with Schwing Equipment
Transcription
with Schwing Equipment
Volume : 4 Issue : 11 Q4 2014 & Q1 2015 Leading the Change with Schwing Equipment 2 Project in Progress 4 8 Notable Projects Achievements 10 New Launch Follow us on 1 VC & MD’s Message Dear Customer, A very warm greeting to all the readers of Concreting Times. The last six months were not very eventful. Market continued to be flat even though sentiments continued to be positive. The recently announced budget brought some cheer amongst the construction industry and the equipment manufacturers with the announcement on increase in infrastructure investments, setting up of 5 new ultra mega power projects of 4000 megawatts and announcement of issue of infrastructure bonds. For the concreting equipment manufacturers, there is added hope as the highways minister has been repeatedly hinting at more and more concrete road projects. There is an urgent need that government implements all these projects as quickly as possible. At SSI, we are heavily banking on the implementation of these projects and in anticipation, are further investing on mechanization. In the last six months, we also launched two new products viz., tower cranes and self-loading mixers. Our team is working very hard to localize these products and be a substantial contributor to developing India. Finally, I would like to take this opportunity to wish all the readers a very Happy and Prosperous New Year 2015. All the best, Vice Chairman & Managing Director - SSI Projects in Progress Chenab Bridge Project, Jammu & Kashmir The Chenab Bridge is an arch bridge under construction in Jammu & Kashmir, India. It spans the Chenab River between Bakkal and Kauri, in Reasi district of Jammu and Kashmir. When completed, the bridge will be 359 meters (1,178 ft) above the river Chenab and it will be the Highest Bridge in the World. The bridge is part of several bridges and tunnels which makes up the Katra - Laole Section of the JUSBRL Project in Jammu and Kashmir. Northern Railway owns the total Project, Konkan Railway Corporation is executing the project on behalf of Northern Railways and the Chenab Bridge project undertaking a joint venture company of AFCONS Infrastructure Limited, Ultra and VSL bagged the prestigious project. The project which is constructed using Schwing concreting equipment have done 17,000 m3 of Concrete till date. It is expected to be a total of 66,000 m3 of concrete for the project. M25 and M40 grade of concrete is produced in which M25 Grade is used for Shotcreating and M40 is used in foundations. 2 Machine Model Quantity Batching Plant CP 30 2 Nos Concrete Pump BP 350 2 Nos Transit Mixer AM 6 7 Nos Shotcrete Machine TSM 30.14 2 Nos CT News “Person of the Year” Award from Equipment India Stetter Self Loading Mixer unveiled Shri.Venkaiah Naidu, Minister of Urban Development today along with Mr. Anand Sundaresan Managing Director, SCHWING Stetter India and Mr. V.G. Sakthikumar, Managing Director, SCHWING Stetter Sales & Services Pvt. Ltd unveiled the SCHWING Self-Loading Mixer at the BAICON 2015. Other dignitaries present during the unveiling were Mr. B.Seeniah, Chief Patron BAICON 2015 and Mr. Sushanthakumar Basu, President, BAI. SCHWING Stetter India, one of the pioneers of concrete construction equipment in India, has displayed the Self Loading Mixer, a miniature concrete mixing equipment that will revolutionize construction activities in urban and rural construction sites. Mr. Anand Sundaresan, Vice Chairman& Managing Director, Schwing Stetter India was awarded the "2nd Equipment India Person of the year" by Pratap Padode, Editor-in-Chief Equipment India Managing Director, ASAPP Media Information Group, in the presence of Samir Bansal, General manager, Off Highway Research during the 2nd Equipment India Annual Award held on15th Dec at India Expo Mart Noida. SCHWING Stetter India lauched SCHWING-XCMG Tower Crane SCHWING Stetter India with its expertise in concrete construction equipment in India, has brought expertise from group company XCMG, one of the Top 5 World Renowned Construction Equipment manufacturing companies to launch an exclusive range of SCHWING-XCMG Tower Cranes in India today. This marks the entry of SCHWING Stetter into the material handling industry. SCHWING Stetter has always drawn emphasis on understanding customer needs and the SCHWING concrete pumps and the SCHWING-XCMG Tower crane will work in synergy to suit their requirements. The SCHWING-XCMG Tower Crane can withstand extreme conditions in construction sites. These highly adaptable fast- BuiltMat 2015- Coimbatore Schwing Stetter India recently participated in BuiltMat 2015 exhibition held between 5 to 8th February 2015 at CODISSIA Trade Complex, Coimbatore. The event which is one of the largest Construction and Interior fair was jointly organized by Association of Consulting Civil Engineers (INDIA), Builders Association of India and The Indian Institute of Architects. During the event Schwing Stetter displayed its newly launched Self Loading Mixer – SLM 4000 and Concrete Pump 1807 and received huge customer appreciations. erecting Tower Cranes are designed with several features to handle high-rise projects. The Tower Cranes made by SCHWING-XCMG comes in various capacities and types ranging between 5 tons and 6 tons. 3 Notable Projects 630 meter Pumping by 21 year old Concrete Pump My Home Vihanga - Hyderabad. My Home Vihanga, residential project is located on top a hillock in Gachibowli, near Wipro Junction. This project will give the Hyderabad a full view of the IT and Financial District. The 21-acre mega project houses 1996 apartments measuring 1115 ft to 2160 ft in area. The project consists of 20 block of 18 floors each and has a total concrete volume of 1.7 Lakhs m3. The project is designed for RCC shear wallframed structure. The project has various grades of concrete requirement like M20, M25, M30, M40& M50. Till date around 70,000m3 of concreting has been completed. Schwing Stetter BP 4000 (160 kw) a 21 year old concrete pump has recently done a long distance pumping of 632 meters horizontal in a single pour of 26 hours continuously at Ghodbunder, Thane, Mumbai. The pump was hired by Amar Construction (India Crete RMC) and was used for raft foundation of Electrical Transmission Tower (dedicated line for Mumbai Metro) situated on island at Varsova Creek, Ghodbunder Road, Thane. L&T Constructions who are the main contractor of this project have appreciated the support & service provided by the team of Schwing Stetter India for this record pour. The Project is owned by My Home Constructions Pvt. Ltd. and concrete work is being done by SVS Projects Pvt. Ltd. Hyderabad. Schwing Stetter India has contributed with its entire range of concreting equipments in this project. The project has Schwing Stetter Equipments like Batching Plant CP 30 – 3 nos, Concrete Pump SP 1800 – 1no, Boom Pump S36X – 1no & KVM32XL – 1no, Separate Placing Boom SPB 35 – 2 nos and Concrete Mixers – AM6SHN – 8 nos. Relay Pumping at Bangalore Metro Schwing Pumps at Omkar Project- Mumbai. Schwing SP1400 has done relay pumping of 18 meters vertical and 620 meter horizontal at Bangalore Metro Project. The pumping was done by Vijaynirman Company, which has taken subcontract for track concrete pumping from SOMA. A total of 120 m3 of M 30 Grade concrete was pumped in 6 hour for this concrete pour. Schwing Stetter SP4800 pump along with SPB35 is concreting Omkar 1973 one of the prestigious residential projects coming up in Worli, Mumbai. The current height of core wall is at 170 meters in tower-3 and 70 meters in tower-2 and it is expected to reach a maximum height of 340 meter. The project also has Stetter M2.25 Batching Plants and has produced and pumped various grades of concrete like M80, M70, M60 & M50. 4 Customer Speaks An Interview with Jitender Sandhu Managing Director – Sandhu Construction Equipment & Services. (Ghaziabad , Uttar Pradesh) About Customer Before entering in to the Ready-mix Concrete business, Mr. Jitender Sandhu, Managing Director of Sandhu Construction Equipment and Services worked as an Electrical Operator. In 2002 he joined Anand Machinery and handled all Batching Plant Setup for the company. After completion of five years there in 2007, he started his own firm called Sandhu Construction Equipment & Services. As a result of his hard work & quality of service, Sandhu Construction Equipment & Services is now a renowned name in manufacturing/trading of Construction/Infrastructures related business in the National Capital territory of Delhi. In 2013 Mr. Sandhu purchased Schwing Stetter Equipment after which, he had replaced all his other equipment with Schwing machineries including Batching Plants, Concrete Pumps & Transit Mixers. Landmark Projects Galaxy Vega Exotica Dream Valley Panchsheel –Exotica fresco Victory's India Habitat Center Schwing Equipments:Batching Plant - CP 30 Star Batcher Concrete Pump - SP 1400 D Transit Mixer - AM6SHC Why Schwing Stetter India? When you talk about quality &reliability in concrete machinery, the only name which I can recall is Schwing Stetter India. After getting associated with Schwing Stetter I got to know,how much maintenance cost and difficulties we have reduced in our company. I personally used to visit all my old non Schwing machinery & batching plants on daily basis due to down time,halting & spare parts issue but after getting associated with Schwing Stetter's Machinery I am relaxed. I visit the sites with Schwing Stetter's Machinery once in a month or two, it's been more than 18 Months,and there is no single downtime with Schwing Stetter's Plant & Pump. My Experience with Schwing Stetter Concrete Pumps. The ease of operations in Schwing Stetter Concrete Pumps has no match in the Concrete Industry. I strongly believe Schwing Stetter is the real master when it comes to Concrete Pumping.The machines are so operator friendly that I have trained four of my helpers who are working in Delhi NCR as professional operators.With Schwing's Rock Valve the choking & Maintenance of the pumps has reduced. The spares parts availability and the service support are always there to back us. Gyanender Kumar Rai My Message GirdhariLal Construction Pvt Ltd. Delhi I highly recommend everyone to go for Schwing equipment only, if you expect a hassle free & reliable Concrete Pumping. My message to fellow operators is if you want to take the best out of the machines, please maintain & clean the machines regularly & then no one can stop you to achieve success in Life by your hard work. Thank you. My History & Nature of Work:I started working in2007 as a helper of Stationary Concrete Pump and in 2009 began operating Boom pump. I have a total Experience of 7 year in Concrete Pumps operation I can also operate machines like Concrete Pumps SP 1200 , SP 1400,SP 1800 , Boom Pumps 32X & S36X.Currently I have being posted in Andaman & Nicobar Island. 5 Leading the Change SCHWING Stetter India as one of the pioneers in concrete equipment manufacturer in India, has always stood in toes for manufacturing advanced technology equipment for the Construction Industry in India. With the aim to provide a high quality equipment with uninterrupted customer service and support the company is expanding its wings to introduce world class construction equipment in India. SCHWING Stetter India unveiled 5 new products in ready-mix concrete technology: concrete mixing equipment, truck mixers, concrete pumps as well as Tower cranes at BC India exhibition, which took place from December 15 to 18, 2014 in the India Expo Centre in Greater Noida / Delhi. Speaking on the occasion, Mr. Anand Sundaresan, Managing Director, SCHWING Stetter India said, “SCHWING Stetter is delighted to showcase 5 exclusive products for the Indian concreting industry. These innovative and advanced products are designed for providing the necessary concreting solutions to all our customers. This year at bcIndia we are also displaying our SCHWING-XCMG Tower Crane.” Mr. V.G. Sakthikumar, Chief Operating Officer, SCHWING Stetter India said, “We focus on innovative technologies that save time; money and increase performance standards. This exhibition will provide customers a chance to explore construction equipment technologies at bc India exhibition”. The new products were unveiled by Mr. Anand Sundaresan, Managing Director, SCHWING Stetter India, and Mr. V.G. Sakthikumar, Managing Director, SCHWING Stetter Sales & Services Pvt. Ltd. SCHWING Stetter also showcased its latest Tower Crane product range in the material handling segment. These highly adaptable fast-erecting Tower Cranes are designed with several features to handle high-rise projects. The Tower Cranes made by SCHWING-XCMG comes in various capacities and types ranging between 5 tons and 6 tons. The new range of products will cater to all segments like batching plants for concrete preparation; transit mixers for concrete transportation; concrete pumps for concrete placement; shotcreting pumps for tunnel application and recycling plants for recycling of concrete. The International Trade Fair bC India 2015 which had exhibitors from Construction Machinery, Building Material Machines, Mining Machines and Construction Vehicles manufactures is said to have a total of 26,000 visitors and 635 exhibitors from 25 countries. 6 Leading the Change 7 Events Schwing Stetter at ConMac 2015 Schwing Stetter India participated in CONMAC 2015 held between 27th, 28th February & 1st March 2015 at Maniram Dewan Center, Guwahati, India. The first edition of ConMac 2015 was organized in association with the Confederation of Indian Industry (CII) and Indian Construction Equipment Manufacturer’s Association (ICEMA) which had a focus on the North-East Region. During the exhibition Schwing Stetter India launched 4 new products in the truck mixers and concrete pumps category. Schwing Stetter is catering concreting equipment’s to Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura. The new range of products will be supply to all segments like batching plants for concrete preparation; transit mixers for concrete transportation; concrete pumps for concrete placement; shotcreting pumps for tunnel application and recycling plants for recycling of concrete. Schwing Stetter thanks all its customers in North East region & Government Officials who visited us and made the exhibition successful. Schwing Equipment around the World Oil Well Platform, Toronto, Canada 3rd Bosporus Bridge, Istanbul. I-75 Modernization Project, Dayton, Ohio, USA. Belo Monte Hydroelectric Plant, Brazil 8 Project Abroad Deep Caissons Pumped w/ Separate Placing Boom Replacing the Hwy 70 bridge over Caney Fork River between Sparta and Smithville, TN is anything but normal. Because the State has plans to widen the route in the future, the design calls for a support structure of cast-in-place concrete that could accommodate four lanes of traffic. The current $38 million contract held by Massman Construction, Kansas City, MO calls for a two-lane welded steel bridge on the four-lane substructure. And because the Caney Fork River was dammed in the late 1950s the Caney Fork River forms Center Hill Lake at the Hwy 70 crossing. “Because the reservoir is not navigable, we had to truck everything to the site – cranes, barges, pumps,” according to Massman Senior Project Manager, Dale Helmig. It took over 250 trailer loads to bring in five cranes up to 300-ton capacity, barges large enough to support the massive lifting equipment, a Schwing SP 4800 concrete pump and 31-meter separate placing boom. The process of pinning together 10ft x 40-ft modular barge sections, assembling five cranes and support equipment took two months beginning in April 2013. movement. “We have to maintain a 190-foot open channel at all times which is why we have pumped from both sides of the river, “ according to Helmig. The SP 4800 is maintaining volume and distance requirements on the job with a 443-hp diesel powering an open loop hydraulic system with eight-inch diameter pumping cylinders. The pump features highvolume and high-pressure settings that can be switched depending on the application. A high pressure Rock Valve with dual shifting cylinders complements the 2020-5 150/90 pump kit that can generate 2364 psi on the concrete. “We have several Schwings that have performed well with very little maintenance which is essential in these out-of-the-way locations,” says Helmig. The new bridge is being built 60-feet north of the existing bridge which spans 1200-feet of the lake. Caissons up to 150-feet deep and 11.5-feet in diameter were drilled to bedrock and the resulting piers formed from concrete pumped with a tremie pipe. The SP 4800 is pumping from both sides of the river and up to 1150-feet of five-inch pipeline has been assembled to reach the pier work at times. “Some of the piers took more than 575-yards of concrete just to break water,” Helmig states, “From there we add a 30-foot shaft extension of poured-in- place concrete, then we pump the strut that ties a set of three piers together, add an eight-foot diameter column and eightfoot cap. At that point we are 90-feet above the water.” There are three sets of three piers being constructed in the channel and one set of piers on land to support the new bridge. Concrete abutments on both banks are also being pumped as part of the contract. “We have been able to pump up to one hundred yards per hour at times, but we average sixty-five to eighty yards per hour most of the time,” Helmig notes, “Some of the larger volume piers have taken ten hours of continuous pumping.” Pumping through the cranesupported tremie pipe puts the end in fresh concrete so that the rising concrete from the bottom displaces the water without washing out the cement content. After priming the pipeline, a ball is inserted which pushes out any water in the line and concrete follows. Because of the depth of some of the caissons, the tremie pipe is in two sections. As concrete rises in the caisson, the placing boom's tip section connected to the pipe also rises. When the junction in the tremie pipe emerges from the concrete, the pump is stopped, the top section of tremie pipe is disconnected and removed, the tip section of In order to reach to the top of the piers, Massman utilizes a bargemounted Schwing three-section 31-meter pacing boom. The hydraulic boom mounts on a pedestal that is bolted to an X-frame welded to the barge. A diesel power pack accompanies the boom. The pipeline from pump to boom is laid over the existing bridge and barges in 10-foot lengths with heavy-duty clamps. A one cubic-yard thrust-block near the pump embeds the first section of pipe to reduce 9 New Product Launches Mobile Batching Plant - M21Z Tower Crane XGT63YD (5013-5) Mobile Version Plant suitable for Transit Mixer discharge with output of 21 Cu M per hour. This plant is ideally suited for small medium volume construction. We are offering wider selection option (to choose) to meet customer's specific needs. 5ton, 50m boom(with free standing height of 35 meters). Both internal climbing and external climbing mechanisms can be offered. This will eventually be indigenized in next few months. We can offer 6ton Tower Cranes. Self-Propelled TSR30.14 S43SXSBR02 on 6x4 Chassis 14m long Concrete Sprayer boom with proven SCHWING concrete Pump. Dozing output is controlled from the operator held console electronically liking it to the concrete pump strokes. Longest Boom for a Three Axle Chassis. SCHWING RZ boom combines roll and Z fold at the tip to offer better flexibility for the boom operation. This can also be mounted on 8x4 chassis. 5 section boom enables overall vehicle length to be under 12m for ease of maneuverability and accessibility. Self Loading Mixer 4000 SP1807 - Concrete Pump SLM 4000 SLM 4000 The SLM 4000 has an engine capacity of 110hp created to meet the requirements of the tier 2 and tier 3 towns. Self-Loading Mixers are miniature machines that can automatically load sand and other aggregates required for mixing concrete, blend the raw materials, transport and unload the mixture. This smart machine can help construction companies to monitor their consumption pattern by exporting data and the firmware used in the SLM can be constantly upgraded based on customer requirements. New Concrete Pump with High pressure rock valve is suitable for Concrete Sites of medium high rise construction. New aesthetic aerodynamic design will be dedicated for all Models Trailer Pumps in the future. This pump is launched to meet the requirements of higher volume output meeting the demand of customers to increase the speed of construction. 10 Weigh Bridge Tech Project Solution Automatic Lubrication System Use our Automatic Lubrication System for your Concrete/Boom Pump to get maximum trouble free pumping time. We have observed that maximum breakdown of your Pump is due to non-Lubrication of the Machine. We offer Automatic Lubrication System for your Pump, which is capable to Pump Lubrication in working time for maximum penetration. You can save grease up to 60% of your total present consumption, if you start using this system. Water Chilling Plant Exclusively designed for weighing of high axle load vehicles at RMC Infrastructure, Construction, Ports and Project sites with highest accuracy, greater reliability and less maintenance. Out standing resistance to wear and corrosive atmosphere at project sites. Web Camera Integration option, Pre-cast civil foundation option. One stop solution for real time material reconciliation and Inventory Planning at RMC and Construction sites. Multiple batching plants can be integrated at project sites. Real time cross checking of accuracy of batching plant and truck scale. Stand alone usage for all other non concrete material weighment like steel etc., at project sites. Customized inventory inward and material outward reports Composite design of steel and Concrete. Concrete to stay in compression and tensional forces are handled by the high strength steel structure below the concrete top deck. Schwing Stetter provides solution for temperature controlled concrete by providing water chilling plant of different models to meet the requirement of 30M³/Hr and 56M³/Hr output batching plants. This Water chilling plant is constructed with tank and coil which is fully automated and does not require any additional manpower for control of valves and chiller. Batching Plant Operator himself can control the operation of chiller, valves through a single touch on Mimic Screen Provided in plant control room. For higher output capacity plants, chiller can be made based on requirements. Complete Bolted design ensures quick and easy assembling, dismantling, transporting and re-assembling at project sites. Self checking & center loaded swing link mounted and hermitically sealed heavy duty Double Ended Shear Beam Load cells. Recycling Plant Bag Cutting System Concern for our environment and an increased awareness of costs are the main reasons for worldwide efforts to solve the concrete industry's disposal and recycling problems. Profiting from extensive experience gained with sieve / Cyclone separation system, Stetter has developed this concrete recycling plant. Our systems have proved to be more reliable, economical and highly wear-resistant. Our permanent development efforts have made the Stetter concrete recycling plant an exceptionally strong product. We offer Bag Cutting System for feeding Cement, Fly ash, Micro Silica etc in high speed. In this System wastage of Material is almost nil, Involvement of labour is also not required to operate this machine. It comes with an electrical panel with mimic display. It can be operated by one operator. Since the bags can be taken for pouring to the Silo directly from the vehicle which has transported the material, the wastage of Cement will be nil. 11 The Last Word Dear Customer, We stay hopeful, like you in the revival of Construction activities on ground and we are preparing to come out with more Products, Services and Technical Solutions for Sites in the near future. Two Launches namely, Tower Crane and Self Loading Mixer were done successfully. Tower Cranes are now available as fully imported machine and Self Loading Mixers are available for demonstration & trials. We are proud to be part of “Chenab Bridge Project” of AFCONS Infrastructure Limited. Notably, our Shotcreting Machine TSM 30.14 in this Project, is also becoming popular in various other Tunnel Projects in India. Thanks to BC India, Delhi and Conmac, Guwahati Exhibitions,we had wonderful opportunity to meet many of you and interact personally. We appreciate the valuable inputs, you had given on the 6 (Six) New Products that, we launched during this Exhibition. This Magazine also brings, informations on some of our Project Solutions like Weigh Bridge, Chilling Plant, Bag Cutting Machine, Recycling Plant and Automatic Lubrication System. We sincerely hope the days to come, are busy for every Stakeholders in the Construction Industry. Happy reading!!! With best regards, V.G. Sakthi Kumar Managing Director - SSSSPL For any feedback regarding this newsletter, email at [email protected] Reach New Heights with rane SCHWING - XCMG Tower C SCHWING - XCMG introduces range of Tower Cranes which withstands the extreme conditions in construction sites. These highly adaptable fast-erecting Tower Cranes are designed with several features to handle high-rise projects. For further details, please contact us. Batching Plants I Concrete Pumps I Transit Mixers I Concrete Recycling Plants I Belt Conveyors I Separate Placing Booms I Shotcrete Pumps I Tower Cranes ISO 9001:2008 :: OHSAS 18001: 2007 :: ISO 14001:2004 F 71 - 72, SIPCOT Industrial Park, Irungattukottai, Sriperumpudur Taluk, Kancheepuram District,Tamil Nadu - 602105. Phone : 044 2715 6780 / 781, 47108100 / 33555588 Fax : 044 27156539 Visit us at www.schwingstetterindia.com MUMBAI 022 25624863 / 64, 30718300 / 33555588 I NEW DELHI 011 3092 8500 / 33555588 HYDERABAD 040 6615 1783 / 33555588 I BANGALORE 080 4243 8400 / 33555588 KOLKATA 033 3322 3300 / 33555588 I COCHIN 0484 4055984 / 3355558 I AHMEDABAD 079 40244200 / 33555588 PUNE 020 26055651 / 2 / 33555588 I MOHALI 0172 3957500 / 3957503 BHUBANESWAR 0674 2463999 / 3355558 I GUWAHATI 0361 2234738 I RAIPUR 0771 2562325 Published by Schwing Stetter India in Chennai. All Correspondence to be sent to [email protected] Designed and Printed by A.L. Senthil Kumar :: For private circulation only, not for sale. Many more to come... January 2015
Similar documents
concrete - SCHWING Stetter
The project is owned by Bengal NRI Housing Complex Ltd., and the construction contract was awarded to L&T ECC. The project will have facilities like its own sewage pumping station and sewage treatm...
More informationMetro Rail Projects
55th floor [240 meters] at Ahuja Tower Project in Mumbai. The pump which was deployed for concrete pouring at 52 floor did till the maximum tower height of 55 floors [240 meters]. The tower is cons...
More information