1 12 3 12 14 24 6 ** Topsoil per tandem load Mulch, Forrest Brown Dyed Chips Blue Princess Holly #5 Euonymus Alatus Compatyca 24" Grass Morning Light #3 Installation Labor Mini Skid Steer Irrigation work will be invoiced at time and materials $2,386.36 8 12 480 8 Maiden grass #3 Old gold junipers #5 Sq.ft.weed barrier Scoops of brown dyed mulch Planting soil mix $1,884.00 Project 4 Irrigation Westside - north end Southshore Ct. Adjusted to remove cost of cutting & repairing driveway Installation Labor to cut and jackhammer driveway 4 Installation Labor for Jackhamme 60 1" Schedule 40 PVC Bell End Pipe 6 30 SCH 40 PVE BE 2" (Sleeve under Drive) 60 1 15 15 200 Wire 18-5 Valve 1" Spray 4" Nozzle, RB MPR ADJ 1" High Density Flex Pipe Green Horizons does not do irrigation Installation of 1 5 Zone Irrigation System (1) 1 1" Double Check Backflow 1 7" Station Rainbird Controller 5 DV 100 Valves 11 5000 Series Rotors 13 6" 1800 Series Sprays 9 4" 1800 Series Sprays 2 Days Installation Lake Region ewer and Water Charges 1" water tap with meter 5/8" water tap with meter 1650 610 1 Sublet Labor to re-pour Concrete $1,472.62 $4,090.00 (1) In addition to the work included in Nelson's proposal, Vaughn"s work extends current system to both sides of the entry, the trash enclosures & to the planting bed at the inside of the curve across from the center island, as well as extending the Johannesen system with 3 additional sprinkler heads along the golf course side of Southshore toward center island Project 5 Vegetation Control and Maintenance Area 1 - betweeen rear of units and 18th tee boxes Limb up trees and weed eat underbrush on Golf Course property between Townhomes and 18th hole Tee-boxes 60 Installation Labor 2 Hauling Fees 2 Chipper Rental $2,300.00 Area 2 - entry, east side Southshore Ct. and center island 12 Installation Labor to trim River Birch in Installation Labor to trim River Birch in Island and trim native trees east side of Island and trim native trees east side of entry road entry road Amount invoiced for same work in 2010 0 $1,835.00 1 Hauling Fees to haul off debris Project 6 Total The work Four Seasons should have performed attime of development along north side of Southshore across from Johannesen's $425.00 $2,725.00 0 0 720 720 1 45 8 14 16 9 2 40 600 16 Rosetta Outcropping /ff Installation Labor to install Wall /ff Installation Labor to install Wall /ff 1-Inch Rock Topsoil per tandem load Hauling Fees Mini Excvtr/Thumb 10,000# hammer Rotor 5000 Plus Rain Bird Valve 1" 1" Schedule 40 PVC Bell End Pipe LF- 1" High Density Flex Pipe Irrigation Labor Hydroseed Mix (EZ Mulch, Fertilizer, and 2 Tacifier and seed) $30,316.29 Projects Requested for Budget Year 2014 Project 1 - Landscaping at front entry & trash enclosure Project 4 - Irrigation - partial (estimate-includes water tap/meter) Project 5 - Vegetation Control and Maintenance $2,386.36 $2,200.00 $2,725.00 $1,884.00 $2,200.00 0 (2) $4,084.00 Total Requested Projects $7,311.36 $1,835.00 $1,835.00 $5,919.00 Vaughn Irrigation, LLC Estimate 625 Osage Hills Road Lake Ozark, MO 65049 Phone/Fax Cell 573-365-0994 573-216-1417 [email protected] www.vaughnirrigation.com Date Estimate # 9/2/2014 2014-37 Larry Johannesen Qty Total Description 1 Installation of 1 5 Zone Irrigation System 1 - 1" Double Check Backflow 1 - 7" Station Rainbird Controller 5 - DV 100 Valves 11 - 5000 Series Rotors 13 - 6" 1800 Series Sprays 9 - 4" 1800 Series Sprays 2 Days Installation 3,930.00 Labor and Material to add 3 - 4" sprays to Existing Irrigation System Sales Tax 160.00 0.00 Vaughn Irrigation, LLC is fully insured Estimated Submitted by: ______________________________, Date: _______ Estimate Accepted by: ________________________________, Date: _______ Total Balance due upon completion 50% down may be required Estimate Valid for 60 Days $4,090.00 Nelson Land Service Estimate P.O. Box 2178 Lake Ozark, MO 65049 Date Estimate # 8/7/2014 756 Name / Address Via Bacino Townhomes 91 Grand Point Blvd. Sunrise Beach, MO 65079 Project Description Qty Installation Labor to cut and jackhammer driveway Installation Labor for Jackhammer 1" Schedule 40 PVC Bell End Pipe SCH 40 PVE BE 2" (Sleeve under Drive) Wire 18-5 Valve 1" Spray 4" Nozzle, RB MPR ADJ 1" High Density Flex Pipe Turf Type Fescue Sod 1 Square Yard Premium Topsoil per tandem load Installation Labor Mini Skid Steer Sublet Labor to re-pour Concrete Cost 6 4 60 30 60 1 15 15 200 350 2 16 8 1 Total 28.00 65.00 0.97 1.52 0.57 29.70 4.22067 2.20 0.39 4.38714 250.00 30.00 50.00 700.00 Subtotal Sales Tax (5.725%) Total Phone # E-mail 573-392-9993 [email protected] 168.00 260.00 58.20 45.60T 34.20 29.70 63.31 33.00 78.00 1,535.50 500.00 480.00 400.00 700.00 $4,385.51 $2.61 $4,388.12 Nelson Land Service Estimate P.O. Box 2178 Lake Ozark, MO 65049 Date Estimate # 8/13/2014 928 Name / Address Via Bacino Townhomes 91 Grand Point Blvd. Sunrise Beach, MO 65079 Project Description Qty Grass Morning Light #2 Crape Myrtle Sioux Clump #15 Premium Topsoil per Cubic yard Mulch, Forrest Brown Dyed Chips Installation Labor to build up planting box for trees, install plants and mulch Cost 8 2 2 2 8 Total 25.30 213.29 22.00 49.50 30.00 Subtotal Sales Tax (5.725%) Total Phone # E-mail 573-392-9993 [email protected] 202.40T 426.58T 44.00 99.00 240.00 $1,011.98 $36.01 $1,047.99 Nelson Land Service Estimate P.O. Box 2178 Lake Ozark, MO 65049 Date Estimate # 8/13/2014 929 Name / Address Via Bacino Townhomes 91 Grand Point Blvd. Sunrise Beach, MO 65079 Project Description Qty Installation Labor to trim River Birch in Island and trim native trees east side of entry road Hauling Fees to haul off debris Cost Total 12 30.00 360.00 1 65.00 65.00 Subtotal Sales Tax (5.725%) Total Phone # E-mail 573-392-9993 [email protected] $425.00 $0.00 $425.00 Nelson Land Service Estimate P.O. Box 2178 Lake Ozark, MO 65049 Date Estimate # 8/13/2014 930 Name / Address Via Bacino Townhomes 91 Grand Point Blvd. Sunrise Beach, MO 65079 Project Description Qty Installation Labor to limb up trees and weed eat underbrush on Golf Course property adjacent to Townhomes Hauling Fees Chipper Rental Cost Total 60 30.00 1,800.00 2 2 65.00 185.00 130.00 370.00 Subtotal Sales Tax (5.725%) Total Phone # E-mail 573-392-9993 [email protected] $2,300.00 $0.00 $2,300.00 Nelson Land Service Estimate P.O. Box 2178 Lake Ozark, MO 65049 Date Estimate # 8/13/2014 931 Name / Address Via Bacino Townhomes 91 Grand Point Blvd. Sunrise Beach, MO 65079 Project Description Qty Rosetta Outcropping per face foot Installation Labor to install Wall per face foot Strata GT-140 4 oz nonwoven fabric 4/17 x 360' 166.67 sq yd 1-Inch Rock Topsoil per tandem load Hauling Fees Mini Excavator with Thumb 10,000# Labor and hammer Rotor 5000 Plus Rain Bird Valve 1" 1" Schedule 40 PVC Bell End Pipe 1" High Density Flex Pipe Irrigation Labor Hydroseed Mix (EZ Mulch, Fertilizer, and Tacifier and seed) Cost 720 720 1 45 8 14 16 9 2 40 600 16 2 Total 21.25 10.00 347.60 12.50 160.00 90.00 90.00 27.49 29.70 0.97 0.43 35.00 400.00 Subtotal Sales Tax (5.725%) Total Phone # E-mail 573-392-9993 [email protected] 15,300.00T 7,200.00 347.60T 562.50T 1,280.00 1,260.00 1,440.00 247.41T 59.40T 38.80T 258.00T 560.00 800.00 $29,353.71 $962.58 $30,316.29 Nelson Land Service Estimate P.O. Box 2178 Lake Ozark, MO 65049 Date Estimate # 9/3/2014 938 Name / Address Via Bacino Townhomes 91 Grand Point Blvd. Sunrise Beach, MO 65079 Project Description Qty Topsoil per tandem load Mulch, Forrest Brown Dyed Chips Blue Princess Holly #5 Euonymus Alatus Compatyca 24" Grass Morning Light #3 Installation Labor Mini Skid Steer **Irrigation work will be invoiced at time and materials* Cost 1 12 3 12 14 24 6 Total 250.00 49.50 47.85 70.29 32.89 30.00 50.00 Subtotal Sales Tax (5.725%) Total Phone # E-mail 573-392-9993 [email protected] 250.00 594.00 143.55T 843.48T 460.46T 720.00 300.00 $3,311.49 $82.87 $3,394.36 Proposal Green Horizons Garden Center LLC 166 Chimney Point Sunrise Beach, MO 65079 Phone(573)374-2005 Fax(573)374-8555 To Location Right side past front entrance. Larry Johannesen 50 South Shore Ct. Sunrise Beach,Mo.65079 Email [email protected] Home 374-2040 Office Mobile 847-650-3584 Fax Date Aug.229,2014 We hereby submit specifications for: * Work to include 4 bed areas on hillside between drive and golf course. Each bed to consist of aprox.120 sq.ft and includes 2 maiden grass in a #3 container, 3 old gold junipers in a #5 container,weed barrier and brown dyed mulch.All plant holes will be overdug with planting soil backfill, excavated soil to be hauled away. * Total materials consist of 8 Maiden grass #3 12 Old gold junipers #5 480 Sq.ft.weed barrier 8 Scoops of brown dyed mulch Planting soil mix Total materials and labor $ 1,884.00 $ 1,884.00 Thank You,Rick Penno We Propose to furnish material and labor -complete in accordance with the above specification, for the sum of: Payment to be made as follows:balance due upon and completion of work All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above this proposal. All agreements contingent upon strikes accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Worker's Compensation Insurance. This proposal may be withdrawn by us if not accepted within 30 days. We are not liable for adverse weather such as rain, hail, freezing, drought, or incidental failure of equipment. Authorized Signature: Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance: Signature: Unless otherwise agreed to in writing, the balance is due and payable in full upon completion of job. All accounts not paid within 30 days after billing shall be charged 1 1/2% finance charge from date of billing on the monthly balance. All amounts unpaid 2 months after the original billing shall be turned over for collections and purchasers agree to pay all court and legal fees. Any material or labor paid with a credit card will be charged a 3% convenience fee Notice to Owner - Failure of this contractor to pay those persons supplying material or services to complete this contract can result in the filing of mechanic's lien on the property which is the subject of this contract pursuant to chapter 429, RSMo. To avoid this result you may ask this contractor for "Lien Waivers" from all persons supplying material or services for the work described in this contract. Failure to secure lien waivers may result in your paying for labor and materials twice. Proposal Green Horizons Garden Center LLC 166 Chimney Point Sunrise Beach, MO 65079 Phone(573)374-2005 Fax(573)374-8555 To Location Front entrance to community Larry Johannesen 50 South Shore Ct. Sunrise Beach,Mo.65079 Email [email protected] Home 374-2040 Office Mobile 847-650-3584 Fax Date Aug.18,2014 We hereby submit specifications for: ** Phase 1 landscaping - area at front entry and around trash enclosure,furnish and install the following materials. 3 Purple pride beautyberry #3 4 Adagio grass #3 6 Little henry itea #3 1 Dynamite crape myrtle #5 5 Green velvet boxwood #5 4 Maiden grass #3 * Overdig all holes,haul off spoils and backfill with a top soil planting mix. * 3 existing graveled areas to be top dressed with brown dyed mulch Total materials and labor. $ 1,813.00 ** Alternate 1 - 1 pre cast concrete drop inlet with a 36" by 36" cast iron grate. Drop inlet to be set at head of existing 24" culvert pipe going under road. After setting, area to be cleaned up, backfilled for positive drainage and disturbed areas to be top dressed with rip rap. Add $ 2,288.00 ** Phase 2 - remove existing gravel between curb and grass area that is currently in the area of ash trees [mulch to remain].Add 4" of top soil,fine grade,seed, fertilize and straw. Total materials,labor and eqpt. $ 2,626.00 Thank You,Rick Penno We Propose to furnish material and labor -complete in accordance with the above specification, for the sum of: Payment to be made as follows: 10 % down, balance due upon and completion of work All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above this proposal. All agreements contingent upon strikes accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Worker's Compensation Insurance. This proposal may be withdrawn by us if not accepted within 30 days. We are not liable for adverse weather such as rain, hail, freezing, drought, or incidental failure of equipment. Authorized Signature: Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance: Signature: Unless otherwise agreed to in writing, the balance is due and payable in full upon completion of job. All accounts not paid within 30 days after billing shall be charged 1 1/2% finance charge from date of billing on the monthly balance. All amounts unpaid 2 months after the original billing shall be turned over for collections and purchasers agree to pay all court and legal fees. Any material or labor paid with a credit card will be charged a 3% convenience fee Notice to Owner - Failure of this contractor to pay those persons supplying material or services to complete this contract can result in the filing of mechanic's lien on the property which is the subject of this contract pursuant to chapter 429, RSMo. To avoid this result you may ask this contractor for "Lien Waivers" from all persons supplying material or services for the work described in this contract. Failure to secure lien waivers may result in your paying for labor and materials twice.